ML17088A819: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 24: | Line 24: | ||
==Subject:== | ==Subject:== | ||
License Renewal of the PULSTAR Reactor with Power Uprate to 2.6 MW Gentlemen: In accordance with the provisions of 10 CFR 2.109, 10 CFR 50.33 and 10 CFR 50.34, NC State University hereby requests a renewal of Operating License No. R-120 for the PULSTAR Reactor, a Class 104 licensed facility utilized for education, research, and extension. This renewal package includes materials supporting a requested increase of the licensed power limit from 1.0 MW to 2.6 MW. In support of this renewal and power uprate request, the following documentation is enclosed: 1. Updated Safety Analysis Report (SAR) 2. Financial Qualifications Report 3. Environmental Report 4. Technical Specifications (revised in accordance with the updated Safety Analysis Report) 5. Reactor Operator Training and Requalification Program 6. Emergency Plan The facility Physical Security Plan will be submitted separately per the requirements of 10 CFR 73.23. Both the SAR and the Technical Specifications conform to the format given in NUREG-1537. If you have any questions in this matter, please direct them to Dr. Ayman Hawari, Director of the Nuclear Reactor Program, at (919)515-7294, or via email at ayman.hawari@ncsu.edu. I declare under penalty of perjury that the forgoing is true and correct. Executed on 241h February 2017. incerely, J .. '-A, CAJo,,L___ W. Randolph Woodson Chancellor WRW/mh cc: Dr. Ayman Hawari, Director, Nuclear Reactor Program, North Carolina State University | License Renewal of the PULSTAR Reactor with Power Uprate to 2.6 MW Gentlemen: In accordance with the provisions of 10 CFR 2.109, 10 CFR 50.33 and 10 CFR 50.34, NC State University hereby requests a renewal of Operating License No. R-120 for the PULSTAR Reactor, a Class 104 licensed facility utilized for education, research, and extension. This renewal package includes materials supporting a requested increase of the licensed power limit from 1.0 MW to 2.6 MW. In support of this renewal and power uprate request, the following documentation is enclosed: 1. Updated Safety Analysis Report (SAR) 2. Financial Qualifications Report 3. Environmental Report 4. Technical Specifications (revised in accordance with the updated Safety Analysis Report) 5. Reactor Operator Training and Requalification Program 6. Emergency Plan The facility Physical Security Plan will be submitted separately per the requirements of 10 CFR 73.23. Both the SAR and the Technical Specifications conform to the format given in NUREG-1537. If you have any questions in this matter, please direct them to Dr. Ayman Hawari, Director of the Nuclear Reactor Program, at (919)515-7294, or via email at ayman.hawari@ncsu.edu. I declare under penalty of perjury that the forgoing is true and correct. Executed on 241h February 2017. incerely, J .. '-A, CAJo,,L___ W. Randolph Woodson Chancellor WRW/mh cc: Dr. Ayman Hawari, Director, Nuclear Reactor Program, North Carolina State University}} | ||
}} |
Revision as of 21:52, 18 May 2018
ML17088A819 | |
Person / Time | |
---|---|
Site: | North Carolina State University |
Issue date: | 02/24/2017 |
From: | Woodson W R North Carolina State University |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML17088A818 | List: |
References | |
Download: ML17088A819 (1) | |
Text
NC STATE UNIVERSITY February 24, 2017 Office of the Chancellor ncsu .edu/chancellor U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Reference:
NC State University PULSTAR Reactor Docket No. 50-297, License No. R-120 Campus Box 7001 Holladay Hall, Suite A Raleigh, NC 27695-7001 P: 919.515.2191
Subject:
License Renewal of the PULSTAR Reactor with Power Uprate to 2.6 MW Gentlemen: In accordance with the provisions of 10 CFR 2.109, 10 CFR 50.33 and 10 CFR 50.34, NC State University hereby requests a renewal of Operating License No. R-120 for the PULSTAR Reactor, a Class 104 licensed facility utilized for education, research, and extension. This renewal package includes materials supporting a requested increase of the licensed power limit from 1.0 MW to 2.6 MW. In support of this renewal and power uprate request, the following documentation is enclosed: 1. Updated Safety Analysis Report (SAR) 2. Financial Qualifications Report 3. Environmental Report 4. Technical Specifications (revised in accordance with the updated Safety Analysis Report) 5. Reactor Operator Training and Requalification Program 6. Emergency Plan The facility Physical Security Plan will be submitted separately per the requirements of 10 CFR 73.23. Both the SAR and the Technical Specifications conform to the format given in NUREG-1537. If you have any questions in this matter, please direct them to Dr. Ayman Hawari, Director of the Nuclear Reactor Program, at (919)515-7294, or via email at ayman.hawari@ncsu.edu. I declare under penalty of perjury that the forgoing is true and correct. Executed on 241h February 2017. incerely, J .. '-A, CAJo,,L___ W. Randolph Woodson Chancellor WRW/mh cc: Dr. Ayman Hawari, Director, Nuclear Reactor Program, North Carolina State University