ML20028A054: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:I Cp&L Carolina Power & Light Company Nm H. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 NOV1 0 B82 Robinson File No: | ||
I | 15505 Se rial: | ||
Cp&L Carolina Power & Light Company Nm H. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 NOV1 0 B82 Robinson File No: | RSEP/82-1857 Mr. Richard C. DeYoung, Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. | ||
20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET No. 50-261 LICENSEE NO. DPR-23 MONTHLY OPERATIONS REPORT | |||
==Dear Mr. DeYoung:== | ==Dear Mr. DeYoung:== | ||
In accordance with Technical Specification 6.9.1.c for the H. E. Robinson Steam Electric Plant, Unit No. 2, Carolina Power and Light Company herewith submits the report of operation statistics and shutdown experience for the month of October,1982. | |||
In accordance with Technical Specification 6.9.1.c for the H. E. Robinson Steam Electric Plant, Unit No. 2, Carolina Power and Light Company herewith submits the report of operation statistics and shutdown experience for the month of October,1982. In addition to the October report, corrected reports for August and September,1982 are also included. The August report contained two calculational errors, Cross Thermal Energy Generated, and Net Electrical Energy Generated, and an administrative error in the type designation for outages 08-05 and 08-06. The September report was also revised to include the correct year-to-date information resulting f rom the changes made in tugust. | In addition to the October report, corrected reports for August and September,1982 are also included. | ||
The August report contained two calculational errors, Cross Thermal Energy Generated, and Net Electrical Energy Generated, and an administrative error in the type designation for outages 08-05 and 08-06. | |||
The September report was also revised to include the correct year-to-date information resulting f rom the changes made in tugust. | |||
Very truly yours, ll[ lt R. B. Starkey, Jr. | Very truly yours, ll[ lt R. B. Starkey, Jr. | ||
General Manager H. B. Robinson SEG Plant FMG/b ss cc: | General Manager H. B. Robinson SEG Plant FMG/b ss cc: | ||
J. P. O'Reilly (1) 8211160345 821110 PDR ADOCK 05000261 R | R. A. Hartfield (2) | ||
J. P. O'Reilly (1) 8211160345 821110 PDR ADOCK 05000261 R | |||
PDR | |||
__ -. _ _ _ _}} | |||
Latest revision as of 20:48, 20 December 2024
| ML20028A054 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 11/10/1982 |
| From: | Starkey R CAROLINA POWER & LIGHT CO. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20028A055 | List: |
| References | |
| RSEP-82-1857, NUDOCS 8211160345 | |
| Download: ML20028A054 (1) | |
Text
I Cp&L Carolina Power & Light Company Nm H. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 NOV1 0 B82 Robinson File No:
15505 Se rial:
RSEP/82-1857 Mr. Richard C. DeYoung, Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET No. 50-261 LICENSEE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Mr. DeYoung:
In accordance with Technical Specification 6.9.1.c for the H. E. Robinson Steam Electric Plant, Unit No. 2, Carolina Power and Light Company herewith submits the report of operation statistics and shutdown experience for the month of October,1982.
In addition to the October report, corrected reports for August and September,1982 are also included.
The August report contained two calculational errors, Cross Thermal Energy Generated, and Net Electrical Energy Generated, and an administrative error in the type designation for outages 08-05 and 08-06.
The September report was also revised to include the correct year-to-date information resulting f rom the changes made in tugust.
Very truly yours, ll[ lt R. B. Starkey, Jr.
General Manager H. B. Robinson SEG Plant FMG/b ss cc:
R. A. Hartfield (2)
J. P. O'Reilly (1) 8211160345 821110 PDR ADOCK 05000261 R
__ -. _ _ _ _