ML16180A272: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = Letter
| document type = Letter
| page count = 2
| page count = 2
}}
=Text=
{{#Wiki_filter:  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  June 28, 2016  Mr. Benjamin C. Waldrep Site Vice President Shearon Harris Nuclear Power Plant M/C HNP01 New Hill, NC  27562-0165 
==SUBJECT:==
SHEARON HARRIS NUCLEAR POWER PLANT - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2015-038 
==Dear Mr. Waldrep:==
The Nuclear Regulatory Commission (NRC) Office of Investigations (OI) has completed their investigation regarding alleged discrimination against a radiation protection technician for raising safety concerns.
The NRC determined that there was insufficient evidence to substantiate that the individual was discriminated against for raising safety concerns. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room). Sincerely,        /RA/        George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects 
CERTIFIED MAIL 7012 1010 0002 6821 1875 RETURN RECEIPT REQUESTED 
ML16180A272    SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRP RII:EICS RII:DRP  SIGNATURE DXW4 MXM3 via email GTH  NAME DJackson MCheckle GHopper  DATE 6/27/2016 6/27/2016 6/27/2016  E-MAIL COPY?    YES NO      YES NO      YES NO       
}}
}}

Revision as of 15:31, 14 May 2018

Shearon Harris Nuclear Power Plant - Investigative Synopsis, Office of Investigations Case No. 2-2015-038
ML16180A272
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/28/2016
From: Hopper G T
NRC/RGN-II/DRP/RPB4
To: Waldrep B C
Carolina Power & Light Co
References
2-2015-038
Download: ML16180A272 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 28, 2016 Mr. Benjamin C. Waldrep Site Vice President Shearon Harris Nuclear Power Plant M/C HNP01 New Hill, NC 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2015-038

Dear Mr. Waldrep:

The Nuclear Regulatory Commission (NRC) Office of Investigations (OI) has completed their investigation regarding alleged discrimination against a radiation protection technician for raising safety concerns.

The NRC determined that there was insufficient evidence to substantiate that the individual was discriminated against for raising safety concerns. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room). Sincerely, /RA/ George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects

CERTIFIED MAIL 7012 1010 0002 6821 1875 RETURN RECEIPT REQUESTED

ML16180A272 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:EICS RII:DRP SIGNATURE DXW4 MXM3 via email GTH NAME DJackson MCheckle GHopper DATE 6/27/2016 6/27/2016 6/27/2016 E-MAIL COPY? YES NO YES NO YES NO