{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  In the Matter of )  )  Docket No. 50-271-LA ENTERGY NUCLEAR VERMONT  ) YANKEE, LLC AND ENTERGY ) ASLBP No. 15-934-01-LA-BD01 NUCLEAR OPERATIONS, INC.  )  )  February 23, 2015 (Vermont Yankee Nuclear Power Station)  )  THE STATE OF BRIEF IN SUPPORT OF NOTICE OF APPEAL OF  JANUARY 28, 2015 MEMORANDUM AND ORDER DENYING                              Aaron Kisicki        Vermont Department of Public Service        112 State Street  Drawer 20        Montpelier, VT 05620        Tel: (802) 828-3785        aaron.kisicki@state.vt.us        Counsel for the State of Vermont Table of Contents  INTRODUCTION .......................................................................................................................... 1 STANDARD OF REVIEW ............................................................................................................ 4 DISCUSSION ................................................................................................................................. 5 I. Appendix E to Existing ERDS System Without Conducting a Safety Analysis Upon Reaching Permanently Defueled or Shut Down Status .................................................................................................... 5 A. ERDS provides a clear and substantial safety benefit historically recognized by the NRC in a wide variety of accident scenarios .......................................................................... 6 B. The Vermont Yankee staff reductions proposed in the LAR are predicated on the elimination of ERDS and are material to the findings the NRC must make on the LAR ...... 9 C. Unique circumstances with respect to emergency response at Vermont Yankee justify a continued ERDS feed from the facility to the NRC ........................................................... 11 II. Attack Any NRC Regulation .................................................................................................... 12 III. Health and Safety. ..................................................................................................................... 16 CONCLUSION ............................................................................................................................. 21 1  UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  In the Matter of )  )  Docket No. 50-271-LA ENTERGY NUCLEAR VERMONT  ) YANKEE, LLC AND ENTERGY ) ASLBP No. 15-934-01-LA-BD01 NUCLEAR OPERATIONS, INC.  )  )  February 23, 2015 (Vermont Yankee Nuclear Power Station)  )  THE STATE OF BRIEF IN SUPPORT OF NOTICE OF APPEAL OF  JANUARY 28, 2015 MEMORANDUM AND ORDER DENYING    INTRODUCTION  Pursuant to 10 CFR § 2.311(b), the State of Vermont , represented by the Vermont Department of Public Service, herby submits to the U.S. Nuclear Regulatory Commission the following brief in support of its notice of appeal of the Atomic Safety January 28, 2015 tember 22, 2014 Notice of Intention to Participate, Petition to Intervene, and  A clear spilt among the ASLB is present with respect to the proper interpretation of NRC regulations controlling the implementation, maintenance, and ). On March 24, 2014, Entergy Nuclear Vermont Yankee, LLC and Entergy Operations, 2  1  The proposed changes contained in the LAR included, among other things, termination of the VY ERDS system.2  communication link with the NRC Operations Center.3  The State in turn received access to the VY ERDS data from the NRC thrxecuted between it and the NRC in 1996.4  ERDS data under the MOU. The LAR was noticed in the Federal Register on July 22, 2014.5  The State issued timely comments to the NRC during the public comment period raising a an emergency at VY under the RERP.6 On September 22, 2014, the State filed a Notice of Intention to Participate, Petition to Intervene, and Hearing Request in response to the LAR.7  The Petition brought forth a single re to ensure continued communication of radiological and                                                  1 See Letter from Christopher J. Wamser, on behalf of Entergy Nuclear Operations, Inc., to NRC, Proposed Changes to the Vermont Yankee Emergency Plan (Mar. 24, 2014) -018) (Agency Documents Access and Management System [ADAMS] Accession No. ML14085A257). 2 See LAR, Attachment 4, Analysis of Proposed Post-Shutdown On-Shift Staffing, at 8. 3 See VY Emergency Plan (Rev. 54) at 42 (ADAMS Accession No. ML14339A646). 4 See Final Memorandum of Understanding Between the U.S. Nuclear Regulatory Commission and the State of Vermont, 62 Fed. Reg. 6281-2 (Dec. 10, 1996). 5 79 Fed. Reg. 42,539-40. 6 See Comments from the Vermont Public Service Department regarding the following License Amendment Request published in the Federal Register on July 22, 2014 at 3 (Aug. 21, 2014) (ADAMS Accession No. ML14239A029). 7 See Vermont Department of Public Service Notice of Intention to Participate, Petition to Intervene, and Hearing Request (Sept. 22, 2014) (ADAMS Accession No. ML14267A524).
3  other data at VY to the State sufficient to facilitate adequate State emergency response under the RERP, in violation of 10 CFR §§ 50.47, 50.57(a)(3), and 50.92. The State sought limited and reasonable relief: that the VY ERDS feed to the NRC that had been in place and operational for over 20 years be kept in place, or that a comparable or better communication system with the State be established until all spent fuel currently in the spent fuel pool is transferred to dry cask storage. Entergy estimates that all spent fuel will be placed in dry cask storage by the end of 2020. procedural grounds.8  9  The ALSB held an oral argument on the Petition on December 1, 2014,10 and issued its Order denying the Petition on January 28, 2015.11 In its Order, the ASLB attempted to resolve the salient question of whether 10 CFR Appendix E to Part 50, § VI.2 allows a licensee that had installed ERDS at a facility pursuant to an NRC safety backfit analysis in the 1990s to terminate its ERDS feed to the NRC without NRC approval once the facility has been permanently defueled. In a 2-1 split decision, the ALSB found that Appendix E, § VI.2 contains no regulatory requirement for continuing the VY ERDS feed now that the facility is permanently shut down. The ASLB, did, however, conclude that Entergy was obligated to conduct an analysis of the impact of VY ERDS termination on the                                                  8 See ic Service Notice of Intention to Participate, Petition to ring Request (Oct. 20, 2014) (ADAMS Accession No. ML14293A701). 9 See Participate, Petition to Intervene, and Hearing Request (Oct. 31, 2014 [later refiled on Nov. 4, 2014]) (ADAMS Accession No. ML14308A570)  10 See Transcript of Teleconference re: Entergy Nuclear Vermont Yankee, Vermont Yankee Nuclear Power Station  11 See ASLB Memorandum and Order LBP-15-4 (Ruling on Request for Hearing and Petition to Intervene) (Jan. 28, 2015) (ADAMS Accession No. ML15028A521).
4  effectiveness of the VY EP, pursuant to 10 CFR § 50.54(q)(3), prior to issuance of the requested license amendment. On February 4, 2014, the NRC Staff issued the license amendment, despite no indication from Entergy that it had conducted the necessary § 50.54(q)(3) VY ERDS safety analysis, or evidence that it reviewed the impact of ERDS termination on VY EP effectiveness. Entergy has since informed the State that it intended to terminate the VY ERDS feed to the NRC (and the understanding that the VY ERDS feed to the NRC is no longer operational. STANDARD OF REVIEW The State files this appeal as a matter of right pursuant to 10 C.F.R. § 2.311(c). In re All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents, 77 N.R.C. 39, 44 (2013). Where, as here, a Petition to Intervene was denied and the principal error upon which the appeal is based is a legal error, the Commission does not defer to the decision of the ASLB: Our rules of practice provide for an automatic right to appeal a licensing board decision deciding standing and contention admissibility, on the question whether a petition to intervene and request for hearing should have been granted, or denied in its entirety. Here, FirstEnergy argues that the Board should have denied Petitioners' hearing request because Petitioners submitted no admissible contentions. In examining contention admissibility, we generally defer to the Board unless we find either an error of law or abuse of discretion.12                                                    12 In re FirstEnergy Nuclear Operating Co., 75 N.R.C. 393, 396-397 (2012)(footnotes omitted).
5  DISCUSSION  The State now brings three contested issues presented in the ASLB Order before the NRC. First, whether the ALSB was correct in determining that 10 CFR Part 50, Appendix E, § NRC was correct in granting the LAR without review of the § 50.54(q)(3) VY ERDS safety analysis required by the ASLB Order, and/or whether Entergy was allowed to apparently terminate the VY ERDS feed to the NRC prior to submission of the safety analysis for NRC Staff review. Lastly, the State challenges whether the Petition was an impermissible collateral attack on an existing NRC regulation. I. Termination of an Existing ERDS System Without Conducting a Safety Analysis Upon Reaching Permanently Defueled or Shut Down Status  The ASLB rested its denial of the Petition in large part on a broad conclusion regarding the purported meaning and intent of 10 CFR Part 50, Appendix E, § VI.2: s requirement that ERDS be established and maintained at all nuclear facilities applies only to the § VI.2 points to a broader reading that does not necessarily allow for licensee termination of ERDS at facility shutdown without NRC review, especially when viewed in the context of the most facilities creates additional circumstances that support a broader reading of the regulation.
6  A. ERDS provides a clear and substantial safety benefit historically recognized by the NRC in a wide variety of accident scenarios  Appendix E to 10 CFR Part 50 addresses emergency planning and preparedness requirements for licensees, including the use of ERDS at facilities. Appendix E, § VI.2 provides that or indefinitely, onsite hardware shall be provided at each unit by the licensee to interface with the NRC receiving system. Software, which will be made available by the NRC, will assemble the data to be transmitted and transmit data from each unit via an output port on the appropriate  In determining the scope of the § VI.2 exception for facilities, the State turns to th and safety in strong emergency response in the event of an accident: The NRC, in its mandated role to protect public health and safety, has a responsibility in the event of a reactor accident to monitor the actions of the licensee, who has the primary continuing responsibility for limiting the consequences of the accident. The NRC also has an important role in assuring the flow of accurate information to affected offsite officials and the public regarding the status of the emergency and, as requested or needed, giving advisory support or assistance in diagnosing the situation, isolating critical problems and determining what remedial actions are appropriate. The NRC must be capable of providing to State and local authorities, and to other Federal agencies, an independent assessment of protective actions recommended by the licensee. Given the regulatory and statutory basis, and given the importance of emergency planning and response in the defense-in-depth context, when an accident has occurred, the NRC believes that a significant increase in its ability to perform its role would constitute a substantial increase to the overall protection of the public health and safety. Since the principal effect of ERDS will be a marked improvement in the availability, timeliness, and reliability of key information about what is taking place at the reactor during an accident, particularly during the critical early hours before the NRC Site Team arrives, it is the judgment of the NRC that the implementation of ERDS will provide a significant improvement in the NRC's ability to accurately and promptly assess the situation at the site.
7  In emergency drills conducted by the NRC and power reactor licensees, the information on the status of the reactor is typically 15-30 minutes old by the time it is received at the NRC Operations Center when transmitted via the existing Emergency Notification System (ENS). Moreover, inaccuracies and errors have been found in that information which in some cases has led to confusion and misunderstanding of the situation. In drills which have employed a prototype of the ERDS, there has been profound improvement in the availability, timeliness, and reliability of the information transmitted. The actual experience of the NRC using the existing ENS alone contrasted with drills where both ENS and a prototype ERDS were used is the basis for its conclusion, that ERDS will provide significant improvements in the NRC's ability to understand what is taking place during an emergency, and thereby more effectively perform its role of monitoring and advising the licensee. More importantly, the improvement in assessment performance significantly improved the NRC's ability to provide appropriate recommendations and advice to the State and local officials who are required to make the decisions regarding the offsite protective actions which are necessary to protect the public. Because the decision made by the State and local authorities with regard to offsite protective actions could significantly affect the public health consequences of a reactor accident, it is the judgment of the NRC that a significant improvement in the NRC's ability to provide the right recommendation at the right time provides a substantial improvement in the overall protection to the public. An effective emergency response capability in the event of a reactor accident is an essential element of the defense-in-depth approach to protection of the public health and safety. The NRC's role during an emergency is part of that capability. Because the ERDS will provide a significant improvement in the NRC's ability to perform that role in an emergency, the proposed ERDS improvements are therefore justified, and the costs of implementing those improvements are modest.13  The SOC/backfit analysis makes clear that implementation of ERDS at all operational plants at the time would provide substantially better information over the then-existing Emergency Notification System in any emergency situation at a facility, and that coordination reference to reactor accidents is not dispositive with respect to the scope of ERDS utility. A reactor emergency is only one of many accident scenarios where ERDS could provide critical                                                  13 Emergency Response Data System, 56 Fed. Reg. 40178, Aug. 13, 1991.
8  and timely information to both the NRC and the State, and the kind that may have come most easily to mind at the time the SOC was drafted. There is no limiting language in the SOC that indicates that the NRC intended there to be any limitations on the use of ERDS. Placing a limitation on the types of accident scenarios protecting public health and safety. In fact, the LAR analyzes a number of plausible accident scenarios that could occur at a defueled facility where spent fuel is present in the cooling pool. These scenarios include Hostile Action/Force design basis threat, fuel handling accident, aircraft potential threat, control room fire requiring evacuation and maintain spent fuel pool cooling, and general emergency with radioactive release and protective action recommendation.14  Entergy notes the activation of ERDS as part of its response to each of these analyzed emergency scenarios in the LAR, in further recognition of ERDS value in non-reactor accidents, yet without any supporting analysis. Since the promulgation of the ERDS rules, the NRC has recognized that spent fuel pool accidents can occur even at shutdown reactor sites.15  While the NRC views the probability of these accidents as low, it recognizes that if they occur, the consequences are severe, with the most serious scenarios resulting in the deaths of thousands of people, permanent contamination of thousands of square miles of land, and billions of dollars of economic loss.16  The most recent analysis placed heavy reliance on the effectiveness of emergency planning to mitigate the                                                  14 See LAR, Attachment 4 at 10-45; Tr. 25-26. 15 See Consequence Study of a Beyond-Design-Basis Earthquake Affecting the Spent Fuel Pool for a U.S. Mark I Boiling Water Reactor (October, 2013) (ADAMS Accession No. ML13256A342) at 160 et. seq.;  A Safety and Regulatory Assessment of Generic BWR and PWR Permanently Shutdown Nuclear Power Plants (NUREG/CR 6451 (1997))(ADAMS Accession No. ML082260098) at Table 4.2. 16 Id.
9  potential consequences of spent fuel pool accidents.17  This more recent analysis underscores the need for the State to be able to properly devise and execute emergency response plans using all tools outlined in the RERP, given the recognized risk of a serious fuel pool accident. The RERP relies on access to ERDS in large part because of the significant benefits and the need for effective coordination of emergency response with the State. B. The Vermont Yankee staff reductions proposed in the LAR are predicated on the elimination of ERDS and are material to the findings the NRC must make on the LAR  Part 50, Appendix E, § IV.2 was promulgated in 1991 and the exemption it provides should be interpreted as applying only to plants that were already shut down at that time. The regulation is framed prospectively, outlining the obligations that operational plants will need to meet going forward. It makes sense, particularly in light of the Nthe NRC would not make shutdown plants go through the expensive and complicated process of setting up an ERDS system from scratch. The incremental safety increase from such a requirement at shutdown plants might not substantially outweigh the enormous costs of setting up such a system. It is an entirely different question, however, whether plants that already have ERDS in place should be allowed to decrease safety at their plants by eliminating those systems to save a relatively small amount of ongoing operating expenses. As Judge Wardwell made clear in his ASLB Order dissent, § VI.2 speaks only to the initial installation, startup, operation, and maintenance of the newly-created ERDS system.18  There is no indication in the regulation that it was intended to allow licensees that had already set up an ERDS system to terminate its feed to the NRC upon achieving permanently defueled                                                  17 Consequence Study at Appendix A. 18 See ASLB Order, Wardwell Dissent at 8.
10  status, let alone in instances where an ERDS system exists that the State emergency preparedness program has become dependent upon and continues to rely on. Given the clear intent articulated licensee ERDS feeds to the NRC should stay in place under any circumstances where termination could be detrimental to coordination of State and local emergency response and thus imperil public health and safety. VY continues to pose credible accident threats in its defueled state (with spent fuel in the fuel pool) and nothing in either the rule itself or the SOC/backfit analysis suggests that a lesser response capability to those risks to public health should be entertained merely because the reactor is no longer operational. Even if the regulation could be read as exempting plants that are shut down after 1991, the permanent shut down exception contained in 10 C.F.R. Part 50, Appendix E is neither prescriptive nor proscriptive. It is merely silent and grants no affirmative right for a licensee to discontinue it ERDS feed upon permanent shutdown. It does not prohibit the NRC from imposing an obligation on Entergy to continue the operation of the VY ERDS data feed to the NRC in order to provide adequate protection for the public health and safety. At the very least, sufficient ambiguity is present in the rule justifying the NRC to militate toward the increased public health and safety protection afforded by a continued ERDS feed to the NRC (and the 19 Lastly, 10 CFR  licensee shall complete implementation of the ERDS by February 13, 1993, or before escalation facilities built in the future, were required to implement ERDS before escalation to full power.                                                  19 See Id. at 2.
11  The NRC Staff conceded that ERDS was a requirement for all plants going forward as a result of result of § VI.4.d after February 13, 1993. The § IV regulatory scheme was then left with a mandate for all plants to install and maintain ERDS before full power production, with no provision expressly allowing or even contemplating termination of the ERDS feed under any circumstances. C. Unique circumstances with respect to emergency response at Vermont Yankee justify a continued ERDS feed from the facility to the NRC  ERDS feed to the NRC (and the State). First, Section 7.10 of the VY EP (Revision 54) explicitly calls for a continuous ERDS feed to the NRC.20  The LAR made no apparent change to § 7.10 of the ERDS feed in evaluating and executing emergency response activities. Both the licensee and State emergency response plans expressly contemplate ERDS connection with the NRC, yet Entergy has neither provided any analysis of the impact of termination of that feed, nor has it presented an alternative communications mechanism to the NRC or the State in ERDS absence. Second, could occur at the plant in its current permanently defueled state. Again, Entergy has not outlined any alternative form of communication to the NRC or the State as a replacement for ERDS in the event of an emergency under any of these scenarios. Lastly, the State is seeking a finite extension of ERDS use. It seeks access to the VY ERDS feed only while spent fuel is present in the fuel pool  in this case until approximately 2020. Once the spent fuel is transferred to dry cask storage and the credible risk of an emergency involving the potential                                                  20 See VY EP at 42.
12  release of radiation, such as those analyzed in the LAR, has passed, the State agrees that access to ERDS data is no longer necessary. II. The S Does Not Collaterally Attack Any NRC Regulation  contention collaterally challenges another NRC regulation21: Entergy has failed to ensure a Radiological Monitoring System that will provide the information that the State needs to assess Vermont Yankee conditions as part  action decision-making process, and Entergy has thus failed to demonstrate that its license amendment request (1) will not significantly reduce the margin of safety or significantly increase the consequences of an accident previously evaluated as required by 10 CFR § 50.92; (2) will provide adequate protection for the public health and safety as required by 10 CFR § 50.57(a)(3); and (3) will comply with the requirements of 10 CFR § 50.47 to provide reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency.22  The sound NRC law and deprives the State of a hearing on an issue of vital interest to it and its emergency planning programs. The alleged conflicting regulations are 10 C.F.R. §§ 50.47 and 50.54(q)(3). Stated broadly, the Board reasoned that because 10 C.F.R. Part 50 Appendix E, Section VI.2 does not require hardware for an ERDS system for any permanently shutdown posal to terminate the operating ERDS feed already in place  C.F.R. §§ 50.47 and 50.54(q)(3)  constitutes a collateral attack on Appendix E. First, the State is not seeking to impose the requirements of § 50.54(q)(3) on Entergy. All parties, including Entergy, and the ASLB agreed that Entergy must submit a safety analysis,                                                  21 See ASLB Order, Majority at 1. petition and has standing to intervene, but we nevertheless deny collaterally challenges an NRC regulation and  22 Petition at 3-4.
13  pursuant to 10 CFR § 50.54(q)(3), showing ERDS disconnection would result in no reduction in the effectiveness of the overall VY EP, prior to Entergy disconnecting its ERDS feed to the NRC (and the State).23  with §§ 50.47(b) and 50.54(q)(3) collaterally attacks the ERDS provision in Part 50, Appendix E, §VI is incorrect. Second, the sole reason §§ 50.47(b) and 50.54(q)(3) are applicable here is due to e decision to rely on the operation of the ERDS feed to the NRC as a key component of the VY EP. Once Entergy made that decision, it imposed upon itself the NRC regulatory obligation to amend its emergency plan prior to elimination of the ERDS feed, and to implement the requested license amendment, only if the licensee performs and retains an analysis demonstrating that the changes do not reduce the effectiveness of the plan and the plan, as changed, continues to meet the requirements in appendix E to this part and, for nuclear power reactor licensees, the planning standards of § 50.47(b).24  Third, because the ASLB declined to grant the State and itself a role in determining  whether Entergy had conducted the required analysis justifying termination of the ERDS feed, § 50.54(q)(3) safety analysis. to the VY operating license was plainly made without review of a ERDS safety analysis.25  The Amendment Issuance notes that the initial LAR was supplemented only two times: on May 21                                                  23 Tr. 43-44, see also Tr. 50; ASLB Order, Majority at 20-21, 23; ALSB Order, Wardwell Dissent at 17. 24 10 CFR § 50.54.(q)(3). 25 See Letter from James Kim, Project Manager, Plant Licensing IV-2 and Decommissioning Transition Branch, Vermont Yankee Nuclear Power Station  Issuance of Amendment to Renewed Facility Operating License re: Changes to the Emergency Plan (TAC Accession No. ML14346A065) at 1; Amendment No. 261 at 1-2; Safety Evaluation at 1-2, 4-7, 22.
14  argument on December 1, 2014 post-date either of those supplemental filings by over three months. ERDS data feed to the NRC within a day of NRC Staff issuance of the LAR, without filing with NRC the § 50.54(q)(3) ERDS safety analysis Entergy acknowledged it was obligated to perform prior ERDS disconnection. ERDS feed prior to submitting the analysis it agreed to perform for review, coupled with the required, alone  beyond any determination of the meaning of Appendix E, § VI.2  justifies overturning the ALSB Order and admitting the StatEntergy and NRC Staff are apparently ignoring NRC safety requirements as interpreted by the ASLB. Fourth, 10 CFR § 50.47(b), requires that licensee emergency plans show, among other [p]rocedures have been established for notification, by the licensee, of State and local response organizations and for notification of emergency personnel by all organizations; the content of initial and followup messages to response organizations and the public has been established; and means to provide early notification and clear instruction to the populace within ations to 26  requirement as part of its contention not to challenge Appendix E, but rather because NRC regulations, through operation of § 50.54(q)(3), and confirmed by the NRC Staff guidance                                                  26 10 CFR §§ 50.47(b)(5) and (6).
15  contained in the so-called Lewis Memorandum on which both Entergy and NRC Staff relied in opposing intervention, impose on Entergy the obligation to demonstrate that termination of the VY ERDS feed does not compromise public health and safety.27  Entergy seeks to remove from its Emergency Plan a program that it once claimed, and NRC Staff agreed, was essential to dependence upon a fully operational ERDS to ensure that its emergency resources will be used most effectively to protect the public health and safety in the event of an accident is supported by ample evidence. Fifth, inasmuch as Section VI.2 of Appendix E addresses only when a licensee is required to install ERDS hardware and §§ 50.47(b) and 50.54(q)(3) address the whether operation of the ERDS system is required for an adequate emergency plan and the circumstances under which termination of the ERDS feed is allowed, there is neither a logical nor legal connection between Once Entergy incorporated ERDS into its emergency plan, ERDS became subject to the requirements governing emergency plans including §§ 50.47(b) and 50.54(q)(3). Like any other license provision, any provision of the VY EP that was used to demonstrate the adequacy of the plan cannot be removed from the plan by license amendment unless and until an applicant is able to demonstrate its removal will not reduce the effectiveness of the EP or otherwise compromise the public health and safety                                                  27 See Memorandum of Robert Lewis, NRC Director of Division of Preparedness and Response, Office of Nuclear Security and Incident Response, Emergency Response Data Systems at Plants That Have Permanently Ceased mergency plan relies upon ERDS for the provision of assessment data to the emergency response organization, which is an emergency planning function, the licensee will need to evaluate whether removing ERDS results in a reduction in effectiveness for its special circumstances. In either case, the licensee of a permanently shut-down facility seeking to remove ERDS is required by Paragraph 50.54(q)(3) to perform and retain an analysis that concludes that the removal of ERDS is not a reduction in effectiveness. A simple cross-reference to this memo Id. at 2.
16  ations pursuant to 10 C.F.R. §§ 50.47 and 50.54(q)(3), addressing when and how a licensee can terminate ERDS operation constitutes a collateral attack on Part 50, Appendix E, outlining licensee obligations to create an ERDS program is incorrect. The Stateadmitted. III. Public Health and Safety. aiting Staff held a public meeting to address public concerns with the proposed amendment and then, without the benefit of a full adjudicatory hearing and the decision of an independent hearing to issues raised by the State during the public comment period in the State Consultation section of the Amendment Issuance.28 The State had filed public comments raising concerns about the The NRC Staff made a number of statements that are either incorrect in part, or altogether 29  First, the NRC Staff posited that the LAR did not request the removal of ERDS, but rather a staffing reduction.30  On the face of the LAR it is clear that Entergy sought removal of                                                  28 See Amendment Issuance, Safety Evaluation at 24-28  29 Id. at 28. 30 Id. at 27.
17  ERDS as a component of the overall requested staffing reductions. In addition, NRC Staff  specifically Part 50, Appendix E, § VI.2  does not require continued use of ERDS at a defueled facility. The settled, as evidenced by the ASLB split decisThere is simply no firm basis, particularly during the pendency of the ASLB Order appeal  Second, the NRC Staff stated  again without any supporting analysis  31  As discussed above, a final determination regarding the correct interpretation of 10 CFR Part 50, Appendix E, § VI.2 has not been made. At best, the NRC Staff response was premature; at makes no acknowledgment of the § 50.54(q)(3) ERDS safety analysis required by the Lewis Memorandum and the ASLB Order. 54) provides that VY will maintain a continuous ERDS communication with the NRC Operations Center; it makes no commitment that ERDS will be provided by the licensee to the 32  connectivity under the license amendment is critically wrong. Section 7.10 of the VY SEP, s a continuous ERDS connection with                                                  31 Id. at 28. 32 Id.
18  33  At the time Revision 54 became effective on December 19, 2013, that statement was true. It is not, as the NRC Staff appears to suggest, indicative of any ERDS communication scheme after issmakes clear that the ERDS communications link referenced in Revision 54 of the VY SEP, and II.C.9 of Ente-Shutdown On-Shift Staffing plainly states a permanently shut down and defueled condition. The task of ERDS activation is therefore not included as an on-34  Furthermore, the termination of the VY-NRC ERDS link is highly problematic for the State, irrespective of  By endorsing an LAR that seeks to terminate communications links critical to the State RERP, the NRC appeared to suggest that a licensee has no obligation to ensure any base level of state emergency planning capabilities. The NRC regulations point in the other direction. 10 CFR § 50.47(b)(6) requires licensee emergency plaprovided the primary means for the provision of this required communications link under Revision 54 of the VY EP. The state also recognized the importance of the data provided by ERDS and explicitly predicates many of the emergency response activities on information received from the VY ERDS link to the NRC under a memorandum of understanding executed between the State and the NRC. Entergy has not made provisions for alternative communications with the State in the absence of ERDS that are equal to or exceed the quality                                                  33 VY EP at 42. 34 LAR, Attachment 4 at 8.
19  Decommissioning Coordinator has identified no less than 37 ERDS data points that are still event of an emergency at the facility.35  Entergy must show compliance with all requirements of § 50.47(b) as part of the § 50.54(q)(3) ERDS safety analysis that has yet to be completed, filed with the NRC, and reviewed by NRC Staff as directed by the ASLB Order. The NRC Staff response is therefore misplaced given the requirements of § 50.47(b), the NRC Staffanalysis of the impact of VY ERDS termination. Issuance of the license amendment was premature, and failed to consider a safety analysis required by NRC regulation, the ASLB Order,  since the premaunderstanding that Entergy terminated its VY ERDS feed to the NRC within a day of the amendment issuance. Entergy has not completed or provided its promised ERDS safety analysis, contrary clear guidance from the Lewis Memorandum, a directive from the ASLB, and its own without Entergy making any showing that it is able to meet the §§ 50.47(b) and 50.54(q)(3) requirements with alternative communications methods in the absence of ERDS, and the health and safety of Vermont citizens has been unnecessarily placed at risk. However, at this stage of the proceeding, the State need not prove its case on the merits.                                                  35 Tr. at 30, 89.
20  Determining whether a contention is adequately supported by a concise allegation of the facts or expert opinion, however, does not call upon the intervenor to make its case at [the contention admissibility] stage of the proceeding, but rather to indicate what facts or expert opinions, be it one fact or opinion or many, of which it is aware at that point in time which provide the basis for its contention. 54 Fed. Reg. at 33,170. A petitioner does not have to provide an exhaustive list of its experts or evidence or prove the merits of its contention at the admissibility stage. As with a summary disposition motion, the support for a contention may be viewed in a light that is favorable to the petitioner and inferences that can be drawn from evidence may be construed in favor of the petitioner. See Palo Verde, CLI 91-12, 34 NRC at 155; 10 C.F.R. § 2.710(c).36  failures of Entergy and the NRC Staff in evaluating the impact of VY ERDS termination on public health and safety. An in-depth inquiry before the ASLB and/or the NRC to examine the safety issues not presented by Entergy and not reviewed by the NRC Staff in issuing the license amendment is necessary to correct these failures and allow the tribunal to make ultimate determinations as to the safety value of ERDS at defueled facilities, particularly in light of the until all spent fuel is transferred from wet storage to dry cask storage. In this instance, Entergy has represented in its PSDAR that all spent fuel will be in dry cask storage by approximately 2020. Alternative venues for relief, such as an enforcement action under 10 CFR § 2.206, as necessary safety analysis.37  The harm to the State is occurring now, is ongoing, and is real. The ASLB panel assigned to this proceeding is familiar with these issues, and administrative                                                  36 In re Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station) LPB-06-20, 64 N.R.C. 131 at 150(footnotes omitted). 37 See Majority at 23; Tr. at 81. A § 2.206 petition would be reviewed by the NRC Staff which has already made an independent evaluation of safety from the ASLB and/or the NRC.
21  preferable to initiating a new proceeding from scratch. CONCLUSION  Based on the foregoing, the State of Vermont respectfully requests the U.S. Nuclear Regulatory Commission to grant its Notice of Intention to Participate, Petition to Intervene, and of the same. The State also respectfully requests that the NRC accept the contention contained in its Petition, and order the ASLB to convene a hearing for the purpose of conducting an in-depth investigation and establishing an evidentiary record related health and safety of its citizens.        Respectfully submitted,  /Signed (electronically) by/        Aaron Kisicki        Counsel for the State of Vermont        Vermont Department of Public Service        112 State Street  Drawer 20        Montpelier, VT 05620        (802) 828-3785        aaron.kisicki@state.vt.us  Dated at Montpelier, Vermont This 23rd day of February, 2015}}

Revision as of 19:43, 14 June 2018

State of Vermont'S Brief in Support of Notice of Appeal of Atomic Safety and Licensing Boards January 28 2015 Memorandum and Order Denying States Request for Hearing and Petition to Intervene
ML15055A277
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/23/2015
From: Kisicki A
State of VT, Dept of Public Service
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-271-LA, ASLBP 15-934-01-LA- BD01, RAS 27290
Download: ML15055A277 (23)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ) ) Docket No. 50-271-LA ENTERGY NUCLEAR VERMONT ) YANKEE, LLC AND ENTERGY ) ASLBP No. 15-934-01-LA-BD01 NUCLEAR OPERATIONS, INC. ) ) February 23, 2015 (Vermont Yankee Nuclear Power Station) ) THE STATE OF BRIEF IN SUPPORT OF NOTICE OF APPEAL OF JANUARY 28, 2015 MEMORANDUM AND ORDER DENYING Aaron Kisicki Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620 Tel: (802) 828-3785 aaron.kisicki@state.vt.us Counsel for the State of Vermont Table of Contents INTRODUCTION .......................................................................................................................... 1 STANDARD OF REVIEW ............................................................................................................ 4 DISCUSSION ................................................................................................................................. 5 I. Appendix E to Existing ERDS System Without Conducting a Safety Analysis Upon Reaching Permanently Defueled or Shut Down Status .................................................................................................... 5 A. ERDS provides a clear and substantial safety benefit historically recognized by the NRC in a wide variety of accident scenarios .......................................................................... 6 B. The Vermont Yankee staff reductions proposed in the LAR are predicated on the elimination of ERDS and are material to the findings the NRC must make on the LAR ...... 9 C. Unique circumstances with respect to emergency response at Vermont Yankee justify a continued ERDS feed from the facility to the NRC ........................................................... 11 II. Attack Any NRC Regulation .................................................................................................... 12 III. Health and Safety. ..................................................................................................................... 16 CONCLUSION ............................................................................................................................. 21 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ) ) Docket No. 50-271-LA ENTERGY NUCLEAR VERMONT ) YANKEE, LLC AND ENTERGY ) ASLBP No. 15-934-01-LA-BD01 NUCLEAR OPERATIONS, INC. ) ) February 23, 2015 (Vermont Yankee Nuclear Power Station) ) THE STATE OF BRIEF IN SUPPORT OF NOTICE OF APPEAL OF JANUARY 28, 2015 MEMORANDUM AND ORDER DENYING INTRODUCTION Pursuant to 10 CFR § 2.311(b), the State of Vermont , represented by the Vermont Department of Public Service, herby submits to the U.S. Nuclear Regulatory Commission the following brief in support of its notice of appeal of the Atomic Safety January 28, 2015 tember 22, 2014 Notice of Intention to Participate, Petition to Intervene, and A clear spilt among the ASLB is present with respect to the proper interpretation of NRC regulations controlling the implementation, maintenance, and ). On March 24, 2014, Entergy Nuclear Vermont Yankee, LLC and Entergy Operations, 2 1 The proposed changes contained in the LAR included, among other things, termination of the VY ERDS system.2 communication link with the NRC Operations Center.3 The State in turn received access to the VY ERDS data from the NRC thrxecuted between it and the NRC in 1996.4 ERDS data under the MOU. The LAR was noticed in the Federal Register on July 22, 2014.5 The State issued timely comments to the NRC during the public comment period raising a an emergency at VY under the RERP.6 On September 22, 2014, the State filed a Notice of Intention to Participate, Petition to Intervene, and Hearing Request in response to the LAR.7 The Petition brought forth a single re to ensure continued communication of radiological and 1 See Letter from Christopher J. Wamser, on behalf of Entergy Nuclear Operations, Inc., to NRC, Proposed Changes to the Vermont Yankee Emergency Plan (Mar. 24, 2014) -018) (Agency Documents Access and Management System [ADAMS] Accession No. ML14085A257). 2 See LAR, Attachment 4, Analysis of Proposed Post-Shutdown On-Shift Staffing, at 8. 3 See VY Emergency Plan (Rev. 54) at 42 (ADAMS Accession No. ML14339A646). 4 See Final Memorandum of Understanding Between the U.S. Nuclear Regulatory Commission and the State of Vermont, 62 Fed. Reg. 6281-2 (Dec. 10, 1996). 5 79 Fed. Reg. 42,539-40. 6 See Comments from the Vermont Public Service Department regarding the following License Amendment Request published in the Federal Register on July 22, 2014 at 3 (Aug. 21, 2014) (ADAMS Accession No. ML14239A029). 7 See Vermont Department of Public Service Notice of Intention to Participate, Petition to Intervene, and Hearing Request (Sept. 22, 2014) (ADAMS Accession No. ML14267A524).

3 other data at VY to the State sufficient to facilitate adequate State emergency response under the RERP, in violation of 10 CFR §§ 50.47, 50.57(a)(3), and 50.92. The State sought limited and reasonable relief: that the VY ERDS feed to the NRC that had been in place and operational for over 20 years be kept in place, or that a comparable or better communication system with the State be established until all spent fuel currently in the spent fuel pool is transferred to dry cask storage. Entergy estimates that all spent fuel will be placed in dry cask storage by the end of 2020. procedural grounds.8 9 The ALSB held an oral argument on the Petition on December 1, 2014,10 and issued its Order denying the Petition on January 28, 2015.11 In its Order, the ASLB attempted to resolve the salient question of whether 10 CFR Appendix E to Part 50, § VI.2 allows a licensee that had installed ERDS at a facility pursuant to an NRC safety backfit analysis in the 1990s to terminate its ERDS feed to the NRC without NRC approval once the facility has been permanently defueled. In a 2-1 split decision, the ALSB found that Appendix E, § VI.2 contains no regulatory requirement for continuing the VY ERDS feed now that the facility is permanently shut down. The ASLB, did, however, conclude that Entergy was obligated to conduct an analysis of the impact of VY ERDS termination on the 8 See ic Service Notice of Intention to Participate, Petition to ring Request (Oct. 20, 2014) (ADAMS Accession No. ML14293A701). 9 See Participate, Petition to Intervene, and Hearing Request (Oct. 31, 2014 [later refiled on Nov. 4, 2014]) (ADAMS Accession No. ML14308A570) 10 See Transcript of Teleconference re: Entergy Nuclear Vermont Yankee, Vermont Yankee Nuclear Power Station 11 See ASLB Memorandum and Order LBP-15-4 (Ruling on Request for Hearing and Petition to Intervene) (Jan. 28, 2015) (ADAMS Accession No. ML15028A521).

4 effectiveness of the VY EP, pursuant to 10 CFR § 50.54(q)(3), prior to issuance of the requested license amendment. On February 4, 2014, the NRC Staff issued the license amendment, despite no indication from Entergy that it had conducted the necessary § 50.54(q)(3) VY ERDS safety analysis, or evidence that it reviewed the impact of ERDS termination on VY EP effectiveness. Entergy has since informed the State that it intended to terminate the VY ERDS feed to the NRC (and the understanding that the VY ERDS feed to the NRC is no longer operational. STANDARD OF REVIEW The State files this appeal as a matter of right pursuant to 10 C.F.R. § 2.311(c). In re All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents, 77 N.R.C. 39, 44 (2013). Where, as here, a Petition to Intervene was denied and the principal error upon which the appeal is based is a legal error, the Commission does not defer to the decision of the ASLB: Our rules of practice provide for an automatic right to appeal a licensing board decision deciding standing and contention admissibility, on the question whether a petition to intervene and request for hearing should have been granted, or denied in its entirety. Here, FirstEnergy argues that the Board should have denied Petitioners' hearing request because Petitioners submitted no admissible contentions. In examining contention admissibility, we generally defer to the Board unless we find either an error of law or abuse of discretion.12 12 In re FirstEnergy Nuclear Operating Co., 75 N.R.C. 393, 396-397 (2012)(footnotes omitted).

5 DISCUSSION The State now brings three contested issues presented in the ASLB Order before the NRC. First, whether the ALSB was correct in determining that 10 CFR Part 50, Appendix E, § NRC was correct in granting the LAR without review of the § 50.54(q)(3) VY ERDS safety analysis required by the ASLB Order, and/or whether Entergy was allowed to apparently terminate the VY ERDS feed to the NRC prior to submission of the safety analysis for NRC Staff review. Lastly, the State challenges whether the Petition was an impermissible collateral attack on an existing NRC regulation. I. Termination of an Existing ERDS System Without Conducting a Safety Analysis Upon Reaching Permanently Defueled or Shut Down Status The ASLB rested its denial of the Petition in large part on a broad conclusion regarding the purported meaning and intent of 10 CFR Part 50, Appendix E, § VI.2: s requirement that ERDS be established and maintained at all nuclear facilities applies only to the § VI.2 points to a broader reading that does not necessarily allow for licensee termination of ERDS at facility shutdown without NRC review, especially when viewed in the context of the most facilities creates additional circumstances that support a broader reading of the regulation.

6 A. ERDS provides a clear and substantial safety benefit historically recognized by the NRC in a wide variety of accident scenarios Appendix E to 10 CFR Part 50 addresses emergency planning and preparedness requirements for licensees, including the use of ERDS at facilities. Appendix E, § VI.2 provides that or indefinitely, onsite hardware shall be provided at each unit by the licensee to interface with the NRC receiving system. Software, which will be made available by the NRC, will assemble the data to be transmitted and transmit data from each unit via an output port on the appropriate In determining the scope of the § VI.2 exception for facilities, the State turns to th and safety in strong emergency response in the event of an accident: The NRC, in its mandated role to protect public health and safety, has a responsibility in the event of a reactor accident to monitor the actions of the licensee, who has the primary continuing responsibility for limiting the consequences of the accident. The NRC also has an important role in assuring the flow of accurate information to affected offsite officials and the public regarding the status of the emergency and, as requested or needed, giving advisory support or assistance in diagnosing the situation, isolating critical problems and determining what remedial actions are appropriate. The NRC must be capable of providing to State and local authorities, and to other Federal agencies, an independent assessment of protective actions recommended by the licensee. Given the regulatory and statutory basis, and given the importance of emergency planning and response in the defense-in-depth context, when an accident has occurred, the NRC believes that a significant increase in its ability to perform its role would constitute a substantial increase to the overall protection of the public health and safety. Since the principal effect of ERDS will be a marked improvement in the availability, timeliness, and reliability of key information about what is taking place at the reactor during an accident, particularly during the critical early hours before the NRC Site Team arrives, it is the judgment of the NRC that the implementation of ERDS will provide a significant improvement in the NRC's ability to accurately and promptly assess the situation at the site.

7 In emergency drills conducted by the NRC and power reactor licensees, the information on the status of the reactor is typically 15-30 minutes old by the time it is received at the NRC Operations Center when transmitted via the existing Emergency Notification System (ENS). Moreover, inaccuracies and errors have been found in that information which in some cases has led to confusion and misunderstanding of the situation. In drills which have employed a prototype of the ERDS, there has been profound improvement in the availability, timeliness, and reliability of the information transmitted. The actual experience of the NRC using the existing ENS alone contrasted with drills where both ENS and a prototype ERDS were used is the basis for its conclusion, that ERDS will provide significant improvements in the NRC's ability to understand what is taking place during an emergency, and thereby more effectively perform its role of monitoring and advising the licensee. More importantly, the improvement in assessment performance significantly improved the NRC's ability to provide appropriate recommendations and advice to the State and local officials who are required to make the decisions regarding the offsite protective actions which are necessary to protect the public. Because the decision made by the State and local authorities with regard to offsite protective actions could significantly affect the public health consequences of a reactor accident, it is the judgment of the NRC that a significant improvement in the NRC's ability to provide the right recommendation at the right time provides a substantial improvement in the overall protection to the public. An effective emergency response capability in the event of a reactor accident is an essential element of the defense-in-depth approach to protection of the public health and safety. The NRC's role during an emergency is part of that capability. Because the ERDS will provide a significant improvement in the NRC's ability to perform that role in an emergency, the proposed ERDS improvements are therefore justified, and the costs of implementing those improvements are modest.13 The SOC/backfit analysis makes clear that implementation of ERDS at all operational plants at the time would provide substantially better information over the then-existing Emergency Notification System in any emergency situation at a facility, and that coordination reference to reactor accidents is not dispositive with respect to the scope of ERDS utility. A reactor emergency is only one of many accident scenarios where ERDS could provide critical 13 Emergency Response Data System, 56 Fed. Reg. 40178, Aug. 13, 1991.

8 and timely information to both the NRC and the State, and the kind that may have come most easily to mind at the time the SOC was drafted. There is no limiting language in the SOC that indicates that the NRC intended there to be any limitations on the use of ERDS. Placing a limitation on the types of accident scenarios protecting public health and safety. In fact, the LAR analyzes a number of plausible accident scenarios that could occur at a defueled facility where spent fuel is present in the cooling pool. These scenarios include Hostile Action/Force design basis threat, fuel handling accident, aircraft potential threat, control room fire requiring evacuation and maintain spent fuel pool cooling, and general emergency with radioactive release and protective action recommendation.14 Entergy notes the activation of ERDS as part of its response to each of these analyzed emergency scenarios in the LAR, in further recognition of ERDS value in non-reactor accidents, yet without any supporting analysis. Since the promulgation of the ERDS rules, the NRC has recognized that spent fuel pool accidents can occur even at shutdown reactor sites.15 While the NRC views the probability of these accidents as low, it recognizes that if they occur, the consequences are severe, with the most serious scenarios resulting in the deaths of thousands of people, permanent contamination of thousands of square miles of land, and billions of dollars of economic loss.16 The most recent analysis placed heavy reliance on the effectiveness of emergency planning to mitigate the 14 See LAR, Attachment 4 at 10-45; Tr. 25-26. 15 See Consequence Study of a Beyond-Design-Basis Earthquake Affecting the Spent Fuel Pool for a U.S. Mark I Boiling Water Reactor (October, 2013) (ADAMS Accession No. ML13256A342) at 160 et. seq.; A Safety and Regulatory Assessment of Generic BWR and PWR Permanently Shutdown Nuclear Power Plants (NUREG/CR 6451 (1997))(ADAMS Accession No. ML082260098) at Table 4.2. 16 Id.

9 potential consequences of spent fuel pool accidents.17 This more recent analysis underscores the need for the State to be able to properly devise and execute emergency response plans using all tools outlined in the RERP, given the recognized risk of a serious fuel pool accident. The RERP relies on access to ERDS in large part because of the significant benefits and the need for effective coordination of emergency response with the State. B. The Vermont Yankee staff reductions proposed in the LAR are predicated on the elimination of ERDS and are material to the findings the NRC must make on the LAR Part 50, Appendix E, § IV.2 was promulgated in 1991 and the exemption it provides should be interpreted as applying only to plants that were already shut down at that time. The regulation is framed prospectively, outlining the obligations that operational plants will need to meet going forward. It makes sense, particularly in light of the Nthe NRC would not make shutdown plants go through the expensive and complicated process of setting up an ERDS system from scratch. The incremental safety increase from such a requirement at shutdown plants might not substantially outweigh the enormous costs of setting up such a system. It is an entirely different question, however, whether plants that already have ERDS in place should be allowed to decrease safety at their plants by eliminating those systems to save a relatively small amount of ongoing operating expenses. As Judge Wardwell made clear in his ASLB Order dissent, § VI.2 speaks only to the initial installation, startup, operation, and maintenance of the newly-created ERDS system.18 There is no indication in the regulation that it was intended to allow licensees that had already set up an ERDS system to terminate its feed to the NRC upon achieving permanently defueled 17 Consequence Study at Appendix A. 18 See ASLB Order, Wardwell Dissent at 8.

10 status, let alone in instances where an ERDS system exists that the State emergency preparedness program has become dependent upon and continues to rely on. Given the clear intent articulated licensee ERDS feeds to the NRC should stay in place under any circumstances where termination could be detrimental to coordination of State and local emergency response and thus imperil public health and safety. VY continues to pose credible accident threats in its defueled state (with spent fuel in the fuel pool) and nothing in either the rule itself or the SOC/backfit analysis suggests that a lesser response capability to those risks to public health should be entertained merely because the reactor is no longer operational. Even if the regulation could be read as exempting plants that are shut down after 1991, the permanent shut down exception contained in 10 C.F.R. Part 50, Appendix E is neither prescriptive nor proscriptive. It is merely silent and grants no affirmative right for a licensee to discontinue it ERDS feed upon permanent shutdown. It does not prohibit the NRC from imposing an obligation on Entergy to continue the operation of the VY ERDS data feed to the NRC in order to provide adequate protection for the public health and safety. At the very least, sufficient ambiguity is present in the rule justifying the NRC to militate toward the increased public health and safety protection afforded by a continued ERDS feed to the NRC (and the 19 Lastly, 10 CFR licensee shall complete implementation of the ERDS by February 13, 1993, or before escalation facilities built in the future, were required to implement ERDS before escalation to full power. 19 See Id. at 2.

11 The NRC Staff conceded that ERDS was a requirement for all plants going forward as a result of result of § VI.4.d after February 13, 1993. The § IV regulatory scheme was then left with a mandate for all plants to install and maintain ERDS before full power production, with no provision expressly allowing or even contemplating termination of the ERDS feed under any circumstances. C. Unique circumstances with respect to emergency response at Vermont Yankee justify a continued ERDS feed from the facility to the NRC ERDS feed to the NRC (and the State). First, Section 7.10 of the VY EP (Revision 54) explicitly calls for a continuous ERDS feed to the NRC.20 The LAR made no apparent change to § 7.10 of the ERDS feed in evaluating and executing emergency response activities. Both the licensee and State emergency response plans expressly contemplate ERDS connection with the NRC, yet Entergy has neither provided any analysis of the impact of termination of that feed, nor has it presented an alternative communications mechanism to the NRC or the State in ERDS absence. Second, could occur at the plant in its current permanently defueled state. Again, Entergy has not outlined any alternative form of communication to the NRC or the State as a replacement for ERDS in the event of an emergency under any of these scenarios. Lastly, the State is seeking a finite extension of ERDS use. It seeks access to the VY ERDS feed only while spent fuel is present in the fuel pool in this case until approximately 2020. Once the spent fuel is transferred to dry cask storage and the credible risk of an emergency involving the potential 20 See VY EP at 42.

12 release of radiation, such as those analyzed in the LAR, has passed, the State agrees that access to ERDS data is no longer necessary. II. The S Does Not Collaterally Attack Any NRC Regulation contention collaterally challenges another NRC regulation21: Entergy has failed to ensure a Radiological Monitoring System that will provide the information that the State needs to assess Vermont Yankee conditions as part action decision-making process, and Entergy has thus failed to demonstrate that its license amendment request (1) will not significantly reduce the margin of safety or significantly increase the consequences of an accident previously evaluated as required by 10 CFR § 50.92; (2) will provide adequate protection for the public health and safety as required by 10 CFR § 50.57(a)(3); and (3) will comply with the requirements of 10 CFR § 50.47 to provide reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency.22 The sound NRC law and deprives the State of a hearing on an issue of vital interest to it and its emergency planning programs. The alleged conflicting regulations are 10 C.F.R. §§ 50.47 and 50.54(q)(3). Stated broadly, the Board reasoned that because 10 C.F.R. Part 50 Appendix E, Section VI.2 does not require hardware for an ERDS system for any permanently shutdown posal to terminate the operating ERDS feed already in place C.F.R. §§ 50.47 and 50.54(q)(3) constitutes a collateral attack on Appendix E. First, the State is not seeking to impose the requirements of § 50.54(q)(3) on Entergy. All parties, including Entergy, and the ASLB agreed that Entergy must submit a safety analysis, 21 See ASLB Order, Majority at 1. petition and has standing to intervene, but we nevertheless deny collaterally challenges an NRC regulation and 22 Petition at 3-4.

13 pursuant to 10 CFR § 50.54(q)(3), showing ERDS disconnection would result in no reduction in the effectiveness of the overall VY EP, prior to Entergy disconnecting its ERDS feed to the NRC (and the State).23 with §§ 50.47(b) and 50.54(q)(3) collaterally attacks the ERDS provision in Part 50, Appendix E, §VI is incorrect. Second, the sole reason §§ 50.47(b) and 50.54(q)(3) are applicable here is due to e decision to rely on the operation of the ERDS feed to the NRC as a key component of the VY EP. Once Entergy made that decision, it imposed upon itself the NRC regulatory obligation to amend its emergency plan prior to elimination of the ERDS feed, and to implement the requested license amendment, only if the licensee performs and retains an analysis demonstrating that the changes do not reduce the effectiveness of the plan and the plan, as changed, continues to meet the requirements in appendix E to this part and, for nuclear power reactor licensees, the planning standards of § 50.47(b).24 Third, because the ASLB declined to grant the State and itself a role in determining whether Entergy had conducted the required analysis justifying termination of the ERDS feed, § 50.54(q)(3) safety analysis. to the VY operating license was plainly made without review of a ERDS safety analysis.25 The Amendment Issuance notes that the initial LAR was supplemented only two times: on May 21 23 Tr. 43-44, see also Tr. 50; ASLB Order, Majority at 20-21, 23; ALSB Order, Wardwell Dissent at 17. 24 10 CFR § 50.54.(q)(3). 25 See Letter from James Kim, Project Manager, Plant Licensing IV-2 and Decommissioning Transition Branch, Vermont Yankee Nuclear Power Station Issuance of Amendment to Renewed Facility Operating License re: Changes to the Emergency Plan (TAC Accession No. ML14346A065) at 1; Amendment No. 261 at 1-2; Safety Evaluation at 1-2, 4-7, 22.

14 argument on December 1, 2014 post-date either of those supplemental filings by over three months. ERDS data feed to the NRC within a day of NRC Staff issuance of the LAR, without filing with NRC the § 50.54(q)(3) ERDS safety analysis Entergy acknowledged it was obligated to perform prior ERDS disconnection. ERDS feed prior to submitting the analysis it agreed to perform for review, coupled with the required, alone beyond any determination of the meaning of Appendix E, § VI.2 justifies overturning the ALSB Order and admitting the StatEntergy and NRC Staff are apparently ignoring NRC safety requirements as interpreted by the ASLB. Fourth, 10 CFR § 50.47(b), requires that licensee emergency plans show, among other [p]rocedures have been established for notification, by the licensee, of State and local response organizations and for notification of emergency personnel by all organizations; the content of initial and followup messages to response organizations and the public has been established; and means to provide early notification and clear instruction to the populace within ations to 26 requirement as part of its contention not to challenge Appendix E, but rather because NRC regulations, through operation of § 50.54(q)(3), and confirmed by the NRC Staff guidance 26 10 CFR §§ 50.47(b)(5) and (6).

15 contained in the so-called Lewis Memorandum on which both Entergy and NRC Staff relied in opposing intervention, impose on Entergy the obligation to demonstrate that termination of the VY ERDS feed does not compromise public health and safety.27 Entergy seeks to remove from its Emergency Plan a program that it once claimed, and NRC Staff agreed, was essential to dependence upon a fully operational ERDS to ensure that its emergency resources will be used most effectively to protect the public health and safety in the event of an accident is supported by ample evidence. Fifth, inasmuch asSection VI.2 of Appendix E addresses only when a licensee is required to install ERDS hardware and §§ 50.47(b) and 50.54(q)(3) address the whether operation of the ERDS system is required for an adequate emergency plan and the circumstances under which termination of the ERDS feed is allowed, there is neither a logical nor legal connection between Once Entergy incorporated ERDS into its emergency plan, ERDS became subject to the requirements governing emergency plans including §§ 50.47(b) and 50.54(q)(3). Like any other license provision, any provision of the VY EP that was used to demonstrate the adequacy of the plan cannot be removed from the plan by license amendment unless and until an applicant is able to demonstrate its removal will not reduce the effectiveness of the EP or otherwise compromise the public health and safety 27 See Memorandum of Robert Lewis, NRC Director of Division of Preparedness and Response, Office of Nuclear Security and Incident Response, Emergency Response Data Systems at Plants That Have Permanently Ceased mergency plan relies upon ERDS for the provision of assessment data to the emergency response organization, which is an emergency planning function, the licensee will need to evaluate whether removing ERDS results in a reduction in effectiveness for its special circumstances. In either case, the licensee of a permanently shut-down facility seeking to remove ERDS is required by Paragraph 50.54(q)(3) to perform and retain an analysis that concludes that the removal of ERDS is not a reduction in effectiveness. A simple cross-reference to this memo Id. at 2.

16 ations pursuant to 10 C.F.R. §§ 50.47 and 50.54(q)(3), addressing when and how a licensee can terminate ERDS operation constitutes a collateral attack on Part 50, Appendix E, outlining licensee obligations to create an ERDS program is incorrect. The Stateadmitted. III. Public Health and Safety. aiting Staff held a public meeting to address public concerns with the proposed amendment and then, without the benefit of a full adjudicatory hearing and the decision of an independent hearing to issues raised by the State during the public comment period in the State Consultation section of the Amendment Issuance.28 The State had filed public comments raising concerns about the The NRC Staff made a number of statements that are either incorrect in part, or altogether 29 First, the NRC Staff posited that the LAR did not request the removal of ERDS, but rather a staffing reduction.30 On the face of the LAR it is clear that Entergy sought removal of 28 See Amendment Issuance, Safety Evaluation at 24-28 29 Id. at 28. 30 Id. at 27.

17 ERDS as a component of the overall requested staffing reductions. In addition, NRC Staff specifically Part 50, Appendix E, § VI.2 does not require continued use of ERDS at a defueled facility. The settled, as evidenced by the ASLB split decisThere is simply no firm basis, particularly during the pendency of the ASLB Order appeal Second, the NRC Staff stated again without any supporting analysis 31 As discussed above, a final determination regarding the correct interpretation of 10 CFR Part 50, Appendix E, § VI.2 has not been made. At best, the NRC Staff response was premature; at makes no acknowledgment of the § 50.54(q)(3) ERDS safety analysis required by the Lewis Memorandum and the ASLB Order. 54) provides that VY will maintain a continuous ERDS communication with the NRC Operations Center; it makes no commitment that ERDS will be provided by the licensee to the 32 connectivity under the license amendment is critically wrong. Section 7.10 of the VY SEP, s a continuous ERDS connection with 31 Id. at 28. 32 Id.

18 33 At the time Revision 54 became effective on December 19, 2013, that statement was true. It is not, as the NRC Staff appears to suggest, indicative of any ERDS communication scheme after issmakes clear that the ERDS communications link referenced in Revision 54 of the VY SEP, and II.C.9 of Ente-Shutdown On-Shift Staffing plainly states a permanently shut down and defueled condition. The task of ERDS activation is therefore not included as an on-34 Furthermore, the termination of the VY-NRC ERDS link is highly problematic for the State, irrespective of By endorsing an LAR that seeks to terminate communications links critical to the State RERP, the NRC appeared to suggest that a licensee has no obligation to ensure any base level of state emergency planning capabilities. The NRC regulations point in the other direction. 10 CFR § 50.47(b)(6) requires licensee emergency plaprovided the primary means for the provision of this required communications link under Revision 54 of the VY EP. The state also recognized the importance of the data provided by ERDS and explicitly predicates many of the emergency response activities on information received from the VY ERDS link to the NRC under a memorandum of understanding executed between the State and the NRC. Entergy has not made provisions for alternative communications with the State in the absence of ERDS that are equal to or exceed the quality 33 VY EP at 42. 34 LAR, Attachment 4 at 8.

19 Decommissioning Coordinator has identified no less than 37 ERDS data points that are still event of an emergency at the facility.35 Entergy must show compliance with all requirements of § 50.47(b) as part of the § 50.54(q)(3) ERDS safety analysis that has yet to be completed, filed with the NRC, and reviewed by NRC Staff as directed by the ASLB Order. The NRC Staff response is therefore misplaced given the requirements of § 50.47(b), the NRC Staffanalysis of the impact of VY ERDS termination. Issuance of the license amendment was premature, and failed to consider a safety analysis required by NRC regulation, the ASLB Order, since the premaunderstanding that Entergy terminated its VY ERDS feed to the NRC within a day of the amendment issuance. Entergy has not completed or provided its promised ERDS safety analysis, contrary clear guidance from the Lewis Memorandum, a directive from the ASLB, and its own without Entergy making any showing that it is able to meet the §§ 50.47(b) and 50.54(q)(3) requirements with alternative communications methods in the absence of ERDS, and the health and safety of Vermont citizens has been unnecessarily placed at risk. However, at this stage of the proceeding, the State need not prove its case on the merits. 35 Tr. at 30, 89.

20 Determining whether a contention is adequately supported by a concise allegation of the facts or expert opinion, however, does not call upon the intervenor to make its case at [the contention admissibility] stage of the proceeding, but rather to indicate what facts or expert opinions, be it one fact or opinion or many, of which it is aware at that point in time which provide the basis for its contention. 54 Fed. Reg. at 33,170. A petitioner does not have to provide an exhaustive list of its experts or evidence or prove the merits of its contention at the admissibility stage. As with a summary disposition motion, the support for a contention may be viewed in a light that is favorable to the petitioner and inferences that can be drawn from evidence may be construed in favor of the petitioner. See Palo Verde, CLI 91-12, 34 NRC at 155; 10 C.F.R. § 2.710(c).36 failures of Entergy and the NRC Staff in evaluating the impact of VY ERDS termination on public health and safety. An in-depth inquiry before the ASLB and/or the NRC to examine the safety issues not presented by Entergy and not reviewed by the NRC Staff in issuing the license amendment is necessary to correct these failures and allow the tribunal to make ultimate determinations as to the safety value of ERDS at defueled facilities, particularly in light of the until all spent fuel is transferred from wet storage to dry cask storage. In this instance, Entergy has represented in its PSDAR that all spent fuel will be in dry cask storage by approximately 2020. Alternative venues for relief, such as an enforcement action under 10 CFR § 2.206, as necessary safety analysis.37 The harm to the State is occurring now, is ongoing, and is real. The ASLB panel assigned to this proceeding is familiar with these issues, and administrative 36 In re Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station) LPB-06-20, 64 N.R.C. 131 at 150(footnotes omitted). 37 See Majority at 23; Tr. at 81. A § 2.206 petition would be reviewed by the NRC Staff which has already made an independent evaluation of safety from the ASLB and/or the NRC.

21 preferable to initiating a new proceeding from scratch. CONCLUSION Based on the foregoing, the State of Vermont respectfully requests the U.S. Nuclear Regulatory Commission to grant its Notice of Intention to Participate, Petition to Intervene, and of the same. The State also respectfully requests that the NRC accept the contention contained in its Petition, and order the ASLB to convene a hearing for the purpose of conducting an in-depth investigation and establishing an evidentiary record related health and safety of its citizens. Respectfully submitted, /Signed (electronically) by/ Aaron Kisicki Counsel for the State of Vermont Vermont Department of Public Service 112 State Street Drawer 20 Montpelier, VT 05620 (802) 828-3785 aaron.kisicki@state.vt.us Dated at Montpelier, Vermont This 23rd day of February, 2015