ML20028A062

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Sept 1982
ML20028A062
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/05/1982
From: Norris H
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20028A055 List:
References
NUDOCS 8211160362
Download: ML20028A062 (1)


Text

. . ~*

OPE!MTING DATA REPORT DOCKET NO: 50-261 DATE: 821005 w CO>f?LETED 15Y: H. Ray Norris TELEP110NE: (503) 353-4524 OPERATING STATUS Notes:

1. Unit Name: H. B. Robinson Unit No. 2
2. Reporting Period: 820901, 0000/820930,2400 ' There are presently 157 spent fuel
3. Licensed Thermal Power (Kit): 2300 assemblies in the spent fuel pool.
4. Nameplate Rating (Cross MUe): 739
5. Desina Electrical Rating (Not MWe):_ 700
6. Maximun Dependable Capacity (Gross MWe): 700
7. Maximum Dependable Capacity (Net MWe):_ .665 8.~

11 Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, Give Reasons: No change r

9. Pvwer Level to Which Restricted, If Any (Met FMe): 1955 MWr Reactor Power
10. Reasons For Restrictions, if Any: Although the Unit is not restrrcted by-any 6uTstdr-egency, the power level is presTriTIy reducea cue to stYaW~gEHEfutdr TUnB1deratiolr.--

This Month Yr.-to-Date Cun.ulative

11. llours in lieporting Period 720 6551 101477
12. Kumber of Hours Reactor Uns Critical 707.80 ~I379.63 74725.05
13. Reacter Reserve U.utdown Hours 0 0 1085.30
14. Hours Cencrator La-Line 591.57 2173.77
15. Unit Reserve Shutdowa Hours 0 72729.08_

0 23.20

16. Gros.s Thermal Energy Generated ( MH) 1029160 *3775627 *146871001-
17. Grosr. Electrical Energy Generated (>NH) 318393 1189675 47267645
18. Net Electrical Energy Generated (> Nil) 295731 *1084427 *44704678
19. Unit Seevice Factor 82.16 33.18 71.67
20. Unit Availability Factor 82.16 33.18 71.69
21. Unit Capacity Factor (Using MDC Net) 61.76 24.89 66.24
22. Unit Capacity Factor (Using DER Net) 58.67 23.64 62.93
23. Unit Forced Outage Rate 17.83 _ *11.19 *14.49
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Ecch):

Type-2 2/26/83 Four week steam generator inspection outage.

, 25. If Shut Dowa At End of Report Period, Estimated Date of Startup: On line l 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved 1NITIAL CRITICALITY --- ---

INITIAL ELECTRICITY - - - ---

COMMERCIAL OPERATION - - - ---

i f'211160362 821110 PDR ADOCK 05000261 j R PDR

.;

  • Corrected on 821102

]

  • 9/77)