ML20028A054

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Oct 1982 & Corrected Monthly Operating Repts for Aug & Sept 1982
ML20028A054
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 11/10/1982
From: Starkey R
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20028A055 List:
References
RSEP-82-1857, NUDOCS 8211160345
Download: ML20028A054 (1)


Text

I ,

Cp&L Carolina Power & Light Company Nm H. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 NOV1 0 B82 Robinson File No: 15505 Se rial: RSEP/82-1857 Mr. Richard C. DeYoung, Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET No. 50-261 LICENSEE NO. DPR-23 MONTHLY OPERATIONS REPORT

Dear Mr. DeYoung:

In accordance with Technical Specification 6.9.1.c for the H. E. Robinson Steam Electric Plant, Unit No. 2, Carolina Power and Light Company herewith submits the report of operation statistics and shutdown experience for the month of October,1982. In addition to the October report, corrected reports for August and September,1982 are also included. The August report contained two calculational errors, Cross Thermal Energy Generated, and Net Electrical Energy Generated, and an administrative error in the type designation for outages 08-05 and 08-06. The September report was also revised to include the correct year-to-date information resulting f rom the changes made in tugust.

Very truly yours, ll[ lt R. B. Starkey, Jr.

General Manager H. B. Robinson SEG Plant FMG/b ss cc: R. A. Hartfield (2)

J. P. O'Reilly (1) 8211160345 821110 PDR ADOCK 05000261 R PDR

. - - _. _, _ _ _ . _ ___ __ - . _ _ _ _