ML21085A690
| ML21085A690 | |
| Person / Time | |
|---|---|
| Site: | North Carolina State University |
| Issue date: | 03/26/2021 |
| From: | Hawari A North Carolina State University |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML21085A688 | List: |
| References | |
| Download: ML21085A690 (1) | |
Text
Nuclear Reactor Program Department of Nuclear Engineering www.ne.ncsu.edu/nrp Campus Box 7909 2500 Stinson Drive Raleigh, NC 27695-7909 919.515.7294 (voice) 919.513.1276 (fax) 26 March 2021 Document Control Desk US Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Re:
Annual Report for 2020 License No. R-120 Docket No. 50-297 In accordance with Technical Specification 6.7.4, the annual operating report for the North Carolina State PULSTAR Reactor facility is attached.
If you have any questions regarding this correspondence or require additional information, please contact Scott Lassell, Manager of Engineering and Operations at 919-515-3347, or via email at salassel@ncsu.edu.
I declare under penalty of perjury that the forgoing is true and correct. Executed on 26 March 2021.
Ayman I. Hawari, Ph. D.,
Director, Nuclear Reactor Program North Carolina State University
Enclosures:
Annual Operating Report for 2020 Attachment A: PULSTAR Reactor Environmental Radiation Surveillance Report