ML17088A167: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CALLAWAY - SP17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY | {{#Wiki_filter:CALLAWAY - SP17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCE SectionPage17.1QUALITYASSURANCEDURINGDESIGNANDCONSTRUCTION...........17.0-117.2QUALITYASSURANCEDURINGTHEOPERATIONSPHASE..................17.0-1 CALLAWAY - SP17.0-1Rev. OL-13 5/03CHAPTER17.0QUALITYASSURANCE17.1QUALITYASSURANCEDURINGDESIGNANDCONSTRUCTION This section is not applicable to an FSAR.17.2QUALITYASSURANCEDURINGTHEOPERATIONSPHASE The Operational Quality Assurance Program for the Union Electric Company's Callaway Plant is described in the O perational Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly maintained in this section of the FSAR, is now maintained in the OQAM as a separate licensing document. | ||
CALLAWAY - SA17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY | The OQAM will be maintained in accordance with the requirements of 10CFR50.54. | ||
CALLAWAY - SA17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCE SectionPage17.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE | |||
..................17.2-1 CALLAWAY - SA17.2-1Rev. OL-13 5/0317.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Operational Quality Assu rance Program for the Union Electric Company Callaway Plant is described in the O perating Quality A ssurance Manual (OQAM). The Quality Assurance Program description, formerly also maintained in th is section of the FSAR, is now maintained solely in the OQAM as a separate licens ing document. The OQAM will be maintained in accordance with the requirement s of 10 CFR 50.54.}} |
Revision as of 20:56, 29 June 2018
ML17088A167 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 03/29/2017 |
From: | Klos L J Plant Licensing Branch IV |
To: | Diya F Union Electric Co |
Klos L J | |
References | |
Download: ML17088A167 (4) | |
Text
CALLAWAY - SP17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCE SectionPage17.1QUALITYASSURANCEDURINGDESIGNANDCONSTRUCTION...........17.0-117.2QUALITYASSURANCEDURINGTHEOPERATIONSPHASE..................17.0-1 CALLAWAY - SP17.0-1Rev. OL-13 5/03CHAPTER17.0QUALITYASSURANCE17.1QUALITYASSURANCEDURINGDESIGNANDCONSTRUCTION This section is not applicable to an FSAR.17.2QUALITYASSURANCEDURINGTHEOPERATIONSPHASE The Operational Quality Assurance Program for the Union Electric Company's Callaway Plant is described in the O perational Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly maintained in this section of the FSAR, is now maintained in the OQAM as a separate licensing document.
The OQAM will be maintained in accordance with the requirements of 10CFR50.54.
CALLAWAY - SA17.0-iTABLE OF CONTENTSCHAPTER 17.0QUALITY ASSURANCE SectionPage17.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE
..................17.2-1 CALLAWAY - SA17.2-1Rev. OL-13 5/0317.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Operational Quality Assu rance Program for the Union Electric Company Callaway Plant is described in the O perating Quality A ssurance Manual (OQAM). The Quality Assurance Program description, formerly also maintained in th is section of the FSAR, is now maintained solely in the OQAM as a separate licens ing document. The OQAM will be maintained in accordance with the requirement s of 10 CFR 50.54.