Corrected Monthly Operating Rept for Aug 1982
ML20028A059
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/02/1982
From: Norris H
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20028A055 List:
References
NUDOCS 8211160357
Download: ML20028A059 (2)


Text

,

, OPERATING DATA. REPORT DOCKET NO: 50-261 DATE: 820902

  • COMPLETED BY: H. Ray Norris
  • . TELEP110NE: (803) 383-4524 OPERATING STATUS Notes:
1. Unit Name: H. B. Robinson Unit No. 2 There are presently 157 spent
2. Reporting Period: 820801.0000/820831.2400 fuel assemblies in the 's pent
3. Licensed Thermal Power (MWt): 2300 fuel pool.
4. Nameplate Ra. ting (Gross tale): 739
5. Design Electrical Rating (Net }Me):700
6. tbximum Dependable Capacity (Gross FMe): 700
7. Maximum Dependable Capacity (Net FMe): 665
8. If Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, Give ..

Reasons: No change

9. Power Level to Which Restricted, If Any (Not Mile): 1955 MWT Reactor Power
10. Reasons For Restrictions, If Any: Although the Unit is not restricted by any outside agency, the power level is presently reduced due to steam generator considerations.

This Month' Yr.-to-Date Cumulative

11. Hours in Reporting Period 744 5,831 100,757 -
12. Number of Hours Reactor Was Critical . 304.73 1,671.83 74,017.25
13. Reactor Reserve Shutdown llours 0 0 1.085.30
14. Hours Generator On-Line 215.10 1,582.20 72.137.51

.15. Unit Reserve Shutdowa Hours 0 0 23.20

16. Gross Thermal Energy Generated (IMI) *245157 *2746467 '*145841841
17. Gross Electrical Energy Generated (FMH) 72.952 .871.282 46.'949.252
18. Net Electrical Energy Generated (FMH) *54837 *788696 *44408947
19. Unit Service Factor 28.91 27.13 7 L . 59 '
20. Unit Availability Factor 28.91 27.13 71.61
21. Unit Capacity Factor (Using MDC N'et) 11.08 20.33 66.27
22. Unit Capacity Factor (Using DER Net) 10.53 _19.32 62.96
23. Unit Forced Outage Rate *40.37 *8.43 *14.46
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type-2, 2/26/83, Four week steam generator inspection outage.

l, 25 If Chut Down At End of Report Period, Estimated Date of Startup: On line

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY ,--- ---

INITIAL ELECTRICITY --- ---

COMMERCIAL OPERATION --- --- -

8211160357 821110 PDR ADOCK 05000261 R PDR

  • Corrected on 821102 (9/77)

Cg ,

J DOCKET NO.

50-261

- UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME H. B. Robinson DATE 820902

  • H. Ray Norris COMPLETED BY i REPORT MONTil Augus t TELEPHONE (803) 383-4524 e.

._ E E 5 r, "gv t Cause & Correesiver -

-, .] ? 3 $Y5 ji5 Lisensec Event g,7 9-3 Action to No. Date y, 3g s Prevent Recurrence H A E $ s Report

  • mO E'

v

~ 5 =!!

.e -

5 .

--- ZZ ZZZZZZ Shuutdown for maintenance / refueling 2-01 820801 S 350.08 B/C 3 outage 3 --- HB HTEXCH While bringing the unit off line F 131.59 B 08-02 82'0815 due to , faulty MW* indication, the unit tripped. Cause-low icvel S/G

' resulting in low level trip.

HH VALVEX High level S/G. Cause-trip due to 08-03 820821 F 6.00 A 3 --

feedwater reg. valve malfunction.

HH VALVEX High level S/G. Cause-trip due to 08-04 820821 F 8.01 A 3 ---

feedwate'r reg. valve malfunction.

--- HA TURBIN Required turbine over speed trip 08-05 820822 *S 32.27 B 1 test following refueling /maintenanc a outage.

~

y

~

- - - - HA TURBIN Required turbine test-adjusted over-08-06 820825 '

  • S ., 0.23 B speed trip.

3 4

I . 2 Method: Exhibit G Instructions

  • F: For(cd Reaw n; - .

for Preparation of Data I. Manual -

S: Scheduled A l'iluipment Failure (Explain) Entr> Sheets for Licensee 2-Manual Scram.

n Maintenance of Test 3 Autmnatic Scram.

Event Repor (LER) File (NUREG-C. Refueling 4-Other'(Explain) 0161)

D Regulatory Restriction 1:.-Operator Training & License Examination 5 F-Admmisirative Exhibit ! Same Sourec G. Operational Error (Explain) .

Il-Other (Explain)

(9/77) t o Corrected on 821102 .. . . . ... - - .