ML20028A062
| ML20028A062 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 10/05/1982 |
| From: | Norris H CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20028A055 | List: |
| References | |
| NUDOCS 8211160362 | |
| Download: ML20028A062 (1) | |
Text
~*
OPE!MTING DATA REPORT DOCKET NO:
50-261 DATE:
821005 w
CO>f?LETED 15Y:
H. Ray Norris TELEP110NE:
(503) 353-4524 OPERATING STATUS Notes:
- 1. Unit Name:
H. B. Robinson Unit No. 2
- 2. Reporting Period: 820901, 0000/820930,2400
' There are presently 157 spent fuel
- 3. Licensed Thermal Power (Kit):
2300 assemblies in the spent fuel pool.
- 4. Nameplate Rating (Cross MUe):
739
- 5. Desina Electrical Rating (Not MWe):_
700
- 6. Maximun Dependable Capacity (Gross MWe):
700
- 7. Maximum Dependable Capacity (Net MWe):_
.665 8.~ 11 Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, Give Reasons:
No change r
- 9. Pvwer Level to Which Restricted, If Any (Met FMe):
1955 MWr Reactor Power
- 10. Reasons For Restrictions, if Any:
Although the Unit is not restrrcted by-any 6uTstdr-egency, the power level is presTriTIy reducea cue to stYaW~gEHEfutdr TUnB1deratiolr.--
This Month Yr.-to-Date Cun.ulative
- 11. llours in lieporting Period 720 6551 101477
- 12. Kumber of Hours Reactor Uns Critical 707.80
~I379.63 74725.05
- 13. Reacter Reserve U.utdown Hours 0
0 1085.30
- 14. Hours Cencrator La-Line 591.57 2173.77 72729.08_
- 15. Unit Reserve Shutdowa Hours 0
0 23.20
- 16. Gros.s Thermal Energy Generated ( MH) 1029160
- 3775627
- 146871001-
- 17. Grosr. Electrical Energy Generated (>NH) 318393 1189675 47267645
- 18. Net Electrical Energy Generated (> Nil) 295731
- 1084427
- 44704678
- 19. Unit Seevice Factor 82.16 33.18 71.67
- 20. Unit Availability Factor 82.16 33.18 71.69
- 21. Unit Capacity Factor (Using MDC Net) 61.76 24.89 66.24
- 22. Unit Capacity Factor (Using DER Net) 58.67 23.64 62.93
- 23. Unit Forced Outage Rate 17.83
_ *11.19
- 14.49
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Ecch):
Type-2 2/26/83 Four week steam generator inspection outage.
- 25. If Shut Dowa At End of Report Period, Estimated Date of Startup:
On line l
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved 1NITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
f'211160362 821110 PDR ADOCK 05000261 j
R PDR
- Corrected on 821102 9/77)
]