ML060310197: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 2: Line 2:
| number = ML060310197
| number = ML060310197
| issue date = 11/25/2005
| issue date = 11/25/2005
| title = 2005/11/25-Motion to Reopen Millstone License Renewal Proceeding Filed by the Connecticut Coalition Against Millstone
| title = Motion to Reopen Millstone License Renewal Proceeding Filed by the Connecticut Coalition Against Millstone
| author name = Burton N
| author name = Burton N
| author affiliation = Connecticut Coalition Against Millstone
| author affiliation = Connecticut Coalition Against Millstone
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 The entire text of the N RC's response is as follows:
{{#Wiki_filter:1The entire text of the N RCs response is as follows:
NRC's Office of Public Affairs has published a background paper entitled "Radiation 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of:Docket Nos. 50-336-LR,DOMINION NUCLEAR:50-423-LR CONNECTICUT, INC.:(Millstone Nuclear Power:Station, Units 2 and 3):NOVEMBER 25, 2005 MOTION TO REOPEN The Connecticut Coalition Against Millstone ("Coalition") moves to reopen these proceedings on the application of Dominion Nuclear Connecticut, Inc."Dominion") to extend the operating
NRCs Office of Public Affairs has published a background paper entitled Radiation 1
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket Nos. 50-336-LR, DOMINION NUCLEAR 50-423-LR CONNECTICUT, INC.
licenses of Millstone Units 2 and 3. Further, t he Coalition seeks leave to submit an amended petition to intervene.
(Millstone Nuclear Power Station, Units 2 and 3)
 
NOVEMBER 25, 2005 MOTION TO REOPEN The Connecticut Coalition Against Millstone (Coalition) moves to reopen these proceedings on the application of Dominion Nuclear Connecticut, Inc.Dominion) to extend the operating licenses of Millstone Units 2 and 3. Further, the Coalition seeks leave to submit an amended petition to intervene.
This motion is premised upon newly discovered evidence of fraud, deceit and cover-up by
This motion is premised upon newly discovered evidence of fraud, deceit and cover-up by the staff of the U.S. Nuclear Regulatory Commission (NRC).
 
the staff of the U.S. Nuclear Regulatory Commission ("NRC").
 
In support of this motion, the Coalition respectfully represents as follows:
In support of this motion, the Coalition respectfully represents as follows:
: 1. In the course of the NRC's proceedings on Dominion's application to extend the operating
: 1. In the course of the NRCs proceedings on Dominions application to extend the operating licenses of Millstone Units 2 and 3, the Coalition submitted various filings to the NRC, dated March 2, 2005 (Exhibit A hereto) and March 16, 2005 (Exhibit B hereto).
 
: 2. In Exhibits A and B, and attachments thereto, the Coalition identified inter alia evidence that the Millstone Nuclear Power Station releases levels of strontium-90 to the environment which are in excess of its federal license.
licenses of Millstone Units 2 and 3, the Coalition submitted various filings to the NRC, dated
: 3. Such evidence is contained in Dominions own reports to the NRC and the Connecticut Department of Environmental Protection (DEP) of levels of strontium-90 concentrations found in goat milk sampled 5.5 miles north-northeast of Millstone.
 
: 4. In comparison with average concentrations of strontium-90 found in commercially sold cows milk at various locations in the United States by the U.S. Environmental Protection Agency in 2003, the levels of strontium-90 reported in goat milk sampled at 120 Dayton Road in Waterford, Connecticut, are dangerously high. See Declaration of Ernest J. Sternglass, Ph.D.,
March 2, 2005 (Exhibit A hereto) and March 16, 2005 (Exhibit B hereto).
: 2. In Exhibits A and B, and attachments thereto, the Coalition identified inter alia evidence that the Millstone Nuclear Power Station releases levels of strontium-90 to the environment
 
which are in excess of its federal license.
: 3. Such evidence is contained in Dominion's own reports to the NRC and the Connecticut
 
Department of Environmental Protection ("DEP") of levels of strontium-90 concentrations found
 
in goat milk sampled 5.5 miles north-northeast of Millstone.
: 4. In comparison with average concentrations of strontium-90 found in commercially sold
 
cow's milk at various locations in the United States by the U.S. Environmental Protection
 
Agency in 2003, the levels of strontium-90 reported in goat milk sampled at 120 Dayton Road in
 
Waterford, Connecticut, are dangerously high. See Declaration of Ernest J. Sternglass, Ph.D.,
annexed hereto as Exhibit C.
annexed hereto as Exhibit C.
: 5. According to documents filed by Dominion and its predecessor, Northeast Nuclear Energy
: 5. According to documents filed by Dominion and its predecessor, Northeast Nuclear Energy Company, environmental monitoring of station stack releases of strontium-90 were permitted by the NRC to be discontinued on or before 1997; since such date, Millstone has relied principally upon environmental monitoring of goat milk samples to ascertain the levels of strontium-90 released into the air and the surrounding environment by Millstones routine operations.
 
: 6. The NRC staff reviewed the Coalitions submissions identified hereinabove and other related public comments, according to its Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 22 Regarding Millstone Power Station, Units 2 and 3" issued in July 2005. See Appendix A-102 - A-106.
Company, environmental monitoring of station stack releases of strontium-90 were permitted by
: 7. The NRCs response, as set forth in Supplement 22,1 attempts to justify a conclusion that
 
the NRC to be discontinued on or before 1997; since such date, Millstone has relied principally
 
upon environmental monitoring of goat milk samples to ascertain the levels of strontium-90
 
released into the air and the surrounding environment by Millstone's routine operations.
: 6. The NRC staff reviewed the Coalition's submissions identified hereinabove and other


related public comments, according to its "Generic Environmental Impact Statement for License
Protection and the Tooth Fairy Issue, which contains the following information about Strontium-90 (Sr-90). Approximately 16.8 million Curies of Sr-90 were dispersed globally by atmospheric testing of nuclear weapons before 1980, and Sr-90 has a half-life of 28 years. Therefore, millions of Curies of that Sr-90 is still in the environment and accounts for about 0.3% of the average annual dose of roughly 300 millirem a person in the United States receives from natural background radiation. An additional 216,000 Curies of Sr-90 were released into the atmosphere as a result of the Chernobyl accident. Altogether, the 103 nuclear power plants in the United States release a total of about 1/1000th of a Curie of Sr-90 each year.
Dominions annual radiological effluent reports to the NRC indicate that Millstone releases an average of 2 microCuries (2 X 10(6) Curies) of Sr-90 in liquid and gaseous effluents each year. A total of 1 microCurie of Sr-90 was released in gaseous effluents in 2002, and no detectable amount of Sr-90 was released in gaseous effluents in 2001, 2003 and 2004. Millstone also releases a small amount of Sr-89, which has a half-life of about 50 days. Because of the short half-life, any Sr-89 in the environment around Millstone could not be from Chernobyl or atmospheric testing and would likely be from Millstone effluents. If Sr-90 is found in the environment without Sr-89 near an operating nuclear power plant, then it is highly likely that the Sr-90 is from Chernobyl or atmospheric testing. No Sr-89 was detected in the gaseous effluents for 2001, 2002 and 2003. In 2001, 2002, 2003 and 2004, 20 microCuries, 200 microC uries, 2w20 microCuries and 90 microCuries of Sr-89 were released in liquid effluents, respectively.
As part of its radiological environmental monitoring program, Dominion obtains milk samples from goats at farms near Millstone and performs radio-chemical analysis to determine the concentrations of Sr-89 and Sr-90 in that milk. Dominions annual radiological environmental reports to the NRC typically indicate concentrations ranging from below the lower limit of detectability to 15 picoCuries (15 X 10(-12)) of Sr-90 per liter of milk, and the concentrations of Sr-89 are below the lower limit of detectability.
Dominion has concluded that the Sr-90 is from atmospheric testing of nuclear weapons or the Chernobyl accident because the plant would have to release Curies of Sr-90 (not microCuries) to result in the concentrations measured in the milk.
Sometimes higher concentrations of Sr-90 are found; Dominion reported a concentration of 55.5 picoCuries (55.5 X 10(-12)) of Sr-90 per liter in goat milk that was composited from July, August and September of 2001 at a farm approximately 5 miles from the plant. Dominion believes that the goats sometimes begin to nibble the roots of the pasture grass. Along with the grass roots, the goats may also ingest some soil that contains Sr-90 left in the environment from atmospheric nuclear testing. Analyses of the same goat milk indicated that the concentration of Sr-89 was below the lower limit of detectability, another indication that the Sr-90 is not from Millstone.
The Connecticut Department of Environmental Protection (CTDEP) also analyses 2


Renewal of Nuclear Plants, Supplement 22 Regarding Millstone Power Station, Units 2 and 3" issued in July 2005. See Appendix A-102 - A-106.
: 7. The NRC's response, as set forth in Supplement 22, 1 attempts to justify a conclusion that Protection and the Tooth Fairy Issue," wh ich contains the following information about Strontium-90 (Sr-90). Approx imately 16.8 million Curies of Sr-90 were dispersed globally by atmospheric testing of nucl ear weapons before 1980, and Sr-90 has a half-life of 28 years. Therefore, m illions of Curies of that Sr-90 is still in the environment and accounts for about 0.3% of the average annual dose of roughly 300 millirem a person in the United States receives from natural background radiation. An additional 216,000 Curies of Sr-90 were released into the atmosphere as a result of the Chernobyl accident. Altogether, the 103 nuclear power plant s in the United States release a total of about 1/1000th of a Curie of Sr-90 each year.
Dominion's annual radiological effluent reports to the NRC indicate that Millstone releases an average of 2 microCuries (2 X 10(6) Curies) of Sr-90 in liquid and gaseous effluents each year. A total of 1 microCurie of Sr-90 was released in gaseous effluents in 2002, and no detectable amount of Sr-90 wa s released in gaseous effluents in 2001, 2003 and 2004. Millstone also releases a small amount of Sr-89, which has a half-life of about 50 days. Because of the short half-life, any Sr-89 in the environment around Millstone could not be from Chernobyl or at mospheric testing and would likely be from Millstone effluents. If Sr-90 is found in t he environment without S r-89 near an operating nuclear power plant, then it is highly likel y that the Sr-90 is from Chernobyl or atmospheric testing. No Sr-89 was detec ted in the gaseous effluents for 2001, 2002 and 2003. In 2001, 2002, 2003 and 2004, 20 microC uries, 200 microC uries, 2w20 microCuries and 90 microCuries of Sr-89 were released in liquid effluents, respectively.
As part of its radiological environment al monitoring program, Dominion obtains milk samples from goats at farms near Millst one and performs radio-chemical analysis to determine the concentrations of Sr-89 and Sr-90 in that milk. Dominion's annual radiological environmental reports to the NRC typically indicate concentrations ranging from below the lower limit of detectability to 15 picoCuries (15 X 10(-12)) of Sr-90 per liter of milk, and the concentrations of Sr-89 are below the lower limit of detectability.
Dominion has concluded that the Sr-90 is fr om atmospheric testing of nuclear weapons or the Chernobyl accident because the plant w ould have to release Curies of Sr-90 (not microCuries) to result in the concentrations measured in the milk.
Sometimes higher concentrations of Sr-90 are found; Dominion reported a concentration of 55.5 picoCuries (55.5 X 10(-12
)) of Sr-90 per liter in goat milk that was composited from July, August and September of 2001 at a farm approximately 5 miles from the plant. Dominion believes that the goats sometimes begin to nibble the roots of the pasture grass. Along with the grass root s, the goats may also ingest some soil that contains Sr-90 left in the environment from at mospheric nuclear testing. Analyses of the same goat milk indicated that the concentra tion of Sr-89 was below the lower limit of detectability, another indication that the Sr-90 is not from Millstone.
The Connecticut Department of Envi ronmental Protection (CTDEP) also analyses 2
4 of 120 Dayton Road in Waterford, clipping pasture grass, Exhibit D herein.
4 of 120 Dayton Road in Waterford, clipping pasture grass, Exhibit D herein.
Katie the Goat is available for observation during grazing activities by the
Katie the Goat is available for observation during grazing activities by the NRC.
 
NRC.
: 15. Goats are simply not root-feeders.
: 15. Goats are simply not root-feeders.
: 16. Goats' jaw structures are such that they cut grass "scissor-like" with
: 16. Goats jaw structures are such that they cut grass scissor-like with opposing motion of the upper and lower jaw; while cows, sheep and horses are known to chomp grass so that it may be yanked up by the roots, goats are far more fastidious. For this reason, they are favored as pasture livestock around the world.
 
: 17. Dominion did not support its novel scientific theorizing - that the goats sometimes begin to nibble the roots of the pasture grass - with any studies or scientific papers, let alone photographs of the 120 Dayton Road pasture or the goats during their grazing.
opposing motion of the upper and lower jaw; while cows, sheep and horses
: 18. Dominions second statement is even more revealing:
 
Along with the grass roots, the goats may also ingest some soil that contains Sr-90 left in the environment from atmospheric nuclear testing.
are known to chomp grass so that it may be yanked up by the roots, goats
: 19. This statement is scientifically unsound because fallout from atmospheric nuclear testing has decayed to levels far below those measured in the goat milk, nor did Dominion identify any other location in the state in which similarly high levels of strontium-90 attributable to atmospheric weapons testing have been measured.
 
: 20. Rather than dismiss Dominions unsound scientific theorizing as the bogus concoction that it is, the NRC staff came to the same conclusion as Dominion and discredited Millstone as a source of the environmental poisoning.
are far more fastidious. For this reason, they are favored as pasture
: 21. In discrediting Millstone as the source of the excessive strontium-90 levels in the goat milk sampled at 120 Dayton Road, Dominion and the NRC have engaged in fraud, deceit and cover-up for the purpose of justifying license extension.
 
: 22. The Coalition believes that Millstone is the source of the excessively high levels of strontium-90 found in the goat milk at 120 Dayton Road and that such evidence strongly suggests that Millstone is violating its NRC license during routine operations.
livestock around the world.
: 23. Strontium-90 is a deadly carcinogen which is readily ingested by the human body; it causes bone cancer and leukemia, attacks the immune
: 17. Dominion did not support its novel scientific theorizing - "that the
 
goats sometimes begin to nibble the roots of the pasture grass" - with any
 
studies or scientific papers, let alone photographs of the 120 Dayton Road
 
pasture or the goats during their grazing.
: 18. Dominion's second statement is even more revealing:
Along with the grass roots, the goats may also ingest some soil that contains Sr-90 left in the environment from atmospheric nuclear


testing. 19. This statement is scientifically unsound because fallout from atmospheric nuclear testing has decayed to levels far below those
2See article in The New London Day, Dominion Repairs Metal Connectors During Refueling Outage at Unit 3" (October 22, 2005)
 
Featured in Region Dominion Repairs Metal Connectors During Refueling Outage At Unit 3 By PATRICIA DADDONA Day Staff Writer, Waterford Published on 10/22/2005 Waterford Dominion Nuclear Connecticut is repairing welds that connect pipes and a nozzle in equipment used to maintain pressure in the Unit 3 reactor at Millstone Power Station.
measured in the goat milk, nor did Dominion identify any other location in
The reactor is closed for refueling.
 
On Tuesday, Dominion workers reported the discovery of dents in the metal welds to the Nuclear Regulatory Commission and set about repairing them, Dominion spokesman Pete Hyde said.
the state in which similarly high levels of strontium-90 attributable to
The problem was found during routine inspections during the outage and presents no safety hazard or performance problem for the reactor, according to Hyde and NRC spokesman Neil Sheehan.
 
The NRC required the company to ask permission to make the repairs because the corrosion-resistant material being used differs from the original metal, known as Alloy 600, and is located in a key mechanical system, Sheehan and Hyde said.
atmospheric weapons testing have been measured.
: 20. Rather than dismiss Dominion's unsound scientific theorizing as the
 
bogus concoction that it is, the NRC staff "came to the same conclusion" as
 
Dominion and discredited Millstone as a source of the environmental
 
poisoning.
: 21. In discrediting Millstone as the source of the excessive strontium-90
 
levels in the goat milk sampled at 120 Dayton Road, Dominion and the
 
NRC have engaged in fraud, deceit and cover-up for the purpose of
 
justifying license extension.
: 22. The Coalition believes that Millstone is the source of the excessively
 
high levels of strontium-90 found in the goat milk at 120 Dayton Road and
 
that such evidence strongly suggests that Millstone is violating its NRC
 
license during routine operations.
: 23. Strontium-90 is a deadly carcinogen which is readily ingested by the
 
human body; it causes bone cancer and leukemia, attacks the immune 2 See article in The New London Day, "Dominion Repairs Metal Connectors During Refueling Outage at Unit 3" (October 22, 2005)
Featured in Region Dominion Repairs Metal Connectors During Refueling Outage At Unit 3
 
By PATRICIA DADDONA
 
Day Staff Writer, Waterford
 
Published on 10/22/2005 Waterford - Dominion Nuclear Connecticut is repairing welds that connect pipes and a nozzle in equipment used to maintain pressure in the Unit 3 reactor at Millstone Power Station.The reactor is closed for refueling.
 
On Tuesday, Dominion workers reported the discovery of dents in the metal welds to the Nuclear Regulatory Commission and set about repairing them, Dominion
 
spokesman Pete Hyde said.
The problem was found during routine ins pections during the outage and presents no safety hazard or performance problem for the reactor, according to Hyde and NRC
 
spokesman Neil Sheehan.
The NRC required the company to ask permission to make the repairs because the corrosion-resistant material bei ng used differs from the original metal, known as "Alloy 600," and is located in a key mechanical system, Sheehan and Hyde said.
5 system and is responsible for a host of other life-threatening diseases.
5 system and is responsible for a host of other life-threatening diseases.
Bone cancer and leukemia have become endemic in the community
Bone cancer and leukemia have become endemic in the community surrounding Millstone since Millstone commenced operation in 1970.
 
: 24. The Coalition believes that Dominion and the NRC staffs duplicitous and fraudulent conduct regarding Dominions samplings of strontium-90 in goat milk requires a full reopening the these proceedings.
surrounding Millstone since Millstone commenced operation in 1970.
: 25. Recently, it has been revealed that Dominion and the NRC staff have otherwise engaged in fraud, deceit and cover-up, for example, when they repeatedly misled the public about dangerous emissions of radionuclides during the Class II emergency declared at Millstone Unit 3 in March 2005.
: 24. The Coalition believes that Dominion and the NRC staff's duplicitous
: 26. Recent disclosures regarding the presence of tin whiskers in circuit boards at Millstone Unit 3, welding defects,2 issues regarding equipment
 
and fraudulent conduct regarding Dominion's samplings of strontium-90 in


goat milk requires a full reopening the these proceedings.
On Friday, the NRC approved that request and is having an independent consultant review the repair plan, Sheehan said.
: 25. Recently, it has been revealed that Dominion and the NRC staff
In pressurized nuclear reactors, the dominant type now in use in the United States, steam that turns turbines to generate electricity courses through a generator outside the reactor core. A piece of equipment known as a pressurizer keeps highly pressurized water flowing through the reactor to prevent it from boiling, Sheehan said.
 
have otherwise engaged in fraud, deceit and cover-up, for example, when
 
they repeatedly misled the public about dangerous emissions of
 
radionuclides during the Class II emergency declared at Millstone Unit 3 in
 
March 2005.
: 26. Recent disclosures regarding the presence of tin whiskers in circuit
 
boards at Millstone Unit 3, welding defects, 2 issues regarding equipment On Friday, the NRC approved that reques t and is having an independent consultant review the repair plan, Sheehan said.
In pressurized nuclear reactors, the domi nant type now in use in the United States, steam that turns turbines to generate elec tricity courses through a generator outside the reactor core. A piece of equipment known as a pressurizer keeps highly pressurized water flowing through the reactor to prevent it from boiling, Sheehan said.
Water enters the pressurizer through two spray heads in a nozzle, he said.
Water enters the pressurizer through two spray heads in a nozzle, he said.
 
The dents in the three-quarter-inch-thick welds are two-tenths of an inch deep and do not penetrate the metal, but need to be repaired to prevent further damage, Hyde said.
The dents in the three-quarter-inch-thick we lds are two-tenths of an inch deep and do not penetrate the metal, but need to be repair ed to prevent further damage, Hyde said.
Hyde said the defect may have resulted from the way the pipes and nozzle were first fused together sometime between 1977, when the nozzle was made, and 1986, when the plant began operating. The problem is a common one in the industry that reactor owners were advised last year to be on the lookout for, Sheehan said.
Hyde said the defect may have resulted from the way the pipes and nozzle were first fused together - sometime between 1977, when the nozzle was made, and 1986, when the plant began operating. The problem is a common one in the industry that reactor owners were advised last year to be on the lookout for, Sheehan said.
The company's recent decision to replace the entire reactor vessel head at Unit 2 was based on similar flaws in other types of equipment, Hyde said.
The company's recent decision to replace the entire reactor vessel head at Unit 2 was based on similar flaws in other types of equipment, Hyde said.
During an outage, Dominion inspects all welds connecting key pieces of equipment in the reactors using ultrasound and radiography, Hyde said.
During an outage, Dominion inspects all welds connecting key pieces of equipment in the reactors using ultrasound and radiography, Hyde said.
The flaws are not a result of metal fatigue, Hyde and Sheehan said, and should not affect the company's plans to renew the licenses of both Unit 2 and Unit 3.
The flaws are not a result of metal fatigue, Hyde and Sheehan said, and should not affect the company's plans to renew the licenses of both Unit 2 and Unit 3. will be good through the life of the proposed new license for Unit 3, which would extend to 2045, they said.
will be good through the life of the proposed new license for Unit 3, which
 
would extend to 2045, they said.
NRC experts have recommended re-licensing, which could be authorized in the summer.  
NRC experts have recommended re-licensing, which could be authorized in the summer.  
© The Day Publishing Co., 2005 For home delivery, please call 1-866-846-9099 6
integrity as identified by the Advisory Committee on Reactor Safeguards


© The Day Publishing Co., 2005 For home delivery, please call 1-866-846-9099
goat milk from the same locations as Dominion and has obtained similar analysis results. CTDEP has not identified any evidence of the Sr-90 in the goats milk as being from Millstone. The NRC inspected the monitoring programs at Millstone and reviewed Dominions annual reports and came to the same conclusion.
 
Based on the sources of Sr-90, measurements in the environment, and health effects studies (see Section 4.7 of the SEIS), the [NRC] staff concludes that the comments [of the Connecticut Coalition Against Millstone and Dr. Sternglass] provided no new and significant information on Sr-90 releases from Millstone and their impact on human health; therefore, the comments were not evaluated further. There was no revision to the text of the SEIS [Supplemental Environmental Impact Statement]..
6 integrity as identified by the Advisory Committee on Reactor Safeguards goat milk from the same locations as Dominion and has obtained similar analysis results. CTDEP has not identified any evidenc e of the Sr-90 in the goat's milk as being from Millstone. The NRC inspected the m onitoring programs at Millstone and reviewed Dominion's annual reports and came to the same conclusion.
Based on the sources of Sr-90, measurements in the environment, and health effects studies (see Section 4.7 of the SEI S), the [NRC] staff concludes that the comments [of the Connecticut Coalition Agai nst Millstone and Dr. Sternglass] provided no new and significant information on Sr-90 re leases from Millstone and their impact on human health; therefore, the comments we re not evaluated further. There was norevision to the text of the SEIS [Suppl emental Environmental Impact Statement]..
3 the excessively high levels of strontium-90 found in the goat milk at 120 Dayton Road in Waterford are not traceable to Millstone.
3 the excessively high levels of strontium-90 found in the goat milk at 120 Dayton Road in Waterford are not traceable to Millstone.
: 8. Supplement 22 contains this statement:
: 8. Supplement 22 contains this statement:
Dominion believes that the goats sometimes begin to nibble the roots of the pasture grass. Along with the grass roots, the goats may also
Dominion believes that the goats sometimes begin to nibble the roots of the pasture grass. Along with the grass roots, the goats may also ingest some soil that contains Sr-90 left in the environment from atmospheric nuclear testing.
 
: 9. This statement is not supported by any independent evidence by Dominion of the conditions of the goat pasture at 120 Dayton Road nor the customs of goats feeding at such location.
ingest some soil that contains Sr-90 left in the environment from
: 10. The statement Dominion believes that the goats sometimes begin to nibble the roots of the pasture grass is particularly telling.
 
: 11. Such statement evidences a complete lack of knowledge about the grazing practices of goats generally and the grazing habits of the goats at 120 Dayton Road.
atmospheric nuclear testing.
: 12. The 20-acre goat habitat at 120 Dayton Road is lush with pasture vegetation and forested area; observations made by the Coalition during the Fall of 2005 confirmed that the pasture grass was lush and was not eaten to the roots.
: 9. This statement is not supported by any independent evidence by Dominion of the conditions of the goat pasture at 120 Dayton Road nor the
: 13. The Coalition was informed by the goats owner, Allen T. Moran, that such a statement of his goats eating habits was ludicrous and that his goats did not graze pasture grass down to the roots.
 
: 14. Indeed, in common with other goats, the 120 Dayton Road goats clipped the top parts of pasture grasses and moved on to other pasture grasses, tree bark and leaves. See photograph of Katie the Goat, formerly
customs of goats feeding at such location.
: 10. The statement "Dominion believes that the goats sometimes begin
 
to nibble the roots of the pasture grass" is particularly telling.
: 11. Such statement evidences a complete lack of knowledge about the
 
grazing practices of goats generally and the grazing habits of the goats at
 
120 Dayton Road.
: 12. The 20-acre goat habitat at 120 Dayton Road is lush with pasture
 
vegetation and forested area; observations made by the Coalition during
 
the Fall of 2005 confirmed that the pasture grass was lush and was not
 
eaten to the roots.
: 13. The Coalition was informed by the goats' owner, Allen T. Moran, that such a statement of his goats' eating habits was ludicrous and that his
 
goats did not graze pasture grass down to the roots.
: 14. Indeed, in common with other goats, the 120 Dayton Road goats
 
clipped the top parts of pasture grasses and moved on to other pasture
 
grasses, tree bark and leaves. See photograph of Katie the Goat, formerly 7 and left uncorrected, concealment of planned refurbishments and power upgrading during the relicensing proceedings and the reliance upon
 
falsification of environmental impacts - including the virtual extinction of the
 
Niantic winter flounder stock - require that this motion be granted so that
 
these and other issues which have arisen since the NRC dismissed the
 
Coalition's intervention may be appropriated addressed.
CONNECTICUT COALITION AGAINST MILLSTONE
_________________________
Nancy Burton
 
147 Cross Highway
 
Redding Ridge CT 06876
 
Tel. 203-938-3952 Exhibit  A CONNECTICUT COALITION AGAINST MILLSTONE www.mothballmillstone.org March 2, 2005 Chief Rules and Directives Branch
 
Division of Administrative Services
 
Office of Administration
 
Mailstop T-6D59
 
U.S. Nuclear Regulatory Commission


Washington DC 20555-0001 Re: Millstone Nuclear Power Station/Draft Environmental Impact Statement
7 and left uncorrected, concealment of planned refurbishments and power upgrading during the relicensing proceedings and the reliance upon falsification of environmental impacts - including the virtual extinction of the Niantic winter flounder stock - require that this motion be granted so that these and other issues which have arisen since the NRC dismissed the Coalitions intervention may be appropriated addressed.
CONNECTICUT COALITION AGAINST MILLSTONE Nancy Burton 147 Cross Highway Redding Ridge CT 06876 Tel. 203-938-3952 Exhibit A CONNECTICUT COALITION AGAINST MILLSTONE www.mothballmillstone.org March 2, 2005 Chief Rules and Directives Branch Division of Administrative Services Office of Administration Mailstop T-6D59 U.S. Nuclear Regulatory Commission Washington DC 20555-0001 Re: Millstone Nuclear Power Station/Draft Environmental Impact Statement


==Dear Sirs:==
==Dear Sirs:==
The Connecticut Coalition Against Millstone submits herewith preliminary comments concerning the draft Environmental Impact Statement (EIS) which the NRC staff has prepared in support of relicensing


The Connecticut Coalition Against Millstone submits herewith preliminary comments concerning the draft Environmental Impact
8 of Millstone nuclear reactors Units 2 and 3 to extend their terms to the years 2035 and 2045 respectively. These comments will be supplemented with a separate filing with attachments.
 
The Coalition strongly opposes Millstone relicensing.
Statement (EIS) which the NRC staff has prepared in support of relicensing 8 of Millstone nuclear reactors Units 2 and 3 to extend their terms to the years 2035 and 2045 respectively. These comments will be supplemented
The data available to the U.S. Nuclear Regulatory Commission in its environmental review establishes a clear link between Millstones radiological and chemical discharges to the environment and major health effects in the surrounding community.
 
with a separate filing with attachments.
The Coalition strongly opposes Millstone relicensing.  
 
The data available to the U.S. Nuclear Regulatory Commission in its environmental review establishes a clear link between Millstone's radiological and chemical discharges to the environment and major health effects in the surrounding community.
The data reviewed by the NRC is alarming.
The data reviewed by the NRC is alarming.
The data strongly suggests - and indeed does so almost to a certainty -
The data strongly suggests - and indeed does so almost to a certainty -
that Dominion Nuclear Connecticut, Inc. is operating and will continue to
that Dominion Nuclear Connecticut, Inc. is operating and will continue to operate the Millstone Nuclear Power Station in violation of NRC regulations requiring limiting doses to the public of 15 millirems per year to any organ.
 
Put another way, the data strongly suggests that Dominions Millstone daily operations exceed the permissible dose of radiation to the public and will continue to do so during the proposed relicensing period.
operate the Millstone Nuclear Power Station in violation of NRC regulations
Based on Dominions own reporting of radiation sampling in the environment, the Coalition believes the available data reviewed by the NRC for the years 2001, 2002 and 2003 prove that routine operations of Millstone are in violation of federal health standards and are illegal.
 
By its own admission, the NRC confined its review of Millstone radiological releases, for Environmental Impact Statement purposes, to the years 2001, 2002 and 2003. (Radioactive Waste Management Systems and Effluent Control Systems 2.1.4, DEIS at 2-9) (No explanation is provided in the DEIS as to why the years 1970-2000 and the year 2004 -
requiring limiting doses to the public of 15 millirems per year to any organ.
Put another way, the data strongly suggests that Dominion's Millstone daily operations exceed the permissible dose of radiation to the public and
 
will continue to do so during the proposed relicensing period.
Based on Dominion's own reporting of radiation sampling in the environment, the Coalition believes the available data reviewed by the
 
NRC for the years 2001, 2002 and 2003 prove that routine operations of
 
Millstone are in violation of federal health standards and are illegal.
By its own admission, the NRC confined its review of Millstone radiological releases, for Environmental Impact Statement purposes, to the
 
years 2001, 2002 and 2003. ("Radioactive Waste Management Systems
 
and Effluent Control Systems 2.1.4," DEIS at 2-9) (No explanation is
 
provided in the DEIS as to why the years 1970-2000 and the year 2004 -
 
with the most current data - were excluded from review.)
with the most current data - were excluded from review.)
The Annual Radiological Environmental Operating Report submitted by Dominion Nuclear Connecticut, Inc. to the NRC for the year 2001 - one of
The Annual Radiological Environmental Operating Report submitted by Dominion Nuclear Connecticut, Inc. to the NRC for the year 2001 - one of the few reports the NRC specifically identified that it had reviewed in its EIS procedure - contains the following information:
 
the few reports the NRC specifically identified that it had reviewed in its EIS
 
procedure - contains the following information:
9 On September 19, 2001, a concentration of strontium-90 of 55.5 picoCuries per liter (pCi/l) was measured in a sample of goat milk
 
taken from a location 5.5 miles north-northeast of the Millstone
 
Nuclear Power Station. The uncertainty factor reported was plus or
 
minus 5.3 pCi/L.
A concentration of 55.5 picoCuries per liter is an "extremely large concentration, close to twice the highest concentration measured in
 
Connecticut pooled milk at the height of nuclear weapons testing in 1963 of
 
23 pCi/L," according to a report dated March 1, 2005 by Dr. Ernest J.
 
Sternglass, Professor Emeritus of Radiological Physics at the University of
 
Pittsburgh School of Medicine and an acknowledged pioneer in the field of
 
the effects of low-level ionizing radiation on living cells. The report appears
 
annexed hereto as Exhibit A.
Moreover, according to Dr. Sternglass, since the measured value is ten times as large as the measurement uncertainty, "this is an extremely
 
significant result, with an astronomically small chance that it is a statistical
 
fluctuation."
Put into perspective, an individual drinking two eight-ounce glasses of the strontium-90-contaminated goat milk on a daily basis would receive a
 
maximum permissible dose of radiation - under NRC guidelines - within 30
 
days.      This assumes no other radiological contamination of the milk. However, strontium-90 never appears alone in the environment. When the
 
radiological effects of identified concentrations of radionuclides also
 
reported in the same goat milk sample - cesium-134, cesium-137, iodine-
 
131, barium-140 and others - are considered, the effect is even more
 
damaging and far less milk would need to be consumed over fewer days
 
before the maximum permissible radiation doses established by federal law
 
would be exceeded, according to Dr. Sternglass.
    "The dose to bone or the bone marrow when other fission products are present is some 5 to 6 times greater than from strontium-90 alone, and the
 
Dominion reports for goat milk show significant concentrations of other
 
fission products, such as cesium-137, in significant concentrations," Dr.


9 On September 19, 2001, a concentration of strontium-90 of 55.5 picoCuries per liter (pCi/l) was measured in a sample of goat milk taken from a location 5.5 miles north-northeast of the Millstone Nuclear Power Station. The uncertainty factor reported was plus or minus 5.3 pCi/L.
A concentration of 55.5 picoCuries per liter is an extremely large concentration, close to twice the highest concentration measured in Connecticut pooled milk at the height of nuclear weapons testing in 1963 of 23 pCi/L, according to a report dated March 1, 2005 by Dr. Ernest J.
Sternglass, Professor Emeritus of Radiological Physics at the University of Pittsburgh School of Medicine and an acknowledged pioneer in the field of the effects of low-level ionizing radiation on living cells. The report appears annexed hereto as Exhibit A.
Moreover, according to Dr. Sternglass, since the measured value is ten times as large as the measurement uncertainty, this is an extremely significant result, with an astronomically small chance that it is a statistical fluctuation.
Put into perspective, an individual drinking two eight-ounce glasses of the strontium-90-contaminated goat milk on a daily basis would receive a maximum permissible dose of radiation - under NRC guidelines - within 30 days.
This assumes no other radiological contamination of the milk. However, strontium-90 never appears alone in the environment. When the radiological effects of identified concentrations of radionuclides also reported in the same goat milk sample - cesium-134, cesium-137, iodine-131, barium-140 and others - are considered, the effect is even more damaging and far less milk would need to be consumed over fewer days before the maximum permissible radiation doses established by federal law would be exceeded, according to Dr. Sternglass.
The dose to bone or the bone marrow when other fission products are present is some 5 to 6 times greater than from strontium-90 alone, and the Dominion reports for goat milk show significant concentrations of other fission products, such as cesium-137, in significant concentrations, Dr.
Sternglass states in his report, Exhibit A.
Sternglass states in his report, Exhibit A.
10    "Using the NRC NUREG 1.109 dose factor of 0.0172 mrem/pCi/l
[millirem] from Table A-5, a mere 2.4 pCi/l daily intake results in the


maximum permissible dose to any organ of 15 mrem per year set by NRC
10 Using the NRC NUREG 1.109 dose factor of 0.0172 mrem/pCi/l
 
[millirem] from Table A-5, a mere 2.4 pCi/l daily intake results in the maximum permissible dose to any organ of 15 mrem per year set by NRC guidelines, 23 times the amount measured in a single liter, according to the Sternglass report.
guidelines, 23 times the amount measured in a single liter," according to
Attached to Dr. Sternglass report are measurements, reported to the NRC by Dominion, of strontium-90 in goat milk sampled at locations within 5 miles of Millstone during the years 2001, 2002 and 2003.
 
the Sternglass report.
Attached to Dr. Sternglass' report are measurements, reported to the NRC by Dominion, of strontium-90 in goat milk sampled at locations within
 
5 miles of Millstone during the years 2001, 2002 and 2003.
The reported samples of measurements show concentrations of 13 to 14 pCi/l on other days during the three-year period. According to Dr.
The reported samples of measurements show concentrations of 13 to 14 pCi/l on other days during the three-year period. According to Dr.
 
Sternglass, these are also significantly high readings since strontium-90, concentrating in milk due to atmospheric nuclear weapons testing which ended in 1980, has declined to less than 1 pCi/l in areas far removed from any nuclear reactors.
Sternglass, these are also significantly high readings since strontium-90, concentrating in milk due to atmospheric nuclear weapons testing which
Since the samples are collected by Dominion only twice a month, it is unknown whether actual concentrations on other days exceeded the levels reported.
 
In 1997, Millstones previous owner, Northeast Utilities, persuaded the NRC to permit it to discontinue sampling for strontium-90 in its air filter monitoring program. As the 1997 Annual Radiological Environmental Operating report states:
ended in 1980, has declined to less than 1 pCi/l in areas far removed from
 
any nuclear reactors.
Since the samples are collected by Dominion only twice a month, it is unknown whether actual concentrations on other days exceeded the levels
 
reported.
In 1997, Millstone's previous owner, Northeast Utilities, persuaded the NRC to permit it to discontinue sampling for strontium-90 in its air filter
 
monitoring program. As the 1997 Annual Radiological Environmental
 
Operating report states:
Section 4.5 Air Particulate Strontium (Table 5)
Section 4.5 Air Particulate Strontium (Table 5)
Table 5 in past years was used to report the measurement of Sr-89
Table 5 in past years was used to report the measurement of Sr-89 and Sr-90 in quarterly composited air particulate filters. These measurements are not required by the Radiological Effluent Monitoring Manual (REMM) and have been discontinued. Previous data has shown the lack of detectable station activity in this media.
 
This fact, and the fact that milk samples are a much more sensitive indicator of fission product existence in the environment, prompted the decision for discontinuation. In the event of widespread plant related contamination or special events such as the Chernobyl incident, these measurements may be made.
and Sr-90 in quarterly composited air particulate filters. These
 
measurements are not required by the Radiological Effluent
 
Monitoring Manual (REMM) and have been discontinued. Previous
 
data has shown the lack of detectable station activity in this media.
 
This fact, and the fact that milk samples are a much more sensitive
 
indicator of fission product existence in the environment, prompted
 
the decision for discontinuation. In the event of widespread plant
 
related contamination or special events such as the Chernobyl
 
incident, these measurements may be made.
Strontium-90 is among the most deadly byproducts of nuclear fission.
Strontium-90 is among the most deadly byproducts of nuclear fission.
Once ingested, its highly-energetic electrons damage and cause mutations 11 in nearby cells. Exposure to low levels of strontium-90 and other bone-seeking radioactive chemicals routinely released by nuclear power plants
Once ingested, its highly-energetic electrons damage and cause mutations
 
does not merely increase the risk of bone cancer or leukemia, but it
 
weakens the immune defenses provided by the white cells of the blood that


originate in the bone marrow. See Declaration of Ernest J. Sternglass (August 8, 2004) submitted to the NRC in In the Matter of Dominion Nuclear Connecticut, Inc
11 in nearby cells. Exposure to low levels of strontium-90 and other bone-seeking radioactive chemicals routinely released by nuclear power plants does not merely increase the risk of bone cancer or leukemia, but it weakens the immune defenses provided by the white cells of the blood that originate in the bone marrow. See Declaration of Ernest J. Sternglass (August 8, 2004) submitted to the NRC in In the Matter of Dominion Nuclear Connecticut, Inc., Docket No. 50-336-LR, 50-423-LR, ASLBP No.
., Docket No. 50-336-LR, 50-423-LR, ASLBP No.
04-824-01-LR, annexed hereto as Exhibit B.
04-824-01-LR, annexed hereto as Exhibit B.
    "As recently shown in the 2003 report by the European Committee on Radiation Risk, numerous epidemiological and laboratory studies have
As recently shown in the 2003 report by the European Committee on Radiation Risk, numerous epidemiological and laboratory studies have shown that the risk of cancer and other diseases produced by local internal doses to critical organs from fission products that are inhaled or ingested have been underestimated by extrapolation from high external doses by factors of hundreds to thousand of times, according to the Sternglass report, Exhibit A.
 
This explains why it now appears that releases from nuclear plants, often acting synergistically with other environmental pollutants, are a major neglected reason for the recent rise of illness and deaths both among newborns and the elderly observed in the U.S. in the last two decades, as also discussed in the ECRR report, according to Dr. Sternglass. Id.
shown that the risk of cancer and other diseases produced by local internal
For these reasons, it is my professional opinion that the Millstone Nuclear Plant should not be relicensed, Dr. Sternglass stated. In his report, Exhibit A.
The Coalition has previously submitted, in these and the related Atomic Safety and Licensing Board proceedings, documentation from Joseph Mangano and Michael Steinberg which links the Millstone radiological effluent releases - including strontium to significant negative health consequences in the community. These documents are incorporated by reference herein.
CONNECTICUT COALITION AGAINST MILLSTONE Nancy Burton


doses to critical organs from fission products that are inhaled or ingested
12 Please address correspondence to:
 
Nancy Burton 147 Cross Highway Redding Ridge CT 06876 Tel. 203-938-3952 Exhibit B CONNECTICUT COALITION AGAINST MILLSTONE www.mothballmillstone.org March 16, 2005 Chief Rules and Directives Branch Division of Administrative Services Office of Administration Mailstop T-6D59 U.S. Nuclear Regulatory Commission Washington DC 20555-0001 Re: Millstone Nuclear Power Station/Draft Environmental Impact Statement/Supplemental Comments
have been underestimated by extrapolation from high external doses by
 
factors of hundreds to thousand of times," according to the Sternglass
 
report, Exhibit A.
    "This explains why it now appears that releases from nuclear plants, often acting synergistically with other environmental pollutants, are a major
 
neglected reason for the recent rise of illness and deaths both among
 
newborns and the elderly observed in the U.S. in the last two decades, as
 
also discussed in the ECRR report," according to Dr. Sternglass. Id.
 
    "For these reasons, it is my professional opinion that the Millstone
 
Nuclear Plant should not be relicensed," Dr. Sternglass stated. In his
 
report, Exhibit A.
The Coalition has previously submitted, in these and the related Atomic Safety and Licensing Board proceedings, documentation from Joseph
 
Mangano and Michael Steinberg which links the Millstone radiological
 
effluent releases - including strontium to significant negative health
 
consequences in the community. These documents are incorporated by
 
reference herein.
CONNECTICUT COALITION AGAINST MILLSTONE Nancy Burton 12 Please address correspondence to:
Nancy Burton
 
147 Cross Highway
 
Redding Ridge CT 06876
 
Tel. 203-938-3952 Exhibit B CONNECTICUT COALITION AGAINST MILLSTONE www.mothballmillstone.org March 16, 2005 Chief Rules and Directives Branch
 
Division of Administrative Services
 
Office of Administration
 
Mailstop T-6D59
 
U.S. Nuclear Regulatory Commission
 
Washington DC 20555-0001 Re: Millstone Nuclear Power Station/Draft Environmental Impact Statement/Supplemental Comments


==Dear Sirs:==
==Dear Sirs:==
The NRC is committed to protecting the public health and safety.
- Statement of NRCs Organizational Values The Connecticut Coalition Against Millstone submits herewith its supplemental comments concerning the draft Environmental Impact Statement (SEIS) which the NRC staff has prepared in support of relicensing of Millstone nuclear reactors Units 2 and 3 to extend their terms to the years 2035 and 2045 respectively. These comments were preceded by preliminary comments submitted on March 2, 2005.


The NRC is committed to protecting the public health and safety.- Statement of NRC's Organizational Values The Connecticut Coalition Against Millstone submits herewith its supplemental comments concerning the draft Environmental Impact
3 See NRCs Principles of Good Regulation, attached.
 
13 Unfortunately, our review of the SEIS and our interaction with NRCs SEIS staff concerning its evaluation of the operational history of the Millstone Nuclear Power Station lead us to conclude that in this instance the NRC has entirely departed from its self-defined organizational values (see above).
Statement (SEIS) which the NRC staff has prepared in support of
Indeed, we are driven to conclude that, in this instance, the NRC staff is not even remotely concerned about the effects of Millstone releases of radiation to the public health and safety and to the environment.
 
Nor has the NRC staff adhered to the Principles of Good Regulation heralded on the NRCs website.3 The standard defining evaluation criteria for the NRC staffs environmental review is defined in 10 CFR 51.95( c )(4) as follows:
relicensing of Millstone nuclear reactors Units 2 and 3 to extend their terms
... whether or not the adverse environmental impacts of license renewal are so great that preserving the option of license renewal for energy planning decisionmakers would be unreasonable.
 
The NRC staff has preliminarily concluded in its draft Environmental Impact Statement that the adverse environmental impacts of license renewal are not so great that preserving the option of license renewal for energy planning decisionmakers would be unreasonable.
to the years 2035 and 2045 respectively. These comments were preceded
This conclusion is clearly erroneous and based on incorrect and incomplete information, industry bias and flawed analysis. It also manifests a profound disregard for the health and welfare of the community.
 
This conclusion ignores substantial available evidence that Millstone operations have had and will continue to have devastating health impacts on a wide scale and will continue to cause irreversible environmental damage on a wide scale.
by preliminary comments submitted on March 2, 2005.
3 See NRC's "Principles of Good Regulation," attached.
13     Unfortunately, our review of the SEIS and our interaction with NRC's SEIS staff concerning its evaluation of the operational history of the Millstone Nuclear Power Station lead us to conclude that in this instancethe NRC has entirely departed from its self-defined organizational
 
values (see above).
Indeed, we are driven to conclude that, in this instance, the NRC staff is not even remotely concerned about the effects of Millstonereleases of radiation to the public health and safety and to the
 
environment.
Nor has the NRC staff adhered to the "Principles of Good Regulation" heralded on the NRC's website.
3     The standard defining evaluation criteria for the NRC staff's
 
environmental review is defined in 10 CFR 51.95( c )(4) as follows:. . . whether or not the adverse environmental impacts of license renewal are so great that preserving the option of license renewal for
 
energy planning decisionmakers would be unreasonable.
The NRC staff has preliminarily concluded in its draft Environmental Impact Statement that the adverse environmental impacts of license
 
renewal are not so great that preserving the option of license renewal for
 
energy planning decisionmakers would be unreasonable.
This conclusion is clearly erroneous and based on incorrect and incomplete information, industry bias and flawed analysis.
It also manifests a profound disregard for the health and welfare of the community.
This conclusion ignores substantial available evidence that Millstone operations have had and will continue to have devastating
 
health impacts on a wide scale and will continue to cause irreversible


environmental damage on a wide scale.
4 For this reason, each of the environmental issues required for consideration in the Environmental Impact Statement process should be considered to be a Category 2 issue, subject to site-specific consideration.
4 For this reason, each of the environmental issues required for consideration in the Environmental Impact Statement process should be considered to be a Category 2 issue, subject to site-specific consideration.
5 See Millstone & Me: Sex, Lies and Radiation in Southeastern Connecticut by Michael Steinberg (Black Rain Press 1998),   6 See Testimony of Ernest J. Sterngl ass, Ph.D., presented to a Congressional Committee investigating nuclear power issues.
5 See Millstone & Me: Sex, Lies and Radiation in Southeastern Connecticut by Michael Steinberg (Black Rain Press 1998),
7 See, e.g.,
6 See Testimony of Ernest J. Sternglass, Ph.D., presented to a Congressional Committee investigating nuclear power issues.
www.mothballmillstone.org , experience of Charles D. Douton, Jr.
7 See, e.g., www.mothballmillstone.org, experience of Charles D. Douton, Jr.
8 See, James Plumb v. Northeast Nuclear Energy Company (Superior Court, Judicial District of New London); Clarence O. Reynolds
8 See, James Plumb v. Northeast Nuclear Energy Company (Superior Court, Judicial District of New London); Clarence O. Reynolds v. Department of Public Utility Control (Superior Court, Judicial District of New Britain); John DelCore v. Northeast Nuclear Energy Co., U.S. District Court, District of Connecticut.
: v. Department of Public Utility Control (Superior Court, Judicial District of New Br itain); John DelCore v. Northeast Nuclear Energy Co., U.S. District Court, District of Connecticut.
14 Our detailed comments follow. Following the Introduction, our comments appear in sequence conforming to the appearance of topics in the draft Environmental Impact Statement (SEIS). Our comments today address the SEIS up to 5.0 (Environmental Impacts of Postulated Accidents). Additional comments addressed to Section 5.0 et seq. will be provided subsequently hereto.
14     Our detailed comments follow. Following the Introduction, our comments appear in sequence conforming to the appearance of topics in
Introduction The U.S. Nuclear Regulatory Commission (NRC) is considering relicensing of the Millsone Nuclear Power Station, Units 2 and 3 for additional 20-year terms. Without relicensing, Unit 2s operating license would expire in the year 2015 and Unit 3s operating license would expire in the year 2025.
 
Together with Unit 1, these reactors have had an operational history since 1970 which is among the ugliest in the annals of the nuclear industry.4 Millstones radioactive releases have been among the highest of all nuclear reactors in the United States.5 Millstones routine radiation releases were linked early-on with cancers and other diseases.6 Millstones treatment of its workforce by way of exposing it to unnecessary radiation levels7 and its treatment of nuclear whistleblowers by ostracism and retaliatory firings have made it notorious within the nuclear industry.8 While full-time inspectors from the NRC were onsite, Millstone lost two highly radioactive spent fuel rods. These irradiated rods contain plutonium and other fission elements which may be diverted to create dirty bombs. While Millstones environmental monitoring program was being monitored by the NRC and Connecticuts Department of Environmental Protection (DEP),
the draft Environmental Impact Statement (SEIS). Our comments today
 
address the SEIS up to 5.0 ("Environmental Impacts of Postulated
 
Accidents"). Additional comments addressed to Section 5.0 et seq. will be provided subsequently hereto.
Introduction The U.S. Nuclear Regulatory Commission ("NRC") is considering relicensing of the Millsone Nuclear Power Station, Units 2 and 3 for
 
additional 20-year terms. Without relicensing, Unit 2's operating license
 
would expire in the year 2015 and Unit 3's operating license would expire
 
in the year 2025.
Together with Unit 1, these reactors have had an operational history since 1970 which is among the ugliest in the annals of the nuclear
 
industry.4 Millstone's radioactive releases have been among the highest of all nuclear reactors in the United States.
5 Millstone's routine radiation releases were linked early-on with cancers and other diseases.
6 Millstone's treatment of its workforce by way of exposing it to unnecessary radiation
 
levels 7 and its treatment of nuclear whistleblowers by ostracism and retaliatory firings have made it notorious within the nuclear industry.
8 While full-time inspectors from the NRC were onsite, Millstone lost two highly
 
radioactive spent fuel rods. These irradiated rods contain plutonium and
 
other fission elements which may be diverted to create dirty bombs. While
 
Millstone's environmental monitoring program was being monitored by the
 
NRC and Connecticut's Department of Environmental Protection ("DEP"),
9 See "Owner of Connecticut Nuclear Plant Accepts a Record Fine" (The New York Times September 28, 1999), attached.
10 The Coalition attaches hereto the "Emer gency Authorization" issued on October 13, 2000 which "legalizes" violations of the expired NPDES permit and which ex-
 
Commissioner Rocque "transferred" to Do minion when it was a paper company without assets. Prior to issuing EAs for Millst one operations, Commissioner Rocque admitted in writing he lacked authority to issue em ergency authorizations on an emergency basis for unlimited durations. The EA attached hereto has been in effect on an emergency basis since 2000 premised on a "finding" that it was required to avert "an imminent threat to health or safety."The SEIS makes no reference to this EA.
15 Millstone's personnel brazenly falsified environmental monitoring reports to the NRC and DEP and sabotaged the sample-taking activities.
9    Connecticut's regulatory apparatus has failed to safeguard the public.
 
Millstone's five-year National Pollution Discharge Elimination System
 
("NPDES") permit expired on December 14, 1997 - eight years ago - and it
 
has not been renewed. Nevertheless, DEP has permitted Millstone to
 
operate under the 1992 permit in brazen violation of the letter and spirit of
 
the federal Clean Water Act. Former DEP Commissioner Arthur J. Rocque, Jr., routinely authorized "emergency authorizations" ("EAs") while
 
recognizing his lack of legal authority to do so.
10 These EAs - of indefinite duration permitting releases of toxic and carcinogenic substances without
 
enforceable limits - permit Millstone's owners and operators to do, inter alia , what Northeast Utilities pleaded guilty to doing wilfully and illegally when it pleaded guilty in the U.S. District Court in September 1999 to
 
committing environmental felonies at Millstone and paying a $10 million
 
fine. Clearly, the Clean Water Act prohibits major waivers of NPDES permit
 
conditions without notice to the public and a meaningful opportunity for
 
public input. Commissioner Rocque issued sequential EAs without notice to
 
the public and he did not provide an opportunity for public comment. To our
 
knowledge, Rocque's successor, DEP Commissioner Gina McCarthy, has
 
done nothing to bring the Millstone operations into compliance with the law.


9 See Owner of Connecticut Nuclear Plant Accepts a Record Fine (The New York Times September 28, 1999), attached.
10 The Coalition attaches hereto the Emergency Authorization issued on October 13, 2000 which legalizes violations of the expired NPDES permit and which ex-Commissioner Rocque transferred to Dominion when it was a paper company without assets. Prior to issuing EAs for Millstone operations, Commissioner Rocque admitted in writing he lacked authority to issue emergency authorizations on an emergency basis for unlimited durations. The EA attached hereto has been in effect on an emergency basis since 2000 premised on a finding that it was required to avert an imminent threat to health or safety.The SEIS makes no reference to this EA.
15 Millstones personnel brazenly falsified environmental monitoring reports to the NRC and DEP and sabotaged the sample-taking activities.9 Connecticuts regulatory apparatus has failed to safeguard the public.
Millstones five-year National Pollution Discharge Elimination System (NPDES) permit expired on December 14, 1997 - eight years ago - and it has not been renewed. Nevertheless, DEP has permitted Millstone to operate under the 1992 permit in brazen violation of the letter and spirit of the federal Clean Water Act. Former DEP Commissioner Arthur J. Rocque, Jr., routinely authorized emergency authorizations (EAs) while recognizing his lack of legal authority to do so.10 These EAs - of indefinite duration permitting releases of toxic and carcinogenic substances without enforceable limits - permit Millstones owners and operators to do, inter alia, what Northeast Utilities pleaded guilty to doing wilfully and illegally when it pleaded guilty in the U.S. District Court in September 1999 to committing environmental felonies at Millstone and paying a $10 million fine. Clearly, the Clean Water Act prohibits major waivers of NPDES permit conditions without notice to the public and a meaningful opportunity for public input. Commissioner Rocque issued sequential EAs without notice to the public and he did not provide an opportunity for public comment. To our knowledge, Rocques successor, DEP Commissioner Gina McCarthy, has done nothing to bring the Millstone operations into compliance with the law.
She has permitted the status quo to reign. Connecticut Attorney General Richard S. Blumenthal is complicit in the illegal Millstone activities. Mr.
She has permitted the status quo to reign. Connecticut Attorney General Richard S. Blumenthal is complicit in the illegal Millstone activities. Mr.
Blumenthal successfully suppressed the truth of Millstones illegal operations in litigation brought to require Millstone operations to comply with existing laws.
Regardless of whether Millstone has been technically out of compliance with the law during much or all of its 35-year operational life, its operations have systematically endangered the public health and safety.


Blumenthal successfully suppressed the truth of Millstone's illegal
11 Websters Dictionary defines misfeasance as the performance of a lawful action in an illegal or improper manner.
12 Refer to the Coalitions March 2, 2005 submission and attachments thereto.
13 Websters Dictionary defines malfeasance as wrongful conduct, especially by a public official.
16 Millstone operations are a clear and present danger to the public health, safety and welfare.
Although Millstones reactors have been operating since 1970, and thus have generated a 35-year history of operations and record of environmental impact, the NRC selected only a three-year period (2001, 2002 and 2003) to review to assess Millstone radiological emissions for purposes of its SEIS evaluation. Necessarily, the NRC staffs superficial and selective review deprived it of the opportunity to engage in a meaningful assessment of the environmental impacts of Millstones complete operating history to inform the evaluation necessary to evaluate the full scope of future effects during a potential period of license extension.
At the same time, the NRC staff virtually ignored the information available to it even in the limited area it selected for review: the years 2001-2003.11 The most glaring example we may provide you of this appears as the preliminary comment we provided to you on, together with the declaration of Ernest J. Sternglass, Ph.D.12 Dr. Sternglass evaluated Dominion Nuclear Connecticut, Inc.s reports of strontium-90 levels sampled in goat milk five miles from Millstone during 2001, 2002 and 2003. Although one sample measurement reported by Northeast Utilities in 2001 was at a level nearly twice the highest level of measured strntium-90 concentration in Connecticut milk during the height of the atmospheric nuclear weapons testing in the 1960s, this fact is not reported in the SEIS nor is it analyzed, nor are the other high strontium-90 measurements in goat milk sampled five miles downwind from Millstone analyzed.13 We perceive a determined lack of dedication by the NRC staff to genuinely understand the full scope of environmental - including human health - impacts of continued operations of Millstone. Documents which we


operations in litigation brought to require Millstone operations to comply
14 See Response of Richard L. Emch, Jr. to the Coalitions February 5, 2005 queries, Paragraph 7 (attached); Documents responsive to this request were presented to the NRC by the Coalition as attachments to the Affidavit of Cynthia M. Besade dated August 5, 2005.
 
15 See Transcript of January 11, 2005 public informational meeting sponsored by the NRCs SEIS staff at the Waterford CT Town Hall.
with existing laws.
Regardless of whether Millstone has been technically out of compliance with the law during much or all of its 35-year operational life, its operations
 
have systematically endangered the public health and safety.
11 Webster's Dictionary defines misfeasance as "the performance of a lawful action in an illegal or improper manner."
12 Refer to the Coalition's March 2, 2005 submission and attachments thereto.
13 Webster's Dictionary defines malfeasance as "wrongful conduct, especially by a public official."
16    Millstone operations are a clear and present danger to the publichealth, safety and welfare.
Although Millstone's reactors have been operating since 1970, and thus have generated a 35-year history of operations and record of
 
environmental impact, the NRC selected only a three-year period (2001, 2002 and 2003) to review to assess Millstone radiological emissions for
 
purposes of its SEIS evaluation. Necessarily, the NRC staff's superficial
 
and selective review deprived it of the opportunity to engage in a
 
meaningful assessment of the environmental impacts of Millstone's
 
complete operating history to inform the evaluation necessary to evaluate
 
the full scope of future effects during a potential period of license
 
extension.
At the same time, the NRC staff virtually ignored the information available to it even in the limited area it selected for review: the years 2001-
 
2003.11    The most glaring example we may provide you of this appears as the
 
preliminary comment we provided to you on, together with the declaration
 
of Ernest J. Sternglass, Ph.D.
12 Dr. Sternglass evaluated Dominion Nuclear Connecticut, Inc.'s reports of strontium-90 levels sampled in goat milk five
 
miles from Millstone during 2001, 2002 and 2003. Although one sample
 
measurement reported by Northeast Utilities in 2001 was at a level nearly
 
twice the highest level of measured strntium-90 concentration in
 
Connecticut milk during the height of the atmospheric nuclear weapons
 
testing in the 1960s, this fact is not reported in the SEIS nor is it analyzed, nor are the other high strontium-90 measurements in goat milk sampled
 
five miles downwind from Millstone analyzed.
13    We perceive a determined lack of dedication by the NRC staff to
 
genuinely understand the full scope of environmental  - including human
 
health - impacts of continued operations of Millstone. Documents which we 14 See Response of Richard L. Emch, Jr. to the Coalition's February 5, 2005 queries, Paragraph 7 (attached); Documents responsive to this request were presented to the
 
NRC by the Coalition as attachments to the Affidavit of Cynthia M. Besade dated August 5, 2005.
15 See Transcript of January 11, 2005 public informational meeting sponsored by the NRC's SEIS staff at the Waterford CT Town Hall.
16 The Coalition will address this issue in a subsequent filing.
16 The Coalition will address this issue in a subsequent filing.
17 Press clippings from the Hartford Courant, Norwich Bulletin and The New London Day are attached.
17 Press clippings from the Hartford Courant, Norwich Bulletin and The New London Day are attached.
18 See SEIS at 4.1.3.
18 See SEIS at 4.1.3.
17 provided to the NRC have apparently been destroyed.
17 provided to the NRC have apparently been destroyed.14 Comments made in relicensing proceedings attended by the SEIS staff and documents submitted in such proceedings were ignored or disregarded by the SEIS staff.15 We continue to be troubled by the fact that documents produced by the SEIS staff in response to our queries about the SEIS submitted to the SEIS staff on January 23, 2005 were withheld by the NRCs own Freedom of Information staff and have yet to be released.16 Similarly, we are astonished that the NRC staff most involved with the SEIS declined our invitation to attend the press conference we gave on the Niantic Bay shoreline 1.5 miles from Millstone on March 10, 2005. At our press conference, we introduced Zachary M. Hartley, a 7-year-old boy born with a rare cancer in his jawbone.17 During critical months of her pregnancy, Zacharys mother swam regularly and unknowingly in the nuclear mixing zone18 which is known locally as the Hole-in-the-Wall Beach. We invited the entire NRC to attend the press conference and address questions to our expert, Dr. Helen Caldicott, world-renowned pediatrician, co-founder of Physicians for Social Responsibility and a leading authority on the health effects of low-level ionizing radiation such as is routinely emitted by Millstone. Zacharys medical records were available for NRC review. Not a single representative of the NRC appeared, not even one of the resident inspectors assigned to Millstone.
14 Comments made in relicensing proceedings attended by the SEIS staff and documents
Dr. Caldicott linked young Zacharys rare jawbone cancer to Millstones radiological and toxic chemical emissions as being the likely causative agent. Dr. Caldicott acknowledged that, while there cannot be a 100-per-cent certainty that Millstone caused Zacharys medical condition, cesium-137 which Northeast Utilities found in a fish in the same nuclear mixing zone in 1997 - the year of Zacharys mothers pregnancy - and which contamination it admitted was discharged by Millstone, is known to be


submitted in such proceedings were ignored or disregarded by the SEIS
19 See Coalition letter to Connecticut General Assembly Public Health and Environment Committees dated March 4, 2005, attached.
18 associated with cancer, including cancer of the bone. We are transcribing Dr. Caldicotts comments and will provide the NRC with a copy as soon as the transcription is available.
In light of the facts which have come light regarding Zachary M. Hartley, the Coalition has requested that the Connecticut General Assemblys Public Health and Environment Committees convene a special public hearing to consider our request to close the Niantic shoreline beaches.19 We understand that the legislature may find it necessary, in order to adequately protect the public health and safety, to enact legislation to close Millstone forthwith. Governor M. Jodi Rell has referred our request to the Commissioner of Public Health; we are asking him to exercise his authority to close the Niantic beaches as a health hazard. We further anticipate that the Connecticut DEP will order that Millstone convert from its once-through cooling system to a closed cooling system, thereby virtually eliminating the discharge of radioactive and toxic chemical contaminants to the Niantic and Waterford shorelines. The SEIS does not address the prospect that Millstone will undergo a major refurbishment in the conversion from the once-through to a closed cooling system. This is a major omission in the SEIS.
We recognize that the events in question in Zacharys life arose in 1997, prior to Dominions takeover of Millstone in 2001. However, Zacharys sickness is a factor which must be considered in the operational history of Millstone. Under Dominion ownership, Millstone has continued to release the same radioactive and toxic chemical waste byproducts as NU before.
Indeed, Dominion is currently seeking permission from CTDEP to add new chemicals to the mixing zone and continue the routine discharge of others. Nowhere in the SEIS is it stated that the NRC staff reviewed Dominions application for renewal of the NPDES permit. Nowhere are these facts assessed in the SEIS.
The SEIS fails to meaningfully consider the routine environmental impacts of Millstones radiological releases, relying on the conclusion in the NRCs Generic Environmental Impact Statement that all the nations nuclear power plants release radiation within levels permitted under the NRCs regulations and therefore may be expected to continue to do so in


staff.15    We continue to be troubled by the fact that documents produced by the
20 GEIS 4.6.1.1.
 
19 the future. These conclusions do not apply to Millstone. See discussion at infra.
SEIS staff in response to our queries about the SEIS submitted to the SEIS
Even NRCs Generic Environmental Impact Statement (GEIS) states that cesium-137 - for one - may be expected to bioaccumulate such that its buildup in the environment will increase by 35 per cent during the postulated renewal period at each of the nations nuclear power plants undergoing relicensing.20 GEIS section 4.6.1.1 states in part as follows:
 
To determine whether the added period of operation following license renewal would, by virtue of buildup, result in significant (double) added dose, the ratios of buildup factors for midlives of 30 to midlives of 20 years were evaluated. These ratios amount to a 35 per cent increase for Cesium-137 and a 6 per cent increase for cobalt-60.
staff on January 23, 2005 were withheld by the NRC's own Freedom of
In certain cases, the bioaccumulation factors may require reexamination. These principally involve fish (in the human food chain) that are bottom feeders. Bottom feeders may ingest worms and other biota that may remobilize radioactive materials accumulated in the sediments.
 
Accumulation of radioactive materials in the environment is of concern not only to license renewal but also to operation under present licenses.
Information staff and have yet to be released.
(Emphasis added.)
16    Similarly, we are astonished that the NRC staff most involved with the
This reference is entirely omitted from consideration in the SEIS. The SEIS omits any analysis of the predicted buildup of cesium-137 or cobalt-60 or any other radionuclides in the environment surrounding Millstone. To the extent that cesium-137 released to the environment will have enhanced effects, the NRCs staffs failure to assess the impact to the health and safety of the community - including Niantic Bay beachgoers who may be pregnant - borders on reckless endangerment.  
 
SEIS declined our invitation to attend the press conference we gave on the
 
Niantic Bay shoreline 1.5 miles from Millstone on March 10, 2005. At our
 
press conference, we introduced Zachary M. Hartley, a 7-year-old boy born
 
with a rare cancer in his jawbone.
17 During critical months of her pregnancy, Zachary's mother swam regularly and unknowingly in the
 
nuclear  "mixing zone" 18 which is known locally as the Hole-in-the-Wall Beach. We invited the entire NRC to attend the press conference and
 
address questions to our expert, Dr. Helen Caldicott, world-renowned
 
pediatrician, co-founder of Physicians for Social Responsibility and a
 
leading authority on the health effects of low-level ionizing radiation such
 
as is routinely emitted by Millstone. Zachary's medical records were
 
available for NRC review. Not a single representative of the NRC
 
appeared, not even one of the resident inspectors assigned to Millstone.
 
Dr. Caldicott linked young Zachary's rare jawbone cancer to Millstone's
 
radiological and toxic chemical emissions as being the likely causative
 
agent. Dr. Caldicott acknowledged that, while there cannot be a 100-per-
 
cent certainty that Millstone caused Zachary's medical condition, cesium-
 
137 which Northeast Utilities found in a fish in the same nuclear "mixing
 
zone" in 1997 - the year of Zachary's mother's pregnancy - and which
 
contamination it admitted was discharged by Millstone, is known to be 19 See Coalition letter to Connecticut General Assembly Public Health and Environment Committees dated March 4, 2005, attached.
18 associated with cancer, including cancer of the bone. We are transcribing Dr. Caldicott's comments and will provide the NRC with a copy as soon as
 
the transcription is available.
In light of the facts which have come light regarding Zachary M. Hartley, the Coalition has requested that the Connecticut General Assembly's
 
Public Health and Environment Committees convene a special public
 
hearing to consider our request to close the Niantic shoreline beaches.
19 We understand that the legislature may find it necessary, in order to
 
adequately protect the public health and safety, to enact legislation to close
 
Millstone forthwith. Governor M. Jodi Rell has referred our request to the
 
Commissioner of Public Health; we are asking him to exercise his authority
 
to close the Niantic beaches as a health hazard. We further anticipate that
 
the Connecticut DEP will order that Millstone convert from its once-through


cooling system to a closed cooling system, thereby virtually eliminating the
discharge of radioactive and toxic chemical contaminants to the Niantic and
Waterford shorelines. The SEIS does not address the prospect that
Millstone will undergo a major refurbishment in the conversion from the
once-through to a closed cooling system. This is a major omission in the
SEIS. We recognize that the events in question in Zachary's life arose in 1997, prior to Dominion's takeover of Millstone in 2001. However, Zachary's
sickness is a factor which must be considered in the operational history of
Millstone. Under Dominion ownership, Millstone has continued to release
the same radioactive and toxic chemical waste byproducts as NU before.
Indeed, Dominion is currently seeking permission from CTDEP to add new chemicals to the "mixing zone" and continue the routine discharge of others. Nowhere in the SEIS is it stated that the NRC staff reviewed
Dominion's application for renewal of the NPDES permit. Nowhere are
these facts assessed in the SEIS.
The SEIS fails to meaningfully consider the routine environmental impacts of Millstone's radiological releases, relying on the "conclusion" in
the NRC's Generic Environmental Impact Statement that all the nation's
nuclear power plants release radiation within levels permitted under the
NRC's regulations and therefore may be expected to continue to do so in 20 GEIS 4.6.1.1.
19 the future. These conclusions do not apply to Millstone. See discussion at infra.      Even NRC's Generic Environmental Impact Statement ("GEIS") states that cesium-137 - for one - may be expected to bioaccumulate such that its buildup in the environment will increase by 35 per cent during the postulated renewal period at each of the nation's nuclear power
plants undergoing relicensing
.20      GEIS section 4.6.1.1 states in part as follows:
To determine whether the added period of operation following license renewal would, by virtue of buildup, result in significant (double)
added dose, the ratios of buildup factors for midlives of 30 to midlives of 20 years were evaluated.
These ratios amount to a 35 per cent increase for Cesium-137 and a 6 per cent increase for cobalt-60.
In certain cases, the bioaccumulation factors may requirereexamination. These principally involve fish (in the human food chain) that are bottom feeders. Bottom feeders may ingest worms and other biota that may remobilize radioactive materials
accumulated in the sediments.
Accumulation of radioactive materials in the environment is ofconcern not only to license renewal but also to operation under
present licenses.(Emphasis added.)
This reference is entirely omitted from consideration in the SEIS. The SEIS omits any analysis of the predicted buildup of cesium-137 or cobalt-
60 or any other radionuclides in the environment surrounding Millstone. To
the extent that cesium-137 released to the environment will have enhanced
effects, the NRC's staff's failure to assess the impact to the health and
safety of the community - including Niantic Bay beachgoers who may be
pregnant - borders on reckless endangerment.
21 See [citation to follow]
21 See [citation to follow]
22 A copy of the report is attached.
22 A copy of the report is attached.
23 See "Conservation Group Sues Brayton Poin t" (Providence Journal, March 11, 2005), attached.20     It is known that cobalt-60 released by Millstone bioaccumulates in the sediment of Jordan Cove and is therefore subject to being ingested by
23 See Conservation Group Sues Brayton Point (Providence Journal, March 11, 2005),
 
attached.
worms and thereby enter the food chain.
20 It is known that cobalt-60 released by Millstone bioaccumulates in the sediment of Jordan Cove and is therefore subject to being ingested by worms and thereby enter the food chain.21 Yet, the SEIS fails to re-examine this phenomenon - and the potential for bioaccumulation of other radionuclides in the environment surrounding Millstone - consistent with GEIS section 4.6.1.1.
21 Yet, the SEIS fails to "re-examine" this phenomenon - and the potential for bioaccumulation of other
 
radionuclides in the environment surrounding Millstone - consistent with
 
GEIS section 4.6.1.1.
Nor does the SEIS examine the quality of environmental stewardship exercised by Dominion in its other corporate activities.
Nor does the SEIS examine the quality of environmental stewardship exercised by Dominion in its other corporate activities.
We suggest you review the October 2003 report by Public Citizen,"Dominion Resources, Inc.; A Public Citizen Corporate Profile." 22 Public Citizen reports that "[I]n April 2003, Dominion's VEPCO agreed to a $1.2 billion enforcement settlement with the US Department of Justice and the US Environmental Protection Agency for violations of the Clean Air Act."
We suggest you review the October 2003 report by Public Citizen, "Dominion Resources, Inc.; A Public Citizen Corporate Profile." 22 Public Citizen reports that "[I]n April 2003, Dominions VEPCO agreed to a $1.2 billion enforcement settlement with the US Department of Justice and the US Environmental Protection Agency for violations of the Clean Air Act."
(Emphasis added.)
(Emphasis added.)
The report further states that Dominion's VEPCO failed to install pollution control equipment at its coal-fired Mount Storm Power Plant in
The report further states that Dominions VEPCO failed to install pollution control equipment at its coal-fired Mount Storm Power Plant in West Virginia after it made significant modifications that increased power-generating capacity. This was a violation of the Clean Air Act and, "according to the EPA, resulted in the release of massive amounts of sulfur dioxide, nitrogen oxide, and particulate matter."
 
Dominions Dominion Energy, owner of the Brayton Point Power Station in Massachusetts, releases 240 pounds of toxic mercury annually from that facility - enough to poison 120 million pounds of fish part of the Dominion network of companies, according to the Providence (RI) Journal of March 11, 2005.23 Eating mercury in fish and shellfish presents a danger to children and pregnant mothers by harming developing nervous systems.
West Virginia after it made significant modifications that increased power-
Dominion Energy has been served with a notice of intent to sue by the Conservation Law Foundation, according to the newspaper report.
 
According to the SEIS, four states and all or parts of 15 counties fall within the 50-mile radius of Millstone (eight in Connecticut, four in Rhode Island, two in Massachusetts and one in New York). An estimated
generating capacity. This was a violation of the Clean Air Act and, "according to the EPA, resulted in the release of 'massive amounts' of
 
sulfur dioxide, nitrogen oxide, and particulate matter."     Dominion's Dominion Energy, owner of the Brayton Point Power Station in Massachusetts, releases 240 pounds of toxic mercury annually from that
 
facility - enough to poison 120 million pounds of fish part of the Dominion
 
network of companies, according to the Providence (RI) Journal of March
 
11, 2005.23 Eating mercury in fish and shellfish presents a danger to children and pregnant mothers by harming developing nervous systems.
 
Dominion Energy has been served with a notice of intent to sue by the
 
Conservation Law Foundation, according to the newspaper report.
 
According to the SEIS, four states and all or parts of 15 counties fall
 
within the 50-mile radius of Millstone (eight in Connecticut, four in Rhode
 
Island, two in Massachusetts and one in New York). An estimated 21 2,868,207 people live within this area. This equates to a population density of 219 persons/square kilometer or 567 persons per square mile. In the
 
GEIS matrix of rank of sparseness (Category 4) and proximity (Category 4)
 
result in the conclusion that Millstone is located in a high-population area.
 
Moreover, the population within a 10-mile radius of Millstone increases
 
seasonally as a result of an influx of approximately 10,500 summer
 
residents. The SEIS contains no figures of the seasonal influx of visitors to
 
the eastern end of Long Island although it is within the 50-mile radius of
 
Millstone.
In conclusion, it is clear that the adverse environmental impacts of license renewal are so great that preserving the option of license renewal for energy planning decisionmakers would be beyond
 
"unreasonable" - license renewal for Millstone is a license to kill.
This conclusion is unassailable when the full scope of available information about Millstone's environmental impacts is properly
 
considered.
Detailed Comments GEIS Is Inapplicable to the Millstone EIS The Millstone Draft Environmental Impact Statement analysis largely avoids the primary issue presented by the prospect of relicensing Millstone Units 2 and 3 for additional 20-year terms: the effects of routine
 
releases of radiological and toxic chemical releases to human health and
 
the environment surrounding the nuclear facility.
The troubled nuclear industry knew that if the truth about the radiological impacts of nuclear power plant operations could be addressed
 
in relicensing proceedings, no community in American would accept the
 
prospect to hosting a nuclear power plant beyond its initial 40-year
 
licensing term. The GEIS is a fiction contrived by the nuclear industry and
 
adopted by the NRC to deny the public an opportunity to challenge
 
relicensing of nuclear power plants based on radiological impacts to human
 
health and the environment.
The NRC's Generic Environmental Impact Statement ("GEIS") was published in the year 1996, or nine (9) years prior to the NRC's invitation 22 for public comment on the SEIS, at a time when Unit 2 had operated for 26 years, Unit 1 for 21 and Unit 3 for 10 years. Necessarily, when the GEIS
 
refers to "current levels" of radiation, it is referring to radiation levels which
 
were "current" in 1996 or earlier. The GEIS is not itself current, but is
 
outdated and fails to account for the past nine (9) years of operations within
 
the U.S. nuclear industry.
The GEIS itself is obsolete. Although the NRC staff states in the SEIS it was not required to consider site-specific aspects of Millstone's routine
 
radiological emissions because Millstone site-specific routine radiological
 
emissions were considered in the GEIS at Appendix E, GEIS Appendix E is limited to "routine" radiological emissions during the years 1985-1987. No
 
explanation is given why a report published by the NRC in 1996 relies on
 
10-year-old data, when its purpose is to project radiation levels five
 
decades into the future. At best, GEIS's radiological analysis of "routine"
 
Millstone radiological emissions is incomplete and superficial.
 
More significantly, the GEIS fails to account for any of the following facts
 
and circumstances - routine and extraordinary - which have occurred at
 
Millstone since 1996, including the following:1.The NRC placed the entire Millstone Nuclear Power Station on its "Watch List" and ordered an unprecedented three-reactor two-year
 
shutdown in 1996 because of national media exposure of wilful, systemic disregard for safety standards and licensing requirements;
 
Unit 1 never restarted, Unit 3 restarted in 1996 and Unit 3 restarted in
 
1999;2.In 1996, after workers in the site maintenance department at Millstone were diagnosed with brain cancers and Northeast Utilities
 
dismissed the entire department - after securing releases the
 
workers would not sue Northeast Utilities if the company paid them
 
double severence pay - and hired transient contract workers to
 
perform hot and dirty tasks within the plant, two of the workers died
 
untimely deaths due to their brain cancers.3.On December 16, 1997, Zachary M. Hartley was born with a rare jawbone cancer which required major life-threatening surgery. His
 
mother swam regularly in the nuclear/chemical "mixing zone"
 
otherwise known as the Hole-in-the-Wall Beach on the Niantic Bay
 
shoreline during critical months of her pregnancy with Zachary.
24 See "Owner of Connecticut Nuclear Plant A ccepts a Record Fine" (New York Times September 28, 1999), attached.
234.In 1997, Northeast Utilities caught a fish contaminated with cesium-137, a deadly carcinogen, it admitted releasing into Niantic Bay, in
 
the nuclear/chemical "mixing zone" which stretches from the
 
Millstone discharge point to the Niantic Bay shoreline, a popular
 
summer destination for families with young children.5.On or before 1997, Millstone dispensed with its measurement of strontium-90 in quarterly composited air particulate filters, relying
 
instead on infrequent sampling of goat milk in the community to
 
determine whether its strontium-90 emissions reached harmful levels
 
after-the-fact.6.In September 1999, Northeast Utilities, predecessor to Dominion, pleaded guilty to committing environmental felonies including
 
falsifying environmental monitoring records and releasing hydrazine, a carcinogen, illegally into the Long Island Sound.
24 7.A Connecticut Superior Court judge enjoined the restart of Millstone Unit 2 in 1999 because he was persuaded that the health and
 
stability of the indigenous Niantic winter flounder stocks were
 
endangered by operations of the Millstone intake structures through
 
entrainment and impingement. Fish Unlimited v. Northeast Utilities
.8.In 2000, two commercial fishermen sued Northeast Utilities for tortiously causing the collapse of the formerly commercially viable
 
Niantic winter flounder fishing stocks; their suit remains pending. 9.In 2000, Northeast Utilities acknowledged that - even under daily supervision by onsite inspectors of the NRC - it had lost two highly
 
radioactive spent fuel rods from the Unit 1 spent fuel pool.10.In 2000, the Connecticut Department of Public Utility Control
("DPUC") oversaw a "public auction" by Northeast Utilities to sell the
 
Millstone Nuclear Power Station; the public was excluded from the
 
"public auction"; virtually all key "public auction" documents were
 
redacted and ordered sealed by the DPUC; over public protest, and
 
despite the Coalition's disclosure that Dominion had the worst safety
 
record in the nuclear industry including the deaths of seven nuclear
 
workers at its nuclear facilities in Virginia, the DPUC approved the
 
sale of Millstone to Dominion Nuclear Connecticut, Inc., ("DNC") at
 
the time a paper entity with no assets with only a post office box in
 
Niantic, Connecticut; when the Connecticut Coalition Against
 
Millstone obtained a Superior Court hearing date for a judge to
 
consider its challenge to the rigged sale and the prospective transfer 24 of expired environmental permits to DNC, lawyers for Northeast Utilities and DNC met ex parte with Superior Court Chief Administrative Judge John J. Langenbach and obtained an order
 
suspending the hearing so the sale could proceed without court
 
review; when the matter was brought to the Connecticut Supreme
 
Court, Justice Christine Vertefeuille, beneficiary of a Northeast
 
Utilities 401K plan, recused herself; Connecticut Attorney General
 
Richard S. Blumenthal, although entitled to automatic party status in
 
the DPUC proceedings, declined participation. So occurred the
 
"public auction" of Connecticut's worst polluter.11.In April  2001, Connecticut's Commissioner of Environmental Protection, Arthur J. Rocque, Jr., "transferred""an expired NPDES (National Pollution Discharge Elimination System) permit (it had
 
expired four years earlier) and "emergency authorizations" (which he
 
admitted in writing he lacked legal authority to issue) to "Dominion
 
Nuclear Connecticut, Inc.," at that time a paper company with a post


office box in Niantic but no assets. Dominion has been operating
21 2,868,207 people live within this area. This equates to a population density of 219 persons/square kilometer or 567 persons per square mile. In the GEIS matrix of rank of sparseness (Category 4) and proximity (Category 4) result in the conclusion that Millstone is located in a high-population area.
Moreover, the population within a 10-mile radius of Millstone increases seasonally as a result of an influx of approximately 10,500 summer residents. The SEIS contains no figures of the seasonal influx of visitors to the eastern end of Long Island although it is within the 50-mile radius of Millstone.
In conclusion, it is clear that the adverse environmental impacts of license renewal are so great that preserving the option of license renewal for energy planning decisionmakers would be beyond unreasonable - license renewal for Millstone is a license to kill.
This conclusion is unassailable when the full scope of available information about Millstones environmental impacts is properly considered.
Detailed Comments GEIS Is Inapplicable to the Millstone EIS The Millstone Draft Environmental Impact Statement analysis largely avoids the primary issue presented by the prospect of relicensing Millstone Units 2 and 3 for additional 20-year terms: the effects of routine releases of radiological and toxic chemical releases to human health and the environment surrounding the nuclear facility.
The troubled nuclear industry knew that if the truth about the radiological impacts of nuclear power plant operations could be addressed in relicensing proceedings, no community in American would accept the prospect to hosting a nuclear power plant beyond its initial 40-year licensing term. The GEIS is a fiction contrived by the nuclear industry and adopted by the NRC to deny the public an opportunity to challenge relicensing of nuclear power plants based on radiological impacts to human health and the environment.
The NRCs Generic Environmental Impact Statement (GEIS) was published in the year 1996, or nine (9) years prior to the NRCs invitation


under the authority of the expired permit for four years and DEP has
22 for public comment on the SEIS, at a time when Unit 2 had operated for 26 years, Unit 1 for 21 and Unit 3 for 10 years. Necessarily, when the GEIS refers to current levels of radiation, it is referring to radiation levels which were current in 1996 or earlier. The GEIS is not itself current, but is outdated and fails to account for the past nine (9) years of operations within the U.S. nuclear industry.
The GEIS itself is obsolete. Although the NRC staff states in the SEIS it was not required to consider site-specific aspects of Millstones routine radiological emissions because Millstone site-specific routine radiological emissions were considered in the GEIS at Appendix E, GEIS Appendix E is limited to routine radiological emissions during the years 1985-1987. No explanation is given why a report published by the NRC in 1996 relies on 10-year-old data, when its purpose is to project radiation levels five decades into the future. At best, GEISs radiological analysis of routine Millstone radiological emissions is incomplete and superficial.
More significantly, the GEIS fails to account for any of the following facts and circumstances - routine and extraordinary - which have occurred at Millstone since 1996, including the following:
: 1. The NRC placed the entire Millstone Nuclear Power Station on its Watch List and ordered an unprecedented three-reactor two-year shutdown in 1996 because of national media exposure of wilful, systemic disregard for safety standards and licensing requirements; Unit 1 never restarted, Unit 3 restarted in 1996 and Unit 3 restarted in 1999;
: 2. In 1996, after workers in the site maintenance department at Millstone were diagnosed with brain cancers and Northeast Utilities dismissed the entire department - after securing releases the workers would not sue Northeast Utilities if the company paid them double severence pay - and hired transient contract workers to perform hot and dirty tasks within the plant, two of the workers died untimely deaths due to their brain cancers.
: 3. On December 16, 1997, Zachary M. Hartley was born with a rare jawbone cancer which required major life-threatening surgery. His mother swam regularly in the nuclear/chemical mixing zone otherwise known as the Hole-in-the-Wall Beach on the Niantic Bay shoreline during critical months of her pregnancy with Zachary.


not renewed the permit in the intervening time.12.In 2001, Dominion reported concentration levels of strontium-90 contamination in goat milk sampled within five (5) miles downwind of
24 See Owner of Connecticut Nuclear Plant Accepts a Record Fine (New York Times September 28, 1999), attached.
23
: 4. In 1997, Northeast Utilities caught a fish contaminated with cesium-137, a deadly carcinogen, it admitted releasing into Niantic Bay, in the nuclear/chemical mixing zone which stretches from the Millstone discharge point to the Niantic Bay shoreline, a popular summer destination for families with young children.
: 5. On or before 1997, Millstone dispensed with its measurement of strontium-90 in quarterly composited air particulate filters, relying instead on infrequent sampling of goat milk in the community to determine whether its strontium-90 emissions reached harmful levels after-the-fact.
: 6. In September 1999, Northeast Utilities, predecessor to Dominion, pleaded guilty to committing environmental felonies including falsifying environmental monitoring records and releasing hydrazine, a carcinogen, illegally into the Long Island Sound.24
: 7. A Connecticut Superior Court judge enjoined the restart of Millstone Unit 2 in 1999 because he was persuaded that the health and stability of the indigenous Niantic winter flounder stocks were endangered by operations of the Millstone intake structures through entrainment and impingement. Fish Unlimited v. Northeast Utilities.
: 8. In 2000, two commercial fishermen sued Northeast Utilities for tortiously causing the collapse of the formerly commercially viable Niantic winter flounder fishing stocks; their suit remains pending.
: 9. In 2000, Northeast Utilities acknowledged that - even under daily supervision by onsite inspectors of the NRC - it had lost two highly radioactive spent fuel rods from the Unit 1 spent fuel pool.
10.
In 2000, the Connecticut Department of Public Utility Control (DPUC) oversaw a public auction by Northeast Utilities to sell the Millstone Nuclear Power Station; the public was excluded from the public auction; virtually all key public auction documents were redacted and ordered sealed by the DPUC; over public protest, and despite the Coalitions disclosure that Dominion had the worst safety record in the nuclear industry including the deaths of seven nuclear workers at its nuclear facilities in Virginia, the DPUC approved the sale of Millstone to Dominion Nuclear Connecticut, Inc., (DNC) at the time a paper entity with no assets with only a post office box in Niantic, Connecticut; when the Connecticut Coalition Against Millstone obtained a Superior Court hearing date for a judge to consider its challenge to the rigged sale and the prospective transfer


the Millstone Nuclear Power Station nearly twice as high as the
24 of expired environmental permits to DNC, lawyers for Northeast Utilities and DNC met ex parte with Superior Court Chief Administrative Judge John J. Langenbach and obtained an order suspending the hearing so the sale could proceed without court review; when the matter was brought to the Connecticut Supreme Court, Justice Christine Vertefeuille, beneficiary of a Northeast Utilities 401K plan, recused herself; Connecticut Attorney General Richard S. Blumenthal, although entitled to automatic party status in the DPUC proceedings, declined participation. So occurred the public auction of Connecticuts worst polluter.
 
11.
highest recording measurement of strontium-90 concentrations in
In April 2001, Connecticuts Commissioner of Environmental Protection, Arthur J. Rocque, Jr., "transferred"an expired NPDES (National Pollution Discharge Elimination System) permit (it had expired four years earlier) and emergency authorizations (which he admitted in writing he lacked legal authority to issue) to Dominion Nuclear Connecticut, Inc., at that time a paper company with a post office box in Niantic but no assets. Dominion has been operating under the authority of the expired permit for four years and DEP has not renewed the permit in the intervening time.
 
12.
Connecticut milk during the height of the 1960s atmospheric nuclear
In 2001, Dominion reported concentration levels of strontium-90 contamination in goat milk sampled within five (5) miles downwind of the Millstone Nuclear Power Station nearly twice as high as the highest recording measurement of strontium-90 concentrations in Connecticut milk during the height of the 1960s atmospheric nuclear weapons testing.
 
13.
weapons testing.13.In 2001, terrorists who had targeted nuclear power plants hijacked a passenger jet and flew over the Indian Point Nuclear
In 2001, terrorists who had targeted nuclear power plants hijacked a passenger jet and flew over the Indian Point Nuclear Power Plant 29 miles of New York City before slamming into the World Trade Center. The U.S. Department of Homeland Security, subsequently created, designated the Millstone Nuclear Power Plant a terrorists target of choice.
 
14.
Power Plant 29 miles of New York City before slamming into the
In 2004, Connecticut State Senator Melodie Peters, Chairman of the powerful Energy and Technology Committee, took a paying job with Dominion in public relations to advocate for Millstone relicensing, without giving up her legislative commitments.
 
: 11. On August 16, 2003, Joseph H. Besade became the seventh known pipefitter to die prematurely from workplace exposures at Millstone.
World Trade Center. The U.S. Department of Homeland Security, subsequently created, designated the Millstone Nuclear Power Plant
15.
 
On August 5, 2004, Cynthia M. Besade reported to the NRC in an affidavit her personal knowledge of some 67 cancers in persons known directly or indirectly to her, all living within or close to the five-
a terrorist's target of choice.14.In 2004, Connecticut State Senator Melodie Peters, Chairman of the powerful Energy and Technology Committee, took a paying job
 
with Dominion in public relations to advocate for Millstone relicensing, without giving up her legislative commitments.
: 11. On August 16, 2003, Joseph H. Besade became the seventh known pipefitter to die prematurely from workplace exposures at Millstone.15.On August 5, 2004, Cynthia M. Besade reported to the NRC in an affidavit her personal knowledge of some 67 cancers in persons
 
known directly or indirectly to her, all living within or close to the five-25 See "Millstone Owner Turned Down Free Homeland Security Device" (The New London Day, March 9, 2005) 25 mile radius surrounding Millstone, including childhood cancers and the case of a 17-year-old Waterford high school student diagnosed
 
with ovarian cancer; from one street alone - Seabreeze Drive, north-
 
northeast and less than two miles downwind of Millstone - seven (7)
 
cases of cancer were reported.16.On August 5, 2004, Richard Heaton drove seven (7) hours from the University of Pennsylvania Medical Center to New London to
 
participate in a press conference and proceeding before the NRC to
 
share the facts of his daughter's rare thyroid cancer which developed
 
following her exposure to Millstone effluents at age 10.17.In 2004, Dominion rejected the U.S. Department of Homeland Security's offer of a free security enhancement to protect the three
 
Millstone intake structures from terrorist attack.
2518.In February 2005, the Coalition discovered that Zachary M.
Hartley's rare jawbone cancer, believed caused by his mother's in utero exposure to Millstone radiological and chemical effluents in the nuclear/chemical "mixing zone" in 1997, was knowingly excluded
 
from listing in the State of Connecticut's Tumor Registry because part
 
of the orange-size cancerous tumor removed from Zachary's mouth
 
in life-saving surgery was determined to be benign.19.On March 10, 2005, Dr. Helen Caldicott, world-renowned pediatrician, authority on the health effects of low-level ionizing
 
radiation and co-founder of Physicians for Social Responsibility, declared the likelihood that 7-year-old Zachary M. Hartley's rare
 
jawbone cancer was caused by his mother's exposure to Millstone's
 
radiological and chemical effluents.


25 See Millstone Owner Turned Down Free Homeland Security Device (The New London Day, March 9, 2005) 25 mile radius surrounding Millstone, including childhood cancers and the case of a 17-year-old Waterford high school student diagnosed with ovarian cancer; from one street alone - Seabreeze Drive, north-northeast and less than two miles downwind of Millstone - seven (7) cases of cancer were reported.
16.
On August 5, 2004, Richard Heaton drove seven (7) hours from the University of Pennsylvania Medical Center to New London to participate in a press conference and proceeding before the NRC to share the facts of his daughters rare thyroid cancer which developed following her exposure to Millstone effluents at age 10.
17.
In 2004, Dominion rejected the U.S. Department of Homeland Securitys offer of a free security enhancement to protect the three Millstone intake structures from terrorist attack.25 18.
In February 2005, the Coalition discovered that Zachary M.
Hartleys rare jawbone cancer, believed caused by his mothers in utero exposure to Millstone radiological and chemical effluents in the nuclear/chemical mixing zone in 1997, was knowingly excluded from listing in the State of Connecticuts Tumor Registry because part of the orange-size cancerous tumor removed from Zacharys mouth in life-saving surgery was determined to be benign.
19.
On March 10, 2005, Dr. Helen Caldicott, world-renowned pediatrician, authority on the health effects of low-level ionizing radiation and co-founder of Physicians for Social Responsibility, declared the likelihood that 7-year-old Zachary M. Hartleys rare jawbone cancer was caused by his mothers exposure to Millstones radiological and chemical effluents.
Moreover, Millstone is unique in the annals of the U.S. nuclear industry:
Moreover, Millstone is unique in the annals of the U.S. nuclear industry:
Millstone has released the highest levels of radionuclides of any nuclear
Millstone has released the highest levels of radionuclides of any nuclear power station in the country at various times over the past 35 years of its operational history.
 
From 1970 to 1987, Millstone had released a total reported release of 32 curies of radioactive iodine and particulates into the air, which included the highly carcinogenic strontium-90 and iodine-131, together with 6.7 million curies of total fission and activation gases such as xenon and krypton. During the same period, Millstone released 581 curies or 581 trillion picoCuries of radiation in the highest liquid volume of such releases
power station in the country at various times over the past 35 years of its
 
operational history.
From 1970 to 1987, Millstone had released a total reported release of 32 curies of radioactive iodine and particulates into the air, which included
 
the highly carcinogenic strontium-90 and iodine-131, together with 6.7
 
million curies of total fission and activation gases such as xenon and
 
krypton. During the same period, Millstone released 581 curies or 581
 
trillion picoCuries of radiation in the highest liquid volume of such releases 26 See Declaration of Ernest J. Sternglass, Ph.D., In the Matter of Dominion Nuclear Connecticut, Inc., Docket No. 50-336-LR, 50-423-LR, ASLBP No. 04-824-01-LR (August 8, 2004) 27 Id. 28 Id. 29 Id. 30 Id. 26 of mixed fission and activation products of any nuclear plant in the United States.26      In a single year, 1975, Millstone released a record reported high of 9.99 curies of iodine and particulates into the air and 199 curies of liquid mixed
 
fission and activation products into the Long Island Sound, also a record for
 
all U.S. reactors.
27 Id.      While the strontium-90 concentration in milk declined for the United States as a whole between 1970 and 1975, from 8 pCi/l to 3 pCi/l, it rose
 
from 9.8 in 1970 to a high of 15.8 in 1973 and 14.8 in 1974 near Millstone, remaining at 10.7 by 1975. This is far in excess of the U.S. average of 3
 
pCi/l, ruling out any significant contribution to the local milk from bomb test
 
fallout by France and China that continued until 1980.
28      The calculated yearly radiation dose to bone of a child due to excess strontium-90 within 10 to 15 miles of Millstone, in excess of the yearly dose
 
for the United States, rose from 33 millirem per year in the first full year of
 
operation to 204 millirem per year by 1974, nearly three times the normal
 
background level of 70 millirems per year in Connecticut.
29      These doses of strontium-90 alone may be compared with the 15 millirem per year to any organ permitted under current NRC regulations, the 2 millirem produced to bone marrow in a typical X-ray of a child, and
 
the 80 millirem per year to a developing fetus found to produce a doubling
 
of the rate of childhood leukemia in the studies of the renowned Dr. Alice
 
Stewart.30      Given all these facts and circumstances, the application of a "Generic Environmental Impact Statement" to Millstone, thereby precluding site-
 
specific analysis in the Environmental Impact Statement, is so deeply
 
flawed as to be fraudulent.
27    The Coalition and others have provided "new and significant" information which compels the NRC to conduct a site-specific analysis of
 
the environmental impacts of relicensing Millstone Units 2 and 3. See


discussion at pages 32 et seq. infra.     At the very least, the NRC should be required to evaluate the environmental impact of Millstone's radiological and chemical effluents -
26 See Declaration of Ernest J. Sternglass, Ph.D., In the Matter of Dominion Nuclear Connecticut, Inc., Docket No. 50-336-LR, 50-423-LR, ASLBP No. 04-824-01-LR (August 8, 2004) 27 Id.
28 Id.
29 Id.
30 Id.
26 of mixed fission and activation products of any nuclear plant in the United States.26 In a single year, 1975, Millstone released a record reported high of 9.99 curies of iodine and particulates into the air and 199 curies of liquid mixed fission and activation products into the Long Island Sound, also a record for all U.S. reactors.27 Id.
While the strontium-90 concentration in milk declined for the United States as a whole between 1970 and 1975, from 8 pCi/l to 3 pCi/l, it rose from 9.8 in 1970 to a high of 15.8 in 1973 and 14.8 in 1974 near Millstone, remaining at 10.7 by 1975. This is far in excess of the U.S. average of 3 pCi/l, ruling out any significant contribution to the local milk from bomb test fallout by France and China that continued until 1980.28 The calculated yearly radiation dose to bone of a child due to excess strontium-90 within 10 to 15 miles of Millstone, in excess of the yearly dose for the United States, rose from 33 millirem per year in the first full year of operation to 204 millirem per year by 1974, nearly three times the normal background level of 70 millirems per year in Connecticut.29 These doses of strontium-90 alone may be compared with the 15 millirem per year to any organ permitted under current NRC regulations, the 2 millirem produced to bone marrow in a typical X-ray of a child, and the 80 millirem per year to a developing fetus found to produce a doubling of the rate of childhood leukemia in the studies of the renowned Dr. Alice Stewart.30 Given all these facts and circumstances, the application of a Generic Environmental Impact Statement to Millstone, thereby precluding site-specific analysis in the Environmental Impact Statement, is so deeply flawed as to be fraudulent.


singly, in synergy and cumulatively - under site-specific analysis to qualify
27 The Coalition and others have provided new and significant information which compels the NRC to conduct a site-specific analysis of the environmental impacts of relicensing Millstone Units 2 and 3. See discussion at pages 32 et seq. infra.
 
At the very least, the NRC should be required to evaluate the environmental impact of Millstones radiological and chemical effluents -
under the standards of the National Environmental Policy Act.2.1.4.2 Gaseous Waste Processing Systems and Effluent Controls In this section, the SEIS describes the liquid, gaseous and solid waste management systems presently in place to collect and treat the radioactive
singly, in synergy and cumulatively - under site-specific analysis to qualify under the standards of the National Environmental Policy Act.
 
2.1.4.2 Gaseous Waste Processing Systems and Effluent Controls In this section, the SEIS describes the liquid, gaseous and solid waste management systems presently in place to collect and treat the radioactive materials which are produced as a by-product of the nuclear plant operations.
materials which are produced as a by-product of the nuclear plant
 
operations.
The SEIS states as follows:
The SEIS states as follows:
Radioactive material produced from fission of uranium-235 and neutron activation of metals in the reactor coolant system is the
Radioactive material produced from fission of uranium-235 and neutron activation of metals in the reactor coolant system is the primary source of liquid, gaseous and solid waste. The radioactive fission products build up within the fuel. Most of these fission products are contained in the fuel pellets and sealed fuel rods, but small quantities escape from the fuel rods into the reactor coolant.
 
Neutron activation of trace concentrations of metals entrained in reactor coolant such as zirconium, iron and cobalt creates radioactive isotopes of these metals. Both fission and activation products in liquid and gaseous forms are continuously removed from reactor coolant and captured on several different types of filter media. Units 2 and 3 operate separate liquid and gaseous processing systems. Gaseous discharges for each unit are monitored separately before they are discharged to the stack or to other designated release points for each unit. All liquid discharges are directed to a canal which terminates in the old quarry and the quarry discharges to Long Island Sound.
primary source of liquid, gaseous and solid waste. The radioactive
Despite these comments, it is clear that station monitoring of radioactive effluents is presently inadequate and incomplete and that some
 
fission products build up within the fuel. Most of these fission
 
products are contained in the fuel pellets and sealed fuel rods, but
 
small quantities escape from the fuel rods into the reactor coolant.
 
Neutron activation of trace concentrations of metals entrained in
 
reactor coolant such as zirconium, iron and cobalt creates radioactive
 
isotopes of these metals. Both fission and activation products in liquid
 
and gaseous forms are continuously removed from reactor coolant
 
and captured on several different types of filter media. Units 2 and 3
 
operate separate liquid and gaseous processing systems. Gaseous
 
discharges for each unit are monitored separately before they are


discharged to the stack or to other designated release points for each
31 See Coalitions March 2, 2005 filing to the NRC.
 
unit. All liquid discharges are directed to a canal which terminates in
 
the old quarry and the quarry discharges to Long Island Sound.
Despite these comments, it is clear that station monitoring of radioactive effluents is presently inadequate and incomplete and that some 31 See Coalition's March 2, 2005 filing to the NRC.
28 radionuclides are released into the environment without measurement or documentation.
28 radionuclides are released into the environment without measurement or documentation.
For example, In 1997, Northeast Utilities reported in its Annual Radiological Environmental Operating Report as follows:
For example, In 1997, Northeast Utilities reported in its Annual Radiological Environmental Operating Report as follows:
Section 4.5 Air Particulate Strontium (Table 5)
Section 4.5 Air Particulate Strontium (Table 5)
Table 5 in past years was used to report the measurement of Sr-89 and Sr-90 in quarterly composited air particulate filters.
Table 5 in past years was used to report the measurement of Sr-89 and Sr-90 in quarterly composited air particulate filters. These measurements are not required by the Radiological Effluent Monitoring Manual (REMM) and have been discontinued.
Thesemeasurements are not required by the Radiological Effluent
Previous data has shown the lack of detectable station activity in this media. This fact, and the fact that milk samples are a much more sensitive indicator of fission product existence in the environment, prompted the decision for discontinuation. In the event of widespread plant related contamination or special events such as the Chernobyl incident, these measurements may be made.
 
As Dr. Sternglass has pointed out,31 in 2001, Dominion recorded concentrations of strontium-90 in goat milk sampled five miles from Millstone at a level nearly twice that of the highest recorded concentration of strontium-90 in milk in Connecticut during the peak of atmospheric atomic bomb testing in the 1960s.
Monitoring Manual (REMM) and have been discontinued.
Previous data has shown the lack of detectable station activity in this
 
media. This fact, and the fact that milk samples are a much more
 
sensitive indicator of fission product existence in the environment, prompted the decision for discontinuation. In the event of widespread
 
plant related contamination or special events such as the Chernobyl
 
incident, these measurements may be made."
As Dr. Sternglass has pointed out, 31 in 2001, Dominion recorded concentrations of strontium-90 in goat milk sampled five miles from
 
Millstone at a level nearly twice that of the highest recorded concentration
 
of strontium-90 in milk in Connecticut during the peak of atmospheric
 
atomic bomb testing in the 1960s.
In 1997 alone, there were numerous reported incidences of station radiation monitors being inoperable:
In 1997 alone, there were numerous reported incidences of station radiation monitors being inoperable:
Unit 1 Liquid Radwaste Effluent Monitor (inoperable 6/7/96 - 3/25/97
Unit 1 Liquid Radwaste Effluent Monitor (inoperable 6/7/96 - 3/25/97
Line 1,094: Line 296:
198 days in 1997, 404 days total)
198 days in 1997, 404 days total)
Unit 2 Steam Generator Blowdown Monitor (inoperable 2/22/96 -
Unit 2 Steam Generator Blowdown Monitor (inoperable 2/22/96 -
8/26/97 - 237 days in 1997, 551 days total)(NU claims no discharges
8/26/97 - 237 days in 1997, 551 days total)(NU claims no discharges were made during this period)
 
were made during this period) 29 Unit 2 Clean Waste Monitor Tank Radiation Monitor (inoperable 5/25/97 - 7/1/97 - 37 days)(NU claims no discharges were made


during this period)
29 Unit 2 Clean Waste Monitor Tank Radiation Monitor (inoperable 5/25/97 - 7/1/97 - 37 days)(NU claims no discharges were made during this period)
Even the GEIS acknowledges that some airborne radioactive effluent releases are not monitored, recorded or documented.
Even the GEIS acknowledges that some airborne radioactive effluent releases are not monitored, recorded or documented.
Within the entire body of radioactive airborne effluents released by Millstone over the course of its 35-year operational life, the SEIS only
Within the entire body of radioactive airborne effluents released by Millstone over the course of its 35-year operational life, the SEIS only specifically considers those reported by Dominion in 2002 as follows:
 
Unit 2: Total fission and activation gas activity released 128 Curies Iodine-131 4.90 X 10 -3 Curies Particulates 1.22 X 10 -5 Curies Tritium 31.2 Curies Unit 3: Total; fission and activation gas activity released 2.45 Curies Iodine-131 1.52 X 10 -6 Curies Particulates 6.08 X 10 -5 Curies Tritium 47.3 Curies These figures do not break down the radioisotopes released, other than for Iodine-131 and Tritium, and do not identify nor quantify which radioactive gases are emitted, such as xenon-137 (with a half-life of 3.9 minutes decaying to cesium-137 with a half-life of 30 years); xenon-135 (with a half-life of 9.17 hours decaying to cesium-135 with a half-life of 3,000,000 years); nor krypton-89 (with a half-life of 3.2 minutes decaying to strontium-89 with a half-life of 52 days). These radioactive materials are long-lived and have cumulative impacts. The SEIS does not analyze these environmental impacts.
specifically considers those reported by Dominion in 2002 as follows:
The SEIS states: These releases from both units are typical of annual releases from Millstone and are not expected to increase during the renewal period.
Unit 2: Total fission and activation gas activity released 128 Curies Iodine-131 4.90 X 10 -3 Curies
Since the SEIS analysis was self-limited to the years 2001, 2002 and 2003, and annual releases for the 32 other years Millstone has been operating were not considered, the statement that These releases from
 
Particulates 1.22 X 10 -5 Curies
 
Tritium 31.2 Curies Unit 3: Total; fission and activation gas activity released 2.45 Curies Iodine-131 1.52 X 10 -6 Curies


Particulates  6.08 X 10 -5 Curies
32 See discussion at page 20 infra.
30 both units are typical of annual releases from Millstone is not substantiated.
Moreover, the SEIS statement, that [these releases] are not expected to increase during the renewal period is incorrect. First, releases of tritium, a known cancer-causing radioactive toxic with a half-life of 12.3 years. are trending upward.32 Second, as Units 2 and 3 operate for longer periods at full capacity, airborne radioactive emissions will increase. Similarly, if during the renewal period Millstone Units 2 or 3 receive approval for power upgrades, airborne radioactive emissions will increase. The consequences of these reasonably foreseeable circumstances were not analyzed in the SEIS.
Moreover, the SEIS does not identify nor quantify strontium-90 releases, nor note the absence of strontium-90 monitoring from the station stack, while strontium-90 concentrations are regularly found to be inordinately high in goat milk taken from samples five miles from Millstone.
2.2.7 Radiological Impacts In section 2.2.7, Radiological Impacts, on page 2-43, the section concludes, "The applicant does not anticipate any significant changes to the radioactive effluent releases or exposures from Millstone operations during the renewal period and, therefore, the impacts to the environment are not expected to change."
However, in Dominion Nuclear Connecticut Millstone Station Annual Radiological Operating Report 2003, in section 4.14, Seawater, on page 4-9, it is stated, "since the restart of Unit 3 in 1998 and Unit 2 in 1999, tritium releases in liquid effluents have risen to levels at or above [emphasis added] those observed during pre-shutdown period."
Dominion records indicate that Millstone released 1854 curies of liquid radiation in 2000, an all time high. Such reported releases totaled 1273 curies in 2001, 1537 in 2002 and 1278 in 2003. NRC records for Millstones liquid tritium releases totaled from 1970-1994 totaled 11,550 curies. The total from 1995-2003 was 8551 curies.


Tritium 47.3 Curies These figures do not break down the radioisotopes released, other than for Iodine-131 and Tritium, and do not identify nor quantify which
33 See The Carcinogen, Mutagenic, Teratogenic and Transmutational Effects of Tritium, Citizens Awareness Network, April 1994.
 
31 This trend of increasing amounts of tritium releases is dangerous because tritium has carcinogenic, mutagenic, teratogenic and transmutational properties whose effect upon the environment which have not been considered in the SEIS.33 The coastline around Millstone is lined with beaches and shoreline communities, with many summer residents as well. Human activities in the area include swimming, boating, fishing, clamming, scalloping. Thus there are ample opportunities for liquid tritium contamination of people and shore and marine life.
radioactive gases are emitted, such as xenon-137 (with a half-life of 3.9
It is undeniable that the more the pressurized water reactors of Units 2 and 3 operate, the more tritium by-products they will create and release into the environment.
 
The current stated policy of both Dominion and the nuclear power industry in general is to operate power reactors as close to maximum capacity as possible. In 2003 Millstone 3 operated at almost 100%
minutes decaying to cesium-137 with a half-life of 30 years); xenon-135 (with a half-life of 9.17 hours decaying to cesium-135 with a half-life of
capacity. Millstone 2 operated at 80% capacity, but only because it shut down for refueling.
 
The increasing amounts of tritium discharged into Long Island Sound means that Dominions claim that it "does not anticipate any significant changes to radioactive releases or exposures from Millstone operations during the renewal period" is false. Therefore the NRCs conclusion that "impacts to the environment are not expected to change" is also false.
3,000,000 years); nor krypton-89 (with a half-life of 3.2 minutes decaying to
 
strontium-89 with a half-life of 52 days). These radioactive materials are
 
long-lived and have cumulative impacts. The SEIS does not analyze these
 
environmental impacts.
The SEIS states: "These releases from both units are typical of annual releases from Millstone and are not expected to increase during the
 
renewal period."
Since the SEIS analysis was self-limited to the years 2001, 2002 and 2003, and annual releases for the 32 other years Millstone has been
 
operating were not considered, the statement that "These releases from 32 See discussion at page  20 infra.
30 both units are typical of annual releases from Millstone" is not substantiated.
Moreover, the SEIS statement, that [these releases] are not expected to increase during the renewal period" is incorrect. First, releases of tritium, a
 
known cancer-causing radioactive toxic with a half-life of 12.3 years. are
 
trending upward.
32 Second, as Units 2 and 3 operate for longer periods at full capacity, airborne radioactive emissions will increase. Similarly, if
 
during the renewal period Millstone Units 2 or 3 receive approval for power
 
upgrades, airborne radioactive emissions will increase. The consequences
 
of these reasonably foreseeable circumstances were not analyzed in the
 
SEIS. Moreover, the SEIS does not identify nor quantify strontium-90 releases, nor note the absence of strontium-90 monitoring from the station stack, while strontium-90 concentrations are regularly found to be inordinately
 
high in goat milk taken from samples five miles from Millstone.
2.2.7  Radiological Impacts In section 2.2.7, Radiological Impacts, on page 2-43, the section concludes, "The applicant does not anticipate any significant changes to
 
the radioactive effluent releases or exposures from Millstone operations
 
during the renewal period and, therefore, the impacts to the environment
 
are not expected to change."    However, in Dominion Nuclear Connecticut Millstone Station Annual Radiological Operating Report 2003, in section 4.14, Seawater, on page 4-
 
9, it is stated, "since the restart of Unit 3 in 1998 and Unit 2 in 1999, tritium releases in liquid effluents have risen to levels at or above [emphasis added] those observed during pre-shutdown period."    Dominion records indicate that Millstone released 1854 curies of liquid radiation in 2000, an all time high. Such reported releases totaled 1273
 
curies in 2001, 1537 in 2002 and 1278 in 2003. NRC records for Millstone's
 
liquid tritium releases totaled from 1970-1994 totaled 11,550 curies. The
 
total from 1995-2003 was 8551 curies.
33 See "The Carcinogen, Mutagenic, Teratogenic and Transmutational Effects of Tritium," Citizens Awar eness Network, April 1994.
31     This trend of increasing amounts of tritium releases is dangerous because tritium has carcinogenic, mutagenic, teratogenic and
 
transmutational properties whose effect upon the environment which have
 
not been considered in the SEIS.
33     The coastline around Millstone is lined with beaches and shoreline
 
communities, with many summer residents as well. Human activities in the
 
area include swimming, boating, fishing, clamming, scalloping. Thus there
 
are ample opportunities for liquid tritium contamination of people and shore
 
and marine life.
It is undeniable that the more the pressurized water reactors of Units 2 and 3 operate, the more tritium by-products they will create and release
 
into the environment.
The current stated policy of both Dominion and the nuclear power industry in general is to operate power reactors as close to maximum
 
capacity as possible. In 2003 Millstone 3 operated at almost 100%
 
capacity. Millstone 2 operated at 80% capacity, but only because it shut
 
down for refueling.
The increasing amounts of tritium discharged into Long Island Sound means that Dominion's claim that it "does not anticipate any significant
 
changes to radioactive releases or exposures from Millstone operations
 
during the renewal period" is false. Therefore the NRC's conclusion that "impacts to the environment are not expected to change" is also false.
Given this history, the NRC should mandate the immediate installation of filters to mitigate liquid tritium discharges from Millstone units 2 and 3.
Given this history, the NRC should mandate the immediate installation of filters to mitigate liquid tritium discharges from Millstone units 2 and 3.
In addition, the NRC should mandate the testing of drinking water, well water and groundwater and in marine life in areas affected by Millstone for the presence of tritium. At present only sea water is tested for tritium.
Until these measures have been put into place and monitoring results have been made public until Millstones current operating licenses expire, or units 2 and 3 permanently shut down, the NRC should not consider granting license extensions for Millstone units 2 and 3, in consideration of the health and safety of the public.


In addition, the NRC should mandate the testing of drinking water, well
32 4.1 Cooling System The GEIS identifies the issue of scouring caused by discharged cooling water as a Category 1 issue. As a Category 1 issue, the NRC staff will not review it on a Millstone site-specific basis in the absence of new and significant information.
 
The SEIS states the NRC staff has not identified any significant new information during its independent review of the Dominion ER, the staffs site visit, the scoping process, its review of monitoring programs, or its evaluation of other available information.
water and groundwater and in marine life in areas affected by Millstone for
Yet, scouring caused by discharged cooling water was identified by a technician in the Millstone Environmental Laboratory as an irreversible environmental impact during a recent public presentation on Dominions environmental impacts presented at the Three Rivers Community College.
 
Accordingly, the NRC staff should request Dominion to release details to it of this new and significant information.
the presence of tritium. At present only sea water is tested for tritium.
4.1.1 Entrainment of Fish and Shellfish in Early Life Stages Entrainment of winter flounder larvae at the Millstone intakes is a major issue and it is one which has been the subject of much litigation in the Connecticut courts. Lawsuits have been brought by local fishermen complaining that Millstone intake structures have driven the indigenous Niantic winter flounder population to near-extinction. The fishermen have successfully resisted dilatory and repetitive motions on the part of Dominion and Northeast Utilities to dismiss their claims.
Until these measures have been put into place and monitoring results have been made public until Millstone's current operating licenses expire, or units 2 and 3 permanently shut down, the NRC should not consider
 
granting license extensions for Millstone units 2 and 3, in consideration of
 
the health and safety of the public.
324.1 Cooling System The GEIS identifies the issue of scouring caused by discharged cooling water as a Category 1 issue. As a "Category 1" issue, the NRC staff will not
 
review it on a Millstone site-specific basis in the absence of "new and
 
significant information."
The SEIS states the NRC staff "has not identified any significant new information during its independent review of the Dominion ER, the staff's
 
site visit, the scoping process, its review of monitoring programs, or its
 
evaluation of other available information."
Yet, scouring caused by discharged cooling water was identified by a technician in the Millstone Environmental Laboratory as an irreversible
 
environmental impact during a recent public presentation on Dominion's
 
environmental impacts presented at the Three Rivers Community College.
Accordingly, the NRC staff should request Dominion to release details to it of this "new and significant information."4.1.1 Entrainment of Fish and Shellfish in Early Life Stages Entrainment of winter flounder larvae at the Millstone intakes is a major issue and it is one which has been the subject of much litigation in the
 
Connecticut courts. Lawsuits have been brought by local fishermen
 
complaining that Millstone intake structures have driven the indigenous
 
Niantic winter flounder population to near-extinction. The fishermen have
 
successfully resisted dilatory and repetitive motions on the part of
 
Dominion and Northeast Utilities to dismiss their claims.
The SEIS states:
The SEIS states:
The staff independently reviewed the Millstone Units 2 and 3 ER
[Environmental Report], visited the site, and reviewed the applicants NPDES permit. The staff also reviewed relevant scientific articles and agency documents (CTDEP) and NOAA (National Oceanic and Atmospheric Administration) Fisheries (also known as National Marine


    "The staff independently reviewed the Millstone Units 2 and 3 ER
34 See Northeast Utilities 1997 Annual Radiological Environmental Operating Report at Section 4.17.2 (Cs-137 was detected in one sample from the Niantic Bay (location 35).
[Environmental Report], visited the site, and reviewed the applicant's
Positive indications are seldom seen in this media outside of the immediate discharge vicinity.)
 
33 Fisheries Service [NMFS], interviewed agency staff, and interviewed a faculty member at the University of Connecticut who has conducted research on entrainment at Millstone. [Crivello 2003]
NPDES permit. The staff also reviewed relevant scientific articles and
Astonishingly, the NRC staff does not report any attempt to consult with the fishermen who are targeted in the SEIS for the demise of the Niantic winter flounder population. Had the NRC staff attempted to locate commercial fishermen who fish for Niantic winter flounder near Millstone, it would have learned that the resource has vanished and, with it, the fishermen and a way of life.
 
Nor, apparently, did the NRC staff make any effort to consult with the experts who have testified in court proceedings to the overwhelming evidence that the suction action of the Millstone intake structures is the predominant cause of the collapse of the Niantic winter flounder population and has been since 1986, when Millstone Unit 3 went online.
agency documents (CTDEP) and NOAA (National Oceanic and
Northeast Utilities obtained operating licenses for Millstone in the 1970s based on projections - possibly knowingly bogus - that the Millstone intake structures would have a far less devastating effect on the Niantic winter flounder larvae than has in fact occurred.
 
Although NRC staff spoke with Prof. Crivello of the University of Connecticut, who has studied Millstone entrainment, the staff does not explicitly identify Prof. Crivello as a paid consultant to Millstones owners and operators each time his name appears in the SEIS.
Atmospheric Administration) Fisheries (also known as National Marine 34 See Northeast Utilities 1997 Annual Radiologi cal Environmental Operating Report at Section 4.17.2 ("Cs-137 was detected in one samp le from the Niantic Bay (location 35).
Why did the NRC staff not meet with DEPs Victor Crecco, author of reports debunking Dominions theorizing about the Millstone impacts on the Niantic winter flounder collapse?
Positive indications are seldom seen in th is media outside of the immediate discharge vicinity.")
The SEIS analysis of the collapse of the indigenous fishing stocks does not mention the discovery of a fish caught in Niantic Bay in 1997 contaminated with cesium-137 - nor Northeast Utilities acknowledgment that the cesium-137 originated in its nuclear operations.34
33 Fisheries Service [NMFS], interviewed agency staff, and interviewed a faculty member at the University of Connecticut who has conducted
 
research on entrainment at Millstone." [Crivello 2003]
Astonishingly, the NRC staff does not report any attempt to consult with the fishermen who are targeted in the SEIS for the demise of the Niantic winter flounder population. Had the NRC staff attempted to locate
 
commercial fishermen who fish for Niantic winter flounder near Millstone, it
 
would have learned that the resource has vanished and, with it, the
 
fishermen and a way of life.
Nor, apparently, did the NRC staff make any effort to consult with the experts who have testified in court proceedings to the overwhelming
 
evidence that the suction action of the Millstone intake structures is the
 
predominant cause of the collapse of the Niantic winter flounder population
 
and has been since 1986, when Millstone Unit 3 went online.
Northeast Utilities obtained operating licenses for Millstone in the 1970s based on projections - possibly knowingly bogus - that the Millstone intake
 
structures would have a far less devastating effect on the Niantic winter
 
flounder larvae than has in fact occurred.
Although NRC staff spoke with Prof. Crivello of the University of Connecticut, who has studied Millstone entrainment, the staff does not
 
explicitly identify Prof. Crivello as a paid consultant to Millstone's owners
 
and operators each time his name appears in the SEIS.
Why did the NRC staff not meet with DEP's Victor Crecco, author of reports debunking Dominion's theorizing about the Millstone impacts on the
 
Niantic winter flounder collapse?
The SEIS analysis of the collapse of the indigenous fishing stocks does not mention the discovery of a fish caught in Niantic Bay in 1997
 
contaminated with cesium-137 - nor Northeast Utilities' acknowledgment
 
that the cesium-137 originated in its nuclear operations.
34 35 See [citation to follow]
34    The SEIS analysis does not mention the build-up of cobalt-60 in Jordan Cove near the Millstone discharge point 35 nor does the SEIS analyze the contribution of cobalt-60 buildup in sediment as a contributing factor in the
 
collapse of the population of the bottom-feeding Niantic winter flounder.
Attributing the collapse of the fishing stocks to elevated water temperatures, the SEIS fails to consider the contribution of Millstone's 24-
 
hour-a-day, seven-day-a-week thermal discharges to the Long Island
 
Sound. While the SEIS reports that "[T]he CTDEP [Division of Marine Fisheries which has been analyzing this issue for nearly a decade] believes that
 
Millstone is having a significant impact due to entrainment of winter
 
flounder larvae," the SEIS relies on NOAA and NMFS reports - which
 
contain no data of the unique conditions at Niantic Bay but are devoted to a
 
broad, regional analysis of fishing stocks -  to discredit CTDEP Division of
 
Marine Fisheries, as follows:
Regulatory agencies concerned with the management of winter flounder have concluded that the resource is overfished and
 
overexploited (NOAA 1998; NMFS 2003) and have instituted
 
measures to reduce fishing pressure throughout Long Island Sound
 
and the southern New England-middle-Atlantic region. Thus, there is
 
ample evidence to suggest that fishing pressure is directly contributing to the decline both local and regional levels at and may represent the major impact to this resource. The extent to which
 
Dominion contributes to or exacerbates the problem in the Niantic
 
River system is not elucidated by fish population studies reviewed in
 
this SEIS." [Emphasis added.]
As stated, the SEIS does not identify either a NOAA or NFSS study specific to the Niantic River winter flounder nor the recent fishing habits of
 
commercial fishermen in the area; thus, its failure to accord credit to the
 
CTDEP for its insights appears to be result-driven, to obscure and
 
downplay the fact that the Millstone Nuclear Power State has been the
 
primary factor in driving indigenous fishing stocks to collapse. Or, as Rhode
 
Island expert on Niantic winter flounder, Mark Gibson - a witness whose
 
testimony aided Connecticut Superior Court Judge Robert Hale in issuing a 36 Draft NUREG-1437, Supplement 22, 2-26 (December 2004) 35 temporary restraining order keeping Millstone Unit 2 shut down during the 1999 spawning season to avoid harmful entrainment effects to the fish


population - has stated, Millstone is the worst predator of fish in the
35 See [citation to follow]
34 The SEIS analysis does not mention the build-up of cobalt-60 in Jordan Cove near the Millstone discharge point35 nor does the SEIS analyze the contribution of cobalt-60 buildup in sediment as a contributing factor in the collapse of the population of the bottom-feeding Niantic winter flounder.
Attributing the collapse of the fishing stocks to elevated water temperatures, the SEIS fails to consider the contribution of Millstones 24-hour-a-day, seven-day-a-week thermal discharges to the Long Island Sound.
While the SEIS reports that [T]he CTDEP [Division of Marine Fisheries which has been analyzing this issue for nearly a decade] believes that Millstone is having a significant impact due to entrainment of winter flounder larvae, the SEIS relies on NOAA and NMFS reports - which contain no data of the unique conditions at Niantic Bay but are devoted to a broad, regional analysis of fishing stocks - to discredit CTDEP Division of Marine Fisheries, as follows:
Regulatory agencies concerned with the management of winter flounder have concluded that the resource is overfished and overexploited (NOAA 1998; NMFS 2003) and have instituted measures to reduce fishing pressure throughout Long Island Sound and the southern New England-middle-Atlantic region. Thus, there is ample evidence to suggest that fishing pressure is directly contributing to the decline both local and regional levels at and may represent the major impact to this resource. The extent to which Dominion contributes to or exacerbates the problem in the Niantic River system is not elucidated by fish population studies reviewed in this SEIS. [Emphasis added.]
As stated, the SEIS does not identify either a NOAA or NFSS study specific to the Niantic River winter flounder nor the recent fishing habits of commercial fishermen in the area; thus, its failure to accord credit to the CTDEP for its insights appears to be result-driven, to obscure and downplay the fact that the Millstone Nuclear Power State has been the primary factor in driving indigenous fishing stocks to collapse. Or, as Rhode Island expert on Niantic winter flounder, Mark Gibson - a witness whose testimony aided Connecticut Superior Court Judge Robert Hale in issuing a


Northeast.
36 Draft NUREG-1437, Supplement 22, 2-26 (December 2004) 35 temporary restraining order keeping Millstone Unit 2 shut down during the 1999 spawning season to avoid harmful entrainment effects to the fish population - has stated, Millstone is the worst predator of fish in the Northeast.
The SEIS concludes:
The SEIS concludes:
The staff's evaluation of past impacts of entrainment on Niantic River winter flounder is inconclusive because unresolved questions remain
The staffs evaluation of past impacts of entrainment on Niantic River winter flounder is inconclusive because unresolved questions remain about population dynamics, life history, and unknown factors that may be impacting the population. The available data do not allow us to unequivocally link or decouple population declines with Millstone operations... Because the spawning adult population is very low, and in consideration of the 20-year license renewal period, the staffs conclusion is that the impacts would be moderate.
 
The Coalition has reference to Figure 2-6 (Comparison of Winter Flounder Population Trends in Niantic River and Long Island Sound.36 This figure illustrates clearly that while the winter flounder fishing stocks in the region are rebounding - perhaps due in part to fishing restrictions that apply throughout the region - the Niantic River winter flounder population continues its collapse.
about population dynamics, life history, and unknown factors that
The facts available to the NRC staff demonstrate that the sole factor which has prevented the Niantic River winter flounder population from enjoying a rebound as has the species elsewhere in the region due to tightened fishing restrictions is the most obvious one: the Millstone Nuclear Power Station.
 
It is submitted that if the SEIS staff had pondered the ramifications of Figure 2-6 in consultation with the Niantic fishermen who have gone out of business and the fishermens expert witnesses and CTDEPs marine biologist Victor Crecco, in light of all the facts and circumstances, the NRC staff would have been compelled to categorize the impact to Niantic winter flounder from continued operations of Millstone in a license renewal period to be major and devastating and probably irreversible.
may be impacting the population. The available data do not allow us
 
to unequivocally link or decouple population declines with Millstone
 
operations . . . Because the spawning adult population is very low, and in consideration of the 20-year license renewal period, the staff's
 
conclusion is that the impacts would be moderate.
The Coalition has reference to Figure 2-6 ("Comparison of Winter Flounder Population Trends in Niantic River and Long Island Sound".
36 This figure illustrates clearly that while the winter flounder fishing stocks in the
 
region are rebounding - perhaps due in part to fishing restrictions that
 
apply throughout the region - the Niantic River winter flounder population
 
continues its collapse.
The facts available to the NRC staff demonstrate that the sole factor which has prevented the Niantic River winter flounder population from
 
enjoying a rebound as has the species elsewhere in the region due to


tightened fishing restrictions is the most obvious one: the Millstone Nuclear
Power Station.
It is submitted that if the SEIS staff had pondered the ramifications of Figure 2-6 in consultation with the Niantic fishermen who have gone out of
business and the fishermen's expert witnesses and CTDEP's marine
biologist Victor Crecco, in light of all the facts and circumstances, the NRC
staff would have been compelled to categorize the impact to Niantic winter
flounder from continued operations of Millstone in a license renewal period
to be "major" and devastating and probably irreversible.
37 Report of a commercial lobsterman to the Coalition.
37 Report of a commercial lobsterman to the Coalition.
36     The weight of credible evidence is that the operations of the Millstone Nuclear Power Station have driven the winter flounder to virtual extinction, a phenomenon not contemplated in the original Millstone environmental
36 The weight of credible evidence is that the operations of the Millstone Nuclear Power Station have driven the winter flounder to virtual extinction, a phenomenon not contemplated in the original Millstone environmental impact statement. Future entrainment during the license renewal period will definitely assure that the once-abundant, commercially important resource will never return.
 
4.1.2.1 Impingement Monitoring 4.1.2.2. Impingement Mortality At the request of Northeast Utilities, CT DEP permitted routine impingement monitoring for Unit 2 to cease in December 1987. Unit 2 did not have a fish return and all impinged marine organisms were presumed lost. Routine impingement monitoring has never been conducted for Unit 3.
impact statement. Future entrainment during the license renewal period will
The most recent data for Unit 2 involves sampling collected biweekly from July 2000 to June 2001. It is questionable whether the Unit 2 fish return was in operation during such period.37 Data for Unit 3 involve samplings collected biweekly from January to December 1993.
 
These samplings do not suffice in frequency to form a data base to support conclusions about impingement during the 35-year operations of Millstone, nor to provide an adequate basis for extrapolation to the future.
definitely assure that the once-abundant, commercially important resource
 
will never return.
4.1.2.1 Impingement Monitoring 4.1.2.2. Impingement Mortality At the request of Northeast Utilities, CT DEP permitted routine impingement monitoring for Unit 2 to cease in December 1987. Unit 2 did
 
not have a fish return and all impinged marine organisms were presumed
 
lost. Routine impingement monitoring has never been conducted for Unit 3.
The most recent data for Unit 2 involves sampling collected biweekly from July 2000 to June 2001. It is questionable whether the Unit 2 fish
 
return was in operation during such period.
37 Data for Unit 3 involve samplings collected biweekly from January to December 1993.
These samplings do not suffice in frequency to form a data base to support conclusions about impingement during the 35-year operations of
 
Millstone, nor to provide an adequate basis for extrapolation to the future.
Thus, the SEIS statement:
Thus, the SEIS statement:
Based on the assessment to date, the staff expects that the measures in place at Millstone Units 2 and 3 (i.e., aquatic organism
Based on the assessment to date, the staff expects that the measures in place at Millstone Units 2 and 3 (i.e., aquatic organism return systems) provide mitigation for impacts related to impingement, and no new mitigation measures are warranted.
 
return systems) provide mitigation for impacts related to
 
impingement, and no new mitigation measures are warranted.
is not supported by genuine evidence.
is not supported by genuine evidence.
4.1.3 Heat Shock
4.1.3 Heat Shock The SEIS states:


The SEIS states:
38 See GEISS Appendix E.19 37 Millstone has remained in compliance with the NPDES thermal and discharge volume limits at the quarry cut. [SEIS at page 4-28]
38 See GEISS Appendix E.19 37 Millstone has remained in compliance with the NPDES thermal and discharge volume limits at the quarry cut. [SEIS at page 4-28]
Yet, the SEIS report is absent any indicia of an independent basis from which to render such a conclusion.
Yet, the SEIS report is absent any indicia of an independent basis from which to render such a conclusion.
The SEIS states:
The SEIS states:
The [NRC] staff also independently reviewed monitoring reports for the cooling-water discharge mixing zone. . . .the boundary of the
The [NRC] staff also independently reviewed monitoring reports for the cooling-water discharge mixing zone....the boundary of the mixing zone cannot exceed a radius of 2438 m (8000 ft) from discharge outlet at the quarry cut.
 
The SEIS report does not identify a single monitoring report by date or otherwise; any conclusions regarding the cooling-water discharge mixing zone are utterly unsubstantiated.
mixing zone cannot exceed a radius of 2438 m (8000 ft) from
4.3 Radiological Impacts of Normal Operations The NRC SEIS staff review of Millstone data on the most critical issue of radiological impacts of normal operations was self-limited to the years 2001, 2002 and 2003.
 
The NRC GEIS staff review of Millstone data on the most critical issue of radiological impacts of normal operations was self-limited to the years 1985, 1986 and 1987.38 Thus, in its consideration of whether the Millstone Nuclear Power Station should be permitted to operate in the years 2015-2025 (Unit 2) and 2025-2045 (Unit 3), the NRC deliberately failed to consider the radiological impacts of normal operations for the years 1970-1984, 1988-2000 and 2004 to the present.
discharge outlet at the quarry cut.
Put another way, the NRC considered Millstones radiological impacts of normal operations for only 6 of the 35 years the Millstone nuclear reactors have been routinely releasing harmful radiation into the environment - just 17 per cent of Millstones operational history. Twenty-
The SEIS report does not identify a single monitoring report by date or otherwise; any conclusions regarding the cooling-water discharge mixing
 
zone are utterly unsubstantiated.
4.3 Radiological Impacts of Normal Operations
 
The NRC SEIS staff review of Millstone data on the most critical issue of "radiological impacts of normal operations" was self-limited to the years
 
2001, 2002 and 2003.
The NRC GEIS staff review of Millstone data on the most critical issue of "radiological impacts of normal operations" was self-limited to the years
 
1985, 1986 and 1987.
38     Thus, in its consideration of whether the Millstone Nuclear Power
 
Station should be permitted to operate in the years 2015-2025 (Unit 2) and
 
2025-2045 (Unit 3), the NRC deliberately failed to consider the "radiological
 
impacts of normal operations" for the years 1970-1984, 1988-2000 and
 
2004 to the present.
Put another way, the NRC considered Millstone's "radiological impacts of normal operations" for only 6 of the 35 years the Millstone nuclear
 
reactors have been routinely releasing harmful radiation into the
 
environment - just 17 per cent of Millstone's operational history. Twenty-38 nine (29) years of Millstone's routine releases of harmful radiation releases to the environment are not evaluated in either the GEIS or the SEIS.
By limiting the pool of data considered in the GEIS and the SEIS to a period of time which encompasses only 17 per cent of Millstone's
 
operational history of harmful radiation releases to the environment, the
 
NRC failed to consider all available information. The NRC's evaluation of
 
future impacts based on past impacts rests of an inadequate data base and
 
its conclusions are accordingly unreliable, if not invalid. Certainly, the NRC
 
staff's consideration of "cumulative" impacts (SEIS section 4.8.3) is
 
scientifically unsound if not indeed scientifically fraudulent, since the NRC
 
staff did not review, tabulate or assess the full scope of past impacts to be
 
able to "accumulate" cumulate impacts..
On its website, www.nrc.gov/who-we-are/values.html, the NRC states that it "adheres" to "Principles of Good Regulation" which include the
 
following:
Independence: . . . Final decisions must be based on objective, unbiased assessments of all information, and must be documented
 
with reasons explicitly stated."
The SEIS and GEIS systematically exclude all available information concerning Millstone's radiological effluents for the years 1970-1985, 1988-
 
2000 and 2004 to the present. No reason for such exclusion is explicitly


stated.     The GEIS addresses radiological impacts of "normal" operations of nuclear power plants during a projected renewal period as follows:
38 nine (29) years of Millstones routine releases of harmful radiation releases to the environment are not evaluated in either the GEIS or the SEIS.
By limiting the pool of data considered in the GEIS and the SEIS to a period of time which encompasses only 17 per cent of Millstones operational history of harmful radiation releases to the environment, the NRC failed to consider all available information. The NRCs evaluation of future impacts based on past impacts rests of an inadequate data base and its conclusions are accordingly unreliable, if not invalid. Certainly, the NRC staffs consideration of cumulative impacts (SEIS section 4.8.3) is scientifically unsound if not indeed scientifically fraudulent, since the NRC staff did not review, tabulate or assess the full scope of past impacts to be able to accumulate cumulate impacts..
On its website, www.nrc.gov/who-we-are/values.html, the NRC states that it adheres to Principles of Good Regulation which include the following:
Independence:... Final decisions must be based on objective, unbiased assessments of all information, and must be documented with reasons explicitly stated.
The SEIS and GEIS systematically exclude all available information concerning Millstones radiological effluents for the years 1970-1985, 1988-2000 and 2004 to the present. No reason for such exclusion is explicitly stated.
The GEIS addresses radiological impacts of normal operations of nuclear power plants during a projected renewal period as follows:
Radiation exposures to public (license renewal term):
Radiation exposures to public (license renewal term):
GEIS: "Radiation doses to the public will continue at current levels associated with normal operations." (GEIS 4.6.2)
GEIS: Radiation doses to the public will continue at current levels associated with normal operations. (GEIS 4.6.2)
Occupational radiation exposures (license renewal term):
Occupational radiation exposures (license renewal term):
GEIS: Projected maximum occupational doses during the license renewal term are within the range of doses experienced during


GEIS: "Projected maximum occupational doses during the license renewal term are within the range of doses experienced during 39 See GEIS, Table E19.
39 See GEIS, Table E19.
39 normal operations and normal maintenance outages, and would be well below regulatory limits.
39 normal operations and normal maintenance outages, and would be well below regulatory limits.
The GEIS categorizes the issue of "radiological impacts of normal operations" as a Category 1 issue, meaning that the SEIS reviewing staff
The GEIS categorizes the issue of radiological impacts of normal operations as a Category 1 issue, meaning that the SEIS reviewing staff need not consider site-specific issues at all in the absence of new and significant information.
 
The Coalition believes that radiological impacts of normal operations must be considered on a site-specific basis with regard to Millstone Units 2 and 3 as a Category 2 issue. See discussion at page 32 et seq. infra.
need not consider site-specific issues at all in the absence of "new and
Because the SEIS did not consider the issue as a Category 2 issue, the SEIS is deeply flawed and inadequate and falls far short of meeting the NRCs Principles of Good Regulation.
 
Finally, as stated, the SEIS states that the NRC staff is not required to evaluate Millstone radiation releases on a site-specific basis because Millstone releases were subjected to site-specific analysis in the GEIS which found them to be well within regulatory limits. This statement is most misleading in that it fails to acknowledge that the NRC GEIS staff limited itself to reviewing Millstones reported radiological emissions for the years 1985, 1986 and 1987 only.39 Millstones largest reactor, the 1,220-megaWatt Unit 3 - was still under construction in 1985. By the year 1987, it had not established an operational record; it has since substantially increased output and, hence, routine radiological emissions.
significant information."
GEIS Section 4.6 (Radiological Impacts of Normal Operation) provides in pertinent part as follows:
The Coalition believes that "radiological impacts of normal operations" must be considered on a site-specific basis with regard to Millstone Units 2
This section provides an evaluation of the radiological impacts on occupational personnel and members of the public during normal operation following license renewal. This evaluation extends to all 118 nuclear power reactors. Radiation exposures occurring after license renewal are projected based on present levels of exposures.
 
Estimates of additional maintenance, testing and inspections as a result of a variety of age-related changes in operational procedures were made based on the anticipated changes to current operation and are detailed in Section 2.6 and Appendix B. Added maintenance,
and 3 as a Category 2 issue. See discussion at page 32 et seq. infra
.Because the SEIS did not consider the issue as a Category 2 issue, the
 
SEIS is deeply flawed and inadequate and falls far short of meeting the
 
NRC's "Principles of Good Regulation."
Finally, as stated, the SEIS states that the NRC staff is not required to evaluate Millstone radiation releases on a site-specific basis because
 
Millstone releases were subjected to site-specific analysis in the GEIS
 
which found them to be "well within regulatory limits." This statement is
 
most misleading in that it fails to acknowledge that the NRC GEIS staff
 
limited itself to reviewing Millstone's reported radiological emissions for the
 
years 1985, 1986 and 1987 only.
39 Millstone's largest reactor, the 1,220-megaWatt Unit 3 - was still under construction in 1985. By the year 1987, it
 
had not established an operational record; it has since substantially
 
increased output and, hence, "routine" radiological emissions.
 
GEIS Section 4.6 ("Radiological Impacts of Normal Operation")
provides in pertinent part as follows:
 
This section provides an evaluation of the radiological impacts on
 
occupational personnel and members of the public during normal
 
operation following license renewal. This evaluation extends to all


118 nuclear power reactors. Radiation exposures occurring after
40 See discussion at page 10 supra.
 
40 testing, and inspection will be accompanied by increased exposure time to members of the work force but are not expected to significantly influence dose to members of the public.
license renewal are projected based on present levels of exposures.
As noted,40 the GEIS was published in 1996. Hence the above statement, Radiation exposures occurring after license renewal are projected based on present levels of exposures, must be read with regard to 1996-or-earlier levels of exposure, rather than actual current exposures. However, the NRC SEIS staff limited its review to 2001-2003 data, rather than actual current exposures. As also noted, the NRC GEIS staff only reviewed Millstones 1985-1987 exposure data.
 
Estimates of additional maintenance, testing and inspections as a
 
result of a variety of age-related changes in operational procedures
 
were made based on the anticipated changes to current operation
 
and are detailed in Section 2.6 and Appendix B. Added maintenance, 40 See discussion at page 10 supra.
40 testing, and inspection will be accompanied by increased exposure time to members of the work force but are not expected to
 
significantly influence dose to members of the public.
As noted, 40 the GEIS was published in 1996. Hence the above statement, "Radiation exposures occurring after license renewal are
 
projected based on present levels of exposures," must be read with regard
 
to 1996-or-earlier levels of exposure, rather than actual "current"
 
exposures. However, the NRC SEIS staff limited its review to 2001-2003
 
data, rather than actual "current" exposures. As also noted, the NRC GEIS
 
staff only reviewed Millstone's 1985-1987 exposure data.
With regard to the above statement:
With regard to the above statement:
 
Estimates of additional maintenance, testing and inspections as a result of a variety of age-related changes in operational procedures were made based on the anticipated changes to current operation and are detailed in Section 2.6 and Appendix B.
Estimates of additional maintenance, testing and inspections as a result of a variety of age-related changes in operational procedures
the SEIS fails to identify or evaluate any additional maintenance, testing and inspections as a result of a variety of age-related changes in operational procedures at Millstone.
 
were made based on the anticipated changes to current operation
 
and are detailed in Section 2.6 and Appendix B.
the SEIS fails to identify or evaluate any "additional maintenance, testing and inspections as a result of a variety of age-related changes in
 
operational procedures" at Millstone.
With regard to the above statement:
With regard to the above statement:
Added maintenance, testing, and inspection will be accompanied by increased exposure time to members of the work force but are not
Added maintenance, testing, and inspection will be accompanied by increased exposure time to members of the work force but are not expected to significantly influence dose to members of the public the SEIS fails to identify or evaluate any added maintenance, testing, and inspection at Millstone and hence fails to evaluate increased exposure time to members of the work force and members of the public during the proposed renewal period.
 
The SEIS also fails to consider the environmental impact of Dominions August 24, 2004 submittal to the NRC requesting approval of the Nuclear Facility Quality Assurance Program Description. According to an Request for Additional Information (RAI), dated February 24, 2005, this program
expected to significantly influence dose to members of the public the SEIS fails to identify or evaluate any "added maintenance, testing, and inspection "at Millstone and hence fails to evaluate increased exposure
 
time to members of the work force and members of the public during the
 
proposed renewal period.
The SEIS also fails to consider the environmental impact of Dominion's August 24, 2004 submittal to the NRC requesting approval of the "Nuclear
 
Facility Quality Assurance Program Description." According to an Request
 
for Additional Information ("RAI"), dated February 24, 2005, this program 41 deletes from the Millstone Quality Assurance program radiological protection responsibilities which include "maintaining records and reports
 
on radioactive contamination levels." If this application is approved, a
 
safeguard to protect against excessive worker radiological contamination
 
will be lost and there will be no basis for the NRC to conclude now that
 
occupational radiation exposures during the license renewal term will be
 
small and within regulatory limits.
The NRC SEIS staff accepted at face value Dominion's self-assessment that it would not conduct "major" refurbishment in the future. Thus, the NRC
 
SEIS staff considered neither "major" or "minor" refurbishments. The NRC
 
SEIS staff's conclusions about the radiological impacts during
 
refurbishment are therefore necessarily flawed. Given the strong likelihood
 
that major refurbishment in the form of a stationwide conversion from once-
 
through cooling to closed cooling systems will be ordered by the
 
Connecticut DEP - to avoid future exposure of pregnant women and others
 
to harmful radioactive and toxic waste effluents in the "mixing zone" and to
 
avoid irreversible impacts to the indigenous Niantic winter flounder - the
 
radiological impacts from such refurbishment should have been fully
 
explored and analyzed in the SEIS.
The NRC's GEIS further states at section 4.6.1.1:
To determine whether the added period of operation following license renewal would, by virtue of buildup, result in significant (double)
 
added dose, the ratios of buildup factors for midlives of 30 to midlives
 
of 20 years were evaluated. These ratios amount to a 35 per cent
 
increase for Cesium-137 and a 6 per cent increase for cobalt-60.
 
This added increase due to buildup will not significantly change the
 
total dose to members of the public.
In certain cases, the bioaccumulation factors may require reexamination. These principally involve fish (in the human food
 
chain) that are bottom feeders. Bottom feeders may ingest worms


and other biota that may remobilize radioactive materials
41 deletes from the Millstone Quality Assurance program radiological protection responsibilities which include maintaining records and reports on radioactive contamination levels. If this application is approved, a safeguard to protect against excessive worker radiological contamination will be lost and there will be no basis for the NRC to conclude now that occupational radiation exposures during the license renewal term will be small and within regulatory limits.
The NRC SEIS staff accepted at face value Dominions self-assessment that it would not conduct major refurbishment in the future. Thus, the NRC SEIS staff considered neither major or minor refurbishments. The NRC SEIS staffs conclusions about the radiological impacts during refurbishment are therefore necessarily flawed. Given the strong likelihood that major refurbishment in the form of a stationwide conversion from once-through cooling to closed cooling systems will be ordered by the Connecticut DEP - to avoid future exposure of pregnant women and others to harmful radioactive and toxic waste effluents in the mixing zone and to avoid irreversible impacts to the indigenous Niantic winter flounder - the radiological impacts from such refurbishment should have been fully explored and analyzed in the SEIS.
The NRCs GEIS further states at section 4.6.1.1:
To determine whether the added period of operation following license renewal would, by virtue of buildup, result in significant (double) added dose, the ratios of buildup factors for midlives of 30 to midlives of 20 years were evaluated. These ratios amount to a 35 per cent increase for Cesium-137 and a 6 per cent increase for cobalt-60.
This added increase due to buildup will not significantly change the total dose to members of the public.
In certain cases, the bioaccumulation factors may require reexamination. These principally involve fish (in the human food chain) that are bottom feeders. Bottom feeders may ingest worms and other biota that may remobilize radioactive materials accumulated in the sediments.
Accumulation of radioactive materials in the environment is of concern not only to license renewal but also to operation under present licenses.


accumulated in the sediments.
Accumulation of radioactive materials in the environment is of concern not only to license renewal but also to operation under
present licenses.
41 See discussion at page 8 supra.
41 See discussion at page 8 supra.
42 See 1997 Annual Radiological Environm ental Monitoring Program Report.
42 See 1997 Annual Radiological Environmental Monitoring Program Report.
42     As stated, 41 the bioaccumulation of cobalt-60 in sediment in Jordan Cove near the Millstone discharge point has been established. The SEIS
42 As stated,41 the bioaccumulation of cobalt-60 in sediment in Jordan Cove near the Millstone discharge point has been established. The SEIS does not address this phenomenon, even though required by the GEIS.
 
Millstones monitoring of the aquatic environment in the area of the discharge has also revealed the presence of the following plant-related radionuclides: cobalt-60, zinc-65, silver-110 and cesium-137.42 In 1997 and at other times, [I]ndications of plant releases were observed in aquatic flora, including detectable levels of cobalt-60, zinc-65 and silver-110. According to the 1997 Radiological Environmental report filed by Northeast Utilities, The detection of these [radio]nuclides throughout the year, as witnessed by positives detected in other aquatic media, correspond to radioactive liquid discharges from the three Millstone units.
does not address this phenomenon, even though required by the GEIS.
Sampling of this media provides useful information because it is very sensitive to plant discharges. However, since seaweed is not consumed, other media are utilized in the determination of dose consequences (e.g., see Shellfish and Fish results)
Millstone's monitoring of the aquatic environment in the area of the discharge has also revealed the presence of the following plant-related
The presence of cesium-137 in a fish caught in the mixing zone within the Niantic Bay - as identified as a plant-related contamination in the 1997 Millstone effluent report - suggests widespread bioaccumulation of that carcinogenic radioisotope within the environment, requiring a re-examination pursuant to GEIS standards.
 
The radiological impacts of normal operations should be analyzed as a site-specific Category 2 issue.
radionuclides: cobalt-60, zinc-65, silver-110 and cesium-137.
4.4 Socioeconomic Impacts of Plant Operations During the License Renewal Period The SEIS considers the economic contribution to the community through payment of Dominions workforce; however, the SEIS does not separate out the economic investment made in maintaining a workforce to monitor Unit 1, a nuclear power plant undergoing decommissioning, and its
42     In 1997 and at other times, "[I]ndications of plant releases were
 
observed" in aquatic flora, including detectable levels of cobalt-60, zinc-65
 
and silver-110. According to the 1997 Radiological Environmental report
 
filed by Northeast Utilities, The detection of these [radio]nuclides throughout the year, as witnessed by positives detected in other aquatic media, correspond
 
to radioactive liquid discharges from the three Millstone units.
 
Sampling of this media provides useful information because it is very
 
sensitive to plant discharges. However, since seaweed is not
 
consumed, other media are utilized in the determination of dose
 
consequences (e.g., see Shellfish and Fish results)
The presence of cesium-137 in a fish caught in the "mixing zone" within the Niantic Bay - as identified as a plant-related contamination in the 1997
 
Millstone effluent report - suggests widespread bioaccumulation of that
 
carcinogenic radioisotope within the environment, requiring a "re-
 
examination pursuant to GEIS standards.
The "radiological impacts of normal operations" should be analyzed as a site-specific Category 2 issue.
4.4 Socioeconomic Impacts of Plant Operations During the License Renewal Period The SEIS considers the economic contribution to the community through payment of Dominion's workforce; however, the SEIS does not


separate out the economic investment made in maintaining a workforce to
43 repository of spent nuclear fuel. Nor does the SEIS consider the prospect of a continuing workforce required to maintain Units 2 and 3 in the event each or both units is/are decommissioned or prematurely shut down before or during the renewal period.
 
The SEIS does not consider the enormous health care costs associated with the communitys long-term exposure to low-level ionizing radiation, nor worker illnesses related to their exposures. We are aware of a recent surgery, upon a patient whose cancer is fairly linked to Millstone radiological and toxic chemical emissions, which cost in excess of $2.5 million. This does not include follow-up or lifelong care.
monitor Unit 1, a nuclear power plant undergoing decommissioning, and its 43 repository of spent nuclear fuel. Nor does the SEIS consider the prospect of a continuing workforce required to maintain Units 2 and 3 in the event
 
each or both units is/are decommissioned or prematurely shut down before
 
or during the renewal period.
The SEIS does not consider the enormous health care costs associated with the community's long-term exposure to low-level ionizing radiation, nor
 
worker illnesses related to their exposures. We are aware of a recent
 
surgery, upon a patient whose cancer is fairly linked to Millstone
 
radiological and toxic chemical emissions, which cost in excess of $2.5
 
million. This does not include follow-up or lifelong care.
The SEIS is incomplete and inaccurate in its assessment of socioeconomic impacts.
The SEIS is incomplete and inaccurate in its assessment of socioeconomic impacts.
4.4.6 Environmental Justice The SEIS does not address the environmental justice issues involved in the transportation and storage of nuclear waste generate by the Millstone
4.4.6 Environmental Justice The SEIS does not address the environmental justice issues involved in the transportation and storage of nuclear waste generate by the Millstone Nuclear Power Station, either during its 35 years of operations or in the future. Transportation through poor urban areas and storage of Millstones nuclear waste in poor rural communities both implicate environmental justice concerns; neither aspect was addressed in the SEIS.
 
4.7 Evaluation of Potential New and Significant Information on Impacts of Operations During the Renewal Term The Connecticut Coalition Against Millstone and others have provided the SEIS staff with new and significant information which, once considered, dictates site-specific review as Category 2 issues or, in the alternative, rejection of the SEIS in toto.
Nuclear Power Station, either during its 35 years of operations or in the
The new and significant information may be summarized as follows:
 
Millstone causes cancer and Millstone is responsible
future. Transportation through poor urban areas and storage of Millstone's
 
nuclear waste in poor rural communities both implicate environmental
 
justice concerns; neither aspect was addressed in the SEIS.
4.7 Evaluation of Potential New and Significant Information on Impacts of Operations During the Renewal Term The Connecticut Coalition Against Millstone and others have provided the SEIS staff with "new and significant information" which, once
 
considered, dictates site-specific review as Category 2 issues or, in the


alternative, rejection of the SEIS in toto. The "new and significant" information may be summarized as follows:
43 See footnote 4 supra.
Millstone causes cancer and Millstone is responsible 43 See footnote 4 supra.
44 See the list of radionuclides listed at pages 34-35.
44 See the list of radionuclides listed at pages 34-35.
45 See the list of chemical effluent emissions listed at pages 36-40.
45 See the list of chemical effluent emissions listed at pages 36-40.
44 for an increased cancer incidence in the surrounding community.
44 for an increased cancer incidence in the surrounding community.
The SEIS states that "commentators" have provided "no evidence to support a causal relationship between increased cancer incidence and
The SEIS states that commentators have provided no evidence to support a causal relationship between increased cancer incidence and Millstone operations.
The NRCs SEIS staff concluded that the information provided during the scoping process was not new and significant with respect to the findings of the GEIS on the health effects to the public from radiological effluent releases due to the Millstone operations.
To the contrary: the Coalition and others have presented overwhelming and unrebutted evidence of a causal relationship between increased cancer incidence and Millstone operations.
While these facts are significant, they are not new.
Since practically the onset of Millstone nuclear operations, Millstones radiological emissions have been linked to heightened cancer incidences.43 This is hardly surprising.
Since the onset of its operations, Millstones owners and operators have submitted reports to the NRC and the DEP detailing their radiological44 and chemical45 effluent emissions to the air and water.
Millstone routinely releases to the air and water the following radioactive materials:
Ag Be-7 Ce-144


Millstone operations."
46 Fission and Activation Products - Millstone Unit 2 Liquid Effluents - Batch Sampling -
The NRC's SEIS staff concluded that the information provided during the scoping process was not new and significant with respect
1997 as reported in 1997 Radiological Environmental Monitoring Program.
 
45 Co-57 Co-58 Co-60 Cr-51 Cs-134 Cs-137 Fe-55 Fe-59 I-131 I-133 Kr-85 Kr-88 La-140 Mn-54 Mo-99 Na-24 Nb-95 Nb-97 Ru-105 Sb-122 Sb-124 Sb-125 Sn-113 Sr-89 Sr-90 Sr-92 TC-99M TC-101 TC-104 Tritium Xe-133 Xe-135 Zn-69M Zr-95 Zr-9746 This list is not exhaustive.
to the findings of the GEIS on the health effects to the public from radiological effluent releases due to the Millstone operations."
To the contrary: the Coalition and others have presented overwhelming and unrebutted evidence of a causal relationship between increased


cancer incidence and Millstone operations.
47 See selected bibliography prepared by Nuclear Information Resource Service, attached.
While these facts are "significant," they are not "new."
48 U.S. Environmental Protection Agency website, Understanding Radiation: Health Effects (3/16/05) 49 U.S. Nuclear Regulatory Commission website, Fact Sheet: Biological Effects of Radiation. (3/26/05) 46 All radionuclides released by Millstone cause cancer.47 According to the U.S. Environmental Protection Agency, Radioactive materials that decay spontaneously produce ionizing radiation. Any living tissue in the human body can be damaged by ionizing radiation. Cancer is considered by most people the primary health effect from radiation exposure.
Since practically the onset of Millstone nuclear operations, Millstone's radiological emissions have been linked to heightened cancer incidences.
43    This is hardly surprising.
Since the onset of its operations, Millstone's owners and operators have submitted reports to the NRC and the DEP detailing their radiological 44 and chemical 45 effluent emissions to the air and water.      Millstone routinely releases to the air and water the following radioactive materials:
Ag Be-7 Ce-144 46 Fission and Activation Products - Millstone Unit 2 Liquid Effluents - Batch Sampling -
1997 as reported in 1997 Radiological Environmental Monitoring Program.
45 Co-57 Co-58 Co-60 Cr-51 Cs-134 Cs-137 Fe-55 Fe-59 I-131 I-133 Kr-85 Kr-88 La-140 Mn-54 Mo-99 Na-24 Nb-95 Nb-97 Ru-105 Sb-122 Sb-124 Sb-125 Sn-113 Sr-89 Sr-90 Sr-92 TC-99M TC-101 TC-104 Tritium Xe-133 Xe-135 Zn-69M Zr-95 Zr-97 46    This list is not exhaustive.
47 See selected bibliography prepared by Nuclear Information Resource Service, attached.48 U.S. Environmental Protection Agency website, "Understanding Radiation: Health Effects" (3/16/05) 49 U.S. Nuclear Regulatory Commission webs ite, "Fact Sheet: Biological Effects of Radiation." (3/26/05) 46     All radionuclides released by Millstone cause cancer.
47     According to the U.S. Environmental Protection Agency, Radioactive materials that decay spontaneously produceionizing radiation. Any living tissue in the human body can be damaged by ionizing radiation. Cancer is considered by most people the primary health effect from radiation exposure.
Simply put, cancer is the uncontrolled growth of cells.
Simply put, cancer is the uncontrolled growth of cells.
Ordinarily, natural processes control the rate at which cells grow and replace themselves. They also control the body's processes
Ordinarily, natural processes control the rate at which cells grow and replace themselves. They also control the bodys processes for repairing and replacing damages tissue. Damage occurring at the cellular or molecular level can disrupt the control processes, permitting the uncontrolled growth of cells - cancer.
This is why ionizing radiations ability to break chemical bonds in atoms and molecules makes it such a potent carcinogen....
There is no firm basis for setting a safe level of exposure above background for stochastic effects [those resulting from long-term, low-level exposure to radiation].... Other than cancer, the most prominent long-term health effects [from radiation exposure] are teratogenic [those that result from the exposure of fetuses or unborn children to radiation] and genetic
[those that can be passed from parent to child] mutations.48 According to the U.S. Nuclear Regulatory Commission, genetic effects and the development of cancer are the primary health concerns attributed to radiation exposure.49 Many chemicals discharged by Millstone are known carcinogens, such as hydrazine, hexavalent chromium, cadmium, lead and benzene and many others.


for repairing and replacing damages tissue. Damage occurring
50 Millstone 1997 Radiological Environmental Monitoring Program Report and documents filed with Connecticut DEP.
47 Millstone routinely discharges into the nuclear/chemical mixing zone which extends 8,000 feet toward the Niantic and Waterford shorelines, the following chemicals and others:50 Chemicals & Metals Known or Suspected Present in Discharge Aluminum Antimony Ammonia Ammonium Hydroxide Arsenic Barium Beryllium Boric Acid Boron Bromide Bulab 6002 Cadmium Carbohydrazide Chlorine Chromium Cobalt Conquor 3585 (methoxypropylamine and diethylhydroxylamine)
Copper Cyanide Dietylhydroxylamine Epichlorohydrin Ethanolomine Fluoride Freon Hexavalent Chromium Hydrazine Hydrogen Peroxide Iron Methoxypropylamine Molybdate


at the cellular or molecular level can disrupt the control
48 Molybdenum Nalcolyte Nickel Nitrogen Oil & Grease Phosphorus Selenium Silver Styrene Sulfate Sulfide Sulfite Surfactants Thallium Tin Titanium Tolyltriazole Xylene Zinc Zirconium Volatiles Acrolein Acrylonitrile Benzene Bromoform Carbon Tetrachloride Chlorobenzene Chlorodibromomethane Chloroethane 2-Chloroethylvinyl Ether Chloroform Dichlorobromomethane 1, 1-Dichloroethane 1, 2-Dichloroethane 1, 1-Dichloroethylene 1, 2-Dichloropropane 1, 3-Dichloropropylene Ethylbenzene


processes, permitting the uncontrolled growth of cells - cancer.
49 Methylbromide Methylchloride Methylene Chloride 1, 1, 2, 2, -Tetrachloroethane Tetrachloroethylene Toluene 1, 2-Trans-Dichloroethylene 1, 1, 1-Trichloroethane 1, 1, 2-Trichloroethane Trichloroethylene Vinyl Chloride GC/MS Fraction Acid Compounds 2-Chlorophenol 2, 4-Dichlorophenol 2, 4-Dimethylphenol 4, 6-Dinitro-O-Cresol 2, 4-Dinitrophenol 2-Nitrophenol 4-Nitrophenol P-Chloro-M-Cresol Pentachlorophenol Phenol 2, 4, 6-Trichlorophenol Base Neutral Compounds Acenaothylene Benzidine Benzo(a)anthracene Benzo(a)pyrene Benzo(ghi)perylene Benzo(k)fluoranthene Bis(2-Chloroethyl) Ether Bis(2-Ethylhexyl)phthalate Chrysene Dibenzo(ah)anthracene 1,2-Dichlorobenzene 1.3-Dichlorobenzene 1.4-Dichlorobenzene
This is why ionizing radiation's ability to break chemical bonds
 
in atoms and molecules makes it such a potent carcinogen. . . .
 
There is no firm basis for setting a "safe" level of exposure
 
above background for stochastic effects [those resulting from
 
long-term, low-level exposure to radiation]. . . . Other than
 
cancer, the most prominent long-term health effects [from
 
radiation exposure] are teratogenic [those that result from the
 
exposure of fetuses or unborn children to radiation] and genetic
 
[those that can be passed from parent to child] mutations.
48    According to the U.S. Nuclear Regulatory Commission, geneticeffects and the development of cancer are the primary health
 
concerns attributed to radiation exposure.
49     Many chemicals discharged by Millstone are known carcinogens, such as hydrazine, hexavalent chro mium, cadmium, lead and benzeneand many others.
50 Millstone 1997 Radiological Environm ental Monitoring Program Report and documents filed with Connecticut DEP.
47    Millstone routinely discharges into the nuclear/chemical "mixing zone" which extends 8,000 feet toward the Niantic and Waterford
 
shorelines, the following chemicals and others:
50 Chemicals & Metals "Known or Suspected Present" in Discharge Aluminum Antimony Ammonia Ammonium Hydroxide
 
Arsenic Barium Beryllium Boric Acid
 
Boron Bromide Bulab 6002
 
Cadmium Carbohydrazide
 
Chlorine Chromium Cobalt Conquor 3585 (methoxypropylamine and diethylhydroxylamine)
 
Copper Cyanide Dietylhydroxylamine Epichlorohydrin
 
Ethanolomine
 
Fluoride Freon Hexavalent Chromium Hydrazine Hydrogen Peroxide
 
Iron Methoxypropylamine Molybdate 48MolybdenumNalcolyte Nickel Nitrogen Oil & Grease
 
Phosphorus
 
Selenium Silver Styrene Sulfate Sulfide Sulfite Surfactants
 
Thallium Tin Titanium Tolyltriazole Xylene Zinc Zirconium Volatiles AcroleinAcrylonitrile
 
Benzene Bromoform Carbon Tetrachloride
 
Chlorobenzene
 
Chlorodibromomethane
 
Chloroethane 2-Chloroethylvinyl Ether
 
Chloroform
 
Dichlorobromomethane
 
1, 1-Dichloroethane
 
1, 2-Dichloroethane 1, 1-Dichloroethylene
 
1, 2-Dichloropropane 1, 3-Dichloropropylene Ethylbenzene 49MethylbromideMethylchloride Methylene Chloride
 
1, 1, 2, 2, -Tetrachloroethane Tetrachloroethylene
 
Toluene 1, 2-Trans-Dichloroethylene
 
1, 1, 1-Trichloroethane
 
1, 1, 2-Trichloroethane Trichloroethylene Vinyl Chloride GC/MS Fraction Acid Compounds 2-Chlorophenol 2, 4-Dichlorophenol 2, 4-Dimethylphenol
 
4, 6-Dinitro-O-Cresol
 
2, 4-Dinitrophenol
 
2-Nitrophenol
 
4-Nitrophenol
 
P-Chloro-M-Cresol
 
Pentachlorophenol
 
Phenol 2, 4, 6-Trichlorophenol Base Neutral CompoundsAcenaothylene Benzidine Benzo(a)anthracene Benzo(a)pyrene Benzo(ghi)perylene
 
Benzo(k)fluoranthene Bis(2-Chloroethyl) Ether Bis(2-Ethylhexyl)phthalate Chrysene Dibenzo(ah)anthracene
 
1,2-Dichlorobenzene
 
1.3-Dichlorobenzene
 
1.4-Dichlorobenzene 50 3.3-DichlorobenzidinesDiethyl phthalate Dimethyl phthalate Di-n-butyl phthalate
 
2,4-Dinitrotoulene 1,2-Diphenylhydrazine
 
Fluoranthene
 
Fluorene Hexachlorobenzene Hexachlorocyclopentadiene
 
Hexachloroethane Indenol1,2,3-ed)pyrene
 
Isophorone
 
Nurobenzene N-Nitrosodimethylamine N-Nitrosodiphenylamine
 
Phenanthrene Pyrene Pesticides Aldrin Chlordane DDT DDE Dieldrin Endosulfan(alpha)


50 3.3-Dichlorobenzidines Diethyl phthalate Dimethyl phthalate Di-n-butyl phthalate 2,4-Dinitrotoulene 1,2-Diphenylhydrazine Fluoranthene Fluorene Hexachlorobenzene Hexachlorocyclopentadiene Hexachloroethane Indenol1,2,3-ed)pyrene Isophorone Nurobenzene N-Nitrosodimethylamine N-Nitrosodiphenylamine Phenanthrene Pyrene Pesticides Aldrin Chlordane DDT DDE Dieldrin Endosulfan(alpha)
Endosulfan (beta)
Endosulfan (beta)
 
Endosulfan Sulfae Endrin Endrin Aldehyde Heptachlor Heotachlor epoxide Arochlor 1016(PCB)
Endosulfan Sulfae
 
Endrin Endrin Aldehyde
 
Heptachlor
 
Heotachlor epoxide
 
Arochlor 1016(PCB)
 
Arochlor 1232(PCB)
Arochlor 1232(PCB)
Arochlor 1242(PCB)
Arochlor 1242(PCB)
Arochlor 1248 (PCB)
Arochlor 1248 (PCB)
Arochlor 1254 (PCB)
Arochlor 1254 (PCB)
Arochlor 1260 (PCB)
Arochlor 1260 (PCB)
Toxaphene


Toxaphene 51 See Memorandum of Ernest J. Sternglass, Ph.D. dated March 8, 2005 ("Synergistic Interaction of radiation, Air Pollution and Chemicals") and references therein (copy attached). And see "Health Effects of sele cted Industrial Chemicals and Radionuclides"(STAND Technical Report 2003-2) at page 5 (copy attached).
51 See Memorandum of Ernest J. Sternglass, Ph.D. dated March 8, 2005 (Synergistic Interaction of radiation, Air Pollution and Chemicals) and references therein (copy attached). And see Health Effects of selected Industrial Chemicals and Radionuclides (STAND Technical Report 2003-2) at page 5 (copy attached).
52 See 1997 Annual Radiological Envir onmental Operating Report at page 4-5.
52 See 1997 Annual Radiological Environmental Operating Report at page 4-5.
53 See [citation to follow]
53 See [citation to follow]
51 Other Substances Ammonia Benzo(b)fluoranthene
51 Other Substances Ammonia Benzo(b)fluoranthene Chlorine Hexachlorocyclohexane (Alpha)
 
Chlorine Hexachlorocyclohexane (Alpha)
Hexachlorocyclohexane (Beta)
Hexachlorocyclohexane (Beta)
Hexachlorocyclohexane (Gamma)
Hexachlorocyclohexane (Gamma) 2,3,7,8-TCDD The interaction of radionuclides and chemicals has been established to create a synergy, multiplying the harmful effects of each.51 Millstone discharges these radionuclides and chemicals - and more - into the air and into the nuclear/chemical mixing zone known as Niantic Bay, Pleasure Beach and Jordan Cove, defined as an area within 8,000 feet of the Millstone discharge point.
Some of the radionuclides, such as cesium-137, have been found in fish swimming in Niantic Bay.52 Some of the radionuclides, such as cobalt-60, have been found in the sediment of Jordan Cove where they enter the food chain when they are ingested by worms.53 Some of the radionuclides and toxic chemicals very likely entered Zachary M. Hartleys mother while she was swimming in the nuclear/chemicalmixing zone popularly known as Hole-in-the-Wall Beach during critical months of her pregnancy with Zachary, according to an expert on the health effects of low-level ionizing


2,3,7,8-TCDD The interaction of radionuclides and chemicals has beenestablished to create a synergy, multiplying the harmful effects of
54 See footnote 14 supra.
 
52 radiation, Dr. Helen Caldicott.54 Four pathways are possible:
each.51    Millstone discharges these radionuclides and chemicals - and
 
more - into the air and into the nuclear/chemical "mixing zone" known as Niantic Bay, Pleasure Beach and Jordan Cove, defined as
 
an area within 8,000 feet of the Millstone discharge point.
Some of the radionuclides, such as cesium-137, have been foundin fish swimming in Niantic Bay.
52    Some of the radionuclides, such as cobalt-60, have been found in
 
the sediment of Jordan Cove where they enter the food chain whenthey are ingested by worms.
53    Some of the radionuclides and toxic chemicals very likely entered Zachary M. Hartley's mother while she was swimming in the nuclear/chemical"mixing zone" popularly known as Hole-in-the-Wall Beach during critical months of her pregnancy with Zachary, according to an expert on the health effects of low-level ionizing 54 See footnote 14 supra.
52 radiation, Dr. Helen Caldicott.
54 Four pathways are possible:
breathing, swallowing, skin contact and eating a radioactive fish.
breathing, swallowing, skin contact and eating a radioactive fish.
Zachary was born with a rare cancer in his jawbone requiring lifesaving surgery.
Zachary was born with a rare cancer in his jawbone requiring lifesaving surgery.
In SEIS section 4.7, beginning on page 4-53, the NRC states,"During scoping, some commentators suggested that operation of
In SEIS section 4.7, beginning on page 4-53, the NRC states, "During scoping, some commentators suggested that operation of Millstone resulted in excess cancers in populations around the plant site," and "other support of these positions at the May 2004 public meeting or thereafter commentators suggested there is no relationship between cancer incidence and nuclear power plants.
 
Millstones cumulative dose to the environment and humans, based on annual Millstone reports filed with the NRC since 1970, totals over 6.5 curies. As reported in the response to section 2.2.7, releases of tritium into Long Island Sound since Millstones restart in 1998 are at all time highs in its operating history.
Millstone resulted in excess cancers in populations around the plant site," and "other support of these positions at the May 2004 public
Current annual plant reports indicate that Millstone Units 2 and 3, as in the years since 1970, have been releasing radionuclides such as strontium-90, cesium-137, iodine-131, -133 and -135, cobalt -58 and -
 
60, krypton-85, xenon-131, -133 and -135, and other such radioactive chemicals, all known to be carcinogenic.
meeting or thereafter commentators suggested there is no
The NRCs denial of a causal relationship between Millstones 35 years of radioactive releases and elevated cancer rates in nearby towns, and in New London County as a whole, does not hold up to scrutiny.
 
The most glaring example of the NRCs denial in the Millstone SEIS is its complete omission of consideration of the August 17, 2004 declaration of Dr. Ernest J. Sternglass. The Millstone SEIS lists, on page C-9, Dr. Sternglass declaration as received on August 17, 2004.
relationship between cancer incidence and nuclear power plants."
This is the only mention of it in the SEIS.
Millstone's cumulative dose to the environment and humans, based on annual Millstone reports filed with the NRC since 1970, totals over 6.5 curies. As reported in the response to section 2.2.7, releases of tritium into Long Island Sound since Millstone's restart in 1998 are at all time highs in its operating history.
Consequently, the declaration was omitted from the NRCs evaluation of potential new and significant information in section 4.7.
Current annual plant reports indicate that Millstone Units 2 and 3,as in the years since 1970, have b een releasing radionuclides such as strontium- 90, cesium-137, iodine-131, -133 and -135, cobalt -58 and -
60, krypton-85, xenon-131, -133 and -135, and other such radioactive
 
chemicals, all known to be carcinogenic.
The NRC's denial of a causal relationship between Millstone's 35years of radioactive releases and elevated cancer rates in nearby towns, and in New London County as a whole, does not hold up to scrutiny. The most glaring example of the NRC's denial in the Millstone SEIS is its complete omission of consideration of the August 17, 2004
 
declaration of Dr. Ernest J. Sternglass. The Millstone SEIS lists, on
 
page C-9, Dr. Sternglass' declaration as received on August 17, 2004.
This is the only mention of it in the SEIS. Consequently, the declaration was omitted from the NRC's evaluation of potential new and significant information in section 4.7.
53    In his declaration, Dr. Sternglass presents his credentials as an expert in the field of radiation and human health. He has written and
 
published numerous studies in this field in peer reviewed scientific
 
journals and testified to Congress and other government agencies on
 
this subject.
 
The NRC knows full well who Dr. Sternglass is. He first brought up the
 
problem of radioactive releases in relation to increasing cancer rates
 
around nuclear plants, and in towns near Millstone in particular, to the public eye in the 1970s. He has conducted and published studies
 
informing the public of this continuing problem ever since.      In his declaration, Dr. Sternglass methodically outlines the "causalrelationship between abnormally high doses of strontium-90 in milk
 
produced near Millstone and the pattern of cancer changes at various
 
distances from the Millstone plant. Dr. Sternglass also states in his declaration, "It is my professional opinion that the radioactive releases from the Millstone Nuclear
 
Power Station since its startup have caused and will continue to cause [emphasis added] excess infant mortality, low birthweight, leukemia and cancer as well as increased rates of both chronic and
 
infectious diseases in the towns around Millstone as well as in New London County and Connecticut as a whole."    For the NRC to exclude Dr. Sternglass' declaration from section 4.7 is a glaring major error in that in and of itself invalidates the NRC's
 
conclusion that "information provided during the scoping process
 
was not new and significant with respect to the findings of the GEIS
 
on the health effects to the public from radiological effluent releases
 
due to the Millstone operations."
This statement rather is indicative of the NRC's determination to support the nuclear industry's-and in this case Dominion's-rush to
 
relicense old unsafe nuclear plants, to the detriment of the public'shealth and safety.
 
This bias is repeated in statements and omission throughout section
 
4.7, as the following will demonstrate. For example, in dealing with the Connecticut Tumor Registry's report, "Cancer Incidence in Connecticut Counties 1995-99," the NRC 54does report that New London County "had the highest incidence rate of all invasive tumors for females," but omits that this rate was second highest for males, as was reported at the May 2004 public
 
meeting. Furthermore, the NRC characterizes information in the reportindicating that New London County had the highest rate for 12
 
specific kinds of cancers as "several forms," a choice of words that
 
seeks to minimize a major health crisis.
The NRC also fails to mention information from the report, whichwas testified to at the May 2004 public meeting, that New London County had the second highest rate for six more kinds of cancer, third
 
highest for five additional ones, and fourth highest for seven more, totally 30 out of 39 kinds of cancers in which New London County was counted separately. All of the above reveals a deliberate and systematic attempt to exclude the most important "new and significant" information about


Millstone radioactive releases and its effects on human health. Similarly, in dealing with a 2003 study by Joseph Mangano et al,presented at the May 2004 public meeting, "Elevated Childhood
53 In his declaration, Dr. Sternglass presents his credentials as an expert in the field of radiation and human health. He has written and published numerous studies in this field in peer reviewed scientific journals and testified to Congress and other government agencies on this subject.
The NRC knows full well who Dr. Sternglass is. He first brought up the problem of radioactive releases in relation to increasing cancer rates around nuclear plants, and in towns near Millstone in particular, to the public eye in the 1970s. He has conducted and published studies informing the public of this continuing problem ever since.
In his declaration, Dr. Sternglass methodically outlines the "causal relationship between abnormally high doses of strontium-90 in milk produced near Millstone and the pattern of cancer changes at various distances from the Millstone plant.
Dr. Sternglass also states in his declaration, "It is my professional opinion that the radioactive releases from the Millstone Nuclear Power Station since its startup have caused and will continue to cause [emphasis added] excess infant mortality, low birthweight, leukemia and cancer as well as increased rates of both chronic and infectious diseases in the towns around Millstone as well as in New London County and Connecticut as a whole."
For the NRC to exclude Dr. Sternglass declaration from section 4.7 is a glaring major error in that in and of itself invalidates the NRCs conclusion that "information provided during the scoping process was not new and significant with respect to the findings of the GEIS on the health effects to the public from radiological effluent releases due to the Millstone operations."
This statement rather is indicative of the NRCs determination to support the nuclear industrys-and in this case Dominions-rush to relicense old unsafe nuclear plants, to the detriment of the publics health and safety.
This bias is repeated in statements and omission throughout section 4.7, as the following will demonstrate.
For example, in dealing with the Connecticut Tumor Registrys report, "Cancer Incidence in Connecticut Counties 1995-99," the NRC


Cancer Incidence Proximate to U.S. Nuclear Power Plants," the SEIS selectively focuses on information from the study that indicates there may not be a causal relationship between Millstone's radioactive releases and health problems. So the NRC states the study "reported no significant difference in childhood cancer mortality rates between
54 does report that New London County "had the highest incidence rate of all invasive tumors for females," but omits that this rate was second highest for males, as was reported at the May 2004 public meeting.
Furthermore, the NRC characterizes information in the report indicating that New London County had the highest rate for 12 specific kinds of cancers as "several forms," a choice of words that seeks to minimize a major health crisis.
The NRC also fails to mention information from the report, which was testified to at the May 2004 public meeting, that New London County had the second highest rate for six more kinds of cancer, third highest for five additional ones, and fourth highest for seven more, totally 30 out of 39 kinds of cancers in which New London County was counted separately.
All of the above reveals a deliberate and systematic attempt to exclude the most important "new and significant" information about Millstone radioactive releases and its effects on human health.
Similarly, in dealing with a 2003 study by Joseph Mangano et al, presented at the May 2004 public meeting, "Elevated Childhood Cancer Incidence Proximate to U.S. Nuclear Power Plants," the SEIS selectively focuses on information from the study that indicates there may not be a causal relationship between Millstones radioactive releases and health problems. So the NRC states the study "reported no significant difference in childhood cancer mortality rates between counties surrounding the nuclear plants and the U.S. population."
This would be fine and fair if the agency did not also exclude the major finding of the study, which is that "cancer incidence for children less than 10 years of age, who live within 30 miles of each of 14 plants [one of which is Millstone] in the eastern U.S. (49 counties with a population of more than 16 million) exceeds the national average. The excess 12.4% suggests that 1 in 9 cancers among children who reside near nuclear reactors is linked to radioactive emissions."


counties surrounding the nuclear plants and the U.S. population."     This would be fine and fair if the agency did not also exclude themajor finding of the study, which is that "cancer incidence for children less than 10 years of age, who live within 30 miles of each of
55 Once again, this omission is deliberate and systematic, serving the nuclear industrys interests to the detriment of the publics health and safety.
The NRC also failed to mention numerous other studies listed in the bibliography of study that have linked radioactive releases from nuclear facilities to elevated cancers.
Another example of this exclusion of new and significant information is the NRCs treatment of the 1990 National Cancer Institute study of cancer in counties near nuclear power plants.
That study found that the risk for leukemia in children under 10 in New London County was over 3 times higher than for same aged children in "control counties" used for comparison. The NRC focused on NRC information that sought to downplay of that finding.
However, the NRC excluded other NCI information cited by Joseph Mangano in his report, also presented and testified to at the May 2004 public meeting, entitled "2500 Excess Cancer Cases in New London County Since 1970; Radioactive Emissions From Millstone May Be Cause." In that report Mangano stated, "in Millstones first 14 years, leukemia cases for New London County children under 10 were 55%
higher than the state, and leukemia deaths 45% higher. All scientists agree that children are most sensitive to low-level radiations effects."
Once again, the NRCs failure to give equal weight to critical evidence invalidates its analysis and makes its conclusions false, as well as disqualifying itself as a just arbiter.
Another example is its treatment of another Connecticut Tumor Registry report, which examines cancer incidence in Connecticut towns 1995-99, rather than by county.
First of all, this report was not brought in by the public during the scoping process. The NRC decided to do so on its own as part of its response to information presented at the May 2004 public meeting and thereafter. Why? The NRC reported on the results of the study for only one town, Waterford, site of Millstone. The NRC reported "The


14 plants [one of which is Millstone] in the eastern U.S. (49 counties
55 See Cancer Incidences in Connecticut Towns 1995-1999, as compiled by Michael Steinberg, attached.
56 town of Waterford does not have the highest ratio of observed cancers to expected cancers for any form of cancer analyzed."
As the NRC well knows, there is no barrier to prevent Millstone radioactive emissions from traveling beyond the boundaries of the town of Waterford. A more comprehensive such analysis would have included other towns near Millstone. But the NRC didnt do that, once again excluding critical information.
However, investigative journalist and author Michael Steinberg of Niantic, CT, did perform such an analysis, including the towns of Waterford, East Lyme, Old Lyme, New London and Groton together.
Steinbergs analysis, included herein, found higher than expected incidence of cancer in these towns together for: all female cancers, lung cancer for females, colorectal cancers for females, prostate cancer for males, breast cancer for females, melanoma for both males and females, and cervical cancer for females.55 These findings are consistent with findings presented from the Connecticut Tumor Registrys study of Connecticut Counties 1995-99, as well as information presented in Manganos 1998 study "2500 Excess Cancer Cases...", Sternglass declaration, and a new study by Mangano presented at the January 11, 2005 meeting.
Finally, the NRC reports in section 4.7 that a 2000 study by the Connecticut Academy of Science and Engineering (CASE) found that "The town of Waterford was not in the highest ratio category for any cancer except thyroid cancer, and at least three other town had higher ratios for thyroid cancer. At least 30 town had higher ratios for pediatric leukemia (ages 0 to 14) than Waterford."
First of all, this analysis, as reported above, is defective by limiting it to Waterford. Secondly, the CASE study focused on the Connecticut Yankee Nuclear Plant, and Millstone is never mentioned in it.
Therefore radioactive emissions from Millstone are not considered in its analysis. Furthermore, information for cancer is not reported statistically by town, other than in maps where towns are not


with a population of more than 16 million) exceeds the national average. The excess 12.4% suggests that 1 in 9 cancers among
56 We attach a study critical of the CASE report, entitled Epidemiological Evaluation of the CASE Report Entitled Study of Radiation Exposure from the Connecticut Yankee Nuclear Power Plant(Suzanne Gutter and Edwin van Wijngarden)(February 21, 2001) 57 identified specifically but are marked by varying shades of white to black.
Nevertheless, the maps do indicate elevated cancers in towns around Millstone for all the specific kinds of cancers studied: thyroid cancer is elevated not only in Waterford, but also in Groton, Old Lyme and Stonington. Multiple myeloma is elevated for Waterford. And acute adult leukemia is elevated for Groton and Ledyard, both downwind of Millstone.
However, while the CASE study uses information from the Connecticut Tumor Registry for 1976-95, i does not look for trends over those years (e.g. by comparing cancer rate increases or decreases over 5 year periods, as was done in studies by Sternglass and Mangano).
The CASE study was initiated in 1997. At that time, all three Millstone reactors had been shut down for two years because of gross mismanagement and harassment of whistleblowers. At that time Northeast Utilities owned and operated Millstone, and still owned the permanently shut down Connecticut Yankee Nuclear Plant. CASE reports that Northeast Utilities was one of its top financial supporters at that time, and its website still shows NU at the top of its list of financial supporters.56 Thus NU in effect was a major funder of the CASE study, which means CASE had a major conflict of interest, one that put pressure on it to come up with results that would please the hand that feeds it.
All the above points to the failure of the NRC to conduct a fair and unbiased analysis of the critical information given as public testimony at the May 2004 pubic meeting in Waterford, Connecticut, and in documents presented there and thereafter to the NRC.
As a result the NRCs conclusion that there is not new and significant information is fatally flawed. The agency excluded and downplayed the critical information that was presented, information


children who reside near nuclear reactors is linked to radioactive
57 See www.dph.state.ct.us/OPPE/hptumor.htm 58 that establishes a strong and clear relationship between Millstones 35 years of radioactive emissions and the concurrent rise of cancers and other diseases in towns around Millstone and in New London County, as well as across Connecticut and into Rhode Island.
 
While the Connecticut Tumor Registry is a source of much information about the heightened incidence of cancer and related diseases in the area surrounding Millstone, it is not a completely reliable source of information.
emissions."
Zachary M. Hartley is not the only victim of Millstones radiological and toxic chemical releases. In any individual cancer case, a 100 per cent positive correlation with a suspected causative agent cannot be made. That is why we rely on all available information obtained formally - such as the Connecticut Tumor Registry and epidemiological research - as well as informally, through reports of victims themselves or their family members to understand the scope of this public health emergency.
55    Once again, this omission is deliberate and systematic, serving thenuclear industry's interests to the detr iment of the public's health andsafety.      The NRC also failed to mention numerous other studies listed inthe bibliography of study that have linked radioactive releases from
Although Zachary was born in Connecticut with a life-threatening cancer in his jaw and although a tumor the size of an orange was removed from his face when he was 14 months of age, the Connecticut Tumor Registry does not list Zacharys cancer. The Registrys explanation is that a portion of Zacharys tumor was benign and therefore it does not qualify for listing in the Connecticut Tumor Registry.
 
nuclear facilities to elevated cancers.
Another example of this exclusion of new and significant information is the NRC's treatment of the 1990 National Cancer Institute study of cancer in counties near nuclear power plants.      That study found that the risk for leukemia in children under 10 inNew London County was over 3 times higher than for same aged
 
children in "control counties" u sed for comparison. The NRC focusedon NRC information that sought to downplay of that finding.      However, the NRC excluded other NCI information cited by JosephMangano in his report, also presented and testified to at the May 2004
 
public meeting, entitled "2500 Excess Cancer Cases in New London County Since 1970; Radioactive Emissions From Millstone May Be Cause." In that report Mangano stated, "in Millstone's first 14 years, leukemia cases for New London County children under 10 were 55%higher than the state, and leukemia deaths 45% higher. All scientists agree that children are most sensitive to low-level radiation's effects."    Once again, the NRC's failure to give equal weight to criticalevidence invalidates its analysis and makes its conclusions false, as well as disqualifying itself as a just arbiter.
Another example is its treatment of another Connecticut TumorRegistry report, which examines cancer incidence in Connecticut towns 1995-99, rather than by county.      First of all, this report was not brought in by the public during the scoping process. The NRC decided to do so on its own as part of its response to information presented at the May 2004 public meeting and thereafter. Why? The NRC reported on the results of the study for only one town, Waterford, site of Millstone. The NRC reported "The 55 See "Cancer Incidences in Connecticut Towns 1995-1999," as compiled by Michael Steinberg, attached.
56 town of Waterford does not have the highest ratio of observed cancers to expected cancers for any form of cancer analyzed."    As the NRC well knows, there is no barrier to prevent Millstoneradioactive emissions from traveling beyond the boundaries of the
 
town of Waterford. A more comprehensive such analysis would have included other towns near Millstone. But the NRC didn't do that, once
 
again excluding critical information.
However, investigative journalist and author Michael Steinberg ofNiantic, CT, did perform such an analysis, including the towns of Waterford, East Lyme, Old Lyme, New London and Groton together.
Steinberg's analysis, included herein, found higher than expected
 
incidence of cancer in these towns together for: all female cancers, lung cancer for females, color ectal cancers for females, prostate cancer for males, breast cancer for females, melanoma for both males
 
and females, and cervical cancer for females.
55    These findings are consistent with findings presented from the Connecticut Tumor Registry's study of Connecticut Counties 1995-99, as well as information presented in Mangano's 1998 study "2500 Excess Cancer Cases...", Sternglass' declaration, and a new study by Mangano presented at the January 11, 2005 meeting. Finally, the NRC reports in section 4.7 that a 2000 study by theConnecticut Academy of Science and Engineering (CASE) found that "The town of Waterford was not in the highest ratio category for anycancer except thyroid cancer, and at least three other town had higher ratios for thyroid cancer. At least 30 town had higher ratios for
 
pediatric leukemia (ages 0 to 14) than Waterford."    First of all, this analysis, as reported above, is defective by limitingit to Waterford. Secondly, the CASE study focused on the Connecticut Yankee Nuclear Plant, and Millstone is never mentioned in it.
 
Therefore radioactive emissions from Millstone are not considered in its analysis. Furthermore, information for cancer is not reported statistically by town, other than in maps where towns are not 56 We attach a study critical of the CASE report, entitled "Epidemiological Evaluation of the CASE Report Entitled 'Study of Radiat ion Exposure from the Connecticut Yankee Nuclear Power Plant'"(Suzanne Gutter and Edwin van Wijngarden)(February 21, 2001) 57identified specifically but are marked by varying shades of white to black. Nevertheless, the maps do indicate elevated cancers in townsaround Millstone for all the specific kinds of cancers studied: thyroid cancer is elevated not only in Waterford, but also in Groton, Old Lyme and Stonington. Multiple myeloma is elevated for Waterford. And acute adult leukemia is elevated for Groton and Ledyard, both
 
downwind of Millstone.
However, while the CASE study uses information from the Connecticut Tumor Registry for 1976-95, i does not look for trends over those years (e.g. by comparing cancer rate increases or decreases over 5 year periods, as was done in studies by Sternglass
 
and Mangano). The CASE study was initiated in 1997. At that time, all threeMillstone reactors had been shut down for two years because of
 
gross mismanagement and harassmen t of whistleblowers. At that time Northeast Utilities owned and operated Millstone, and still owned the permanently shut down Connecticut Yankee Nuclear Plant. CASE
 
reports that Northeast Utilities was one of its top financial supporters
 
at that time, and its website still shows NU at the top of its list of
 
financial supporters.
56    Thus NU in effect was a major funder of the CASE study, which
 
means CASE had a major conflict of interest, one that put pressure on
 
it to come up with results that would please the hand that feeds it.
All the above points to the failure of the NRC to conduct a fair andunbiased analysis of the critical information given as public testimony at the May 2004 pubic meeting in Waterford, Connecticut, and in
 
documents presented there and thereafter to the NRC.
 
As a result the NRC's conclusion that there is not new and significant information is fatally flawed. The agency excluded and downplayed the critical inform ation that was presented, information 57 See www.dph.state.c t.us/OPPE/hptumor.htm 58 that establishes a strong and clear relationship between Millstone's35 years of radioactive emissions and the concurrent rise of cancers
 
and other diseases in towns around Millstone and in New London County, as well as across Connecticut and into Rhode Island. While the Connecticut Tumor Registry is a source of much information about the heightened incidence of cancer and related
 
diseases in the area surrounding Millstone, it is not a completely
 
reliable source of information.
Zachary M. Hartley is not the only victim of Millstone's radiological and toxic chemical releases. In any individual cancer case, a 100 per cent
 
positive correlation with a suspected causative agent cannot be made. That
 
is why we rely on all available information obtained formally - such as the
 
Connecticut Tumor Registry and epidemiological research - as well as
 
informally, through reports of victims themselves or their family members to
 
understand the scope of this public health emergency.
Although Zachary was born in Connecticut with a life-threatening cancer in his jaw and although a tumor the size of an orange was removed from
 
his face when he was 14 months of age, the Connecticut Tumor Registry
 
does not list Zachary's cancer. The Registry's explanation is that a portion
 
of Zachary's tumor was benign and therefore it does not qualify for listing in
 
the Connecticut Tumor Registry.
The NRC SEIS staff relies on a report of the National Cancer Institute (NCI 1990), which in turn relies on data of the Connecticut Tumor Registry.
The NRC SEIS staff relies on a report of the National Cancer Institute (NCI 1990), which in turn relies on data of the Connecticut Tumor Registry.
According to the Connecticut Tumor Registry website, it obtains its funding from the National Cancer Institute.57 The NCI report is fifteen (15) years old. The NCI report was released four (4) years after Millstone Unit 3 commenced generating nuclear energy and long before many cancers associated with its dangerous emissions might be detected. It does not reflect the extremely high concentrations of strontium-90, a carcinogen, found in goat milk sampled within five miles of Millstone in 2001. It does not report the case of Zachary M. Hartley. It does not report the case of Rachel Heaton, who developed a rare form of thyroid cancer years after swimming in the Niantic shoreline mixing zone because she moved from the area.
Nor does it report the brain tumor of Charles D. Douton, Jr., one of three


According to the Connecticut Tumor Registry website, it obtains its funding
58 See ECRR Report Challenges Entrenches Radiation Assumptions (MIRS, February 21, 2003) 59 former Millstone site maintenance workers who developed brain tumors and were dismissed from their jobs at Millstone by Northeast Utilities, as identified by Cynthia M. Besade in her August 5, 2004 affidavit. The NCI report does not include any of the seven (7) cancer cases recently identified to the NRC SEIS staff among residents or former residents of a single road - Seabreeze Drive - in Waterford two miles downwind from Millstone. The Connecticut Coalition Against Millstone is actively investigating to determine to what extent the Connecticut Tumor Registry fails to maintain records of other Millstone victims.
 
The Connecticut Coalition Against Millstone is also actively investigating information it has received of rare cancers - including a fatal skin cancer confined to the feet of a woman who frequently waded for long periods in the nuclear/chemical mixing zone to the east of the Millstone discharge point - in the community surrounding Millstone. The information under review includes dozens of cases of early childhood death and disease.
from the National Cancer Institute.
The Coalition attaches a selected Bibliography compiled by the Nuclear Information Resource Service (NIRS) linking nuclear power plant radiological emissions with cancers in their communities. For example, NIRS reports a 400 per cent increase in leukemia incidence in the population living downwind from the Pilgrim (MA) Nuclear Power Plant during the first five years after nuclear fuel was known to have leaked excess radioactivity. A necessary review of Millstone records will reveal the occurrence of leaking fuel at Unit 2 after Dominion assumed ownership.
57 The NCI report is fifteen (15) years old. The NCI report was released four (4) years after Millstone Unit 3
The Coalition notes that the European Committee on Radiation Risk (ECRR) has reported that radiation dose models employed by the NRC and other governmental agencies are probably 100 to 1,000 times too high to be accurate.58 The NRC SEIS staff had to be reminded at the NRCs January 11, 2005 public meeting on the SEIS that the Coalition and others had previously submitted documentation to the NRC establishing a causative link between Millstone radiological and toxic effluent emissions and the heightened cancer rates in the area surrounding Millstone.
 
commenced generating nuclear energy and long before many cancers
 
associated with its dangerous emissions might be detected. It does not
 
reflect the extremely high concentrations of strontium-90, a carcinogen, found in goat milk sampled within five miles of Millstone in 2001. It does not
 
report the case of Zachary M. Hartley. It does not report the case of Rachel
 
Heaton, who developed a rare form of thyroid cancer years after swimming
 
in the Niantic shoreline "mixing zone" because she moved from the area.
 
Nor does it report the brain tumor of Charles D. Douton, Jr., one of three 58 See "ECRR Report Challenges Entrenches Radiation Assumptions" (MIRS, February 21, 2003)59 former Millstone site maintenance workers who developed brain tumors and were dismissed from their jobs at Millstone by Northeast Utilities, as
 
identified by Cynthia M. Besade in her August 5, 2004 affidavit. The NCI
 
report does not include any of the seven (7) cancer cases recently
 
identified to the NRC SEIS staff among residents or former residents of a
 
single road - Seabreeze Drive - in Waterford two miles downwind from
 
Millstone. The Connecticut Coalition Against Millstone is actively
 
investigating to determine to what extent the Connecticut Tumor Registry
 
fails to maintain records of other Millstone victims.
The Connecticut Coalition Against Millstone is also actively investigating information it has received of rare cancers - including a fatal skin cancer
 
confined to the feet of a woman who frequently waded for long periods in
 
the nuclear/chemical "mixing zone" to the east of the Millstone discharge
 
point - in the community surrounding Millstone. The information under
 
review includes dozens of cases of early childhood death and disease.
The Coalition attaches a selected Bibliography compiled by the Nuclear Information Resource Service ("NIRS") linking nuclear power plant
 
radiological emissions with cancers in their communities. For example, NIRS reports a 400 per cent increase in leukemia incidence in the
 
population living downwind from the Pilgrim (MA) Nuclear Power Plant
 
during the first five years after nuclear fuel was known to have leaked
 
excess radioactivity. A necessary review of Millstone records will reveal the


occurrence of leaking fuel at Unit 2 after Dominion assumed ownership.
60 The NRC SEIS staff did not adhere to the NRCs Principles of Good Regulation, which require in part:
The Coalition notes that the European Committee on Radiation Risk
("ECRR") has reported that radiation dose models employed by the NRC
 
and other governmental agencies are probably 100 to 1,000 times too high
 
to be accurate.
58      The NRC SEIS staff had to be reminded at the NRC's January 11, 2005 public meeting on the SEIS that the Coalition and others had
 
previously submitted documentation to the NRC establishing a causative
 
link between Millstone radiological and toxic effluent emissions and the
 
heightened cancer rates in the area surrounding Millstone.
60     The NRC SEIS staff did not adhere to the NRC's Principles of Good Regulation, which require in part:
Independence: Nothing but the highest possible standards of ethical performance and professionalism should influence regulation.
Independence: Nothing but the highest possible standards of ethical performance and professionalism should influence regulation.
However, independence does not imply isolation. All available facts and opinions must be sought openly from licensees and other interested members of the public. The many and possibly conflicting public interests involved must be considered.
The SEIS states that the NRC staff and its contractors discussed Millstones history of radiological effluent and environmental monitoring with officials from CTDEPs Division of Radiation. The reports cited above by CTDPH, CASE and the national Cancer Institute were also discussed. CTDEP conducts its own radiological environmental monitoring program around Millstone. STDEP had also reviewed the reports by CTDPH, CASE and the National Cancer Institute. CTDEP concluded that Millstones radiological effluent and environmental monitoring data were accurate. CTDEP also concluded that the reports cited above by CTDPH, CASE and the National Cancer Institute reports showed no evidence of a causal link between public exposure to Millstones radiological effluents and cancer in Connecticut towns.
The Connecticut Coalition Against Millstone has sent correspondence to Dr. Edward C. Wilds, Director of the DEP Radiation Bureau, to determine what conversations occurred with the SEIS staff, whether the DEP staff agrees with the characterizations of its conduct and input in the SEIS.
Finally, the Coalition asked Dr. Wilds if he agreed with the SEIS statement that CTDEP concluded that Millstones radiological effluent and environmental monitoring data were accurate, and if so, to specify what radiological effluent and environmental monitoring data were referenced and, further, if so, how such statement could be reconciled with Northeast Utilities plea of guilty in 1999 in the U.S. District Court to committing environmental felonies, including falsifying environmental monitoring records.
To date, Dr. Wilds has failed to respond to the Coalitions request.


However, independence does not imply isolation. All available facts
61 3.7.3.
 
Cumulative Radiological Impacts The GEIS did not perform a meaningful analysis of cumulative radiological impacts because its data base was limited to Millstone effluent discharges from 1985-1987.
and opinions must be sought openly from licensees and other
 
interested members of the public. The many and possibly conflicting
 
public interests involved must be considered.
The SEIS states that the NRC staff and its contractors discussed Millstone's history of radiological effluent and environmental monitoring with officials from CTDEP's
 
Division of Radiation. The reports cited above by CTDPH, CASE and
 
the national Cancer Institute were also discussed. CTDEP conducts
 
its own radiological environmental monitoring program around
 
Millstone. STDEP had also reviewed the reports by CTDPH, CASE
 
and the National Cancer Institute. CTDEP concluded that Millstone's
 
radiological effluent and environmental monitoring data were
 
accurate. CTDEP also concluded that the reports cited above by
 
CTDPH, CASE and the National Cancer Institute reports showed no
 
evidence of a causal link between public exposure to Millstone's
 
radiological effluents and cancer in Connecticut towns."
The Connecticut Coalition Against Millstone has sent correspondence to Dr. Edward C. Wilds, Director of the DEP Radiation Bureau, to determine
 
what conversations occurred with the SEIS staff, whether the DEP staff
 
agrees with the characterizations of its conduct and input in the SEIS.
 
Finally, the Coalition asked Dr. Wilds if he agreed with the SEIS statement
 
that "CTDEP concluded that Millstone's radiological effluent and
 
environmental monitoring data were accurate," and if so, to specify what
 
radiological effluent and environmental monitoring data were referenced
 
and, further, if so, how such statement could be reconciled with Northeast
 
Utilities' plea of guilty in 1999 in the U.S. District Court to committing
 
environmental felonies, including falsifying environmental monitoring
 
records. To date, Dr. Wilds has failed to respond to the Coalition's request.
61 3.7.3.Cumulative Radiological Impacts The GEIS did not perform a meaningful analysis of cumulative radiological impacts because its data base was limited to Millstone effluent
 
discharges from 1985-1987.
The GEIS further states:
The GEIS further states:
In addition, the radiological environmental monitoring program conducted by Dominion in the vicinity of Millstone measures radiation
In addition, the radiological environmental monitoring program conducted by Dominion in the vicinity of Millstone measures radiation and radioactive material from all sources, including Millstone; therefore, the monitoring program measures cumulative radiological impacts.
The Health Physics Society defines cumulative dose as follows:
The total dose resulting from repeated exposures of ionizing radiation to the same portion of the body, or to the whole body, over a period of time.
Correspondingly, the SEIS failed to conduct the analysis required by virtue of GEIS 4.6.1.1, which provides:
To determine whether the added period of operation following license renewal would, by virtue of buildup, result in significant (double) added dose, the ratios of buildup factors for midlives of 30 to midlives of 20 years were evaluated. These ratios amount to a 35 per cent increase for Cesium-137 and a 6 per cent increase for cobalt-60.
This added increase due to buildup will not significantly change the total dose to members of the public.
In certain cases, the bioaccumulation factors may require reexamination. These principally involve fish (in the human food chain) that are bottom feeders. Bottom feeders may ingest worms and other biota that may remobilize radioactive materials accumulated in the sediments.
Accumulation of radioactive materials in the environment is of concern not only to license renewal but also to operation under present licenses.


and radioactive material from all sources, including Millstone;
62 Accordingly, the SEIS is substantially flawed on the issue of cumulative radiological impacts.
Conclusion It has been demonstrated herein that the adverse environmental impacts of Millstone license renewal are so great that preserving the option of license renewal for energy planning decisionmakers would be unreasonable. The NRC should reach such a conclusion in its final Environmental Impact Statement.
In the alternative, the NRC should recognize that its staff has failed to consider the full scope of the environmental impacts of present or future Millstone operations, and similarly, the licensee has failed to fully apprise the NRC of all pertinent facts and circumstances sufficient to enable the NRC to undertake meaningful review; in the absence of such complete evaluation the NRC must deny relicensing.
CONNECTICUT COALITION AGAINST MILLSTONE


therefore, the monitoring program measures cumulative radiological
63 Nancy Burton 147 Cross Highway Redding Ridge CT 06876 Tel. 203-938-3952 Exhibit C DECLARATION I, Ernest J. Sternglass, Ph.D., do hereby declare as follows:
 
: 1. I am a professor emeritus in radiology with a specialty in radiation physics at the University of Pittsburgh School of Medicine.
impacts.The Health Physics Society defines cumulative dose as follows:
The total dose resulting from repeated exposures of ionizing radiation to the same portion of the body, or to the whole body, over a period
 
of time. Correspondingly, the SEIS failed to conduct the analysis required by virtue of GEIS 4.6.1.1, which provides:
To determine whether the added period of operation following license renewal would, by virtue of buildup, result in significant (double)
 
added dose, the ratios of buildup factors for midlives of 30 to midlives
 
of 20 years were evaluated. These ratios amount to a 35 per cent
 
increase for Cesium-137 and a 6 per cent increase for cobalt-60.
 
This added increase due to buildup will not significantly change the
 
total dose to members of the public.
In certain cases, the bioaccumulation factors may require reexamination. These principally involve fish (in the human food
 
chain) that are bottom feeders. Bottom feeders may ingest worms
 
and other biota that may remobilize radioactive materials
 
accumulated in the sediments.
Accumulation of radioactive materials in the environment is of concern not only to license renewal but also to operation under
 
present licenses.
62    Accordingly, the SEIS is substantially flawed on the issue of cumulative radiological impacts.
Conclusion It has been demonstrated herein that the adverse environmental impacts of Millstone license renewal are so great that preserving the option
 
of license renewal for energy planning decisionmakers would be
 
unreasonable. The NRC should reach such a conclusion in its final
 
Environmental Impact Statement.
In the alternative, the NRC should recognize that its staff has failed to consider the full scope of the environmental impacts of present or future
 
Millstone operations, and similarly, the licensee has failed to fully apprise
 
the NRC of all pertinent facts and circumstances sufficient to enable the
 
NRC to undertake meaningful review; in the absence of such complete
 
evaluation the NRC must deny relicensing.
CONNECTICUT COALITION AGAINST MILLSTONE 63 Nancy Burton 147 Cross Highway
 
Redding Ridge CT 06876
 
Tel. 203-938-3952 Exhibit C DECLARATION I, Ernest J. Sternglass, Ph.D., do hereby declare as follows:
: 1. I am a professor emeritus in radiology with a specialty in radiation physics at the University
 
of Pittsburgh School of Medicine.
2.I also serve as scientific director of the Radiation and Public Health Project.
2.I also serve as scientific director of the Radiation and Public Health Project.
: 3. I have reviewed data recently compiled by the U.S. Environmental Protection Agency
: 3. I have reviewed data recently compiled by the U.S. Environmental Protection Agency regarding its measurements of levels of strontium-
 
regarding its measurements of levels of strontium-64 90 in milk sold commercially at various locations in the United States.
: 4. The source of such data is "Environmental Radiation Data, quarterly report
 
#115, July to September 2003, and it contains EPA
 
measurements of strontium-90 concentrations in
 
milk as follows, all in picoCuries per liter:
San Francisco CA July 8, 2003  0.73 Dover DE July 22, 2003  0.19
 
Atlanta GA July 30, 2003  0.59
 
Wichita KA July 15, 2003  0.42
 
Grand Rapids MI July 8, 2003  0.45
 
Syracuse NY July 10, 2003  0.53
 
San Antonio TX July 7, 2003 0.02
 
Spokane WA July 8, 2003  0.13
: 5. I have also reviewed data submitted to the Connecticut Department of Environmental
 
Protection by Dominion Nuclear Connecticut, Inc.
 
with regard to its samplings and analysis of the
 
levels of strontium-90 found in goat milk sampled at
 
120 Dayton Road in Waterford, Connecticut, during
 
the years 2001, 2002 and 2003. This data includes
 
reported concentrations of 55.5 and `13 to 14
 
picoCuries of strontium-90.
: 6. Comparison of the EPA data with the Dominion data


reveals: The data reveals that for 8 other locations
64 90 in milk sold commercially at various locations in the United States.
: 4. The source of such data is Environmental Radiation Data, quarterly report
#115, July to September 2003, and it contains EPA measurements of strontium-90 concentrations in milk as follows, all in picoCuries per liter:
San Francisco CA July 8, 2003 0.73 Dover DE July 22, 2003 0.19 Atlanta GA July 30, 2003 0.59 Wichita KA July 15, 2003 0.42 Grand Rapids MI July 8, 2003 0.45 Syracuse NY July 10, 2003 0.53 San Antonio TX July 7, 2003 0.02 Spokane WA July 8, 2003 0.13
: 5. I have also reviewed data submitted to the Connecticut Department of Environmental Protection by Dominion Nuclear Connecticut, Inc.
with regard to its samplings and analysis of the levels of strontium-90 found in goat milk sampled at 120 Dayton Road in Waterford, Connecticut, during the years 2001, 2002 and 2003. This data includes reported concentrations of 55.5 and `13 to 14 picoCuries of strontium-90.
: 6. Comparison of the EPA data with the Dominion data reveals: The data reveals that for 8 other locations across the nation the levels of radioactive strontium-90 in milk are 10 to 100 times smaller than those measured near the Millstone Nuclear Power Plant, in particular the 55.5 picoCuries per liter measured in 2001 in the goat milk collected at 120 Dayton Road, 5 miles north-northeast of the plant.
This is an extremely


across the nation the
65 large concentration, close to twice the concentration in Connecticut milk at the height of nuclear weapons testing in 1963 of 23 picoCuries per liter.
 
: 7. It is my opinion that the evidence of strontium-90 levels in goat milk sampled from such location strongly suggests that the Millstone Nuclear Power Station releases excess levels of strontium-90 to the surrounding environment and that such emissions expose the community to a significant health risk which dictates closure of the Millstone Nuclear Power Plant as a matter of public health.
levels of radioactive strontium-90 in milk are 10 to
 
100 times smaller than
 
those measured near the Millstone Nuclear Power
 
Plant , in particular the
 
55.5 picoCuries per liter measured in 2001 in the
 
goat milk collected at 120
 
Dayton Road, 5 miles north-northeast of the plant.
 
This is an extremely 65 large concentration, close to twice the concentration in Connecticut milk at
 
the height of nuclear weapons testing in 1963 of 23
 
picoCuries per liter.
: 7. It is my opinion that the evidence of strontium-90 levels in goat milk sampled from such
 
location strongly suggests that the Millstone Nuclear
 
Power Station releases excess levels of strontium-
 
90 to the surrounding environment and that such
 
emissions expose the community to a significant
 
health risk which dictates closure of the Millstone
 
Nuclear Power Plant as a matter of public health.
I hereby declare that the statements above are true and are submitted under penalty of perjury.
I hereby declare that the statements above are true and are submitted under penalty of perjury.
_________________________
Ernest J.
Ernest J.
Sternglass, Ph.D.
Sternglass, Ph.D.
Dated: November 16, 2005 New York, New York 66 Exhibit D     ..}}
Dated: November 16, 2005 New York, New York
 
66 Exhibit D
.}}

Latest revision as of 12:50, 15 January 2025

Motion to Reopen Millstone License Renewal Proceeding Filed by the Connecticut Coalition Against Millstone
ML060310197
Person / Time
Site: Millstone  
(DPR-065, NPF-049)
Issue date: 11/25/2005
From: Burton N
Connecticut Coalition Against Millstone
To:
NRC/OCM
Julian E
References
50-336/423-LR, ASLBP 50-837-01-LR, RAS 11127
Download: ML060310197 (67)


Text

1The entire text of the N RCs response is as follows:

NRCs Office of Public Affairs has published a background paper entitled Radiation 1

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of Docket Nos. 50-336-LR, DOMINION NUCLEAR 50-423-LR CONNECTICUT, INC.

(Millstone Nuclear Power Station, Units 2 and 3)

NOVEMBER 25, 2005 MOTION TO REOPEN The Connecticut Coalition Against Millstone (Coalition) moves to reopen these proceedings on the application of Dominion Nuclear Connecticut, Inc.Dominion) to extend the operating licenses of Millstone Units 2 and 3. Further, the Coalition seeks leave to submit an amended petition to intervene.

This motion is premised upon newly discovered evidence of fraud, deceit and cover-up by the staff of the U.S. Nuclear Regulatory Commission (NRC).

In support of this motion, the Coalition respectfully represents as follows:

1. In the course of the NRCs proceedings on Dominions application to extend the operating licenses of Millstone Units 2 and 3, the Coalition submitted various filings to the NRC, dated March 2, 2005 (Exhibit A hereto) and March 16, 2005 (Exhibit B hereto).
2. In Exhibits A and B, and attachments thereto, the Coalition identified inter alia evidence that the Millstone Nuclear Power Station releases levels of strontium-90 to the environment which are in excess of its federal license.
3. Such evidence is contained in Dominions own reports to the NRC and the Connecticut Department of Environmental Protection (DEP) of levels of strontium-90 concentrations found in goat milk sampled 5.5 miles north-northeast of Millstone.
4. In comparison with average concentrations of strontium-90 found in commercially sold cows milk at various locations in the United States by the U.S. Environmental Protection Agency in 2003, the levels of strontium-90 reported in goat milk sampled at 120 Dayton Road in Waterford, Connecticut, are dangerously high. See Declaration of Ernest J. Sternglass, Ph.D.,

annexed hereto as Exhibit C.

5. According to documents filed by Dominion and its predecessor, Northeast Nuclear Energy Company, environmental monitoring of station stack releases of strontium-90 were permitted by the NRC to be discontinued on or before 1997; since such date, Millstone has relied principally upon environmental monitoring of goat milk samples to ascertain the levels of strontium-90 released into the air and the surrounding environment by Millstones routine operations.
6. The NRC staff reviewed the Coalitions submissions identified hereinabove and other related public comments, according to its Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 22 Regarding Millstone Power Station, Units 2 and 3" issued in July 2005. See Appendix A-102 - A-106.
7. The NRCs response, as set forth in Supplement 22,1 attempts to justify a conclusion that

Protection and the Tooth Fairy Issue, which contains the following information about Strontium-90 (Sr-90). Approximately 16.8 million Curies of Sr-90 were dispersed globally by atmospheric testing of nuclear weapons before 1980, and Sr-90 has a half-life of 28 years. Therefore, millions of Curies of that Sr-90 is still in the environment and accounts for about 0.3% of the average annual dose of roughly 300 millirem a person in the United States receives from natural background radiation. An additional 216,000 Curies of Sr-90 were released into the atmosphere as a result of the Chernobyl accident. Altogether, the 103 nuclear power plants in the United States release a total of about 1/1000th of a Curie of Sr-90 each year.

Dominions annual radiological effluent reports to the NRC indicate that Millstone releases an average of 2 microCuries (2 X 10(6) Curies) of Sr-90 in liquid and gaseous effluents each year. A total of 1 microCurie of Sr-90 was released in gaseous effluents in 2002, and no detectable amount of Sr-90 was released in gaseous effluents in 2001, 2003 and 2004. Millstone also releases a small amount of Sr-89, which has a half-life of about 50 days. Because of the short half-life, any Sr-89 in the environment around Millstone could not be from Chernobyl or atmospheric testing and would likely be from Millstone effluents. If Sr-90 is found in the environment without Sr-89 near an operating nuclear power plant, then it is highly likely that the Sr-90 is from Chernobyl or atmospheric testing. No Sr-89 was detected in the gaseous effluents for 2001, 2002 and 2003. In 2001, 2002, 2003 and 2004, 20 microCuries, 200 microC uries, 2w20 microCuries and 90 microCuries of Sr-89 were released in liquid effluents, respectively.

As part of its radiological environmental monitoring program, Dominion obtains milk samples from goats at farms near Millstone and performs radio-chemical analysis to determine the concentrations of Sr-89 and Sr-90 in that milk. Dominions annual radiological environmental reports to the NRC typically indicate concentrations ranging from below the lower limit of detectability to 15 picoCuries (15 X 10(-12)) of Sr-90 per liter of milk, and the concentrations of Sr-89 are below the lower limit of detectability.

Dominion has concluded that the Sr-90 is from atmospheric testing of nuclear weapons or the Chernobyl accident because the plant would have to release Curies of Sr-90 (not microCuries) to result in the concentrations measured in the milk.

Sometimes higher concentrations of Sr-90 are found; Dominion reported a concentration of 55.5 picoCuries (55.5 X 10(-12)) of Sr-90 per liter in goat milk that was composited from July, August and September of 2001 at a farm approximately 5 miles from the plant. Dominion believes that the goats sometimes begin to nibble the roots of the pasture grass. Along with the grass roots, the goats may also ingest some soil that contains Sr-90 left in the environment from atmospheric nuclear testing. Analyses of the same goat milk indicated that the concentration of Sr-89 was below the lower limit of detectability, another indication that the Sr-90 is not from Millstone.

The Connecticut Department of Environmental Protection (CTDEP) also analyses 2

4 of 120 Dayton Road in Waterford, clipping pasture grass, Exhibit D herein.

Katie the Goat is available for observation during grazing activities by the NRC.

15. Goats are simply not root-feeders.
16. Goats jaw structures are such that they cut grass scissor-like with opposing motion of the upper and lower jaw; while cows, sheep and horses are known to chomp grass so that it may be yanked up by the roots, goats are far more fastidious. For this reason, they are favored as pasture livestock around the world.
17. Dominion did not support its novel scientific theorizing - that the goats sometimes begin to nibble the roots of the pasture grass - with any studies or scientific papers, let alone photographs of the 120 Dayton Road pasture or the goats during their grazing.
18. Dominions second statement is even more revealing:

Along with the grass roots, the goats may also ingest some soil that contains Sr-90 left in the environment from atmospheric nuclear testing.

19. This statement is scientifically unsound because fallout from atmospheric nuclear testing has decayed to levels far below those measured in the goat milk, nor did Dominion identify any other location in the state in which similarly high levels of strontium-90 attributable to atmospheric weapons testing have been measured.
20. Rather than dismiss Dominions unsound scientific theorizing as the bogus concoction that it is, the NRC staff came to the same conclusion as Dominion and discredited Millstone as a source of the environmental poisoning.
21. In discrediting Millstone as the source of the excessive strontium-90 levels in the goat milk sampled at 120 Dayton Road, Dominion and the NRC have engaged in fraud, deceit and cover-up for the purpose of justifying license extension.
22. The Coalition believes that Millstone is the source of the excessively high levels of strontium-90 found in the goat milk at 120 Dayton Road and that such evidence strongly suggests that Millstone is violating its NRC license during routine operations.
23. Strontium-90 is a deadly carcinogen which is readily ingested by the human body; it causes bone cancer and leukemia, attacks the immune

2See article in The New London Day, Dominion Repairs Metal Connectors During Refueling Outage at Unit 3" (October 22, 2005)

Featured in Region Dominion Repairs Metal Connectors During Refueling Outage At Unit 3 By PATRICIA DADDONA Day Staff Writer, Waterford Published on 10/22/2005 Waterford Dominion Nuclear Connecticut is repairing welds that connect pipes and a nozzle in equipment used to maintain pressure in the Unit 3 reactor at Millstone Power Station.

The reactor is closed for refueling.

On Tuesday, Dominion workers reported the discovery of dents in the metal welds to the Nuclear Regulatory Commission and set about repairing them, Dominion spokesman Pete Hyde said.

The problem was found during routine inspections during the outage and presents no safety hazard or performance problem for the reactor, according to Hyde and NRC spokesman Neil Sheehan.

The NRC required the company to ask permission to make the repairs because the corrosion-resistant material being used differs from the original metal, known as Alloy 600, and is located in a key mechanical system, Sheehan and Hyde said.

5 system and is responsible for a host of other life-threatening diseases.

Bone cancer and leukemia have become endemic in the community surrounding Millstone since Millstone commenced operation in 1970.

24. The Coalition believes that Dominion and the NRC staffs duplicitous and fraudulent conduct regarding Dominions samplings of strontium-90 in goat milk requires a full reopening the these proceedings.
25. Recently, it has been revealed that Dominion and the NRC staff have otherwise engaged in fraud, deceit and cover-up, for example, when they repeatedly misled the public about dangerous emissions of radionuclides during the Class II emergency declared at Millstone Unit 3 in March 2005.
26. Recent disclosures regarding the presence of tin whiskers in circuit boards at Millstone Unit 3, welding defects,2 issues regarding equipment

On Friday, the NRC approved that request and is having an independent consultant review the repair plan, Sheehan said.

In pressurized nuclear reactors, the dominant type now in use in the United States, steam that turns turbines to generate electricity courses through a generator outside the reactor core. A piece of equipment known as a pressurizer keeps highly pressurized water flowing through the reactor to prevent it from boiling, Sheehan said.

Water enters the pressurizer through two spray heads in a nozzle, he said.

The dents in the three-quarter-inch-thick welds are two-tenths of an inch deep and do not penetrate the metal, but need to be repaired to prevent further damage, Hyde said.

Hyde said the defect may have resulted from the way the pipes and nozzle were first fused together sometime between 1977, when the nozzle was made, and 1986, when the plant began operating. The problem is a common one in the industry that reactor owners were advised last year to be on the lookout for, Sheehan said.

The company's recent decision to replace the entire reactor vessel head at Unit 2 was based on similar flaws in other types of equipment, Hyde said.

During an outage, Dominion inspects all welds connecting key pieces of equipment in the reactors using ultrasound and radiography, Hyde said.

The flaws are not a result of metal fatigue, Hyde and Sheehan said, and should not affect the company's plans to renew the licenses of both Unit 2 and Unit 3. will be good through the life of the proposed new license for Unit 3, which would extend to 2045, they said.

NRC experts have recommended re-licensing, which could be authorized in the summer.

© The Day Publishing Co., 2005 For home delivery, please call 1-866-846-9099 6

integrity as identified by the Advisory Committee on Reactor Safeguards

goat milk from the same locations as Dominion and has obtained similar analysis results. CTDEP has not identified any evidence of the Sr-90 in the goats milk as being from Millstone. The NRC inspected the monitoring programs at Millstone and reviewed Dominions annual reports and came to the same conclusion.

Based on the sources of Sr-90, measurements in the environment, and health effects studies (see Section 4.7 of the SEIS), the [NRC] staff concludes that the comments [of the Connecticut Coalition Against Millstone and Dr. Sternglass] provided no new and significant information on Sr-90 releases from Millstone and their impact on human health; therefore, the comments were not evaluated further. There was no revision to the text of the SEIS [Supplemental Environmental Impact Statement]..

3 the excessively high levels of strontium-90 found in the goat milk at 120 Dayton Road in Waterford are not traceable to Millstone.

8. Supplement 22 contains this statement:

Dominion believes that the goats sometimes begin to nibble the roots of the pasture grass. Along with the grass roots, the goats may also ingest some soil that contains Sr-90 left in the environment from atmospheric nuclear testing.

9. This statement is not supported by any independent evidence by Dominion of the conditions of the goat pasture at 120 Dayton Road nor the customs of goats feeding at such location.
10. The statement Dominion believes that the goats sometimes begin to nibble the roots of the pasture grass is particularly telling.
11. Such statement evidences a complete lack of knowledge about the grazing practices of goats generally and the grazing habits of the goats at 120 Dayton Road.
12. The 20-acre goat habitat at 120 Dayton Road is lush with pasture vegetation and forested area; observations made by the Coalition during the Fall of 2005 confirmed that the pasture grass was lush and was not eaten to the roots.
13. The Coalition was informed by the goats owner, Allen T. Moran, that such a statement of his goats eating habits was ludicrous and that his goats did not graze pasture grass down to the roots.
14. Indeed, in common with other goats, the 120 Dayton Road goats clipped the top parts of pasture grasses and moved on to other pasture grasses, tree bark and leaves. See photograph of Katie the Goat, formerly

7 and left uncorrected, concealment of planned refurbishments and power upgrading during the relicensing proceedings and the reliance upon falsification of environmental impacts - including the virtual extinction of the Niantic winter flounder stock - require that this motion be granted so that these and other issues which have arisen since the NRC dismissed the Coalitions intervention may be appropriated addressed.

CONNECTICUT COALITION AGAINST MILLSTONE Nancy Burton 147 Cross Highway Redding Ridge CT 06876 Tel. 203-938-3952 Exhibit A CONNECTICUT COALITION AGAINST MILLSTONE www.mothballmillstone.org March 2, 2005 Chief Rules and Directives Branch Division of Administrative Services Office of Administration Mailstop T-6D59 U.S. Nuclear Regulatory Commission Washington DC 20555-0001 Re: Millstone Nuclear Power Station/Draft Environmental Impact Statement

Dear Sirs:

The Connecticut Coalition Against Millstone submits herewith preliminary comments concerning the draft Environmental Impact Statement (EIS) which the NRC staff has prepared in support of relicensing

8 of Millstone nuclear reactors Units 2 and 3 to extend their terms to the years 2035 and 2045 respectively. These comments will be supplemented with a separate filing with attachments.

The Coalition strongly opposes Millstone relicensing.

The data available to the U.S. Nuclear Regulatory Commission in its environmental review establishes a clear link between Millstones radiological and chemical discharges to the environment and major health effects in the surrounding community.

The data reviewed by the NRC is alarming.

The data strongly suggests - and indeed does so almost to a certainty -

that Dominion Nuclear Connecticut, Inc. is operating and will continue to operate the Millstone Nuclear Power Station in violation of NRC regulations requiring limiting doses to the public of 15 millirems per year to any organ.

Put another way, the data strongly suggests that Dominions Millstone daily operations exceed the permissible dose of radiation to the public and will continue to do so during the proposed relicensing period.

Based on Dominions own reporting of radiation sampling in the environment, the Coalition believes the available data reviewed by the NRC for the years 2001, 2002 and 2003 prove that routine operations of Millstone are in violation of federal health standards and are illegal.

By its own admission, the NRC confined its review of Millstone radiological releases, for Environmental Impact Statement purposes, to the years 2001, 2002 and 2003. (Radioactive Waste Management Systems and Effluent Control Systems 2.1.4, DEIS at 2-9) (No explanation is provided in the DEIS as to why the years 1970-2000 and the year 2004 -

with the most current data - were excluded from review.)

The Annual Radiological Environmental Operating Report submitted by Dominion Nuclear Connecticut, Inc. to the NRC for the year 2001 - one of the few reports the NRC specifically identified that it had reviewed in its EIS procedure - contains the following information:

9 On September 19, 2001, a concentration of strontium-90 of 55.5 picoCuries per liter (pCi/l) was measured in a sample of goat milk taken from a location 5.5 miles north-northeast of the Millstone Nuclear Power Station. The uncertainty factor reported was plus or minus 5.3 pCi/L.

A concentration of 55.5 picoCuries per liter is an extremely large concentration, close to twice the highest concentration measured in Connecticut pooled milk at the height of nuclear weapons testing in 1963 of 23 pCi/L, according to a report dated March 1, 2005 by Dr. Ernest J.

Sternglass, Professor Emeritus of Radiological Physics at the University of Pittsburgh School of Medicine and an acknowledged pioneer in the field of the effects of low-level ionizing radiation on living cells. The report appears annexed hereto as Exhibit A.

Moreover, according to Dr. Sternglass, since the measured value is ten times as large as the measurement uncertainty, this is an extremely significant result, with an astronomically small chance that it is a statistical fluctuation.

Put into perspective, an individual drinking two eight-ounce glasses of the strontium-90-contaminated goat milk on a daily basis would receive a maximum permissible dose of radiation - under NRC guidelines - within 30 days.

This assumes no other radiological contamination of the milk. However, strontium-90 never appears alone in the environment. When the radiological effects of identified concentrations of radionuclides also reported in the same goat milk sample - cesium-134, cesium-137, iodine-131, barium-140 and others - are considered, the effect is even more damaging and far less milk would need to be consumed over fewer days before the maximum permissible radiation doses established by federal law would be exceeded, according to Dr. Sternglass.

The dose to bone or the bone marrow when other fission products are present is some 5 to 6 times greater than from strontium-90 alone, and the Dominion reports for goat milk show significant concentrations of other fission products, such as cesium-137, in significant concentrations, Dr.

Sternglass states in his report, Exhibit A.

10 Using the NRC NUREG 1.109 dose factor of 0.0172 mrem/pCi/l

[millirem] from Table A-5, a mere 2.4 pCi/l daily intake results in the maximum permissible dose to any organ of 15 mrem per year set by NRC guidelines, 23 times the amount measured in a single liter, according to the Sternglass report.

Attached to Dr. Sternglass report are measurements, reported to the NRC by Dominion, of strontium-90 in goat milk sampled at locations within 5 miles of Millstone during the years 2001, 2002 and 2003.

The reported samples of measurements show concentrations of 13 to 14 pCi/l on other days during the three-year period. According to Dr.

Sternglass, these are also significantly high readings since strontium-90, concentrating in milk due to atmospheric nuclear weapons testing which ended in 1980, has declined to less than 1 pCi/l in areas far removed from any nuclear reactors.

Since the samples are collected by Dominion only twice a month, it is unknown whether actual concentrations on other days exceeded the levels reported.

In 1997, Millstones previous owner, Northeast Utilities, persuaded the NRC to permit it to discontinue sampling for strontium-90 in its air filter monitoring program. As the 1997 Annual Radiological Environmental Operating report states:

Section 4.5 Air Particulate Strontium (Table 5)

Table 5 in past years was used to report the measurement of Sr-89 and Sr-90 in quarterly composited air particulate filters. These measurements are not required by the Radiological Effluent Monitoring Manual (REMM) and have been discontinued. Previous data has shown the lack of detectable station activity in this media.

This fact, and the fact that milk samples are a much more sensitive indicator of fission product existence in the environment, prompted the decision for discontinuation. In the event of widespread plant related contamination or special events such as the Chernobyl incident, these measurements may be made.

Strontium-90 is among the most deadly byproducts of nuclear fission.

Once ingested, its highly-energetic electrons damage and cause mutations

11 in nearby cells. Exposure to low levels of strontium-90 and other bone-seeking radioactive chemicals routinely released by nuclear power plants does not merely increase the risk of bone cancer or leukemia, but it weakens the immune defenses provided by the white cells of the blood that originate in the bone marrow. See Declaration of Ernest J. Sternglass (August 8, 2004) submitted to the NRC in In the Matter of Dominion Nuclear Connecticut, Inc., Docket No. 50-336-LR, 50-423-LR, ASLBP No.

04-824-01-LR, annexed hereto as Exhibit B.

As recently shown in the 2003 report by the European Committee on Radiation Risk, numerous epidemiological and laboratory studies have shown that the risk of cancer and other diseases produced by local internal doses to critical organs from fission products that are inhaled or ingested have been underestimated by extrapolation from high external doses by factors of hundreds to thousand of times, according to the Sternglass report, Exhibit A.

This explains why it now appears that releases from nuclear plants, often acting synergistically with other environmental pollutants, are a major neglected reason for the recent rise of illness and deaths both among newborns and the elderly observed in the U.S. in the last two decades, as also discussed in the ECRR report, according to Dr. Sternglass. Id.

For these reasons, it is my professional opinion that the Millstone Nuclear Plant should not be relicensed, Dr. Sternglass stated. In his report, Exhibit A.

The Coalition has previously submitted, in these and the related Atomic Safety and Licensing Board proceedings, documentation from Joseph Mangano and Michael Steinberg which links the Millstone radiological effluent releases - including strontium to significant negative health consequences in the community. These documents are incorporated by reference herein.

CONNECTICUT COALITION AGAINST MILLSTONE Nancy Burton

12 Please address correspondence to:

Nancy Burton 147 Cross Highway Redding Ridge CT 06876 Tel. 203-938-3952 Exhibit B CONNECTICUT COALITION AGAINST MILLSTONE www.mothballmillstone.org March 16, 2005 Chief Rules and Directives Branch Division of Administrative Services Office of Administration Mailstop T-6D59 U.S. Nuclear Regulatory Commission Washington DC 20555-0001 Re: Millstone Nuclear Power Station/Draft Environmental Impact Statement/Supplemental Comments

Dear Sirs:

The NRC is committed to protecting the public health and safety.

- Statement of NRCs Organizational Values The Connecticut Coalition Against Millstone submits herewith its supplemental comments concerning the draft Environmental Impact Statement (SEIS) which the NRC staff has prepared in support of relicensing of Millstone nuclear reactors Units 2 and 3 to extend their terms to the years 2035 and 2045 respectively. These comments were preceded by preliminary comments submitted on March 2, 2005.

3 See NRCs Principles of Good Regulation, attached.

13 Unfortunately, our review of the SEIS and our interaction with NRCs SEIS staff concerning its evaluation of the operational history of the Millstone Nuclear Power Station lead us to conclude that in this instance the NRC has entirely departed from its self-defined organizational values (see above).

Indeed, we are driven to conclude that, in this instance, the NRC staff is not even remotely concerned about the effects of Millstone releases of radiation to the public health and safety and to the environment.

Nor has the NRC staff adhered to the Principles of Good Regulation heralded on the NRCs website.3 The standard defining evaluation criteria for the NRC staffs environmental review is defined in 10 CFR 51.95( c )(4) as follows:

... whether or not the adverse environmental impacts of license renewal are so great that preserving the option of license renewal for energy planning decisionmakers would be unreasonable.

The NRC staff has preliminarily concluded in its draft Environmental Impact Statement that the adverse environmental impacts of license renewal are not so great that preserving the option of license renewal for energy planning decisionmakers would be unreasonable.

This conclusion is clearly erroneous and based on incorrect and incomplete information, industry bias and flawed analysis. It also manifests a profound disregard for the health and welfare of the community.

This conclusion ignores substantial available evidence that Millstone operations have had and will continue to have devastating health impacts on a wide scale and will continue to cause irreversible environmental damage on a wide scale.

4 For this reason, each of the environmental issues required for consideration in the Environmental Impact Statement process should be considered to be a Category 2 issue, subject to site-specific consideration.

5 See Millstone & Me: Sex, Lies and Radiation in Southeastern Connecticut by Michael Steinberg (Black Rain Press 1998),

6 See Testimony of Ernest J. Sternglass, Ph.D., presented to a Congressional Committee investigating nuclear power issues.

7 See, e.g., www.mothballmillstone.org, experience of Charles D. Douton, Jr.

8 See, James Plumb v. Northeast Nuclear Energy Company (Superior Court, Judicial District of New London); Clarence O. Reynolds v. Department of Public Utility Control (Superior Court, Judicial District of New Britain); John DelCore v. Northeast Nuclear Energy Co., U.S. District Court, District of Connecticut.

14 Our detailed comments follow. Following the Introduction, our comments appear in sequence conforming to the appearance of topics in the draft Environmental Impact Statement (SEIS). Our comments today address the SEIS up to 5.0 (Environmental Impacts of Postulated Accidents). Additional comments addressed to Section 5.0 et seq. will be provided subsequently hereto.

Introduction The U.S. Nuclear Regulatory Commission (NRC) is considering relicensing of the Millsone Nuclear Power Station, Units 2 and 3 for additional 20-year terms. Without relicensing, Unit 2s operating license would expire in the year 2015 and Unit 3s operating license would expire in the year 2025.

Together with Unit 1, these reactors have had an operational history since 1970 which is among the ugliest in the annals of the nuclear industry.4 Millstones radioactive releases have been among the highest of all nuclear reactors in the United States.5 Millstones routine radiation releases were linked early-on with cancers and other diseases.6 Millstones treatment of its workforce by way of exposing it to unnecessary radiation levels7 and its treatment of nuclear whistleblowers by ostracism and retaliatory firings have made it notorious within the nuclear industry.8 While full-time inspectors from the NRC were onsite, Millstone lost two highly radioactive spent fuel rods. These irradiated rods contain plutonium and other fission elements which may be diverted to create dirty bombs. While Millstones environmental monitoring program was being monitored by the NRC and Connecticuts Department of Environmental Protection (DEP),

9 See Owner of Connecticut Nuclear Plant Accepts a Record Fine (The New York Times September 28, 1999), attached.

10 The Coalition attaches hereto the Emergency Authorization issued on October 13, 2000 which legalizes violations of the expired NPDES permit and which ex-Commissioner Rocque transferred to Dominion when it was a paper company without assets. Prior to issuing EAs for Millstone operations, Commissioner Rocque admitted in writing he lacked authority to issue emergency authorizations on an emergency basis for unlimited durations. The EA attached hereto has been in effect on an emergency basis since 2000 premised on a finding that it was required to avert an imminent threat to health or safety.The SEIS makes no reference to this EA.

15 Millstones personnel brazenly falsified environmental monitoring reports to the NRC and DEP and sabotaged the sample-taking activities.9 Connecticuts regulatory apparatus has failed to safeguard the public.

Millstones five-year National Pollution Discharge Elimination System (NPDES) permit expired on December 14, 1997 - eight years ago - and it has not been renewed. Nevertheless, DEP has permitted Millstone to operate under the 1992 permit in brazen violation of the letter and spirit of the federal Clean Water Act. Former DEP Commissioner Arthur J. Rocque, Jr., routinely authorized emergency authorizations (EAs) while recognizing his lack of legal authority to do so.10 These EAs - of indefinite duration permitting releases of toxic and carcinogenic substances without enforceable limits - permit Millstones owners and operators to do, inter alia, what Northeast Utilities pleaded guilty to doing wilfully and illegally when it pleaded guilty in the U.S. District Court in September 1999 to committing environmental felonies at Millstone and paying a $10 million fine. Clearly, the Clean Water Act prohibits major waivers of NPDES permit conditions without notice to the public and a meaningful opportunity for public input. Commissioner Rocque issued sequential EAs without notice to the public and he did not provide an opportunity for public comment. To our knowledge, Rocques successor, DEP Commissioner Gina McCarthy, has done nothing to bring the Millstone operations into compliance with the law.

She has permitted the status quo to reign. Connecticut Attorney General Richard S. Blumenthal is complicit in the illegal Millstone activities. Mr.

Blumenthal successfully suppressed the truth of Millstones illegal operations in litigation brought to require Millstone operations to comply with existing laws.

Regardless of whether Millstone has been technically out of compliance with the law during much or all of its 35-year operational life, its operations have systematically endangered the public health and safety.

11 Websters Dictionary defines misfeasance as the performance of a lawful action in an illegal or improper manner.

12 Refer to the Coalitions March 2, 2005 submission and attachments thereto.

13 Websters Dictionary defines malfeasance as wrongful conduct, especially by a public official.

16 Millstone operations are a clear and present danger to the public health, safety and welfare.

Although Millstones reactors have been operating since 1970, and thus have generated a 35-year history of operations and record of environmental impact, the NRC selected only a three-year period (2001, 2002 and 2003) to review to assess Millstone radiological emissions for purposes of its SEIS evaluation. Necessarily, the NRC staffs superficial and selective review deprived it of the opportunity to engage in a meaningful assessment of the environmental impacts of Millstones complete operating history to inform the evaluation necessary to evaluate the full scope of future effects during a potential period of license extension.

At the same time, the NRC staff virtually ignored the information available to it even in the limited area it selected for review: the years 2001-2003.11 The most glaring example we may provide you of this appears as the preliminary comment we provided to you on, together with the declaration of Ernest J. Sternglass, Ph.D.12 Dr. Sternglass evaluated Dominion Nuclear Connecticut, Inc.s reports of strontium-90 levels sampled in goat milk five miles from Millstone during 2001, 2002 and 2003. Although one sample measurement reported by Northeast Utilities in 2001 was at a level nearly twice the highest level of measured strntium-90 concentration in Connecticut milk during the height of the atmospheric nuclear weapons testing in the 1960s, this fact is not reported in the SEIS nor is it analyzed, nor are the other high strontium-90 measurements in goat milk sampled five miles downwind from Millstone analyzed.13 We perceive a determined lack of dedication by the NRC staff to genuinely understand the full scope of environmental - including human health - impacts of continued operations of Millstone. Documents which we

14 See Response of Richard L. Emch, Jr. to the Coalitions February 5, 2005 queries, Paragraph 7 (attached); Documents responsive to this request were presented to the NRC by the Coalition as attachments to the Affidavit of Cynthia M. Besade dated August 5, 2005.

15 See Transcript of January 11, 2005 public informational meeting sponsored by the NRCs SEIS staff at the Waterford CT Town Hall.

16 The Coalition will address this issue in a subsequent filing.

17 Press clippings from the Hartford Courant, Norwich Bulletin and The New London Day are attached.

18 See SEIS at 4.1.3.

17 provided to the NRC have apparently been destroyed.14 Comments made in relicensing proceedings attended by the SEIS staff and documents submitted in such proceedings were ignored or disregarded by the SEIS staff.15 We continue to be troubled by the fact that documents produced by the SEIS staff in response to our queries about the SEIS submitted to the SEIS staff on January 23, 2005 were withheld by the NRCs own Freedom of Information staff and have yet to be released.16 Similarly, we are astonished that the NRC staff most involved with the SEIS declined our invitation to attend the press conference we gave on the Niantic Bay shoreline 1.5 miles from Millstone on March 10, 2005. At our press conference, we introduced Zachary M. Hartley, a 7-year-old boy born with a rare cancer in his jawbone.17 During critical months of her pregnancy, Zacharys mother swam regularly and unknowingly in the nuclear mixing zone18 which is known locally as the Hole-in-the-Wall Beach. We invited the entire NRC to attend the press conference and address questions to our expert, Dr. Helen Caldicott, world-renowned pediatrician, co-founder of Physicians for Social Responsibility and a leading authority on the health effects of low-level ionizing radiation such as is routinely emitted by Millstone. Zacharys medical records were available for NRC review. Not a single representative of the NRC appeared, not even one of the resident inspectors assigned to Millstone.

Dr. Caldicott linked young Zacharys rare jawbone cancer to Millstones radiological and toxic chemical emissions as being the likely causative agent. Dr. Caldicott acknowledged that, while there cannot be a 100-per-cent certainty that Millstone caused Zacharys medical condition, cesium-137 which Northeast Utilities found in a fish in the same nuclear mixing zone in 1997 - the year of Zacharys mothers pregnancy - and which contamination it admitted was discharged by Millstone, is known to be

19 See Coalition letter to Connecticut General Assembly Public Health and Environment Committees dated March 4, 2005, attached.

18 associated with cancer, including cancer of the bone. We are transcribing Dr. Caldicotts comments and will provide the NRC with a copy as soon as the transcription is available.

In light of the facts which have come light regarding Zachary M. Hartley, the Coalition has requested that the Connecticut General Assemblys Public Health and Environment Committees convene a special public hearing to consider our request to close the Niantic shoreline beaches.19 We understand that the legislature may find it necessary, in order to adequately protect the public health and safety, to enact legislation to close Millstone forthwith. Governor M. Jodi Rell has referred our request to the Commissioner of Public Health; we are asking him to exercise his authority to close the Niantic beaches as a health hazard. We further anticipate that the Connecticut DEP will order that Millstone convert from its once-through cooling system to a closed cooling system, thereby virtually eliminating the discharge of radioactive and toxic chemical contaminants to the Niantic and Waterford shorelines. The SEIS does not address the prospect that Millstone will undergo a major refurbishment in the conversion from the once-through to a closed cooling system. This is a major omission in the SEIS.

We recognize that the events in question in Zacharys life arose in 1997, prior to Dominions takeover of Millstone in 2001. However, Zacharys sickness is a factor which must be considered in the operational history of Millstone. Under Dominion ownership, Millstone has continued to release the same radioactive and toxic chemical waste byproducts as NU before.

Indeed, Dominion is currently seeking permission from CTDEP to add new chemicals to the mixing zone and continue the routine discharge of others. Nowhere in the SEIS is it stated that the NRC staff reviewed Dominions application for renewal of the NPDES permit. Nowhere are these facts assessed in the SEIS.

The SEIS fails to meaningfully consider the routine environmental impacts of Millstones radiological releases, relying on the conclusion in the NRCs Generic Environmental Impact Statement that all the nations nuclear power plants release radiation within levels permitted under the NRCs regulations and therefore may be expected to continue to do so in

20 GEIS 4.6.1.1.

19 the future. These conclusions do not apply to Millstone. See discussion at infra.

Even NRCs Generic Environmental Impact Statement (GEIS) states that cesium-137 - for one - may be expected to bioaccumulate such that its buildup in the environment will increase by 35 per cent during the postulated renewal period at each of the nations nuclear power plants undergoing relicensing.20 GEIS section 4.6.1.1 states in part as follows:

To determine whether the added period of operation following license renewal would, by virtue of buildup, result in significant (double) added dose, the ratios of buildup factors for midlives of 30 to midlives of 20 years were evaluated. These ratios amount to a 35 per cent increase for Cesium-137 and a 6 per cent increase for cobalt-60.

In certain cases, the bioaccumulation factors may require reexamination. These principally involve fish (in the human food chain) that are bottom feeders. Bottom feeders may ingest worms and other biota that may remobilize radioactive materials accumulated in the sediments.

Accumulation of radioactive materials in the environment is of concern not only to license renewal but also to operation under present licenses.

(Emphasis added.)

This reference is entirely omitted from consideration in the SEIS. The SEIS omits any analysis of the predicted buildup of cesium-137 or cobalt-60 or any other radionuclides in the environment surrounding Millstone. To the extent that cesium-137 released to the environment will have enhanced effects, the NRCs staffs failure to assess the impact to the health and safety of the community - including Niantic Bay beachgoers who may be pregnant - borders on reckless endangerment.

21 See [citation to follow]

22 A copy of the report is attached.

23 See Conservation Group Sues Brayton Point (Providence Journal, March 11, 2005),

attached.

20 It is known that cobalt-60 released by Millstone bioaccumulates in the sediment of Jordan Cove and is therefore subject to being ingested by worms and thereby enter the food chain.21 Yet, the SEIS fails to re-examine this phenomenon - and the potential for bioaccumulation of other radionuclides in the environment surrounding Millstone - consistent with GEIS section 4.6.1.1.

Nor does the SEIS examine the quality of environmental stewardship exercised by Dominion in its other corporate activities.

We suggest you review the October 2003 report by Public Citizen, "Dominion Resources, Inc.; A Public Citizen Corporate Profile." 22 Public Citizen reports that "[I]n April 2003, Dominions VEPCO agreed to a $1.2 billion enforcement settlement with the US Department of Justice and the US Environmental Protection Agency for violations of the Clean Air Act."

(Emphasis added.)

The report further states that Dominions VEPCO failed to install pollution control equipment at its coal-fired Mount Storm Power Plant in West Virginia after it made significant modifications that increased power-generating capacity. This was a violation of the Clean Air Act and, "according to the EPA, resulted in the release of massive amounts of sulfur dioxide, nitrogen oxide, and particulate matter."

Dominions Dominion Energy, owner of the Brayton Point Power Station in Massachusetts, releases 240 pounds of toxic mercury annually from that facility - enough to poison 120 million pounds of fish part of the Dominion network of companies, according to the Providence (RI) Journal of March 11, 2005.23 Eating mercury in fish and shellfish presents a danger to children and pregnant mothers by harming developing nervous systems.

Dominion Energy has been served with a notice of intent to sue by the Conservation Law Foundation, according to the newspaper report.

According to the SEIS, four states and all or parts of 15 counties fall within the 50-mile radius of Millstone (eight in Connecticut, four in Rhode Island, two in Massachusetts and one in New York). An estimated

21 2,868,207 people live within this area. This equates to a population density of 219 persons/square kilometer or 567 persons per square mile. In the GEIS matrix of rank of sparseness (Category 4) and proximity (Category 4) result in the conclusion that Millstone is located in a high-population area.

Moreover, the population within a 10-mile radius of Millstone increases seasonally as a result of an influx of approximately 10,500 summer residents. The SEIS contains no figures of the seasonal influx of visitors to the eastern end of Long Island although it is within the 50-mile radius of Millstone.

In conclusion, it is clear that the adverse environmental impacts of license renewal are so great that preserving the option of license renewal for energy planning decisionmakers would be beyond unreasonable - license renewal for Millstone is a license to kill.

This conclusion is unassailable when the full scope of available information about Millstones environmental impacts is properly considered.

Detailed Comments GEIS Is Inapplicable to the Millstone EIS The Millstone Draft Environmental Impact Statement analysis largely avoids the primary issue presented by the prospect of relicensing Millstone Units 2 and 3 for additional 20-year terms: the effects of routine releases of radiological and toxic chemical releases to human health and the environment surrounding the nuclear facility.

The troubled nuclear industry knew that if the truth about the radiological impacts of nuclear power plant operations could be addressed in relicensing proceedings, no community in American would accept the prospect to hosting a nuclear power plant beyond its initial 40-year licensing term. The GEIS is a fiction contrived by the nuclear industry and adopted by the NRC to deny the public an opportunity to challenge relicensing of nuclear power plants based on radiological impacts to human health and the environment.

The NRCs Generic Environmental Impact Statement (GEIS) was published in the year 1996, or nine (9) years prior to the NRCs invitation

22 for public comment on the SEIS, at a time when Unit 2 had operated for 26 years, Unit 1 for 21 and Unit 3 for 10 years. Necessarily, when the GEIS refers to current levels of radiation, it is referring to radiation levels which were current in 1996 or earlier. The GEIS is not itself current, but is outdated and fails to account for the past nine (9) years of operations within the U.S. nuclear industry.

The GEIS itself is obsolete. Although the NRC staff states in the SEIS it was not required to consider site-specific aspects of Millstones routine radiological emissions because Millstone site-specific routine radiological emissions were considered in the GEIS at Appendix E, GEIS Appendix E is limited to routine radiological emissions during the years 1985-1987. No explanation is given why a report published by the NRC in 1996 relies on 10-year-old data, when its purpose is to project radiation levels five decades into the future. At best, GEISs radiological analysis of routine Millstone radiological emissions is incomplete and superficial.

More significantly, the GEIS fails to account for any of the following facts and circumstances - routine and extraordinary - which have occurred at Millstone since 1996, including the following:

1. The NRC placed the entire Millstone Nuclear Power Station on its Watch List and ordered an unprecedented three-reactor two-year shutdown in 1996 because of national media exposure of wilful, systemic disregard for safety standards and licensing requirements; Unit 1 never restarted, Unit 3 restarted in 1996 and Unit 3 restarted in 1999;
2. In 1996, after workers in the site maintenance department at Millstone were diagnosed with brain cancers and Northeast Utilities dismissed the entire department - after securing releases the workers would not sue Northeast Utilities if the company paid them double severence pay - and hired transient contract workers to perform hot and dirty tasks within the plant, two of the workers died untimely deaths due to their brain cancers.
3. On December 16, 1997, Zachary M. Hartley was born with a rare jawbone cancer which required major life-threatening surgery. His mother swam regularly in the nuclear/chemical mixing zone otherwise known as the Hole-in-the-Wall Beach on the Niantic Bay shoreline during critical months of her pregnancy with Zachary.

24 See Owner of Connecticut Nuclear Plant Accepts a Record Fine (New York Times September 28, 1999), attached.

23

4. In 1997, Northeast Utilities caught a fish contaminated with cesium-137, a deadly carcinogen, it admitted releasing into Niantic Bay, in the nuclear/chemical mixing zone which stretches from the Millstone discharge point to the Niantic Bay shoreline, a popular summer destination for families with young children.
5. On or before 1997, Millstone dispensed with its measurement of strontium-90 in quarterly composited air particulate filters, relying instead on infrequent sampling of goat milk in the community to determine whether its strontium-90 emissions reached harmful levels after-the-fact.
6. In September 1999, Northeast Utilities, predecessor to Dominion, pleaded guilty to committing environmental felonies including falsifying environmental monitoring records and releasing hydrazine, a carcinogen, illegally into the Long Island Sound.24
7. A Connecticut Superior Court judge enjoined the restart of Millstone Unit 2 in 1999 because he was persuaded that the health and stability of the indigenous Niantic winter flounder stocks were endangered by operations of the Millstone intake structures through entrainment and impingement. Fish Unlimited v. Northeast Utilities.
8. In 2000, two commercial fishermen sued Northeast Utilities for tortiously causing the collapse of the formerly commercially viable Niantic winter flounder fishing stocks; their suit remains pending.
9. In 2000, Northeast Utilities acknowledged that - even under daily supervision by onsite inspectors of the NRC - it had lost two highly radioactive spent fuel rods from the Unit 1 spent fuel pool.

10.

In 2000, the Connecticut Department of Public Utility Control (DPUC) oversaw a public auction by Northeast Utilities to sell the Millstone Nuclear Power Station; the public was excluded from the public auction; virtually all key public auction documents were redacted and ordered sealed by the DPUC; over public protest, and despite the Coalitions disclosure that Dominion had the worst safety record in the nuclear industry including the deaths of seven nuclear workers at its nuclear facilities in Virginia, the DPUC approved the sale of Millstone to Dominion Nuclear Connecticut, Inc., (DNC) at the time a paper entity with no assets with only a post office box in Niantic, Connecticut; when the Connecticut Coalition Against Millstone obtained a Superior Court hearing date for a judge to consider its challenge to the rigged sale and the prospective transfer

24 of expired environmental permits to DNC, lawyers for Northeast Utilities and DNC met ex parte with Superior Court Chief Administrative Judge John J. Langenbach and obtained an order suspending the hearing so the sale could proceed without court review; when the matter was brought to the Connecticut Supreme Court, Justice Christine Vertefeuille, beneficiary of a Northeast Utilities 401K plan, recused herself; Connecticut Attorney General Richard S. Blumenthal, although entitled to automatic party status in the DPUC proceedings, declined participation. So occurred the public auction of Connecticuts worst polluter.

11.

In April 2001, Connecticuts Commissioner of Environmental Protection, Arthur J. Rocque, Jr., "transferred"an expired NPDES (National Pollution Discharge Elimination System) permit (it had expired four years earlier) and emergency authorizations (which he admitted in writing he lacked legal authority to issue) to Dominion Nuclear Connecticut, Inc., at that time a paper company with a post office box in Niantic but no assets. Dominion has been operating under the authority of the expired permit for four years and DEP has not renewed the permit in the intervening time.

12.

In 2001, Dominion reported concentration levels of strontium-90 contamination in goat milk sampled within five (5) miles downwind of the Millstone Nuclear Power Station nearly twice as high as the highest recording measurement of strontium-90 concentrations in Connecticut milk during the height of the 1960s atmospheric nuclear weapons testing.

13.

In 2001, terrorists who had targeted nuclear power plants hijacked a passenger jet and flew over the Indian Point Nuclear Power Plant 29 miles of New York City before slamming into the World Trade Center. The U.S. Department of Homeland Security, subsequently created, designated the Millstone Nuclear Power Plant a terrorists target of choice.

14.

In 2004, Connecticut State Senator Melodie Peters, Chairman of the powerful Energy and Technology Committee, took a paying job with Dominion in public relations to advocate for Millstone relicensing, without giving up her legislative commitments.

11. On August 16, 2003, Joseph H. Besade became the seventh known pipefitter to die prematurely from workplace exposures at Millstone.

15.

On August 5, 2004, Cynthia M. Besade reported to the NRC in an affidavit her personal knowledge of some 67 cancers in persons known directly or indirectly to her, all living within or close to the five-

25 See Millstone Owner Turned Down Free Homeland Security Device (The New London Day, March 9, 2005) 25 mile radius surrounding Millstone, including childhood cancers and the case of a 17-year-old Waterford high school student diagnosed with ovarian cancer; from one street alone - Seabreeze Drive, north-northeast and less than two miles downwind of Millstone - seven (7) cases of cancer were reported.

16.

On August 5, 2004, Richard Heaton drove seven (7) hours from the University of Pennsylvania Medical Center to New London to participate in a press conference and proceeding before the NRC to share the facts of his daughters rare thyroid cancer which developed following her exposure to Millstone effluents at age 10.

17.

In 2004, Dominion rejected the U.S. Department of Homeland Securitys offer of a free security enhancement to protect the three Millstone intake structures from terrorist attack.25 18.

In February 2005, the Coalition discovered that Zachary M.

Hartleys rare jawbone cancer, believed caused by his mothers in utero exposure to Millstone radiological and chemical effluents in the nuclear/chemical mixing zone in 1997, was knowingly excluded from listing in the State of Connecticuts Tumor Registry because part of the orange-size cancerous tumor removed from Zacharys mouth in life-saving surgery was determined to be benign.

19.

On March 10, 2005, Dr. Helen Caldicott, world-renowned pediatrician, authority on the health effects of low-level ionizing radiation and co-founder of Physicians for Social Responsibility, declared the likelihood that 7-year-old Zachary M. Hartleys rare jawbone cancer was caused by his mothers exposure to Millstones radiological and chemical effluents.

Moreover, Millstone is unique in the annals of the U.S. nuclear industry:

Millstone has released the highest levels of radionuclides of any nuclear power station in the country at various times over the past 35 years of its operational history.

From 1970 to 1987, Millstone had released a total reported release of 32 curies of radioactive iodine and particulates into the air, which included the highly carcinogenic strontium-90 and iodine-131, together with 6.7 million curies of total fission and activation gases such as xenon and krypton. During the same period, Millstone released 581 curies or 581 trillion picoCuries of radiation in the highest liquid volume of such releases

26 See Declaration of Ernest J. Sternglass, Ph.D., In the Matter of Dominion Nuclear Connecticut, Inc., Docket No. 50-336-LR, 50-423-LR, ASLBP No. 04-824-01-LR (August 8, 2004) 27 Id.

28 Id.

29 Id.

30 Id.

26 of mixed fission and activation products of any nuclear plant in the United States.26 In a single year, 1975, Millstone released a record reported high of 9.99 curies of iodine and particulates into the air and 199 curies of liquid mixed fission and activation products into the Long Island Sound, also a record for all U.S. reactors.27 Id.

While the strontium-90 concentration in milk declined for the United States as a whole between 1970 and 1975, from 8 pCi/l to 3 pCi/l, it rose from 9.8 in 1970 to a high of 15.8 in 1973 and 14.8 in 1974 near Millstone, remaining at 10.7 by 1975. This is far in excess of the U.S. average of 3 pCi/l, ruling out any significant contribution to the local milk from bomb test fallout by France and China that continued until 1980.28 The calculated yearly radiation dose to bone of a child due to excess strontium-90 within 10 to 15 miles of Millstone, in excess of the yearly dose for the United States, rose from 33 millirem per year in the first full year of operation to 204 millirem per year by 1974, nearly three times the normal background level of 70 millirems per year in Connecticut.29 These doses of strontium-90 alone may be compared with the 15 millirem per year to any organ permitted under current NRC regulations, the 2 millirem produced to bone marrow in a typical X-ray of a child, and the 80 millirem per year to a developing fetus found to produce a doubling of the rate of childhood leukemia in the studies of the renowned Dr. Alice Stewart.30 Given all these facts and circumstances, the application of a Generic Environmental Impact Statement to Millstone, thereby precluding site-specific analysis in the Environmental Impact Statement, is so deeply flawed as to be fraudulent.

27 The Coalition and others have provided new and significant information which compels the NRC to conduct a site-specific analysis of the environmental impacts of relicensing Millstone Units 2 and 3. See discussion at pages 32 et seq. infra.

At the very least, the NRC should be required to evaluate the environmental impact of Millstones radiological and chemical effluents -

singly, in synergy and cumulatively - under site-specific analysis to qualify under the standards of the National Environmental Policy Act.

2.1.4.2 Gaseous Waste Processing Systems and Effluent Controls In this section, the SEIS describes the liquid, gaseous and solid waste management systems presently in place to collect and treat the radioactive materials which are produced as a by-product of the nuclear plant operations.

The SEIS states as follows:

Radioactive material produced from fission of uranium-235 and neutron activation of metals in the reactor coolant system is the primary source of liquid, gaseous and solid waste. The radioactive fission products build up within the fuel. Most of these fission products are contained in the fuel pellets and sealed fuel rods, but small quantities escape from the fuel rods into the reactor coolant.

Neutron activation of trace concentrations of metals entrained in reactor coolant such as zirconium, iron and cobalt creates radioactive isotopes of these metals. Both fission and activation products in liquid and gaseous forms are continuously removed from reactor coolant and captured on several different types of filter media. Units 2 and 3 operate separate liquid and gaseous processing systems. Gaseous discharges for each unit are monitored separately before they are discharged to the stack or to other designated release points for each unit. All liquid discharges are directed to a canal which terminates in the old quarry and the quarry discharges to Long Island Sound.

Despite these comments, it is clear that station monitoring of radioactive effluents is presently inadequate and incomplete and that some

31 See Coalitions March 2, 2005 filing to the NRC.

28 radionuclides are released into the environment without measurement or documentation.

For example, In 1997, Northeast Utilities reported in its Annual Radiological Environmental Operating Report as follows:

Section 4.5 Air Particulate Strontium (Table 5)

Table 5 in past years was used to report the measurement of Sr-89 and Sr-90 in quarterly composited air particulate filters. These measurements are not required by the Radiological Effluent Monitoring Manual (REMM) and have been discontinued.

Previous data has shown the lack of detectable station activity in this media. This fact, and the fact that milk samples are a much more sensitive indicator of fission product existence in the environment, prompted the decision for discontinuation. In the event of widespread plant related contamination or special events such as the Chernobyl incident, these measurements may be made.

As Dr. Sternglass has pointed out,31 in 2001, Dominion recorded concentrations of strontium-90 in goat milk sampled five miles from Millstone at a level nearly twice that of the highest recorded concentration of strontium-90 in milk in Connecticut during the peak of atmospheric atomic bomb testing in the 1960s.

In 1997 alone, there were numerous reported incidences of station radiation monitors being inoperable:

Unit 1 Liquid Radwaste Effluent Monitor (inoperable 6/7/96 - 3/25/97

- 83 days in 1997, 291 days total)

Unit 1 Service Water Effluent Monitor (inoperable 6/9/96 - 7/18/97 -

198 days in 1997, 404 days total)

Unit 2 Steam Generator Blowdown Monitor (inoperable 2/22/96 -

8/26/97 - 237 days in 1997, 551 days total)(NU claims no discharges were made during this period)

29 Unit 2 Clean Waste Monitor Tank Radiation Monitor (inoperable 5/25/97 - 7/1/97 - 37 days)(NU claims no discharges were made during this period)

Even the GEIS acknowledges that some airborne radioactive effluent releases are not monitored, recorded or documented.

Within the entire body of radioactive airborne effluents released by Millstone over the course of its 35-year operational life, the SEIS only specifically considers those reported by Dominion in 2002 as follows:

Unit 2: Total fission and activation gas activity released 128 Curies Iodine-131 4.90 X 10 -3 Curies Particulates 1.22 X 10 -5 Curies Tritium 31.2 Curies Unit 3: Total; fission and activation gas activity released 2.45 Curies Iodine-131 1.52 X 10 -6 Curies Particulates 6.08 X 10 -5 Curies Tritium 47.3 Curies These figures do not break down the radioisotopes released, other than for Iodine-131 and Tritium, and do not identify nor quantify which radioactive gases are emitted, such as xenon-137 (with a half-life of 3.9 minutes decaying to cesium-137 with a half-life of 30 years); xenon-135 (with a half-life of 9.17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> decaying to cesium-135 with a half-life of 3,000,000 years); nor krypton-89 (with a half-life of 3.2 minutes decaying to strontium-89 with a half-life of 52 days). These radioactive materials are long-lived and have cumulative impacts. The SEIS does not analyze these environmental impacts.

The SEIS states: These releases from both units are typical of annual releases from Millstone and are not expected to increase during the renewal period.

Since the SEIS analysis was self-limited to the years 2001, 2002 and 2003, and annual releases for the 32 other years Millstone has been operating were not considered, the statement that These releases from

32 See discussion at page 20 infra.

30 both units are typical of annual releases from Millstone is not substantiated.

Moreover, the SEIS statement, that [these releases] are not expected to increase during the renewal period is incorrect. First, releases of tritium, a known cancer-causing radioactive toxic with a half-life of 12.3 years. are trending upward.32 Second, as Units 2 and 3 operate for longer periods at full capacity, airborne radioactive emissions will increase. Similarly, if during the renewal period Millstone Units 2 or 3 receive approval for power upgrades, airborne radioactive emissions will increase. The consequences of these reasonably foreseeable circumstances were not analyzed in the SEIS.

Moreover, the SEIS does not identify nor quantify strontium-90 releases, nor note the absence of strontium-90 monitoring from the station stack, while strontium-90 concentrations are regularly found to be inordinately high in goat milk taken from samples five miles from Millstone.

2.2.7 Radiological Impacts In section 2.2.7, Radiological Impacts, on page 2-43, the section concludes, "The applicant does not anticipate any significant changes to the radioactive effluent releases or exposures from Millstone operations during the renewal period and, therefore, the impacts to the environment are not expected to change."

However, in Dominion Nuclear Connecticut Millstone Station Annual Radiological Operating Report 2003, in section 4.14, Seawater, on page 4-9, it is stated, "since the restart of Unit 3 in 1998 and Unit 2 in 1999, tritium releases in liquid effluents have risen to levels at or above [emphasis added] those observed during pre-shutdown period."

Dominion records indicate that Millstone released 1854 curies of liquid radiation in 2000, an all time high. Such reported releases totaled 1273 curies in 2001, 1537 in 2002 and 1278 in 2003. NRC records for Millstones liquid tritium releases totaled from 1970-1994 totaled 11,550 curies. The total from 1995-2003 was 8551 curies.

33 See The Carcinogen, Mutagenic, Teratogenic and Transmutational Effects of Tritium, Citizens Awareness Network, April 1994.

31 This trend of increasing amounts of tritium releases is dangerous because tritium has carcinogenic, mutagenic, teratogenic and transmutational properties whose effect upon the environment which have not been considered in the SEIS.33 The coastline around Millstone is lined with beaches and shoreline communities, with many summer residents as well. Human activities in the area include swimming, boating, fishing, clamming, scalloping. Thus there are ample opportunities for liquid tritium contamination of people and shore and marine life.

It is undeniable that the more the pressurized water reactors of Units 2 and 3 operate, the more tritium by-products they will create and release into the environment.

The current stated policy of both Dominion and the nuclear power industry in general is to operate power reactors as close to maximum capacity as possible. In 2003 Millstone 3 operated at almost 100%

capacity. Millstone 2 operated at 80% capacity, but only because it shut down for refueling.

The increasing amounts of tritium discharged into Long Island Sound means that Dominions claim that it "does not anticipate any significant changes to radioactive releases or exposures from Millstone operations during the renewal period" is false. Therefore the NRCs conclusion that "impacts to the environment are not expected to change" is also false.

Given this history, the NRC should mandate the immediate installation of filters to mitigate liquid tritium discharges from Millstone units 2 and 3.

In addition, the NRC should mandate the testing of drinking water, well water and groundwater and in marine life in areas affected by Millstone for the presence of tritium. At present only sea water is tested for tritium.

Until these measures have been put into place and monitoring results have been made public until Millstones current operating licenses expire, or units 2 and 3 permanently shut down, the NRC should not consider granting license extensions for Millstone units 2 and 3, in consideration of the health and safety of the public.

32 4.1 Cooling System The GEIS identifies the issue of scouring caused by discharged cooling water as a Category 1 issue. As a Category 1 issue, the NRC staff will not review it on a Millstone site-specific basis in the absence of new and significant information.

The SEIS states the NRC staff has not identified any significant new information during its independent review of the Dominion ER, the staffs site visit, the scoping process, its review of monitoring programs, or its evaluation of other available information.

Yet, scouring caused by discharged cooling water was identified by a technician in the Millstone Environmental Laboratory as an irreversible environmental impact during a recent public presentation on Dominions environmental impacts presented at the Three Rivers Community College.

Accordingly, the NRC staff should request Dominion to release details to it of this new and significant information.

4.1.1 Entrainment of Fish and Shellfish in Early Life Stages Entrainment of winter flounder larvae at the Millstone intakes is a major issue and it is one which has been the subject of much litigation in the Connecticut courts. Lawsuits have been brought by local fishermen complaining that Millstone intake structures have driven the indigenous Niantic winter flounder population to near-extinction. The fishermen have successfully resisted dilatory and repetitive motions on the part of Dominion and Northeast Utilities to dismiss their claims.

The SEIS states:

The staff independently reviewed the Millstone Units 2 and 3 ER

[Environmental Report], visited the site, and reviewed the applicants NPDES permit. The staff also reviewed relevant scientific articles and agency documents (CTDEP) and NOAA (National Oceanic and Atmospheric Administration) Fisheries (also known as National Marine

34 See Northeast Utilities 1997 Annual Radiological Environmental Operating Report at Section 4.17.2 (Cs-137 was detected in one sample from the Niantic Bay (location 35).

Positive indications are seldom seen in this media outside of the immediate discharge vicinity.)

33 Fisheries Service [NMFS], interviewed agency staff, and interviewed a faculty member at the University of Connecticut who has conducted research on entrainment at Millstone. [Crivello 2003]

Astonishingly, the NRC staff does not report any attempt to consult with the fishermen who are targeted in the SEIS for the demise of the Niantic winter flounder population. Had the NRC staff attempted to locate commercial fishermen who fish for Niantic winter flounder near Millstone, it would have learned that the resource has vanished and, with it, the fishermen and a way of life.

Nor, apparently, did the NRC staff make any effort to consult with the experts who have testified in court proceedings to the overwhelming evidence that the suction action of the Millstone intake structures is the predominant cause of the collapse of the Niantic winter flounder population and has been since 1986, when Millstone Unit 3 went online.

Northeast Utilities obtained operating licenses for Millstone in the 1970s based on projections - possibly knowingly bogus - that the Millstone intake structures would have a far less devastating effect on the Niantic winter flounder larvae than has in fact occurred.

Although NRC staff spoke with Prof. Crivello of the University of Connecticut, who has studied Millstone entrainment, the staff does not explicitly identify Prof. Crivello as a paid consultant to Millstones owners and operators each time his name appears in the SEIS.

Why did the NRC staff not meet with DEPs Victor Crecco, author of reports debunking Dominions theorizing about the Millstone impacts on the Niantic winter flounder collapse?

The SEIS analysis of the collapse of the indigenous fishing stocks does not mention the discovery of a fish caught in Niantic Bay in 1997 contaminated with cesium-137 - nor Northeast Utilities acknowledgment that the cesium-137 originated in its nuclear operations.34

35 See [citation to follow]

34 The SEIS analysis does not mention the build-up of cobalt-60 in Jordan Cove near the Millstone discharge point35 nor does the SEIS analyze the contribution of cobalt-60 buildup in sediment as a contributing factor in the collapse of the population of the bottom-feeding Niantic winter flounder.

Attributing the collapse of the fishing stocks to elevated water temperatures, the SEIS fails to consider the contribution of Millstones 24-hour-a-day, seven-day-a-week thermal discharges to the Long Island Sound.

While the SEIS reports that [T]he CTDEP [Division of Marine Fisheries which has been analyzing this issue for nearly a decade] believes that Millstone is having a significant impact due to entrainment of winter flounder larvae, the SEIS relies on NOAA and NMFS reports - which contain no data of the unique conditions at Niantic Bay but are devoted to a broad, regional analysis of fishing stocks - to discredit CTDEP Division of Marine Fisheries, as follows:

Regulatory agencies concerned with the management of winter flounder have concluded that the resource is overfished and overexploited (NOAA 1998; NMFS 2003) and have instituted measures to reduce fishing pressure throughout Long Island Sound and the southern New England-middle-Atlantic region. Thus, there is ample evidence to suggest that fishing pressure is directly contributing to the decline both local and regional levels at and may represent the major impact to this resource. The extent to which Dominion contributes to or exacerbates the problem in the Niantic River system is not elucidated by fish population studies reviewed in this SEIS. [Emphasis added.]

As stated, the SEIS does not identify either a NOAA or NFSS study specific to the Niantic River winter flounder nor the recent fishing habits of commercial fishermen in the area; thus, its failure to accord credit to the CTDEP for its insights appears to be result-driven, to obscure and downplay the fact that the Millstone Nuclear Power State has been the primary factor in driving indigenous fishing stocks to collapse. Or, as Rhode Island expert on Niantic winter flounder, Mark Gibson - a witness whose testimony aided Connecticut Superior Court Judge Robert Hale in issuing a

36 Draft NUREG-1437, Supplement 22, 2-26 (December 2004) 35 temporary restraining order keeping Millstone Unit 2 shut down during the 1999 spawning season to avoid harmful entrainment effects to the fish population - has stated, Millstone is the worst predator of fish in the Northeast.

The SEIS concludes:

The staffs evaluation of past impacts of entrainment on Niantic River winter flounder is inconclusive because unresolved questions remain about population dynamics, life history, and unknown factors that may be impacting the population. The available data do not allow us to unequivocally link or decouple population declines with Millstone operations... Because the spawning adult population is very low, and in consideration of the 20-year license renewal period, the staffs conclusion is that the impacts would be moderate.

The Coalition has reference to Figure 2-6 (Comparison of Winter Flounder Population Trends in Niantic River and Long Island Sound.36 This figure illustrates clearly that while the winter flounder fishing stocks in the region are rebounding - perhaps due in part to fishing restrictions that apply throughout the region - the Niantic River winter flounder population continues its collapse.

The facts available to the NRC staff demonstrate that the sole factor which has prevented the Niantic River winter flounder population from enjoying a rebound as has the species elsewhere in the region due to tightened fishing restrictions is the most obvious one: the Millstone Nuclear Power Station.

It is submitted that if the SEIS staff had pondered the ramifications of Figure 2-6 in consultation with the Niantic fishermen who have gone out of business and the fishermens expert witnesses and CTDEPs marine biologist Victor Crecco, in light of all the facts and circumstances, the NRC staff would have been compelled to categorize the impact to Niantic winter flounder from continued operations of Millstone in a license renewal period to be major and devastating and probably irreversible.

37 Report of a commercial lobsterman to the Coalition.

36 The weight of credible evidence is that the operations of the Millstone Nuclear Power Station have driven the winter flounder to virtual extinction, a phenomenon not contemplated in the original Millstone environmental impact statement. Future entrainment during the license renewal period will definitely assure that the once-abundant, commercially important resource will never return.

4.1.2.1 Impingement Monitoring 4.1.2.2. Impingement Mortality At the request of Northeast Utilities, CT DEP permitted routine impingement monitoring for Unit 2 to cease in December 1987. Unit 2 did not have a fish return and all impinged marine organisms were presumed lost. Routine impingement monitoring has never been conducted for Unit 3.

The most recent data for Unit 2 involves sampling collected biweekly from July 2000 to June 2001. It is questionable whether the Unit 2 fish return was in operation during such period.37 Data for Unit 3 involve samplings collected biweekly from January to December 1993.

These samplings do not suffice in frequency to form a data base to support conclusions about impingement during the 35-year operations of Millstone, nor to provide an adequate basis for extrapolation to the future.

Thus, the SEIS statement:

Based on the assessment to date, the staff expects that the measures in place at Millstone Units 2 and 3 (i.e., aquatic organism return systems) provide mitigation for impacts related to impingement, and no new mitigation measures are warranted.

is not supported by genuine evidence.

4.1.3 Heat Shock The SEIS states:

38 See GEISS Appendix E.19 37 Millstone has remained in compliance with the NPDES thermal and discharge volume limits at the quarry cut. [SEIS at page 4-28]

Yet, the SEIS report is absent any indicia of an independent basis from which to render such a conclusion.

The SEIS states:

The [NRC] staff also independently reviewed monitoring reports for the cooling-water discharge mixing zone....the boundary of the mixing zone cannot exceed a radius of 2438 m (8000 ft) from discharge outlet at the quarry cut.

The SEIS report does not identify a single monitoring report by date or otherwise; any conclusions regarding the cooling-water discharge mixing zone are utterly unsubstantiated.

4.3 Radiological Impacts of Normal Operations The NRC SEIS staff review of Millstone data on the most critical issue of radiological impacts of normal operations was self-limited to the years 2001, 2002 and 2003.

The NRC GEIS staff review of Millstone data on the most critical issue of radiological impacts of normal operations was self-limited to the years 1985, 1986 and 1987.38 Thus, in its consideration of whether the Millstone Nuclear Power Station should be permitted to operate in the years 2015-2025 (Unit 2) and 2025-2045 (Unit 3), the NRC deliberately failed to consider the radiological impacts of normal operations for the years 1970-1984, 1988-2000 and 2004 to the present.

Put another way, the NRC considered Millstones radiological impacts of normal operations for only 6 of the 35 years the Millstone nuclear reactors have been routinely releasing harmful radiation into the environment - just 17 per cent of Millstones operational history. Twenty-

38 nine (29) years of Millstones routine releases of harmful radiation releases to the environment are not evaluated in either the GEIS or the SEIS.

By limiting the pool of data considered in the GEIS and the SEIS to a period of time which encompasses only 17 per cent of Millstones operational history of harmful radiation releases to the environment, the NRC failed to consider all available information. The NRCs evaluation of future impacts based on past impacts rests of an inadequate data base and its conclusions are accordingly unreliable, if not invalid. Certainly, the NRC staffs consideration of cumulative impacts (SEIS section 4.8.3) is scientifically unsound if not indeed scientifically fraudulent, since the NRC staff did not review, tabulate or assess the full scope of past impacts to be able to accumulate cumulate impacts..

On its website, www.nrc.gov/who-we-are/values.html, the NRC states that it adheres to Principles of Good Regulation which include the following:

Independence:... Final decisions must be based on objective, unbiased assessments of all information, and must be documented with reasons explicitly stated.

The SEIS and GEIS systematically exclude all available information concerning Millstones radiological effluents for the years 1970-1985, 1988-2000 and 2004 to the present. No reason for such exclusion is explicitly stated.

The GEIS addresses radiological impacts of normal operations of nuclear power plants during a projected renewal period as follows:

Radiation exposures to public (license renewal term):

GEIS: Radiation doses to the public will continue at current levels associated with normal operations. (GEIS 4.6.2)

Occupational radiation exposures (license renewal term):

GEIS: Projected maximum occupational doses during the license renewal term are within the range of doses experienced during

39 See GEIS, Table E19.

39 normal operations and normal maintenance outages, and would be well below regulatory limits.

The GEIS categorizes the issue of radiological impacts of normal operations as a Category 1 issue, meaning that the SEIS reviewing staff need not consider site-specific issues at all in the absence of new and significant information.

The Coalition believes that radiological impacts of normal operations must be considered on a site-specific basis with regard to Millstone Units 2 and 3 as a Category 2 issue. See discussion at page 32 et seq. infra.

Because the SEIS did not consider the issue as a Category 2 issue, the SEIS is deeply flawed and inadequate and falls far short of meeting the NRCs Principles of Good Regulation.

Finally, as stated, the SEIS states that the NRC staff is not required to evaluate Millstone radiation releases on a site-specific basis because Millstone releases were subjected to site-specific analysis in the GEIS which found them to be well within regulatory limits. This statement is most misleading in that it fails to acknowledge that the NRC GEIS staff limited itself to reviewing Millstones reported radiological emissions for the years 1985, 1986 and 1987 only.39 Millstones largest reactor, the 1,220-megaWatt Unit 3 - was still under construction in 1985. By the year 1987, it had not established an operational record; it has since substantially increased output and, hence, routine radiological emissions.

GEIS Section 4.6 (Radiological Impacts of Normal Operation) provides in pertinent part as follows:

This section provides an evaluation of the radiological impacts on occupational personnel and members of the public during normal operation following license renewal. This evaluation extends to all 118 nuclear power reactors. Radiation exposures occurring after license renewal are projected based on present levels of exposures.

Estimates of additional maintenance, testing and inspections as a result of a variety of age-related changes in operational procedures were made based on the anticipated changes to current operation and are detailed in Section 2.6 and Appendix B. Added maintenance,

40 See discussion at page 10 supra.

40 testing, and inspection will be accompanied by increased exposure time to members of the work force but are not expected to significantly influence dose to members of the public.

As noted,40 the GEIS was published in 1996. Hence the above statement, Radiation exposures occurring after license renewal are projected based on present levels of exposures, must be read with regard to 1996-or-earlier levels of exposure, rather than actual current exposures. However, the NRC SEIS staff limited its review to 2001-2003 data, rather than actual current exposures. As also noted, the NRC GEIS staff only reviewed Millstones 1985-1987 exposure data.

With regard to the above statement:

Estimates of additional maintenance, testing and inspections as a result of a variety of age-related changes in operational procedures were made based on the anticipated changes to current operation and are detailed in Section 2.6 and Appendix B.

the SEIS fails to identify or evaluate any additional maintenance, testing and inspections as a result of a variety of age-related changes in operational procedures at Millstone.

With regard to the above statement:

Added maintenance, testing, and inspection will be accompanied by increased exposure time to members of the work force but are not expected to significantly influence dose to members of the public the SEIS fails to identify or evaluate any added maintenance, testing, and inspection at Millstone and hence fails to evaluate increased exposure time to members of the work force and members of the public during the proposed renewal period.

The SEIS also fails to consider the environmental impact of Dominions August 24, 2004 submittal to the NRC requesting approval of the Nuclear Facility Quality Assurance Program Description. According to an Request for Additional Information (RAI), dated February 24, 2005, this program

41 deletes from the Millstone Quality Assurance program radiological protection responsibilities which include maintaining records and reports on radioactive contamination levels. If this application is approved, a safeguard to protect against excessive worker radiological contamination will be lost and there will be no basis for the NRC to conclude now that occupational radiation exposures during the license renewal term will be small and within regulatory limits.

The NRC SEIS staff accepted at face value Dominions self-assessment that it would not conduct major refurbishment in the future. Thus, the NRC SEIS staff considered neither major or minor refurbishments. The NRC SEIS staffs conclusions about the radiological impacts during refurbishment are therefore necessarily flawed. Given the strong likelihood that major refurbishment in the form of a stationwide conversion from once-through cooling to closed cooling systems will be ordered by the Connecticut DEP - to avoid future exposure of pregnant women and others to harmful radioactive and toxic waste effluents in the mixing zone and to avoid irreversible impacts to the indigenous Niantic winter flounder - the radiological impacts from such refurbishment should have been fully explored and analyzed in the SEIS.

The NRCs GEIS further states at section 4.6.1.1:

To determine whether the added period of operation following license renewal would, by virtue of buildup, result in significant (double) added dose, the ratios of buildup factors for midlives of 30 to midlives of 20 years were evaluated. These ratios amount to a 35 per cent increase for Cesium-137 and a 6 per cent increase for cobalt-60.

This added increase due to buildup will not significantly change the total dose to members of the public.

In certain cases, the bioaccumulation factors may require reexamination. These principally involve fish (in the human food chain) that are bottom feeders. Bottom feeders may ingest worms and other biota that may remobilize radioactive materials accumulated in the sediments.

Accumulation of radioactive materials in the environment is of concern not only to license renewal but also to operation under present licenses.

41 See discussion at page 8 supra.

42 See 1997 Annual Radiological Environmental Monitoring Program Report.

42 As stated,41 the bioaccumulation of cobalt-60 in sediment in Jordan Cove near the Millstone discharge point has been established. The SEIS does not address this phenomenon, even though required by the GEIS.

Millstones monitoring of the aquatic environment in the area of the discharge has also revealed the presence of the following plant-related radionuclides: cobalt-60, zinc-65, silver-110 and cesium-137.42 In 1997 and at other times, [I]ndications of plant releases were observed in aquatic flora, including detectable levels of cobalt-60, zinc-65 and silver-110. According to the 1997 Radiological Environmental report filed by Northeast Utilities, The detection of these [radio]nuclides throughout the year, as witnessed by positives detected in other aquatic media, correspond to radioactive liquid discharges from the three Millstone units.

Sampling of this media provides useful information because it is very sensitive to plant discharges. However, since seaweed is not consumed, other media are utilized in the determination of dose consequences (e.g., see Shellfish and Fish results)

The presence of cesium-137 in a fish caught in the mixing zone within the Niantic Bay - as identified as a plant-related contamination in the 1997 Millstone effluent report - suggests widespread bioaccumulation of that carcinogenic radioisotope within the environment, requiring a re-examination pursuant to GEIS standards.

The radiological impacts of normal operations should be analyzed as a site-specific Category 2 issue.

4.4 Socioeconomic Impacts of Plant Operations During the License Renewal Period The SEIS considers the economic contribution to the community through payment of Dominions workforce; however, the SEIS does not separate out the economic investment made in maintaining a workforce to monitor Unit 1, a nuclear power plant undergoing decommissioning, and its

43 repository of spent nuclear fuel. Nor does the SEIS consider the prospect of a continuing workforce required to maintain Units 2 and 3 in the event each or both units is/are decommissioned or prematurely shut down before or during the renewal period.

The SEIS does not consider the enormous health care costs associated with the communitys long-term exposure to low-level ionizing radiation, nor worker illnesses related to their exposures. We are aware of a recent surgery, upon a patient whose cancer is fairly linked to Millstone radiological and toxic chemical emissions, which cost in excess of $2.5 million. This does not include follow-up or lifelong care.

The SEIS is incomplete and inaccurate in its assessment of socioeconomic impacts.

4.4.6 Environmental Justice The SEIS does not address the environmental justice issues involved in the transportation and storage of nuclear waste generate by the Millstone Nuclear Power Station, either during its 35 years of operations or in the future. Transportation through poor urban areas and storage of Millstones nuclear waste in poor rural communities both implicate environmental justice concerns; neither aspect was addressed in the SEIS.

4.7 Evaluation of Potential New and Significant Information on Impacts of Operations During the Renewal Term The Connecticut Coalition Against Millstone and others have provided the SEIS staff with new and significant information which, once considered, dictates site-specific review as Category 2 issues or, in the alternative, rejection of the SEIS in toto.

The new and significant information may be summarized as follows:

Millstone causes cancer and Millstone is responsible

43 See footnote 4 supra.

44 See the list of radionuclides listed at pages 34-35.

45 See the list of chemical effluent emissions listed at pages 36-40.

44 for an increased cancer incidence in the surrounding community.

The SEIS states that commentators have provided no evidence to support a causal relationship between increased cancer incidence and Millstone operations.

The NRCs SEIS staff concluded that the information provided during the scoping process was not new and significant with respect to the findings of the GEIS on the health effects to the public from radiological effluent releases due to the Millstone operations.

To the contrary: the Coalition and others have presented overwhelming and unrebutted evidence of a causal relationship between increased cancer incidence and Millstone operations.

While these facts are significant, they are not new.

Since practically the onset of Millstone nuclear operations, Millstones radiological emissions have been linked to heightened cancer incidences.43 This is hardly surprising.

Since the onset of its operations, Millstones owners and operators have submitted reports to the NRC and the DEP detailing their radiological44 and chemical45 effluent emissions to the air and water.

Millstone routinely releases to the air and water the following radioactive materials:

Ag Be-7 Ce-144

46 Fission and Activation Products - Millstone Unit 2 Liquid Effluents - Batch Sampling -

1997 as reported in 1997 Radiological Environmental Monitoring Program.

45 Co-57 Co-58 Co-60 Cr-51 Cs-134 Cs-137 Fe-55 Fe-59 I-131 I-133 Kr-85 Kr-88 La-140 Mn-54 Mo-99 Na-24 Nb-95 Nb-97 Ru-105 Sb-122 Sb-124 Sb-125 Sn-113 Sr-89 Sr-90 Sr-92 TC-99M TC-101 TC-104 Tritium Xe-133 Xe-135 Zn-69M Zr-95 Zr-9746 This list is not exhaustive.

47 See selected bibliography prepared by Nuclear Information Resource Service, attached.

48 U.S. Environmental Protection Agency website, Understanding Radiation: Health Effects (3/16/05) 49 U.S. Nuclear Regulatory Commission website, Fact Sheet: Biological Effects of Radiation. (3/26/05) 46 All radionuclides released by Millstone cause cancer.47 According to the U.S. Environmental Protection Agency, Radioactive materials that decay spontaneously produce ionizing radiation. Any living tissue in the human body can be damaged by ionizing radiation. Cancer is considered by most people the primary health effect from radiation exposure.

Simply put, cancer is the uncontrolled growth of cells.

Ordinarily, natural processes control the rate at which cells grow and replace themselves. They also control the bodys processes for repairing and replacing damages tissue. Damage occurring at the cellular or molecular level can disrupt the control processes, permitting the uncontrolled growth of cells - cancer.

This is why ionizing radiations ability to break chemical bonds in atoms and molecules makes it such a potent carcinogen....

There is no firm basis for setting a safe level of exposure above background for stochastic effects [those resulting from long-term, low-level exposure to radiation].... Other than cancer, the most prominent long-term health effects [from radiation exposure] are teratogenic [those that result from the exposure of fetuses or unborn children to radiation] and genetic

[those that can be passed from parent to child] mutations.48 According to the U.S. Nuclear Regulatory Commission, genetic effects and the development of cancer are the primary health concerns attributed to radiation exposure.49 Many chemicals discharged by Millstone are known carcinogens, such as hydrazine, hexavalent chromium, cadmium, lead and benzene and many others.

50 Millstone 1997 Radiological Environmental Monitoring Program Report and documents filed with Connecticut DEP.

47 Millstone routinely discharges into the nuclear/chemical mixing zone which extends 8,000 feet toward the Niantic and Waterford shorelines, the following chemicals and others:50 Chemicals & Metals Known or Suspected Present in Discharge Aluminum Antimony Ammonia Ammonium Hydroxide Arsenic Barium Beryllium Boric Acid Boron Bromide Bulab 6002 Cadmium Carbohydrazide Chlorine Chromium Cobalt Conquor 3585 (methoxypropylamine and diethylhydroxylamine)

Copper Cyanide Dietylhydroxylamine Epichlorohydrin Ethanolomine Fluoride Freon Hexavalent Chromium Hydrazine Hydrogen Peroxide Iron Methoxypropylamine Molybdate

48 Molybdenum Nalcolyte Nickel Nitrogen Oil & Grease Phosphorus Selenium Silver Styrene Sulfate Sulfide Sulfite Surfactants Thallium Tin Titanium Tolyltriazole Xylene Zinc Zirconium Volatiles Acrolein Acrylonitrile Benzene Bromoform Carbon Tetrachloride Chlorobenzene Chlorodibromomethane Chloroethane 2-Chloroethylvinyl Ether Chloroform Dichlorobromomethane 1, 1-Dichloroethane 1, 2-Dichloroethane 1, 1-Dichloroethylene 1, 2-Dichloropropane 1, 3-Dichloropropylene Ethylbenzene

49 Methylbromide Methylchloride Methylene Chloride 1, 1, 2, 2, -Tetrachloroethane Tetrachloroethylene Toluene 1, 2-Trans-Dichloroethylene 1, 1, 1-Trichloroethane 1, 1, 2-Trichloroethane Trichloroethylene Vinyl Chloride GC/MS Fraction Acid Compounds 2-Chlorophenol 2, 4-Dichlorophenol 2, 4-Dimethylphenol 4, 6-Dinitro-O-Cresol 2, 4-Dinitrophenol 2-Nitrophenol 4-Nitrophenol P-Chloro-M-Cresol Pentachlorophenol Phenol 2, 4, 6-Trichlorophenol Base Neutral Compounds Acenaothylene Benzidine Benzo(a)anthracene Benzo(a)pyrene Benzo(ghi)perylene Benzo(k)fluoranthene Bis(2-Chloroethyl) Ether Bis(2-Ethylhexyl)phthalate Chrysene Dibenzo(ah)anthracene 1,2-Dichlorobenzene 1.3-Dichlorobenzene 1.4-Dichlorobenzene

50 3.3-Dichlorobenzidines Diethyl phthalate Dimethyl phthalate Di-n-butyl phthalate 2,4-Dinitrotoulene 1,2-Diphenylhydrazine Fluoranthene Fluorene Hexachlorobenzene Hexachlorocyclopentadiene Hexachloroethane Indenol1,2,3-ed)pyrene Isophorone Nurobenzene N-Nitrosodimethylamine N-Nitrosodiphenylamine Phenanthrene Pyrene Pesticides Aldrin Chlordane DDT DDE Dieldrin Endosulfan(alpha)

Endosulfan (beta)

Endosulfan Sulfae Endrin Endrin Aldehyde Heptachlor Heotachlor epoxide Arochlor 1016(PCB)

Arochlor 1232(PCB)

Arochlor 1242(PCB)

Arochlor 1248 (PCB)

Arochlor 1254 (PCB)

Arochlor 1260 (PCB)

Toxaphene

51 See Memorandum of Ernest J. Sternglass, Ph.D. dated March 8, 2005 (Synergistic Interaction of radiation, Air Pollution and Chemicals) and references therein (copy attached). And see Health Effects of selected Industrial Chemicals and Radionuclides (STAND Technical Report 2003-2) at page 5 (copy attached).

52 See 1997 Annual Radiological Environmental Operating Report at page 4-5.

53 See [citation to follow]

51 Other Substances Ammonia Benzo(b)fluoranthene Chlorine Hexachlorocyclohexane (Alpha)

Hexachlorocyclohexane (Beta)

Hexachlorocyclohexane (Gamma) 2,3,7,8-TCDD The interaction of radionuclides and chemicals has been established to create a synergy, multiplying the harmful effects of each.51 Millstone discharges these radionuclides and chemicals - and more - into the air and into the nuclear/chemical mixing zone known as Niantic Bay, Pleasure Beach and Jordan Cove, defined as an area within 8,000 feet of the Millstone discharge point.

Some of the radionuclides, such as cesium-137, have been found in fish swimming in Niantic Bay.52 Some of the radionuclides, such as cobalt-60, have been found in the sediment of Jordan Cove where they enter the food chain when they are ingested by worms.53 Some of the radionuclides and toxic chemicals very likely entered Zachary M. Hartleys mother while she was swimming in the nuclear/chemicalmixing zone popularly known as Hole-in-the-Wall Beach during critical months of her pregnancy with Zachary, according to an expert on the health effects of low-level ionizing

54 See footnote 14 supra.

52 radiation, Dr. Helen Caldicott.54 Four pathways are possible:

breathing, swallowing, skin contact and eating a radioactive fish.

Zachary was born with a rare cancer in his jawbone requiring lifesaving surgery.

In SEIS section 4.7, beginning on page 4-53, the NRC states, "During scoping, some commentators suggested that operation of Millstone resulted in excess cancers in populations around the plant site," and "other support of these positions at the May 2004 public meeting or thereafter commentators suggested there is no relationship between cancer incidence and nuclear power plants.

Millstones cumulative dose to the environment and humans, based on annual Millstone reports filed with the NRC since 1970, totals over 6.5 curies. As reported in the response to section 2.2.7, releases of tritium into Long Island Sound since Millstones restart in 1998 are at all time highs in its operating history.

Current annual plant reports indicate that Millstone Units 2 and 3, as in the years since 1970, have been releasing radionuclides such as strontium-90, cesium-137, iodine-131, -133 and -135, cobalt -58 and -

60, krypton-85, xenon-131, -133 and -135, and other such radioactive chemicals, all known to be carcinogenic.

The NRCs denial of a causal relationship between Millstones 35 years of radioactive releases and elevated cancer rates in nearby towns, and in New London County as a whole, does not hold up to scrutiny.

The most glaring example of the NRCs denial in the Millstone SEIS is its complete omission of consideration of the August 17, 2004 declaration of Dr. Ernest J. Sternglass. The Millstone SEIS lists, on page C-9, Dr. Sternglass declaration as received on August 17, 2004.

This is the only mention of it in the SEIS.

Consequently, the declaration was omitted from the NRCs evaluation of potential new and significant information in section 4.7.

53 In his declaration, Dr. Sternglass presents his credentials as an expert in the field of radiation and human health. He has written and published numerous studies in this field in peer reviewed scientific journals and testified to Congress and other government agencies on this subject.

The NRC knows full well who Dr. Sternglass is. He first brought up the problem of radioactive releases in relation to increasing cancer rates around nuclear plants, and in towns near Millstone in particular, to the public eye in the 1970s. He has conducted and published studies informing the public of this continuing problem ever since.

In his declaration, Dr. Sternglass methodically outlines the "causal relationship between abnormally high doses of strontium-90 in milk produced near Millstone and the pattern of cancer changes at various distances from the Millstone plant.

Dr. Sternglass also states in his declaration, "It is my professional opinion that the radioactive releases from the Millstone Nuclear Power Station since its startup have caused and will continue to cause [emphasis added] excess infant mortality, low birthweight, leukemia and cancer as well as increased rates of both chronic and infectious diseases in the towns around Millstone as well as in New London County and Connecticut as a whole."

For the NRC to exclude Dr. Sternglass declaration from section 4.7 is a glaring major error in that in and of itself invalidates the NRCs conclusion that "information provided during the scoping process was not new and significant with respect to the findings of the GEIS on the health effects to the public from radiological effluent releases due to the Millstone operations."

This statement rather is indicative of the NRCs determination to support the nuclear industrys-and in this case Dominions-rush to relicense old unsafe nuclear plants, to the detriment of the publics health and safety.

This bias is repeated in statements and omission throughout section 4.7, as the following will demonstrate.

For example, in dealing with the Connecticut Tumor Registrys report, "Cancer Incidence in Connecticut Counties 1995-99," the NRC

54 does report that New London County "had the highest incidence rate of all invasive tumors for females," but omits that this rate was second highest for males, as was reported at the May 2004 public meeting.

Furthermore, the NRC characterizes information in the report indicating that New London County had the highest rate for 12 specific kinds of cancers as "several forms," a choice of words that seeks to minimize a major health crisis.

The NRC also fails to mention information from the report, which was testified to at the May 2004 public meeting, that New London County had the second highest rate for six more kinds of cancer, third highest for five additional ones, and fourth highest for seven more, totally 30 out of 39 kinds of cancers in which New London County was counted separately.

All of the above reveals a deliberate and systematic attempt to exclude the most important "new and significant" information about Millstone radioactive releases and its effects on human health.

Similarly, in dealing with a 2003 study by Joseph Mangano et al, presented at the May 2004 public meeting, "Elevated Childhood Cancer Incidence Proximate to U.S. Nuclear Power Plants," the SEIS selectively focuses on information from the study that indicates there may not be a causal relationship between Millstones radioactive releases and health problems. So the NRC states the study "reported no significant difference in childhood cancer mortality rates between counties surrounding the nuclear plants and the U.S. population."

This would be fine and fair if the agency did not also exclude the major finding of the study, which is that "cancer incidence for children less than 10 years of age, who live within 30 miles of each of 14 plants [one of which is Millstone] in the eastern U.S. (49 counties with a population of more than 16 million) exceeds the national average. The excess 12.4% suggests that 1 in 9 cancers among children who reside near nuclear reactors is linked to radioactive emissions."

55 Once again, this omission is deliberate and systematic, serving the nuclear industrys interests to the detriment of the publics health and safety.

The NRC also failed to mention numerous other studies listed in the bibliography of study that have linked radioactive releases from nuclear facilities to elevated cancers.

Another example of this exclusion of new and significant information is the NRCs treatment of the 1990 National Cancer Institute study of cancer in counties near nuclear power plants.

That study found that the risk for leukemia in children under 10 in New London County was over 3 times higher than for same aged children in "control counties" used for comparison. The NRC focused on NRC information that sought to downplay of that finding.

However, the NRC excluded other NCI information cited by Joseph Mangano in his report, also presented and testified to at the May 2004 public meeting, entitled "2500 Excess Cancer Cases in New London County Since 1970; Radioactive Emissions From Millstone May Be Cause." In that report Mangano stated, "in Millstones first 14 years, leukemia cases for New London County children under 10 were 55%

higher than the state, and leukemia deaths 45% higher. All scientists agree that children are most sensitive to low-level radiations effects."

Once again, the NRCs failure to give equal weight to critical evidence invalidates its analysis and makes its conclusions false, as well as disqualifying itself as a just arbiter.

Another example is its treatment of another Connecticut Tumor Registry report, which examines cancer incidence in Connecticut towns 1995-99, rather than by county.

First of all, this report was not brought in by the public during the scoping process. The NRC decided to do so on its own as part of its response to information presented at the May 2004 public meeting and thereafter. Why? The NRC reported on the results of the study for only one town, Waterford, site of Millstone. The NRC reported "The

55 See Cancer Incidences in Connecticut Towns 1995-1999, as compiled by Michael Steinberg, attached.

56 town of Waterford does not have the highest ratio of observed cancers to expected cancers for any form of cancer analyzed."

As the NRC well knows, there is no barrier to prevent Millstone radioactive emissions from traveling beyond the boundaries of the town of Waterford. A more comprehensive such analysis would have included other towns near Millstone. But the NRC didnt do that, once again excluding critical information.

However, investigative journalist and author Michael Steinberg of Niantic, CT, did perform such an analysis, including the towns of Waterford, East Lyme, Old Lyme, New London and Groton together.

Steinbergs analysis, included herein, found higher than expected incidence of cancer in these towns together for: all female cancers, lung cancer for females, colorectal cancers for females, prostate cancer for males, breast cancer for females, melanoma for both males and females, and cervical cancer for females.55 These findings are consistent with findings presented from the Connecticut Tumor Registrys study of Connecticut Counties 1995-99, as well as information presented in Manganos 1998 study "2500 Excess Cancer Cases...", Sternglass declaration, and a new study by Mangano presented at the January 11, 2005 meeting.

Finally, the NRC reports in section 4.7 that a 2000 study by the Connecticut Academy of Science and Engineering (CASE) found that "The town of Waterford was not in the highest ratio category for any cancer except thyroid cancer, and at least three other town had higher ratios for thyroid cancer. At least 30 town had higher ratios for pediatric leukemia (ages 0 to 14) than Waterford."

First of all, this analysis, as reported above, is defective by limiting it to Waterford. Secondly, the CASE study focused on the Connecticut Yankee Nuclear Plant, and Millstone is never mentioned in it.

Therefore radioactive emissions from Millstone are not considered in its analysis. Furthermore, information for cancer is not reported statistically by town, other than in maps where towns are not

56 We attach a study critical of the CASE report, entitled Epidemiological Evaluation of the CASE Report Entitled Study of Radiation Exposure from the Connecticut Yankee Nuclear Power Plant(Suzanne Gutter and Edwin van Wijngarden)(February 21, 2001) 57 identified specifically but are marked by varying shades of white to black.

Nevertheless, the maps do indicate elevated cancers in towns around Millstone for all the specific kinds of cancers studied: thyroid cancer is elevated not only in Waterford, but also in Groton, Old Lyme and Stonington. Multiple myeloma is elevated for Waterford. And acute adult leukemia is elevated for Groton and Ledyard, both downwind of Millstone.

However, while the CASE study uses information from the Connecticut Tumor Registry for 1976-95, i does not look for trends over those years (e.g. by comparing cancer rate increases or decreases over 5 year periods, as was done in studies by Sternglass and Mangano).

The CASE study was initiated in 1997. At that time, all three Millstone reactors had been shut down for two years because of gross mismanagement and harassment of whistleblowers. At that time Northeast Utilities owned and operated Millstone, and still owned the permanently shut down Connecticut Yankee Nuclear Plant. CASE reports that Northeast Utilities was one of its top financial supporters at that time, and its website still shows NU at the top of its list of financial supporters.56 Thus NU in effect was a major funder of the CASE study, which means CASE had a major conflict of interest, one that put pressure on it to come up with results that would please the hand that feeds it.

All the above points to the failure of the NRC to conduct a fair and unbiased analysis of the critical information given as public testimony at the May 2004 pubic meeting in Waterford, Connecticut, and in documents presented there and thereafter to the NRC.

As a result the NRCs conclusion that there is not new and significant information is fatally flawed. The agency excluded and downplayed the critical information that was presented, information

57 See www.dph.state.ct.us/OPPE/hptumor.htm 58 that establishes a strong and clear relationship between Millstones 35 years of radioactive emissions and the concurrent rise of cancers and other diseases in towns around Millstone and in New London County, as well as across Connecticut and into Rhode Island.

While the Connecticut Tumor Registry is a source of much information about the heightened incidence of cancer and related diseases in the area surrounding Millstone, it is not a completely reliable source of information.

Zachary M. Hartley is not the only victim of Millstones radiological and toxic chemical releases. In any individual cancer case, a 100 per cent positive correlation with a suspected causative agent cannot be made. That is why we rely on all available information obtained formally - such as the Connecticut Tumor Registry and epidemiological research - as well as informally, through reports of victims themselves or their family members to understand the scope of this public health emergency.

Although Zachary was born in Connecticut with a life-threatening cancer in his jaw and although a tumor the size of an orange was removed from his face when he was 14 months of age, the Connecticut Tumor Registry does not list Zacharys cancer. The Registrys explanation is that a portion of Zacharys tumor was benign and therefore it does not qualify for listing in the Connecticut Tumor Registry.

The NRC SEIS staff relies on a report of the National Cancer Institute (NCI 1990), which in turn relies on data of the Connecticut Tumor Registry.

According to the Connecticut Tumor Registry website, it obtains its funding from the National Cancer Institute.57 The NCI report is fifteen (15) years old. The NCI report was released four (4) years after Millstone Unit 3 commenced generating nuclear energy and long before many cancers associated with its dangerous emissions might be detected. It does not reflect the extremely high concentrations of strontium-90, a carcinogen, found in goat milk sampled within five miles of Millstone in 2001. It does not report the case of Zachary M. Hartley. It does not report the case of Rachel Heaton, who developed a rare form of thyroid cancer years after swimming in the Niantic shoreline mixing zone because she moved from the area.

Nor does it report the brain tumor of Charles D. Douton, Jr., one of three

58 See ECRR Report Challenges Entrenches Radiation Assumptions (MIRS, February 21, 2003) 59 former Millstone site maintenance workers who developed brain tumors and were dismissed from their jobs at Millstone by Northeast Utilities, as identified by Cynthia M. Besade in her August 5, 2004 affidavit. The NCI report does not include any of the seven (7) cancer cases recently identified to the NRC SEIS staff among residents or former residents of a single road - Seabreeze Drive - in Waterford two miles downwind from Millstone. The Connecticut Coalition Against Millstone is actively investigating to determine to what extent the Connecticut Tumor Registry fails to maintain records of other Millstone victims.

The Connecticut Coalition Against Millstone is also actively investigating information it has received of rare cancers - including a fatal skin cancer confined to the feet of a woman who frequently waded for long periods in the nuclear/chemical mixing zone to the east of the Millstone discharge point - in the community surrounding Millstone. The information under review includes dozens of cases of early childhood death and disease.

The Coalition attaches a selected Bibliography compiled by the Nuclear Information Resource Service (NIRS) linking nuclear power plant radiological emissions with cancers in their communities. For example, NIRS reports a 400 per cent increase in leukemia incidence in the population living downwind from the Pilgrim (MA) Nuclear Power Plant during the first five years after nuclear fuel was known to have leaked excess radioactivity. A necessary review of Millstone records will reveal the occurrence of leaking fuel at Unit 2 after Dominion assumed ownership.

The Coalition notes that the European Committee on Radiation Risk (ECRR) has reported that radiation dose models employed by the NRC and other governmental agencies are probably 100 to 1,000 times too high to be accurate.58 The NRC SEIS staff had to be reminded at the NRCs January 11, 2005 public meeting on the SEIS that the Coalition and others had previously submitted documentation to the NRC establishing a causative link between Millstone radiological and toxic effluent emissions and the heightened cancer rates in the area surrounding Millstone.

60 The NRC SEIS staff did not adhere to the NRCs Principles of Good Regulation, which require in part:

Independence: Nothing but the highest possible standards of ethical performance and professionalism should influence regulation.

However, independence does not imply isolation. All available facts and opinions must be sought openly from licensees and other interested members of the public. The many and possibly conflicting public interests involved must be considered.

The SEIS states that the NRC staff and its contractors discussed Millstones history of radiological effluent and environmental monitoring with officials from CTDEPs Division of Radiation. The reports cited above by CTDPH, CASE and the national Cancer Institute were also discussed. CTDEP conducts its own radiological environmental monitoring program around Millstone. STDEP had also reviewed the reports by CTDPH, CASE and the National Cancer Institute. CTDEP concluded that Millstones radiological effluent and environmental monitoring data were accurate. CTDEP also concluded that the reports cited above by CTDPH, CASE and the National Cancer Institute reports showed no evidence of a causal link between public exposure to Millstones radiological effluents and cancer in Connecticut towns.

The Connecticut Coalition Against Millstone has sent correspondence to Dr. Edward C. Wilds, Director of the DEP Radiation Bureau, to determine what conversations occurred with the SEIS staff, whether the DEP staff agrees with the characterizations of its conduct and input in the SEIS.

Finally, the Coalition asked Dr. Wilds if he agreed with the SEIS statement that CTDEP concluded that Millstones radiological effluent and environmental monitoring data were accurate, and if so, to specify what radiological effluent and environmental monitoring data were referenced and, further, if so, how such statement could be reconciled with Northeast Utilities plea of guilty in 1999 in the U.S. District Court to committing environmental felonies, including falsifying environmental monitoring records.

To date, Dr. Wilds has failed to respond to the Coalitions request.

61 3.7.3.

Cumulative Radiological Impacts The GEIS did not perform a meaningful analysis of cumulative radiological impacts because its data base was limited to Millstone effluent discharges from 1985-1987.

The GEIS further states:

In addition, the radiological environmental monitoring program conducted by Dominion in the vicinity of Millstone measures radiation and radioactive material from all sources, including Millstone; therefore, the monitoring program measures cumulative radiological impacts.

The Health Physics Society defines cumulative dose as follows:

The total dose resulting from repeated exposures of ionizing radiation to the same portion of the body, or to the whole body, over a period of time.

Correspondingly, the SEIS failed to conduct the analysis required by virtue of GEIS 4.6.1.1, which provides:

To determine whether the added period of operation following license renewal would, by virtue of buildup, result in significant (double) added dose, the ratios of buildup factors for midlives of 30 to midlives of 20 years were evaluated. These ratios amount to a 35 per cent increase for Cesium-137 and a 6 per cent increase for cobalt-60.

This added increase due to buildup will not significantly change the total dose to members of the public.

In certain cases, the bioaccumulation factors may require reexamination. These principally involve fish (in the human food chain) that are bottom feeders. Bottom feeders may ingest worms and other biota that may remobilize radioactive materials accumulated in the sediments.

Accumulation of radioactive materials in the environment is of concern not only to license renewal but also to operation under present licenses.

62 Accordingly, the SEIS is substantially flawed on the issue of cumulative radiological impacts.

Conclusion It has been demonstrated herein that the adverse environmental impacts of Millstone license renewal are so great that preserving the option of license renewal for energy planning decisionmakers would be unreasonable. The NRC should reach such a conclusion in its final Environmental Impact Statement.

In the alternative, the NRC should recognize that its staff has failed to consider the full scope of the environmental impacts of present or future Millstone operations, and similarly, the licensee has failed to fully apprise the NRC of all pertinent facts and circumstances sufficient to enable the NRC to undertake meaningful review; in the absence of such complete evaluation the NRC must deny relicensing.

CONNECTICUT COALITION AGAINST MILLSTONE

63 Nancy Burton 147 Cross Highway Redding Ridge CT 06876 Tel. 203-938-3952 Exhibit C DECLARATION I, Ernest J. Sternglass, Ph.D., do hereby declare as follows:

1. I am a professor emeritus in radiology with a specialty in radiation physics at the University of Pittsburgh School of Medicine.

2.I also serve as scientific director of the Radiation and Public Health Project.

3. I have reviewed data recently compiled by the U.S. Environmental Protection Agency regarding its measurements of levels of strontium-

64 90 in milk sold commercially at various locations in the United States.

4. The source of such data is Environmental Radiation Data, quarterly report
  1. 115, July to September 2003, and it contains EPA measurements of strontium-90 concentrations in milk as follows, all in picoCuries per liter:

San Francisco CA July 8, 2003 0.73 Dover DE July 22, 2003 0.19 Atlanta GA July 30, 2003 0.59 Wichita KA July 15, 2003 0.42 Grand Rapids MI July 8, 2003 0.45 Syracuse NY July 10, 2003 0.53 San Antonio TX July 7, 2003 0.02 Spokane WA July 8, 2003 0.13

5. I have also reviewed data submitted to the Connecticut Department of Environmental Protection by Dominion Nuclear Connecticut, Inc.

with regard to its samplings and analysis of the levels of strontium-90 found in goat milk sampled at 120 Dayton Road in Waterford, Connecticut, during the years 2001, 2002 and 2003. This data includes reported concentrations of 55.5 and `13 to 14 picoCuries of strontium-90.

6. Comparison of the EPA data with the Dominion data reveals: The data reveals that for 8 other locations across the nation the levels of radioactive strontium-90 in milk are 10 to 100 times smaller than those measured near the Millstone Nuclear Power Plant, in particular the 55.5 picoCuries per liter measured in 2001 in the goat milk collected at 120 Dayton Road, 5 miles north-northeast of the plant.

This is an extremely

65 large concentration, close to twice the concentration in Connecticut milk at the height of nuclear weapons testing in 1963 of 23 picoCuries per liter.

7. It is my opinion that the evidence of strontium-90 levels in goat milk sampled from such location strongly suggests that the Millstone Nuclear Power Station releases excess levels of strontium-90 to the surrounding environment and that such emissions expose the community to a significant health risk which dictates closure of the Millstone Nuclear Power Plant as a matter of public health.

I hereby declare that the statements above are true and are submitted under penalty of perjury.

Ernest J.

Sternglass, Ph.D.

Dated: November 16, 2005 New York, New York

66 Exhibit D

.