ML17088A167: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:CALLAWAY - SP17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCESectionPage17.1QUALITYASSURANCEDURINGDESIGNANDCONSTRUCTION...........17.0-117.2QUALITYASSURANCEDURINGTHEOPERATIONSPHASE..................17.0-1 CALLAWAY - SP17.0-1Rev. OL-135/03CHAPTER17.0QUALITYASSURANCE17.1QUALITYASSURANCEDURINGDESIGNANDCONSTRUCTIONThis section is not applicable to an FSAR.17.2QUALITYASSURANCEDURINGTHEOPERATIONSPHASEThe Operational Quality Assurance Program for the Union Electric Company's Callaway Plant is described in the Operational Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly maintained in this section of the FSAR, is now maintained in the OQAM as a separate licensing document. The OQAM will be maintained in accordance with the requirements of 10CFR50.54.
{{#Wiki_filter:CALLAWAY - SP17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCE SectionPage17.1QUALITYASSURANCEDURINGDESIGNANDCONSTRUCTION...........17.0-117.2QUALITYASSURANCEDURINGTHEOPERATIONSPHASE..................17.0-1 CALLAWAY - SP17.0-1Rev. OL-13 5/03CHAPTER17.0QUALITYASSURANCE17.1QUALITYASSURANCEDURINGDESIGNANDCONSTRUCTION This section is not applicable to an FSAR.17.2QUALITYASSURANCEDURINGTHEOPERATIONSPHASE The Operational Quality Assurance Program for the Union Electric Company's Callaway Plant is described in the O perational Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly maintained in this section of the FSAR, is now maintained in the OQAM as a separate licensing document.
CALLAWAY - SA17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCESectionPage17.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE..................17.2-1 CALLAWAY - SA17.2-1Rev. OL-135/0317.2QUALITY ASSURANCE DURING THE OPERATIONS PHASEThe Operational Quality Assurance Program for the Union Electric Company Callaway Plant is described in the Operating Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly also maintained in this section of the FSAR, is now maintained solely in the OQAM as a separate licensing document. The OQAM will be maintained in accordance with the requirements of 10 CFR 50.54.}}
The OQAM will be maintained in accordance with the requirements of 10CFR50.54.
CALLAWAY - SA17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCE SectionPage17.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE
..................17.2-1 CALLAWAY - SA17.2-1Rev. OL-13 5/0317.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Operational Quality Assu rance Program for the Union Electric Company Callaway Plant is described in the O perating Quality A ssurance Manual (OQAM). The Quality Assurance Program description, formerly also maintained in th is section of the FSAR, is now maintained solely in the OQAM as a separate licens ing document. The OQAM will be maintained in accordance with the requirement s of 10 CFR 50.54.}}

Revision as of 20:56, 29 June 2018

Callaway Plant, Unit 1 - Final Safety Analysis Report, Revision OL-22, Chapter 17, Quality Assurance
ML17088A167
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/29/2017
From: Klos L J
Plant Licensing Branch IV
To: Diya F
Union Electric Co
Klos L J
References
Download: ML17088A167 (4)


Text

CALLAWAY - SP17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCE SectionPage17.1QUALITYASSURANCEDURINGDESIGNANDCONSTRUCTION...........17.0-117.2QUALITYASSURANCEDURINGTHEOPERATIONSPHASE..................17.0-1 CALLAWAY - SP17.0-1Rev. OL-13 5/03CHAPTER17.0QUALITYASSURANCE17.1QUALITYASSURANCEDURINGDESIGNANDCONSTRUCTION This section is not applicable to an FSAR.17.2QUALITYASSURANCEDURINGTHEOPERATIONSPHASE The Operational Quality Assurance Program for the Union Electric Company's Callaway Plant is described in the O perational Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly maintained in this section of the FSAR, is now maintained in the OQAM as a separate licensing document.

The OQAM will be maintained in accordance with the requirements of 10CFR50.54.

CALLAWAY - SA17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCE SectionPage17.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE

..................17.2-1 CALLAWAY - SA17.2-1Rev. OL-13 5/0317.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Operational Quality Assu rance Program for the Union Electric Company Callaway Plant is described in the O perating Quality A ssurance Manual (OQAM). The Quality Assurance Program description, formerly also maintained in th is section of the FSAR, is now maintained solely in the OQAM as a separate licens ing document. The OQAM will be maintained in accordance with the requirement s of 10 CFR 50.54.