| | {{#Wiki_filter:From: Ennis, Rick Sent: Thursday, August 07, 2014 2:45 PM To: Stephanie.Hanson@exeloncorp.com Cc: David Helker; Lamb, Taylor Subject: Acceptance Review for TACs MF4401 & MF4402 - Peach Bottom Units 2 and 3 - Adminstrative License and Technical Specification Changes Stephanie, By letter dated July 11, 2014 (ADAMS Accession No. ML14192B143), Exelon Generation Company, LLC submitted a license amendment request for Peach Bottom Atomic Power Station, Units 2 and 3. The proposed amendment would incorporate several administrative changes to the facility operating license and the technical specifications. The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| | |
| | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. |
| | If you have any questions, please contact me at (301) 415-1420. |
| | Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation |
| | |
| }} | | }} |
Revision as of 03:15, 22 March 2018
Letter Sequence Acceptance Review |
---|
TAC:MF4401, Control Room Habitability (Approved, Closed) TAC:MF4402, Control Room Habitability (Approved, Closed) |
|
MONTHYEARML14192B1432014-07-11011 July 2014 License Amendment Request to Revise Facility Operating License and the Technical Specifications to Incorporate Administrative Changes Project stage: Request ML14219A5982014-08-0707 August 2014 Acceptance Review for TACs MF4401 & MF4402 - Peach Bottom Units 2 and 3 - Administrative License and Technical Specification Changes Project stage: Acceptance Review ML14337A2942014-12-0101 December 2014 Response to Request for Additional Information Regarding Request to Revise Facility Operating Licenses and the Technical Specifications to Incorporate Administrative Changes Project stage: Response to RAI ML14363A2272015-03-11011 March 2015 Issuance of Amendments Revise Facility Operating License and the Technical Specifications to Incorporate Administrative Changes Project stage: Approval ML16019A1012016-01-15015 January 2016 MELLLA License Amendment Request - Supplement 8, Proprietary Labeling Corrections and Implementation Plan Change Project stage: Supplement 2014-08-07
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1782024-07-0303 July 2024 NRC Email Response to Peach Bottoms Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24163A3522024-05-15015 May 2024 Meeting Feedback from May 14, 2024, Meeting with Constellation on Peach Bottom Atomic Power Station Units Nos. 2 and 3 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24088A3192024-03-28028 March 2024 Audit Plan Associated with Peach Bottom, Unit 1 - 10 CFR 50.82(a)(3) Alternate Decommissioning Schedule ML24002A7132023-12-29029 December 2023 Supplement - Peach Bottom Security Rule Exemption Request – ISFSI Docket No. Reference (EPID L-2023-LLE-0032) (Updated) (Email) ML23352A3242023-12-18018 December 2023 Acceptance of Requested Licensing Action Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations (EPID L- 2023-LLN-0004) ML23331A9112023-11-22022 November 2023 Supplement - Peach Bottom Security Rule Exemption Request – ISFSI Docket No. Reference ML23304A0182023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Peach Bottom 2 & 3 - Exemption from Security Rule (L-2023-LLE-0032) ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22024A1852022-01-24024 January 2022 Acceptance for Review of Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21134A0152021-05-14014 May 2021 Acceptance Ventilation Filter Testing LAR ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20343A3492020-12-0707 December 2020 Acceptance of Requested Licensing Action: Peach Bottom Relief Request for N-16 Nozzle ML20324A6472020-11-19019 November 2020 Acceptance of Requested Licensing Action: Peach Bottom One-time Exemption App. B Sect. VI.C.3.(I)(1) Force on Force (COVID-19) ML20314A0282020-11-0606 November 2020 Verbal Relief for Penetration Nozzle ML20283A7722020-10-0909 October 2020 Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020 ML20276A0762020-10-0202 October 2020 Acceptance of Requested Licensing Action, One-Time Acceptance for Review - Peach Bottom of Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20217L3462020-08-0404 August 2020 Audit Plan Regarding License Amendment Request to Implement Riskinformed Extended Completion Times (L-2020-LLA-0120) ML20191A0182020-07-0101 July 2020 NRR E-mail Capture - Exelon Fleet RR for SPI for Appendix J Valves ML20178A1392020-06-26026 June 2020 Acceptance Review for Peach Bottom - License Amendment Request for TSTF-505 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 2024-09-06
[Table view] |
Text
From: Ennis, Rick Sent: Thursday, August 07, 2014 2:45 PM To: Stephanie.Hanson@exeloncorp.com Cc: David Helker; Lamb, Taylor Subject: Acceptance Review for TACs MF4401 & MF4402 - Peach Bottom Units 2 and 3 - Adminstrative License and Technical Specification Changes Stephanie, By letter dated July 11, 2014 (ADAMS Accession No. ML14192B143), Exelon Generation Company, LLC submitted a license amendment request for Peach Bottom Atomic Power Station, Units 2 and 3. The proposed amendment would incorporate several administrative changes to the facility operating license and the technical specifications. The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415-1420.
Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation