TDI DIESEL GENERATOR DESIGN REVIEW AND                         ,
TDI DIESEL GENERATOR DESIGN REVIEW AND QUALITY REVALIDATION REPORT prepared for 1
QUALITY REVALIDATION REPORT prepared for 1
MISSISSIPPI POWER AND LIGHT COMPANY GRAND GULF NUCLEAR STATION - UNIT 1-q by V
MISSISSIPPI POWER AND LIGHT COMPANY GRAND GULF NUCLEAR STATION - UNIT 1-q                                               by V
TDI DIESEL GENERATOR OWNERS GROUP Revision 1 February,.1985 Reviewed _by:
,                                  TDI DIESEL GENERATOR OWNERS GROUP Revision 1 February,.1985 Reviewed _by:             -
R. J. Deese Licensing Coordinator 2
R. J. Deese
.TDI. Diesel Generator Owners Group Approved by:
,                                            Licensing Coordinator 2
bi C. L. Ray
                                            .TDI. Diesel Generator Owners Group Approved by:                   bi     -
'' ' (
C. L. Ray     '' ' (
' Technical Program Director TDI Diesel Generator Owners. Group l
                                            ' Technical Program Director TDI Diesel Generator Owners. Group l
N 8504180418 850416 PDR ADOCK 05000416 l
N       8504180418 850416         ''
S PDR z,
.                    PDR ADOCK 05000416 l                   S               PDR       z, l~
l~
GG1434-l
GG1434-l


2.6 -FINAL DOCUMENTATION' The DR/QR program.has been completed for Mississippi Power and Light.               A summary of the results of this effort are contained in Section 3.0.
2.6 -FINAL DOCUMENTATION' The DR/QR program.has been completed for Mississippi Power and Light.
Appendix ~ I contains component ' DR/QR Summary Reports which provide a                 !
A summary of the results of this effort are contained in Section 3.0.
detailed summary of .the review and analysis performed on each component               !
Appendix ~ I contains component ' DR/QR Summary Reports which provide a detailed summary of.the review and analysis performed on each component
                . including references to supporting documentation and the recommendations and conclusions resulting from this effort.
. including references to supporting documentation and the recommendations and conclusions resulting from this effort.
Appendix II contains a comprehensive set of maintenance and surveillance recommendations - for 'each component. These recommendations were derived l               : from existing vendor recommendations and the individual component DR/QR i               Summary reports. The purpose of this Appendix is to provide the utility a basis for its maintenance and surveillance program which will maintain the qualification of its diesel generators for the life of the plant.
Appendix II contains a comprehensive set of maintenance and surveillance recommendations - for 'each component.
This entire report constitutes final documentation of the completion of               1 the DR/QR Program on the Grand Gulf TDI diesel generators.
These recommendations were derived l
: from existing vendor recommendations and the individual component DR/QR i
Summary reports. The purpose of this Appendix is to provide the utility a basis for its maintenance and surveillance program which will maintain the qualification of its diesel generators for the life of the plant.
This entire report constitutes final documentation of the completion of 1
the DR/QR Program on the Grand Gulf TDI diesel generators.
O O
O O
GG1434                                   2-6.                           .REV.'l
GG1434 2-6.
.REV.'l


3.0 Results of Design Review and Quality Revalidation The DR/QR Program implemented for the Grand Gulf Nuclear Station - Unit 1 TDI diesels was consistently performed with the generic methodology described in Section 2.0. The results of these reviews are summarized in         ,
3.0 Results of Design Review and Quality Revalidation The DR/QR Program implemented for the Grand Gulf Nuclear Station - Unit 1 TDI diesels was consistently performed with the generic methodology described in Section 2.0.
this section. More detailed component summary reports are contained in           l Appendix I of this report.                                                       '
The results of these reviews are summarized in this section.
Section - 3.1 and 3.2 list the components of the Grand Gulf diesel generators which _have been           reviewed- under Phase   I   and Phase   II respectively.         The majority of these_ components are assessed to be acceptable for their intended service with unlimited life provided the recommendations identified are followed.             These recommendations deal mainly with additional inspection requirements, and installation, operating and maintenance procedure improvements.               In some cases, procurement specification recommendations are identified to aid the utility in its spare parts program.
More detailed component summary reports are contained in Appendix I of this report.
Some of the components required _ modifications as identified in the recommended actions.         The implementation of these recommended actions by the. utility will result in a component which is acceptable for its intended service with unlimited life.
Section - 3.1 and 3.2 list the components of the Grand Gulf diesel generators which _have been reviewed-under Phase I
and Phase II respectively.
The majority of these_ components are assessed to be acceptable for their intended service with unlimited life provided the recommendations identified are followed.
These recommendations deal mainly with additional inspection requirements, and installation, operating and maintenance procedure improvements.
In some
: cases, procurement specification recommendations are identified to aid the utility in its spare parts program.
Some of the components required _ modifications as identified in the recommended actions.
The implementation of these recommended actions by the. utility will result in a component which is acceptable for its intended service with unlimited life.
O l
O l
O GG1703                                       3-1                                 REV 1 6
O GG1703 3-1 REV 1 6


y                                                                                             ,
y i
  .- i 3.1 Summary Resolution of Sixteen Generic Components (Phase I)
3.1 Summary Resolution of Sixteen Generic Components (Phase I)
The results of the Phase I program have been submitted to the NRC in a series of reports and supplements (Refs. 2 through 34) which covered the 15 generic components. The results of these reviews are summarized below.
The results of the Phase I program have been submitted to the NRC in a series of reports and supplements (Refs. 2 through 34) which covered the 15 generic components.
Component             Acceptability       Recommended Action
The results of these reviews are summarized below.
              . Turbocharger         Unlimited Life       Additional testing and (MP-022/3)                                 maintenance requirements.
Component Acceptability Recommended Action
. Turbocharger Unlimited Life Additional testing and (MP-022/3) maintenance requirements.
Revision of. operating procedures.
Revision of. operating procedures.
Base and_ Bearing     Unlimited Life       Additional maintenance and Caps (03-305A,                             inspection requirements.
Base and_ Bearing Unlimited Life Additional maintenance and Caps (03-305A, inspection requirements.
03-305C, 03-3050)
03-305C, 03-3050)
Crankshaft             Unlimited Life       None (03-310A)
Crankshaft Unlimited Life None (03-310A)
Cylinder Block         Unlimited Life       Additional maintenance and Q       and Liner (03-315A,03-315C) inspection requirements.
Cylinder Block Unlimited Life Additional maintenance and Q
Cylinder Head         Unlimited Life       None Studs (03-315E)
and Liner inspection requirements.
Connecting Rods:       Unlimited Life       Additional inspection Connecting Rods                             requirenents.
(03-315A,03-315C)
Cylinder Head Unlimited Life None Studs (03-315E)
Connecting Rods:
Unlimited Life Additional inspection Connecting Rods requirenents.
and Bushings (03-340A)
and Bushings (03-340A)
I '
I Connecting Rod Unlimited Life Additional maintenance Bearing Shells requirements. Additional (03-3408) inspections recommended.
Connecting Rod         Unlimited Life       Additional maintenance Bearing Shells                               requirements. Additional (03-3408)                                   inspections recommended.
Pistons (03-341A)
Pistons (03-341A)     Unlimited Life       AN piston skirt should be replaced with AE piston skirt.
Unlimited Life AN piston skirt should be replaced with AE piston skirt.
Air Start Valve       Unlimited Life       Additional maintenance (03-359)                                   requirements. Verification of dimensions recommended.
Air Start Valve Unlimited Life Additional maintenance (03-359) requirements. Verification of dimensions recommended.
Cylinder Heads         Unlimited Life       Additional maintenance
Cylinder Heads Unlimited Life Additional maintenance
              '(03-360A)                                   requirements.
'(03-360A) requirements.
GG1703                                 3-2                                   REV 1
GG1703 3-2 REV 1
                                                                    .        .4
.4


            - Component           Acceptability       Recommended Action                   l Fuel Injection       Unlimited Life     Additional testing and Equipment: Tube                         maintenance requirements.
- Component Acceptability Recommended Action Fuel Injection Unlimited Life Additional testing and Equipment: Tube maintenance requirements.
Assembly (03-365C)                       Procurement specification             l requirement.                         l 1
Assembly (03-365C)
Main and Connector   Unlimited Life     Additional procurement Pushrods (03-390C,                       requirement. Additional 03-3900)                                 inspections recommended.
Procurement specification requirement.
Main and Connector Unlimited Life Additional procurement Pushrods (03-390C, requirement.
Additional 03-3900) inspections recommended.
Random destructive testing recommended.
Random destructive testing recommended.
Rocker Arm           Unlimited Life     Additional maintenance Capscrews                               requirements.                         ;
Rocker Arm Unlimited Life Additional maintenance Capscrews requirements.
(03-390F)                                                                       {
(03-390F)
l Jacket Water         Unlimited Life     Additional maintenance and Pump (03-425A)                         . inspection requirements.
{
Wiring and           Unlimited Life     None Terminations (03-688B)
l Jacket Water Unlimited Life Additional maintenance and Pump (03-425A)
. inspection requirements.
Wiring and Unlimited Life None Terminations (03-688B)
()
()
l                     .
l D
D O
l O GG1703 3 REV 1
l
!      GG1703                             3                                 REV 1


k 3.2 Summary Resolution of Phase II Components Component             Acceptability         Recommended Action TURBO, INTAKE, INTERCOOLER & EXHAUST Intercooler         Unlimited Life       Additional maintenance (F-068)                                     requirements.
k 3.2 Summary Resolution of Phase II Components Component Acceptability Recommended Action TURBO, INTAKE, INTERCOOLER & EXHAUST Intercooler Unlimited Life Additional maintenance (F-068) requirements.
Flex Connections     Unlimited Life       None (GG-111)
Flex Connections Unlimited Life None (GG-111)
Intake Air           Unlimited Life       None Silencer (GG-116)
Intake Air Unlimited Life None Silencer (GG-116)
Intake Air Filters   Unlimited Life       None (GG-118)
Intake Air Filters Unlimited Life None (GG-118)
Turbocharger         Unlimited Life       Additional inspection and (MP-022/023)         (pending comple-     maintenance requirements.
Turbocharger Unlimited Life Additional inspection and (MP-022/023)
tion of the         Also additional pre-nozzle ring         lubrication procedures.
(pending comple-maintenance requirements.
vane and cap-O                               screws failure analysis) l         Turbocharger Thrust   Unlimited Life       None Bearing Lubricant System (02-CFR)
tion of the Also additional pre-nozzle ring lubrication procedures.
Intake Manifold       Modifications         Additional maintenance             1 Piping                                     recorimendations. Addition             ;
vane and cap-O screws failure analysis) l Turbocharger Thrust Unlimited Life None Bearing Lubricant System (02-CFR)
(02-375)                                   of U-Bolt supports to crossover piping. Additional Quality inspections recommended.
Intake Manifold Modifications Additional maintenance 1
Exhaust Manifold     Modifications         Replacement of slip joints.
Piping recorimendations.
(02-380A)                                   Refer to Component Design Review Checklist 02-380A l                                                     for details. Additional inspection requirements.
Addition (02-375) of U-Bolt supports to crossover piping.
Exhaust' Manifold:   Unlimited Life       Additional Quality inspections
Additional Quality inspections recommended.
          . Gaskets and Bolting                       recommended.
Exhaust Manifold Modifications Replacement of slip joints.
(02-380A)
Refer to Component Design Review Checklist 02-380A l
for details.
Additional inspection requirements.
Exhaust' Manifold:
Unlimited Life Additional Quality inspections
. Gaskets and Bolting recommended.
(02-3808)
(02-3808)
Turbocharger -       Unlimited Life       Implementation of proper torque Bracket                                     on bracket bolting. Additional 3 (02-475A)                                   inspections recommended.
Turbocharger -
GG1703                                 3-4                               REV 1.
Unlimited Life Implementation of proper torque Bracket on bracket bolting.
Additional 3
(02-475A) inspections recommended.
GG1703 3-4 REV 1.


(3       Component'           Acceptability       Recommended Action V       . Turbocharger Bracket- Unlimited Life     Additional Quality inspection Air Butterfly-                           and maintenance requirements.
(3 Component' Acceptability Recommended Action V
. Turbocharger Bracket-Unlimited Life Additional Quality inspection Air Butterfly-and maintenance requirements.
Valve Assembly (with Actuator)
Valve Assembly (with Actuator)
(02-4758)
(02-4758)
Turbocharger Bracket- Unlimited Life     None                                     !
Turbocharger Bracket-Unlimited Life None Bolting and Gaskets (02-475C)
Bolting and Gaskets (02-475C)
Intercooler Unlimited Life None Piping:
Intercooler         Unlimited Life     None Piping:   Pipe (02-717N)
Pipe (02-717N)
Intercooler         Unlimited Life     None Piping: Couplings, Gaskets, Bolting
Intercooler Unlimited Life None Piping:
,          (02-717P)
Couplings, Gaskets, Bolting (02-717P)
LUBE OIL Lube Oil Heat-       Unlimited Life     Additional maintenance Exchanger                                 requirements.
LUBE OIL Lube Oil Heat-Unlimited Life Additional maintenance Exchanger requirements.
,          (GG-104)
(GG-104)
Lube Oil System -     Unlimited Life     None Auxiliary Lube                                                                     >
Lube Oil System -
Oil Pump (GG-108) i         Befere and After     Unlimited Life     Additional inspections                 y Lube Pump                                 recoreended.
Unlimited Life None Auxiliary Lube Oil Pump (GG-108) i Befere and After Unlimited Life Additional inspections y
j         (GG 109)
Lube Pump recoreended.
Oil Prelube           Unlimitec site     Additional maintenance l
j (GG 109)
Filter .                                 requirements.
Oil Prelube Unlimitec site Additional maintenance l
(GG-121) l         Lube Oil Full         Unlimited Life   . Additional maintenance-(         Pressure Strainer                       and inspection requirements (SE-025)'
Filter.
l         Lube Oil Pressure   -Unlimited Life     Additional maintenance i-         Regulating Valve                         requirements.
requirements.
(GG-121) l Lube Oil Full Unlimited Life
. Additional maintenance-(
Pressure Strainer and inspection requirements (SE-025)'
l Lube Oil Pressure
-Unlimited Life Additional maintenance i-Regulating Valve requirements.
(00-420)
(00-420)
          -Lube Oil Fittings -   Unlimited Life     None Internal Headers (02-307A-LB)
-Lube Oil Fittings -
O       Lube Oil Fittings-   Unlimited Life     None
Unlimited Life None Internal Headers (02-307A-LB)
          -Internal Headers (02-307A-SB)
O Lube Oil Fittings-Unlimited Life None
GG1703                               3-5                                   REV 1
-Internal Headers (02-307A-SB)
GG1703 3-5 REV 1


Component-             Acceptability       Recommended Action Lube Oil Fittings -     Unlimited life . None                                     j
Component-Acceptability Recommended Action Lube Oil Fittings -
        -Internal Tubing &
Unlimited life None j
Fittings (02-3078)                                                                           l Lube Oil Fitting       Modifications       Modifications to the Internal-Supports                           auxiliary internal lube (02-307D)                                   oil header.   (Refer to DR/QR Report 02-3070 for details).
-Internal Tubing &
        . Lube Oil Pumps         Unlimited Life     None (02-420)
Fittings (02-3078)
Lube Oil Lines -       Unlimited Life     None External: . Tubings, Fittings, Couplings (02-465A-LB)
Lube Oil Fitting Modifications Modifications to the Internal-Supports auxiliary internal lube (02-307D) oil header.
Lube Oil Lines -       Unlimited Life     None
(Refer to DR/QR Report 02-3070 for details).
        ' External: Tubing, Fittings, Couplings (02-465A-SB)
. Lube Oil Pumps Unlimited Life None (02-420)
Lube Oil Lines -       There are no supports for this component.
Lube Oil Lines -
External Supports       Refer to Component Design Review Checklist (02-4658-LB)           for 02-465-LB.
Unlimited Life None External:. Tubings, Fittings, Couplings (02-465A-LB)
Lube Oil Lines         Modification       Redesign of support to avoid External: Supports                         an overstressed condition in (02-465B-SB)                               the 3/8 inch diameter engine bolt and bent plate.
Lube Oil Lines -
Lube 911 Liners         Unlimited Life     None i
Unlimited Life None
' External: Tubing, Fittings, Couplings (02-465A-SB)
Lube Oil Lines -
There are no supports for this component.
External Supports Refer to Component Design Review Checklist (02-4658-LB) for 02-465-LB.
Lube Oil Lines Modification Redesign of support to avoid External:
Supports an overstressed condition in (02-465B-SB) the 3/8 inch diameter engine bolt and bent plate.
Lube 911 Liners Unlimited Life None i
External Valves (02-465C)
External Valves (02-465C)
Turbocharger Lube       Modifications       Addition of two-direction, Oil Fittings:     Pipe,                     lateral restraints near Tube, Fittings,.and                       -the horizontal' offsets in Flexible Coupling                           the 5/8-inch tubing, (02-467A-SB)                               between the lube oil header and the turbocharger.
Turbocharger Lube Modifications Addition of two-direction, Oil Fittings:
Turbocharger -         Unlimited Life     None Lube Oil Fittings:
: Pipe, lateral restraints near Tube, Fittings,.and
-the horizontal' offsets in Flexible Coupling the 5/8-inch tubing, (02-467A-SB) between the lube oil header and the turbocharger.
Turbocharger -
Unlimited Life None Lube Oil Fittings:
Supports
Supports
        -(02-467B-SB)-
-(02-467B-SB)-
O i
O i
GG1703                                 6                             REV 1
GG1703 6 REV 1


Component                   Acceptability     Recommended Action Lube Oil Sump Tank           Unlimited Life     Additional maintenance with Strainer Assembly                         recommendations.
Component Acceptability Recommended Action Lube Oil Sump Tank Unlimited Life Additional maintenance with Strainer Assembly recommendations.
and Mounting Hardware (02-540A&C)
and Mounting Hardware (02-540A&C)
Lube Oil Sump             -Unlimited Life     Additional-Quality Inspections Tank - Misc.                                   recommendect.
Lube Oil Sump
Fittings, Gaskets, Pipe & Bolting i
-Unlimited Life Additional-Quality Inspections Tank - Misc.
Material, Valves
recommendect.
            -(02-5408)
Fittings, Gaskets, Pipe & Bolting Material, Valves i
Auxiliary Sub Base & Unlimited life             None 011'&' Water Piping -
-(02-5408)
Auxiliary Sub Base & Unlimited life None 011'&' Water Piping -
Lube Oil: Pipe and Fittings (02-717F-LB)
Lube Oil: Pipe and Fittings (02-717F-LB)
Auxiliary Sub-Base         Unlimited Life     None i
Auxiliary Sub-Base Unlimited Life None i
            & 011 & Water Piping
& 011 & Water Piping
}
}
            - Lube Oil: Piping &
- Lube Oil: Piping &
Fittings.
Fittings.
(02-717F-SB)
(02-717F-SB)
Auxiliary Sub Base         Unlimited Life     Additional inspection
Auxiliary Sub Base Unlimited Life Additional inspection
            & 011 & Water                                   requirements.
& 011 & Water requirements.
Piping - Lube 011:
Piping - Lube 011:
Valves l           (02-717G)
Valves l
Auxiliary Sub Base         Unlimited-Life     Additional maintenance                     '
(02-717G)
            &~ Oil & Water                                 requirements.
Auxiliary Sub Base Unlimited-Life Additional maintenance
Piping ' Lube Oil Gaskets & Bolting (02-717H)
&~ Oil & Water requirements.
Auxiliary Sub Base         Unlimited Life     None
Piping
            & 011 & Water-Piping - Lube 011:
' Lube Oil Gaskets & Bolting (02-717H)
Auxiliary Sub Base Unlimited Life None
& 011 & Water-Piping - Lube 011:
Supports and Mounting Hardware (02-7171-LB)
Supports and Mounting Hardware (02-7171-LB)
Auxiliary Sub. Base         Unlimited Life     None'                                     ;
Auxiliary Sub. Base Unlimited Life None'
;            & 011 & Water Piping - Lube Oil:
& 011 & Water Piping - Lube Oil:
l           Supports and Mounting Hardware (02-7171-58)
l Supports and Mounting Hardware (02-7171-58)
LGG1703                                     3-7                                   REV_ 1 l   .          .
LGG1703 3-7 REV_ 1 l
                                                                                                =.
=.


                ..        -- . =- -.           ..              -  -                    -  .- .                _    - .-                      -
=- -.
Component                     Acceptability                 Recommended Action Misc. Equipment -             Unlimited Life               Additional inspection and Heater, Lube Oil                                           maintenance requirements.
Component Acceptability Recommended Action Misc. Equipment -
Sump Tank p             (02-820A)
Unlimited Life Additional inspection and Heater, Lube Oil maintenance requirements.
Full. Flow Lube               Unlimited Life               Additional inspection Oil Filter                                                 requirements.
Sump Tank p
(02-820A)
Full. Flow Lube Unlimited Life Additional inspection Oil Filter requirements.
(02-8208)-
(02-8208)-
ENGINE BASE & BEARING CAPS Base and Bearing             Unlimited Life               Additional inspection and Caps: Base Assembly,                                       maintenance requirements.-
ENGINE BASE & BEARING CAPS Base and Bearing Unlimited Life Additional inspection and Caps:
Base Assembly, maintenance requirements.-
Bearing Studs &
Bearing Studs &
Nuts and. Main Bearing Caps
Nuts and. Main Bearing Caps
;            '(02-305A,C&D)
'(02-305A,C&D)
CRANKSHAFT & BEARINGS Crankshaft                   Unlimited Life               None
CRANKSHAFT & BEARINGS Crankshaft Unlimited Life None (02-310A)
;              (02-310A)
Crankshaft and Unlimited Life Additional maintenance O
Crankshaft and               Unlimited Life               Additional maintenance O         Bearings: Eearing Shells recommendations.
y Bearings:
y (02-3108) l
Eearing recommendations.
[             Crankcase and                 Unlimited Life               Additional maintenance
Shells (02-3108) l
!              Bearings: Thrust                                           requirements.
[
t             Bearing Ring l             (02-310C)
Crankcase and Unlimited Life Additional maintenance Bearings: Thrust requirements.
Crankcase:                   Unlimited Life               Additional Quality Inspections Crankcase Assembly                                         recommended.
t Bearing Ring l
(02-310C)
Crankcase:
Unlimited Life Additional Quality Inspections Crankcase Assembly recommended.
(02-311A)
(02-311A)
Crankcase:                   Unlimited Life             .None Crankcase Mounting Hardware (02-311D)
Crankcase:
Crankcase:                   Unlimited Life               None Crankcase Gaskets
Unlimited Life
            .and Mounting Hardware
.None Crankcase Mounting Hardware (02-311D)
              .(02-3868)
Crankcase:
CiLINDER BLOCK. LINERS & WATER MANIFOLD Cylinder Block.               Unlimited Life           ~ Additional inspection (02-315A)                                                   requirements.
Unlimited Life None Crankcase Gaskets
GG1703                                               3-8                                             REV 1
.and Mounting Hardware
!                                                -.,_.2                                           ~,.....--s,     _ _    _ - . - _ . _ . . . . ,
.(02-3868)
    -.  ._.      ,_,- -                                . . .  . _ ~ _      _ - _ .          .
CiLINDER BLOCK. LINERS & WATER MANIFOLD Cylinder Block.
Unlimited Life
~ Additional inspection (02-315A) requirements.
GG1703 3-8 REV 1
-.,_.2
_ ~ _
~,.....--s,


Component.        Acceptability        Recommended Action
- (~')
  - (~')
Component.
V             Cylinder Block -   Unlimited Life     Additional inspections and       ~
Acceptability Recommended Action V
Liner                                 maintenance requirements.
Cylinder Block -
Unlimited Life Additional inspections and
~
Liner maintenance requirements.
(02-315C)
(02-315C)
Cylinder Block     Unlimited Life     None Liners & Jacket Water Manifold 1                and Piping ,
Cylinder Block Unlimited Life None Liners & Jacket Water Manifold and Piping,
(02-315D)
1 (02-315D)
Cylinder Block -   Unlimited Life     None Liners and Water Manifold: Studs (02-315E)
Cylinder Block -
Cylinder Block     Unlimited Life     Additional Quality Inspections Liners and Water                       recommended.
Unlimited Life None Liners and Water Manifold:
Studs (02-315E)
Cylinder Block Unlimited Life Additional Quality Inspections Liners and Water recommended.
Manifold - Nuts (02-315F)
Manifold - Nuts (02-315F)
Cylinder Block -   Unlimited Life     Additional review of site Liners and                             documentation toiverify Water Manifold -                       that.the proper cylinder Seals and Gaskets                     liner seals have been installed.
Cylinder Block -
O             (02-315G)
Unlimited Life Additional review of site Liners and documentation toiverify Water Manifold -
Cylinder Block     Unlimited Life     Additional Quality Inspections Covers:   Gaskets                     recommended.
that.the proper cylinder Seals and Gaskets liner seals have been installed.
                  & Bolts (02-3858)
O (02-315G)
AIR START & BARRING DEVICE Starting Air       Unlimited Life     None Tank (GG-112) i Air Start Valve   Unlimited Life     Additional maintenance (02-359)                               requirements.
Cylinder Block Unlimited Life Additional Quality Inspections Covers:
Starting Air       Modifications       Modification to supports Manifold Piping                       in order to provide stiffer (02-441A-LB)                           load paths and to relieve thermal restraint in certain directions.
Gaskets recommended.
,                                                        (Refer to DR/QR report 02-441A-LB for details).
& Bolts (02-3858)
Starting Air       Unlimited Life     None Manifold -
AIR START & BARRING DEVICE Starting Air Unlimited Life None Tank (GG-112) i Air Start Valve Unlimited Life Additional maintenance (02-359) requirements.
Piping, Tubing, O-            and Fittings
Starting Air Modifications Modification to supports Manifold Piping in order to provide stiffer (02-441A-LB) load paths and to relieve thermal restraint in certain directions.
;                (02-441A-SB)
(Refer to DR/QR report 02-441A-LB for details).
GG1703                             3-9                             REV 1
Starting Air Unlimited Life None Manifold -
O-Piping, Tubing, and Fittings (02-441A-SB)
GG1703 3-9 REV 1


                          ..              --        -.                    . . . . ~     ..                  -      . - - - -                        -                . .- -        . . -
.... ~
0 i
0 i
l Component                         Acceptability                                       Recommended Action
Component Acceptability Recommended Action Starting Air Unlimited Life Additional maintenance
,                          Starting Air                     Unlimited Life                                     Additional maintenance                                                       )
)
Manifold: Valves,                                                                     requirements.
Manifold: Valves, requirements.
Strainers, Filters.
Strainers, Filters.
;                        -(02-4418)
-(02-4418)
Starting Air                     Unlimited Life                                     None.
Starting Air Unlimited Life None.
                        . Manifold Supports                                                                                                                                                   ,
. Manifold Supports (02-441C-LB) i Starting Air Modifications Installation of a cover Manifold:
(02-441C-LB)                                                                                                                                                     i Starting Air                     Modifications                                       Installation of a cover Manifold:           Supports                                                           plate on an air pulse tube (02-441C-SB)                                                                         support for the Division II diesel.
Supports plate on an air pulse tube (02-441C-SB) support for the Division II diesel.
Starting Air                     Unlimited Life                                     Additional surveillance and Distributor                                                                           Quality Inspection recommended.
Starting Air Unlimited Life Additional surveillance and Distributor Quality Inspection recommended.
;                            (02-442A)
(02-442A)
Barring Device -                 Unlimited Life.                                     None.
Barring Device -
Pneumatic Regulator Valve / Shutoff Valve j-                         (02-5258)
Unlimited Life.
None.
Pneumatic Regulator Valve / Shutoff Valve j-(02-5258)
CONNECTING RODS 1
CONNECTING RODS 1
Connecting Rods:                 Unlimited Life                                     Additional inspection Connecting Rods                                                                       requirements.
Connecting Rods:
,                          and Bushings (02-340A)
Unlimited Life Additional inspection Connecting Rods requirements.
I                         Connecting Rod                     Unlisited Life                                     Additional maintenance 4
and Bushings (02-340A)
Bearing Shells                                                                         requirements.
I Connecting Rod Unlisited Life Additional maintenance Bearing Shells requirements.
;                          (02-3408)
4 (02-3408)
PISTONS j                         Pistons                           Unlimited Life                                     Additional Quality Inspections
PISTONS j
;                          (02-340C)                                                                             recommended.
Pistons Unlimited Life Additional Quality Inspections (02-340C) recommended.
Pistons:                           Unlimited Life                                     Additional maintenance Rings                                                                                 requirements.
Pistons:
(02-3400) i O
Unlimited Life Additional maintenance Rings requirements.
GG1703-                                                             3-10                                                                     REV 1
(02-3400) i
  -- - - .  ,-.--s             , , - -    ,          -,e-. n--,-,.--e.-           -w-     - , - - - - - , -              -    -----,--g g.   --,-,v-   g -,-wem   -
; O GG1703-3-10 REV 1
w        -r- 7 gr,
,-.--s
-,e-.
n--,-,.--e.-
-w-
-----,--g g.
--,-,v-g
-,-wem w
-r-7 gr,


                                                                                                                                                                              ~             l Component.                             - Acceptability                                   Recommended Action
~
                                ' Pistons:                               - Modifications                                 Replace spiral ring Pin. Assembly                                                                           retainers with Waldes                                           j (02-340E)                                                                               snap ring retainers at                                           i first fuel outage.                                               ;
Component.
Additional inspection                                           ,
- Acceptability Recommended Action
recommendations. Additional                           1           l t
' Pistons:
- Modifications Replace spiral ring Pin. Assembly retainers with Waldes j
(02-340E) snap ring retainers at i
first fuel outage.
Additional inspection recommendations.
Additional 1
Quality inspections recommended.
Quality inspections recommended.
CAMSHAFT & VALVE TRAIN                           s Tappets-and Guides:                       Unlimited Life                                 Additional Quality 2
t CAMSHAFT & VALVE TRAIN s
Intake Exhaust                                                                       _ inspections recommended.
Tappets-and Guides:
Tappet Assembly'                                                                         Additional. maintenance                               1 (02-345A)                                                                               recommendations.
Unlimited Life Additional Quality Intake Exhaust
                                - Tappets.and Guides:                       Unlimited Life                               Additional Quality
_ inspections recommended.
!                                Fuel Tappet                                             .                              inspections recommended.
2 Tappet Assembly' Additional. maintenance 1
1-                             1 Assembly                                                     '                          Additional. maintenance 1
(02-345A) recommendations.
(02-3458)                                                                               recommendations.
- Tappets.and Guides:
Tappets an'd                             Unlimited Life                               None Guides - Fuel Pump Base Assembly.
Unlimited Life Additional Quality Fuel Tappet inspections recommended.
                                .(02-345C)
1-1 Assembly Additional. maintenance (02-3458) recommendations.
Camshaft:                               Unlimited Life-                               Additional Quality inspections l                               Camshaft                                                                               and maintenance requirements.
1 Tappets an'd Unlimited Life None Guides - Fuel Pump Base Assembly.
                                ' Assembly i                                 (02-350A)
.(02-345C)
.                                Camshaft:         Bearings             Unlimited Life                                 None
Camshaft:
!                                (02-3508)
Unlimited Life-Additional Quality inspections l
                                . Camshaft:                               Unlimited Life                           ~    Additional Quality inspections
Camshaft and maintenance requirements.
                                -Supports, Bolting,                                                                       and maintenance requirements.
' Assembly i
and Gears
(02-350A)
;                                (02-350C) i Cylinder Head                           Unlimited Life-                               Additional maintenance and Co~ vers:       Subcover                                                             - Qual i ty' Inspecti on requi rements .
Camshaft:
Assembly-(02-362A) l Rocker Arms and                         Unlimited Life                                 Additional Quality inspections-
Bearings Unlimited Life None (02-3508)
                                'Pushrods- Intake /                                                                       recommended.
. Camshaft:
                                . Intermediate and                                                                                                                                   '
Unlimited Life Additional Quality inspections
Exhaust. Rocker'                                                                                                                                   ^ ''
~
Shaft Assemblies                                                                                                                                       ~
-Supports, Bolting, and maintenance requirements.
and Gears (02-350C) i Cylinder Head Unlimited Life-Additional maintenance and Co~ vers:
Subcover
- Qual i ty' Inspecti on requi rements.
Assembly-(02-362A) l Rocker Arms and Unlimited Life Additional Quality inspections-
'Pushrods-Intake /
recommended.
. Intermediate and Exhaust. Rocker'
^ ''
Shaft Assemblies
~
(02-390A&B)
(02-390A&B)
Jn -
Jn -
                  ~GG1703                                                                       3-11.                                                           'REV 1-
~GG1703 3-11.
                                                                          ~
'REV 1-
      , . - . . ~   ,,e-r-----         y y +u   w-.-e--1   e     -,,w-- ~,,----,-r         -=ew---e--                   +         e-~M - - < - - - - - - -
~
,. -.. ~
,,e-r-----
y y
+u w-.-e--1 e
-,,w--
~,,----,-r
-=ew---e--
+
e-~M


Compon nt'         .
Compon nt' Acceptability Recommended Action
Acceptability     Recommended Action Unlimited Life
~
                                            ~
Rocker Arms and Unlimited Life Recommended that purchase order Pushrods-Pushrods specify destructive verification Intake and Exhaust-of weld quality.
Rocker Arms and                             Recommended that purchase order Pushrods-Pushrods                           specify destructive verification Intake and Exhaust-                         of weld quality.
Pushrods Connector (02-390C&D)
Pushrods Connector (02-390C&D)
Rocker Arms               Unlimited Life     Additional inspection and and Pushrods:                               maintenanct requirements.
Rocker Arms Unlimited Life Additional inspection and and Pushrods:
maintenanct requirements.
Bushings (02-390E)
Bushings (02-390E)
Rocker ' sins and         Unlimited Life     Additiotd quality Inspections Pushrods:-                                   recommended.
Rocker ' sins and Unlimited Life Additiotd quality Inspections Pushrods:-
c             Lifters (02-390F)
recommended.
Rocker Arms and           Unlimited Life   Additional maintenance Pushrods: Miscel-                           requirements.
c Lifters (02-390F)
Rocker Arms and Unlimited Life Additional maintenance Pushrods: Miscel-requirements.
laneous Bolts and Drive Studs (02-390G)
laneous Bolts and Drive Studs (02-390G)
IDLER GEAR ASSEMBLY & FRONT GEAR CASE 1                              Front Gearcase -         Unlimited Life   Additional Quality Inspections Gasket and Bolting                           recommended.
IDLER GEAR ASSEMBLY & FRONT GEAR CASE Front Gearcase -
Unlimited Life Additional Quality Inspections 1
Gasket and Bolting recommended.
(02-335B)
(02-335B)
Idler Gear Assembly - Unlimited life       Additional Quality Inspections Crank to Pump Gear                         and maintenance requirements.
Idler Gear Assembly - Unlimited life Additional Quality Inspections Crank to Pump Gear and maintenance requirements.
(02-355A)
(02-355A)
Idler Gear Assembly       Unlimited Life   Additional Quality Inspections (02-3558)                                   and maintenance requirements.
Idler Gear Assembly Unlimited Life Additional Quality Inspections (02-3558) and maintenance requirements.
FLYWHEEL Flywheel-                 Unlimited Life   None (02-330A) 4
FLYWHEEL Flywheel-Unlimited Life None (02-330A) 4
!                            . Flywheel Bolting         Unlimited Life   Additional Quality Inspections (02-3308)                                   recommended.
. Flywheel Bolting Unlimited Life Additional Quality Inspections (02-3308) recommended.
                ,                                    ENGINE-INSTRUMENTATION & WIRING s
ENGINE-INSTRUMENTATION & WIRING s
I
I
                              . Pyrometer Conduit         Unlimited Life   Additional maintenance Assembly,-                                   requirements.
. Pyrometer Conduit Unlimited Life Additional maintenance Assembly,-
Thermocouple i                               (02-6300)-
requirements.
GG1703         g.                        .3-12                           :REV 1
Thermocouple i
                                                                                  .t
(02-6300)-
            . .                  ~ - .  --
GG1703
.3-12
:REV 1 g.
.t
~


Component                       -Acceptability                     Rectammended Action Engine and Auxiliary Modifications ~                             -Perform an upgrade to Module Wiring Material                                             tighten, fix, replace or Conduit and Fittings:                                             add missing conduit supports.
Component
          ,                Pyrometer Conduit                                                 Addition of supports to all Cat. 1 Assembly - Conduit,-                                               flexible conduits.
-Acceptability Rectammended Action Engine and Auxiliary Modifications ~
c                  Fittings and Supports-(02-688A,02-630A,
-Perform an upgrade to Module Wiring Material tighten, fix, replace or Conduit and Fittings:
  ,                          B,C)
add missing conduit supports.
Engine & Auxiliary               Unlimited Life                   None
Pyrometer Conduit Addition of supports to all Cat. 1 Assembly - Conduit,-
                      ' Module Wiring Materi-al-Wiring and Termi-nation
flexible conduits.
                      .(02-6888)
Fittings and Supports-c (02-688A,02-630A, B,C)
Eng. & Aux. -                     Unlimited Life                   None Module Wiring Material:           Boxes and Terminals (02-688C)~
Engine & Auxiliary Unlimited Life None
Engine Alarm                     Unlimited Life                   None Sensors Temperature and Level Switches O
' Module Wiring Materi-al-Wiring and Termi-nation
                          - Off Safety Engine Alarm Sensors-Wiring
.(02-6888)
                      .(02-690,02-691)-
Eng. & Aux. -
Unlimited Life None Module Wiring Material:
Boxes and Terminals (02-688C)~
Engine Alarm Unlimited Life None Sensors Temperature and Level Switches O
- Off Safety Engine Alarm Sensors-Wiring
.(02-690,02-691)-
+
+
OVERSPEED TRIP & GOVERNOR
OVERSPEED TRIP & GOVERNOR Overspeed Trip -
;                        Overspeed Trip -                 ' Unlimited Life                 Modify testing procedures.
' Unlimited Life Modify testing procedures.
Governor                                                           Additional Quality-Inspections-(02-410A)                                                         recommended.
Governor Additional Quality-Inspections-(02-410A) recommended.
f P.
f I
I Overspeed Trip:                   Unlimited Life                   Additional Quality Inspections
P.
!                        Governor &                                                         recommended.
Overspeed Trip:
!                        Accessory
Unlimited Life Additional Quality Inspections Governor &
!                        Drive Assembly l-                       (02-4108)
recommended.
Overspeed Trip:                   Unlimited Life                   Additional' Quality Inspections Couplings =(Flexible                                               and maintenance requirements.
Accessory Drive Assembly l -
                        & Spider).
(02-4108)
Overspeed Trip:
Unlimited Life Additional' Quality Inspections Couplings =(Flexible and maintenance requirements.
& Spider).
1(02-410C)
1(02-410C)
Overspeed Trip:                   tunlimited Life                   Recommendation that Valve'"0" Vent. Valve                                                         rings be changed every 5 years.
Overspeed Trip:
4 (02-4100)
tunlimited Life Recommendation that Valve'"0" Vent. Valve 4
O                                                                                                                                     .
rings be changed every 5 years.
EGG 1703                                             3-13 REV 1           *
(02-4100)
            .sy:-   ,                              .- -    .        . , _ , - - - . , , -          _ . -  .      .,
O EGG 1703 3-13 REV 1
.sy:-


4 Component-             Acceptability             Recommended Action Governor Drive -       Unlimited Life             Additional Quality inspections Governor and                                     recommended.
4 Component-Acceptability Recommended Action Governor Drive -
Unlimited Life Additional Quality inspections Governor and recommended.
Tachometer Drive Gear and Shaft (02-411A)
Tachometer Drive Gear and Shaft (02-411A)
Governor Drive:       Unlimited Life             Additional Quality inspections n               Couplings, Pins-                                 and maintenance requirements.
Governor Drive:
EL             & Keys
Unlimited Life Additional Quality inspections n
      ;          (02-4118)
Couplings, Pins-and maintenance requirements.
Governor Linkage       Unlimited Life             Additional Quality Inspections u
EL
(02-413A)                                       and maintenance requirements.
& Keys (02-4118)
J               Governor Assembly:   Unlimited Life             Additional Quality Inspections lf             Woodard Governor                                 and maintenance requirements.
Governor Linkage Unlimited Life Additional Quality Inspections u
l         (02-415A)
(02-413A) and maintenance requirements.
Governor Assembly:     Unlimited Life           Additional Quality Inspections
J Governor Assembly:
      =
Unlimited Life Additional Quality Inspections lf Woodard Governor and maintenance requirements.
Booster Servomotor                               recommended.
l (02-415A)
  ?
Governor Assembly:
Unlimited Life Additional Quality Inspections Booster Servomotor recommended.
=
?
(02-4158)
(02-4158)
Governor Assembly:     Unlimited Life           Additional Quality Inspections Heat Exchanger                                   recommended.                   '
Governor Assembly:
9     (02-415C)
Unlimited Life Additional Quality Inspections Heat Exchanger recommended.
ENGINE SHUTDOWN & EQUIPMENT Engine Shutdown         Modifications           Additional two-direction Equipment -                                     lateral restraints on tubing Tubing / Fittings                               lines and modifications (02-695A)                                       to pipe and tubing supports (Refer to DR/QR Report 02-695A for deta.ils).
9 (02-415C)
Engine Shutdown           Unlimited Life       Additional inspection Equipment-Valves,                               requirements.
ENGINE SHUTDOWN & EQUIPMENT Engine Shutdown Modifications Additional two-direction Equipment -
lateral restraints on tubing Tubing / Fittings lines and modifications (02-695A) to pipe and tubing supports (Refer to DR/QR Report 02-695A for deta.ils).
Engine Shutdown Unlimited Life Additional inspection Equipment-Valves, requirements.
Regulators, Orifices (02-6958)
Regulators, Orifices (02-6958)
Engine Shutdown -           Unlimited Life     None Trip Switches (02-695C)
Engine Shutdown -
JACKET WATER Jacket Water                 Unlimited Life     Additional maintenance Heat Exchanger                                   requirements.-
Unlimited Life None Trip Switches (02-695C)
JACKET WATER Jacket Water Unlimited Life Additional maintenance Heat Exchanger requirements.-
(GG-103)
(GG-103)
        ;        Auxiliary Ja::ket             Unlimited Life     None Water Pump-(GG-106)
Auxiliary Ja::ket Unlimited Life None Water Pump-(GG-106)
GG1703                                       3-14                           REV 1
GG1703 3-14 REV 1


        -Component           Acceptability       Recommended Action Jacket Water       Unlimited Life       None Standby Heater Pump
-Component Acceptability Recommended Action Jacket Water Unlimited Life None Standby Heater Pump
        .(GG-107)
.(GG-107)
Jacket Water       Modifications       Addition of an axial Standpipe - Pipe,                       restraint on the jacket Fittings, Gaskets-                       water standpipe overflow (00-700A)                               line and a two-way lateral restraints on the jacket water vent lines.
Jacket Water Modifications Addition of an axial Standpipe - Pipe, restraint on the jacket Fittings, Gaskets-water standpipe overflow (00-700A) line and a two-way lateral restraints on the jacket water vent lines.
Jacket Water       Unlimited Life       Additional maintenance             1 Standpipe- Valve                         recommendations.
Jacket Water Unlimited Life Additional maintenance 1
Standpipe-Valve recommendations.
(00-700B)
(00-700B)
Jacket Water       Modifications       Supports modified to accept Standpipe -                             two-directional lateral loading.
Jacket Water Modifications Supports modified to accept Standpipe -
Supports                                 Diameter of U-bolts be in-
two-directional lateral loading.
        .(00-700C)                               creased from 1/4 inch to 3/8 inch. Refer to DR/QR report 00-700C for details.
Supports Diameter of U-bolts be in-
Jacket Water-       Review Not Required.
.(00-700C) creased from 1/4 inch to 3/8 inch.
i       Standpipe-         See Component Design Review Checklist Switches           for 00-700E.
Refer to DR/QR report 00-700C for details.
,        (00-700E)
Jacket Water-Review Not Required.
Jacket Water       Unlimited Life       Additional inspections Standpipe and                           recommended.                       1
i Standpipe-See Component Design Review Checklist Switches for 00-700E.
      ' Miscellaneous Bolting Material (00-700F)
(00-700E)
Jacket Water       Unlimited Life       None Inlet Manifold -
Jacket Water Unlimited Life Additional inspections Standpipe and recommended.
Manifold Assembly
1
,        with Hardware Coupling and' Gaskets-i       (02-316A&B) i I
' Miscellaneous Bolting Material (00-700F)
1 1O l GG1703                             3-15                             REV 1
Jacket Water Unlimited Life None Inlet Manifold -
Manifold Assembly with Hardware Coupling and' Gaskets-i (02-316A&B) i I
1 1O l
GG1703 3-15 REV 1


l
\\
                                                                                                                              \
' Component' Acceptability Recommended Action Water Discharge Modifications Replacement of elbow and Manifold:
            ' Component'                       Acceptability                 Recommended Action Water Discharge                   Modifications                 Replacement of elbow and                       ,
Jacket flange located on both lines g
g            Manifold: Jacket                                               flange located on both lines                   -
Water Discharge between the 3-inch header
Water Discharge                                                 between the 3-inch header
. Manifold,' Couplings and water jacket shroud and Seals with 2-inch 90 degree
          . Manifold,' Couplings                                             and water jacket shroud and Seals                                                       with 2-inch 90 degree
:(02-317A&B)
:(02-317A&B)                                                     Dresser elbows (Styles 90 or 165). Addition of an east-west restraint near interfacing flange between component Nos. 02-317A&B and 02-717C. Modifications to supports. Refer to DR/QR report 02-317A&B for details.
Dresser elbows (Styles 90 or 165).
Water Discharge                   Unlimited Life                 None Manifold: Supports (02-317C)'
Addition of an east-west restraint near interfacing flange between component Nos. 02-317A&B and 02-717C.
Jacket Water                     Unlimited Life                 Revised installation procedures.
Modifications to supports.
Pump                                                           Additional Quality Inspections (02-425A)                                                       and maintenance recommended.
Refer to DR/QR report 02-317A&B for details.
Turbo Water Piping-               Unlimited Life O         Pipe and Fittings (Small Bore Scope None I
Water Discharge Unlimited Life None Manifold:
:            Only)
Supports (02-317C)'
Jacket Water Unlimited Life Revised installation procedures.
Pump Additional Quality Inspections (02-425A) and maintenance recommended.
Turbo Water Piping-Unlimited Life None O
Pipe and Fittings (Small Bore Scope I
Only)
(02-437)
(02-437)
Thermostatic                     Unlimited Life                 Additional inspection and Valves                                                           maintenance requirements.
Thermostatic Unlimited Life Additional inspection and Valves maintenance requirements.
L-           (02-515)
L-(02-515)
Auxiliary Sub Base & Unlimited Life                             Additional maintenance Oil & Water                                                     recommendations.                     I
Auxiliary Sub Base & Unlimited Life Additional maintenance Oil & Water recommendations.
_. Piping - Jacket Water: Valves (02-7178)
I
Auxiliary Sub Base               Unlinited Life               -None-i           & 011 & Water LPiping Jacket-Water - Pipe, Couplings, i
_. Piping - Jacket Water:
          . Fittings,: Orifices,
Valves (02-7178)
            & Y Strainers
Auxiliary Sub Base Unlinited Life
                                          ~
-None-i
& 011 & Water LPiping Jacket-Water - Pipe, Couplings, i
. Fittings,: Orifices,
& Y Strainers
~
(02-7_17C-LB)
(02-7_17C-LB)
Aux. Sub Base &                   Unlimited Life L
Aux. Sub Base &
O       011'& Water' Piping--
Unlimited Life None-O 011'& Water' Piping--
          . Jacket. Water: Gaskets-None-and Bolting'.
L
. Jacket. Water: Gaskets-and Bolting'.
(02-7170)
(02-7170)
      -GG1703                                             :3-16;                                     .REV .1-
-GG1703
                ._    ._        . - - . _      _ _ _ _ ,                                                            ._..__s
:3-16;
.REV
.1-s


S Component-           Acceptability             Recommended Action Auxiliary Sub Base   Unlimited Life             None
S Component-Acceptability Recommended Action Auxiliary Sub Base Unlimited Life None
                & 011 & Water.
& 011 & Water.
Piping - Jacket Water: . Supports
Piping - Jacket Water:. Supports
              '(02-717E-LB)
'(02-717E-LB)
F Auxiliary Sub Base   Unlimited Life             None
F Auxiliary Sub Base Unlimited Life None
                & 011 & Water-
& 011 & Water-
              . Piping - Jacket Water: Supports (02-717E-SB)
. Piping - Jacket Water:
            'MiscJ Equipment -       Unlimited Life           Additional inspection and Heater, Jacket                                 maintenance requirements.
Supports (02-717E-SB)
Water Standpipe (02-810A) 4 CYLINDER HEADS & VALVES
'MiscJ Equipment -
.              Cylinder Heads       Unlimited Life           Additional maintenance (02-360A).                                     requirements.
Unlimited Life Additional inspection and Heater, Jacket maintenance requirements.
Cylinder Head         Unlimited Life           Additional maintenance
Water Standpipe (02-810A) 4 CYLINDER HEADS & VALVES Cylinder Heads Unlimited Life Additional maintenance (02-360A).
;              Valves: Intake                                 requirements.
requirements.
              & Exhaust Valves l               (02-3608)
Cylinder Head Unlimited Life Additional maintenance Valves:
              ' Cylinder Head         Unlimited Life           Additional Quality Inspections and Valves:                                     recommended.
Intake requirements.
& Exhaust Valves l
(02-3608)
' Cylinder Head Unlimited Life Additional Quality Inspections and Valves:
recommended.
Bolting and Gaskets (02-360C)~
Bolting and Gaskets (02-360C)~
Cylinder Head         Unlimited Life           None Valves - Springs and Retainers
Cylinder Head Unlimited Life None Valves - Springs and Retainers
(               (02-3600)
(
(02-3600)
FUEL OIL INJECTION
FUEL OIL INJECTION
                    ~
~
Fue1 Drip Tank         Unlimited Life           None.
Fue1 Drip Tank Unlimited Life None.
Assembly:
Assembly:
;            :(00-621A)
:(00-621A)
            . Fuel Injection Equip : Unlimited -Life.         Additional maintenance-
. Fuel Injection Equip : Unlimited -Life.
.-            ment-Fuel Injection                             recommendations.                           1-           ,
Additional maintenance-ment-Fuel Injection recommendations.
F             Pump.     .                                                                                                <
1-F Pump.
(02-365A) l l       GG1703                                       3-17                                         REV .1:
(02-365A) l l
GG1703 3-17 REV.1:
l t-
l t-


Component-                 Acceptability   Recommended Action
Component-Acceptability Recommended Action
<O         Fuel Injection             Unlimited Life Additional maintenance l
<O Fuel Injection Unlimited Life Additional maintenance Equipment-Fuel requirements.
l Equipment-Fuel                             requirements.
Injection Tips (02-3658)
Injection Tips (02-3658)                                                                     !
Fuel Oil Injection Unlimited Life Additional Quality Inspections Equipment-Tube and maintenance requirements.
Fuel Oil Injection         Unlimited Life Additional Quality Inspections Equipment-Tube                             and maintenance requirements.
Assembly.
Assembly .
(02-365C)
(02-365C)
Fuel Injection             Unlimited Life None Equipment     -Supports (02-365D) 1         Fuel Pump Linkage -         Unlimited Life Additional Quality Inspections Fuel Pump control                           recommended.
Fuel Injection Unlimited Life None Equipment
-Supports (02-365D) 1 Fuel Pump Linkage -
Unlimited Life Additional Quality Inspections Fuel Pump control recommended.
Shaft, Linkage Assembly and Bearings (02-371A&B)
Shaft, Linkage Assembly and Bearings (02-371A&B)
Fuel Pump Linkage-         Unlimited Life None
Fuel Pump Linkage-Unlimited Life None
-Automatic Shutdown (02-4138)
'~
'~
          -Automatic Shutdown (02-4138)
D Fuel Oil Booster Unlimited Life None Pump-Engine Driven Pump (02-445) i Fuel Oil Header:
D       Fuel Oil Booster           Unlimited Life None Pump-Engine Driven Pump (02-445)                                                       ,
Modifications Modification of sud orts.
i         Fuel Oil Header:           Modifications   Modification of sud     orts.
[
[         Piping & Tubing                             Refer to DR/QR repc:t 02-450A for details.-
Piping & Tubing Refer to DR/QR repc:t 02-450A (02-450A) for details.-
(02-450A)
Fuel Oil. Header -
Fuel Oil . Header -         Modifications   Redesign of supports (Details Fuel Oil Tubing                             listed in DR/QR Report Supports                                   02-4508).
Modifications Redesign of supports (Details Fuel Oil Tubing listed in DR/QR Report Supports 02-4508).
(02-450B)
(02-450B)
Fuel Oil Filters-           Unlimited Life Additional maintenance and Strainers:                             requirements.
Fuel Oil Filters-Unlimited Life Additional maintenance and Strainers:
requirements.
Filters (02-455A)
Filters (02-455A)
Fue11011 Filters           Unlimited Life Additional maintenance and Strainers:                             requirements.
Fue11011 Filters Unlimited Life Additional maintenance and Strainers:
Strainers
requirements.
!.        (02-4558)
Strainers (02-4558)
LO
LO
    .GG1703                                     3-18                           REV -1
.GG1703 3-18 REV -1


                                                                                                                        )
Component Acceptability Recommended Action Fuel Oil Filters Unlimited Life None.
Component               Acceptability     Recommended Action Fuel Oil Filters         Unlimited Life     None.
and Strainers:
and Strainers:
Mounting Hardware.
Mounting Hardware.
(02-455C).
(02-455C).
Auxiliary Sub Base. Unlimited Life. None
Auxiliary Sub Base.
                  & 011 & Water.
Unlimited Life.
None
& 011 & Water.
Piping.- Fuel 011:
Piping.- Fuel 011:
Piping & Fittings (02-717J)
Piping & Fittings (02-717J)
Auxiliary Sub Base     Unlimited Life     Additional maintenance
Auxiliary Sub Base Unlimited Life Additional maintenance
                  & 011 & Water                               requirements.
& 011 & Water requirements.
Piping - Fuel 011:
Piping - Fuel 011:
                ' Valves 4
' Valves (02-717K) 4 Auxiliary Sub Base Unlimited life Additional maintenance
(02-717K)
& 011 & Water Piping-requirements
Auxiliary Sub Base       Unlimited life     Additional maintenance
-Fuel Oil Gaskets and Bolting (02-717L)
                  & 011 & Water Piping-                       requirements
' Auxiliary Sub Base Unlimited Life.
                -Fuel Oil Gaskets and Bolting (02-717L)
None O
                ' Auxiliary Sub Base     Unlimited Life. None O           & 011 & Water
& 011 & Water
                . Piping - Fuel 011:
. Piping - Fuel 011:
Supports (02-717M)
Supports (02-717M)
GENERATOR Generator               Unlimited Life-   None
GENERATOR Generator Unlimited Life-None (GG-101A)
;                  (GG-101A)
Generator - Shaft Unlimited Life None and Bearing (GG-1018)
Generator - Shaft       Unlimited Life     None and Bearing (GG-1018)
Generator: Generator Modifications
Generator: Generator Modifications
                                          ~                ~ Additional maintenance and Controls                                   inspection requirements.-
~ Additional maintenance and Controls
(GG-119)                                   Replacement of field flashing relays. Reactors should be remounted and the cabinet should be properly ventilated. Recom-mandations to correct construc-tion and mounting inadequacies-of the diodes, the heat sink
~
                                                            -SCRs~and the voltage regulator.
inspection requirements.-
Refer to DR/QR report GG-119-(~                                                     .for details.-
(GG-119)
Replacement of field flashing relays.
Reactors should be remounted and the cabinet should be properly ventilated.
Recom-mandations to correct construc-tion and mounting inadequacies-of the diodes, the heat sink
-SCRs~and the voltage regulator.
Refer to DR/QR report GG-119-(~
.for details.-
(
(
;          'GG1703-                                 3-19                           .REV       1'
'GG1703-3-19
.REV 1'


i l
i Component Acceptability Recommended Action CONTROL PANEL ASSEMBLY Control Panel Unlimited Life None Assembly -
Component                       Acceptability                     Recommended Action CONTROL PANEL ASSEMBLY Control Panel                   Unlimited Life                     None Assembly -
Cabinet / System (02-500A)
Cabinet / System (02-500A)
Control Panel                   Unlimited Life                     None Assembly -
Control Panel Unlimited Life None Assembly -
Accumulator                                                                                                                                         l (02-500F)
Accumulator (02-500F)
Control Panel                   Unlimited Life                     None
Control Panel Unlimited Life None Assembb : Valves
;              Assembb/ : Valves (02-54.G)
/
Control Panel-                 Unlimited Life                     None
(02-54.G)
              ' Assembly - Pressure Switches (02-500H)-                                                                                                                                         t Control Panel                 Unlimited Life                     None                                                                             -
Control Panel-Unlimited Life None
              . Assembly: -Relays (02-500J)
' Assembly - Pressure Switches (02-500H)-
O           Control Panel                 -Unlimited Life                     None
t Control Panel Unlimited Life None
,              Assembly -' Solenoid Valves
. Assembly: -Relays (02-500J)
!              (02-500K)
O Control Panel
Control Panel                 Unlimited Life                     None Assembly - Piping, i               Tubing and Fittings i               (02-500M)
-Unlimited Life None Assembly -' Solenoid Valves (02-500K)
Control Panel                 Unlimited Life                     None Assembly - Terminal Boards / Switches,.
Control Panel Unlimited Life None Assembly - Piping, i
Tubing and Fittings i
(02-500M)
Control Panel Unlimited Life None Assembly - Terminal Boards / Switches,.
Wiring
Wiring
              -(02-500N)
-(02-500N)
ENGINE & AUXILIARY SUB-BASE & FOUNDATION BOLTS Foundation Bolts               Unlimited Life                     Generator-foundation
ENGINE & AUXILIARY SUB-BASE & FOUNDATION BOLTS Foundation Bolts Unlimited Life Generator-foundation
              '(02-550)                                                           bolts should be
'(02-550) bolts should be
                                                                                  -retorqued after each generator short circuit occurrence.
-retorqued after each generator short circuit occurrence.
i'       :GG1703'                                                     3-20.                                           REV I r
i'
_ . _ , . -._...;,      . . . . . . .    -  __ _              . _ . . - . . - . _ _ . _. a. . ~ . - -         . . . . . . _ _ _
:GG1703' 3-20.
REV I r
. a.
. ~. - -


m i
m i
Component-
Component-
;.                                                    - Acceptability         Recommended Action Auxiliary Sub Base & Unlimited Life                     None 011 & Water
- Acceptability Recommended Action Auxiliary Sub Base & Unlimited Life None 011 & Water
: Piping - Auxiliary Sub Base (02-717A)                                                                                                               ,
: Piping - Auxiliary Sub Base (02-717A) j.
j.
4 1
4 1
6 1
6 1
Line 534: Line 693:
i f
i f
i l
i l
                                                                                                                                            -i LO GG1703                                                 3-21                                                       REV 1
-i LO GG1703 3-21 REV 1


l O
O i
i
/
                                                                          /
How To Use This Report Tabs in this report' identify the following categories:
How To Use This Report Tabs in this report' identify the following categories:
Turbo, Intake, Intercooler & Exhaust Lube 011 Engine Base & Bearing' Caps
Turbo, Intake, Intercooler & Exhaust Lube 011 Engine Base & Bearing' Caps
            . Crankshaft & Bearings Cylinder Block, Liners & Water Manifold Air Start & Barring Device Connecting rods Pistons Camshaft'& Valve Train
. Crankshaft & Bearings Cylinder Block, Liners & Water Manifold Air Start & Barring Device Connecting rods Pistons Camshaft'& Valve Train
            ' Idler Gear Assembly & Front Gear Case Flywheel Engine Instrumentation & Wiring Overspeed Trip & Governor Engine Shutdown & Equ.ipment-
' Idler Gear Assembly & Front Gear Case Flywheel Engine Instrumentation & Wiring Overspeed Trip & Governor Engine Shutdown & Equ.ipment-
            -Jacket Water i             Cylinder Heads & Valves Fuel Oil Injection Generator
-Jacket Water i
Cylinder Heads & Valves Fuel Oil Injection Generator
_ Control Panel Assembly
_ Control Panel Assembly
)             Engine & Auxiliary Sub-Base & Foundation Bolts These categories.have been defined to allow the reader to review a complete diesel generator subsystem in.a convenient manner.
)
Engine & Auxiliary Sub-Base & Foundation Bolts These categories.have been defined to allow the reader to review a complete diesel generator subsystem in.a convenient manner.
Within each category tabs identify Grand Gulf specific component numbers.
Within each category tabs identify Grand Gulf specific component numbers.
;      A given component report can be found by:
A given component report can be found by:
!            a)     If the component nubmer is known - use the alpha - numeric index which identifies the volume number and category in which the component report is located.
a)
l l             b)     If only the component name is known - Section 3.2 may be used as a l                   cross-reference to' find the volume number where the component report
If the component nubmer is known - use the alpha - numeric index which identifies the volume number and category in which the component report is located.
(                   may be found.
l l
l j.'
b)
Some reports address _more than one component. A tab is provided for each j     . component.- However,.some components are combined under onefreport. Slip sheets are provided where required to reference back_to the appropriate tab.
If only the component name is known - Section 3.2 may be used as a l
Some components required more than one report. These are identified by the
cross-reference to' find the volume number where the component report
      . abbreviation LB-Large Bore and SB-Saall Bore on the component number tabs.
(
may be found.
l j.
Some reports address _more than one component.
A tab is provided for each j
. component.- However,.some components are combined under onefreport.
Slip sheets are provided where required to reference back_to the appropriate tab.
Some components required more than one report.
These are identified by the
. abbreviation LB-Large Bore and SB-Saall Bore on the component number tabs.
O i-
O i-
      -Index 1898
-Index 1898


l
INDEX-(continued)
.                                                INDEX-(continued)
Component Component Volume Number Description Category No.
Component Component                                                       Volume Number     Description                                 Category               No.
F-068 Intercooler Turbo, Intake, 2
F-068     Intercooler                                 Turbo, Intake,           2 Intrcir. & Ex-haust
Intrcir. & Ex-haust
  'GG-101A-   Generator - Generator                       Generator               4 GG-1018     Generator:   Shaft and                     Generator               4 Bearings GG-103     Jacket Water Heat                           Jacket Water             3 Exchanger GG-104     Lube Oil Heat Exchanger                     Lube 011               2 GG-106     Auxiliary Jacket Water Pump                 Jacket Water             3 GG-107     Jacket Water Standby                       Jacket Water             3 Heater Pump GG-108     Lube Oil System - Aux.                     Lube Oil                 2 Lube Oil Pump i
'GG-101A-Generator - Generator Generator 4
GG-109     Before & After Lube                         Lube Oil                 2
GG-1018 Generator:
              -Oil Pump GG-111     Flex Connections                           Turbo, Intake,           2 Intercooler &
Shaft and Generator 4
Bearings GG-103 Jacket Water Heat Jacket Water 3
Exchanger GG-104 Lube Oil Heat Exchanger Lube 011 2
GG-106 Auxiliary Jacket Water Pump Jacket Water 3
GG-107 Jacket Water Standby Jacket Water 3
Heater Pump GG-108 Lube Oil System - Aux.
Lube Oil 2
Lube Oil Pump i
GG-109 Before & After Lube Lube Oil 2
-Oil Pump GG-111 Flex Connections Turbo, Intake, 2
Intercooler &
Exhaust.
Exhaust.
GG-112     Starting Air Tank                           Air Start &             3 Barring Device GG-116     Intake Air Silencer                         Turbo, Intake,           2 Intercooler &
GG-112 Starting Air Tank Air Start &
Exhaust GG-118     Intake Air Filter                           Turbo, Intake,           2 Intercooler &
3 Barring Device GG-116 Intake Air Silencer Turbo, Intake, 2
Exhaust GG-119     Generator - Generator                       Generator               4 Control GG-121     011 Prelube Filter                         Lube Oil                 2 MP022/023   Turbocharger                               Turbo, Intake,           2 Intrcir. & Exhaust REV 1 11
Intercooler &
                                                                "    * "9" "
Exhaust GG-118 Intake Air Filter Turbo, Intake, 2
Intercooler &
Exhaust GG-119 Generator - Generator Generator 4
Control GG-121 011 Prelube Filter Lube Oil 2
MP022/023 Turbocharger Turbo, Intake, 2
Intrcir. & Exhaust REV 1 11 "9"
Index 1898
Index 1898
_ _ ~ _ -,. -


INDEX (continued) f3 d   Component Component                                                                                                                                                   Volume Number     Description                                                                         Category                                                                           No.
INDEX (continued) f3 d
SE-025     Lube Oil Full Pressure                                                             Lube Oil                                                                           2 Strainer
Component Component Volume Number Description Category No.
  .00-420     Lube Oil Pressure Regulating                                                       Lube Oil                                                                           2 Valve 00-621A   Fuel Oil Drip Tank Assembly                                                         Fuel Oil In-                                                                       4 jection                                                                               1 00-700A   Jacket Water Stand Pipe:                                                           Jacket Water                                                                       3 Pipe, Fittings, Gaskets 00-7006   Jacket Water Stand Pipe:                                                           Jacket Water                                                                       3 Valves 00-700C   Jacket Water Stand Pipe                                                             Jacket Water                                                                       3 Supports 00-700E   Jacket Water Stand Pipe:                                                           Jacket Water                                                                       3 Switches O   00-700F   Jacket Water Stand Pipe:
SE-025 Lube Oil Full Pressure Lube Oil 2
Strainer
.00-420 Lube Oil Pressure Regulating Lube Oil 2
Valve 00-621A Fuel Oil Drip Tank Assembly Fuel Oil In-4 jection 1
00-700A Jacket Water Stand Pipe:
Jacket Water 3
Pipe, Fittings, Gaskets 00-7006 Jacket Water Stand Pipe:
Jacket Water 3
Valves 00-700C Jacket Water Stand Pipe Jacket Water 3
Supports 00-700E Jacket Water Stand Pipe:
Jacket Water 3
Switches O
00-700F Jacket Water Stand Pipe:
Jacket Water 3
Misc. Bolting Mat.
Misc. Bolting Mat.
Jacket Water                                                                        3 02-CFR     Turbocharger Thrust Bearing                                                         Turbo, Intake,                                                                     -2 Lubricant System                                                                   Intrcir. & Ex-haust 02-305A   Base and Bearing Caps: Base                                                         Engine Base                                                                         2 Assembly                                                                           & Bearing Caps 02-305C   Base and Bearing Caps:                                                             Engine Bise                                                                         2 Main Bearing Studs & Nuts                                                           & Bearing Caps 02-3050   Base and Bearing Caps:                                                             Engine Base Main Bearing Caps                                                                   & Bearing Caps                                                                     2 02-307A     Lube Oil Fittings:                                                                 Lube 011 2
02-CFR Turbocharger Thrust Bearing Turbo, Intake,
Internal Headers 02-307B     Lube Oil Fittings:                                                                 Lube Oil                                                                           2 Internal - Tubing & Fittings 02-3070     Lube Oil Fittings Internal:                                                       Lube Oil                                                                           2 Supports O                                                                                             iii REV 1 Index 1898                                                                                               Entire Page Revised
-2 Lubricant System Intrcir. & Ex-haust 02-305A Base and Bearing Caps: Base Engine Base 2
Assembly
& Bearing Caps 02-305C Base and Bearing Caps:
Engine Bise 2
Main Bearing Studs & Nuts
& Bearing Caps 02-3050 Base and Bearing Caps:
Engine Base Main Bearing Caps
& Bearing Caps 2
02-307A Lube Oil Fittings:
Lube 011 2
Internal Headers 02-307B Lube Oil Fittings:
Lube Oil 2
Internal - Tubing & Fittings 02-3070 Lube Oil Fittings Internal:
Lube Oil 2
Supports O
iii REV 1 Index 1898 Entire Page Revised


l
\\
                                                                                                                                                                                                      \
Component Component Volume Number Description Category No.
Component                               Component                                                                                                                   Volume Number                                 Description                                                   Category                                                                 No.
02-310A
.          02-310A                               . Crankshaft                                                     Crankshaft &                                                               2
. Crankshaft Crankshaft &
                                                                                                                , Bearings i-02-310B                                 Crankshaft and Bearings:                                       Crankshaft &                                                               2
2
                                                  ; Bearing Shells                                                 Bearing
, Bearings i -
!                                                                                                                                                                                                      i 02-310C-                               Crankcase and Bearings:                                       Crankshaft &                                                               2 Thrust Bearing Ring                                           Bearing 02-311A                                 Crankcase: Crankcase Assy                                     Crankshaft &                                                               2 Bearing                             ,
02-310B Crankshaft and Bearings:
02-311D                               ~ Crankcase: Crankcase-                                         Crankshaft &                                                               2 Mounting Hardware                                             Bearings 02-315A                                 Cylinder Block Liners &                                       Cyl. Block'&                                                               2
Crankshaft &
,                                                  Water Manifold: Cylinder                                       Liners & Water Block                                                         Manifold                                                                           ,
2
02-315C                                 Cylinder Block Liner &                                         Cyl. Block &                                                               2 Water Manifold -                                               Liners &
; Bearing Shells Bearing i
;                                                  Cylinder Liner                                                 Water Manifold 02-3150                                 Cylinder Block Liners &                                       Cyl. Block &                                                               2 Jacket Water Manifold                                         Liners &
02-310C-Crankcase and Bearings:
                                                    & Piping                                                       Water Manifold 2
Crankshaft &
02-315E                                 Cylinder Block - Liners                                       Cyl. Block &                                                               2 i
2 Thrust Bearing Ring Bearing 02-311A Crankcase: Crankcase Assy Crankshaft &
and Water Manifold: Studs                                     Liners &
2 Bearing 02-311D
Water Manifold l           02-315F                                 Cylinder' Block Liners                                         Cyl. Block &                                                               2
~ Crankcase: Crankcase-Crankshaft &
                                                    & Water Manifold: Nuts                                         Liner & Water-Manifold-4 02-315G                                 Cylinder Block Liners &                                       Cyl. Block &                                                               2 Water Manifold Seals &                                         Liners &
2 Mounting Hardware Bearings 02-315A Cylinder Block Liners &
Gaskets                                                       Water Manifold 02-316A                                 Jacket Water Inlet Manifold:                                   Jacket' Water                                                               3 Manifold Assembly W/ Hardware
Cyl. Block'&
!                                                  and Coupling and Gaskets 02-3168                                 Jacket Water Inlet Manifold:                                   Jacket Water                                                               3
2 Water Manifold: Cylinder Liners & Water Block Manifold 02-315C Cylinder Block Liner &
:                                                  Coupling and Gaskets
Cyl. Block &
;          02-317A                                 Water Discharge Manifold:                                     Jacket Water                                                               3' Jacket Water Discharge l                                                   Manifold, Coupling and Seals
2 Water Manifold -
                                                                                                              'v
Liners &
                                                                                                                                                                                                  ~
Cylinder Liner Water Manifold 02-3150 Cylinder Block Liners &
i                                                                       REV 1      .
Cyl. Block &
[           Index 1898                                                                                                                           Entire Page Revised                                 ,
2 Jacket Water Manifold Liners &
m%. - - .           . . - . . . - , , , ,          .,- _.-r   ., ,__j       ~ . . . _ , . . _ , _        a.   %, . _      _m,......_          .. _ ,.... . _-,._.____ _ _ _ _
& Piping Water Manifold 2
02-315E Cylinder Block - Liners Cyl. Block &
2 and Water Manifold: Studs Liners &
i Water Manifold l
02-315F Cylinder' Block Liners Cyl. Block &
2
& Water Manifold: Nuts Liner & Water-Manifold-4 02-315G Cylinder Block Liners &
Cyl. Block &
2 Water Manifold Seals &
Liners &
Gaskets Water Manifold 02-316A Jacket Water Inlet Manifold:
Jacket' Water 3
Manifold Assembly W/ Hardware and Coupling and Gaskets 02-3168 Jacket Water Inlet Manifold:
Jacket Water 3
Coupling and Gaskets 02-317A Water Discharge Manifold:
Jacket Water 3'
Jacket Water Discharge l
Manifold, Coupling and Seals
'v REV 1
~
i
[
Index 1898 Entire Page Revised m%. - -.
_.-r
.,,__j
~..
a.
_m,......_


INDEX (continued)
INDEX (continued)
' Component Number Component Description                         Category Volume i
O Component
No.
'i Component Volume Number Description Category No.
02-317B       Water Dicharge Manifold:             Jacket Water                   3               '
02-317B Water Dicharge Manifold:
Coupling & Seals                                                                   I 02-317C       Water Discharge Manifold:           Jacket Water                   3 Supports 02-330A       Flywheel'                           Flywheel                       3 02-3308       Flywheel - Bolting                   Flywheel                       3 02-335B       Front Geat Case-Gasket and           Idler Gear As-                 3 Bolting                             sembly & Front Gear Case 02-340A       Connecting Rod: Connecting         Connecting                     3 Rods & Eushings                     Rods l'
Jacket Water 3
;    02-3408       Connecting Rod Bearing               Connecting                     3 i
Coupling & Seals 02-317C Water Discharge Manifold:
Shells                               Rods 02-340C       Pistons                             Pistons                       3 02-340D'     Pistons: Rings                       Pistons                       3 02-340E       Piston: Pin Assembly                 Pistons 3
Jacket Water 3
02-345A       Tappets and Guides:                 Camshaft &                     3 Intake Exhaust                       Valve Train Tappet Assembly 02-345B       Tappets and Guides: Fuel             Camshaft &                     3 Tappet Assembly                     Valve Train 02-345C       Tappets and Guides: Fuel             Camshaft &                     3 Pump Base Assembly                   Valve Train 02-350A       Camshaft:   Camshaft Assembly       Camshaft &                     3 i
Supports 02-330A Flywheel' Flywheel 3
Valve Train 02-350B       Camshaft: Bearings                   Camshaft &                     3 Valve Train 02-3500       Camshaft:' Supports, Bolting         Caeshaft &                     3 and Gears                           Valve Train 02-355A       Idler Gear Assemble: Crank           Idler Gear As-                 3 To Pump Gear                         sembly & Front Gear Case Index 1898                                                                 REV 1 Entire Page Revised
02-3308 Flywheel - Bolting Flywheel 3
02-335B Front Geat Case-Gasket and Idler Gear As-3 Bolting sembly & Front Gear Case 02-340A Connecting Rod:
Connecting Connecting 3
Rods & Eushings Rods l'
02-3408 Connecting Rod Bearing Connecting 3
Shells Rods i
02-340C Pistons Pistons 3
02-340D' Pistons: Rings Pistons 3
02-340E Piston: Pin Assembly Pistons 3
02-345A Tappets and Guides:
Camshaft &
3 Intake Exhaust Valve Train Tappet Assembly 02-345B Tappets and Guides: Fuel Camshaft &
3 Tappet Assembly Valve Train 02-345C Tappets and Guides: Fuel Camshaft &
3 Pump Base Assembly Valve Train 02-350A Camshaft:
Camshaft Assembly Camshaft &
3 i
Valve Train 02-350B Camshaft: Bearings Camshaft &
3 Valve Train 02-3500 Camshaft:' Supports, Bolting Caeshaft &
3 and Gears Valve Train 02-355A Idler Gear Assemble: Crank Idler Gear As-3 To Pump Gear sembly & Front Gear Case Index 1898 REV 1 Entire Page Revised


J INDEX (continued) o O        Component   Component                                                                                                       Volume
J INDEX (continued)
                ' Number     Description                                                                 Category                               No.
O o
Component Component Volume
' Number Description Category No.
]..
]..
.                  02-3558     Idler Gear Assembly                                                         Idler Gear As-                         3 sembly & Front Gear Case 02-359     Air Start Valves                                                           Air Start &                             3 Barring Device 02-360A     Cylinder Heads                                                             Cylinder Heads                           3
02-3558 Idler Gear Assembly Idler Gear As-3 sembly & Front Gear Case 02-359 Air Start Valves Air Start &
                                                                                                          & Valves
3 Barring Device 02-360A Cylinder Heads Cylinder Heads 3
,.                02-3608     Cylinder Head Valves:                                                       Cylinder Heads                           3 Intake & Exhaust Valves                                                     & Valves 02-360C-   Cylinder Head and Valves:                                                   Cylinder Heads                           3 l.
& Valves 02-3608 Cylinder Head Valves:
Bolting and Gaskets                                                         & Valves-02-3600     Cylinder Head Valves -                                                     Cylinder Heads                           3 3       Sprir.gs & Retainers                                                       & Valves 02-362A   ~ Cylinder Head Covers:                                                     Camshaft &                               3 Subcover Assembly                                                           Valve Train l                 02-365A     Fuel Injection Equipment                                                   Fuel Oil In-                             4
Cylinder Heads 3
                              - Fuel-Injection Pump
Intake & Exhaust Valves
& Valves 02-360C-Cylinder Head and Valves:
Cylinder Heads 3
l.
Bolting and Gaskets
& Valves-02-3600 Cylinder Head Valves -
Cylinder Heads 3
3 Sprir.gs & Retainers
& Valves 02-362A
~ Cylinder Head Covers:
Camshaft &
3 Subcover Assembly Valve Train l
02-365A Fuel Injection Equipment Fuel Oil In-4
~
~
jection 02-3658     Fuel Injection Equipment                                                   Fuel Oil In-                             4
- Fuel-Injection Pump jection 02-3658 Fuel Injection Equipment Fuel Oil In-4
                              . Fuel Injection. Tips                                                       jection 02-365C     Fuel Oil Injection Tube                                                     Fuel Oil In-                             4
. Fuel Injection. Tips jection 02-365C Fuel Oil Injection Tube Fuel Oil In-4 Assembly jection I
* Assembly                                                                   jection I                 02-3650'   Fuel Injection Equipment:                                                   Fuel Oil In-                             4 L                             Supports                                                                   jection j                 02-371A     Fuel Pump Linkage: Fuel                                                     Fuel Oil In-                             4 Pump Control Shaft                                                         jection 1
02-3650' Fuel Injection Equipment:
02-371B. Fuel Pump Linkage: Linkage                                                 Fuel 011 In-                             4
Fuel Oil In-4 L
                              ~ Assembly and Bearing                                                 , jection-02-375     Intake Manifold Piping                                                     Turbo, Intake,                           2 Intrcir. & Ex-                                             .!
Supports jection j
haust 02-380A     Exnaust Manifold -                                   .                      Turbo, Intake,                           2                   !
02-371A Fuel Pump Linkage: Fuel Fuel Oil In-4 Pump Control Shaft jection 1
Maaifold                                                                   Intrcir. & Ex-haust vi i
02-371B.
Index 1898                                                                                                   .          REV 1
Fuel Pump Linkage: Linkage Fuel 011 In-4
                                                                                                                    . Entire Page' Revised
~ Assembly and Bearing
_ _ _ , s. _
, jection-02-375 Intake Manifold Piping Turbo, Intake, 2
Intrcir. & Ex-haust 02-380A Exnaust Manifold -
Turbo, Intake, 2
Maaifold Intrcir. & Ex-haust vi i
Index 1898 REV 1
. Entire Page' Revised
_ _ _, s.


1 INDEX (continued)                                             I O Component . Component.                                                               Volume Number       Description                               Category                       No.
INDEX (continued)
i 02-3808     Exhaust Manifold: Gaskets                 Turbo, Intake,                   2 and Bolting                               Intrcir. & Ex-haust 02-385B     Cylinder Block                             Cyl. Block &                     2 Covers                                     Liners & Water Gaskets and Bolting                         Manifold 02-3868     Crankcase:     Crankcase                   Cranshaft &                       2 Gaskets and Mounting                       Bearings Hardware 02-390A     Rocker Arms & Pushrods Intake & Intermediate and                 Camshaft &                       3 Exhaust Rocker Shaft Assembly               Valve Train 02-390B     Rocker Arms and Pushrods:                   Camshaft &                       3 Exhaust Rocker Shaft                       Valve Train Assembly 02-390C     Rocker Arms & Pushrods-                     Camshaft &                       3 Intake & Exhaust.-Pushrods                 Valve Train Connectors 02-3900     Rocker Arms and Pushrods:                   Camshaft &                       3 Pushrods Connector.                         Valve Train 02-390E     Rocker Arms and Pushrods:                   Camshaft &                       3 Bushings                                   Valve Train 02-390F     Rocker Arms and Pushrods:                   Camshaft &                       3 Lifters                                     Valve Train 02-390G     Rocker Arms and Pushrods:                   Camshaft &                       3 Misc. Bolts & Drive Studs                   Valve' Train 1   02-410A     Overspeed Trip: Governor                   Overspeed Trip                   3
O Component. Component.
                                                            & Governor 02-410B     Overspeed Trip: Governor                   Overspeed Trip                   3 and Accessory Drive                         & Governor 02-410C     Overspeed Trip: Couplings                   Overspeed Trip                   3 (Flexible & Spider)                         & Governor 02-410D     Overspeed Trip                             Overspeed Trip                   3 Vent Val,ves                               & Governor vii Index 1898                                                                         REV 1 Entire Page Revised
Volume Number Description Category No.
i 02-3808 Exhaust Manifold: Gaskets Turbo, Intake, 2
and Bolting Intrcir. & Ex-haust 02-385B Cylinder Block Cyl. Block &
2 Covers Liners & Water Gaskets and Bolting Manifold 02-3868 Crankcase:
Crankcase Cranshaft &
2 Gaskets and Mounting Bearings Hardware 02-390A Rocker Arms & Pushrods Intake & Intermediate and Camshaft &
3 Exhaust Rocker Shaft Assembly Valve Train 02-390B Rocker Arms and Pushrods:
Camshaft &
3 Exhaust Rocker Shaft Valve Train Assembly 02-390C Rocker Arms & Pushrods-Camshaft &
3 Intake & Exhaust.-Pushrods Valve Train Connectors 02-3900 Rocker Arms and Pushrods:
Camshaft &
3 Pushrods Connector.
Valve Train 02-390E Rocker Arms and Pushrods:
Camshaft &
3 Bushings Valve Train 02-390F Rocker Arms and Pushrods:
Camshaft &
3 Lifters Valve Train 02-390G Rocker Arms and Pushrods:
Camshaft &
3 Misc. Bolts & Drive Studs Valve' Train 1
02-410A Overspeed Trip: Governor Overspeed Trip 3
& Governor 02-410B Overspeed Trip: Governor Overspeed Trip 3
and Accessory Drive
& Governor 02-410C Overspeed Trip: Couplings Overspeed Trip 3
(Flexible & Spider)
& Governor 02-410D Overspeed Trip Overspeed Trip 3
Vent Val,ves
& Governor vii Index 1898 REV 1 Entire Page Revised


                                                  ._. ._ _ _ .        .._m.                                   _ . _      __
.._m.
i i
i c
c l
INDEX (continued) c Component Component Volume i
INDEX (continued) c                     Component               Component                                                                                                       Volume i                 ' Number                   Description                                                         Category                                       No.
' Number Description Category No.
                  . 02-411A                 Governor Drive: Governor                                             Overspeed Trip                                 3 and Tachometer Drive Gear                                           & Governor
. 02-411A Governor Drive: Governor Overspeed Trip 3
                                            & Shaft 02-4118'               Governor Drive: Couplings,                                           Overspeed Trip                                 3 Pins & Keys                                                         & Governor 413A                 Governor Linkage                                                     Overspeed Trip                                 3 L                                                                                                                 & Governor i:
and Tachometer Drive Gear
02-4138                 Fuel Pump Linkage-                                                   Fuel Oil In-                                   4 Automatic Shutdown                                                 -jection 02-415A               Governor Assembly: Woodward                                           Overspeed Trip                                 3 Governor                                                             & Governor l                     02-4158               Governor Assembly-Booster                                           Overspeed Trip                                   3 Servosoter                                                         & Governor
& Governor
,                    02-415C               Governor Assembly-Heat                                               Overspeed Trip                                   3
& Shaft 02-4118' Governor Drive: Couplings, Overspeed Trip 3
;                                            Exchanger                                                       . & Governor 02-420                   Lube Oil , Pump                                                     Lube 011                                       2 i
Pins & Keys
02-425A               Jacket Water Pump                                                   Jacket Water                                     3 l
& Governor 413A Governor Linkage Overspeed Trip 3
02-437                 Turbo Water Piping:                                                 Jacket Water                                     3 l                                             Pipe & Fittings 02-441A'               Starting Air Manifold                                               Air Start &                                     3
L
                                    ,        Piping                                                               Barring Device l                     02-4418                 Starting Air Manifold                                               Air Start &                                     3 Valves, Strainer, Filters                                             Barring Device i
& Governor i:
02-441C'               Starting Air Manifold                                               Air Start &                                     3 l
02-4138 Fuel Pump Linkage-Fuel Oil In-4 Automatic Shutdown
                                            . Supports                                                         . Barring Device i
-jection 02-415A Governor Assembly: Woodward Overspeed Trip 3
02-442A               . Starting Air Distributor                                             Air Start &                                     3 Director Assembly.                                                   Barring Device 02-442B                 Starting Air Distributor:-                                           Air Start & .                                   3 Tubing, Fittings, Gaskets                                             Barring Device 02-445                 Fuel Oil Booster Pump                                               Fuel 011 In-                                   4 i
Governor
Engine Driven                                                       jection viii
& Governor l
                    .Index 1898                                                                                                                     REV 1 Entire Page Revised
02-4158 Governor Assembly-Booster Overspeed Trip 3
  ,e   - , < , . r,     ,,-g..w,
Servosoter
                                  ,  .e   ,    ,r. m.,   , n _a a   ,  --.-,,s_,.., - _ , - ..n. ,,,.,,-nn.,.,a         ..--e,.---n--.,e..   +e ..,-..,w..   ,--- ,r- -. e,--
& Governor 02-415C Governor Assembly-Heat Overspeed Trip 3
Exchanger
. & Governor 02-420 Lube Oil, Pump Lube 011 2
i 02-425A Jacket Water Pump Jacket Water 3
l 02-437 Turbo Water Piping:
Jacket Water 3
l Pipe & Fittings 02-441A' Starting Air Manifold Air Start &
3 Piping Barring Device l
02-4418 Starting Air Manifold Air Start &
3 Valves, Strainer, Filters Barring Device i
02-441C' Starting Air Manifold Air Start &
3 l
. Supports
. Barring Device i
02-442A
. Starting Air Distributor Air Start &
3 Director Assembly.
Barring Device 02-442B Starting Air Distributor:-
Air Start &.
3 Tubing, Fittings, Gaskets Barring Device 02-445 Fuel Oil Booster Pump Fuel 011 In-4 i
Engine Driven jection viii
.Index 1898 REV 1 Entire Page Revised
,e r,
,,-g..w,
.e
,r.
m.,
n
_a a
--.-,,s_,..,
..n.
,,,.,,-nn.,.,a
..--e,.---n--.,e..
+e
..,-..,w..
,r-e,--


_ . - _ . . _              _~                         -        - . .                . _ . . . _ _                . ..    ._ _ . _ _ _ _ .        _.      . . . _ _ _ .
_~
i INDEX-(continued)
i INDEX-(continued)
O                 Component                     . Component                                                                                             Volume i                           Number                         Description                                                               Category
O Component
* No.
. Component Volume i
02-450A                         Fuel-011' Header: Piping &                                               Fuel Oil.In-                           4 Tubing                                                                   jection l                           02-4508                       Fuel Oil Header:                                                         Fuel Oil In-                         4
Number Description Category No.
[                                                           Fuel Oil Tubing Supports                                                 jection
02-450A Fuel-011' Header: Piping &
: j.                           02-455A                       Fuel Oil Filters &                                                       Fuel Oil In-                         4 l'                                                         Strainers: Filters                                                     -jection 02-455B                       Fuel Oil Filters and                                                     Fuel Oil In-                         4
Fuel Oil.In-4 Tubing jection l
  ,                                                        Strainers: . Strainers                                                   jection
02-4508 Fuel Oil Header:
;                          02-455C                       Fuel Oil Filters &                                                       Fuel Oil In-                         4
Fuel Oil In-4
{                                                       ~ Strainer: Mounting Hardware                                               jection
[
,                            02-465A-                       Lube Oil Lines External:                                                 Lube Oil                             2
Fuel Oil Tubing Supports jection j.
;                                                        . Tubing, Fittings, Couplings t
02-455A Fuel Oil Filters &
l                           02-465B'                       Lube Oil Lines - External                                                 Lube Oil                             2 Supports 02-465C                       Lube Oil Lines External:                                                 Lube Oil                               2
Fuel Oil In-4 l'
;                                                          Valves                                                                                                                                   >
Strainers: Filters
l-                           02-467A                       Turbocharger Lube 011                                                   Lube Oil                               2
-jection 02-455B Fuel Oil Filters and Fuel Oil In-4 Strainers:. Strainers jection 02-455C Fuel Oil Filters &
:                                                          Fittings - Pipe, Tubing, i                                                           Fittings & Flexible Coupling 4678                       Turbocharger: Lube Oil                                                   Lube 011                               2
Fuel Oil In-4
;                                                          Fittings - Supports 02-475A                       Turbocharger: Bracket                                                     Turbo, Intake,                         2
{
;                                                                                                                                    Intrc1r. & Ex-
~ Strainer: Mounting Hardware jection 02-465A-Lube Oil Lines External:
;                                                                                                                                    naust                                                           :
Lube Oil 2
i-                           02-4758                       Turbocharger Bracket-                                                     Turbo, Intake,                         2
. Tubing, Fittings, Couplings t
;                                                          Air Butterfly Valve                                                       Intrcir. & Ex-haust L
l 02-465B' Lube Oil Lines - External Lube Oil 2
i                           02-475C                       Turbocharger: Bracket -                                                   Turbo, Intake,                         2 i                                                         Bolting & Gaskets                                                         Intrcir. & Ex-l                                                                                                                                   haust l                           02-500A-                     Control Panel Assembly:                                                   Control Panel                         4 Cabinet / System                                                         Assembly O                 02-500F                       Control Panel Assembly:                                                   Control Panel                         4 U                                               Accumulator                                                               Assembly ix                                                                 ,
Supports 02-465C Lube Oil Lines External:
Index 1898                                                                                                                 .
Lube Oil 2
REV 1 Entire Page Revised
Valves l-02-467A Turbocharger Lube 011 Lube Oil 2
Fittings - Pipe, Tubing, i
Fittings & Flexible Coupling 4678 Turbocharger: Lube Oil Lube 011 2
Fittings - Supports 02-475A Turbocharger: Bracket Turbo, Intake, 2
Intrc1r. & Ex-naust i-02-4758 Turbocharger Bracket-Turbo, Intake, 2
Air Butterfly Valve Intrcir. & Ex-haust L
i 02-475C Turbocharger: Bracket -
Turbo, Intake, 2
i Bolting & Gaskets Intrcir. & Ex-l haust l
02-500A-Control Panel Assembly:
Control Panel 4
Cabinet / System Assembly O
02-500F Control Panel Assembly:
Control Panel 4
U Accumulator Assembly ix Index 1898 REV 1 Entire Page Revised


3 INDEX (continued)
3 INDEX (continued)
Component   Component                                                           Volume Number       Description                         Category                         No.
Component Component Volume Number Description Category No.
02-500G     Control Panel                       Control Panel                     4 Valves-                             Assembly 02-500H     . Control Panel Assembly:             Control Panel                     4 Pressure Switch                     Assembly 02-500J     Control' Panel Assembly:             Control Panel                     4 Relays                               Assembly 02-500K     Control Panel Assembly:             Control Panel                     4 Solenoid Valves                     Assembly 02-500M     Control Panel Assembly:             Control Panel                     4 Piping, Tubing, Fittings           . Assembly 02-500N     Control Panel Assembly:             Control Panel                     4 Terminal Boards / Switches,         Assembly Wiring 02-515       Thermostatic Valve                   Jacket Water                       3
02-500G Control Panel Control Panel 4
() 02-5258     Barring Device - Pneumatic Regulator Valve Shut Air Start &
Valves-Assembly 02-500H
Barring Device 3
. Control Panel Assembly:
!                Off Valve 02-540A     Lube Oil Sump                       Lube Oil                           2 with Strainer Assembly and Mounting Hardward 02-5408   ' Lube Oil Sump -Tank: Misc.           Lube Oil                           2 I         ,
Control Panel 4
Fittings, Gaskets, Pipe
Pressure Switch Assembly 02-500J Control' Panel Assembly:
                  & Bolting Material, Valves 02-540C     Lube Oil Sump Tank:                 Lube Oil                           2
Control Panel 4
;                  Mounting Hardware 02-550       Foundation Bolts                     Engine & Aux.                     4 Sub Base &
Relays Assembly 02-500K Control Panel Assembly:
Foundation Bolts 02-630A     Pyrometer Conduit Assembly:         Engine Instru-                     3 Conduit                             mentation &
Control Panel 4
Wiring 02-630B     Pyrometer Conduit Assembly:         Engine Instru-                     3 O               Conduit Fittings                     mentation &
Solenoid Valves Assembly 02-500M Control Panel Assembly:
Control Panel 4
Piping, Tubing, Fittings
. Assembly 02-500N Control Panel Assembly:
Control Panel 4
Terminal Boards / Switches, Assembly Wiring 02-515 Thermostatic Valve Jacket Water 3
()
02-5258 Barring Device - Pneumatic Air Start &
3 Regulator Valve Shut Barring Device Off Valve 02-540A Lube Oil Sump Lube Oil 2
with Strainer Assembly and Mounting Hardward 02-5408
' Lube Oil Sump -Tank: Misc.
Lube Oil 2
I Fittings, Gaskets, Pipe
& Bolting Material, Valves 02-540C Lube Oil Sump Tank:
Lube Oil 2
Mounting Hardware 02-550 Foundation Bolts Engine & Aux.
4 Sub Base &
Foundation Bolts 02-630A Pyrometer Conduit Assembly:
Engine Instru-3 Conduit mentation &
Wiring 02-630B Pyrometer Conduit Assembly:
Engine Instru-3 O
Conduit Fittings mentation &
Wiring x
Wiring x
Index 1898                                                                     REV 1 Entire Page Revised
Index 1898 REV 1 Entire Page Revised


W INDEX (continued)                                                   i O. Component   Component                                                               Volume I
W INDEX (continued) i O.
        . Number       Description                           Category                           No.
Component Component Volume
        .02-630C       Pyr'ometer Conduit Assembly:           Engine Instru-                       3 Support-                               mentation & Wiring 02-6300     Pyrometer. Conduit Assembly:           Engine Instu-                       3
. Number Description Category No.
                      -Thermocouple mentation &
.02-630C Pyr'ometer Conduit Assembly:
Wiring 02-688A     Engine & Aux Module Wiring-           Engine Instru-                     3 Material- conduit ~& Fittings;         mentation &
Engine Instru-3 Support-mentation & Wiring 02-6300 Pyrometer. Conduit Assembly:
Pyrometer Conduit Assembly-           .W iring Conduit, Fitting, Supports                                                               .
Engine Instu-3
102-6888     : Engine & Aux. Module. Wiring           Engine Instru-                     3 Material: Wiring &                     mentation &
-Thermocouple mentation &
Terminations                         . Wiring 02-688C     Engine & Aux. Module Wiring           Engine Instu-                       3 Material: Boxes & Terminals           mentation &
Wiring 02-688A Engine & Aux Module Wiring-Engine Instru-3 Material-conduit ~& Fittings; mentation &
Wiring 02-690       Engine Alarm Sensors                   Engine Instru-                     3 O                 Temperature & Level Switches Off Engine Safety Alarm Sensors-mentation &
Pyrometer Conduit Assembly-
Wiring Wiring 02-691       Off Engine Alarm Sensors               Engine Instru-                     -3 mentation &.
. iring W
Wiring l       02-695A       Engine Shut Down Equipment:           Engine Shut--                       3 Tubing & Fittings-
Conduit, Fitting, Supports 102-6888
;                                                            down & Equip-l                                                             ment 1
: Engine & Aux. Module. Wiring Engine Instru-3 Material: Wiring &
02-6958     . Engine Shut Down Equipment:-           Engine Shut-                       3
mentation &
                    . Valves, Regulator, Orifices           down & Equip-                                     .
Terminations
ment 02-695C     Engine Shutdown: Trip                   Engine Shut-                       3 Switches                               down & Equip-ment
. Wiring 02-688C Engine & Aux. Module Wiring Engine Instu-3 Material: Boxes & Terminals mentation &
      '02-717A       Aux Sub Base'& Oil &                   Engine Aux.                         4.           !
Wiring 02-690 Engine Alarm Sensors Engine Instru-3 O
Water Piping: Aux.Sub Base           >Sub-Base &
Temperature & Level mentation &
Foundation Bolts O   02-7178     Aux Sub Base & 011 &
Switches Off Engine Wiring Safety Alarm Sensors-Wiring 02-691 Off Engine Alarm Sensors Engine Instru-
Water Piping:' Jacket Water Valves Jacket Water-                        3 xi Index.1898                                                                       REV -1 Entire Page Revised
-3 mentation &.
  .    - . . - . , -    . .      .. :. - -      a.   --              . . - - - . - - = - - . . - . -
Wiring l
02-695A Engine Shut Down Equipment:
Engine Shut--
3 Tubing & Fittings-down & Equip-l ment 1
02-6958
. Engine Shut Down Equipment:-
Engine Shut-3
. Valves, Regulator, Orifices down & Equip-ment 02-695C Engine Shutdown: Trip Engine Shut-3 Switches down & Equip-ment
'02-717A Aux Sub Base'& Oil &
Engine Aux.
4.
Water Piping: Aux.Sub Base
>Sub-Base &
Foundation Bolts O
02-7178 Aux Sub Base & 011 &
Jacket Water-3 Water Piping:' Jacket Water Valves xi Index.1898 REV -1 Entire Page Revised a.
.. - - -. - - = - -.. -. -


i                                                         INDEX (continued)
i INDEX (continued)
Component- Component                                                                                           Volume 4
Component-Component Volume Number Description Category No.
Number           Description                                     Category                                       No.
4 02-717C Aux Sub. Base & 011 and Water Jacket Water 3
02-717C           Aux Sub. Base & 011 and Water                   Jacket Water                                     3 Piping Jacket Water-Pipe, Couplings, Fittings,-Orifices,
Piping Jacket Water-Pipe, Couplings, Fittings,-Orifices, Y Strainers 02-717D Aux Sub Base & 011 & Water Jacket Water 3
.                              Y Strainers
i Piping: Jacket Water Gaskets
;            02-717D           Aux Sub Base & 011 & Water                       Jacket Water                                     3 i                               Piping: Jacket Water Gaskets
.& Bolting-02-717E Aux Sub Base & 011 & Water Jacket Water 3
                              .& Bolting-02-717E           Aux Sub Base & 011 & Water                       Jacket Water                                   3 Piping Jacket Water:
Piping Jacket Water:
Supports
+
+
Supports Lube Oil 02-717F           Aux Sub Base & 011 & Water                                                                       2 Piping Lube Oil Pipe Tube and Fittings 02-717G           Aux Sub Base & 011 & Water                       Lube Oil                                       2 j                               Piping: Lube Oil-Valves 02-717H         . Aux Sub Base & 011 & Water-                     Lube Oil                                       2 j
02-717F Aux Sub Base & 011 & Water Lube Oil 2
O                         Piping: Lube 011 Gaskets and Bolting
Piping Lube Oil Pipe Tube and Fittings 02-717G Aux Sub Base & 011 & Water Lube Oil 2
(             02-717I           Aux Sub Base Lube & 011                         Lube Oil                                       2 I
j Piping: Lube Oil-Valves 02-717H
                              .& Water Piping - Lube 011: Supports & Mounting l                               Hardware l             02 -717J         Aux Sub Base & 011 & Water                       Fuel Oil In-                                   4
. Aux Sub Base & 011 & Water-Lube Oil 2
          ,                    Piping:. Fuel Oil-Piping                         jection
O Piping: Lube 011 Gaskets j
,                              and Fittings l                                       .
and Bolting
!            02-717K           Aux Sub Base & 011 & Water                       Fuel Oil In-                                   4 Piping: Fuel Oil-Valves                         jection 1
(
02-717L       . Aux Sub Base & 011 & Water                       Fuel Oil In-                                   4 Piping: Fuel Oil-Gaskets                         jection
02-717I Aux Sub Base Lube & 011 Lube Oil 2
                                & Bolting 02-717M           Aux:Sub Base & 011 & Water                       Fuel Oil In-                                   4 Piping: Fuel.0il-Supports                       jaction 02-717N           Intercooler Piping - Pipe                       Turbo, Intake                                   2 Intercooler &
I
.& Water Piping - Lube 011: Supports & Mounting l
Hardware l
-717J 02 Aux Sub Base & 011 & Water Fuel Oil In-4 Piping:. Fuel Oil-Piping jection and Fittings l
02-717K Aux Sub Base & 011 & Water Fuel Oil In-4 Piping: Fuel Oil-Valves jection 1
02-717L
. Aux Sub Base & 011 & Water Fuel Oil In-4 Piping: Fuel Oil-Gaskets jection
& Bolting 02-717M Aux:Sub Base & 011 & Water Fuel Oil In-4 Piping: Fuel.0il-Supports jaction 02-717N Intercooler Piping - Pipe Turbo, Intake 2
Intercooler &
Exhaust O
Exhaust O
xii Index 1898-                                                                                             REV. 1
xii Index 1898-REV. 1
}                                                                                             Entire Page Revised
}
Entire Page Revised


_ ~       .    . _ -              -        -.          -                          .-              -. .
_ ~
(''S                                                       INDEX (continued)
(''S INDEX (continued)
Component           Component                                                                     Volume Number               Description                                 Category                           No.
Component Component Volume Number Description Category No.
02-717P             Intercooler Piping -                         Turbo, Intake                       2 1                                      Coupling, Gaskets,                           Intercooler &
02-717P Intercooler Piping -
Bolting                                     Exhaust 02-810A               Misc. Equipment - Heater,                   Jacket Water                       3 Jacket Water 02-820A             Misc. Equipment:                             Lube Oil                           2 Lube 011 Sump Tank' Heaters 02-8208               Full Flow Lube                               Lube Oil                           2 011 Filter Appendix II                                                                       4
Turbo, Intake 2
                                    ' Appendix III                                                       ~
Coupling, Gaskets, Intercooler &
1 Bolting Exhaust 02-810A Misc. Equipment - Heater, Jacket Water 3
Jacket Water 02-820A Misc. Equipment:
Lube Oil 2
Lube 011 Sump Tank' Heaters 02-8208 Full Flow Lube Lube Oil 2
011 Filter Appendix II 4
' Appendix III
~
4 1
4 1
i 1
i 1
y i
y i
l i
l i
xiii Index 1898                                                                                   REV 1 e Revised
xiii Index 1898 REV 1 Entire Paru Revised e
                                                                                          ----__ Entire Paru


i i
i i
Page 1 of 2 i
Page 1 of 2 i
COMPONENT DESIGN REVIEW CHECKLIST                                                   i
COMPONENT DESIGN REVIEW CHECKLIST i
;                                                                                          GRAND GULF NUCLEAR STATION - UNIT 1                                                   ,
GRAND GULF NUCLEAR STATION - UNIT 1 i
i
COMPONENT Intake Nanifold Piping CLASSIFICATION TYPE B
.                              COMPONENT Intake Nanifold Piping                                                                     CLASSIFICATION TYPE         B 5
5 COMPONENT PART NO.
COMPONENT PART NO.                                   02-375                       TASK DESCRIPTION NO.:         DR-07-02-375-2                   !
02-375 TASK DESCRIPTION NO.:
{                             (SNPS PART NUMBER 03-375)
DR-07-02-375-2
{
(SNPS PART NUMBER 03-375)
TASK DESCRIPTIONS:
TASK DESCRIPTIONS:
j                              Design review of this . component is not necessary since Impe11 performed a comparison of the Intake Manifold Structure and piping spool pieces, fittings                                                                     .
[
Design review of this. component is not necessary since Impe11 performed a j
comparison of the Intake Manifold Structure and piping spool pieces, fittings and supports of Grand-Gulf to Comanche Peak and found that with the U-Bolt
?
?
and supports of Grand- Gulf to Comanche Peak and found that with the U-Bolt                                                                      !
[
[
i-'
Supports ~added to the crossover piping the component is adequate.
Supports ~added to the crossover piping the component is adequate.                                                                               :
i-I The site experience for Grand Gulf noted some indication of Elbows cracking
The site experience for Grand Gulf noted some indication of Elbows cracking                                                                       I
[
[                             during installation.                                           The apparent cause of the past cracks appear to be
during installation.
!                              misalignment.
The apparent cause of the past cracks appear to be misalignment.
i.
i.
i                           ...This               problem is similar to that of Comanche Peak and as a maintenance 1
i
...This problem is similar to that of Comanche Peak and as a maintenance 1
l recommendation when misalignment is encountered:
l recommendation when misalignment is encountered:
I
I Other castings may be tried in an attempt at a better fit.
* Other castings may be tried in an attempt at a better fit.                                                         )
)
i                                              e              Bolt hole diameters on the intake manifold elbows may be increased 1
1 Bolt hole diameters on the intake manifold elbows may be increased i
i i                                                               from 1/16" oversize to 1/8" oversize. However under no circumst-                                                 t
i e
{                                                               ances shall any component be jacked to fit.
i from 1/16" oversize to 1/8" oversize.
;                                                                                                                                                                              1 l                             The.following Quality inspections are recommended to be performed:                                                                                 4 i
However under no circumst-t
!
{
* Visually inspect all intake manifolds for cracks at the flange faces I                                             .
ances shall any component be jacked to fit.
!
1 l
* Upon installation, ensure that the manifold installation does not                                                 !
The.following Quality inspections are recommended to be performed:
[                                                               cause excessive stress on flange bolt holes due to misalignment (see j                                                               the CQRC for this component installation recommendations).
4 i
i-
Visually inspect all intake manifolds for cracks at the flange faces I
: l.                           ' PRIMARY FUNCTION:.
Upon installation, ensure that the manifold installation does not
{                             Not required i
[
                            . ATTRIBUTES TO BE VERIFIED:
cause excessive stress on flange bolt holes due to misalignment (see j
1 Not required                                                                                                                                       '
the CQRC for this component installation recommendations).
O                                                                                                                                                                       '
i-l.
l GG1518/1                                                                                                                     REY.1 ~
' PRIMARY FUNCTION:.
{
Not required i
. ATTRIBUTES TO BE VERIFIED:
1 Not required O
l
[
GG1518/1 REY.1 ~
1
1
[


    .a i
.a i
j.
j.
Page 1 of 2 COMPONENT DESIGN RE"IEW CHECKLIST
Page 1 of 2 COMPONENT DESIGN RE"IEW CHECKLIST GRAND GULF NUCLEAR ST ATTON - UNIT 1 i
:                                            GRAND GULF NUCLEAR ST ATTON - UNIT 1 i
j COMPONENT Turbocharner - Bracket CLASSIFICATION TYPE B 1
j               COMPONENT Turbocharner - Bracket                                       CLASSIFICATION TYPE B 1
COMPONENT PART NUMBER 02-475A TASK DESCRIPTION NO.: OR-07-02-475A-2 (SNPS PART NUMBER 03-475A)
;              COMPONENT PART NUMBER 02-475A                           TASK DESCRIPTION NO.: OR-07-02-475A-2 (SNPS PART NUMBER 03-475A)
J i
J                                                                                                                                       '
TASK DESCRIPTIONS:
i TASK DESCRIPTIONS:                                                                                                       i i
i i
i-             Design review of this component is not required based on the review of lead                                             l
i-Design review of this component is not required based on the review of lead l
)             engine DR/QR reports (Shoreham/ Comanche Peak). The review of industry and site                                         ,
)
;.            experience indicates only one incident of- failure, which was 'actually related more to the bracket bolting than to the bracket itself.
engine DR/QR reports (Shoreham/ Comanche Peak).
4 The analytical basis for the Comanche Peak DR/QR report for this component                                               l identified that in the worst case load condition, vibration and manifold nozzle                                         j loads could potentially produce bolt loads in excess of preloads. Therefore, the bracket to engine and bracket to turbo base screws (P.N. G8-001-143 and                                             '
The review of industry and site experience indicates only one incident of-failure, which was 'actually related more to the bracket bolting than to the bracket itself.
,              G8-001-120) are recommended to be inspected on a regular basis as discussed
The analytical basis for the Comanche Peak DR/QR report for this component 4
;              below:
identified that in the worst case load condition, vibration and manifold nozzle j
;                                                                                                                                        l i
loads could potentially produce bolt loads in excess of preloads.
:
Therefore, the bracket to engine and bracket to turbo base screws (P.N. G8-001-143 and G8-001-120) are recommended to be inspected on a regular basis as discussed below:
* Each month for the first three months of commercial operation these I
l i
screws . should be inspected to assure that no screw has loosened because of engine operating loads. If during these inspections none                               1 of the screws are found loosened or damaged, from then en l
Each month for the first three months of commercial operation these I
inspections are to be conducted on a yearly basis (or during plant j                             shutdown). But if any time during inspection any screw is foui.d
screws. should be inspected to assure that no screw has loosened because of engine operating loads.
!                              loosened or damaged, it must then be replaced (if damaged) and all                                       c screws retorqued as follows; 125 ft-lbs for the bracket to engine I
If during these inspections none 1
screws and 75 ft-lbs for the bracket to turbo base screws.
l of the screws are found loosened or damaged, from then en inspections are to be conducted on a yearly basis (or during plant j
l               To avoid damage to bracket to engine, and/or bracket to turbo, base screws, l             the proper torques as 'delinated above should be utilized for each respective                                           .
shutdown).
l bracket bolting application.                                                                                             i There are no modification reconsnendations' for this component.                                                         ;
But if any time during inspection any screw is foui.d loosened or damaged, it must then be replaced (if damaged) and all c
Quality revalidation for this component is not required.                                                                  .
screws retorqued as follows; 125 ft-lbs for the bracket to engine screws and 75 ft-lbs for the bracket to turbo base screws.
I l
To avoid damage to bracket to engine, and/or bracket to turbo, base screws, l
the proper torques as 'delinated above should be utilized for each respective l
bracket bolting application.
i There are no modification reconsnendations' for this component.
Quality revalidation for this component is not required.
i.
i.
I i               PRIMARY FUNCTION:
I i
PRIMARY FUNCTION:
L f
L f
Not required o                                                                                                                               1 GG1403/1                                                                                               REV. 1           l
Not required o
        -...,.-..--.-.----,_-.-..--.-.-.-.--_..-.--,-....L-
1 GG1403/1 REV. 1 l
-...,.-..--.-.----,_-.-..--.-.-.-.--_..-.--,-....L-


COMPONENT DESIGN REVIEW CHECKLIST       Page 2 of 2 ATTRIBUTES TO BE VERIFIED:
COMPONENT DESIGN REVIEW CHECKLIST Page 2 of 2 ATTRIBUTES TO BE VERIFIED:
Not required
. SPECIFIED STANDARDS:
Not required
Not required
      . SPECIFIED STANDARDS:
,      Not required


==REFERENCES:==
==REFERENCES:==
 
-Not required DOCUMENTATION REQUIRED:
      -Not required
Not required i
;      DOCUMENTATION REQUIRED:
l GROUP CHAIRPERSON Id,-
:      Not required i
PROGRAM MANAGERd\\4wh b&h l
l GROUP CHAIRPERSON   Id,-                     PROGRAM MANAGERd\4wh b&h l
1 i
1 i
e
e
(
(
;                                                                              REV. 1 CARRY OVER FROM i                                                                       PREVIOUS PAGE GG1403/2 l-
REV. 1 CARRY OVER FROM i
PREVIOUS PAGE GG1403/2 l-


_ _ _ . .    . __          m   _.          . . - . _ . _ _ _ . _ _ .                              .  ._ _        . . . _ .        _ _ _ .
m t
t j-Page 1 of 2 I
j-Page 1 of 2 I
COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR POWER STATION - UNIT 1 i                           Before & After
COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR POWER STATION - UNIT 1 i
!                COMPONENT Lube Oil Pump                                                                           CLASSIFICATION TYPE A COMPONENT PART NUMBER GG-109                               TASK DESCRIPTION NO.:                           OR-07-GG-109-3                   ,
Before & After COMPONENT Lube Oil Pump CLASSIFICATION TYPE A COMPONENT PART NUMBER GG-109 TASK DESCRIPTION NO.:
l                (SNPS PART NUMBER 10-113) i TASK OESCRIPTIONS:
OR-07-GG-109-3 l
i Design review for this component is not required based on the review of the
(SNPS PART NUMBER 10-113) i TASK OESCRIPTIONS:
!                applicable industry and site experience and the lead engine DR/QR reports j'              (Shoreham/ Comanche Peak).           This pump is a standard three screw positive dis-placement pump used extensively in industrial, process, marine and utility power-plant services. It is accepted in industry as a reliable product.
i Design review for this component is not required based on the review of the applicable industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).
A review of pump nozzle loads indicates that the applied piping loads are
This pump is a standard three screw positive dis-j' placement pump used extensively in industrial, process, marine and utility power-plant services.
!                above the manufacturers recommended allowables. There has however been no 3
It is accepted in industry as a reliable product.
experience of pump leakage due to these loads at Comanche Peak or other V-16 installations.         As such the following inspection should be performed as part                                                     1 of the daily engine walkdown:
A review of pump nozzle loads indicates that the applied piping loads are above the manufacturers recommended allowables.
* The pump should be . inspected for signs of leakage and corrective
There has however been no 3
!                            modifications           (addition of flexible piping connections) be l     ,
experience of pump leakage due to these loads at Comanche Peak or other V-16 installations.
As such the following inspection should be performed as part 1
of the daily engine walkdown:
The pump should be. inspected for signs of leakage and corrective modifications (addition of flexible piping connections) be l
implemented as required.
implemented as required.
!                No modifications are required for this component based on the lead engine i               report.                                                                                                                                        .
No modifications are required for this component based on the lead engine i
1 l               Quality revalidation of this component was not required.
report.
1 l
Quality revalidation of this component was not required.
PRIMARY FUNCTION:
PRIMARY FUNCTION:
Not required l
Not required l
ATTRIBUTES 70 8E VERIFIED:
ATTRIBUTES 70 8E VERIFIED:
,                Not required
Not required
{
{
l               SPECIFIED STANDAR05:
l SPECIFIED STANDAR05:
Not required GG1068/1                                                                                                             REV 1
Not required GG1068/1 REV 1


d Page 2 of 2                                         l O      
d Page 2 of 2 O


==REFERENCES:==
==REFERENCES:==
            -Not required l
-Not required i
l' DOCUMENTATION REQUIRED:
Not required GROUP CHAIRPERSON 1
PROGRAM MANAGE N C % e u -
f f
O
~
i U
i l
i l
l
l O
;            DOCUMENTATION REQUIRED:
4 4
.            Not required GROUP CHAIRPERSON          1              -                          -
=
PROGRAM MANAGE N C % e u -
f                                                                                                                      O
                                                                                                                                                                                            ~
i                                                U f                          ,
i l                                                    '
l 4
O 4
                                                                                              =
I 1
I 1
i l-3 REV. 1 CARRY OVER FROM PREVIOUS PAGE l
i l-3 REV. 1 CARRY OVER FROM PREVIOUS PAGE l
GG1068/2
GG1068/2
      ----y, ,,.    . - . . -  , - ,, .  -y,y . _ , . _ - -.w.,__,       _ _ - , , -    _-v,,.,   _,.,e.--   , -    , ..,,. .        ..,%..      _ _ . - . , . . . . - -      .,.%.    ---    .
----y,
-y,y
-.w.,__,
_-v,,.,
_,.,e.--


Paga 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST
Paga 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST
          )-                                     GRAND GULF NUCLEAR STATION - UNIT 1 Crankshaft and Bearings:
)-
,                  ' COMPONENT Bearina Shells                                             CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-310B                           TASK DESCRIPTION NO.:       DR-07-02-3108-2                 l (SNPS PART NUMBER 0_3-3108)                                                                                       l TASK DESCRIPTIONS:
GRAND GULF NUCLEAR STATION - UNIT 1 Crankshaft and Bearings:
' COMPONENT Bearina Shells CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-310B TASK DESCRIPTION NO.:
DR-07-02-3108-2 (SNPS PART NUMBER 0_3-3108)
TASK DESCRIPTIONS:
Design Review for this component is not required, based upon:
Design Review for this component is not required, based upon:
* Part numbers R-3313, .R-3315 and R-3317 were reviewed for the Comanche l                           Peak DSRV-16-4. engine.
Part numbers R-3313,.R-3315 and R-3317 were reviewed for the Comanche l
* Main bearing loads at Grand Gulf are equivalent to those seen at Comanche Peak.
Peak DSRV-16-4. engine.
            , ' * '        At Comanche -Peak, the bearing shells were found suitable .for their application, with a margin of safety suitable for small variances in loading.
Main bearing loads at Grand Gulf are equivalent to those seen at Comanche Peak.
* There have been no design related incidents reported in the EDG Computer
At Comanche -Peak, the bearing shells were found suitable.for their application, with a margin of safety suitable for small variances in loading.
,                          Tracking System.'
There have been no design related incidents reported in the EDG Computer Tracking System.'
i                   e      Grand Gulf site experience has been review (d and does not affect the integrity of the main bearing shell design.
i Grand Gulf site experience has been review (d and does not affect the e
integrity of the main bearing shell design.
TER 07-041 has been reviewed and found consistent with the conclusion reached in the Comanche-Peak DR/QR report.
TER 07-041 has been reviewed and found consistent with the conclusion reached in the Comanche-Peak DR/QR report.
i-                 There are no modification recommendations for this component.
i-There are no modification recommendations for this component.
{                   The following maintenance recommendation -is made based on the lead engine DR/QR report:
{
1
The following maintenance recommendation -is made based on the lead engine DR/QR report:
* The main bearings should be inspected for shell thickness and evaluated
1 The main bearings should be inspected for shell thickness and evaluated for wear and evidence of crankshaft misalignment at the first refueling outage and alternate outages thereafter.
:                          for wear and evidence of crankshaft misalignment at the first refueling outage and alternate outages thereafter. If misalignment is indicated, corrective procedures should be implemented.
If misalignment is indicated, corrective procedures should be implemented.
Quality revalidation requirements for this component have been' completed.
Quality revalidation requirements for this component have been' completed.
                                                                          ^
PRIMARY FUNCTION:
PRIMARY FUNCTION:
Not required                                                                                                 '
^
!D GG1475/1                     -
Not required
REV. 1
!D GG1475/1 REV. 1
_                                  . Y.
. Y.


I                                                   .,
I Paga 2 of 2 ATTRIBUTES TO BE VERIFIED l
Paga 2 of 2
Not required l
;_                ATTRIBUTES TO BE VERIFIED l                 Not required l
SPECIFIED STANDARDS:
:                  SPECIFIED STANDARDS:
l Not. required
l                 Not. required


==REFERENCES:==
==REFERENCES:==
 
Not required j
Not required j                 DOCUMENTATION REQUIRED:
DOCUMENTATION REQUIRED:
I
I
                - Not required GROUP CHAIRPERSON PROGRAM MANAGER d\<a w                                           a       g
- Not required PROGRAM MANAGER d\\<a w a
( /(/                                                                                     Q 4
GROUP CHAIRPERSON g
( /(/
Q 4
!O l
!O l
i                                           /
i
/
l i
l i
I t
I t
                                                                                              )
)
i                                                                                 Y 3                                                                                   4
i Y
                                                                                            ?
4 3
                                            .E r
?
l~             :~                             i                                                                                                       REV. 1 1                                                                                                                         CARRY OVER FROM
. E r
                                                                                                                          ' PREVIOUS PAGE~
l~
:~
i REV. 1 1
CARRY OVER FROM
' PREVIOUS PAGE~
l l
l l
GG1475/2                             s '.
GG1475/2 s '.
n
n
_-        , . - . .  ,.m,-     . - -,  v... .        ...,[   ,)-.-   ,. - . . - - :.        - - - . -----.h---- -
,.m,-
                                                                                                                            - - - - - . _ - - - - - - - - * ~ - - - - - - - - - - - '
v...
...,[
,)-.-
-----.h----
- - - - - - - - * ~ - - - - - - - - - - - '


d l
d l
TDI OWNERS GROUP for GRAND GULF NUCLEAR STATION - UNIT 1
TDI OWNERS GROUP for GRAND GULF NUCLEAR STATION - UNIT 1 CYLINDER BLOCK l
.                                                          CYLINDER BLOCK                                                                 l
COMPONENT PART NO. 02-315A I
!                                                    COMPONENT PART NO. 02-315A                                                           !
INTRODUCTION The TDI Emergency Diesel Generator Owners Group Program for the Grand Gulf i
I        INTRODUCTION The TDI Emergency Diesel Generator Owners Group Program for the Grand Gulf i                       Nuclear Station requires Design and Quality Revalidation reviews of the cylinder blocks to determine the adequacy of design for its intended use at Grand Gulf. The blocks are manufactured by TDI and are supplied under j                       their part number 02-315-03-AE. The cylinder block forms the framework i                       of the liquid cooled engine and provides passage for coolant and support for the cylinder liners and cylinder- heads.                                                       1 II       OBJECTIVE i
Nuclear Station requires Design and Quality Revalidation reviews of the cylinder blocks to determine the adequacy of design for its intended use at Grand Gulf.
The objective of this review was to evaluate the adequacy of the cylinder
The blocks are manufactured by TDI and are supplied under j
                                                                                                                                          ~
their part number 02-315-03-AE.
block for its intended service at Grand Gulf Nuclear Station.                                                     ,
The cylinder block forms the framework i
l             III METHODOLOGY-In order to meet the stated objective the following methods were .used:
of the liquid cooled engine and provides passage for coolant and support for the cylinder liners and cylinder-heads.
* Review of liquid penetrant inspections of Grand Gulf DSRV-16 Division 1 engine block.
1 II OBJECTIVE i
l-
~
* Review of engine operating conditions at Grand Gulf and identifica-
The objective of this review was to evaluate the adequacy of the cylinder block for its intended service at Grand Gulf Nuclear Station.
.                              tion of any differences from those at Comanche Peak.
l III METHODOLOGY-In order to meet the stated objective the following methods were.used:
* Performance       of dimensional       check     and         evaluation of   cylinder         >
Review of liquid penetrant inspections of Grand Gulf DSRV-16 Division l-1 engine block.
liner / block interai: tion.
Review of engine operating conditions at Grand Gulf and identifica-tion of any differences from those at Comanche Peak.
!
Performance of dimensional check and evaluation of cylinder liner / block interai: tion.
* Evaluation, of steady state stresses,- alternating stresses and stiff-ness in key portions of the cylinder block.
Evaluation, of steady state stresses,- alternating stresses and stiff-ness in key portions of the cylinder block.
* Evaluation of crack growth rate for cylinder' block landing and counterbore diameter by comparison with ' conservative Shoreham data and analysis.
Evaluation of crack growth rate for cylinder' block landing and counterbore diameter by comparison with ' conservative Shoreham data and analysis.
i i
i i
* Review of Grand Gulf site, nuclear and non-nuclear experiences. -(See Appendix C)
Review of Grand Gulf site, nuclear and non-nuclear experiences. -(See Appendix C)
* Review of Quality Revalidation Checklist- results for acceptability.
Review of Quality Revalidation Checklist-results for acceptability.
l
l
!                                                                                                                    =REV.1:
=REV.1:
GG1603/1'
GG1603/1'


l l
l l
4 IV         RESULTS AND CONCLUSIONS
4 IV RESULTS AND CONCLUSIONS A - generic investigation of the structural adequacy of the TDI R-4 and RV-4 Series diesel engine cylinder blocks for emergency standby service in nuclear power plants is summarized in Reference 1.
;                    A - generic investigation of the structural adequacy of the TDI R-4 and RV-4 Series diesel engine cylinder blocks for emergency standby service in                                                     l nuclear power plants is summarized in Reference 1. The investigation                                                             j considers the cause, extent, and consequences of cylinder block cracking,                                                         l and the inspections required to assure sufficient margin of safety during continued operation under test and postulated accident conditions.                                                 g Evaluation of steady state stresses, alternating stresses and stiffness in key portions of the cylinder block was accomplished as part of the strain                                                     ,
The investigation j
gauge testing and the results were included in the cumulative damage and crack growth analyses. The cumulative damage algorithm is explained in                                                         :'
considers the cause, extent, and consequences of cylinder block cracking, and the inspections required to assure sufficient margin of safety during continued operation under test and postulated accident conditions.
Reference 1.
g Evaluation of steady state stresses, alternating stresses and stiffness in key portions of the cylinder block was accomplished as part of the strain gauge testing and the results were included in the cumulative damage and crack growth analyses.
l                   The Division 1 diesel generator has been inspected for block top cracks in the region adjacent to and between the cylinders. No cracked ligaments or                                                     i stud-to-stud or stud-to-end cracks were found.                               This engine has also                               i
The cumulative damage algorithm is explained in Reference 1.
,                    completed 1397 hours of operation as-of June 11, 1984.                                   The load breakdown                     l
l The Division 1 diesel generator has been inspected for block top cracks in the region adjacent to and between the cylinders.
!                      for this service is 411 hours unknown load, 114 hours at load less than 50 percent, 455 hourt between 50 percent and 60 percent load, 78 hours i                     between 60 percent and 99 percent load, 310 hours at 100 percent load, and
No cracked ligaments or i
!                    14 hours at 110 percent locd (Ref. 2).                                                                                          .
stud-to-stud or stud-to-end cracks were found.
t The engine operating conditions at Grand Gulf were compared to those at Comanche Peak and Shoreham.                       No significant differences were found that                                   ;
This engine has also i
would affect the structural integrity assessment of the Grand Gulf blocks.
completed 1397 hours of operation as-of June 11, 1984.
The load breakdown l
for this service is 411 hours unknown load, 114 hours at load less than 50 percent, 455 hourt between 50 percent and 60 percent load, 78 hours i
between 60 percent and 99 percent load, 310 hours at 100 percent load, and 14 hours at 110 percent locd (Ref. 2).
t The engine operating conditions at Grand Gulf were compared to those at Comanche Peak and Shoreham.
No significant differences were found that would affect the structural integrity assessment of the Grand Gulf blocks.
3 1
3 1
Results of dimensional inspection of the cylinder liners and of the mating i
Results of dimensional inspection of the cylinder liners and of the mating i
block surfaces were used to evaluate the interaction of the block and cylinder liner in th'e analysis of steady and alternating stresses. These results were utilized in the cumulative damage analysis.                                                                        .
block surfaces were used to evaluate the interaction of the block and cylinder liner in th'e analysis of steady and alternating stresses.
i The power . output for this engine is 7000 kW at 100 percent load. Maximum                                                       !
These results were utilized in the cumulative damage analysis.
output required for LOOP /LOCA is 4654 kW. The duratiori of a LOOP /LOCA                                                         '
i The power. output for this engine is 7000 kW at 100 percent load.
used in this analysis is 168 hours.
Maximum output required for LOOP /LOCA is 4654 kW.
3 Strain gauge" testing of the original .Shoreham EDG 103 block, inspection data from before and after testing, and materials testing were used as a
The duratiori of a LOOP /LOCA used in this analysis is 168 hours.
,                    basis to predict adequate life for cylinder blocks. The apparent rate of l~                   propagation of cracks between stud holes in the original Shoreham EDG 103 block, when compared with the Grand Gulf Division 1 LOOP /LOCA                                                                 ;
3 Strain gauge" testing of the original.Shoreham EDG 103 block, inspection data from before and after testing, and materials testing were used as a basis to predict adequate life for cylinder blocks.
requirements, indicates that even if the Grand Gulf : block - had ligament                                                       '
The apparent rate of l~
                    . cracks it is predicted to withstand with sufficient margin a LOOP /LOCA event.                                                                                                                       -;
propagation of cracks between stud holes in the original Shoreham EDG 103
                    ' In addition, this engine has completed substantial operational experience l                     and has been inspected and was found to be without block top cracks. To                                                       a verify engine reliability it is recommended that material microstructure evaluation be performed, but this is not required until additional engine O                operation equal . to the existing operation based on a cumulative damage algorithm has been experienced.
: block, when compared with the Grand Gulf Division 1
GG1603/2                                                                                                                 REV. 1 yw .>we-       yy.-, e - # [ -e   v   v rr-- +w-     +-v -
LOOP /LOCA requirements, indicates that even if the Grand Gulf : block - had ligament
                                                                                                                  -              -e-  -        --
. cracks it is predicted to withstand with sufficient margin a LOOP /LOCA event.
' In addition, this engine has completed substantial operational experience l
and has been inspected and was found to be without block top cracks.
To a
verify engine reliability it is recommended that material microstructure O
evaluation be performed, but this is not required until additional engine operation equal. to the existing operation based on a cumulative damage algorithm has been experienced.
GG1603/2 REV. 1 yw
.>we-yy.-,
e
- # [
-e v
v rr--
+w-
+-v
-e-


L                                                                                   Page 3 of 3                         )
L Page 3 of 3
i           Application of the algorithm following Figure 5-1 of Reference 1 shows
)
;          that the blocks will perform satisfactorily for 421 hours at 100 percent
i Application of the algorithm following Figure 5-1 of Reference 1 shows that the blocks will perform satisfactorily for 421 hours at 100 percent j.
: j.         power level without inspection.           Engine- operation in excess of this time i          period without. inspection could be justified if the fatigue damage index                         1 l
power level without inspection.
i          since the last inspection has not exceeded the allowable fatigue damage                                   >
Engine-operation in excess of this time period without. inspection could be justified if the fatigue damage index 1
l i
since the last inspection has not exceeded the allowable fatigue damage i
index before the last inspection.
index before the last inspection.
In the future, after the additional engine operation without inspection
In the future, after the additional engine operation without inspection has been accumulated, one of two alternative requirements should be fulfilled prior to continued engine operation thereafter.
;          has been accumulated, one of two alternative requirements should be fulfilled       prior   to   continued   engine   operation     thereafter.         The alternatives are:
The alternatives are:
* Inspect the microstructure -of the block top and verify whether it represents typical . microstructure for grey cast iron, Class 40. The block material at Grand Gulf is conservatively assumed to have the                                   -
Inspect the microstructure -of the block top and verify whether it represents typical. microstructure for grey cast iron, Class 40.
poor fatigue resistance equal to Shoreham EDG 103 block. An addi-                                   ,
The block material at Grand Gulf is conservatively assumed to have the poor fatigue resistance equal to Shoreham EDG 103 block.
tional 122 operating hours are available if Grand Gulf blocks are                           1       ,
An addi-tional 122 operating hours are available if Grand Gulf blocks are 1
,                found to be made of typical material.
found to be made of typical material.
* Inspect the block top for detectable ligament, stud-to-stud or j                 stud-to-end cracks. .If none are found, then additional engine operation may be performed until the future fatigue damage index equals the total allowable fatigue damage index accrued to the' last l                     1
Inspect the block top for detectable ligament, stud-to-stud or j
:                inspection. This second alternative may be repeated indefinitely
stud-to-end cracks.
!-              .throughout the life of the engine.                                                                   ,
.If none are found, then additional engine operation may be performed until the future fatigue damage index equals the total allowable fatigue damage index accrued to the' last l 1
The information provided on the following TERs - has been reviewed 'and is consistent with the final conclusions of this report:                 07-011, 07-018, j           07-036.
inspection.
!          Quality Revalidation Inspection results identified in Appendix B have been
This second alternative may be repeated indefinitely
.          reviewed and. considered in the performance of this design review and the l           results are consistent with the final conclusions of this report.
.throughout the life of the engine.
Based on the above review and implementation of routine inspections, it                                   ,
The information provided on the following TERs - has been reviewed 'and is consistent with the final conclusions of this report:
is concluded that the cylinder blocks are acceptable for their intended                                   f use at Grand Gulf.
07-011, 07-018, j
V     REFERENCES
07-036.
: 1.   " Design Review of TDI-R4 and RV-4 Series Emergency Diesel Generator l                 Cylinder Blocks." FaAA-84-9-11.
Quality Revalidation Inspection results identified in Appendix B have been reviewed and. considered in the performance of this design review and the l
: 2. FaAA Support Package Number SP-84-9-11(c).
results are consistent with the final conclusions of this report.
O l
Based on the above review and implementation of routine inspections, it f
l-L                                                                                                       REV. 1-l   GG1603/3' 1^
is concluded that the cylinder blocks are acceptable for their intended use at Grand Gulf.
_                    . _ ,              r .-  ._ , ,
V REFERENCES 1.
" Design Review of TDI-R4 and RV-4 Series Emergency Diesel Generator l
Cylinder Blocks." FaAA-84-9-11.
2.
FaAA Support Package Number SP-84-9-11(c).
O ll-L REV. 1-l GG1603/3' 1^
r


Appendix        B                                                                   Page B1 of 8 O                                                                                      07-02-315A COMPONENT QUALITY REVALIDATION CHECKLIST Mississippi Power & Light COMPONENT Cylinder Block                             UTILITY Grand Gulf Nuclear Station Unit-1                 l 4
O ppendix B A
GPL NO.         02-315A                             REV. NO.               2                                 ,
Page B1 of 8 07-02-315A COMPONENT QUALITY REVALIDATION CHECKLIST Mississippi Power & Light COMPONENT Cylinder Block UTILITY Grand Gulf Nuclear Station Unit-1 4
SNPS GPL NO.           03-315A TASK DESCRIPTIONS DIVISION I
GPL NO.
: 1.           Assemble and review existing documentation.
02-315A REV. NO.
: 2.           Perform a dimensional check on the area around the cylinder liner for all cylinder block liner landings.                                 '
2 SNPS GPL NO.
: 3.           Perform a Liquid Penetrant test on the cylinder block liner ' landing i                       along the top- landing surface, fillet radius, and vertical face adjacent to the landing surface.             Liner landings for cylinders 3L, y
03-315A TASK DESCRIPTIONS DIVISION I 1.
4L, SL, 6L, 3R, 4R, 5R and 6R should be inspected with the liners removed.     If linear indications are found, increase inspection plan
Assemble and review existing documentation.
;                        to all liner landings.
2.
: 4.           Perform a Liquid Penetrant test on the-cylinder head mating surface on top of the cylinder block.         The area between stud hole and liner, and between adjacent cylinder stud hole should be inspected. The i
Perform a dimensional check on the area around the cylinder liner for all cylinder block liner landings.
inspection plan should include cylinders 3L, 4L, 5L, 6L, 3R, 4R, SR                     y and 6R. If linear indications are found, increase inspection plan to all cylinders.
3.
: 5.           Perform an Eddy . Current test on the cylinder head stud holes if
Perform a Liquid Penetrant test on the cylinder block liner ' landing i
                      - required (i.e. linear indications found at stud hole extending into threads).
along the top-landing surface, fillet radius, and vertical face adjacent to the landing surface.
: 6.           Remove a ' sample from the cylinder block by drilling and cutting.
Liner landings for cylinders 3L, y
The sample shall be tetrahedral in shape with a one inch square base and a _ height of - 5/8 inch.       Attachment B shows the location where               I the sample should be taken.                                                                  .
4L, SL, 6L, 3R, 4R, 5R and 6R should be inspected with the liners removed.
!O GG0935/1-                                                                                     REV. 1
If linear indications are found, increase inspection plan to all liner landings.
4.
Perform a Liquid Penetrant test on the-cylinder head mating surface on top of the cylinder block.
The area between stud hole and liner, and between adjacent cylinder stud hole should be inspected.
The i
inspection plan should include cylinders 3L, 4L, 5L, 6L, 3R, 4R, SR y
and 6R.
If linear indications are found, increase inspection plan to all cylinders.
5.
Perform an Eddy. Current test on the cylinder head stud holes if
- required (i.e. linear indications found at stud hole extending into threads).
6.
Remove a ' sample from the cylinder block by drilling and cutting.
The sample shall be tetrahedral in shape with a one inch square base and a _ height of - 5/8 inch.
Attachment B shows the location where I
the sample should be taken.
!O GG0935/1-REV. 1


          .              -.              .  -        . . _ - - - -      --      -    -    =,     -  -
=,
l l
COMPONENT QUALITY REVALIDATION CHECKLIST Page B2 of 8 07-02-315A TASK DESCRIPTIONS (continued)
COMPONENT QUALITY REVALIDATION CHECKLIST             Page B2 of 8           !
DIVISION II 1.
07-02-315A
Assemble and review existing documentation.
,        TASK DESCRIPTIONS (continued)
2.
DIVISION II
Perform a dimensional _ check on the area around the cylinder liner for all cylinder block liner landings.
: 1. Assemble and review existing documentation.
: 2. Perform a dimensional _ check on the area around the cylinder liner
;                    for all cylinder block liner landings.
i'
i'
              ~ 3. Perform a Liquid Penetrant test on the cylinder block liner landing along the top. landing surface, fillet radius, and vertical face
~ 3.
!                    adjacent to the landing surface.                 This inspection plan should be     y performed on cylinders 3L, 4L, 5L', 6L, 3R, 4R, 5R and 6R.
Perform a Liquid Penetrant test on the cylinder block liner landing along the top. landing surface, fillet radius, and vertical face adjacent to the landing surface.
l               4. Perform a Liquid Penetrant test on the cylinder head mating surface
This inspection plan should be y
;                    on top of the cylinder block. The area between stud holes and liner, 1                   and between ' adjacent cylinder head and stud -holes should be inspected. The inspection plan should be performed on cylinders 3L,                 1 4L, SL, 6L, 3R, 4R, SR and 6R.                                                         ,
performed on cylinders 3L, 4L, 5L', 6L, 3R, 4R, 5R and 6R.
l 4.
Perform a Liquid Penetrant test on the cylinder head mating surface on top of the cylinder block.
The area between stud holes and liner, 1
and between ' adjacent cylinder head and stud -holes should be inspected.
The inspection plan should be performed on cylinders 3L, 1
4L, SL, 6L, 3R, 4R, SR and 6R.
5.
Remove a sample from the cylinder block by drilling and cutting.
Remove a sample from the cylinder block by drilling and cutting.
5.
The sample shall be tetrahedral in shape with a one inch square base and a height of 5/8 inch.
The sample shall be tetrahedral in shape with a one inch square base and a height of 5/8 inch. Attachment B shows the location where the sample should be taken.                                                             I ATTRIBUTES TO BE VERIFIED DIVISION I
Attachment B shows the location where the sample should be taken.
: 1. Quality status of Component Document Package
I ATTRIBUTES TO BE VERIFIED DIVISION I 1.
(               2. Dimensions of the cylinder block liner landing ' area l
Quality status of Component Document Package
l           3-5. Surface integrity of the cylinder block liner landing
(
: 6. Samples taken from the cylinder block are in accordance with TER
2.
                    #99-016.
Dimensions of the cylinder block liner landing ' area l
!              DIVISION II l
l 3-5.
;            ' 1. ~ Quality' status of Component Document Package
Surface integrity of the cylinder block liner landing 6.
: 2. Dimensions of the cylinder block liner landing area                                     '
Samples taken from the cylinder block are in accordance with TER
O GG0935/2                                                                               REV. 1 w   , -      - -                          ,      .
#99-016.
DIVISION II l
' 1.
~ Quality' status of Component Document Package 2.
Dimensions of the cylinder block liner landing area O
GG0935/2 REV. 1
!w


l
l
                                                    ' How To Use This Report Tabs in this report identify the following categories:
' How To Use This Report Tabs in this report identify the following categories:
Turbo, Intake,'Intercooler & Exhaust-                                             i Lube Oil                                                                         '
Turbo, Intake,'Intercooler & Exhaust-i Lube Oil
                          ' Engine Base & Bearing Caps Crankshaft & Bearings Cylinder Block, Liners & Water _ Manifold Air Start & Barring Device Connecting rods
' Engine Base & Bearing Caps Crankshaft & Bearings Cylinder Block, Liners & Water _ Manifold Air Start & Barring Device Connecting rods Pistons Camshaft & Valve Train Idler Gear Assembly & Front Gear Case
,                          Pistons Camshaft & Valve Train Idler Gear Assembly & Front Gear Case
[
                        . Flywheel                                                                         [
. Flywheel
                        . Engine Instrumentation & Wiring Overspeed Trip & Governor -
. Engine Instrumentation & Wiring Overspeed Trip & Governor -
                                    ~
~
Engine Shutdown & Equipment                                 '
Engine Shutdown & Equipment Jacket Water Cylinder Heads & Valves i
Jacket Water
Fuel Oil Injection Generator Control Panel Assembly Engine & Auxiliary Sub-Base & Foundation Bolts These categories have been defined to allow the reader to review a complete diesel generator subsystem-in a convenient' manner.
;                        Cylinder Heads & Valves i
Fuel Oil Injection Generator                                   ,
Control Panel Assembly Engine & Auxiliary Sub-Base & Foundation Bolts These categories have been defined to allow the reader to review a complete diesel generator subsystem-in a convenient' manner.
Within each category tabs identify Grand Gulf specific component numbers.
Within each category tabs identify Grand Gulf specific component numbers.
A given component report can be found by:
A given component report can be found by:
.                        a)     If the component nubmer is known - use the alpha - numeric index i
a)
which identifies the volume number and category in which the component report is located.
If the component nubmer is known - use the alpha - numeric index which identifies the volume number and category in which the i
component report is located.
b)- -If only.the component name is known - Section 3.2 may be used as a cross-reference to find the volume number where the component report may be found.
b)- -If only.the component name is known - Section 3.2 may be used as a cross-reference to find the volume number where the component report may be found.
Some reports address more than~one component. A tab is provided for each-                           ~
Some reports address more than~one component.
component. 'However, some components are combined under one report.- Slip
A tab is provided for each-
'      sheets are provided where required to reference back to the appropriate tab.
~
Some components required more than one report. These are identified by the abbreviation LB-Large Bore and SB-Saall Bore on the component number tabs.
component. 'However, some components are combined under one report.- Slip sheets are provided where required to reference back to the appropriate tab.
4 O
Some components required more than one report.
i Index 1898 L_      _ _ _ _ _ . _ _ _ _ _                  _ _    .--                    -  -        -          -
These are identified by the abbreviation LB-Large Bore and SB-Saall Bore on the component number tabs.
4
' O i
Index 1898 L


INDEX (continued) j           Comporent   Component.                                       .                              Volume Nuuoer       Description                                     Category                                 No.
INDEX (continued) j Comporent Component.
F-068       Intercooler                                     Turbo, Intake,                               2 Intrcir. & Ex-
Volume Nuuoer Description Category No.
,                                                                        haust GG-101A     Generator - Generator                         Generator                                     4 GG-1018. Generator:     Shaft and                       Generator                                     4 Bearings GG-103       Jacket Water Heat                             Jacket Water                                 3 i                       Exchanger GG-104       Lube Oil Heat Exchanger                         Lube Oil                                     2 GG-106       Auxiliary Jacket Water Pump                   Jacket Water         ,
F-068 Intercooler Turbo, Intake, 2
3 i           GG-107       Jacket Water Standby                           Jacket Water                                 3 j                       Heater Pump GG-108       Lube Oil System - Aux.                   . Lube Oil                                     2
Intrcir. & Ex-haust GG-101A Generator - Generator Generator 4
,                        Lube Oil Pump GG-109       Before & After Lube                           Lube 011                                     2
GG-1018.
;                        Oil Pump.
Generator:
GG-111       Flex Connections                               Turbo, Intake,                               2 Intercooler &
Shaft and Generator 4
Exhaust GG-112       Starting Air Tank                             Air Start &                                 3 j                                                                       Barring Device GG-116       Intake Air Silencer                           Turbo, Intake,                               2 Intercooler &
Bearings GG-103 Jacket Water Heat Jacket Water 3
!                                                                      Exhaust GG-118       Intake Air Filter                             Turbo, Intake,                               2 Intercooler &
i Exchanger GG-104 Lube Oil Heat Exchanger Lube Oil 2
Exhaust GG-119       Generator - Generator,                         Generator                                   4 Control               -
GG-106 Auxiliary Jacket Water Pump Jacket Water 3
:GG-121         011 Prelube Filter                             Lube Oil                                     2
i GG-107 Jacket Water Standby Jacket Water 3
;        =MP022/023     Turbocharger                                   _ Turbo, Intake,                             2 Intrcir. & Exhaust l
j Heater Pump GG-108 Lube Oil System - Aux.
REV 1                   -
Lube Oil 2
!                                                                ii Entire Page~ Revised l-         Index 1898
Lube Oil Pump GG-109 Before & After Lube Lube 011 2
__ - -_ : 2 6
Oil Pump.
GG-111 Flex Connections Turbo, Intake, 2
Intercooler &
Exhaust GG-112 Starting Air Tank Air Start &
3 j
Barring Device GG-116 Intake Air Silencer Turbo, Intake, 2
Intercooler &
Exhaust GG-118 Intake Air Filter Turbo, Intake, 2
Intercooler &
Exhaust GG-119 Generator - Generator, Generator 4
Control
:GG-121 011 Prelube Filter Lube Oil 2
=MP022/023 Turbocharger
_ Turbo, Intake, 2
Intrcir. & Exhaust l
REV 1 ii Entire Page~ Revised l-Index 1898
: 2 6


INDEX (continued)
INDEX (continued)
Component     Component                                                             Volume             '
Component Component Volume Number Description Category No.
Number         Description                             Category                             No.
SE-025 Lube Oil Full Pressure Lube Oil 2
SE-025         Lube Oil Full Pressure                 Lube Oil                                     2 Strainer 00-420         Lube Oil Pressure Regulating           Lube Oil                                     2 Valve 00-621A       Fuel Oil Drip Tank Assembly             Fuel Oil In-                               4 jection 00-700A       Jacket Water Stand Pipe:               Jacket Water                                 3 Pipe, Fittings, Gaskets 00-7008     -Jacket Water Stand Pipe:               Jacket Water                                 3 Valves 00-700C       Jacket Water Stand Pipe               Jacket Water                               3 Supports 00-700E       Jacket Water Stand Fipe:               Jacket Water                               3 Switches                           ..
Strainer 00-420 Lube Oil Pressure Regulating Lube Oil 2
I      00-700F       Jacket Water Stand Pipe:               Jacket Water                               3 Misc. Bolting Mat.
Valve 00-621A Fuel Oil Drip Tank Assembly Fuel Oil In-4 jection 00-700A Jacket Water Stand Pipe:
02-CFR       Turbocharger Thrust Bearing             Turbo, Intake,                           2 Lubricant System                       Intrcir.~& Ex-haust 02-305A         Base and Bearing Caps: Base           Engine Base                               2 Assembly                               & Bearing Caps 02-305C       Base and Bearing Caps:                 Engine Base                               2 Main Bearing Studs & Nuts               & Bearing Caps 02-305D     -Base.and Bearing Caps:                   Engine Base
Jacket Water 3
                    . Main Bearing Caps                       & Bearing Caps                           2 02-307A         Lube Oil Fittings:                     Lube Oil                                 2 Internal Headers-l 02-3078       Lube Oil Fittings:.                     Lube Oil                                 2 Internal - Tubing & Fittings 02-307D       Lube Oil Fittings Internal:             Lube Oil                                 2 Supports-O iii                                                 .
Pipe, Fittings, Gaskets 00-7008
REV 1 Index 1898 Entire Page Revised
-Jacket Water Stand Pipe:
Jacket Water 3
Valves 00-700C Jacket Water Stand Pipe Jacket Water 3
Supports 00-700E Jacket Water Stand Fipe:
Jacket Water 3
Switches I
00-700F Jacket Water Stand Pipe:
Jacket Water 3
Misc. Bolting Mat.
02-CFR Turbocharger Thrust Bearing Turbo, Intake, 2
Lubricant System Intrcir.~& Ex-haust 02-305A Base and Bearing Caps: Base Engine Base 2
Assembly
& Bearing Caps 02-305C Base and Bearing Caps:
Engine Base 2
Main Bearing Studs & Nuts
& Bearing Caps 02-305D
-Base.and Bearing Caps:
Engine Base
. Main Bearing Caps
& Bearing Caps 2
02-307A Lube Oil Fittings:
Lube Oil 2
Internal Headers-l 02-3078 Lube Oil Fittings:.
Lube Oil 2
Internal - Tubing & Fittings 02-307D Lube Oil Fittings Internal:
Lube Oil 2
Supports-O iii REV 1 Index 1898 Entire Page Revised


INDEX (continued)
INDEX (continued)
Component Component                                                       Volume Number     Description                         Category                     No.
Component Component Volume Number Description Category No.
02-310A   Crankshaft                           Crankshaft &                   2 Bearings 02-310B   Crankshaft and Bearings:             Crankshaft &                   2 Bearing Shells                       8 earing 02-310C. Crankcase and Bearings:             Crankshaft &                 2 Thrust Bearing Ring                 Bearing 02-311A   Crankcase: Crankcase Assy           Crankshaft &                 2 Bearing 02-311D   Crankcase: Crankcase                 Crankshaft &                 2 Mounting Hardware                   Bearings 02-315A   Cylinder Block Liners &             Cyl. Block &                 2 Water Manifold: Cylinder             Liners & Water Block                               Manifold 02-315C   Cylinder Block Liner &           . Cyl. Block &                 2 Water Manifold -                     Liners &
02-310A Crankshaft Crankshaft &
Cylinder Liner                       Water Manifold 02-315D   Cylinder Block Liners &             Cyl. Block ~&                 2 Jacket Water Manifold               Liners &
2 Bearings 02-310B Crankshaft and Bearings:
                & Piping                             Water Manifold 02-315E   Cylinder Block - Liners             Cyl. Block &                 2 and Water Manifold: Studs           Liners &
Crankshaft &
Water Manifold 02-315F   Cylinder Block Liners               Cyl. Block &                 2
2 Bearing Shells 8 earing 02-310C.
                & Water Manifold: Nuts               Liner & Water Manifold l
Crankcase and Bearings:
02-315G   Cylinder Block Liners &             Cyl. Block &                 2 l               Water Manifold Seals &               Liners &
Crankshaft &
Gaskets                             Water Manifold 02-31CA   Jacket Water Inlet Manifold:         Jacket Water                 3 Manifold Assembly W/ Hardware and Coupling and Gaskets i
2 Thrust Bearing Ring Bearing 02-311A Crankcase: Crankcase Assy Crankshaft &
02-316B   Jacket Water Inlet Manifold:         Jacket Water                 3 Coupling and Gaskets 02-317A   Water Discharge Manifold:           Jacket Water                 3 Os            Jacket Water Discharge Manifold, Coupling and Seals                                                                   ,
2 Bearing 02-311D Crankcase: Crankcase Crankshaft &
iv                             REV 1 Index 1898                                                   Entire Page Revised
2 Mounting Hardware Bearings 02-315A Cylinder Block Liners &
Cyl. Block &
2 Water Manifold: Cylinder Liners & Water Block Manifold 02-315C Cylinder Block Liner &
Cyl. Block &
2 Water Manifold -
Liners &
Cylinder Liner Water Manifold 02-315D Cylinder Block Liners &
Cyl. Block ~&
2 Jacket Water Manifold Liners &
& Piping Water Manifold 02-315E Cylinder Block - Liners Cyl. Block &
2 and Water Manifold: Studs Liners &
Water Manifold 02-315F Cylinder Block Liners Cyl. Block &
2
& Water Manifold: Nuts Liner & Water Manifold l
02-315G Cylinder Block Liners &
Cyl. Block &
2 l
Water Manifold Seals &
Liners &
Gaskets Water Manifold 02-31CA Jacket Water Inlet Manifold:
Jacket Water 3
Manifold Assembly W/ Hardware and Coupling and Gaskets 02-316B Jacket Water Inlet Manifold:
Jacket Water 3
i Coupling and Gaskets Os 02-317A Water Discharge Manifold:
Jacket Water 3
Jacket Water Discharge Manifold, Coupling and Seals iv REV 1 Index 1898 Entire Page Revised


INDEX (continued)
INDEX (continued)
.            Component             Component                                                                                                 Volume Number               Description                                               Category                                                 No.
Component Component Volume Number Description Category No.
02-317B             Water Dicharge Manifold:                                 Jacket Water                                               3 Coupling & Seals 02-317C             Water Discharge Manifold:                                 Jacket Water                                               3 Supports 02-330A             Flywheel                                                 Flywheel                                                   3 02-3308             Flywheel - Bolting                                       Flywheel                                                   3 02-335B             Front Gear Case-Gasket and                               Idler Gear As-                                             3 Bolting                                                   sembly & Front Gear Case
02-317B Water Dicharge Manifold:
            .02-340A               Connecting Rod:         Connecting                       Connecting                                                   3 Rods & Bushings                                         Rods 02-340B               Connecting Rod Bearing                                   Connecting                                                 3 Shells                                                   Rods 02-340C               Pistons                                       .          Pistons                                                     3 02-3400               Pistons: Rings                                           Pistons                                                     3 02-340E               Piston: Pin Assembly                                     Pistons                                                   -3 4
Jacket Water 3
02-345A               Tappets and Guides:                                       Camshaft &                                                 3 Intake Exhaust                                         Valve Train Tappet Assembly i-           02-345B               Tappets and Guides: Fuel                               -Camshaft &                                                   3
Coupling & Seals 02-317C Water Discharge Manifold:
,                                  Tappet Assembly                                         Valve Train 02-345C               Tappets and Guides: Fuel                                 Camshaft &                                                   3 Pump Base Assembly                                       Valve Train 02-350A               Camshaft:   Camshaft Assembly                           Camshaft &                                                   3 i
Jacket Water 3
Supports 02-330A Flywheel Flywheel 3
02-3308 Flywheel - Bolting Flywheel 3
02-335B Front Gear Case-Gasket and Idler Gear As-3 Bolting sembly & Front Gear Case
.02-340A Connecting Rod:
Connecting Connecting 3
Rods & Bushings Rods 02-340B Connecting Rod Bearing Connecting 3
Shells Rods 02-340C Pistons Pistons 3
02-3400 Pistons: Rings Pistons 3
02-340E Piston: Pin Assembly Pistons
-3 4
02-345A Tappets and Guides:
Camshaft &
3 Intake Exhaust Valve Train Tappet Assembly i-02-345B Tappets and Guides: Fuel
-Camshaft &
3 Tappet Assembly Valve Train 02-345C Tappets and Guides: Fuel Camshaft &
3 Pump Base Assembly Valve Train 02-350A Camshaft:
Camshaft Assembly Camshaft &
3 i
Valve Train i
Valve Train i
02-350B               Camshaft: Bearings-                                     Camshaft &                                                   3 Valve Train 350C               Camshaft: Supports, Bolting                             Camshaft &                                                   3 and Gears                                               Valve Train 02-355A               Idler Gear Assemble: Crank                               Idler Gear As-                                               3 To Pump Gear =                                           sembly & Front Gear Case v
02-350B Camshaft: Bearings-Camshaft &
:          Index'1898-                                                                                                             REV 1 l                                                                                                               Entire Page Revised i:
3 Valve Train 350C Camshaft: Supports, Bolting Camshaft &
3 and Gears Valve Train 02-355A Idler Gear Assemble: Crank Idler Gear As-3 To Pump Gear =
sembly & Front Gear Case v
Index'1898-REV 1 l
Entire Page Revised i:


        .                          ,    . _ . _        -        . .-          -_          .  - -    .-      ~ __-_- - - - -        -
~ __-_- - - - -
l INDEX (continued)
INDEX (continued)
,                  Component   Component                                                                                   Volume Number       Description                                       Category                                   No.
Component Component Volume Number Description Category No.
02-3558       Idler Gear Assembly                               Idler Gear As-                               3 sembly & Front Gear Case 02-359       Air Start Valves                                 Air Start &                                     3 Barring Device 02-360A     Cylinder Heads                                   Cylin' der Heads                               3
02-3558 Idler Gear Assembly Idler Gear As-3 sembly & Front Gear Case 02-359 Air Start Valves Air Start &
                                                                                  & Valves 02-3608     Cylinder Head Valves:                           Cylinder Heads                                 3 Intake & Exhaust Valves                         & Valves i
3 Barring Device 02-360A Cylinder Heads Cylin' der Heads 3
02-360C     Cylinder Head and. Valves:                       Cylinder Heads                                 3 Bolting and Gaskets                               & Valves 02-3600     Cylinder Head _ Valves -                         Cylinder Hea'ds                               3 Springs & Retainers                               & Valves
& Valves 02-3608 Cylinder Head Valves:
                  '02-362A     Cylinder Head Covers:                             Camshaft &                                     3 Subcover Assembly                                 Valve Train 1
Cylinder Heads 3
02-365A     Fuel _ Injection Equipment                       Fuel Oil In-                                   4
Intake & Exhaust Valves
                                - Fuel Injection-Pump                             jection 02-365B     Fuel Injection Equipment                         Fuel Oil In-                                   4
& Valves i
                              - Fuel Injection Tips                             jection t                   02-365C     Fuel Oil Injection Tube                           Fuel Oil In-                                   4 Assembly                                         jection
02-360C Cylinder Head and. Valves:
!                  02-365D     Fuel Injection Equipment:                         Fuel Oil In-                                   4
Cylinder Heads 3
;                              Supports                                         jection L                 02-371A     Fuel Pump Linkage: Fuel                           Fuel Oil In-                                   4 Pump Control Shaft                               jection l                 02-371B     Fuel Pump Linkage: Linkage                       Fuel Oil In-                                   4 Assembly and Bearing                             jection f
Bolting and Gaskets
02-375       Intake Manifold Piping                           Turbo, Intake,                                 2 Intrcir. & Ex-haust 02-380A     Exhaust Manifold -                           . Turbo, Intake,                                   2
& Valves 02-3600 Cylinder Head _ Valves -
* Manifold.                                         Intrcir. & Ex-                                         ,
Cylinder Hea'ds 3
haust vi
Springs & Retainers
!                  Index 1898                                                                                       REV ,1 j                                                                                             Entire Page Revised
& Valves
. . , _ , ~ ., _.           a- ,--              _ _ . - - - -    _ _ _ -  _
'02-362A Cylinder Head Covers:
_ _ . -              .e . . -
Camshaft &
3 Subcover Assembly Valve Train 1
02-365A Fuel _ Injection Equipment Fuel Oil In-4
- Fuel Injection-Pump jection 02-365B Fuel Injection Equipment Fuel Oil In-4
- Fuel Injection Tips jection t
02-365C Fuel Oil Injection Tube Fuel Oil In-4 Assembly jection 02-365D Fuel Injection Equipment:
Fuel Oil In-4 Supports jection L
02-371A Fuel Pump Linkage: Fuel Fuel Oil In-4 Pump Control Shaft jection l
02-371B Fuel Pump Linkage: Linkage Fuel Oil In-4 Assembly and Bearing jection f
02-375 Intake Manifold Piping Turbo, Intake, 2
Intrcir. & Ex-haust 02-380A Exhaust Manifold -
. Turbo, Intake, 2
Manifold.
Intrcir. & Ex-haust vi Index 1898 REV,1 j
Entire Page Revised
.., _, ~., _.
a-
.e


1 INDEX (continued)
1 INDEX (continued)
Component         Component                                                                           Volume o         Number             Description                                 Category                                   No.                 l l
Component Component Volume o
02-3808           Exhaust Manifold: Gaskets                   Turbo, Intake,                                 2 and Bolting                                 Intrcir. & Ex-haust 02-385B           Cylinder Block                               Cyl. Block &                                 2 Covers         ..                          Liners & Water Gaskets and Bolting                         Manifold 02-3868         ' Crankcase:   Crankcase                   Cranshaft &                                   2                 )
Number Description Category No.
Gaskets and Mounting                       Bearings Hardware 02-390A Rocker Arms'& Pushrods Intake & Intermediate and                   Camshaft &                                     3 Exhaust Rocker Shaft Assembly               Valve Train                     -
l 02-3808 Exhaust Manifold: Gaskets Turbo, Intake, 2
,.        02-3908           Rocker Arms and Pushrods:                   Camshaft &.                                   3 1
and Bolting Intrcir. & Ex-haust 02-385B Cylinder Block Cyl. Block &
Exhaust Rocker Shaft'                       Valve Train I
2 Covers Liners & Water Gaskets and Bolting Manifold 02-3868
' Crankcase:
Crankcase Cranshaft &
2
)
Gaskets and Mounting Bearings Hardware 02-390A Rocker Arms'& Pushrods Intake & Intermediate and Camshaft &
3 Exhaust Rocker Shaft Assembly Valve Train 02-3908 Rocker Arms and Pushrods:
Camshaft &.
3 1
Exhaust Rocker Shaft' Valve Train I
Assembly
Assembly
                                                                ~
~
02-390C           Rocker Arms & Pushrods-                     Camshaft &                                   3 0                     Intake & Exhaust -Pushrods Connectors Valve Train 02-3900           Rocker Arms and Pushrods:                   Camshaft &                                   3 Pushrods Connector.                         Valve Train 02-390E           Rocker Arms and Pushrods:                   Camshaft &                                   3 Bushings ~                                 Valve Train 02-390F           Rocker Arms and Pushrods:                   Camshaft &                                   3 Lifters                                     Valve Train 02-390G           Rocker Arms and Pushrods:                 -Camshaft &                                   3 Misc. Bolts & Drive Studs                   Valve Train 02-410A           Overspeed Trip: Governor                     Overspeed Trip-                               3
02-390C Rocker Arms & Pushrods-Camshaft &
                                                                        & Governor 02-410B           Overspeed Trip: Governor-                   Overspeed Trip                               3 and Accessory Drive                         & Governor 02-410C         'Overspeed Trip: Couplings                     Overspeed Trip                               3 (Flexible & Spider)                         & Governor 02-4100           Overspeed Trip                               Overspeed Trip                               3
3 0
                          . Vent Valves                                 & Governor vii Index 1898                                                                                           REV -1 Entire Page Revised
Intake & Exhaust -Pushrods Valve Train Connectors 02-3900 Rocker Arms and Pushrods:
Camshaft &
3 Pushrods Connector.
Valve Train 02-390E Rocker Arms and Pushrods:
Camshaft &
3 Bushings ~
Valve Train 02-390F Rocker Arms and Pushrods:
Camshaft &
3 Lifters Valve Train 02-390G Rocker Arms and Pushrods:
-Camshaft &
3 Misc. Bolts & Drive Studs Valve Train 02-410A Overspeed Trip: Governor Overspeed Trip-3
& Governor 02-410B Overspeed Trip: Governor-Overspeed Trip 3
and Accessory Drive
& Governor 02-410C
'Overspeed Trip: Couplings Overspeed Trip 3
(Flexible & Spider)
& Governor 02-4100 Overspeed Trip Overspeed Trip 3
. Vent Valves
& Governor vii Index 1898 REV -1 Entire Page Revised


INDEX (continued)
INDEX (continued)
Component       Component                                                                             Volume Number         Description                                       Category                               No.
Component Component Volume Number Description Category No.
i 1
i 1
02-411A         Governor Drive: Governor                         Overspeed Trip                           3 and Tachometer Drive Gear                         & Governor
02-411A Governor Drive: Governor Overspeed Trip 3
!                        & Shaft 02-4118~       Governor Drive: Couplings,                         Overspeed Trip                           3 Pins & Keys                                       & Governor 4
and Tachometer Drive Gear
02-413A       Governor Linkage                                   Overspeed Trip                           3
& Governor
                                                                            & Governor 02-413B       Fuel Pump Linkage-                                 Fuel Oil In-                             4 Automatic Shutdown                                 jection 02-415A       Governor Assembly: Wo odward                     Overspeed Trip                           3 i,                      Governor                                         & Governor 02-415B       Governor Assembly-Booster                         Overspeed Trip                           3 1
& Shaft 02-4118~
Servosoter                                       & Governor 02-415C       Governor Assembly-Heat                   .      Overspeed Trip                           3 Exchanger                                         & Governor 1
Governor Drive: Couplings, Overspeed Trip 3
02-420         Lube Oil Pump                                     Lube Oil                                 2 l
Pins & Keys
02-425A       Jacket Water Pump                                 Jacket Water                             3 02-437         Turbo Water Piping:                               Jacket Water                             3 Pipe &~ Fittings 02-441A       Starting Air Manifold                           Air Start &                               3 Piping                                           Barring Device 02-4418         Starting Air Manifold                           Air Start &_                             3 Valves, Strainer, Filters-                       Barring Device 02-441C         Starting Air Manifold                           Air Start &                               3 Supports                                         Barring Device 02-442A         Starting Air Distributor                         Air Start &                               3
& Governor 4
                                                                                                                                      ~
02-413A Governor Linkage Overspeed Trip 3
,                        Director Assembly.                               Barring Device L
& Governor 02-413B Fuel Pump Linkage-Fuel Oil In-4 Automatic Shutdown jection i,
L       02-442B       _ Starting Air Distributor:                       Air Start &                               3 j                       Tubing, Fittings, Gaskets                       Barring Device 02-445         Fuel Oil Booster Pump                           Fuel Oil.In-                             4 Engine Driven'                                 -jection viii Index 1898-                                                                                   - REV 1 Entire Page-Revised
02-415A Governor Assembly: W odward Overspeed Trip 3
    -    -    __ ,                .  - - , _ _ _ . .    ._        - . _ _ . . . . _      ._. 4 . . _ . _ _ .      . . . - . __
o Governor
& Governor 02-415B Governor Assembly-Booster Overspeed Trip 3
Servosoter
& Governor 1
02-415C Governor Assembly-Heat Overspeed Trip 3
Exchanger
& Governor 1
02-420 Lube Oil Pump Lube Oil 2
02-425A Jacket Water Pump Jacket Water 3
l 02-437 Turbo Water Piping:
Jacket Water 3
Pipe &~ Fittings 02-441A Starting Air Manifold Air Start &
3 Piping Barring Device 02-4418 Starting Air Manifold Air Start &_
3 Valves, Strainer, Filters-Barring Device 02-441C Starting Air Manifold Air Start &
3 Supports Barring Device 02-442A Starting Air Distributor Air Start &
3
~
Director Assembly.
Barring Device L
L 02-442B
_ Starting Air Distributor:
Air Start &
3 j
Tubing, Fittings, Gaskets Barring Device 02-445 Fuel Oil Booster Pump Fuel Oil.In-4 Engine Driven'
-jection viii Index 1898-
- REV 1 Entire Page-Revised 4


INDEX (continued)
INDEX (continued)
          -Component Component                                                         Volume Number   Description                             Category                     No.
-Component Component Volume Number Description Category No.
.          02-450A   Fuel Oil Header: Piping &               Fuel Oil In-                   4 Tubing                                 jection l
02-450A Fuel Oil Header: Piping &
02-4508   Fuel Oil Header:                       Fuel Oil In-                 4 Fuel Oil Tubing Supports               jection 02-455A   Fuel Oil Filters &                     Fuel Oil In-                 4 Strainers: Filters                     jection 02-455B   Fuel Oil Filters and                   Fuel Oil In-                   4 Straine's:
Fuel Oil In-4 Tubing jection l
r    Strainers               jection 02-455C   Fuel Oil Filters &                     Fuel Oil In--                 4 Strainer: Mounting Hardware           jection 02-465A   Lube Oil Lines External:               Lube Oil                       2
02-4508 Fuel Oil Header:
:                    Tubing, Fittings, Couplings l
Fuel Oil In-4 Fuel Oil Tubing Supports jection 02-455A Fuel Oil Filters &
02-465B   Lube Oil Lines - External             Lube Oil                       2 Supports                           .
Fuel Oil In-4 Strainers: Filters jection 02-455B Fuel Oil Filters and Fuel Oil In-4 Straine's:
O      02-465C   Lube Oil Lines External:
Strainers jection r
Valves Lube Oil                       2 02-467A   Turbocharger Lube Oil                 Lube Oil                       2 Fittings - Pipe, Tubing, Fittings & Flexible Coupling 02-4678   Turbocharger: Lube Oil                 Lube Oil                       2 Fittings - Supports 02-475A   Turbocharger: Bracket                 Turbo, Intake,                 2 Intrcir. & Ex-l                                                           haust 02-475B   Turbocharger Bracket-                 Turbo, Intake,                 2 Air Butterfly Valve                   Intrcir. & Ex-haust 02-475C   Turbocharger: Bracket -               Turbo, Intake,                 2 Bolting & Gaskets-                     Intrcir.'& Ex-haust 02-500A   Control Panel Assembly:               Control Panel                 4 l                   Cabinet / System                       Assembly l
02-455C Fuel Oil Filters &
l       ) 02-500F   Control Panel Assembly:               Control Panel                 4 l   s- /             Accumulator                           Assembly IX.
Fuel Oil In--
Index 1898                                                               REV 1 i
4 Strainer: Mounting Hardware jection 02-465A Lube Oil Lines External:
Entire Page Revised
Lube Oil 2
Tubing, Fittings, Couplings l
02-465B Lube Oil Lines - External Lube Oil 2
Supports O
02-465C Lube Oil Lines External:
Lube Oil 2
Valves 02-467A Turbocharger Lube Oil Lube Oil 2
Fittings - Pipe, Tubing, Fittings & Flexible Coupling 02-4678 Turbocharger: Lube Oil Lube Oil 2
Fittings - Supports 02-475A Turbocharger: Bracket Turbo, Intake, 2
Intrcir. & Ex-l haust 02-475B Turbocharger Bracket-Turbo, Intake, 2
Air Butterfly Valve Intrcir. & Ex-haust 02-475C Turbocharger: Bracket -
Turbo, Intake, 2
Bolting & Gaskets-Intrcir.'& Ex-haust 02-500A Control Panel Assembly:
Control Panel 4
l Cabinet / System Assembly l
l
)
02-500F Control Panel Assembly:
Control Panel 4
l s- /
Accumulator Assembly IX.
Index 1898 REV 1 Entire Page Revised i


t INDEX (continued)
t INDEX (continued)
Component                         Component                                                                             Volume Number                             Description                                                       Category                 No.
Component Component Volume Number Description Category No.
,            02-500G                           Control Panel                                                     Control Panel                 4 Valves                                                           Assembly 02-500H                           Control Panel Assembly:                                           Control Panel                 4
02-500G Control Panel Control Panel 4
                                              . Pressure Switch Assembly 02-500J                             Control Panel Assembly:                                           Control Panel                 4 Relays                                                           Assembly 02-500K                             Control Panel Assembly:                                           Control Panel                 4 Solenoid Valves                                                   Assembly 02-500M                             Control Panel Assembly:                                           Control Panel                 4 Piping, Tubing, Fittings                                         Assembly 1           02-500N-                           Control Panel Assembly:                                           Control Panel                 4 Terminal Boards / Switches,                                       Assembly Wiring 02-515                             Thermostatic Valve                                   .          Jacket Water                 3
Valves Assembly 02-500H Control Panel Assembly:
            . 02-5258                           Barring Device - Pneumatic                                       Air Start &                   3 4                                                Regulator Valve Shut -
Control Panel 4
Barring Device Off Valve 4
. Pressure Switch Assembly 02-500J Control Panel Assembly:
02-540A                             Lube Oil Sump                                                     Lube Oil                     2
Control Panel 4
,                                                with Strainer Assembly and Mounting Hardward
Relays Assembly 02-500K Control Panel Assembly:
!            02-540B                             Lube Oil Sump Tank: Misc.                                       - Lube Oil                     2
Control Panel 4
,                                              Fittings, Gaskets, Pipe
Solenoid Valves Assembly 02-500M Control Panel Assembly:
                                                & Bolting Material, Valves
Control Panel 4
)           02-540C                             Lube Oil Sump Tank:                                               Lube.011                     2 i
Piping, Tubing, Fittings Assembly 1
Mounting Hardware 02-550-                             Foundation Bolts                                                 Engine & Aux.                 4 Sub Base &
02-500N-Control Panel Assembly:
Foundation Bolts 02-630A                             Pyrometer Conduit Assembly:                                       Engine Instru-               3
Control Panel 4
:                                                Conduit                                                           mentation &
Terminal Boards / Switches, Assembly Wiring 02-515 Thermostatic Valve Jacket Water 3
l                                                                                                                 Wiring i-02-630B                             Pyrometer Conduit Assembly:                                       Engine Instru-           ,3 i
. 02-5258 Barring Device - Pneumatic Air Start &
Conduit Fittings                                                 mentation &
3 Regulator Valve Shut Barring Device 4
Off Valve 4
02-540A Lube Oil Sump Lube Oil 2
with Strainer Assembly and Mounting Hardward 02-540B Lube Oil Sump Tank: Misc.
- Lube Oil 2
Fittings, Gaskets, Pipe
& Bolting Material, Valves
)
02-540C Lube Oil Sump Tank:
Lube.011 2
i Mounting Hardware 02-550-Foundation Bolts Engine & Aux.
4 Sub Base &
Foundation Bolts 02-630A Pyrometer Conduit Assembly:
Engine Instru-3 Conduit mentation &
l Wiring i-02-630B Pyrometer Conduit Assembly:
Engine Instru-
,3 i
Conduit Fittings mentation &
Wiring
Wiring
,                                                                                                    .X l
.X l
l           Index 1898                                                                                                         _
l Index 1898
                                                                                                                                  .REV 1
.REV 1


s                                    INDEX (continued)
INDEX (continued) s Component Component-Volume Number Description Category No.
Component   Component-                                                     Volume Number       Description                         Category                   No.
02-630C Pyrometer Conduit Assembly:
02-630C     Pyrometer Conduit Assembly:         Engine Instru-                 3 Support                             mentation & Wiring 02-630D     Pyrometer Conduit Assembly:         Engine Instu-                 3 Thermocouple                       mentation &
Engine Instru-3 Support mentation & Wiring 02-630D Pyrometer Conduit Assembly:
Wiring 02-688A     Engine & Aux Module Wiring         Engine Instru-                 3 Material- Conduit & Fittings;       mentation &
Engine Instu-3 Thermocouple mentation &
Pyrometer Conduit Assembly-         Wiring Conduit, Fitting, Supports-02-6888     Engine & Aux. Module Wiring         Engine Instru-                 3 Material: Wiring &                 mentation &
Wiring 02-688A Engine & Aux Module Wiring Engine Instru-3 Material-Conduit & Fittings; mentation &
Terminations                       Wiring 02-688C       Engine & Aux. Module Wiring         Engine Instu-                 3 Material: Boxes & Terminals         mentation &'
Pyrometer Conduit Assembly-Wiring Conduit, Fitting, Supports-02-6888 Engine & Aux. Module Wiring Engine Instru-3 Material: Wiring &
Wiring 02-690       Engine Alarm Sensors               Engine Instru-               3 4
mentation &
O                Temperature & Level Switches Off Engine Safety Alarm Sensors-mentation &
Terminations Wiring 02-688C Engine & Aux. Module Wiring Engine Instu-3 Material: Boxes & Terminals mentation &'
Wiring
Wiring 02-690 Engine Alarm Sensors Engine Instru-3 O
                  -Wiring 02-691       Off Engine Alarm Sensors             Engine Instru-               3 mentation &
Temperature & Level mentation &
Wiring 02-695A     Engine Shut Down Equipment:         Engine Shut-                   3 Tubing & Fittings                   down & Equip-ment 02-6958     Engine Shut Down Equipment:         Engine Shut-                   3 Valves, Regulator, Orifices         down & Equip-ment 02-695C       Engine Shutdown: Trip               Engine Shut-                 3 Switches                           down & Equip-ment
Switches Off Engine Wiring Safety Alarm Sensors-4
,    02-717A       Aux Sub Base & Oil &               Engine Aux.                   4 l
-Wiring 02-691 Off Engine Alarm Sensors Engine Instru-3 mentation &
Water Piping: Aux Sub Base         Sub-Base &
Wiring 02-695A Engine Shut Down Equipment:
Foundation Bolts 0   02-7178       Aux Sub Base & Oil &
Engine Shut-3 Tubing & Fittings down & Equip-ment 02-6958 Engine Shut Down Equipment:
Engine Shut-3 Valves, Regulator, Orifices down & Equip-ment 02-695C Engine Shutdown: Trip Engine Shut-3 Switches down & Equip-ment 02-717A Aux Sub Base & Oil &
Engine Aux.
4 l
Water Piping: Aux Sub Base Sub-Base &
Foundation Bolts 0
02-7178 Aux Sub Base & Oil &
Jacket Water 3
Water Piping: Jacket Water Valves.
Water Piping: Jacket Water Valves.
Jacket Water                  3 xi                                     -
xi Index 1898 REV 1 Entire Page Revised
Index 1898                                                               REV 1 Entire Page Revised


                        .  .~             -      .              -                        _ _ _ _ _ _
.~
g-'S                                 INDEX (continued)
g-'S INDEX (continued)
O     Component Component                                                     Volume Number     Description                         Category                   No.
O Component Component Volume Number Description Category No.
02-717C   Aux Sub Base & 011 and Water         Jacket Water                 3 Piping Jacket Water-Pipe, Couplings, Fittings, Orificas, Y Strainers 02-7170   Aux Sub Base & 011 & Water           Jacket Water                 3 Piping: Jacket Water Gaskets
02-717C Aux Sub Base & 011 and Water Jacket Water 3
                  & Bolting
Piping Jacket Water-Pipe, Couplings, Fittings, Orificas, Y Strainers 02-7170 Aux Sub Base & 011 & Water Jacket Water 3
                                                              ~
Piping: Jacket Water Gaskets
02-717E   Aux Sub Base & Oil & Water           Jacket Water                 3 i                Piping - Jacket Water:
& Bolting
Supports 02-717F   Aux Sub Base & Oil & Water           Lube Oil                     2 Piping Lube Oil Pipe Tube and Fittings 02-717G   Aux Sub Base & 011 & Water           Lube Oil                     2 Piping: Lube Oil-Valves Aux Sub Base & 011 & Water
~
()   02-717H                                        Lube Oil
02-717E Aux Sub Base & Oil & Water Jacket Water 3
!                                                                                    2 Piping: Lube Oil Gaskets and Bolting 02-717I   Aux Sub Base Lube & Oil             -Lube Oil                     2
Piping - Jacket Water:
                  & Water Piping - Lube Oil: Supports & Mounting Hardware 02-717J   Aux Sub Base & 011 & Water           Fuel Oil In-                 4 Piping: Fuel Oil-Piping             jection               .
i Supports 02-717F Aux Sub Base & Oil & Water Lube Oil 2
l and Fittings 02-717K   Aux Sub Base & 011 & Water-         Fuel Oil In-                 4 Piping: Fuel Oil-Valves             jection 02-717L   Aux Sub Base & Oil & Water           Fuel Oil In-                 4 Piping: Fuel Oil-Gaskets             jection
Piping Lube Oil Pipe Tube and Fittings 02-717G Aux Sub Base & 011 & Water Lube Oil 2
                  & Bolting
Piping: Lube Oil-Valves 02-717H Aux Sub Base & 011 & Water Lube Oil 2
!      02-717M   Aux Sub Base & Oil & Water           Fuel Oil In-                 4 Piping: Fuel Oil-Supports           jection 02-717N   Intercooler Piping - Pipe           Turbo, Intake                 2 Inte-cooler &
()
Piping: Lube Oil Gaskets and Bolting 02-717I Aux Sub Base Lube & Oil
-Lube Oil 2
& Water Piping - Lube Oil: Supports & Mounting Hardware 02-717J Aux Sub Base & 011 & Water Fuel Oil In-4 Piping: Fuel Oil-Piping jection l
and Fittings 02-717K Aux Sub Base & 011 & Water-Fuel Oil In-4 Piping: Fuel Oil-Valves jection 02-717L Aux Sub Base & Oil & Water Fuel Oil In-4 Piping: Fuel Oil-Gaskets jection
& Bolting 02-717M Aux Sub Base & Oil & Water Fuel Oil In-4 Piping: Fuel Oil-Supports jection 02-717N Intercooler Piping - Pipe Turbo, Intake 2
Inte-cooler &
Exhaust O
Exhaust O
xii Index 1898                                                             REV 1 Entire Page Revised
xii Index 1898 REV 1 Entire Page Revised


l                                         INDEX (continued)
l INDEX (continued)
Component   Component Volume Number       Description                           Category                           No.
Component Component Volume Number Description Category No.
02-717P     Intercooler Piping -                   Turbo, Intake                       2 Coupling, Gaskets,                     Intercooler &
02-717P Intercooler Piping -
Bolting                               Exhaust                                   ,
Turbo, Intake 2
02-810A       Misc. Equipment - Heater,             Jacket Water                       3 Jacket Water 02-820A       Misc. Equipment:                       Lube 011                           2 Lube Oil Sump Tank' Heaters 02-8208       Full Flow Lube                         Lube Oil                           2 011 Filter                                                                                   '
Coupling, Gaskets, Intercooler &
Appendix II                                                               4 Appendix III                                             ~
Bolting Exhaust 02-810A Misc. Equipment - Heater, Jacket Water 3
Jacket Water 02-820A Misc. Equipment:
Lube 011 2
Lube Oil Sump Tank' Heaters 02-8208 Full Flow Lube Lube Oil 2
011 Filter Appendix II 4
Appendix III
~
4
4
; O
; O
                                                -xiii Index-1898                                                                         REV 1 Entire Page Revised
-xiii Index-1898 REV 1 Entire Page Revised


o                                                                                                               )
o Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 COMPONENT Connecting Rod Bearing Shells CLASSIFICATION TYPE A
i Page 1 of 2                     .
4 COMPONENT PART NUMBER 02-340B TASK DESCRIPTION NO:
COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 COMPONENT Connecting Rod Bearing Shells                     CLASSIFICATION TYPE         A 4
DR-07-02-3408-2 (SNPS PART NUMBER 03-3408) i
COMPONENT PART NUMBER 02-340B               TASK DESCRIPTION NO:     DR-07-02-3408-2 (SNPS PART NUMBER 03-3408) i
~ TASK DESCRIPTIONS:
,    ~ TASK DESCRIPTIONS:
Design review for this component is not required based on the review of the applicable industry and site experience and the lead engine DR/QR report (Comanche Peak).
:        Design review for this component is not required based on the review of the applicable industry and site experience and the lead engine DR/QR report (Comanche Peak). A -review of the connecting rod bearing shells in Comanche Peak indicated that the bearing shells are suitable for their intended applica-
A -review of the connecting rod bearing shells in Comanche Peak indicated that the bearing shells are suitable for their intended applica-
                                                        ~
~
tion, with a margin of safety which will account for. small variances in load-ing. The loading on the connecting rod bearing shells at Grand Gulf and
tion, with a margin of safety which will account for. small variances in load-ing.
* Comanche Peak are equivalent and the operating parameters are similar.
The loading on the connecting rod bearing shells at Grand Gulf and Comanche Peak are equivalent and the operating parameters are similar.
The following maintenance recommendations should be implemented for the con-necting rod bearing shells:
The following maintenance recommendations should be implemented for the con-necting rod bearing shells:
* Inspect . and measure the connecting rod bearing shells to verify The visual and O                 lube oil maintenance which affects wear rate.
Inspect. and measure the connecting rod bearing shells to verify O
dimensional inspection of the bearing shells 'should be conducted at the fuel outage which precedes 500 hours of operation by at least the sum of hours of operation in a LOOP /LOCA event plus the expected hours of operation between outages.
lube oil maintenance which affects wear rate.
!              *  -Perform an x-ray examination on all replacement bearing shells.
The visual and dimensional inspection of the bearing shells 'should be conducted at the fuel outage which precedes 500 hours of operation by at least the sum of hours of operation in a LOOP /LOCA event plus the expected hours of operation between outages.
-Perform an x-ray examination on all replacement bearing shells.
No modifications are recommended for this component.
No modifications are recommended for this component.
The Quality - revalidation requirements for this component have been completed and are considered satisfactory.                                                                   1 PRIMARY FUNCTION:
The Quality - revalidation requirements for this component have been completed and are considered satisfactory.
1 PRIMARY FUNCTION:
Not. required
Not. required
    -ATTRIBUTES TO BE VERIFIED:.
-ATTRIBUTES TO BE VERIFIED:.
Not required
Not required
;O GG1631/1                                                                           .REV. 1
;O GG1631/1
                        .  -.      - - . :. . L-. - - - . -           .--  .. _ _ -      -.  . ._ -.
.REV. 1 L-. - - -. -


_-        -- .--          .              .  =.     - . _ . .      -          - . ~       - . . .-        . - . . - -
=.
1 COMPONENT QUALITY REVALIDATION CHECKLIST                               Page B3 of 3 07-02-340C
-. ~
'        COMPONENT REVIEW                                                                                                                                     .
1 COMPONENT QUALITY REVALIDATION CHECKLIST Page B3 of 3 07-02-340C COMPONENT REVIEW Division I 1.
Division I
All EDGCTS site experience documents have been reviewed with satisfactory results.
: 1. All       EDGCTS     site experience documents                     have been reviewed with satisfactory results.
I l
I l               '2. A Magnetic Particle test rather than a Liquid Penetrant test was
'2.
!.                    performed on the piston skirts and stud boss area.                                             Satisfactory l                     results were reported by TER# 07-002.
A Magnetic Particle test rather than a Liquid Penetrant test was performed on the piston skirts and stud boss area.
l l               3. . No- . inspection         report     has           been     received           which     fulfills             this requirement.
Satisfactory l
Division II
results were reported by TER# 07-002.
: 1. All- EDGCTS           site experience documents have been reviewed with                                                             y-unsatisfactory results. MNCR# 01030-83 remains open.
l l
l           2-3.   . No     inspection         reports   has           been     received which fulfills these
3.
!                      requirements.
. No-. inspection report has been received which fulfills this requirement.
Division II 1.
All-EDGCTS site experience documents have been reviewed with y-unsatisfactory results.
MNCR# 01030-83 remains open.
l 2-3.
. No inspection reports has been received which fulfills these requirements.
l l
l l
RESULTS AND CONCLUSIONS Division-I The Quality Revalidation effort with respect to this component, as outlined above, is complete.             The results have-been forwarded to the design Group for their evaluation and conclusions in support of the final report.
RESULTS AND CONCLUSIONS Division-I The Quality Revalidation effort with respect to this component, as outlined above, is complete.
Division II                     .
The results have-been forwarded to the design Group for their evaluation and conclusions in support of the final report.
Same as Division I-GROUP. CHAIRPERSON             IdA h                                   PROGRAM ' MANAGER O                               --            -
Division II Same as Division I-GROUP. CHAIRPERSON IdA h PROGRAM ' MANAGER O CJryn L
CJryn L
O (GG1039/3_
O (GG1039/3_                                                                                                               REV. 1
REV. 1


;                                                                                                    Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 COMPONENT Piston: Rings                                 CLASSIFICATION TYPE                                 A COMPONENT PART NUMBER 02-3400             TASK DESCRIPTION N0: DR-07-02-340D-2 (SNPS PART. NUMBER 03-341B)
Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 COMPONENT Piston: Rings CLASSIFICATION TYPE A
COMPONENT PART NUMBER 02-3400 TASK DESCRIPTION N0: DR-07-02-340D-2 (SNPS PART. NUMBER 03-341B)
TASK DESCRIPTIONS:
TASK DESCRIPTIONS:
Design _ review .for .this component is not required, based on the review of applicable industry. and site experience and the lead engine DR/QR reports for
Design _ review.for.this component is not required, based on the review of applicable industry. and site experience and the lead engine DR/QR reports for
  'this component (Shoreham/ Comanche Peak).
'this component (Shoreham/ Comanche Peak).
Maintenance recommendations are as follows:
Maintenance recommendations are as follows:
Inspect and measure piston rings every five years per TDI Inspection and Maintenance Record Form.
Inspect and measure piston rings every five years per TDI Inspection and Maintenance Record Form.
Visually   inspect liners for wear every outage.                                         Boroscopic inspection is acceptable if heads are not removed.                                       Note: Ring replacement and cylinder liner honing should be performed in accordance with TDI maintenance procedures.
Visually inspect liners for wear every outage.
Boroscopic inspection is acceptable if heads are not removed.
Note: Ring replacement and cylinder liner honing should be performed in accordance with TDI maintenance procedures.
135* fuel spray tips may be used if inspection results indicate a need for additional action to improve lubrication and reduce coke buildup.
135* fuel spray tips may be used if inspection results indicate a need for additional action to improve lubrication and reduce coke buildup.
When replacing engine oil     use H.D. oil that exceeds series 3 standards. The base stock should be more resistant to thermal degradation and coke formation. The additive package should provide high detergent dispersant properties with high alkalinity and a high level of antiwear additive such as Zinc dithiophosphate. Total Base Number (TBN) should be 12 to 15 for use with #2 fuel oil and a sulfated ash content of 1.5% to 2.0% is preferred. An engine oil with such properties, Mobilguard 412. or equivalent product may be used to insure improved lubrication.
When replacing engine oil use H.D.
oil that exceeds series 3 standards.
The base stock should be more resistant to thermal degradation and coke formation.
The additive package should provide high detergent dispersant properties with high alkalinity and a high level of antiwear additive such as Zinc dithiophosphate.
Total Base Number (TBN) should be 12 to 15 for use with #2 fuel oil and a sulfated ash content of 1.5% to 2.0% is preferred.
An engine oil with such properties, Mobilguard 412. or equivalent product may be used to insure improved lubrication.
No modifications are recommended for the component.
No modifications are recommended for the component.
Quality inspections performed for this component have been reviewed and are considered satisfactory.                                                                                         i PRIMARY FUNCTION:
Quality inspections performed for this component have been reviewed and are i
Not required GG1468/2                                                                                                 REV. I l
considered satisfactory.
PRIMARY FUNCTION:
Not required GG1468/2 REV. I l


COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 COMPONENT Pistons:   Pin Assembly                         CLASSIFICATION TYPE A l
COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 COMPONENT Pistons:
COMPONENT PART NUMBER 02-340E               TASK DESCRIPTION NO.:     DR-07-02-340E-2 (SNPS PART NUMBER 03-341C)
Pin Assembly CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-340E TASK DESCRIPTION NO.:
DR-07-02-340E-2 (SNPS PART NUMBER 03-341C)
TASK DESCRIPTIONS:
TASK DESCRIPTIONS:
Design review for this component is not required based on the review of appli-cable     industry and site     experience   and the lead engine DR/QR reports (Shoreham/ Comanche Peak). The one site experience reported was the loss of a pin retainer which resulted .n scoring of the cylinder liner by the pin.
Design review for this component is not required based on the review of appli-cable industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).
For increased reliability as stated in the Shoreham DR/QR report, it is recom-mended' that Grand Gulf replace the present spiral           ring retainers (P/N F-108-030) with Waldes snap ring retainers (P/N GE-003-067) at the first fuel outage.
The one site experience reported was the loss of a pin retainer which resulted.n scoring of the cylinder liner by the pin.
For increased reliability as stated in the Shoreham DR/QR report, it is recom-mended' that Grand Gulf replace the present spiral ring retainers (P/N F-108-030) with Waldes snap ring retainers (P/N GE-003-067) at the first fuel outage.
The following inspections identified in the lead engine reports should also be conducted at Grand Gulf:
The following inspections identified in the lead engine reports should also be conducted at Grand Gulf:
* Visually inspect all pins for chrome plate damage.
Visually inspect all pins for chrome plate damage.
* Inspect end plugs and reroll or replace any that are loose.
Inspect end plugs and reroll or replace any that are loose.
l Note:     The above inspections should be performed on a five year basis
l Note:
;                  or whenever the pistons are removed and disassembled to an
The above inspections should be performed on a five year basis or whenever the pistons are removed and disassembled to an extent that such inspections are possible.
;                  extent that such inspections are possible.
l Inspect all new or replacement pins by Liquid Penetrant test or a Magnetic l
j Particle test before installation in the engines.
l l
l l
* Inspect all new or replacement pins by Liquid Penetrant test or a Magnetic j      Particle test before installation in the engines.
In addition to the above recommended inspections, the following Quality inspections should be performed:
l l In addition to the above recommended inspections, the following Quality inspections should be performed:
l Perform a visual inspection of the pin assembly for signs of distress.
l
* Perform a visual inspection of the pin assembly for signs of distress.
1 I
1 I
* Perform a dimensional check of one spare pin.
Perform a dimensional check of one spare pin.
  *    -Perform a visual inspection of rolled end plug installation.
-Perform a visual inspection of rolled end plug installation.
l PRIMARY FUNCTION:                         -
l PRIMARY FUNCTION:
l Not required ATTRIBUTES TO BE VERIFIED:
l Not required ATTRIBUTES TO BE VERIFIED:
Not required GG1466/1                                                                         REV 1 1
Not required GG1466/1 REV 1 1
1
1


        .          .          = . - . - . . -             -        -      .- . -    ._-        - _ _ . .                  ..
=. -. -.. -
t Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1                                       :
t Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 I
I Tappets-and Guides:
Tappets-and Guides:
COMPONENT Intake and Exhaust Tappet Assembly                                             CLASSIFICATION TYPE A     ,
COMPONENT Intake and Exhaust Tappet Assembly CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-345A TASK DESCRIPTION NO: OR-07-02-34SA-2
l COMPONENT PART NUMBER 02-345A                                         TASK DESCRIPTION NO: OR-07-02-34SA-2           l
' (SNPS PART NUMBER 03-345A)
          ' (SNPS PART NUMBER 03-345A)
TASK OESCRIPTIONS:
;          TASK OESCRIPTIONS:
Design review for this component is not required based on the review of applicable industry and site experience and the lead engine DR/QR report (Shoreham/ Comanche Peak).
Design review for this component is not required based on the review of applicable industry and site experience and the lead engine DR/QR report (Shoreham/ Comanche Peak).
1 There are no modification recommendations for this component.
1 There are no modification recommendations for this component.
;          The following routine maintenance is recommended for this component:
The following routine maintenance is recommended for this component:
* Verify that the intake and exhaust tappet rollers -are free to rotate, and                               1 that there is no measurable clearance between the cam rollers and roller pins. .This inspection should take place at each outage using TDI inspection and maintenance record form 345-1-1.
Verify that the intake and exhaust tappet rollers -are free to rotate, and 1
that there is no measurable clearance between the cam rollers and roller pins.
.This inspection should take place at each outage using TDI inspection and maintenance record form 345-1-1.
It is recommended that the following Quality inspection be performed:
It is recommended that the following Quality inspection be performed:
9
9 Verify that the rollers are free to rotate and that no measurable clearance exists-between the pin and roller.
* Verify that the rollers are free to rotate and that no measurable clearance exists-between the pin and roller.
PRIMARY FUNCTION:
PRIMARY FUNCTION:
i           Not required ATTRIBUTES TO BE VERIFIED:
i Not required ATTRIBUTES TO BE VERIFIED:
Not required SPECIFIED STANDARDS:
Not required SPECIFIED STANDARDS:
          -Not required O
-Not required O
GG1581/1                                                                                                   REV. 1 ya   p     ,    ,,..a           .,      . - , . -    ---
GG1581/1 REV. 1 ya p
                                                                +c   .-c #                w ew-     w - - -   *  *"  '
,,..a
+c
.-c w
ew-w - - -
-r


    ..                                      ~           _ _ _                _. _    _                                          . _ .
~
t
t


==REFERENCES:==
==REFERENCES:==
Not required DOCUMENTATION REQUIRED:
Not required DOCUMENTATION REQUIRED:
'-    Not required GROUP CHAIRPERSON                          " - - PROGRAM MANAGER NC_,\(
Not required
V' c
- - PROGRAM MANAGER NC_,\\(
                                                                                                                        +*
GROUP CHAIRPERSON V'
c
+*
O F
O F
O
O
                                                                                                                              . REY.1
. REY.1 CARRY OVER FROM GG1581/2
,                                                                                              CARRY OVER FROM GG1581/2
~
                                                                                                                                ~
l PREVIOUS PAGE
l                                                                                                     PREVIOUS PAGE


Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 1
Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Tappets and Guides:
Tappets and Guides:
COMPONENT Fuel Tappet Assembly CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-345B TASK DESCRIPTION NO: DR-07-02-345B-2
:              COMPONENT Fuel Tappet Assembly                                                                       CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-345B                                                           TASK DESCRIPTION NO: DR-07-02-345B-2
~(SNPS PART NUMBER 03-3458) l TASK DESCRIPTIONS:
!            ~(SNPS PART NUMBER 03-3458)
Design review for this component is not ' required based on the review of appli-cable industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).
TASK DESCRIPTIONS:
l Design review for this component is not ' required based on the review of appli-cable       industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).
There are no modification recommendations for this component.
There are no modification recommendations for this component.
The following routine maintenance is recommend for this component:
The following routine maintenance is recommend for this component:
* Verify that ~ the fuel tappet . rollers are free to rotate and that there is
Verify that ~ the fuel tappet. rollers are free to rotate and that there is no measurable clearance between the cam roller and roller pin.
;                    no measurable clearance between the cam roller and roller pin. This inspection should take place at each outage.
This inspection should take place at each outage.
It is recommended that the following Quality inspection be performed:
It is recommended that the following Quality inspection be performed:
* Verify that the rollers are free to rotate and that no measurable clear-
Verify that the rollers are free to rotate and that no measurable clear-ance exits between the pin and the roller.
!                    ance exits between the pin and the roller.
PRIMARY FUNCTION:
PRIMARY FUNCTION:
Not required ATTRIBUTES TO BE VERIFIED:
Not required ATTRIBUTES TO BE VERIFIED:
Line 1,388: Line 2,120:


==REFERENCES:==
==REFERENCES:==
.Not required GG1579/1 REV. 1-


!'            .Not required GG1579/1                                                                                                                          REV. 1-
COMPONENT QUALITY REVALIDATION CHECKLIST Page B2 of 3 07-02-362A ACCEPTANCE CRITERIA Division I 1.
 
Satisfactory Document Package 2-3.
COMPONENT QUALITY REVALIDATION CHECKLIST   Page B2 of 3 07-02-362A ACCEPTANCE CRITERIA Division I
Review of inspection report by the Design Group Division II Same as Division I REFERENCES Division I 1.
: 1. Satisfactory Document Package 2-3. Review of inspection report by the Design Group Division II                         .
QCI-FSI-F11.1-020 2-3.
Same as Division I REFERENCES Division I
Approved Site NDE Procedures Division II Same as Division I DOCUMENTATION REQUIRED Division I
: 1. QCI-FSI-F11.1-020 2-3. Approved Site NDE Procedures Division II Same as Division I DOCUMENTATION REQUIRED Division I
(
(       1. Document Susmary Sheet 1     2-3. Inspection Report Division II l
1.
Same as Division I GROUP CHAIRPERSON /       ([I4,h                   PROGRAM MANAGER             -
Document Susmary Sheet 1
2-3.
Inspection Report Division II l
Same as Division I GROUP CHAIRPERSON /
([I4,h PROGRAM MANAGER
~
U%~.
U%~.
                                ~
COMPONENT REVIEW 1
COMPONENT REVIEW               ,.
Division I
1 Division I
\\
                                                        \
\\
  \     1. All EDGCTSt. site experience documents were assembled and -' reviewed       .v with satisfactory results.           .                                  1 GG0940/2                                                                     REV. 1 2,\ -
1.
t                                                         a
All EDGCTSt. site experience documents were assembled and -' reviewed
.v with satisfactory results.
1 GG0940/2 REV. 1 2,\\ -
t a


Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Rocker Arms and Pushrods -
Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Rocker Arms and Pushrods -
Intake / Intermediate and Exhaust                                                                 l
Intake / Intermediate and Exhaust COMPONENT Rocker Shaft Assemblies CLASSIFICATION TYPE B
;                COMPONENT Rocker Shaft Assemblies                                         CLASSIFICATION TYPE               B COMPONENT PART NUMBER 02-390A&B               TASK DESCRIPTION NO.                     DR-07-02-390A&B-2           :
COMPONENT PART NUMBER 02-390A&B TASK DESCRIPTION NO.
(SNPS PART NUMBER 03-390A&B) 1: '
DR-07-02-390A&B-2 (SNPS PART NUMBER 03-390A&B) 1:
TASK DESCRIPTIONS Design review for this component is not required based on the design review for the DSRV-16 engine at Comanche Peak, which establishes the acceptability of
TASK DESCRIPTIONS Design review for this component is not required based on the design review for the DSRV-16 engine at Comanche Peak, which establishes the acceptability of
                .the rocker shaft assemblies for their intended design. Base.d on a review of i             site, nuclear and non-nuclear industry experience, there have been no design
.the rocker shaft assemblies for their intended design.
: i.             related . failures associated with this component. The only adverse experience at Grand Gul f,           involving a cracked swivel pad, occurred during engine reassembly is not connected with engine operation.
Base.d on a review of i
site, nuclear and non-nuclear industry experience, there have been no design i.
related. failures associated with this component.
The only adverse experience at Grand Gul f, involving a cracked swivel pad, occurred during engine reassembly is not connected with engine operation.
There are no maintenance or modification recommendations for this component.
There are no maintenance or modification recommendations for this component.
The following Quality inspections are recommended'to be performed:
The following Quality inspections are recommended'to be performed:
* Perform a visual inspection of the intake, exhaust and intermediate rocker arm assembly for signs of distress, linear indications and chipped pieces in the outer lips of the pushrod cups. The lips
Perform a visual inspection of the intake, exhaust and intermediate rocker arm assembly for signs of distress, linear indications and chipped pieces in the outer lips of the pushrod cups.
                                ,should be flush in the assembly.
The lips
* Perform a Material Comparator test on one intake / intermediate rocker                         1 shaft and one exhaust rocker shaft.-
,should be flush in the assembly.
PRIMARY FUNCTION l               Not required i
Perform a Material Comparator test on one intake / intermediate rocker 1
shaft and one exhaust rocker shaft.-
PRIMARY FUNCTION l
Not required i
ATTRIBUTES TO BE VERIFIED Not required O
ATTRIBUTES TO BE VERIFIED Not required O
            . GG1630/1'                 .
. GG1630/1' N.
N.
-.. - -.. -, ~.
      ,  ,      .-    - - - -    .  .,    _        __      - . . - - . . - , ~ . ...-          -
 
: e.   >
e.
COMPONENT QUALITY ~ REVALIDATION CHECKLIST             Page 83 of 3 07-02-390C COMPONENT-REVIEW (continued) s.;                   ^2.         All main and connector pushrods are friction welded as reported by TER#'s-07-003 and 07-006.
COMPONENT QUALITY ~ REVALIDATION CHECKLIST Page 83 of 3 07-02-390C COMPONENT-REVIEW (continued) s.;
: 3.         Liquid- Penetrant tests were performed on all main and connector pushrods.         All , connector pushrods were satisfactory as reported by TER# 07-003. All main pushrods were determined to be satisfactory as reported by TER#'s 07-006 and 07-042.
^2.
Division II                 j
All main and connector pushrods are friction welded as reported by TER#'s-07-003 and 07-006.
                                                            ,      A'
3.
                                  -1.           All EDGCTS; site experience documents were assembled and reviewed with 7
Liquid-Penetrant tests were performed on all main and connector pushrods.
All, connector pushrods were satisfactory as reported by TER# 07-003.
All main pushrods were determined to be satisfactory as reported by TER#'s 07-006 and 07-042.
Division II j
A'
-1.
All EDGCTS; site experience documents were assembled and reviewed with 7
satisfactory results.
satisfactory results.
2-3.           No b inspection             report has     been received       which   fulfills   this requirement.                           -
2-3.
RESULTS AND CONCLUSION Diyision I                     '                                                                          '
No b inspection report has been received which fulfills this requirement.
l    O                              ,      i Thi- Quality Revalidatiion effort with respect to this component, as out-lined above, is complete. The results he"e been forwarded to the Design Review Group for their evaluation and conclusions in support of the final
RESULTS AND CONCLUSION Diyision I O
  ;;                                report.
i Thi-Quality Revalidatiion effort with respect to this component, as out-l lined above, is complete.
The results he"e been forwarded to the Design Review Group for their evaluation and conclusions in support of the final report.
Division II 1:
Division II 1:
[l                                   Same as Division I e
[l Same as Division I s.
s.
e I
I                       GROUP CHAIRPERSON 1/afft, I-                       PROGRAM MANAGER     d           e s
GROUP CHAIRPERSON 1/afft, I-PROGRAM MANAGER d e
(JVy a a<   .
(JVy a s
                              -                        s
a<
                                              ?     g f                                           t ll                                       %      3 w
s
GG0936/3
?
      . l7                                                         N
g f
        ~Y           + ;,             : *i                 _g9          _    _  .          _          . . _  . .      .        -      _
t ll 3
w GG0936/3
. l7 N
~ Y
+ ;,
_g9
: *i


COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Governor Drive:
COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Governor Drive:
COMPONENT Couplings, Pins & Keys                           CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-411B               TASK DESCRIPTION NO.: DR-07-02-4118-2 (SNPS PART NUMBER     03-4028)
COMPONENT Couplings, Pins & Keys CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-411B TASK DESCRIPTION NO.: DR-07-02-4118-2 (SNPS PART NUMBER 03-4028)
TASK DESCRIPTIONS:
TASK DESCRIPTIONS:
Design review for this component is not _ required based on the review of appli-cable industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).
Design review for this component is not _ required based on the review of appli-cable industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).
Maintenance recommendations include:
Maintenance recommendations include:
* Check coupling tightness at refueling outages;
Check coupling tightness at refueling outages; Replace coupling elastomeric insert in Koppers coupling at refueling outages.
* Replace coupling elastomeric insert in Koppers coupling at refueling outages.
Replace coupling elastomeric insert prior to placing the engine in 1
* Replace coupling elastomeric insert prior to placing the engine in                   1 emergency standby service.
emergency standby service.
There are no modification recommendations for this component.
There are no modification recommendations for this component.
It is recommended that the folli,ing Quality inspections be performed:
It is recommended that the folli,ing Quality inspections be performed:
* Perform a visual inspection of the coupling for degradation of material;
Perform a visual inspection of the coupling for degradation of material; Verify the coupling material is neoprene by reviewing existing documentation; Visually inspect the set screw and drive pin in accordance with installa-tion instructions.
* Verify   the coupling     material is   neoprene by reviewing existing documentation;
* Visually inspect the set screw and drive pin in accordance with installa-tion instructions.
l PRIMARY FUNCTION:
l PRIMARY FUNCTION:
Not required l
Not required l
ATTRIBUTES TO BE VERIFIED:
ATTRIBUTES TO BE VERIFIED:
Not required j -_GG1553/1                                                                   REV. 1 1
Not required j
-_GG1553/1 REV. 1 1
l
l


l I
I How To Use This Report Tabs in this report identify the following categories:
How To Use This Report Tabs in this report identify the following categories:
Turbo, Intake, Intercooler & Exhaust Lube 011 Engine Base & Bearing Caps Crankshaft & Bearings-Cylinder Block, Liners & Water Manifold Air Start & Barring Device Connecting rods Pistons Camshaft & Valve Train Idler Gear Assembly & Front Gear Case Flywheel Engine Instrumentation & Wiring Overspeed Trip & Governor Engine Shutdown & Equipment i
Turbo, Intake, Intercooler & Exhaust                                             ,
Jacket Water Cylinder Heads & Valves i
Lube 011 Engine Base & Bearing Caps Crankshaft & Bearings-Cylinder Block, Liners & Water Manifold                                                           "
Fuel Oil Injection Generator Control Panel Assembly Engine & Auxiliary Sub-Base & Foundation Bolts These categories have been defined to allow the reader to' review a complete diesel generator subsystem in a convenient manner.
Air Start & Barring Device Connecting rods Pistons Camshaft & Valve Train Idler Gear Assembly & Front Gear Case Flywheel Engine Instrumentation & Wiring Overspeed Trip & Governor Engine Shutdown & Equipment                                   -
i                Jacket Water i
Cylinder Heads & Valves Fuel Oil Injection Generator                                       ,
Control Panel Assembly Engine & Auxiliary Sub-Base & Foundation Bolts These categories have been defined to allow the reader to' review a complete
;            diesel generator subsystem in a convenient manner.
Within each category tabs ' identify Grand Gulf specific component numbers.
Within each category tabs ' identify Grand Gulf specific component numbers.
l           A given component report can be found by:
l A given component report can be found by:
a)     If the component nubmer is known - use the alpha - numeric index-which identifies the volume number and category in which the-component report is located.                 ~~
a)
l~                 b)     -If only the component name is known - Section 3.2 may be used as a i                         cross-reference to find the volume number where the component report l                         .may be found.
If the component nubmer is known - use the alpha - numeric index-which identifies the volume number and category in which the-component report is located.
~~
l~
b)
-If only the component name is known - Section 3.2 may be used as a i
cross-reference to find the volume number where the component report l
.may be found.
I
I
          -Some reports address more than one component. A-tab-is provided for each component. However,-some components are combined under one report.
-Some reports address more than one component.
A-tab-is provided for each component.
However,-some components are combined under one report.
Slip-sheets are provided where required to reference back to the' appropriate tab.
Slip-sheets are provided where required to reference back to the' appropriate tab.
Some components required more than one report. These are identified by~the abbreviationiLB-Large Bore and SB-Small Bore on the component number tabs.
Some components required more than one report.
l O
These are identified by~the abbreviationiLB-Large Bore and SB-Small Bore on the component number tabs.
l,                                                         .j-Index 1898
O l
l,
.j-Index 1898


INDEX (continued)
INDEX (continued)
Component Component-                                                           Volume Number   Description                             Category                           No.
Component Component-Volume Number Description Category No.
l F-068     Intercooler                             Turbo,. Intake,                       2 Intrc1r. & Ex-haust GG-101A   Generator - Generator                 Generator                             4 GG-1018   Generator:     Shaft and               Generator                             4 Bearings GG-103   Jacket Water Heat                     Jacket Water                         3                 .
l F-068 Intercooler Turbo,. Intake, 2
Exchanger GG-104   Lube Oil Heat Exchanger               Lube Oil                             2 GG-106     Auxiliary Jacket Water Pump           Jacket Water       ,
Intrc1r. & Ex-haust GG-101A Generator - Generator Generator 4
3 GG-107     Jacket Water Standby                   Jacket Water                         3 Heater Pump GG-108     Lube Oil System - Aux.             . Lube Oil                             2 Lube Oil Pump
GG-1018 Generator:
.l GG-109     Before & After Lube                   Lube Oil                             2 011 Pump GG-111     Flex Connections                     -Turbo, Intake,                         2 Intercooler &
Shaft and Generator 4
Exhaust l  GG-112-    Starting Air Tank                      Air Start &                          3 Barring Device GG-116    Intake Air Silencer                    Turbo, Intaka,                        2 i'
Bearings GG-103 Jacket Water Heat Jacket Water 3
Exchanger GG-104 Lube Oil Heat Exchanger Lube Oil 2
GG-106 Auxiliary Jacket Water Pump Jacket Water 3
GG-107 Jacket Water Standby Jacket Water 3
Heater Pump GG-108 Lube Oil System - Aux.
Lube Oil 2
Lube Oil Pump
.l GG-109 Before & After Lube Lube Oil 2
011 Pump GG-111 Flex Connections
-Turbo, Intake, 2
Intercooler &
Intercooler &
Exhaust l   GG-118     Intake Air Filter                     Turbo, Intake,                         2 l-                                                   Intercooler &
Exhaust l
Exhaust GG-119     Generator - Generator _               Generator                             4 Control               -
GG-112-Starting Air Tank Air Start &
GG-121     011 Prelube' Filter                   Lube Oil                             2 MP022/023 Turbocharger                         Turbo,-Intake,                       _2 Intrcir. & Exhaust REV 1                     . ,
3 Barring Device GG-116 Intake Air Silencer Turbo, Intaka, 2
  .Index 1898
i Intercooler &
    ,. ,, ,  . :.8 ::               .
Exhaust l
                                                    ...- -. ..      .~&-
GG-118 Intake Air Filter Turbo, Intake, 2
l-Intercooler &
Exhaust GG-119 Generator - Generator _
Generator 4
Control GG-121 011 Prelube' Filter Lube Oil 2
MP022/023 Turbocharger Turbo,-Intake,
_2 Intrcir. & Exhaust REV 1
.Index 1898
. :.8 ::
.~&-


l INDEX (continued)
INDEX (continued)
Component         Component                                                                                     Volume Number           Description                                             Category                                   No.
Component Component Volume Number Description Category No.
2
2 SE-025 Lube Oil! Full Pressure Lube Oil 2
.          SE-025           Lube Oil! Full Pressure                                 Lube Oil                                       2 Strainer 00-420           Lube Oil Pressure Regulating                           Lube Oil                                       2 Valve 00-621A           Fuel Oil Drip Tank Assembly                           Fuel Oil In-                                   4 jection l         00-700A'         Jacket Water Stand Pipe:                               Jacket Water                                   3 Pipe, Fittings, Gaskets 00-7008           Jacket Water Stand Pipe:                               Jacket Water                                   3 Valves 00-700C           Jacket Water. Stand Pipe                               Jacket Water                                   3 Supports 2
Strainer 00-420 Lube Oil Pressure Regulating Lube Oil 2
00-700E           Jacket Water Stand Pipe:                               Jacket Water                                   3 Switches                   +                     .
Valve 00-621A Fuel Oil Drip Tank Assembly Fuel Oil In-4 jection l
O     00-700F'         Jacket Water Stand Pipe:
00-700A' Jacket Water Stand Pipe:
Jacket Water 3
Pipe, Fittings, Gaskets 00-7008 Jacket Water Stand Pipe:
Jacket Water 3
Valves 00-700C Jacket Water. Stand Pipe Jacket Water 3
Supports 00-700E Jacket Water Stand Pipe:
Jacket Water 3
2 Switches
+
O 00-700F' Jacket Water Stand Pipe:
Jacket Water 3
Misc. Bolting Mat.
Misc. Bolting Mat.
Jacket Water 3
02-CFR Turbocharger Thrust Bearing Turbo, Intake, 2
02-CFR           Turbocharger Thrust Bearing                             Turbo, Intake,                                 2 Lubricant System                                       Intrcir. & Ex-haust 02-305A         Base and Bearing Caps: Base                             Engine Base                                   2 Assembly                                               & Bearing Caps 02-305C           Base and Bearing Caps:                                 Engine Base                                   2 Main Bearing Studs & Nuts                               & Bearing Caps 02-305D           Base and Bearing Caps:                               ' Engine Base Main Bearing Caps                                       & Bearing Caps                                 2 1
Lubricant System Intrcir. & Ex-haust 02-305A Base and Bearing Caps: Base Engine Base 2
02-307A-         Lube Oil Fittings:                                     Lube Oil                                       2 Internal Headers 02-307B           Lube Oil Fittings:                                     Lube Oil                                       2
Assembly
                            . Internal - Tubing & Fittings
& Bearing Caps 02-305C Base and Bearing Caps:
; -.      02-307D         _ Lube 011 Fittings Internal:                           Lube Oil.                                     2 Supports E
Engine Base 2
O iii                                                             .
Main Bearing Studs & Nuts
REV 1 Index 1898                                                                                 ' Entire Page Revised
& Bearing Caps 02-305D Base and Bearing Caps:
:. u_._  .       - -
' Engine Base Main Bearing Caps
& Bearing Caps 2
1 02-307A-Lube Oil Fittings:
Lube Oil 2
Internal Headers 02-307B Lube Oil Fittings:
Lube Oil 2
. Internal - Tubing & Fittings 02-307D
_ Lube 011 Fittings Internal:
Lube Oil.
2 Supports O
E iii REV 1 Index 1898
' Entire Page Revised u.


INDEX (continued)
INDEX (continued)
Component         Component-                                                                                 Volume Number           Description-                           Category                                                     No.
Component Component-Volume Number Description-Category No.
02-310A           Crankshaft                             Crankshaft &                                                 2     !
02-310A Crankshaft Crankshaft &
Bearings 02-310B           Crankshaft and Bearings:               Crankshaft &                                                 2 Bearing Shells                         Bearing 02-310C.         Crankcase and Bearings:                 Crankshaft &                                                 2 Thrust Bearing Ring                     Bearing
2 Bearings 02-310B Crankshaft and Bearings:
;    02-311A           Crankcase: Crankcase Assy               Crankshaft &                                                 2 Bearing 02-3110           Crankcase: Crankcase                   Crankshaft &                                                 2 Mounting Hardware                       Bearings i
Crankshaft &
315A           Cylinder Block Liners &                 Cyl. Block &                                                 2 Water Manifold: Cylinder
2 Bearing Shells Bearing 02-310C.
                                                                        ~
Crankcase and Bearings:
Liners & Water
Crankshaft &
,                      Block                                   Manifold 02-315C           Cylinder Block Liner &                 Cyl. Block &                                                 2 Water Manifold -                       Liners &
2 Thrust Bearing Ring Bearing 02-311A Crankcase: Crankcase Assy Crankshaft &
O                   Cylinder Liner                         Water Manifold 02-3150           Cylinder Block Liners &.               Cy1. Block &                                                 2     :
2 Bearing 02-3110 Crankcase: Crankcase Crankshaft &
Jacket Water Manifold                   Liners &
2 Mounting Hardware Bearings i 315A Cylinder Block Liners &
                        & Piping                               Water Manifold 02-315E           Cylinder Block - Liners                 Cyl. Block &                                                 2 and Water Manifold: Studs               Liners &
Cyl. Block &
Water Manifold 02-315F-         Cylinder Block Liners                   Cyl. Block &                                                 2
2 Water Manifold: Cylinder Liners & Water
                        & Water Manifold: Nuts                 Liner & Water Manifold l
~
02-315G           Cylinder Block Liners &                 Cyl. Block'&                                                 2 Water Manifold Seals &                 Liners &
Block Manifold 02-315C Cylinder Block Liner &
.                      Gaskets                                 Water Manifold l     02-316A         ' Jacket Water Inlet Manifold:           Jacket Water                                                 3 Manifold Assembly W/ Hardware and Coupling'and Gaskets 02-316B           Jacket Water Inlet Manifold:           Jacket Water                                                 3 Coupling and Gaskets O 02-317A           Water Discharge Manifold:
Cyl. Block &
Jacket Water Discharge Jacket Water.                                                3 Manifold, Coupling and Seals iv                                                         REV 1 Index 1898                                                                       Entire Page Revised I,     _ .    - - _ _
2 Water Manifold -
Liners &
O Cylinder Liner Water Manifold 02-3150 Cylinder Block Liners &.
Cy1. Block &
2 Jacket Water Manifold Liners &
& Piping Water Manifold 02-315E Cylinder Block - Liners Cyl. Block &
2 and Water Manifold: Studs Liners &
Water Manifold 02-315F-Cylinder Block Liners Cyl. Block &
2
& Water Manifold: Nuts Liner & Water Manifold l
02-315G Cylinder Block Liners &
Cyl. Block'&
2 Water Manifold Seals &
Liners &
Gaskets Water Manifold l
02-316A
' Jacket Water Inlet Manifold:
Jacket Water 3
Manifold Assembly W/ Hardware and Coupling'and Gaskets 02-316B Jacket Water Inlet Manifold:
Jacket Water 3
Coupling and Gaskets O
02-317A Water Discharge Manifold:
Jacket Water.
3 Jacket Water Discharge Manifold, Coupling and Seals iv REV 1 Index 1898 Entire Page Revised I,


Component Component Volume
~
~
Component    Component                                                                                        Volume Number       Description                                       Category                                         No.
Number Description Category No.
02-317B     Water Dicharge Manifold:                           Jacket Water                                       3 o                    Coupling & Seals 02-317C. Water Discharge Manifold:                         Jacket Water                                       3
02-317B Water Dicharge Manifold:
                    . Supports 02-330A     Flywheel                                           Flywheel                                           3 02-330B     Flywheel - Bolting                                 Flywheel                                           3 02-335B     Front Gear Case-Gasket and                         Idler Gear'As-                                   3 Bolting                                         .sembly & Front Gear Case
Jacket Water 3
      .02-340A       Connecting Rod:             Connecting             Connecting                                       3
Coupling & Seals o
                    . Rods & Bushings                                   Rods 02-3408     Connecting Rod Bearing                             Connecting                                       3 Shells                                             Rods 02-340C     Pistons                                       .. Pistons-                                         3 02-3400     Pistons: Rings                                     Pistons                                           3 02-340E     Piston: Pin Assembly                               Pistons                                           3 02-345A     fappets and Guides:                               Camshaft &                                       3 Intake Exhaust                                   Valve Train Ttppet Assembly 02-3458     Tappets and Guides: Fuel                           Camshaft &-                                       3
02-317C.
,                    Tappet Assembly                                   Valve Train 02-345C     Tappets and Guides: Fuel                           Camshaft &                                         3 Pump Base Assembly                                 Valve Train 02-350A     Camshaft:     Camshaft Assembly                   Camshaft &                                         3
Water Discharge Manifold:
!                                                                      Valve Train 350B. Camshaft: Bearings                               . Camshaft &.                                       3 Valve Train.
Jacket Water 3
i 02-350C     Camshaft: Supports, Bolting                       Camshaft &                                         3 ar.d Gears                                         Valve Train
. Supports 02-330A Flywheel Flywheel 3
;.      02-355A     Idler Gear Assemble: Crank                         Idler Gear As-                                   3 To Pump Gear                                       sembly & Front Gear Case v
02-330B Flywheel - Bolting Flywheel 3
l Index 1898-           ,
02-335B Front Gear Case-Gasket and Idler Gear'As-3 Bolting
REV 1 i
.sembly & Front Gear Case
Entire.Page Revised E_______________.        . _. __  _ - . . _ __ . . _ _ . _                . . _ . t c_      ..    . . . _ _ - , .        . . .,_
.02-340A Connecting Rod:
Connecting Connecting 3
. Rods & Bushings Rods 02-3408 Connecting Rod Bearing Connecting 3
Shells Rods 02-340C Pistons Pistons-3 02-3400 Pistons: Rings Pistons 3
02-340E Piston: Pin Assembly Pistons 3
02-345A fappets and Guides:
Camshaft &
3 Intake Exhaust Valve Train Ttppet Assembly 02-3458 Tappets and Guides: Fuel Camshaft &-
3 Tappet Assembly Valve Train 02-345C Tappets and Guides: Fuel Camshaft &
3 Pump Base Assembly Valve Train 02-350A Camshaft:
Camshaft Assembly Camshaft &
3 Valve Train 350B.
Camshaft: Bearings
. Camshaft &.
3 Valve Train.
i 02-350C Camshaft: Supports, Bolting Camshaft &
3 ar.d Gears Valve Train 02-355A Idler Gear Assemble: Crank Idler Gear As-3 To Pump Gear sembly & Front Gear Case v
l Index 1898-REV 1 i
Entire.Page Revised E
. t c


l l
l l
l l
i INDEX (continued)
i INDEX (continued)                                                         l Component   Component                                                                         Volume Number     Description                             Category                                   No.
Component Component Volume Number Description Category No. 3558 Idler Gear Assembly Idler Gear As-3 sembly & Front Gear Case 02-359 Air Start Valves Air Start &
3558     Idler Gear Assembly                     Idler Gear As-                               3 sembly & Front Gear Case 02-359     Air Start Valves                       Air Start &                                   3 Barring Device 02-360A     Cylinder Heads                         Cylinder Heads                               3
3 Barring Device 02-360A Cylinder Heads Cylinder Heads 3
                                                            & Valves 02-360B     Cylinder Head Valves:                   Cylinder Heads                               3 Intake & Exhaust Valves                 & Valves 360C. Cylinder Head and Valves:               Cylinder Heads                               3 Bolting and Gaskets                     & Valves           ,
& Valves 02-360B Cylinder Head Valves:
02-3600     Cylinder Head Valves -                 Cylinder Heads                               3 Springs & Retainers                     & Valves 02-362A     Cylinder Head Covers:           .      Camshaft &                                   3 Subcover Assembly                       Valve Train 02-365A     Fuel Injection Equipment               Fuel Oil In-                                 4
Cylinder Heads 3
                    - Fuel Injection Pump                   jection l
Intake & Exhaust Valves
1 02-365B     Fuel Injection Equipment               Fuel Oil In-                                 4         !
& Valves 360C.
Fuel Injection Tips                   . jection                                                 '
Cylinder Head and Valves:
02-365C     Fuel Oil Injection Tube                 Fuel Oil In-                                 4 Assembly                                 jection
Cylinder Heads 3
!        02-3650   -Fuel Injection Equipment:               Fuel Oil In-                                 4
Bolting and Gaskets
)                   Supports                                 jection 02-371A     Fuel Pump Linkage: Fuel                 Fuel Oil In-                                 4 I.                 Pump Control Shaft                       jection 02-371B     Fuel Pump Linkage: Linkage               Fuel Oil In-                                 4 Assembly and Bearing                   jection l
& Valves 02-3600 Cylinder Head Valves -
02-375     Intake Manifold Piping                 Turbo, Intake,                                 2 Intrc1r. & Ex-                                         )
Cylinder Heads 3
haust 02-380A     Exhaust Manifold'-                     Turbo,-Intake,                                 2
Springs & Retainers
                  . Manifold                               Intrcir.'& Ex-haust-vi Index 1898                                                               .
& Valves 02-362A Cylinder Head Covers:
REV 1             i Entire Page Revised                         j l
Camshaft &
  . -    ._ . . _        _.            _ . . _  __    ____...___.__.e             .- _ _. ____ ______        ___.
3 Subcover Assembly Valve Train 02-365A Fuel Injection Equipment Fuel Oil In-4
- Fuel Injection Pump jection l
1 02-365B Fuel Injection Equipment Fuel Oil In-4 Fuel Injection Tips
. jection 02-365C Fuel Oil Injection Tube Fuel Oil In-4 Assembly jection 02-3650
-Fuel Injection Equipment:
Fuel Oil In-4
)
Supports jection 02-371A Fuel Pump Linkage: Fuel Fuel Oil In-4 I.
Pump Control Shaft jection 02-371B Fuel Pump Linkage: Linkage Fuel Oil In-4 Assembly and Bearing jection 02-375 Intake Manifold Piping Turbo, Intake, 2
l Intrc1r. & Ex-
)
haust 02-380A Exhaust Manifold'-
Turbo,-Intake, 2
. Manifold Intrcir.'& Ex-haust-vi Index 1898 REV 1 i
Entire Page Revised j
l
.e


INDEX (continued)
INDEX (continued)
Component   Component.                                                                                   Volume Number       Description                                           Category                               No.
Component Component.
02-380B       Exhaust Manifold: Gaskets                             Turbo, Intake,                             2 and Bolting                                           Intrcir. & Ex-haust 02-3858       Cylinder Block                                       Cyl. Block &                               2 Covers'                                               Liners & Water Gaskets and Bolting                                   Manifold 02-386B       Crankcase:   Crankcase                               Cranshaft &.                             2 Gaskets and Mounting                                   Bearings Hardware 02-390A       Rocker Arms & Pushrods Intake & Intermediate and                           Camshaft &                                 3 Exhaust Rocker Shaft Assembly                       Valve Train
Volume Number Description Category No.
:              02-3908     Rocker Arms and Pushrods:                             Camshaft &                                 3 Exhaust Rocker Shaft                                 Valve Train Assembly
02-380B Exhaust Manifold: Gaskets Turbo, Intake, 2
                                                                          ~
and Bolting Intrcir. & Ex-haust 02-3858 Cylinder Block Cyl. Block &
l 02-390C     Rocker Arms & Pushrods-                               Camshaft &
2 Covers' Liners & Water Gaskets and Bolting Manifold 02-386B Crankcase:
O                   Intake & Exhaust -Pushrods Connectors Valve Train-3 02-3900     Rocker Arms and Pushrods;                             Camshaft &                                 3 Pushrods Connector.                                 Valve Train l             02-390E     Rocker Arms and Pushrods:                           Camshaft &                                 3 Bushings                                             Valve Train 02-390F     Rocker Arms and Pushrods:                           Camshaft &                                 3 Lifters   '
Crankcase Cranshaft &.
Valve Train 02-390G     Rocker Arms and Pushrods:                           Camshaft &-                                 3 Misc.' Bolts & Drive Studs                           Valve Train 02-410A       Overspeed Trip: Governor Overspeed Trip                             3
2 Gaskets and Mounting Bearings Hardware 02-390A Rocker Arms & Pushrods Intake & Intermediate and Camshaft &
                                                                                & Governor 02-410B     Overspeed Trip: Governor                             Overspeed Trip                               3 and Accessory Drive' -                             & Governor 02-410C     Overspeed Trip: Couplings                           Overspeed Trip                               3.
3 Exhaust Rocker Shaft Assembly Valve Train 02-3908 Rocker Arms and Pushrods:
I (Flexible & Spider)-                               & Governor
Camshaft &
,            02-4100     Overspeed Trip                                       Overspeed Trip                             3 Vent Valves                                         & Governor vii Index 1898                                                                                           REV 1 Entire Page Revised-
3 Exhaust Rocker Shaft Valve Train Assembly l
~
02-390C Rocker Arms & Pushrods-Camshaft &
3 O
Intake & Exhaust -Pushrods Valve Train-Connectors 02-3900 Rocker Arms and Pushrods; Camshaft &
3 Pushrods Connector.
Valve Train l
02-390E Rocker Arms and Pushrods:
Camshaft &
3 Bushings Valve Train 02-390F Rocker Arms and Pushrods:
Camshaft &
3 Lifters Valve Train 02-390G Rocker Arms and Pushrods:
Camshaft &-
3 Misc.' Bolts & Drive Studs Valve Train 02-410A Overspeed Trip: Governor Overspeed Trip 3
& Governor 02-410B Overspeed Trip: Governor Overspeed Trip 3
and Accessory Drive' -
& Governor 02-410C Overspeed Trip: Couplings Overspeed Trip 3.
(Flexible & Spider)-
& Governor I
02-4100 Overspeed Trip Overspeed Trip 3
Vent Valves
& Governor vii Index 1898 REV 1 Entire Page Revised-


INDEX (continued)
INDEX (continued)
O       Component       Component                                                         Volume
O Component Component Volume j.
: j.           Number         Description                         Category                       No.
Number Description Category No.
02-411A         Governor Drive: Governor             Overspeed Trip                   3 and Tachometer Drive Gear           & Governor
02-411A Governor Drive: Governor Overspeed Trip 3
                            & Shaft 4
and Tachometer Drive Gear
02-411E~   - Governor Drive: Couplings,             Overspeed Trip                   3 Pins & Keys                         & Governor 02-413A       Governor. Linkage                     Overspeed Trip                   3
& Governor
                                                                  & Governor 02-413B         Fuel Pump Linkage-                   Fuel Oil In-                     4 Automatic Shutdown                   jection
& Shaft 02-411E~
:02-415A       -Governor Assembly: Woodward             Overspeed Trip                   3 Governor                             & Governor.
- Governor Drive: Couplings, Overspeed Trip 3
;          02-415B         Governor Assembly-Booster             Overspeed Trip                   3 Servosoter                           & Governor L           02-415C-       Governor Assembly-Heat           . Overspeed Trip                 3
4 Pins & Keys
,                          Exchanger-                           & Governor 02-420         Lube Oil Pump Lube Oil                       2 02-425A         Jacket Water Pump                   Jacket Water                     3 02-437         Turbo Water Piping:                   Jacket' Water                   3 Pipe & Fittings 02-441A         Starting Air Manifold               Air Start &                     3
& Governor 02-413A Governor. Linkage Overspeed Trip 3
            .              Piping                               Barring Device 02-441B         Starting Air Manifold                 Air Start &                     3 1                         Valves, Strainer,' Filters           .Barring Device l         02-441C         Starting Air Manifold                 Air Start &                     3 l       ,
& Governor 02-413B Fuel Pump Linkage-Fuel Oil In-4 Automatic Shutdown jection
Supports                             Barring Device t
:02-415A
          ~02-442A         Starting Air Distributor             Air Start &                     3
-Governor Assembly: Woodward Overspeed Trip 3
,                          Director Assembly._                   Barring Device 02-442B         Starting Air Distributor:             Air Start &                     3 Tubing, Fittings, Gaskets             Barring Device 02-445         Fuel Oil Booster Pump                 Fuel Oil In-                     4 Engine Driven                         jection O
Governor
r viii Index 1898                                                                       REV 1 Entire Page Revised
& Governor.
02-415B Governor Assembly-Booster Overspeed Trip 3
Servosoter
& Governor L
02-415C-Governor Assembly-Heat Overspeed Trip 3
Exchanger-
& Governor 02-420 Lube Oil Pump Lube Oil 2
02-425A Jacket Water Pump Jacket Water 3
02-437 Turbo Water Piping:
Jacket' Water 3
Pipe & Fittings 02-441A Starting Air Manifold Air Start &
3 Piping Barring Device 02-441B Starting Air Manifold Air Start &
3 1
Valves, Strainer,' Filters
.Barring Device l
02-441C Starting Air Manifold Air Start &
3 l
Supports Barring Device t
~02-442A Starting Air Distributor Air Start &
3
)
Director Assembly._
Barring Device 02-442B Starting Air Distributor:
Air Start &
3 Tubing, Fittings, Gaskets Barring Device 02-445 Fuel Oil Booster Pump Fuel Oil In-4 Engine Driven jection O
r viii Index 1898 REV 1 Entire Page Revised


,                Component Component                                                                         Volume Number   Description                                   Category                             No.
Component Component Volume Number Description Category No.
02-450A   Fuel 011 Header: Piping &                     Fuel Oil In-                           4         .
02-450A Fuel 011 Header: Piping &
Tubing-                                       jection 4
Fuel Oil In-4 Tubing-jection 4
,                02-4508   Fuel' Oil Header:                             Fuel Oil In-                           4 Fuel Oil Tubing Supports                     jection 02-455A   Fuel Oil Filters &                           Fuel Oil In-                           4 Strainers: Filters                           jection                               -
02-4508 Fuel' Oil Header:
02-4558   Fuel Oil Filters and                         Fuel Oil In-                           4 Strainers:       Strainers                   jection 02-455C-   Fuel Oil Filters &                           Fuel Oil In-                           4 Strainer: Mounting Hardware                   jection
Fuel Oil In-4 Fuel Oil Tubing Supports jection 02-455A Fuel Oil Filters &
!              02-465A   Lube'011 Lines External:                     Lube Oil                               2 Tubing, Fittings, Couplings
Fuel Oil In-4 Strainers: Filters jection 02-4558 Fuel Oil Filters and Fuel Oil In-4 Strainers:
}               02-4658   Lube Oil Lines         ' External             Lube Oil                               2 Supports                                   .
Strainers jection 02-455C-Fuel Oil Filters &
O            02-465C   Lube Oil Lines External:
Fuel Oil In-4 Strainer: Mounting Hardware jection 02-465A Lube'011 Lines External:
Valves Lube Oil                               2 02-467A   Turbocharger Lube Oil                         Lube Oil                               2 Fittings - Pipe, Tubing, Fittings & Flexible Coupling 02-467B   Turbocharger: Lube Oil                       Lube Oil                               2 Fittings - Supports 02-475A   Turbocharger: Bracket                         Turbo, Intake,                         2 Intrcir. & Ex-l                                                                       haust 02-4758   Turbocharger Bracket-                         Turbo, Intake,                         2 Air Butterfly Valve                           Intrcir.'& Ex-haust i               02-475C   Turbocharger: Bracket -                       Turbo, Intake,                         2
Lube Oil 2
;                          Bolting & Gaskets                             Intrc1r. & Ex-haust 02-500A   Control Panel Assembly:                       Control Panel                         4 Cabinet / System                             Assembly i
Tubing, Fittings, Couplings
02-500F=   Control Panel-Assembly:                       Control Panel                         4 Accumulator ~                                 Assembly I
}
ix Index 1898                                                                             REV 1 Entire Page Revised
02-4658 Lube Oil Lines
' External Lube Oil 2
Supports O
02-465C Lube Oil Lines External:
Lube Oil 2
Valves 02-467A Turbocharger Lube Oil Lube Oil 2
Fittings - Pipe, Tubing, Fittings & Flexible Coupling 02-467B Turbocharger: Lube Oil Lube Oil 2
Fittings - Supports 02-475A Turbocharger: Bracket Turbo, Intake, 2
Intrcir. & Ex-l haust 02-4758 Turbocharger Bracket-Turbo, Intake, 2
Air Butterfly Valve Intrcir.'& Ex-haust i
02-475C Turbocharger: Bracket -
Turbo, Intake, 2
Bolting & Gaskets Intrc1r. & Ex-haust 02-500A Control Panel Assembly:
Control Panel 4
Cabinet / System Assembly i
02-500F=
Control Panel-Assembly:
Control Panel 4
Accumulator ~
Assembly I
ix Index 1898 REV 1 Entire Page Revised


INDEX (continued)
INDEX (continued)
Component   Component                                                                 -Volume       l Number       Description                               Category                           No.
Component Component
02-500G     Control Panel                             Control Panel                       4 Valves                                     Assembly 02-500H     Control Panel Assembly:                   Control Panel                       4 Pressure Switch                           Assembly 02-500J~     Control Panel Assembly:                   Control Panel                       4 Relays                                     Assembly 02-500K     Control Panel Assembly:                   Control Panel                       4 Solenoid Valves                           Assembly 02-500M     Control Panel Assembly:                   Control Panel                       4 Piping, Tubing, Fittings                   Assembly 02-500N     Control Panel Assembly:                   Control Panel                       4 4
-Volume Number Description Category No.
Terminal Boards / Switches,               Assembly Wiring 02-515       Thermostatic Valve                     .. Jacket Water                       3
02-500G Control Panel Control Panel 4
  , 0         02-525B     Barring Device - Pneumatic Regulator Valve Shut Off Valve Air Start &
Valves Assembly 02-500H Control Panel Assembly:
                                                                      .Barring Device 3
Control Panel 4
.            02-540A     Lube 011' Sump                             Lube Oil                           2 with Strainer Assembly and Mounting Hardward
Pressure Switch Assembly 02-500J~
;.            02-540B     Lube Oil Sump Tank: Misc.                 Lube Oil                           2 i
Control Panel Assembly:
Fittings, Gaskets, Pipe
Control Panel 4
                            & Bolting Material, Valves 02-540C     Lube'011 Sump Tank:                       Lube Oil                           2 Mounting Hardware 02-550       Foundation Bolts                           Engine & Aux.                       4 Sub Base &
Relays Assembly 02-500K Control Panel Assembly:
Foundation Bolts 02-630A     Pyrometer Conduit Assembly:               Engine Instru-                     3 L
Control Panel 4
Conduit                                   mentation &
Solenoid Valves Assembly 02-500M Control Panel Assembly:
Wiring 02-630B     Pyrometer Conduit Assembly:               Engine Instru-                     -3 Conduit Fittings                           mentation &
Control Panel 4
Piping, Tubing, Fittings Assembly 02-500N Control Panel Assembly:
Control Panel 4
Terminal Boards / Switches, Assembly 4
Wiring 02-515 Thermostatic Valve Jacket Water 3
0 02-525B Barring Device - Pneumatic Air Start &
3 Regulator Valve Shut
.Barring Device Off Valve 02-540A Lube 011' Sump Lube Oil 2
with Strainer Assembly and Mounting Hardward 02-540B Lube Oil Sump Tank: Misc.
Lube Oil 2
i Fittings, Gaskets, Pipe
& Bolting Material, Valves 02-540C Lube'011 Sump Tank:
Lube Oil 2
Mounting Hardware 02-550 Foundation Bolts Engine & Aux.
4 Sub Base &
Foundation Bolts 02-630A Pyrometer Conduit Assembly:
Engine Instru-3 L
Conduit mentation &
Wiring 02-630B Pyrometer Conduit Assembly:
Engine Instru-
-3 Conduit Fittings mentation &
Wiring X
Wiring X
Index 1898                                                                           REV 1 Entire Page Revised 1                                     , _ . _ _
Index 1898 REV 1 Entire Page Revised 1


INDEX (continued)
INDEX (continued)
Component Component                                                         Volume Number     Description                           Category                     No.
Component Component Volume Number Description Category No.
02-630C   Pyrometer Conduit Assembly:           Engine Instru-                 3 Support                               mentation & Wiring                   ;
02-630C Pyrometer Conduit Assembly:
02-6300   Pyrometer Conduit Assembly:           Engine Instu-                   3 Thermocouple                           mentation &
Engine Instru-3 Support mentation & Wiring 02-6300 Pyrometer Conduit Assembly:
Wiring 02-688A   Engine & Aux Module Wiring             Engine Instru-                 3 Material- Conduit & Fittings;         mentation &
Engine Instu-3 Thermocouple mentation &
Pyrometer Conduit Assembly-           Wiring Conduit, Fitting, Supports 02-6888   Engine & Aux. Module Wiring           Engine Instru-                 3 Material: Wiring &                   mentation &
Wiring 02-688A Engine & Aux Module Wiring Engine Instru-3 Material-Conduit & Fittings; mentation &
Terminations                         Wiring 02-688C     Engine & Aux. Module Wiring         Fngine Instu-                   3 t
Pyrometer Conduit Assembly-Wiring Conduit, Fitting, Supports 02-6888 Engine & Aux. Module Wiring Engine Instru-3 Material: Wiring &
Material: Boxes & Terminals         mentation &
mentation &
Wiring 02-690     Engine Alarm Sensors                 Engine Instru-                   3 4
Terminations Wiring 02-688C Engine & Aux. Module Wiring Fngine Instu-3 Material: Boxes & Terminals mentation &
O                Temperature & Level Switches Off Engine mentation &
t Wiring 02-690 Engine Alarm Sensors Engine Instru-3 O
Wiring Safety Alarm Sensors-Wiring 02-691     Off Engine Alarm Sensors             Engine Instru-                   3 mentation &
Temperature & Level mentation &
Wiring 02-695A   Engine Shut Down Equipment:         Engine Shut-                     3 Tubing & Fittings                   down & Equip-
Switches Off Engine Wiring 4
[     .
Safety Alarm Sensors-Wiring 02-691 Off Engine Alarm Sensors Engine Instru-3 mentation &
ment 02-695B   Engine Shut Down Equipment:         Engine Shut-                     3 Valves, Regulator, Orifices         down & Equip-ment 02-695C     Engine Shutdown: Trip               Engine Shut-                     3 Switches                             down & Equip-ment 1
Wiring 02-695A Engine Shut Down Equipment:
02-717A     Aux Sub Base & Oil &                 Engine Aux.                     4 Water Piping: Aux Sub Base           Sub-Base &
Engine Shut-3 Tubing & Fittings down & Equip-
[
ment 02-695B Engine Shut Down Equipment:
Engine Shut-3 Valves, Regulator, Orifices down & Equip-ment 02-695C Engine Shutdown: Trip Engine Shut-3 Switches down & Equip-ment 1
02-717A Aux Sub Base & Oil &
Engine Aux.
4 Water Piping: Aux Sub Base Sub-Base &
Foundation Bolts -
Foundation Bolts -
02-717B     Aux Sub Base & 011 &                 Jacket Water Ox                Water Piping: Jacket Water 3
Ox 02-717B Aux Sub Base & 011 &
Valves                                                                     .
Jacket Water 3
xi Index 1898                                                                 REV 1 Entire Page Revised
Water Piping: Jacket Water Valves xi Index 1898 REV 1 Entire Page Revised


INDEX (continued)
INDEX (continued)
Component       Component                                                                               Volume Number           Description                                       Category                               No.
Component Component Volume Number Description Category No.
02-717C         Aux Sub Base & 011 and Water                     Jacket Water                             3 Piping Jacket Water-Pipe,                                                                                   '
02-717C Aux Sub Base & 011 and Water Jacket Water 3
Couplings, Fittings,-Orifices, Y Strainers 02-717D         Aux Sub Base & 011 & Water                       Jacket Water                             3 i                           Piping: Jc xet Water Gaskets
Piping Jacket Water-Pipe, Couplings, Fittings,-Orifices, Y Strainers 02-717D Aux Sub Base & 011 & Water Jacket Water 3
                          & Bolting 02-717E         Aux Sub Base & 011 & Water                         Jacket Water                             3 l                           Piping - Jacket Water:
i Piping: Jc xet Water Gaskets
& Bolting 02-717E Aux Sub Base & 011 & Water Jacket Water 3
l Piping - Jacket Water:
Supports t
Supports t
02-717F Aux Sub Base & 011 & Water Lube Oil 2
~
~
02-717F        Aux Sub Base & 011 & Water                        Lube Oil                                2 Piping Lube Oil Pipe Tube and Fittings
Piping Lube Oil Pipe Tube and Fittings 02-717G Aux Sub Base & 011 & Water Lube Oil 2
;          02-717G         Aux Sub Base & 011 & Water                         Lube Oil                                 2 j                         Piping: Lube Oil-Valves 02-717H         Aux Sub Base & 011 & Water                       Lube Oil                                 2 0                       Piping: Lube Oil Gaskets and Bolting i
j Piping: Lube Oil-Valves 02-717H Aux Sub Base & 011 & Water Lube Oil 2
02-717I         Aux Sub Base Lube & 011                           Lube Oil                                 2 i
0 Piping: Lube Oil Gaskets and Bolting i
                          & Water. Piping - Lube l                         011: Supports & Mounting l                         Hardware 02-717J         Aux Sub Base & 011 & Water                       Fuel Oil In-'                             4
02-717I Aux Sub Base Lube & 011 Lube Oil 2
!.                        Piping: Fuel Oil-Piping                           jection                                                     .-
i
l                          and Fittings i         02-717K         Aux Sub Base & 011 & Water                       Fuel Oil In-                             4 l                         Piping: Fuel Oil-Valves                         .jection
& Water. Piping - Lube l
* I        02-717L         Aux Sub Base & 011 & Water                         Fuel Oil In-'                             4 i,                       . Piping: Fuel Oil-Gaskets.                         jection                                                     '
011: Supports & Mounting l
I
Hardware 02-717J Aux Sub Base & 011 & Water Fuel Oil In-'
                          & Bolting _
4 Piping: Fuel Oil-Piping jection l
I 02-717M         Aux Sub Base & 011'& Water                         Fuel Oil In-                             4 Piping: Fuel Oil-Supports                         jection 02-717N         Intercooler Piping - Pipe                         Turbo, Intake                             2 Intercooler &
and Fittings i
Exhaust xii                                                             -
02-717K Aux Sub Base & 011 & Water Fuel Oil In-4 l
Index 1898                                                     >
Piping: Fuel Oil-Valves
REV 1 Entire Page Revised
.jection I
_ . . ~ .           -              _.._..__ ___.____                                      ..._.2._____._.
02-717L Aux Sub Base & 011 & Water Fuel Oil In-'
4 i,
. Piping: Fuel Oil-Gaskets.
jection I
& Bolting _
I 02-717M Aux Sub Base & 011'& Water Fuel Oil In-4 Piping: Fuel Oil-Supports jection 02-717N Intercooler Piping - Pipe Turbo, Intake 2
Intercooler &
Exhaust xii Index 1898 REV 1 Entire Page Revised
.. ~.
....2.


INDEX (continued)
INDEX (continued)
Component Component                                                                             Volume Number   Description                                         Category                             No.
Component Component Volume Number Description Category No.
02-717P   Intercooler Piping -                                 Turbo, Intake                         2                         l Coupling, Gaskets,                                   Intercooler &
02-717P Intercooler Piping -
Bolting                                             Exhaust 02-810A   Misc. Equipment - Heater,                           Jacket Water                         3 Jacket Water 02-820A   Misc. Equipment:                                     Lube Oil                             2 Lube Oil Sump Tank' Heaters 02-8208   Full Flow Lube                                       Lube Oil                             2 011 Filter Appendix II                                                                               4 Appendix III                                                                     ~
Turbo, Intake 2
Coupling, Gaskets, Intercooler &
Bolting Exhaust 02-810A Misc. Equipment - Heater, Jacket Water 3
Jacket Water 02-820A Misc. Equipment:
Lube Oil 2
Lube Oil Sump Tank' Heaters 02-8208 Full Flow Lube Lube Oil 2
011 Filter Appendix II 4
Appendix III
~
4 O
4 O
1 i
1 i
O xiii               .
O xiii Index 1898 REV -1 Entire Page Revised
Index 1898                                                                                     REV -1 Entire Page Revised


I 4
4 Page 1 of 2 COMPONENT DESIGN P.EVIEW CHECKLIST i
Page 1 of 2 COMPONENT DESIGN P.EVIEW CHECKLIST                                                                   i l                                   GRAND GULF NUCLEAR STATION - UNIT 1 COM.FONENT Jacket Water Heat Exchanger                                           CLASSIFICATION TYPE B 1           COMPONENT PART NUMBER GG-103                                       TASK DESCRIPTION NO:   DR-07-GG-103-3                       '
l GRAND GULF NUCLEAR STATION - UNIT 1 COM.FONENT Jacket Water Heat Exchanger CLASSIFICATION TYPE B 1
(SMPS PART NUMBER 10-103 )
COMPONENT PART NUMBER GG-103 TASK DESCRIPTION NO:
.          TASK DESCRIPTIONS:
DR-07-GG-103-3 (SMPS PART NUMBER 10-103 )
i 1        Design review for this component is - not required based on the review of applicable industry and site experience and the lead engine DR/QR reports i           (Shoreham/ Comanche Peak).
TASK DESCRIPTIONS:
l         The following maintenance recommendations should be implemented for the jacket water heat exchanger:
i Design review for this component is - not required based on the review of 1
* To avoid corrosion and fouling, the jacket water heat exchanger and
applicable industry and site experience and the lead engine DR/QR reports i
,                associated service water piping should be flushed on a periodic basis in                                               y 1                 the engine standby mode (continuous service flow is sufficient).
(Shoreham/ Comanche Peak).
j               Alternatively, service water chemistry control can be used to maintain i                 heat exchanger performance and integrity.
l The following maintenance recommendations should be implemented for the jacket water heat exchanger:
* During an outage replace packing rings when packing becomes hard or leakage at the packing is noted and cannot be stopped by tightening.
To avoid corrosion and fouling, the jacket water heat exchanger and associated service water piping should be flushed on a periodic basis in y
1 the engine standby mode (continuous service flow is sufficient).
j Alternatively, service water chemistry control can be used to maintain i
heat exchanger performance and integrity.
During an outage replace packing rings when packing becomes hard or leakage at the packing is noted and cannot be stopped by tightening.
There are no modification recommendations for this component.
There are no modification recommendations for this component.
Quality revalidation for this component is not required.
Quality revalidation for this component is not required.
l
l PRIMARY FUNCTION:
!          PRIMARY FUNCTION:
Not required ATTRIBUTES TO BE VERIFIED:
Not required ATTRIBUTES TO BE VERIFIED:
4
4 Not required i
;          Not required i
SPECIFIED STANDARDS:
SPECIFIED STANDARDS:
Not required
Not required
;        - GG1453/1                                                                                                             . REV.1 4
- GG1453/1
r , .  .- -,      .,-ew-       ,-r.. - , - , , . - , . - ,               -
. REV.1 4
                                                                                                                  ~--..--w-..--.,m-+.-
r
.,-ew-
,-r.. -, -,,. -,. -,
4%..
.....--s
~--..--w-..--.,m-+.-
--e---


l l
Page 1 of 2 O/
Page 1 of 2 O/                         COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION UNIT 1 Jacket Water COMPONENT Standpipe:   Valve                             CLASSIFICATION TYPE B COMPONENT NO 00-7008                       TASK DESCRIPTION NO: DR-07-00-700B-4 (SNPS PART NUREETT6-7008)
COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION UNIT 1 Jacket Water COMPONENT Standpipe:
Valve CLASSIFICATION TYPE B COMPONENT NO 00-7008 TASK DESCRIPTION NO:
DR-07-00-700B-4 (SNPS PART NUREETT6-7008)
TASK DESCRIPTIONS:
TASK DESCRIPTIONS:
Design review for this component is not required based on a review of the applicable industry and site experience listed in the EDG Component Tracking System, and the lead engine DR/QR reports (Shoreham/ Comanche Peak).
Design review for this component is not required based on a review of the applicable industry and site experience listed in the EDG Component Tracking System, and the lead engine DR/QR reports (Shoreham/ Comanche Peak).
Line 1,702: Line 2,685:
1 i
1 i
The following maintenance recommendations are made for this component:
The following maintenance recommendations are made for this component:
* Packing should be inspected for leakage on a monthly basis.
Packing should be inspected for leakage on a monthly basis.
Elastomeric parts should be replaced every 5 years.
Elastomeric parts should be replaced every 5 years.
O
O
Line 1,711: Line 2,694:
Not required l
Not required l
SPECIFIED STANDARDS:
SPECIFIED STANDARDS:
,    Not required
Not required


==REFERENCES:==
==REFERENCES:==
Not required GG1052/1 REV. 1


Not required GG1052/1                                                                  REV. 1
Page 2 of 2 O
 
DOCUMENTATION REQUIRED:
l Page 2 of 2 O           DOCUMENTATION REQUIRED:
Not required GROUP CHAIRPERSON PROGRAM MANAGER M \\ h WV
;              Not required GROUP CHAIRPERSON                     -
.i O
PROGRAM MANAGER M \ h
l i
,                                WV
i l
.i
I O
;  O l
i i
l I
O                 -
REV. 1 CARRY OVER FROM PREVIOUS PAGE GG1052/2
REV. 1 CARRY OVER FROM PREVIOUS PAGE GG1052/2


Page 1 of 2 v                           COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Jacket Water Standpipe and COMPONENT Miscellaneous Bolting Material                     CLASSIFICATION TYPE A
Page 1 of 2 v
,    COMPONENT PART NUMBER 00-700F               TASK DESCRIPTION NO.: DR-07-00-700F-3 (SNPS PART NUMBER 00-700F)
COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Jacket Water Standpipe and COMPONENT Miscellaneous Bolting Material CLASSIFICATION TYPE A COMPONENT PART NUMBER 00-700F TASK DESCRIPTION NO.:
DR-07-00-700F-3 (SNPS PART NUMBER 00-700F)
TASK DESCRIPTIONS:
TASK DESCRIPTIONS:
Design review for this component is not required based on the review of the lead engine DR/QR reports (Shoreham/ Comanche Peak) and the lack of site, industry and non-nuclear industry experience. The standpipe and bolting is similar to that used at other plants. The reviews of drawings, specifications and seismic analysis for Shoreham and Comanche Peak have shown adequate ful-fillment of design requirements and generally low stress levels.
Design review for this component is not required based on the review of the lead engine DR/QR reports (Shoreham/ Comanche Peak) and the lack of site, industry and non-nuclear industry experience.
A review of non-code jacket water standpipe design such as is utilized at Grand Gulf has indicated that single sided fillet welds have been used on large bore jacket water, engine driven and auxiliary pump suction and engine return nozzles. This results in high stresses at weld roots which may lead to cracking of weld joints.       As such the following inspection is applicable to   1 this component:
The standpipe and bolting is similar to that used at other plants.
* Visually inspect jacket water standpipe, pump suction and engine return nozzle welds each routine engine run and every 100 hours during extended engine runs. Any visible cracking or minor jacket water leakage should result in rework of nozzle welds.
The reviews of drawings, specifications and seismic analysis for Shoreham and Comanche Peak have shown adequate ful-fillment of design requirements and generally low stress levels.
A review of non-code jacket water standpipe design such as is utilized at Grand Gulf has indicated that single sided fillet welds have been used on large bore jacket water, engine driven and auxiliary pump suction and engine return nozzles.
This results in high stresses at weld roots which may lead to cracking of weld joints.
As such the following inspection is applicable to 1
this component:
Visually inspect jacket water standpipe, pump suction and engine return nozzle welds each routine engine run and every 100 hours during extended engine runs.
Any visible cracking or minor jacket water leakage should result in rework of nozzle welds.
Quality revalidation for this component is not required.
Quality revalidation for this component is not required.
l l
l l
PRIMARY FUNCTION:
l PRIMARY FUNCTION:
l l
l Not required ATTRIBUTES TO BE VERIFIED:
Not required ATTRIBUTES TO BE VERIFIED:
Not required SPECIFIED STANDARDS:
Not required SPECIFIED STANDARDS:
Not required GG1218/1                                                                     REV. 1
Not required GG1218/1 REV. 1


==REFERENCES:==
==REFERENCES:==
 
1.
TDI _ Drawing 101776, 100931, 00-700-01-ER, 00-700-001-EW and 00-700-01-EV
+
+
: 1.      TDI _ Drawing 101776, 100931, 00-700-01-ER, 00-700-001-EW and 00-700-01-EV i             2.       Specification No 9645-M-018.0, Rev. 22, 4-23-82, design specification for standby. diesel generators ' for Mississippi Power and Light Co. , Grand Gulf
i 2.
;                      Nuclear Station Units 1 and 2, Grand Gulf MI, by Bechtel Power Co.
Specification No 9645-M-018.0, Rev. 22, 4-23-82, design specification for standby. diesel generators ' for Mississippi Power and Light Co., Grand Gulf Nuclear Station Units 1 and 2, Grand Gulf MI, by Bechtel Power Co.
i
i DOCUMENTATION REQUIRED:
,            DOCUMENTATION REQUIRED:
Not required i
Not required i
GROUP CHAIRPERSON                                       1                 -- -
GROUP CHAIRPERSON 1
PROGRAM MANAGER d \4                                                       wh I                                                                                                                                               j i,
PROGRAM MANAGER d \\4 w h I
j i,
O i
O i
I i
I i
Line 1,758: Line 2,745:
i -
i -
GG1218/2 i
GG1218/2 i
l an .-.w-,n,n.,. ....~n,,.--,....,-,-----w--...-w,         ,,,.,,-,,-..,m-,,w,...,,-.                     . ~ , , . c- ..--...,n , , . , , . , - , mw ,-----.------.--,--e,r-p. ..r.,- . . . ,---a-
l an
.-.w-,n,n.,.
....~n,,.--,....,-,-----w--...-w,
,,,.,,-,,-..,m-,,w,...,,-.
. ~,,.
c-
..--...,n
,,.,,., -, mw
,-----.------.--,--e,r-p.
..r.,-
,---a-


Pagt Al of 1.                                 i l
Pagt Al of 1.
COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Water Discharge-COMPONENT Manifold:               Supports                                                                 CLASSIFICATION TYPE B COMPONENT PART NUMBER 02-317C                                         TASK DESCRIPTION NO.:                           DR-07-02-317C-2 (SNPS PART NUMBER 03-317C) i TASK DESCRIPTIONS                                                                                                                                                         ,
i COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Water Discharge-COMPONENT Manifold:
4
Supports CLASSIFICATION TYPE B COMPONENT PART NUMBER 02-317C TASK DESCRIPTION NO.:
.                          Design review for this component is not required based on the review of the
DR-07-02-317C-2 (SNPS PART NUMBER 03-317C) i TASK DESCRIPTIONS 4
:                          lead engine DR/QR reports (Shoreham/ Comanche Peak) and the lack of industry, non-nuclear industry, and site experience.
Design review for this component is not required based on the review of the lead engine DR/QR reports (Shoreham/ Comanche Peak) and the lack of industry, non-nuclear industry, and site experience.
Based on previous experience, supports appear to be adequate provided that the corresponding piping component review, Component No. 02-317A&B,.does .not                                                                                               1 mandate modifications. If the piping analysis warrants modifications to the
Based on previous experience, supports appear to be adequate provided that the corresponding piping component review, Component No. 02-317A&B,.does.not 1
  ,                        supports, these modifications will be addressed in the DR/QR report for                                                                                               l l                         Comoonent No. 02-317A&B.
mandate modifications.
If the piping analysis warrants modifications to the supports, these modifications will be addressed in the DR/QR report for l
l Comoonent No. 02-317A&B.
Quality revalidation for this component is not required.
Quality revalidation for this component is not required.
:                          PRIMARY FUNCTION Not required ATTRIBUTES TO BE VERIFIED
PRIMARY FUNCTION Not required ATTRIBUTES TO BE VERIFIED Not required l
!                          Not required l
SPECIFIED STANDARDS l
SPECIFIED STANDARDS                                                                                                                                           .          ,
Not required REFERENCES Not required DOCUMENTATION REQUIRED Not required GROUP CHAIRPERSON
l                          Not required REFERENCES
-= PROGRAM MANAGER d W w e O
* Not required                                                                                                                                                             ;
(j v o
DOCUMENTATION REQUIRED Not required GROUP CHAIRPERSON                                           -= PROGRAM MANAGER d W w e (j v O                                                                                                                                                                    o i
i GG1443/1 REV.1 I -
GG1443/1                                                                                                                                         REV.1 I -
.,,,--.i.-m---,-
      ,  .,,,--.i.-m---,-           w --.--,.+.----,v-           -.y - --,,- -~mmm     , . , , , . ,  r... e   %,--. , , ,.-..------.--p-.   - - , -        .,.m,+e,-%w,.       -,-e,ep<-w.-
w
--.--,.+.----,v-
-.y
-~mmm r...
e
,,,.-..------.--p-.
.,.m,+e,-%w,.
-,-e,ep<-w.-


COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1.
COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1.
Turbo Water Piping -
Turbo Water Piping -
Pipe and Fittings COMPONENT (Small Bore Scope Only)                                                         CLASSIFICATION TYPE B COMPONENT PART NUMBER 02-437                                   TASK     DESCRIPTION     NO.:     DR-05-02-437-3 (SNPS PART NUMBER 03-437A)
Pipe and Fittings COMPONENT (Small Bore Scope Only)
CLASSIFICATION TYPE B COMPONENT PART NUMBER 02-437 TASK DESCRIPTION NO.:
DR-05-02-437-3 (SNPS PART NUMBER 03-437A)
TASK DESCRIPTIONS:
TASK DESCRIPTIONS:
              . Design review - is ' not required for this component based on a review of the applicable industry and site experience and the lead engine DR/QR report (Coranche Peak). The comparative review of the piping configurations from Comanche Peak and Grand Gulf indicates the TDI designs for this component are
. Design review - is ' not required for this component based on a review of the applicable industry and site experience and the lead engine DR/QR report (Coranche Peak).
!              essentially the same. The review of applicable site ' experience indicates that
The comparative review of the piping configurations from Comanche Peak and Grand Gulf indicates the TDI designs for this component are essentially the same.
,              deficient items (cracked welds, cracked piping and piping misalignment) were
The review of applicable site ' experience indicates that deficient items (cracked welds, cracked piping and piping misalignment) were discovered on. the turbo water piping.
!              discovered on. the turbo water piping. All deficiencies addressed have been
All deficiencies addressed have been corrected as detailed in the reference. documents listed in the component tracking system (dated 7-27-84).
;              corrected as detailed in the reference . documents listed in the component tracking system (dated 7-27-84). The cause of these deficiencies has been
The cause of these deficiencies has been attributed to the improper operating / faulty turbocharger.
;              attributed to the improper operating / faulty turbocharger. The turbocharger was
The turbocharger was also replaced (Ref. MCR 767-83, SHT.10 and 13).
!              also replaced (Ref. MCR 767-83, SHT.10 and 13).
There are no maintenance or modification recommendations for this component.
There are no maintenance or modification recommendations for this component.
l1 Quality revalidation for this component is not required.
l1 Quality revalidation for this component is not required.
PRIMARY FUNCTION:
PRIMARY FUNCTION:
Not required i               ATTRIBUTES TO BE VERIFIED:
Not required i
l l               Not required l
ATTRIBUTES TO BE VERIFIED:
l l
Not required l
SPECIFIED STANDARDS:
SPECIFIED STANDARDS:
i               Not required
i Not required


==REFERENCES:==
==REFERENCES:==
Not required O
Not required O
l l               GG1747/1                                                                                                         REV. 1 i
l l
  .-.. . . -      -  1-       - - . . . - , - - , - - - - - . , . - - . -          .-      - -      - -          = -    - - -      --
GG1747/1 REV. 1 i
1-
= -


Page 1 of 2 s                                             COMPONENT DESIGN REVIEW CHECKLIST
Page 1 of 2 s
;                                              GRAND GULF NUCLEAR STATION - UNIT 1 4                                             .
COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 4
Auxiliary Sub Base & 011 &
Auxiliary Sub Base & 011 &
Water Piping - Jacket COMPONENT Water: ' Valves                                                                                           CLASSIFICATION TYPE B COMPONENT PART NUMBER 02-717B                                                                       TASK DESCRIPTION NO.: DR-07-02-717B-1
Water Piping - Jacket COMPONENT Water: ' Valves CLASSIFICATION TYPE B COMPONENT PART NUMBER 02-717B TASK DESCRIPTION NO.:
;          (SNPS PART NUMBER ~03-7178)_
DR-07-02-717B-1 (SNPS PART NUMBER ~03-7178)_
l           TASK DESCRIPTIONS:
l TASK DESCRIPTIONS:
Design review for this component is not required based on a review of the applicable industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).
Design review for this component is not required based on a review of the applicable industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).
No modifications are required for this component.
No modifications are required for this component.
i
i The following maintenance recommendations are made for this component:
.          The following maintenance recommendations are made for this component:
1 Packing should be inspected for leakage on a monthly basis.
1
Elastomeric parts should be replaced every 5 years.
,
* Packing should be inspected for leakage on a monthly basis.
* Elastomeric parts should be replaced every 5 years.
Quality revalidation for this component is not required.
Quality revalidation for this component is not required.
!          PRIMARY FUNCTION:
PRIMARY FUNCTION:
Not required
Not required ATTRIBUTES TO BE VERIFIED:
.          ATTRIBUTES TO BE VERIFIED:
i Not required l
i           Not required l           SPECIFIED STANDARDS:                                                                                                                                 ~
SPECIFIED STANDARDS:
Not required i                                                                                                                                                                   .
~
Not required i
1
1


==REFERENCES:==
==REFERENCES:==
i l
Not required h
I i O GG0368/l REV. 1


i l          Not required h                                                                                                                                                                    I i
Page 2 of 2 O
O GG0368/l                                                                                                                            REV. 1
DOCUMENTATION REQUIRED:
Not required GROUP CHAIRPERSON' PROGRAM MANAGER AC\\<
()I c.)
O 4
e f
O REV. 1 CARRY OVER FROM GG0368/2 i
-~ _. _


Page 2 of 2 O          DOCUMENTATION REQUIRED:
COMPONENT QUALITY REVALIDATION CHECKLIST Page B3 of 4
Not required GROUP CHAIRPERSON'                          PROGRAM MANAGER AC\<                                                        ,
'07-02-360B REFERENCES (continued) l Division II
c.)
.Same as Division I DOCUMENTATION REQUIRED Division I 1.
()I 4
Document Summary Sheet 2-8.
O e
Inspection Report.
f O                                                                                                                            REV. 1 CARRY OVER FROM GG0368/2 i  -~ _ . _          _ _ _ _  __      ._.- _ _ . _ . _ _ _ _ . .      _ - . _ _ _ _ _ _ - - . _ . _ - - _ _ _ _ _ _ _ .
Division II Same as Division I GROUP CHAIRPERSON dM PROGRAM MANAGER e-(JVy.rau.
 
O COMPONENT REVIEW Division I j
COMPONENT QUALITY REVALIDATION CHECKLIST                 Page B3 of 4
1.
                                                                                                                                '07-02-360B REFERENCES (continued)                                                                                           l l
All EDGCTS site experience documents were assembled and reviewed with satisfactory results.
Division II
                                                        .Same as Division I DOCUMENTATION REQUIRED Division I
: 1. Document Summary Sheet 2-8.         Inspection Report.
Division II Same as Division I GROUP CHAIRPERSON                   dM                         PROGRAM MANAGER                   e-         -
(JVy.rau.
O                             COMPONENT REVIEW Division I j                                                         1. All EDGCTS site experience documents were assembled and reviewed with satisfactory results.
1
1
[                                                         2. A visual . inspection of the       valve seating was performed with
[
!                                                              satisfactory results. This was reported by TER# 07-019.
2.
1                                                                                                                                                       -
A visual. inspection of the valve seating was performed with satisfactory results.
: 3. A visual inspection . of tha valve and valve ring (seating) was performed. This was reported by TER# 07-019.
This was reported by TER# 07-019.
i
1 3.
: 4. A visual inspection . was performed on - the valve stems. This was
A visual inspection. of tha valve and valve ring (seating) was performed.
!                                                              reported by TER#'s 07-019 ' and 07-045. Unsatisfactory results were dispositioned by MNCRs 472-84, 473-84 and 475-84.
This was reported by TER# 07-019.
;.                                                        5. . Dimensional inspections were_ performed and the valve to valve guide clearances were ' determined. The results were . reported by TER#
i 4.
A visual inspection. was performed on - the valve stems.
This was reported by TER#'s 07-019 ' and 07-045.
Unsatisfactory results were dispositioned by MNCRs 472-84, 473-84 and 475-84.
5.
. Dimensional inspections were_ performed and the valve to valve guide clearances were ' determined.
The results were. reported by TER#
07-046.-
07-046.-
: 6. A visual inspection of the valve stems was performed at the contact area with the rocker arm. This was reported by TER#'s 07-019_and 07-045. Unsatisfactory results were dispositioned by MNCRs 472-84, O                                                    473-84 and 475-84.
6.
l GG0957/3                                                                                           REV. 1
A visual inspection of the valve stems was performed at the contact area with the rocker arm.
This was reported by TER#'s 07-019_and O
07-045.
Unsatisfactory results were dispositioned by MNCRs 472-84, 473-84 and 475-84.
l GG0957/3 REV. 1


                                                                                                                      )
)
,                                                                                Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Fuel Injection Equipment -
Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Fuel Injection Equipment -
COMPONENT Fuel Injection Pump                               CLASSIFICATION TYPE A
COMPONENT Fuel Injection Pump CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-365A TASK DESCRIPTION NO.: DR-07-02-365A-1 (SNPS PART NUMBER 03-365A) i f
,          COMPONENT PART NUMBER 02-365A                 TASK DESCRIPTION NO.: DR-07-02-365A-1 (SNPS PART NUMBER 03-365A) i f
TASK DESCRIPTIONS:
;          TASK DESCRIPTIONS:
Design review for this component is not required based on the review of the i
Design review for this component is not required based on the review of the i
applicable industry and site experience and the lead engine DR/QR reports l         (Shoreham/ Comanche Peak). This component is used on all of the TDI
applicable industry and site experience and the lead engine DR/QR reports l
!          engines as well as engines manufactured by Cooper Industries, Worthington &
(Shoreham/ Comanche Peak).
j         Nordberg.
This component is used on all of the TDI engines as well as engines manufactured by Cooper Industries, Worthington &
j Nordberg.
There are no modifications recommended for this component.
There are no modifications recommended for this component.
,          The following maintenance recommendations for this component should be
The following maintenance recommendations for this component should be implemented during alternate refueling outages:
!          implemented during alternate refueling outages:
Tear down pump for inspection and complete fuel injection pump inspection in accordance with the TDI Instruction Manual.
* Tear down pump for inspection and complete fuel injection pump inspection in accordance with the TDI Instruction Manual. Evaluate pump condition to determine if remaining pumps require examination.
Evaluate pump condition to determine if remaining pumps require examination.
          . Quality revalidation for this component is not required.
. Quality revalidation for this component is not required.
l PRIMARY FUNCTION:
l PRIMARY FUNCTION:
Not required
Not required ATTRIBUTES TO BE VERIFIED:
!.        ATTRIBUTES TO BE VERIFIED:
Not required I
;          Not required I
SPECIFIED STANDARDS:
SPECIFIED STANDARDS:
Not required O
Not required O
GG1062/1                                                                               REV.,1
GG1062/1 REV.,1


==REFERENCES:==
==REFERENCES:==
t Not required
t Not required
      - DOCUMENTATION REQUIRED:
- DOCUMENTATION REQUIRED:
1 Not required                                                                                                                                                                                       l GROUP CHAIRPERSON                                   -
Not required GROUP CHAIRPERSON PROGRAM MANAGER M \\ & %
PROGRAM MANAGER M \ & %                                                   -
}f C3 4
                                        }f                                                                                                                                 C3 4                                                               %
r 1
r 1
l l
l l
l-REV 1 CARRY 0VER FR06.\-
l-REV 1 CARRY 0VER FR06.\\-
GG1062/2                                                                                                                                           PREVIOUS PAGE
PREVIOUS PAGE GG1062/2
                                        .;s m . . -
.;s m
  , , . - - , - . . - . - . , , , ,    +f.- _      .-  _,
+f.-
                                                                                                                                                                  . . - ,    , .. ' N , __   n.   -. -~_,,
,.. N, __
n.
-. -~_,,


l COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Fuel Injection Equipment-
COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Fuel Injection Equipment-
              -COMPONENT Fuel Injection Tips                               CLASSIFICATION TYPE A COMPONENT PART NUMER 07 "5B   ~
-COMPONENT Fuel Injection Tips CLASSIFICATION TYPE A COMPONENT PART NUMER 07 "5B TASK DESCRIPTION NO.:
TASK DESCRIPTION NO.: DR-07-02-3658-4
DR-07-02-3658-4 (SNPS PART NUMBER 03-3Eb)
:.              (SNPS PART NUMBER 03-3Eb) t TASK OESCRIPTIONS:                                                                             '
~
i-                                                                                                             ,
t TASK OESCRIPTIONS:
Design review for this component is not required based on the review of the applicable industry - and site experience and the lead engine DR/QR reports (Shoreham/ Comanche   Peak). This   component .is used on all     of- the TDI engines as well as engines manufactured by Cooper Industries, Worthington &
i -
,              .Nordberg.
Design review for this component is not required based on the review of the applicable industry - and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).
This component.is used on all of-the TDI engines as well as engines manufactured by Cooper Industries, Worthington &
.Nordberg.
The following maintenance recommendations should be implemented:
The following maintenance recommendations should be implemented:
!                      1)   Inspect for leaks when the engine is running during the monthly                   1 operational test;
1)
: 2) .During   refueling outage the assembly should be disassembled,                     !
Inspect for leaks when the engine is running during the monthly 1
inspect, clean, reassembled, pop tested, and spray pattern checked; 3)- TDI SIM Nos.       107 and 108 be incorporated in the Grand Gulf 3                          maintenance procedures.
operational test; 2)
.During refueling outage the assembly should be disassembled, inspect, clean, reassembled, pop tested, and spray pattern checked; 3)- TDI SIM Nos.
107 and 108 be incorporated in the Grand Gulf maintenance procedures.
3
{
{
s There are no modifica. ion recommendations for this component.
There are no modifica. ion recommendations for this component.
4 Quality revalidation for this component is not required.
s 4
l               PRIMARY FUNCTION:
Quality revalidation for this component is not required.
l PRIMARY FUNCTION:
l Not required ATTRIBUTES TO BE VERIFIED:
l Not required ATTRIBUTES TO BE VERIFIED:
l Not required           -
l Not required l
l SPECIFIED STANDARDS:
SPECIFIED STANDARDS:
Not required O
Not required O
I GG1063/1                                                                     REV. 1
GG1063/1 REV. 1 I
        .__.______.._-._.._L_._.__._______._____-_,.__-.___._.-..._._                              . . _ _
.__.______.._-._.._L_._.__._______._____-_,.__-.___._.-..._._


7
7
                                                                                  ,)
,)
i
? o-s TDI OWNERS GROUP i
?
/
          , o-             /                              -
i for s
s TDI OWNERS GROUP s                                                                        '
I GRAND GULF NUCLEAR POWER STATION l
i                         for I
4 MAINTENANCE REVIEW APPENDIX - II i
GRAND GULF NUCLEAR POWER STATION                                   l 4
(
MAINTENANCE REVIEW
I INTRODUCTION yThe purpose of this Appendix is to provide Grand Gulf with a set of i
  ,                                                                                        APPENDIX - II i
"naintenance and. surveillance recommendations for diesel generator com-ponents which have been developed by TDI and/or the Owners Group as a
:                                                                                                              (
~
I       INTRODUCTION yThe purpose of this Appendix is to provide Grand Gulf with a set of i                   "naintenance and . surveillance recommendations for diesel generator com-
i''
                                                              ~
result of. the overall Owners Group Program.
ponents which have been developed by TDI and/or the Owners Group as a                             .
This Appendix is intended to supple ment. the existing TDI Instruction Manual, Volume I and Volume III, which will maintain the qualification of the diesel generators for the life of the plant.
i''                                     result of. the overall Owners Group Program. This Appendix is intended to supple ment. the existing TDI Instruction Manual, Volume I and Volume III, which will maintain the qualification of the diesel generators for the life of the plant.
j II METHODOLOGY During the implementation of the Owners Group Program Plan, the Owners l
j                               II     METHODOLOGY
Group Technical, Staff reviewed many sources of inform-tion regarding the i.
;                                        During the implementation of the Owners Group Program Plan, the Owners l                                       Group Technical, Staff reviewed many sources of inform-tion regarding the
maintenance and surveillance for the. diesel generator components ident-ified in this Appendix.
: i.                                       maintenance and surveillance for the . diesel generator components ident-                         '
These sources included TDI Instruction Manuals,
ified in this Appendix. These sources included TDI Instruction Manuals,
>> Service Information Menos (SIMS), and TDI correspondence on specific components.
                                    >> Service Information Menos (SIMS), and TDI correspondence on specific                                 !
This review along with Technical Staff input regarding the adequacy of the recommendations found in the sources mentioned above, and additional maintenance recommendations identified during the DR/QR review, forms the basis for the content of this matrix.
components.         This review along with Technical Staff input regarding the adequacy of the recommendations found in the sources mentioned above, and additional maintenance recommendations identified during the DR/QR review,                         '
r III RESULTS AND CONCLUSIONS Proper maintenance. is important in ensuring long, reliable and satis-i factory service of the emergency diesel generators.
r forms the basis for the content of this matrix.
Maintenance work, in l
III RESULTS AND CONCLUSIONS Proper maintenance. is important in ensuring long, reliable and satis-                             i factory service of the emergency diesel generators. Maintenance work, in                           !
order to be effective, must be carried out thoroughly -and regularly.
l
It is for these reasons that a detailed schedule of maintenance servica has
'                                        order to be effective, must be carried out thoroughly -and regularly. It                           !
.been laid out by the Owners Group for the TDI Diesel Generators at Grand
is for these reasons that a detailed schedule of maintenance servica has
' Gulf Nuclear Power Stat. ion.
                                        .been laid out by the Owners Group for the TDI Diesel Generators at Grand
The schedule details specific components requiring maintenance on a regular basis.
                                      ' Gulf Nuclear Power Stat. ion. The schedule details specific components requiring maintenance on a regular basis. This schedule separates the maintenance f activities into a daily, monthly, outage, alternate outage (every othef), 5 year and 10 year frequencies. It should be noted here that the duration time between outages at Grand Gulf is assumed to be 18 months.
This schedule separates the maintenance f activities into a daily, monthly, outage, alternate outage (every othef), 5 year and 10 year frequencies.
It should be noted here that the duration time between outages at Grand Gulf is assumed to be 18 months.
b I
b I
O
O
                            - GG1249/1                                                                                                     '
- GG1249/1


4
4 Page 2 of 3 The Grand Gulf Unit 1 Diesel Engines have had extensive operating and maintenance experience.
        .                                                                                Page 2 of 3 The Grand Gulf Unit 1 Diesel Engines have had extensive operating and                   ...
The recommended intervals between routine maintenance items, such as inspection / cleaning of heat exchangers filters, strainers etc.,
maintenance experience.               The recommended   intervals between routine     '
should be adjusted based on the past experience and maintenance programs in ffect at Grand Gulf Nuclear Station.
maintenance items, such as inspection / cleaning of heat exchangers filters, strainers etc., should be adjusted based on the past experience and
Those less significant diesel generator system components with which standard engineering practice and maintenance will ensure continued operation, are not specifically addressed in the matrix.
,                  maintenance programs in ffect at Grand Gulf Nuclear Station.
Standard main-tenance practices are briefly discussed below.
Those less significant diesel generator system components with which standard engineering practice and maintenance will                 ensure continued operation, are not specifically addressed in the matrix. Standard main-tenance practices are briefly discussed below.
The engine' and generator should be kept clean and dry at all times.
The engine' and generator should be kept clean and dry at all times. Oil and water leakage should be wiped off the unit as quickly as possible in order to assist in locating the source of leakage, prevent potential equipment damage and maintain a safe working environment.             Leaking pipes, gaskets and packing glands should be attended to promptly so as not to impair the reliability and/or operation of the system. Flanged gasketed connections may be retightened to stop leaks and any abnormal engine noises or vibrations. Actions required to correct any abnormal conditions should be carried out in a timely manner. Loose bolts and electrical terminals should be attended to in a safe, practical manner.
Oil and water leakage should be wiped off the unit as quickly as possible in order to assist in locating the source of leakage, prevent potential equipment damage and maintain a safe working environment.
Leaking pipes, gaskets and packing glands should be attended to promptly so as not to impair the reliability and/or operation of the system.
Flanged gasketed connections may be retightened to stop leaks and any abnormal engine noises or vibrations.
Actions required to correct any abnormal conditions should be carried out in a timely manner.
Loose bolts and electrical terminals should be attended to in a safe, practical manner.
Specific items to be maintained on a DAILY basis consist of the following:
Specific items to be maintained on a DAILY basis consist of the following:
]O J
]O 1.
: 1.         Observe and- record lubricating oil and jacket water temperatures (keep warm pump running).                           ,
Observe and-record lubricating oil and jacket water temperatures (keep warm pump running).
: 2.         Drain all low point water collectors, barring device air filter and air receiver tank float traps in the air start system.
J 2.
: 3.         Check engine and auxiliary equipment and piping connections for oil, water, and: fuel oil leaks.
Drain all low point water collectors, barring device air filter and air receiver tank float traps in the air start system.
: 4.         Check level of lubricating oil in the governor and pedestal bearing.
3.
l                             Add oil as needed.
Check engine and auxiliary equipment and piping connections for oil, water, and: fuel oil leaks.
1
4.
: 5.         Check fuel oil pump rack for freedom of_ movement through full limit of travel. Do not disconnect from governe..
Check level of lubricating oil in the governor and pedestal bearing.
!                  6.
l Add oil as needed.
'                              Check turbocharger bearing lubricating oil system sight glass for oil flow.
1 5.
: 7.         Drain water from crankcase vent piping drip legs.
Check fuel oil pump rack for freedom of_ movement through full limit of travel.
: 8.         Verify all. controls in proper position for standby mode.
Do not disconnect from governe..
: 9.         Check-all governor knob settings.
6.
Load       Maxista Droop Zero O                                     Speed       To provide mechanical governor control at 460 rpm.
Check turbocharger bearing lubricating oil system sight glass for oil flow.
GG1249/2                                                               Revision 1
7.
_ _ .                      :d       "D D "               ~ ~
Drain water from crankcase vent piping drip legs.
8.
Verify all. controls in proper position for standby mode.
9.
Check-all governor knob settings.
Load Maxista Droop Zero O
Speed To provide mechanical governor control at 460 rpm.
GG1249/2 Revision 1
:d "D D "
~
~


J
J Page 3 of 3
      .                                                                        Page 3 of 3
: 10. Visually inspect lube oil heat exchanger and jacket water heat exchanger for signs of leakage from the lantern ring leakoff ports,
: 10. Visually inspect lube oil heat exchanger and jacket water heat                 ..
~
exchanger for signs of leakage from the lantern ring leakoff ports,       ~
indicating leaking packing rings.
indicating leaking packing rings.
The following Preventive Maintenance Recommendation Matrix was designed to assist the Maintenance Department in determining the scope of work required to maintain the intended design function of the diesel generators at Grand Gulf on a planned schedule basis. It should be followed closely 4
The following Preventive Maintenance Recommendation Matrix was designed to assist the Maintenance Department in determining the scope of work required to maintain the intended design function of the diesel generators at Grand Gulf on a planned schedule basis.
and referred to often.
It should be followed closely and referred to often.
l O
4 l
d O
O d
GG1249/3 t                             .. _ g ma .                         _            r_ ~ ['
O GG1249/3 t
.. _ g ma.
r_ ~ ['


                      . -                -      ~ .                  . .          .-_-        .    --            ._ .        ..                    .      .                .- ..
~
                                                                                                                                                                                              'l 4
'l 4
GRAIS GULF MAINTEllANCE MATRIX                                                                   :
GRAIS GULF MAINTEllANCE MATRIX 3
3                  'Camponent     Component-                                                                       .
'Camponent Component-Alt.
Alt.
Number Identification FM Recommendation Monthly.
Number         Identification                         FM Recommendation                 Monthly. Outano-   Outane. 5 Year 10 Year Comments.
Outano-Outane. 5 Year 10 Year Comments.
4                  F-068           Intercoolers                       ' 1.     Evaluate heat exchanger         X performance by checking engine operating parameters.
F-068 Intercoolers
,.                                                                        2. Clean / inspect shell and                     X                                   Ref: Lead engine OR/QR -
' 1.
ties sides every optage                                                           Report #F-068 (Items 2,3, or as necessary.                                                                   4)
Evaluate heat exchanger X
: 3. Visually inspect for             X                         ,                      Ref: 7/26/84 IOC external leaks.                                                                   free J. Cadogan to         '
4 performance by checking engine operating parameters.
M. McGerigle, Ref: 08/14/84 letter to C. Ray from M. Lowrey
2.
: 4. The drain connection on the                                                         To be performed daily, air intake system low point should be verified open, and cleaned daily.
Clean / inspect shell and X
MP-022/3     Turbocharger                           1. Measure vibration and                           X-                                 To be accomplished during check with base line data.                                                         24 hour test run.
Ref: Lead engine OR/QR -
                                                                      ' 2. Clean lepeller and diffuser.                   X                                                               i
ties sides every optage Report #F-068 (Items 2,3, or as necessary.
                                                                        '3. Measure rotor end play                         X                                   Review thrust bearing (axial clearance) to                                                               axial clearances after identify trends of in-                                                             inspection to determine creasing clearance, f.e;                                                           if a trend exists. Any
4) 3.
                                                                              -thrust bearing degradation.'                                                       trend toward increasing axial clearar<e could signify thrust bearing degradation. Ref: Lead engine DR/QR Report fMP-022/3 GG1249/4-                                                                                                                 Revision 1 - Entire Page Revised I
Visually inspect for X
9 i
Ref: 7/26/84 IOC external leaks.
i-         ~
free J. Cadogan to M. McGerigle, Ref: 08/14/84 letter to C. Ray from M. Lowrey 4.
}..
The drain connection on the To be performed daily, air intake system low point should be verified open, and cleaned daily.
MP-022/3 Turbocharger 1.
Measure vibration and X-To be accomplished during check with base line data.
24 hour test run.
' 2.
Clean lepeller and diffuser.
X i
'3.
Measure rotor end play X
Review thrust bearing (axial clearance) to axial clearances after identify trends of in-inspection to determine creasing clearance, f.e; if a trend exists. Any
-thrust bearing degradation.'
trend toward increasing axial clearar<e could signify thrust bearing degradation. Ref: Lead engine DR/QR Report fMP-022/3 GG1249/4-Revision 1 - Entire Page Revised I
I 9
i i -
~
}.
4 k'
4 k'
r
r 5-~*
_ _ - _ _ _ _ _              _.____              . _ _ _ _ _ _ _ _                  ,  5-~*                           %  -                ,


_ _ _ - - - - - - _ - - - .                  .  .-,              -    -                - .-                --                              -      -- .                  .~
.~
h i
h i
1 GRAND GULF MAINTENANCE M TRIX Component- Component'                                                                                     Alt.
1 GRAND GULF MAINTENANCE M TRIX Component-Component' Alt.
Number'       . Identification                 . PN lies;ommendation             Monthly       Outane Outane   5 Year 10 Year Comments
Number'
: 4. Perform visual and blue                                       X                 NOTE: Thrust bearing check inspections of                                                           inspection should also' the thrust bearing.                                                             be performed after 40 non prelubed (automatic).
. Identification
fut starts. Ref: Lead engine DR/QR Report NF-022/3
. PN lies;ommendation Monthly Outane Outane 5 Year 10 Year Comments 4.
: 5. Disassemble inspect                                           X                 For Items 1-6, Ref; and refurbish.                                   .                              IOC dated 3/23/84 free M. Wehmeyer to R. Kadlec.
Perform visual and blue X
: 6. Perfore a spectro-                           X                                 To be performed during chemical engine oil-                                                           the last monthly 4..
NOTE: Thrust bearing check inspections of inspection should also' the thrust bearing.
analysis to assist the                                                         test run prior to oil bearing monitoring                                                             change. NOTE: Sample program. To further                                                             to be drawn up stream of expand / clarify cheetcal                                                       lube oil filter.
be performed after 40 non prelubed (automatic).
analysis, ferrographic                                                         Ref: Lead engine DR/QR analysis may be utilized.                                                     Report #NP-022/3 Particular attention shall be paid to copper i     level, and particulate.                                 '
fut starts. Ref: Lead engine DR/QR Report NF-022/3 5.
Disassemble inspect X
For Items 1-6, Ref; and refurbish.
IOC dated 3/23/84 free M. Wehmeyer to R. Kadlec.
6.
Perfore a spectro-X To be performed during chemical engine oil-the last monthly analysis to assist the test run prior to oil 4..
bearing monitoring change. NOTE: Sample program. To further to be drawn up stream of expand / clarify cheetcal lube oil filter.
analysis, ferrographic Ref: Lead engine DR/QR analysis may be utilized.
Report #NP-022/3 Particular attention shall be paid to copper i
level, and particulate.
size, which could signify thrust bearing degradation.
size, which could signify thrust bearing degradation.
SE-025         Full Pressure Lube 011 Strainer. 1.     Record strainer d/p,         X..                                             Use for trend data
SE-025 Full Pressure Lube 011 Strainer.
: 2. Inspect'and clean                           X                                 To be performed when elements,                                                                     the differential pressure across the strainer rises significantly.       ,
1.
GG1249/5                                                                                                             Revision 1 - Entire Page Revised I
Record strainer d/p, X..
Use for trend data 2.
Inspect'and clean X
To be performed when
: elements, the differential pressure across the strainer rises significantly.
GG1249/5 Revision 1 - Entire Page Revised I
r D
r D
I
I


O                                                                               O GRAls GULF MAINTENANCE MATRIX Component Component     .
O O
Alt.
GRAls GULF MAINTENANCE MATRIX Component Component Alt.
Number     I,dentification               PM Recommendation               Monthly       Outaes     Outage   5 Year 10 Year Comments Ref: Lead engine M/QR Report #02-820H, Ref: TDI Instruction Manual, Volume I, Maintenance Schedule
Number I,dentification PM Recommendation Monthly Outaes Outage 5 Year 10 Year Comments Ref: Lead engine M/QR Report #02-820H, Ref: TDI Instruction Manual, Volume I, Maintenance Schedule 3.
: 3. Lube oil strainer                           X pressure gauge -
Lube oil strainer X
!                                                                      calibration clock i
pressure gauge -
00-420     Lube 011 Pressure Regulating   1. Ofsassemble and clean.                       X                                           If valve sticks repeated-Valve                                                                                                                         ly, more frequent cleaning may be necessary. If valve plugging becomes a problem, the dimensions of the valves' internal parts should be checked to ensure proper clear-
calibration clock i
'                                                                                                                                                                ance.
00-420 Lube 011 Pressure Regulating 1.
Ref: Lead engine
Ofsassemble and clean.
: 2. During initial startup after                               ,                            DR/QR Report #00-420 a major reassembly of f                                                                     Lube 011 piping, the L.D.
X If valve sticks repeated-Valve ly, more frequent cleaning may be necessary. If valve plugging becomes a problem, the dimensions of the valves' internal parts should be checked to ensure proper clear-ance.
Ref: Lead engine 2.
During initial startup after DR/QR Report #00-420 a major reassembly of f
Lube 011 piping, the L.D.
regulating valve should be disassembled and cleaned untti abnormal L.0. pressure excursions subside.
regulating valve should be disassembled and cleaned untti abnormal L.0. pressure excursions subside.
00-7008   Jacket Water Standpipe: Valves 1. Inspect the valves for         X                                                         Ref: Lead engine DR/QR packing leakage.                                                                         Report #02-7178 (Items 1,2)
00-7008 Jacket Water Standpipe: Valves 1.
GG1249/6                                                                                                     Revision 1 - Entire Page Revised 4
Inspect the valves for X
Ref: Lead engine DR/QR packing leakage.
Report #02-7178 (Items 1,2)
GG1249/6 Revision 1 - Entire Page Revised 4


s.
s.
GRAIS GULF MAINTEMAIIN! MATRIX
GRAIS GULF MAINTEMAIIN! MATRIX
      = Component   Component'                     .
= Component Component' Alt.
Alt.
l
                  . Identification l       _ Number-                                 PM Recommendation                 Monthly     Outace   Outaae   5 Year -10 Year Comments
_ Number-
: 2.     Replace elastomeric-                                         X
. Identification PM Recommendation Monthly Outace Outaae 5 Year -10 Year Comments 2.
Replace elastomeric-X
[
[
parts in Circle Seal
parts in Circle Seal
                                                        ' valves.                                                                                                     '
' valves.
      ~ 00-700F,   Jacket ifater Standpipe     1. Visually inspect jackat                                                         Any visible cracking or and Miscellaneous Bolting           water standpipe, puep                                                           einer jacket water leakage suction and engine return                                                       should result in rework
~ 00-700F, Jacket ifater Standpipe 1.
                                                      . nozzle welds during each                                                         of nozzle welds. Refr:
Visually inspect jackat Any visible cracking or and Miscellaneous Bolting water standpipe, puep einer jacket water leakage suction and engine return should result in rework
routine engine run and                                                         DR/QR Report 802-700F     _t every 100 hours during ,                                                                                     t extended engine runs.
. nozzle welds during each of nozzle welds. Refr:
02-305A.   . Base' Assembly.             1. Perfore a visual inspection                 X                                   Note: Any cracks detected of the base. The inspection                                                     must be investigated should include the areas                                                       further before the engine
routine engine run and DR/QR Report 802-700F
[                                                       adjacent to the nut pockets                                                     is allowed to return to of each bearing saddle and .                                                   service. The eating be conducted after a thorough                                                   surfaces of the base and
_t every 100 hours during,
,                                                        wipe down of the surfaces,                                                     cap shall be throughly using good lighting.                                                           cleaned with solvent.
t extended engine runs.
before any reassembly.       !
02-305A.
Ref: _ Lead engine DR/QR Report 802-305A.           ,
. Base' Assembly.
02-305C~     Main Bearing Caps - Studs
1.
: 1. Upon removal of bearing                                                         Refr: Lead engine DR/QR and Nuts                           caps, clean mating                                                             Report 802-305C surfaces with a solvent prior to reassembly of the caps to the base.
Perfore a visual inspection X
02-307B     Lube 011 Tubing and Fittings 1. Check tubing for dents                     X                                   Items 1, 2; Ref: TDI
Note: Any cracks detected of the base. The inspection must be investigated should include the areas further before the engine
                    - Internal.                         or crimps.                                                                     Instruction Manual, Vol. I, Maintenance Schedule GG1249/7-                                                                                                   Revision 1 - Entire Page Revised I.
[
adjacent to the nut pockets is allowed to return to of each bearing saddle and.
service. The eating be conducted after a thorough surfaces of the base and wipe down of the surfaces, cap shall be throughly using good lighting.
cleaned with solvent.
before any reassembly.
Ref: _ Lead engine DR/QR Report 802-305A.
02-305C~
Main Bearing Caps - Studs 1.
Upon removal of bearing Refr: Lead engine DR/QR and Nuts caps, clean mating Report 802-305C surfaces with a solvent prior to reassembly of the caps to the base.
02-307B Lube 011 Tubing and Fittings 1.
Check tubing for dents X
Items 1, 2; Ref: TDI
- Internal.
or crimps.
Instruction Manual, Vol. I, Maintenance Schedule GG1249/7-Revision 1 - Entire Page Revised I.
l e
l e


N GRAND GULF MAINTFNANCE MATRIX Component           Component                                                                                           Alt.
N GRAND GULF MAINTFNANCE MATRIX Component Component Alt.
Number             Identification                               PM Recommendation                 Monthly     Outane Outage   5 Year 10 Year Comments
Number Identification PM Recommendation Monthly Outane Outage 5 Year 10 Year Comments 2.
: 2.     Perform gear-train                       X spray check.
Perform gear-train X
                              '02-310A           : Crankshaft                                   1.     Measure crankshaft web                   X                                 Complete TDI Inspection deflection.                                                                 and Malatenance Record Form No. 310-1-1. TDI S
spray check.
Instruction Manual,
'02-310A
                                                                                                                                                                                      . Volume I Section 6.
: Crankshaft 1.
Ref: TOI Instruction Manual, Vol. I, Main-tenance Schedule
Measure crankshaft web X
: 2.       Measure diameter of                                                         This inspection is to be crank journals.                                                             performed during major engine overhauls.
Complete TDI Inspection deflection.
!'                                                                                                                                                                                    Complete TDI Inspection and Maintenance Record Form No. 310-3-1. TDI Instruction Manual, Volume I Section 6.
and Malatenance Record Form No. 310-1-1. TDI Instruction Manual, S
02-3108         . Main Bearings Shells'                         1.       Inspect and measure main                         X ,
. Volume I Section 6.
The first inspection bearing shell thickness                                                     should be performed at Inspection shall evaluate                                                   the first fuel outage bearing wear and evidence                                                   and at alternate outages.
Ref: TOI Instruction Manual, Vol. I, Main-tenance Schedule 2.
of harmful crankshaft                                                       thereafter.
Measure diameter of This inspection is to be crank journals.
misalignment. If results                                                   Complete TDI Inspection show evidence of mis-                                                       and Maintenance Record alignment, TDI recom-'                                                     Form No. 310-2-1, TDI mandations for crankshaft                                                   Instruction Manual, realignment should be                                                       Volume I, Section 6 -
performed during major engine overhauls.
implemented,                                                               one sheet for each main bearing. Use Volume I, Appendix III for clearance values. Ref: TDI In-struction Manual, Vol. 1.
Complete TDI Inspection and Maintenance Record Form No. 310-3-1. TDI Instruction Manual, Volume I Section 6.
GG1249/8                                                                                                                         Revision 1 - Entire Page Revised
02-3108
.                                                                                                                                                                                                                          l t
. Main Bearings Shells' 1.
4 w                                                                                       - - _ _ - _ _ _ _
Inspect and measure main X
The first inspection bearing shell thickness should be performed at Inspection shall evaluate the first fuel outage bearing wear and evidence and at alternate outages.
of harmful crankshaft thereafter.
misalignment. If results Complete TDI Inspection show evidence of mis-and Maintenance Record alignment, TDI recom-'
Form No. 310-2-1, TDI mandations for crankshaft Instruction Manual, realignment should be Volume I, Section 6 -
implemented, one sheet for each main bearing. Use Volume I, Appendix III for clearance values. Ref: TDI In-struction Manual, Vol. 1.
GG1249/8 Revision 1 - Entire Page Revised l
t 4
w


*                            )
)
                        %J                                                                                                                           V GRAND GULF MAINTENANCE MATRIX Component   Component                                                                 Alt.
%J V
Number       Identification       PM Recommendation               Monthly     Outane Outane   5 Year 10 Year Comments Maintenance Schedule Ref: Lead engine DR/QR Report 802-3108 02-310C     Thrust Bearing Ring   1. Measure thrust bearing                     X                                 Complete applicable ring clearance via                                                           of sections TDI
GRAND GULF MAINTENANCE MATRIX Component Component Alt.
                                                      " bump check" method to be,                                                   Inspection and Main-
Number Identification PM Recommendation Monthly Outane Outane 5 Year 10 Year Comments Maintenance Schedule Ref: Lead engine DR/QR Report 802-3108 02-310C Thrust Bearing Ring 1.
                    \                                 performed in conjunction                                                   ' tenance Record Form with crankshaft web                                                           No. 310-1-1 TDI Instruc-deflection measurements.                                                     tion Manual Volume I-The following information                                                     Section 6. NOTE: If should be recorded:                                                           the clearance is
Measure thrust bearing X
* Date of inspection                                                         greater than the maximum
Complete applicable ring clearance via of sections TDI
* Hours of engine operation '                                                 allowed in the TDI
" bump check" method to be, Inspection and Main-
* Hours of engine operation                                                   Instruction Manual, since last bearing re-                                                   then at least one bearing placement (Last bearing                                                   must be replaced.
\\
performed in conjunction
' tenance Record Form with crankshaft web No. 310-1-1 TDI Instruc-deflection measurements.
tion Manual Volume I-The following information Section 6.
NOTE: If should be recorded:
the clearance is
* Date of inspection greater than the maximum
* Hours of engine operation '
allowed in the TDI
* Hours of engine operation Instruction Manual, since last bearing re-then at least one bearing placement (Last bearing must be replaced.
replaced:
replaced:
forward                                                   Bearings should also back)                                                               be replaced if they
forward Bearings should also back) be replaced if they
* NeirTog clearance                                                           are cracked or gouged.
* NeirTog clearance are cracked or gouged.
Ref: Lead engine DR/QR Repo-t 802-310C, Ref: 8/13/84 meno from G. McCarthy to D. Pasquale
Ref: Lead engine DR/QR Repo-t 802-310C, Ref: 8/13/84 meno from G. McCarthy to D. Pasquale 2.
: 2. Visually inspect thrust                             X                         To be performed simult-bearing ring for signs-                                                       aneously with main of cracks, gouges, wear                                                       bearing shell inspec-or degradation.                                                               tion.
Visually inspect thrust X
Ref: Lead engine DR/QR Report #02-310C GG1249/9                                                                                       Revision 1 - Entire Page Revised               ,
To be performed simult-bearing ring for signs-aneously with main of cracks, gouges, wear bearing shell inspec-or degradation.
h
tion.
Ref: Lead engine DR/QR Report #02-310C GG1249/9 Revision 1 - Entire Page Revised h


m                                                                                                                                                                                                   '
m i-GRAND GULF MAINTENANCE MATRIM.
i-
Component component' Alt.
;                                                                                                                              GRAND GULF MAINTENANCE MATRIM.
-Number Identification PM Recommendation.
Component     component'                                                                                                                                       Alt.
Monthly Outace Outaae 5 Year 10 Year Comments 02-311A' Crankcase Assembly-1.
      -Number       Identification                                                                         PM Recommendation.                 Monthly Outace     Outaae   5 Year 10 Year Comments 02-311A'     Crankcase Assembly-                                                                     1. Perfo m a visual inspection               X.                                 The first inspection to be; of the vertical portion                                                       performed after 185 hours of the crankcase arch wall                                                     of at or near full load to the nut pocket area                                                         operation may be used to.
Perfo m a visual inspection X.
for indications of                                                             justify the discontinua-cracking.                                                                     . tion of further inspect-tions. 'Ref: Lead engine
The first inspection to be; of the vertical portion performed after 185 hours of the crankcase arch wall of at or near full load to the nut pocket area operation may be used to.
                                                                                                                                                                                                .DR/QR Regiort #02-311A -
for indications of justify the discontinua-cracking.
  !'  02-315A       Cylinder Block                                                                         1. Perform an inspection of.                                                     Ref: DR/QR Report the cylir:dar block per.                                                       802-315A DR/QR Report 802-315A.
. tion of further inspect-tions. 'Ref: Lead engine
02-315C'   ; Cylinder Liners                                                                         1. Perform a visual inspection               X                                   Borescopic inspection of liners for potential                                                       is acceptable if heads progressive wear.                                                             are not removed.
.DR/QR Regiort #02-311A -
02-315A Cylinder Block 1.
Perform an inspection of.
Ref: DR/QR Report the cylir:dar block per.
802-315A DR/QR Report 802-315A.
02-315C'
; Cylinder Liners 1.
Perform a visual inspection X
Borescopic inspection of liners for potential is acceptable if heads progressive wear.
are not removed.
Complete TDI Inspection and Maintenance Record form No. 315-1-1, TDI Instruction Manual Volume I, Section 6.
Complete TDI Inspection and Maintenance Record form No. 315-1-1, TDI Instruction Manual Volume I, Section 6.
                                                                                                                                                                            ,                    Ref: Lead engine DR/QR Report #02-3418.
Ref: Lead engine DR/QR Report #02-3418.
02-317A84     Water Discharge Manifold -                                                             1. ' Visually inspect for leaks. X                                                   This recommendation is
02-317A84 Water Discharge Manifold -
                  . Jacket Water Discharge                                                                       Note: In the event of a                                                         made on the basis that Piping, Couplings and Seals                                                                   leak developing in the.                                                       the maximum suggested existing Dresser Style 65                                                       operating temperature of-
1.
                                                                                                                . couplings, these couplings                                                     150*F for the Style 65 should be replaced with                                                       coupilng may be exceeded.
' Visually inspect for leaks. X This recommendation is
Dresser Style 90 couplings                                                     The maximum suggested
. Jacket Water Discharge Note: In the event of a made on the basis that 3
,                                                                                                                equipped with Viton gaskets,                                                   operating temperature of the Style 90 is 212*F.
Piping, Couplings and Seals leak developing in the.
GG1249/10                                                                                                                                                             Revision 1 - Entire Page Revised I
the maximum suggested existing Dresser Style 65 operating temperature of-
. couplings, these couplings 150*F for the Style 65 should be replaced with coupilng may be exceeded.
Dresser Style 90 couplings The maximum suggested equipped with Viton gaskets, operating temperature of the Style 90 is 212*F.
GG1249/10 Revision 1 - Entire Page Revised I
I l
I l
2                   -            _  - _ _ _ _ _ _ _
2


h J             ,
h J
: i.                                                                                         GRAIS GULF MAINTENAIICE MATRIM Component Ceaponent                                                                             Alt.
i.
Number     Identification               PM Recommendation                 Monthly     Outaos Outaae         5 Year -10 Year Comments Ref: Letter dated 12/13/84 from C. L.-Ray to J. George. Ref:               i DR/QR Report #02-317A&B 02-340A/B- Connecting Rods, Bushings     1. Inspect and measure To be performed in and Bearing Shells.                 connecting rod bearing                                                                                   conjunction with piston shell to verify lube oil                                                                                 pin inspection. Complete maintenance, which                                                                                 .TDI Inspection and affects wear rate.                                                                                       Maintenance Record Form The visual and dimensional                                                                               No. 340-1-1. TDI inspection of the bearing                                                                                 Instruction Manual, shells should be conducted                                                                               Volume I, Section 6, at the fuel outage which                                                                                 Appendix III for precedes 500 hours of                                                                                   clearnance values. Ref:
GRAIS GULF MAINTENAIICE MATRIM Component Ceaponent Alt.
operation by at least the                                                                               Lead engine DR/QR               '
Number Identification PM Recommendation Monthly Outaos Outaae 5 Year -10 Year Comments Ref: Letter dated 12/13/84 from C. L.-Ray to J. George. Ref:
                                                                              -sum of hours of operation                                                                                 Report #02-3408-in a LOOP /LOCA event-plus the expected hours of operation between outages.
i DR/QR Report #02-317A&B 02-340A/B-Connecting Rods, Bushings 1.
: 2.   . Inspect and measure                                               X                                     Complete TDI Inspection the connecting rods.                                                                                   Maintenance Record Fors           .
Inspect and measure To be performed in and Bearing Shells.
No. 340-2-1,'2, TDI Instruction Manual, Volume I, Sectica 6.
connecting rod bearing conjunction with piston shell to verify lube oil pin inspection. Complete maintenance, which
: 3. Perform an x-ray examin .                                                                               This is to be performed ation on all replacement                                                                               prior to installation of bearing shells to.                                                                                       any replacement bearing
.TDI Inspection and affects wear rate.
                                                                              . acceptance criteria                                                                                     shells. Ref: Lead engine developed by owners                                                                                     DR/QR Report #02-3408 Group Technical Staff.
Maintenance Record Form The visual and dimensional No. 340-1-1. TDI inspection of the bearing Instruction Manual, shells should be conducted Volume I, Section 6, at the fuel outage which Appendix III for precedes 500 hours of clearnance values. Ref:
operation by at least the Lead engine DR/QR
-sum of hours of operation Report #02-3408-in a LOOP /LOCA event-plus the expected hours of operation between outages.
2.
. Inspect and measure X
Complete TDI Inspection the connecting rods.
Maintenance Record Fors No. 340-2-1,'2, TDI Instruction Manual, Volume I, Sectica 6.
3.
Perform an x-ray examin.
This is to be performed ation on all replacement prior to installation of bearing shells to.
any replacement bearing
. acceptance criteria shells. Ref: Lead engine developed by owners DR/QR Report #02-3408 Group Technical Staff.
L l
L l
GG1249/11                                                                                                       Revision 1 - Entire Page Revised l
GG1249/11 Revision 1 - Entire Page Revised l
l r-l ..
l r-l..
l l             +
l l
+
L i
L i
et' 9
et' 9
_____.__________.______________r                      _ _ _      _-2                                     - ~ - - .                                 .-_    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _              _    ___
r
-2
- ~ - -.


GRAND GULF MAINTENANCE MATRIXJ Component. Component                                                                               Alt.
GRAND GULF MAINTENANCE MATRIXJ Component. Component Alt.
Number         Ide.5.ification                 PM Recommendation               Monthly   Outace Outane   5 Year 10 Year Comments
Number Ide.5.ification PM Recommendation Monthly Outace Outane 5 Year 10 Year Comments 4.
: 4. At major engine overhauls                               X                 If fretting has occurred, visually inspect the rack                                                 a further engineering teeth surfaces for signs                                                 evaluation will be of fretting.                                                             necessary. Ref: Lead engine OR/QR Report
At major engine overhauls X
                                                                                                                                                              #02-340A 02-340C       . Pistons                       1. Inspect and measure. skirt                             X                 Complete TDI Inspection and piston pin.                                                           and Maintenance Report Form No. 341-1-1. TDI Instruction Manual, Volume I, Section 6.                 Use Volume 1. Section 8, Appendix III for clear-ance values. To be performed in conjunc-tion with piston pin inspection.                                                         ,
If fretting has occurred, visually inspect the rack a further engineering teeth surfaces for signs evaluation will be of fretting.
02-3400         Pisten Rings                   1. Inspect and measure                                                       Complete TDI Inspection replacement piston rings,                                                 and Maintenance Record.
necessary. Ref: Lead engine OR/QR Report
                                                                                                                                        ,                    Form No. 341-2-1 TDI Instruction Manual, Volume I, Section 6.                 Use Volume I, Section 8. Appendix III for clearance values. To be perform-ed in conjunction with piston pin inspection.
#02-340A 02-340C
i GG1249/12                                                                                                     Revision 1 - Entire Page Revised b
. Pistons 1.
                                                                                                                                    $f
Inspect and measure. skirt X
Complete TDI Inspection and piston pin.
and Maintenance Report Form No. 341-1-1. TDI Instruction Manual, Volume I, Section 6.
Use Volume 1. Section 8, Appendix III for clear-ance values. To be performed in conjunc-tion with piston pin inspection.
02-3400 Pisten Rings 1.
Inspect and measure Complete TDI Inspection replacement piston rings, and Maintenance Record.
Form No. 341-2-1 TDI Instruction Manual, Volume I, Section 6.
Use Volume I, Section 8. Appendix III for clearance values. To be perform-ed in conjunction with piston pin inspection.
i GG1249/12 Revision 1 - Entire Page Revised b
$f


A                                                                                                                               h.
A h.
GRAND GULF MAINTENANCE MATRIX Component   ' Component                                                               Alt.
GRAND GULF MAINTENANCE MATRIX Component
Number       Identification PM Recommendation                   Monthly-     Outaae Outace   5 Year 10 Year Comments
' Component Alt.
: 2.   . Visually inspect liners                       X.                               Borescopic inspection for wear.                                                                       is acceptible if heads NOTE: Ring replacement                                                           are not removed. Com-and cylinder ifner                                                             plate TDI Inspection honing should be performed                                                     and Maintenance Record in accordance with TDI                                                         Form No. 315-1-1. TDI maintenance procedures.
Number Identification PM Recommendation Monthly-Outaae Outace 5 Year 10 Year Comments 2.
Instruction Manual, Volume I, Section 6. Use Volume I, Section 8. Appendix III for clearance values.
. Visually inspect liners X.
Ref: Lead engine DR/QR Report #02-3418 (Items 2,3,4)
Borescopic inspection for wear.
: 3. 135' fuel oil spray.                         X                                 Ref: 07/31/84 memo tips may be used if                                                             from L. Swanger to inspection results                                                             D. Pasquale
is acceptible if heads NOTE: Ring replacement are not removed. Com-and cylinder ifner plate TDI Inspection honing should be performed and Maintenance Record in accordance with TDI Form No. 315-1-1. TDI maintenance procedures.
,                                    indicate a need for additional action to improve lubrication and reduce coke buildup.
Instruction Manual, Volume I, Section 6.
: 4. When replacing engine                         X                                 NOTE: Do no't six oil use H.D. oil that                                                           L.O. brands or types.
Use Volume I, Section 8. Appendix III for clearance values.
exceeds series 3                                                               When changing L.O.
Ref: Lead engine DR/QR Report #02-3418 (Items 2,3,4) 3.
standards. The base                                                             replace the entire stock should be                                                                 L.O. charge. Ref:
135' fuel oil spray.
more resistant to"                                                               08/14/84 letter to thermal degradation                                                             C. Ray from M. Lowrey.
X Ref: 07/31/84 memo tips may be used if from L. Swanger to inspection results D. Pasquale indicate a need for additional action to improve lubrication and reduce coke buildup.
4.
When replacing engine X
NOTE: Do no't six oil use H.D. oil that L.O. brands or types.
exceeds series 3 When changing L.O.
standards. The base replace the entire stock should be L.O. charge. Ref:
more resistant to" 08/14/84 letter to thermal degradation C. Ray from M. Lowrey.
and coke formation.
and coke formation.
The additive package should provide high detergent dispersant properties with high GG1249/13                                                                                       Revision 1 - Entire Page Revised 4
The additive package should provide high detergent dispersant properties with high GG1249/13 Revision 1 - Entire Page Revised 4


i i
i i
l'
l' GRAIS GULF MAINTENANCE MATRIM
!                                                                        GRAIS GULF MAINTENANCE MATRIM
.. Component-Component' Alt.
        .. Component- Component'                                                                             Alt.
Number-Identification PM Recommendation Monthly Outane Outage.
Number-       Identification                 PM Recommendation                 Monthly   Outane Outage. 5 Year 10 Year Comments l
5 Year 10 Year Comments l
I alkalinity and a high level of antiwear additive such as zinc dithiophosphate.
I alkalinity and a high level of antiwear additive such as zinc dithiophosphate.
Total Base Number.
Total Base Number.
(TBN) should be 12' to 15 for use with
(TBN) should be 12' to 15 for use with
                                                              #2 fuel oil and a.                                                                     -
#2 fuel oil and a.
sulfated ash content of 1.55 to 2.0K is
sulfated ash content of 1.55 to 2.0K is preferred. An engine oil with such properties, Mob 11 guard 412 or equivalent product may be used to ensure feproved lubrication.
;                                                            preferred. An engine
! 340E.
.                                                            oil with such properties, Mob 11 guard 412 or equivalent product may be used to ensure feproved lubrication.
[PistonPinAssembly 1.
!       340E.     [PistonPinAssembly             1. Visually inspect'for                             .              X.             Also to be performed i-                                                           chroes plate damage.                                                           whenever pistons are Replace pins which show                                                       removed and disassembled chipped or blistered chrome.                                                   to an extent that such NOTE: All new or re-                                                         inspectionis possible.
Visually inspect'for X.
i                                                             placement pins will be
Also to be performed i-chroes plate damage.
* Ref: Lead engine L.P. or M.P. Inspected _                                                     DR/QR Report #02-341C, before installation in                                                         For details on acceptance.
whenever pistons are Replace pins which show removed and disassembled chipped or blistered chrome.
Owners Group engines.                                                         criteria. Ref: 08/22/84 memo from W. Littmann to i                                                                                                                                          D. Pasquale and Lead engine DR/QR Report
to an extent that such NOTE: All new or re-inspectionis possible.
                                                                                                                                            #02-341C.
i placement pins will be Ref: Lead engine L.P. or M.P. Inspected _
DR/QR Report #02-341C, before installation in For details on acceptance.
Owners Group engines.
criteria. Ref: 08/22/84 memo from W. Littmann to D. Pasquale and Lead i
engine DR/QR Report
#02-341C.
't i
't i
l         GG1249/14                                                                                                   Revision 1 - Entire Page Revised i
l GG1249/14 Revision 1 - Entire Page Revised i
e i
e i
1.
1.
Line 2,178: Line 3,334:
f
f


                      <-~~                                                                                                                                       g
<-~~\\
                          \
g J
J
GRAND GULF MAINTENANCE MATRIX Component.
  , -                                                                        GRAND GULF MAINTENANCE MATRIX Component. Component                                                                             Alt.
Component Alt.
Number       Identification                   PM Recommendation               Monthly     Outane Outage   5 Year' 10 Year Comments
Number Identification PM Recommendation Monthly Outane Outage 5 Year' 10 Year Comments
                                                          ' 2. Inspect end plugs and                                                     Nota: This inspection is reroll or replace any                                                     to be performed whenever that are loose.                                                           the engine is sufficantly dismantled to allow this inspection.
' 2.
Ref: Lead engine DR/QR Report 902-341C 02-345A'     Intake and Exhaust Tappet         1. Inspect intake and exhaust               X                               Complete TDI Inspection Assembly                               tappet assembly condition.                                                 and Maintenance Report Form No. 345-1-1, TDI Instruction Manual, Volume I, Section 6.
Inspect end plugs and Nota: This inspection is reroll or replace any to be performed whenever that are loose.
the engine is sufficantly dismantled to allow this inspection.
Ref: Lead engine DR/QR Report 902-341C 02-345A' Intake and Exhaust Tappet 1.
Inspect intake and exhaust X
Complete TDI Inspection Assembly tappet assembly condition.
and Maintenance Report Form No. 345-1-1, TDI Instruction Manual, Volume I, Section 6.
Ref: TDI Instruction Manual, Vol. 1 Main-tenance Schedule Ref: TDI Letter dated 2/16/84 from D. Schmitz to J. Kammeyer.
Ref: TDI Instruction Manual, Vol. 1 Main-tenance Schedule Ref: TDI Letter dated 2/16/84 from D. Schmitz to J. Kammeyer.
(Ref. IOC 09/14/84 from J. Carbonaro to D. Pasquale).
(Ref. IOC 09/14/84 from J. Carbonaro to D. Pasquale).
: 2. Verify that can rollers                   X                               Complete TDI Inspection are free to rotate, and                                                   and Maintenance Record         (
2.
l                                                                 that there is no                                                         Form No. 345-1-1 TDI         -
Verify that can rollers X
measurable clearance                                                       Instruction Manual, Vol.
Complete TDI Inspection are free to rotate, and and Maintenance Record
                                                                -between the can                                                             I, Section 6. Raf:
(
rollers and the roller                                                     Lead engine DR/QR Report pins.                                                                     #02-345A GG1249/15                                                                                                   Revision 1 - Entire Page Revised L
l that there is no Form No. 345-1-1 TDI measurable clearance Instruction Manual, Vol.
-between the can I, Section 6.
Raf:
rollers and the roller Lead engine DR/QR Report pins.
#02-345A GG1249/15 Revision 1 - Entire Page Revised L
4 l
4 l
]


;f\\
i:
i:
                                                                                                                                                                                ;f\
%J iy.
                                                                                                                                                                                  %J       iy.
I, GRAls GULF MAINTENANCE MATRIX i Component.
I, GRAls GULF MAINTENANCE MATRIX i Component.     ' Component                     .                          .                              .
' Component Alt.'
Alt.'     .          .
Number
                            ' Identification -
' Identification -
s    Number                                                  PM Recommendation                 : Monthly   Outane Outane   5 Year 10 Year Comments 02-3458'       Fuel Tappet-Assembly                     1.     Inspect fuel tappet-                       X                               Complete TDI Inspection assembly condition.                                                     -.and Maintenance Report Form No. 345-1-1. TDI .
PM Recommendation
                                                                                                                                                          ' Instruction Manual, Volume I, Section 6.                      .
: Monthly Outane Outane 5 Year 10 Year Comments s
Ref: TDI Instruction Manual, Vol. 1. Main-tenance Schedule
02-3458' Fuel Tappet-Assembly 1.
        ,                                                              2.     Verify t*.at can rollers.                   X                               Complete TDI Inspection       -
Inspect fuel tappet-X Complete TDI Inspection assembly condition.
are free to rotate, and                                                     and Maintenance Record that there is no measurable-                                               Form No. 345-1-1 TDI clearance between the                                                       Instruction Manual, can rollers and the roller                                                 Vol. I, Section 6.
-.and Maintenance Report Form No. 345-1-1. TDI.
pins.                                                                       Ref: Lead engine DR/QR Report #02-3458 02-350A       ~Can Shaft Assembly                       1.     Perform a visual inspection                 X                               Any signs of cracking, i=                                                                              of all cas lobe surfaces                                                   pitting or spalling shall for signs of cracking,                                                     be followed by a detailed pitting or spalling.                                                       analysis to evaluate the expected 11fe based on the size and exteat of surface distress and           I any corrective measures shall be implemented as indicated by this analysis. Signs of spalling shall result in tamediate replacement of 1-                                                                                                                                                         the can.
' Instruction Manual, Volume I, Section 6.
Ref: TOI Instruction Manual, Vol. I, Main-tenance Schedule, Ref: Lead engine
Ref: TDI Instruction Manual, Vol. 1. Main-tenance Schedule 2.
'--                                                                                                                                                        DR/QR Report #02-350A
Verify t*.at can rollers.
            - GG1249/16                                                                                                               Revision 1 - Entire Page Revised I
X Complete TDI Inspection are free to rotate, and and Maintenance Record that there is no measurable-Form No. 345-1-1 TDI clearance between the Instruction Manual, can rollers and the roller Vol. I, Section 6.
pins.
Ref: Lead engine DR/QR Report #02-3458 02-350A
~Can Shaft Assembly 1.
Perform a visual inspection X
Any signs of cracking, of all cas lobe surfaces pitting or spalling shall i =
for signs of cracking, be followed by a detailed pitting or spalling.
analysis to evaluate the expected 11fe based on the size and exteat of surface distress and I
any corrective measures shall be implemented as indicated by this analysis. Signs of spalling shall result in tamediate replacement of 1-the can.
Ref: TOI Instruction Manual, Vol. I, Main-tenance Schedule, Ref: Lead engine DR/QR Report #02-350A
- GG1249/16 Revision 1 - Entire Page Revised I
4 1
4 1
M
M


O C                                                                                                                                                                                                          .
C O
Z GRANO GULF MAINTENANCE MATRIM
Z GRANO GULF MAINTENANCE MATRIM
                          . Component       . Component                         .                        .
. Component
Alt.
. Component Alt.
* Nweber             Identification-               PM Recommendation                                               Monthly Outaae Outaae         5 Year 10 Year Comments 02-3500           Can Shaft Searings             1.     Inspect and measure cam                                                                 X                                     Complete TDI Inspection -
5 Nweber Identification-PM Recommendation Monthly Outaae Outaae 5 Year 10 Year Comments 02-3500 Can Shaft Searings 1.
shaft bearing shells,                                                                                                         and Maintenance Record Form No. 350-1-1. TDI Instruction Manual, Volume I, Section 6.
Inspect and measure cam X
Use Volume I, Section 8 Appendix III for clear-
Complete TDI Inspection -
,                                                                                                                                                                                                                  ance values.
shaft bearing shells, and Maintenance Record Form No. 350-1-1. TDI Instruction Manual, Volume I, Section 6.
02-350C.           Can Gear                       1.     Visually inspect can gear:                                         X.                                                         Ref: Memo from 8.
Use Volume I, Section 8 Appendix III for clear-ance values.
for chipped or broken                                                                                                         8tekford to E. Montgomery teeth, pitting, excessive'                                                                                                     dated 6/23/84, .
02-350C.
wear, or other abnormal                                                                                                       Ref: Lead engine conditions.                                                                                                                 - DR/QR Report #02-350C
Can Gear 1.
: 2.     Measure gear back lash.                                                     X                                                 Complete applicable NOTE - if can gear hub is'                                                                                                     sections of TDI Inspec-removed.-it is ESSENTIAL                                                                                                       tion and Maintenance that the nut be relocked                                                                                                       Record, Form No. 355-1-1, at the position corres-                                                                                                       TDI M nual Volume I, i-                                                                                   ponding to the pre-                                                                                                           Sectir.o 0, Appendix.
Visually inspect can gear:
scribed torque range of                                                             ,                                        III-1 for clearance 80 (-0+10) ft-lbs.                                                                                                             values. Ref: Lead Insertion of,the cotter-                                                                                                       engine DR/QR Report pin must be accomplished                                                                                                       #02-350C at a torque > 80 ft-Ibs
X.
                                                                                    ' force and < 30 ft-1bs   ~
Ref: Memo from 8.
for chipped or broken 8tekford to E. Montgomery teeth, pitting, excessive' dated 6/23/84,.
wear, or other abnormal Ref: Lead engine conditions.
- DR/QR Report #02-350C 2.
Measure gear back lash.
X Complete applicable NOTE - if can gear hub is' sections of TDI Inspec-removed.-it is ESSENTIAL tion and Maintenance that the nut be relocked Record, Form No. 355-1-1, at the position corres-TDI M nual Volume I, i-ponding to the pre-Sectir.o 0, Appendix.
scribed torque range of III-1 for clearance 80 (-0+10) ft-lbs.
values. Ref: Lead Insertion of,the cotter-engine DR/QR Report pin must be accomplished
#02-350C at a torque > 80 ft-Ibs
' force and < 30 ft-1bs
~
force. If this is not possible another bolt, nut or washer should be used.
force. If this is not possible another bolt, nut or washer should be used.
4 GG1249/17                                                                                                                                         Revision 1 - Entire Page Revised l
4 GG1249/17 Revision 1 - Entire Page Revised t
l i
1 A
1 A
e
e


                                                                                                              -,                  -    -- . -          . . .. - -      .,                  .n... .. -.            ,
.n...
l
l
                                                                                                                                                                                                                              ]
]
j                                                                                                                                 GRAND GULF MAINTENANCE MATRIM P---                 -t             Component .                                                                                     . Alt.
j GRAND GULF MAINTENANCE MATRIM P---
Number                               Identification-                   PM Recommendation.                   Monthly           Outace Outane    5 Year. 10 Year Comments L
-t Component.
                                                                                                                  -The above is applicable to 4-bolt arrangeents only.
Outane 5 Year. 10 Year Comments Alt.
Number Identification-PM Recommendation.
Monthly Outace L
-The above is applicable to 4-bolt arrangeents only.
:The torque range for 6-bolt arrangements is 70 1 20 ft-lbs with the ssee restric-tions as described above for insertion of the cotter' pins.
:The torque range for 6-bolt arrangements is 70 1 20 ft-lbs with the ssee restric-tions as described above for insertion of the cotter' pins.
* 355A                                 Crank to Pump Gear-               - 1.       Visually inspect crankshaft                       X                                     Arty abnormal situations to lube oil pump gear         .
* 355A Crank to Pump Gear-
or indications of for chipped or broken teeth,                                                           progressive pitting.
- 1.
excessive wear, or                                                                     should be reported           ,
Visually inspect crankshaft X
progressive pitting                                                                     for an engineering or other abnormal                                                                       evaluation.
Arty abnormal situations to lube oil pump gear or indications of for chipped or broken teeth, progressive pitting.
conditions.                                                                             Ref: Lead engine DR/QR Report #02-355A
excessive wear, or should be reported progressive pitting for an engineering or other abnormal evaluation.
                                                                                                        - 2.     . Measure gear backlash.                                       X                           Complete applicable sections of TDI             ,
conditions.
                                                                                                                                                    .                                                      Inspection and Main-       .r tenance Record Form .       '
Ref: Lead engine DR/QR Report #02-355A
- 2.
. Measure gear backlash.
X Complete applicable sections of TDI Inspection and Main-
.r tenance Record Form.
Mo. 355-1-1 TDI Manual, Volume I, Section 6.
Mo. 355-1-1 TDI Manual, Volume I, Section 6.
Use Volume 1. Section 8, i                                                                                                                                                                                                           Appendix III-1 from clearance values.
Use Volume 1. Section 8, i
Ref: TDI Instruction         ,
Appendix III-1 from clearance values.
Manual, Vol. I, Main-       t
Ref: TDI Instruction Manual, Vol. I, Main-t
                                                                                                                                                                                                          -tenance Schedule
,c
,c i
-tenance Schedule i
GG1249/18                                                                                                                                         Revision 1 - Entire Page Revised 4
GG1249/18 Revision 1 - Entire Page Revised 4
e 7
e b
e a
7 e
g, e
a g,
                                                                                            ,o - -- -                                                    ,                              --                                v-,
e
,o v-,


  , _ _ _ _  __ . _ _ _ _ _ __          . , _      _. . _ .      ~.                     -                __
~.
l GRM S GULF MAINTENANCE MATRIX Component'.         Component                                                                         Alt.
l GRM S GULF MAINTENANCE MATRIX Component'.
Number               Identification         PM Cecommendation                 Monthly     Outage   Outage   5 Year 10 Year Comments 02-3558             ' Idler Gear Assembly   1. Visually inspect idler                     X.                                 Any abnormal indications gears for chipped or                                                           should be reported for an broken teeth, excessive                                                       engineering evaluation.
Component Alt.
wear pitting, or other                                                         Ref: Lead engine DR/QR abnormal conditions.                                                           Report #02-3558
Number Identification PM Cecommendation Monthly Outage Outage 5 Year 10 Year Comments 02-3558
: 2. Measure gear backlash.                               X                       Complete applicable NOTE: If idler gear hub is                                                     sections lof TDI Inspec-
' Idler Gear Assembly 1.
                                                              -removed, it is recommended                                                     tion and Maintenance that the nut be relocked at                                                   Record Form No. 355-1-1.
Visually inspect idler X.
the position corresponding                                                   TDI Instruction Manual, to the torque of 70120 ft-                                                   "/ol.-I, Section 6, use 1bs. Insertion of the cotter                                                 Vol. 1. Section 8. Appen-pin must be accomplished at'                                                 dix III-1 for clearance a torque 1 50 ft-lb and .1                                                     values.
Any abnormal indications gears for chipped or should be reported for an broken teeth, excessive engineering evaluation.
90 ft-Ib. If this is not                                                   Ref: TDI Is.struction possible, another bolt, nut                                                   Manual, Vol. I, Main-or washer.should be used.                                                     tenance Schedule         :
wear pitting, or other Ref: Lead engine DR/QR abnormal conditions.
Raf: Lead engine           .
Report #02-3558 2.
DR/QR Report #02-3558 02-359               Air Start Valves-       1. Remove, clean and inspect                 X
Measure gear backlash.
* Ensure valve insta11ation air start valves.                                                             includes retorque (Replace copper valve-                                                         requirements.
X Complete applicable NOTE: If idler gear hub is sections lof TDI Inspec-
to head gasket)                                                               Ref: DR/QR Report
-removed, it is recommended tion and Maintenance that the nut be relocked at Record Form No. 355-1-1.
                                                                                                                                              #02-359 (Items 1, 2, 3)
the position corresponding TDI Instruction Manual, to the torque of 70120 ft-
: 2. Inspect the piston, cap,                   X guide and housing sliding i
"/ol.-I, Section 6, use 1bs. Insertion of the cotter Vol. 1. Section 8. Appen-pin must be accomplished at' dix III-1 for clearance a torque 1 50 ft-lb and.1 values.
surfaces'to evaluate wear or corrosion.
90 ft-Ib.
If this is not Ref: TDI Is.struction possible, another bolt, nut Manual, Vol. I, Main-or washer.should be used.
tenance Schedule Raf: Lead engine DR/QR Report #02-3558 02-359 Air Start Valves-1.
Remove, clean and inspect X
Ensure valve insta11ation air start valves.
includes retorque (Replace copper valve-requirements.
to head gasket)
Ref: DR/QR Report
#02-359 (Items 1, 2, 3) 2.
Inspect the piston, cap, X
guide and housing sliding surfaces'to evaluate i
wear or corrosion.
4 1
4 1
GG1249/19                                                                                                     Revision 1 - Entire Page Revised k
GG1249/19 Revision 1 - Entire Page Revised k
1 3
1 3
e
e


GRAND GULF MAINTENANCE MATRIX Component Component                                                                       Alt.
GRAND GULF MAINTENANCE MATRIX Component Component Alt.
Number     Identification         FM Recommendetion                   Monthly Outace ~Outace   5 Year 10 Year Comments
Number Identification FM Recommendetion Monthly Outace ~Outace 5 Year 10 Year Comments 3.
: 3. Ensure that the desiccant'                                                                                                     To be performed daily.
Ensure that the desiccant' To be performed daily.
dryer between the air                                                                                                           Ref: DR/QR Report compressor after cooler                                                                                                         #02-359 and the air receivers
dryer between the air Ref: DR/QR Report compressor after cooler
,                                                                                        .is working properly by blowing down the air receivers daily, and monitoring the                                                                                                                                           ,
#02-359 and the air receivers
moisture content.
.is working properly by blowing down the air receivers daily, and monitoring the moisture content.
,                                                02-360A- ' Cylinder. Head         1. Visually inspect cylinder ~                               X                                                                   Complete TDI Inspection heads (all cylinders).                                                                                                         and Maintenance Record Fors No. 360-1-1. TDI Instruction Manual, Volume I. Section 6. One sheet for each head.
02-360A-
: 2.   . Record cold compression                   X                                                                                   If so indicated remove pressures and maximum                                                                                                           cylinder heads,. grind firing pressures.                                                                                                             valves and reseat.
' Cylinder. Head 1.
Ref: TDI Instruction         !
Visually inspect cylinder ~
Manual Volume I, Section 6.
X Complete TDI Inspection heads (all cylinders).
: 3. Blow-over the engine with                                                                                                       In the event water is starting air per TDI main-detected, the cylinder tenance requirements, Volume                                                                                                   head should be replaced I or at appropriate intervals                                                                                                 or returned to the after shutdown of                                                                                                             vendor for repair.
and Maintenance Record Fors No. 360-1-1. TDI Instruction Manual, Volume I. Section 6.
the engine to ensure                                                                                                           Ref: . Lead engine DR/QR against harmful effects                                                                                                         Report #02-360A
One sheet for each head.
;                                                                                          of water leaks.
2.
GG1249/20                                                                                         Revision 1 - Entire Page Revised I
. Record cold compression X
If so indicated remove pressures and maximum cylinder heads,. grind firing pressures.
valves and reseat.
Ref: TDI Instruction Manual Volume I, Section 6.
3.
Blow-over the engine with In the event water is starting air per TDI main-detected, the cylinder tenance requirements, Volume head should be replaced I or at appropriate intervals or returned to the after shutdown of vendor for repair.
the engine to ensure Ref:. Lead engine DR/QR against harmful effects Report #02-360A of water leaks.
L GG1249/20 Revision 1 - Entire Page Revised I
b 4
b 4
p.
p.
I
I


GRAND GULF MAINTENANCE MATRIX Comp >nent                                           Component                                                                       Alt.
GRAND GULF MAINTENANCE MATRIX Comp >nent Component Alt.
Mumber                                               Identification               PM Recommendation                 Monthly   Outap Outage   5 Year 10 Year Comments I
Mumber Identification PM Recommendation Monthly Outap Outage 5 Year 10 Year Comments I
: 4. Visually inspect the         X                                                     If water leakage is fuel injection port on                                                             detected, the head (s) each cylinder head                                                                 should be replaced.
4.
                                                                                                      "during" the normal                                                                 Ref: Lead engine monthly engine run                                                                 DR/Qlt Report #02-360A for water leaks.
Visually inspect the X
          '02-3608                                                 Cylinder Head - Intake and   1. Visually inspect intake                               X                           Complete the appilcable Exhaust Valves                     and exhaust valve, discs,                                                           sections of TDI Inspection stems and seats for wire                                                           and Maintenance Record drawing, pitting, distortion.                                                       Form 360-2-1.
If water leakage is fuel injection port on detected, the head (s) each cylinder head should be replaced.
"during" the normal Ref: Lead engine monthly engine run DR/Qlt Report #02-360A for water leaks.
'02-3608 Cylinder Head - Intake and 1.
Visually inspect intake X
Complete the appilcable Exhaust Valves and exhaust valve, discs, sections of TDI Inspection stems and seats for wire and Maintenance Record drawing, pitting, distortion.
Form 360-2-1.
concentricity, or any abnormal condition.
concentricity, or any abnormal condition.
: 2. Visually inspect subcovers                                                         This is a one time caly for evidence of valve                                                               inspection to be per-guide blowby (soot).                                                               formed after 500-600 hrs. of engine operation after rebuild of the cylinder head. Ref:
2.
Lead engine DR/QR Report #02-360B i                                                                                               3. Measure intake and exhaust                             X                           Complete applicable valves t. sad thickness.                                                           sections of TDI Inspection and Main-tenance Records Form 360-2-1. TDI Instruction                                       '
Visually inspect subcovers This is a one time caly for evidence of valve inspection to be per-guide blowby (soot).
Manual, Volume I, Section
formed after 500-600 hrs. of engine operation after rebuild of the cylinder head. Ref:
: 6. One sheet for each cylinder. Use Section 8 Appendix III for clearance values. (Items 3, 4)
Lead engine DR/QR Report #02-360B i
GG1249/21                                                                                                                                       Revision 1 - Entire Page Revised i
3.
Measure intake and exhaust X
Complete applicable valves t. sad thickness.
sections of TDI Inspection and Main-tenance Records Form 360-2-1. TDI Instruction Manual, Volume I, Section 6.
One sheet for each cylinder. Use Section 8 Appendix III for clearance values. (Items 3, 4)
GG1249/21 Revision 1 - Entire Page Revised i
4 e
4 e


f~%'
f~%'
O                                                                                                 %./                                                                     0 GRAND GULF MAINTENANCE MATRIK Component Component           .
O
Alt.
%./
Number   Identification.                                                 - PM Recommendation               Monthly     Outage   Outane     5 Year 10 Year Comments-
0 GRAND GULF MAINTENANCE MATRIK Component Component Alt.
                                                                              . 4. Measure intake and exhaust                                   X                 Complete applicable valves - valve-to-guide                                                         sections of TDI- ,
Number Identification.
clearances.                                                                     Inspection and A'ain-tenance Record Form 360-2-1, TDI Manual, Volume I, Section 5.
- PM Recommendation Monthly Outage Outane 5 Year 10 Year Comments-
. 4.
Measure intake and exhaust X
Complete applicable valves - valve-to-guide sections of TDI-,
clearances.
Inspection and 'ain-A tenance Record Form 360-2-1, TDI Manual, Volume I, Section 5.
One sheet for each cylinder.- Use Section
One sheet for each cylinder.- Use Section
: 8. Appendix Il for
: 8. Appendix Il for clearance values.
;                                                                                                                                                                    clearance values.                 t 02-362A   Cylinder Head Covers -                                             1. Perform a liquid penetrant                                   X                 This inspection is to Subcover Assembly                                                       examination of the rocker                                                       be performed in conjunc-are pedestals between the                                                       tion with the rocker i
t 02-362A Cylinder Head Covers -
counter bores and top                                                           are bushing inspections
1.
                                                                                    'and vertical machined                                                         when the rocker are surfaces (connector                                                             shafts are removed from pushrod side only),                                                             the subcovers (Ref:
Perform a liquid penetrant X
This inspection is to Subcover Assembly examination of the rocker be performed in conjunc-are pedestals between the tion with the rocker counter bores and top are bushing inspections i
'and vertical machined when the rocker are surfaces (connector shafts are removed from pushrod side only),
the subcovers (Ref:
Lead engine DR/QR Report #02-390E) or when the rocker are shaft assembly is removed. Subcovers with pedestal cracks
Lead engine DR/QR Report #02-390E) or when the rocker are shaft assembly is removed. Subcovers with pedestal cracks
                                                                                                                                                                  'that extend through the counter bore web down to the threads should be replaced. Ref: Lead j                                                                                                                                                                   engine DR/QR Report
'that extend through the counter bore web down to the threads should be replaced. Ref: Lead j
                                                                                                                                                                    #02-362A s
engine DR/QR Report
a GG1249/22                                                                                                                                     Revision 1 - Entire Page Revised 0
#02-362A s
a GG1249/22 Revision 1 - Entire Page Revised 0


_                          ~ . . .
~...
I
I
                                                                            ~                                                                           J -
~
Jl GRAND GULF MAINTENANCE MATRIM Component : Component                           .
J -
                                                                                                    . Alt.
J l GRAND GULF MAINTENANCE MATRIM Component : Component
Number       Identification         PM Recommendation               Monthly     Outaos ' Outaos     5 Year 10 Year Comments 02-365A     Fuel Injection pumps   1. Tear down one pump for                                 X                         Use representative pump inspection,                                                                       to determine need to-
. Alt.
                                                                                                                                  . overhaul other. pumps Ref: TDI Instruction Manual, Volume I, Maintenance Schedule
Number Identification PM Recommendation Monthly Outaos ' Outaos 5 Year 10 Year Comments 02-365A Fuel Injection pumps 1.
: 2. Complete fuel injection                                 X                         Based on' inspection re-pump inspection in                                                               .sults and operating a cordance with TDI                                                               parameters. NOTE '
Tear down one pump for X
Instruction and Main-                                                             Olsassembly of fuel tenance Manual Volume I.                                                           injection pumps should be performed by a Bendix-Corp. representative.
Use representative pump inspection, to determine need to-
. overhaul other. pumps Ref: TDI Instruction Manual, Volume I, Maintenance Schedule 2.
Complete fuel injection X
Based on' inspection re-pump inspection in
.sults and operating a cordance with TDI parameters. NOTE '
Instruction and Main-Olsassembly of fuel tenance Manual Volume I.
injection pumps should be performed by a Bendix-Corp. representative.
Complete TDI Instruction and Maintenance Record Fora No. 365-1-1, Section 6. Items 1, 2 Ref: 3/26/84 IOC from M. Wehmeyer to T. Fritsch, Ref: 4/27/84 Letter from R..Johnston to R. Jaquinto, Ref: TOI Instruction Manual Section I.
Complete TDI Instruction and Maintenance Record Fora No. 365-1-1, Section 6. Items 1, 2 Ref: 3/26/84 IOC from M. Wehmeyer to T. Fritsch, Ref: 4/27/84 Letter from R..Johnston to R. Jaquinto, Ref: TOI Instruction Manual Section I.
Maintenance Schedule for Item 3. Ref: Lead engine DR/QR Report s
Maintenance Schedule for Item 3. Ref: Lead engine DR/QR Report
                                                                                                                                    #02-365A (Items 2&3).
#02-365A (Items 2&3).
1 1
s 1
      .GG1249/23                                                                                           Revision 1 - Entire Page Revised i
1
                  )
.GG1249/23 Revision 1 - Entire Page Revised i
)
)I 4
)I 4
th
th


E l                                                                                                                   GRM S GULF MAINTENANCE MATRIM
E l
: Component                                               Component                                                                           ' Alt.
GRM S GULF MAINTENANCE MATRIM
Identification Number                                                                                    PM Recommendation               Monthly   Outage Outane   5 Year 10 Year faaments
: Component Component
        .02-3658                                                   Fuel Injectior Nozzles.         1. Remove, inspect and clean                 X                               Ensure that a new copper.
' Alt.
l                                                                                                       tips,                                                                     gasket is used upon reinsta11ation of i
Number Identification PM Recommendation Monthly Outage Outane 5 Year 10 Year faaments
.02-3658 Fuel Injectior Nozzles.
1.
Remove, inspect and clean X
Ensure that a new copper.
l
: tips, gasket is used upon reinsta11ation of i
nozzle into head.
nozzle into head.
Complete TDI Inspection and Maintenance Record Form 365-2-1 Instruction Manual, Volume I.
Complete TDI Inspection and Maintenance Record Form 365-2-1 Instruction Manual, Volume I.
Section 6. Ref:. TDI Instruction Manual, Vol.
Section 6.
Ref:. TDI Instruction Manual, Vol.
I, Section 5, Maintenance Schedule Ref: Lead engine DR/QR Report #02-3658 (Items 1-4)-
I, Section 5, Maintenance Schedule Ref: Lead engine DR/QR Report #02-3658 (Items 1-4)-
L                                                                                                   2. Check nozzle pop pressure.               X
L 2.
;.                                                                                                  3. Check spray pattern.                     X
Check nozzle pop pressure.
: 4. Check assembly for             X                                         To be performed with the leakage,                                                                 engine running during the monthly test run.
X 3.
Ref: Grand Gulf DR/QR i                                                                                                                                                                                 Report #02-3658 Task Description.
Check spray pattern.
02-365C '                                                 Fuel Injection Tubing-         1. Check tubing for leaks         X                                         All fuel oil leak inspec-at compression fittings, tions to be performed while the engine is running.
X 4.
Check assembly for X
To be performed with the
: leakage, engine running during the monthly test run.
Ref: Grand Gulf DR/QR i
Report #02-3658 Task Description.
02-365C '
Fuel Injection Tubing-1.
Check tubing for leaks X
All fuel oil leak inspec-at compression fittings, tions to be performed while the engine is running.
1 I
1 I
GG1249/24                                                                                                                                             Revision 1 - Entire Page Revised
GG1249/24 Revision 1 - Entire Page Revised
: v. .
: v..
GRAND GULF MAINTENANCE MATRIX Component                                             Componaat                                                                                           Alt.
GRAND GULF MAINTENANCE MATRIX Component Componaat Alt.
Number                                                 Identification'                       PM Recommendation                     Monthly   Outage     Outace   5 Year 10 Year Comments
Number Identification' PM Recommendation Monthly Outage Outace 5 Year 10 Year Comments 2.
: 2. Visually inspect tubing             X                                             Fitting inspection for lengths for F.O. leaks                                                             leaks to be performed or cracks,                                                                         at first engine opera-tion following the installation of tubing.
Visually inspect tubing X
Fitting inspection for lengths for F.O. leaks leaks to be performed or cracks, at first engine opera-tion following the installation of tubing.
Subsequent inspections to be performed period-ically as indicated.
Subsequent inspections to be performed period-ically as indicated.
Fuel oil leakage from t'
Fuel oil leakage from shrouded fuel oil lines t'
shrouded fuel oil lines can be detected at the leakoff ports in the base nutsi which are provided for this purpose. Ref: Letter from C. A. Malovrh to V. A. Saleta dated 08/30/84 02-371A                                               Fuel Pump control Shaft           ''.  .
can be detected at the leakoff ports in the base nutsi which are provided for this purpose. Ref: Letter from C. A. Malovrh to V. A. Saleta dated 08/30/84 02-371A Fuel Pump control Shaft Check lube ' ll cups X
Check lubeo' ll cups                 X                                             Ref: Lead engine DR/QR and fill cs necessary.                                                             Report #02-371A 02-3718                                                 Fuel Pump Linkage Assembly             1. ' Grease swivel link on,                       X and Bearings                                 F.0. pump assemblies all cylinders.
Ref: Lead engine DR/QR o
02-375                                                 Intake Manifold                       1. Care should be exercised                                                           If required, other castings-in assembly of cylinder                                                           may be tried to achieve heads onto the engine,                                                           an acceptable fit or bolt to avoid cracking of-                                                             hole diameters may be in-the intake manifold                                                               creased to 1/8" oversized.
and fill cs necessary.
elbows.                                                                           Component should under no circumstances be jacked to fit. Ref: Lead engine frR/QR Report #02-375 GG1249/25                                                                                                                                                           Revision 1 - Entire Page Revised 4
Report #02-371A 02-3718 Fuel Pump Linkage Assembly 1.
' Grease swivel link on, X
and Bearings F.0. pump assemblies all cylinders.
02-375 Intake Manifold 1.
Care should be exercised If required, other castings-in assembly of cylinder may be tried to achieve heads onto the engine, an acceptable fit or bolt to avoid cracking of-hole diameters may be in-the intake manifold creased to 1/8" oversized.
elbows.
Component should under no circumstances be jacked to fit. Ref: Lead engine frR/QR Report #02-375 GG1249/25 Revision 1 - Entire Page Revised 4
6
6


_      _ -    - .        _~         _  _.    . _ _        . . .    .            _ _ . . . _ _          _  _                    _    ._                .        ._              .,
_~
1
1 h.
.                                                                                                                                                                            h.
GRAND GULF MAINTENANCE MATRIX Component Component.
GRAND GULF MAINTENANCE MATRIX Component   Component .                                                                          .
Alt.
Alt.
Number     Identification                 PM Recommendation                   Monthly             Outace.. Outaae   S Year 10 Year Comments' 02-3804     Exhaust Manifold               1.     Visually and NT examine.                                       X.                       To be performed during a sampling of circum .                                                               .the first refueling forential pipe welds and                                                                 outage and alternate
Number Identification PM Recommendation Monthly Outace..
'                                                              corresponding heat-                                                                     outages thereafter.
Outaae S Year 10 Year Comments' 02-3804 Exhaust Manifold 1.
affected zones. This                                                                     However, diesel examination is to.                                                                       operation should not -
Visually and NT examine.
be performed in                                                                         exceed 200 hours be-accordance with Impell                                                                   tween inspections.
X.
memo from G. Shears .                                                                   Ref: 4/24/84 Letter
To be performed during a sampling of circum.
    ,t.
.the first refueling forential pipe welds and outage and alternate corresponding heat-outages thereafter.
to J. Kammeyer dated                                                                     from A. Zeuthen to 08/13/84.                                                                               E. Montgomery Ref: Lead engine DR/QR Report
affected zones. This However, diesel examination is to.
                                                                                                                                                        #02-380A 02-385A :   Crankcase' Relief Valve-     ~ 1.     Clean flame arrestors.                             X                                   Ref: 3/26/84 IOC from M. Wehmeyer to J. Kammeyer
operation should not -
:                                                    2.       Inspect seat and disc.                             X 02-387A     Crankcase Vacuum Fan           1.       Clean and inspect fan.                                         X                         Refr: 3/26/84 IOC from M. Wehmeyer to
be performed in exceed 200 hours be-accordance with Impell tween inspections.
,                                                                                                                                                      J. Kasseyer
memo from G. Shears.
: 2.       Clean motor and check                                         X bearings for roughness.
Ref: 4/24/84 Letter to J. Kammeyer dated from A. Zeuthen to
I       02-390E     . Rocker Arm Bushings           1.       Visually inspect and                                                                     The visual and dimensional measure intake rocker are                                                               inspection of the rocker bushings.                                                                               are bushings should be conducted at the fuel outage which precedes
,t.
!'                                                                                                                                                      2300 hours of operation i
08/13/84.
GG1249/26                                                                                                                 Revision 1 - Entire Page Revised 4
E. Montgomery Ref: Lead engine DR/QR Report
#02-380A 02-385A :
Crankcase' Relief Valve-
~ 1.
Clean flame arrestors.
X Ref: 3/26/84 IOC from M. Wehmeyer to J. Kammeyer 2.
Inspect seat and disc.
X 02-387A Crankcase Vacuum Fan 1.
Clean and inspect fan.
X Refr: 3/26/84 IOC from M. Wehmeyer to J. Kasseyer 2.
Clean motor and check X
bearings for roughness.
I 02-390E
. Rocker Arm Bushings 1.
Visually inspect and The visual and dimensional measure intake rocker are inspection of the rocker bushings.
are bushings should be conducted at the fuel outage which precedes 2300 hours of operation i
GG1249/26 Revision 1 - Entire Page Revised 4
J t
J t
                                                \.
\\.
J r.
J L
i
r.
* A
k i
A


w J-54w-                                                                                                             '
w J-54w-
                                                      )                 -
)
                                                                            ~
.a
                                                                                                                                  .a
~
                                                                                                                                                ,a
ce
                                                                                                                                                                                                ,                                                                                                                    ce E
,a E '.,
                                                                    -                                                    '.,                                               GRAND GULF MAINTEN *CE MATtiX Component                       CamponerA                                     -'                                                                                                            "
GRAND GULF MAINTEN *CE MATtiX Component CamponerA P.
                                                                                                                                                          .              .                                  P .                           Alt.
Alt.
                    -Number                             Idet.tf41 cation '                                                             PM Recosumendation                                                 Monthly   ' Outag           Out4qe             5 Year 10 Year Comments
-Number Idet.tf41 cation '
                                                                                                                                                        ,                                                                                      i v; by at least the sus of
PM Recosumendation Monthly
                                                                                                  ,                                                                                                                                                                                      expected hours et               ;
' Outag Out4qe 5 Year 10 Year Comments i v; by at least the sus of expected hours et
                                                                                .- a , -
.- a, -
                                                                                                                                                                                                                                                                  ,                      operation in a LOOP /LOCA-event plus the expected.
operation in a LOOP /LOCA-event plus the expected.
a                                                                                                             +
a hours of cotrat!on.
hours of cotrat!on .
+
between outages. This
.,Tg, between outages. This inspection schedule,
                                                                                                                          .,Tg,                                             -
may be revised after
inspection schedule ,
.1 the first or subsequent p;,.
                                                                                                                                                                                                                                                    .1                                    may be revised after the first or subsequent a-                        p;,.                                         .^'                                                                                                                                                         '. Inspection results justify a' longer period
. ^ '
                                            )
Inspection results a-justify a' longer period
                                              ~N e                                                                                      <                                              of engine operation p ..;w                                                                                                                                                                                                                                                                                   between inspections. Ref:
)
w;                                                                             ,,N                                                                                                                                                                         7/31/84 meno from G.           '
of engine operation e
McCarthy to D. Pasquale (Items 1, 2, 3) l                                                                                                                 T           <                          -
p..;w
                                                                                            .                                        g              .
~ N between inspections. Ref:
                                        ,                                                          .1       '
w;
                                                                                                                                  . ! 2. 3 VisoallyJnapect and                                                                                                       -                  Not to ,Aceec 1300 i; ..                     nessure exhaest rocker                                                                                         V     s            maximum hoors of engine
,,N 7/31/84 meno from G.
                                                                                                                            **                                                                                                  ~
McCarthy to D. Pasquale g
                                                                                                              ^
(Items 1, 2, 3) l T
                                                                                                              ,                                      are oushingi.                                                                                                      1                operation,between             +
Not to,Aceec 1300
                                                                                                      '                          g,                                                                                                              -y inspections as 2
.1
                                                                                      ;i                                                       X                 ;f                                                                                   ,                                  described above.
. ! 2. 3 VisoallyJnapect and i;..
: i. .
nessure exhaest rocker are oushingi.
,                      .                              y''             <1,                                                         ,
~
: 3.           Visually inspect Ond'                                   -
V maximum hoors of engine s
Not to exceed 730
^
                                  ~''                                           L 1,                                                                                                                                                - measure. intermediate'                                s                                                                            maximum hours'of' engine
operation,between
!                    i                                                                                                                               rocket ars bush %gs.                             ,
+
operation bet'neen p,                                ^
1
e                                                                                                                                                                                    inspection'as descrit,ed s
-y inspections as g,
                                                  <.,,'y  ..
;i X
3 c                                                      y
;f described above.
                                                                                                                                                                                    'M
2
                                                                                                                                                                                    '.       i L
: i..
above.
y''
,            / % , C 3':s4,:
<1, 3.
                ~
Visually inspect Ond' 1,
                              -J
- measure. intermediate' Not to exceed 730
                                                    ~h W m.Qic         ''
~''
Valve Lifters                                   1.,t. Check' valve lash.                                             '
L maximum hours'of' engine s
X
i rocket ars bush %gs.
                                              ,:                                                                                              L :. y                           u
operation bet'neen e
* N           2.           Acinji.ellandadjust f ..
inspection'as descrit,ed p,
X                                                          Ensure lifters are             L if'                                                                                                                                                   lifters - perfore                                                                                                                   installed with the fill
^
,,                                                                                                                                                    leak denn test.                                                                                                                   T holes up.
'M above.
!                                          -e                                                                                                               ,            s     -
s
                                                                                                                                                                                                                                  ?)
/ %, C 3':s4,:
j'                     GG1249/27.                                         '
<.,,'y 3
N                                                                                                                                   #
i c
Revision 1 - Entire Pege Reviseo
y
                                                                                                                                                ''7
-J
,i . _.
~h W m.Qic Valve Lifters 1.,t. Check' valve lash.
;t                                                                                                                                                   ,
L X
V                                                                                                               ,
L :. y u
lL                                                                                           u 3
~
1               /
N 2.
                                                                                                            ,i            f,    v N nn +                                                       -
Acinji.ellandadjust X
Ensure lifters are L
if' f..
lifters - perfore installed with the fill leak denn test.
T holes up.
- e s
?)
j' GG1249/27.
N
,i.
''7 Revision 1 - Entire Pege Reviseo
;t V
lL u
f, N
3
,i 1
/
v nn +
#'~
#'~
q
q
                                                                                                                                                                                                .h
.h s
!',                               .                            ;                                                               -                                                                                                                                                s            .
3 >, V; 9 e
:c T.-                                                                                                                       .
:c T.-
3- >
l
                                            ' , V; 9 e j-.
].
].                                                  g      . ./       > ,                                                                                                                                                                                                                      \                     l
j-.
',  k, e
../
s ,
\\
gj-
g e
                                                                                                                        ,      ,- <.      ,              u                  ;\                                                                                                                                     ,
s,
j-                                                                 -                                                    <
k, gj-u
                                                                                                                                      - ,.                                                                                                  ,,            t.
;\\
                          .    .f                                                                                                       ,4
j-t.
                            .- *                                  ,                                                                    '..O.                                                                                                         __".            ____.._.N'-     *
.f
,4
'..O.
...N'-


[.         ,.          E ' ,. "     ;    ~...,   f,
[.
                                                                                                                                                                                      ~
E ',. "
J.   . . ,
~...,
                                                                                                                                                                                                                    . ' .f [#
f,
: v. wu         ,.
~
e                                                                                           o
J.
;                                                                                                                    9
. '.f
                              ;. 17             <
[#
g                          4 '-                             ;                                          ,
: v. wu e
"                                -M     .
9 o
                                                  ,            o                             .s                           '
;. 17 4 '-
L                                ,
g
1
-M L
                                                                                                                        ~
1 o
                          ,e                                                                               GRAND TULF MAINTENANCE MATRIX Cocyonent               Component                                                                                                           Alt.
.s
?     s      ,;f }w*aer                   Identif*4;;t w                               PM Recommendation                       Monthly     Outage         Outaci       5 Year 10 Year Comments y           es.     i
~
_,          C+C
,e GRAND TULF MAINTENANCE MATRIX Cocyonent Component Alt.
                                                                                                          \                    F                           -
?
Verify condition of '
,;f }w*aer Identif*4;;t w PM Recommendation Monthly Outage Outaci 5 Year 10 Year Comments s
                                            . - <' '                                                                                                                                          lifters via cov arison L               _                                                                                                                        ,
y es.
r                                                                                                                                      ,; ,,.'-                                              of lifter leak down           f
i
                                          ;, ,                                                                                                                                              rate (actual) to
\\
-                              -    j ff G .                                                                                                                                               specifications noted on TDI. Haint Manual.
F Verify condition of '
Ref: TOI liaint. Manual Section 6-B-5. Ref:
C+C lifters via cov arison L
04/16/84 letter to 7                                                                                                                                                                                             R. Johnson from A.
of lifter leak down f
Jaquinto,                         j 1
r rate (actual) to specifications noted j ff G.
02-360G                 Rocker Ars Caperws,                         1. Verify capscrew torque                             k                                         This inspection shovid be Drive Studs (Pop Rivets)                             values                                                       ,                                p rformed at eacn outage g    .,
on TDI. Haint Manual.
                                                                                                                                                                                ,.          if the rockee arms are           j dissassembled for l
Ref: TOI liaint. Manual Section 6-B-5.
                                                        'A       +                                                                                                                           inspection.                       '
Ref:
[                                                                           p                                                                                                               use TOI Instruction Manual, Volume I,                 l Section 8 Appendix                 i r                                                                           ,s                                                                                                               IV for proper torque             i
04/16/84 letter to 7
R. Johnson from A.
: Jaquinto, j
1 02-360G Rocker Ars Caperws, 1.
Verify capscrew torque k
This inspection shovid be Drive Studs (Pop Rivets) values p rformed at eacn outage if the rockee arms are j
g dissassembled for l
'A
+
inspection.
[
p use TOI Instruction Manual, Volume I, l
Section 8 Appendix i
r
,s IV for proper torque i
=
=
valces.                           1 y
valces.
j 2. Verify that rocker ara                             X                                         Ref: Lean engine DR/QR drive studs are intact                                                                         Report #02-390G (Items M
1 y
and tight.                                                                                     1,2) g
j 2.
: s.           ,
Verify that rocker ara X
:                                                                        s,
Ref: Lean engine DR/QR drive studs are intact Report #02-390G (Items and tight.
                                                                        /               ,
1,2)
                                                                    ,/           _
M g
-                                                                                                                                                                                                                              l r
s.
GG1249/28                                                                                                                                             Revision 1 - Entire Page Revised                     l I                                                                                                                                                                                                                               l i
s,
N                                                                                                                                                                                                                              l b                     ,
/
          ~
,/
l r
GG1249/28 Revision 1 - Entire Page Revised l
I l
i N
l b
7_
7_
~
k l
k l
E                                                                                                                                                                                                                               l b
l E
b


1 l
1 l
GR408 GULF MAINTENAllCE MATRIX
GR408 GULF MAINTENAllCE MATRIX
                                            .Camponent. ' C- ; - _ _t                                         .
.Camponent. ' C- ; - _ _t
                                                                                                                                                                              .    ' Alt.                                                   '
' Alt.
Nueber     Identification -                                               PM Recommendation                 . Monthly     Outace ~Outaae         5 Year- 10 Year. Commevcs
Nueber Identification -
                                          .02-410A       Overspeed Trip Governor.                                       .1. Check trip set point                         X                                           Modify the surveillance.-
PM Recommendation
                                                                                                                                - adjust as required.'                                                                   testing procedure to 4
. Monthly Outace ~Outaae 5 Year-10 Year. Commevcs
Note: 'After setting the .                                                             . include verification               -
.02-410A Overspeed Trip Governor.
4 .                                                                                                                             overspeed governor, the                                                                   that the overspeed trip i                                                                                                                             -adjustment screw settings                                                                 is correctly set to an should be marked with                                                                     overspeed trip setting :
.1.
                                                                                                                              ' Torque-Seal to reveal.                                                                   of 518 rpe il X every any unintended changes                                                                   outage. -                     _
Check trip set point X
in the set positions.                                                                   . Ensure that the electric governor and the mechanical
Modify the surveillance.-
                                                                                                                                                                                                                        . backup governor setting are properly returned to their 1
- adjust as required.'
                                                                                                                                                                                                                        ~
testing procedure to Note: 'After setting the.
normal settings following the overspe*d test. The test is to be performed with no load on the engine by increasing the normal governor speed setting (s) until a trip occurs. After               s several inspection
. include verification 4
                                                                                                                                                                                              ,                          periods, the history of the required adjustments should be reviewed to evaluate and possibly modify the testing interval.
4.
                                                                                                                                                                                                                        .Ref: Lead engine DR/QR Report #02-410A i-                                                                                                               .
overspeed governor, the that the overspeed trip i
                                              ^2-4108
-adjustment screw settings is correctly set to an should be marked with overspeed trip setting :
                                                ,        . Overspeed Trip Governor.                                    ._
' Torque-Seal to reveal.
: 1. Remove plugs from housing                     X                                         Ref: IOC dated and. Accessory Drive                              '
of 518 rpe il X every any unintended changes outage. -
and check for magnetic                                                                 -03/27/84 from-
in the set positions.
                                                                                                                                ' particles.                                                                               M. Weyneyer to N. Cooperrider.
. Ensure that the electric governor and the mechanical
. backup governor setting are properly returned to their normal settings following
~
1 the overspe*d test. The test is to be performed with no load on the engine by increasing the normal governor speed setting (s) until a trip occurs. After s
several inspection periods, the history of the required adjustments should be reviewed to evaluate and possibly modify the testing interval.
.Ref: Lead engine DR/QR Report #02-410A i -
1.
Remove plugs from housing X
Ref: IOC dated
^2-4108
. Overspeed Trip Governor.
and check for magnetic
-03/27/84 from-and. Accessory Drive
' particles.
M. Weyneyer to N. Cooperrider.
(Items 1,2,3)
(Items 1,2,3)
GG1249/29                                                                                                                                           Revision 1 - Entire Page Revised 9
GG1249/29 Revision 1 - Entire Page Revised 9
;                                                                                                                                                                                      v m                     >= --        ,                                      y                             - _ _ _ _ _ _ .
v m
>=
y


C                                                                 C                                                                 O GAAfB GULF MAINTENANCE MATRIX Component- . Component - .                                                                                         Alt.
C C
                                  -Number                           Identification '                 PM Recoemendation               Monthly   Outace Outage- - 5 Year 10 Year Comments
O GAAfB GULF MAINTENANCE MATRIX Component-. Component -.
                                                                                                    ' 2. Check shafts for excessive               X radial and axial movement.
Alt.
: 3. Visually inspect accessory               X drive gear for excessive .
-Number Identification '
PM Recoemendation Monthly Outace Outage- - 5 Year 10 Year Comments
' 2.
Check shafts for excessive X
radial and axial movement.
3.
Visually inspect accessory X
drive gear for excessive.
wear.
wear.
02-410C                       Overspeed Trip Drive Couplings .1. Remove the present L-110                                                   To be completed at Lovejoy couplings and                                                       the first refueling replace them with new                                                       outage.
02-410C Overspeed Trip Drive Couplings
units in accordance with SIM 363 and DR/QR Report recommendations.                                                                           ,
.1.
,                                                                                                      2. . Verify that coupilng is                   X tight on shaft.
Remove the present L-110 To be completed at Lovejoy couplings and the first refueling replace them with new outage.
: 3. Replace the Love!'s coupling             X                               Replace elastomer if spiders or test coupling                                                   hardness is greater elastcaer for hardness.                                                   than 90 Shore A.
units in accordance with SIM 363 and DR/QR Report recommendations.
Ref: Lead engine
2.
                                                                                                                                                                .                      DR/QR Report #02-410C (Itees 1,2,3) 02-4100                         Overspeed Trip Vent Valve       1. Disassemble and replace                                 'X               Ref: Lead engine i
. Verify that coupilng is X
                                                                                                            "0" Rings.                                                                 DR/QR Report #02-4100 02-411A                         Governor Drive - Governor       1. Visually inspect drive                     X and Tachometer Drive Gear           . gear and shaft for signs j                                                                     and Shaft                           of wear.
tight on shaft.
GG1249/30                                                                                                                     Revision 1 - Entire Page Revised P
3.
Replace the Love!'s coupling X
Replace elastomer if spiders or test coupling hardness is greater elastcaer for hardness.
than 90 Shore A.
Ref: Lead engine DR/QR Report #02-410C (Itees 1,2,3) 02-4100 Overspeed Trip Vent Valve 1.
Disassemble and replace
'X Ref: Lead engine i
"0" Rings.
DR/QR Report #02-4100 02-411A Governor Drive - Governor 1.
Visually inspect drive X
and Tachometer Drive Gear
. gear and shaft for signs j
and Shaft of wear.
GG1249/30 Revision 1 - Entire Page Revised P


i GRAND GULF MAINTENANCE MATRIX
i GRAND GULF MAINTENANCE MATRIX
                                                ~ Component Component-                                                                   .
~ Component Component-Alt.
Alt.
~ 5 Year. 10 Year Comments Number Identification PM Recossendation
Number   Identification                 PM Recossendation                       .. Monthly Outane Outace           ~ 5 Year. 10 Year Comments 02-4118   Governor Drive - Couplings,.'   1. Check that coupling is                           X                                                               If the coupling is four.J Pins and Keys                       tight on shaft.                                                                                                   to be loose, it should.
.. Monthly Outane Outace 02-4118 Governor Drive - Couplings,.'
1.
Check that coupling is X
If the coupling is four.J Pins and Keys tight on shaft.
to be loose, it should.
be removed, all mating
be removed, all mating
                                                                ~                                                                                                                                                   surfaces cleaned, and the unit reassembled .
~
surfaces cleaned, and the unit reassembled.
using Loctite 609 on the mating surfaces.
using Loctite 609 on the mating surfaces.
Ref: Lead engine DR/QR Report #02-4118 (Items 1&2)
Ref: Lead engine DR/QR Report #02-4118 (Items 1&2) 2.
: 2. Replace elastomeric                               X insert in the Koppers coupling.
Replace elastomeric X
: 3. Replace the present                                                                                               Ref: Lead engine DR/QR neoprene elastomeric                                                                                             Report #02-4118 inserts in the Koppers couplings before placing the engines into emergency STAND 8Y                                                                                                                                             .
insert in the Koppers coupling.
service.
3.
02-413A   Governor Linkage               1. ' Install positive locking                                                                                         Ref: Lead engine DR/QR hardware to the lever are                                                                                         Report #02-413A (Items clamp bolt heads and shaft                                                                                       1-4) roll pins. NOTE: To be perforised as necessary after tightening gov-ernor linkage hardware to design torque specifi-cations.
Replace the present Ref: Lead engine DR/QR neoprene elastomeric Report #02-4118 inserts in the Koppers couplings before placing the engines into emergency STAND 8Y service.
* GG1249/31                                                                                                             Revision 1 - Entire Page Revised
02-413A Governor Linkage 1.
.t
' Install positive locking Ref: Lead engine DR/QR hardware to the lever are Report #02-413A (Items clamp bolt heads and shaft 1-4) roll pins. NOTE: To be perforised as necessary after tightening gov-ernor linkage hardware to design torque specifi-cations.
GG1249/31 Revision 1 - Entire Page Revised
.t i


_ _. _.            . _ ~
. _ ~
O GRAND GULF MA.NTENANCE MATRIX-Component- Component                                                                                                               Alt.                                                .
O GRAND GULF MA.NTENANCE MATRIX-Component-Component Alt.
Number                                 ' Identification ~               PM Recommendation                       Monthly   Outace Outace 5 Year- 10 Year Comments                     ''
Number
: 2.       ' Inspect for loose parts       'X on the linkage assembly.
' Identification ~
: 3.         Lubricate cross shaft           X bearings cups.
PM Recommendation Monthly Outace Outace 5 Year-10 Year Comments 2.
: 4.         Grease the rod end                           X fittings, especially those at the ends
' Inspect for loose parts
                                                                                                                    .of the cross shaft.
'X on the linkage assembly.
02-4138                                   Fuel Pump Linkage: Autcoatic 1.         Check cylinder for                           X                           To be accomplished during Shutdown cylinder                       extension and return.                                                     controls system check.
3.
: 2.         Check tallrad vent                           X                           To be accomplished during for air leakage.                                                         controls system check.
Lubricate cross shaft X
bearings cups.
4.
Grease the rod end X
fittings, especially those at the ends
.of the cross shaft.
02-4138 Fuel Pump Linkage: Autcoatic 1.
Check cylinder for X
To be accomplished during Shutdown cylinder extension and return.
controls system check.
2.
Check tallrad vent X
To be accomplished during for air leakage.
controls system check.
Items 1, 2; Ref: IOC dated 3/26/84 from M. Weheeyer to R. Kaklec.
Items 1, 2; Ref: IOC dated 3/26/84 from M. Weheeyer to R. Kaklec.
                                ' 02-415A                                   Woodward Governor             1.         Drain, flush, refill and                             X                   NOTE: Venting the vent actuator oil system                                                 hydraulic actuator shall with new oil from a                                                       be performed per the clean container ensuring                                                 Woodward manual if more the appropriate cleanliness                                               than a half quart of procedures are followed.                                                 oil is added.
' 02-415A Woodward Governor 1.
GG1249/32                                                                                                                                 Revision 1 - Entire Page Revised t
Drain, flush, refill and X
                                                                                                                        ,                                              p' no
NOTE: Venting the vent actuator oil system hydraulic actuator shall with new oil from a be performed per the clean container ensuring Woodward manual if more the appropriate cleanliness than a half quart of procedures are followed.
oil is added.
GG1249/32 Revision 1 - Entire Page Revised i
t p'
no


o                                                         o
i L-o o
  .                                                                                                                                                                            i L-                                                                                                      v                                                                   Os l
Os v
GRAND GULF MAINTENANCE MATRIM Component         Component-                                                     .                Alt.
l GRAND GULF MAINTENANCE MATRIM Component Component-Alt.
Number             Identification           'PM Recommendation               Monthly     Outace. Outane   5 Year 10 Year Comments
Number Identification
: 2. . Disassemble. Clean and                                     X               ' Items 1, 2, 3; Ref:
'PM Recommendation Monthly Outace.
Refurbish the actuator.                                                       03/27/84 IOC from M. Wehmeyer to N. Cooporrider.
Outane 5 Year 10 Year Comments 2.
. Disassemble. Clean and X
' Items 1, 2, 3; Ref:
Refurbish the actuator.
03/27/84 IOC from M. Wehmeyer to N. Cooporrider.
Ref: TDI Instruction Manual volume I. Section
Ref: TDI Instruction Manual volume I. Section
: 5. Maintenance Schedule
: 5. Maintenance Schedule 3.
: 3. Replace flex element                       X                                   Ref: Lead engine DR/QR for governor drive                                                           Report 802-4118 Governor-coupling.                                                                     Drive Couplinas
Replace flex element X
: 4. . Verify all gc'. N r             X                                           A1) knob settings should control knob settings                                                         be secured with a.
Ref: Lead engine DR/QR for governor drive Report 802-4118 Governor-coupling.
are in appropriate                                                             commercially available positions: .                                                                   product such as LOAD - Maximum                                                                 Torque-Seal.
Drive Couplinas 4.
. Verify all gc'. N r X
A1) knob settings should control knob settings be secured with a.
are in appropriate commercially available positions:.
product such as LOAD - Maximum Torque-Seal.
DROOP - Zero Speed - To provide mechanical governor control at.460 rpm.
DROOP - Zero Speed - To provide mechanical governor control at.460 rpm.
: 5. Modify the surveillance                   X                                   Note: These tests shall testing procedures to                                                         include examinations of include an evaluation of                                                       the engine speed transient the governor settings by                                                       during start and transient means of the two tests below:                                                 Ioading conditions. In-cluded as part of the GG1249/33                                                                                                     Revision 1 - Entire Page Revised 4
5.
Modify the surveillance X
Note: These tests shall testing procedures to include examinations of include an evaluation of the engine speed transient the governor settings by during start and transient means of the two tests below:
Ioading conditions.
In-cluded as part of the GG1249/33 Revision 1 - Entire Page Revised 4
e a
e a


GRAND GULF MINTENANCE MTRIX Component                     Component                 ..                                                                            Alt.
GRAND GULF MINTENANCE MTRIX Component Component Alt.
Number-                       Identification                     PM Recommendation                                   Monthly Outage Outage 5 Year 10 Year Comments a)       Perform a test of'                                                     above tests is the verift-the governor settings                                                 cation that the engine set while under mechanical /                                               speed of 450 rpm is not-electrical governor         .
Number-Identification PM Recommendation Monthly Outage Outage 5 Year 10 Year Comments a)
exceeded by more than 11.2 control, with the diesel'                                             port ont (500 rps max.)
Perform a test of' above tests is the verift-the governor settings cation that the engine set while under mechanical /
generator off the grid                                                 eithar during an engine in the isochronous mode,                                               start or during the largest single idad reduction.
speed of 450 rpm is not-electrical governor exceeded by more than 11.2 control, with the diesel' port ont (500 rps max.)
b)       Perform a test of the                                                 Ref: Lead engine DR/QR governor settings while                                               Report #02-415A.
generator off the grid eithar during an engine in the isochronous mode, start or during the largest single idad reduction.
under mechanical (only)                                                                                     ,
b)
governor control, with the diesel generator off the grid 11 the isochronous soie.
Perform a test of the Ref: Lead engine DR/QR governor settings while Report #02-415A.
: 6.             Augment the setting                                                             Ref: Lead engine DR/QR adjustment procedures as                                                         Report 802-415A.
under mechanical (only) governor control, with the diesel generator off the grid 11 the isochronous soie.
6.
Augment the setting Ref: Lead engine DR/QR adjustment procedures as Report 802-415A.
described in the Woodward Manuals to include tests of the governor response during an engine start to ensure agreement with the specifications as detailed in Item #5.
described in the Woodward Manuals to include tests of the governor response during an engine start to ensure agreement with the specifications as detailed in Item #5.
t 02-4158                       Governor Booster Servosotor         1.           Clean, inspect, and                                             X                 Refr: 3/27/84 IOC from replace "0" - rings                                                             M. Wehmeyer to and gaskets.                                                                     J. Kammeyer 02-415C                       Governor Heat Exchanger             1.           Clean and inspect.                                             X GG1249/34                                                                                                                                     Revision 1 - Entire Page Revised 4
t 02-4158 Governor Booster Servosotor 1.
Clean, inspect, and X
Refr: 3/27/84 IOC from replace "0" - rings M. Wehmeyer to and gaskets.
J. Kammeyer 02-415C Governor Heat Exchanger 1.
Clean and inspect.
X GG1249/34 Revision 1 - Entire Page Revised 4
1 I
1 I
i
i


s                                                                    v\
.v\\
GRAND GULF MAINTENANCE MATRIX Component                           Component                                                                               Alt.
s GRAND GULF MAINTENANCE MATRIX Component Component Alt.
Number                             ' Identification             'PM Recommendation                 Monthly   Outane     Outace 5 Year 10 Year Comments                             ,
Number
02-425A                             Jacket Water Pump - Gear     1. Visually' inspect jacket                     X                               Any abnormal situations water pump gear for                                                           or indications of pro-chipped or broken                                                           grossive pitting should teeth, excessive wear,                                                       be reported for an or potential / progressive                                                   engineering evaluation.
' Identification
                                                                                                        -pitting or other                                                               Ref: Lead engine OR/QR abnormal conditions.                                                         Report #02-3558 1
'PM Recommendation Monthly Outane Outace 5 Year 10 Year Comments 02-425A Jacket Water Pump - Gear 1.
: 2. Check the key to keyway                     X                               This along with the drive interface for a tight                                                         fit of the impeller on fit on both the pump                                                         to the shaft will preclude.
Visually' inspect jacket X
shaft to impeller, and                                                       past problems where-the spline to pump                                                           relative motion between shaft during pump                                                             shaft and impeller caused       i reassembly.                                                                   fretticg and upset of the keyway sides. Ref: Lead
Any abnormal situations water pump gear for or indications of pro-chipped or broken grossive pitting should teeth, excessive wear, be reported for an or potential / progressive engineering evaluation.
                                                                                                                                                                                      . engine DR/QR Report
-pitting or other Ref: Lead engine OR/QR abnormal conditions.
                                                                                                                                                                                        #02-425A.
Report #02-3558 1
: 3. .It is recommended that                                                         Ref: Lead engine DR/QR the castle nut that                                                           Report #02-425A. To drives the external                                                           be performed upon spline on its taper,                                                         reassembly.
2.
i                                                                                                       have minimum and maximum torque values of 120 ft-lbs and 660 ft-1bs, respectively.
Check the key to keyway X
i' GG1249/35                                                                                                                           Revision 1 - Entire Page Revised
This along with the drive interface for a tight fit of the impeller on fit on both the pump to the shaft will preclude.
                                                                                                                                                                $4
shaft to impeller, and past problems where-the spline to pump relative motion between shaft during pump shaft and impeller caused i
reassembly.
fretticg and upset of the keyway sides. Ref: Lead
. engine DR/QR Report
#02-425A.
3.
.It is recommended that Ref: Lead engine DR/QR the castle nut that Report #02-425A. To drives the external be performed upon spline on its taper, reassembly.
i have minimum and maximum torque values of 120 ft-lbs and 660 ft-1bs, respectively.
i' GG1249/35 Revision 1 - Entire Page Revised
$4


                                                                                                                                                                                                              /%
Cm O
Cm                                                                              O                                                                U l                                                                                                                               GRAND GULF MAINTENANCE MATRIM Component                                 Component ..                                                                       - Alt.
U
Number                                     Identification               PM Recommendation                   Monthly   Outace ~0utane 5 Year ' 10 Year Comments 02-437                                     Turbo Water Piping -         1. Visually inspect for-leaks. X                                             This recommendation is.
/%
Pipe and Fittings                 . Note: In the event of a                                                 ~ made on the basis that leak developing in the                                                     the maximum suggested existing Dresser Style 65                                                 operating temperature of.
l GRAND GULF MAINTENANCE MATRIM Component Component..
couplingt, these couplings                                                 150*F for the Style 65 should be replaced with                                                   coupling may be exceeded.
- Alt.
Dresser Style 90 couplings                                                 The maximum suggested equipped with Viton gaskets.                                             operating temperature of
Number Identification PM Recommendation Monthly Outace
                                                                                                                                                                                            -the Style 90 is 212*F.
~0utane 5 Year ' 10 Year Comments 02-437 Turbo Water Piping -
Ref: Letter dated 12/13/84 from C. L. Ray   ,
1.
to J. George.
Visually inspect for-leaks. X This recommendation is.
02-441A                                     Starting Air Manifold:       1. Ensure that the starting       X                                         Ref: 08/27/84 Memo'from Air Vent                           . air manifold vent is                                                     W. Littmann to J. Cadogan, open and effective.                                                       Ref: Lead engine DR/QR Report #00-442A (STAD) 02-441B                                   Air Filter to Starting Air   1. Inspect filter elements.       X                                         Replace as necessary.
Pipe and Fittings
Distributor                                                                                                     Ref: TDI Instruction Manual Vol. I, Main-tenance Schedule Ref:
. Note: In the event of a
Lead engine DR/QR Report #02-441B
~ made on the basis that leak developing in the the maximum suggested existing Dresser Style 65 operating temperature of.
: 2. Replace filter elements.                   X                               It is also recommeaded that the filter be changed at a maxJaum pressure drop of 25 psi. Ref: Lead engine DR/QR Report
couplingt, these couplings 150*F for the Style 65 should be replaced with coupling may be exceeded.
                                                                                                                                                                                              #02-441B
Dresser Style 90 couplings The maximum suggested equipped with Viton gaskets.
                            - GG1249/36                                                                                                                                   Revision 1 - Entire Page Revised               ;
operating temperature of
1 4
-the Style 90 is 212*F.
7
Ref: Letter dated 12/13/84 from C. L. Ray to J. George.
02-441A Starting Air Manifold:
1.
Ensure that the starting X
Ref: 08/27/84 Memo'from Air Vent
. air manifold vent is W. Littmann to J. Cadogan, open and effective.
Ref: Lead engine DR/QR Report #00-442A (STAD) 02-441B Air Filter to Starting Air 1.
Inspect filter elements.
X Replace as necessary.
Distributor Ref: TDI Instruction Manual Vol. I, Main-tenance Schedule Ref:
Lead engine DR/QR Report #02-441B 2.
Replace filter elements.
X It is also recommeaded that the filter be changed at a maxJaum pressure drop of 25 psi. Ref: Lead engine DR/QR Report
#02-441B
- GG1249/36 Revision 1 - Entire Page Revised 1
4 7


                  \                                                                                                                               .
\\
I' GRAIS GULF MAINTEhANCE MATRIX l
I' GRAIS GULF MAINTEhANCE MATRIX l
l    ' Component -Component                                                                           Alt.
' Component -Component Alt.
Number       Identification'           'PM Recommendation               Monthly     Outane .Outace 5 Year 10 Year. Comments
l Number Identification'
                    ' Strainer - Starting         3. Slow down strainer DAILY.                                                 Ref: Lead engine OR/QR Air System '                                                                                               Report #02-4418
'PM Recommendation Monthly Outane.Outace 5 Year 10 Year. Comments
: 4. Clean and inspect strainer X                                             If the st'rainer is monthly,                                                                 excessively dirty, the i
' Strainer - Starting 3.
frequency of cleaning and inspecting should be increased. Ref:
Slow down strainer DAILY.
'                                                                                                                                Lead engine DR/QR Report #02-4418 Air Start Block Valves     5. Clean, refurbish valves                   X                               Ref: Lead engine DR/QR
Ref: Lead engine OR/QR Air System '
                                                      -replace "0" rings and                                                   -Report #02-4418 (Items clean the screened                                                       5,6,7) fitting. Ensure leak tightness after reassembly.                                                                                                         -
Report #02-4418 4.
: 6. Inspect for tightness                     X of fittings and bolts
Clean and inspect strainer X If the st'rainer is
                                                      .and apply locking com-pound, as required during reassembly of components.
: monthly, excessively dirty, the frequency of cleaning i
: 7. Replace the "0"-rirbe                     X of the shuttle valve.
and inspecting should be increased. Ref:
02-442A     Starting Air Distributor   1. Visually inspect the                     X                               Evaluate the degree of Assembly                         poppet valve spool ends                                                   wear to determine and timing can of the                                                     whether existing starting air distributor.                                                 condition would have an adverse effect on timing and the specified ability to start the engine.
Lead engine DR/QR Report #02-4418 Air Start Block Valves 5.
GG1249/37                                                                                           Revision 1 - Fntire Page Revised 9
Clean, refurbish valves X
Ref: Lead engine DR/QR
-replace "0" rings and
-Report #02-4418 (Items clean the screened 5,6,7) fitting. Ensure leak tightness after reassembly.
6.
Inspect for tightness X
of fittings and bolts
.and apply locking com-pound, as required during reassembly of components.
7.
Replace the "0"-rirbe X
of the shuttle valve.
02-442A Starting Air Distributor 1.
Visually inspect the X
Evaluate the degree of Assembly poppet valve spool ends wear to determine and timing can of the whether existing starting air distributor.
condition would have an adverse effect on timing and the specified ability to start the engine.
GG1249/37 Revision 1 - Fntire Page Revised 9
3
3
                                                                                                        $9' n
$9' n


O                                                                                                                                                                                     )   ,
O
GRAle GULF MINTENANCE NATRIX Component   Component                                                                                             Alt.
)
                . Identification Number                                            PH Recommendation.                  Monthly   Ontage'-       Outace   S Year 10 Year Comments.
GRAle GULF MINTENANCE NATRIX Component Component Monthly Ontage'-
s
Outace S Year 10 Year Comments.
: 2.     Ensure that the starting.       X                                                   Ref: Lead engine DR/QR -
Alt.
air manifold went is.                                                                 Report 600-44'A (STAD) ~~                           ;
Number
open and unobstructed.                                                                 (Items 1 &'2)                                   ''
. Identification PH Recommendation.
02-455A~   . Fuel Oil Filter                       1. Record filter d/p.               X                                                   Change' filter elements.
s 2.
Ensure that the starting.
X Ref: Lead engine DR/QR -
air manifold went is.
Report 600-44'A (STAD) ~~
open and unobstructed.
(Items 1 &'2) 02-455A~
. Fuel Oil Filter 1.
Record filter d/p.
X Change' filter elements.
at or before the filter ld/p reaches 20 psid rise above the clean d/p -
at or before the filter ld/p reaches 20 psid rise above the clean d/p -
Purge entrapped air from
Purge entrapped air from
                                                                                                                                                    'the filter canister using the vent valve provided,.                         ,
'the filter canister using the vent valve provided,.
                                                                                                                                                    ,and divert some fuel.
,and divert some fuel.
oil into the newly replaced cartridge.
oil into the newly replaced cartridge.
After air has been
After air has been purged close vent valve and return handle to previous ope.ating position. Ref: toad engine DR/
,                                                                                                                                                    purged close vent valve and return handle to previous ope.ating position. Ref: toad engine DR/
#02-455A.' QR Report 2.
                                                                                                                                                      #02-455A.' QR Report
Inspect canister gaskets X
: 2. Inspect canister gaskets                   X                                           To be performed during and replace as necessary,                                                             change cut of filter elements.
To be performed during and replace as necessary, change cut of filter elements.
Ref: 03/27/84 IOC from M. Wheeyer to J. Disare.
Ref: 03/27/84 IOC from M. Wheeyer to J. Disare.
                                                      - 3. Inspect tubing and mech-         X
- 3.
,                                                            .anical connections for
Inspect tubing and mech-X
;.                                                            tig' tness and/or leaks.                                                                                                                   >
.anical connections for tig' tness and/or leaks.
1
1
  - GG1249/38                                                                                                                 Revision 1 - Entire Page Revised E
- GG1249/38 Revision 1 - Entire Page Revised E
0
0 t
}
}
        + -                       _
+ -


    .. __ .          .    .    .-    _    .      .  . . . . _ . . .                      . . _ . .-    .    . .. ..        .      ,        . . .    .                        ._                      _-- _ m .. ,_-
m I
I L
L GRAIS GULF MAINTENANCE MATRIX--
GRAIS GULF MAINTENANCE MATRIX--
Component P:- Trt Alt.
Component   P:- Trt
{
                              .                                                                                                      Alt.               . .                                                                      .
Number Identification
Number     Identification                     .PM Recommendation                         Monthly         Outaae   Outaae- 5 Year .10 Year. Comments' 02-4558- ' Fuel 011 Strainers..                   1.       Record stritner d/p.               X                                                                 If greater than 5 psid-shift / clean element.'                       e; Ref: Lead engine DR/QR' Report 802-4558 (Items 1&2)
.PM Recommendation Monthly Outaae Outaae-5 Year.10 Year. Comments' 02-4558-
!                                                              '2.       Clean strainer elements.                           X
' Fuel 011 Strainers..
: 3.       Purge air free stand-by                                                                               As required.
1.
i.
Record stritner d/p.
strainers
X If greater than 5 psid-shift / clean element.'
!              02-467A   . Turbocharger Lube Oil                 1.       Visually inspect for leaks.         X-                                                               This recommendation is Fittings Pipe Tubing, Fittings,               . Note: In the event of a                                                                               made on the basis that-and Flexible Coupling                         . leak developing in the       ,                                                                        the maximum suggested .
e; Ref: Lead engine DR/QR' Report 802-4558 (Items 1&2)
a (Sea 11 Bore Scope only)                       existing Dresser Style 65                                                                             operating temperature of couplings, these couplings                                                                       1150*F for the Style 65 should be replaced with -                                                               ,              coup ing may be exceeded.
'2.
Dresser Style 90 couplings                                                                             The mas:taum suggested i
Clean strainer elements.
equipped with Viton gaskets.                                                                           operating temperature of the Style 90 is 212*F.
X i.
Ref: Letter dated                             >1 12/13/84 from C. L. Ray to J. George. Ref:
3.
Purge air free stand-by As required.
strainers 02-467A
. Turbocharger Lube Oil 1.
Visually inspect for leaks.
X-This recommendation is Fittings Pipe Tubing, Fittings,
. Note: In the event of a made on the basis that-and Flexible Coupling
. leak developing in the the maximum suggested.
(Sea 11 Bore Scope only) existing Dresser Style 65 operating temperature of a
couplings, these couplings 1150*F for the Style 65 should be replaced with -
coup ing may be exceeded.
Dresser Style 90 couplings The mas:taum suggested i
equipped with Viton gaskets.
operating temperature of the Style 90 is 212*F.
Ref: Letter dated
>1 12/13/84 from C. L. Ray to J. George. Ref:
DR/QR Report #02-317A&8 t
DR/QR Report #02-317A&8 t
                                                                                                                                                                                                                                -[
-[
[. .
[..
;          - GG1249/39                                                                                                                       Revision 1 - Entire Page Revised i
- GG1249/39 Revision 1 - Entire Page Revised i
i
i
                                                                                                                                            ~ . -            _ _ . _ _ - _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _                -
~. -


          . . . . ..        _.          .  .  - . . . . . _ -                    -                      _    .- . . . . .          .    ~_     . - .      -.  -
~_
4
4 GRM S GULF 80AINTEllAllCE IIATRIX Component P 7 it Alt.
                                              ,                              GRM S GULF 80AINTEllAllCE IIATRIX                                             -
Ilumber Identification ~
Component       P 7 it                                                                                                   Alt.
Plt Recommendation Isonthly
Ilumber         Identification ~               Plt Recommendation                       Isonthly       -Outane         Outaae 5 Year -10 Year ' Comments
-Outane Outaae 5 Year -10 Year ' Comments
:02-475A C       Turbocharger: : Bracket       1.           Ec:h month for the first                                                               [Refs OR/QR Reports I
:02-475A C Turbocharger: : Bracket 1.
                - Bolting and Gaskets                           three months of commercial                                                               #02-475A.C-operation these screws should be inspected to assure that no screw .
Ec:h month for the first
                                                              .has loosened because
[Refs OR/QR Reports I
                                                                'of engine operating loads. If during these inspections none of the screws are found.                                                                                          ..
- Bolting and Gaskets three months of commercial
loosened or oamaged,                                                                                           '!
#02-475A.C-operation these screws should be inspected to assure that no screw
from then on inspections are to be conducted on-
.has loosened because
!                                                            ;ayearlybasis(or
'of engine operating loads. If during these inspections none of the screws are found.
                                                              . during plant shutdown).
loosened or oamaged, from then on inspections are to be conducted on-
But if any time during'                                                                                           .
;ayearlybasis(or
inspectica any screw is found loosened or s                                                                damaged, it must then be replaced (if damaged)
. during plant shutdown).
        .                                                        and all screws retorqued as follows; 125 ft-Ibs for the bracket to
But if any time during' inspectica any screw is found loosened or damaged, it must then be s
                                                              . engine screws.and                                                                                                   '
replaced (if damaged) and all screws retorqued as follows; 125 ft-Ibs for the bracket to
75 ft-lbs for the bracket to turbo base screws,                                                                                           _
. engine screws.and 75 ft-lbs for the bracket to turbo base screws, foote: To avoid damage 1.
foote: To avoid damage 1.
to bracket to engine, and/or bracket to turbo, base screws, the proper
to bracket to engine, and/or bracket to turbo, base screws, the proper
                                                              -torques as delinated above should be utilized for each respective
-torques as delinated above should be utilized for each respective
                                                              -bracket bolting
-bracket bolting
!                                                            -application.
-application.
ee   GG1249/40                                                                                                                       Revision 1 - Entire Page Revised               ,
ee GG1249/40 Revision 1 - Entire Page Revised t
t t
t l.
l.
i.
i.
,                                                                                                                              W l-   r
W l-r


l          -
~
                                              ~
l 1
1
-GRAND GULF MAINTENANCE MATRIX Component Component' Alt.
                                                                                                              -GRAND GULF MAINTENANCE MATRIX
Number Identification PM Recommendation Monthly Dutaae Outaae 5 Year 10 Year Comments j
!                                    Component   Component'                                                                                     Alt.
02-4758
Number       Identification                             PM Recommendation               Monthly     Dutaae Outaae 5 Year 10 Year Comments j                                   02-4758     . Air Butterfly Valve                       1. Lube valve shaft                         X                           . Ref: IOC dated 3/28/84 via grease fittings.                                                     from M. Wehmeyer to J. DiMare. If o11 cups are used, this should be completed monthly.
. Air Butterfly Valve 1.
2   Check valve disc for           X                                         Check by visually observ-i                                                                                                 freedom of movement,                                                     ing valve / actuator oper-ation.                                  .
Lube valve shaft X
Ref: 04/16/84 letter from R. Jaquinto to                       f R. Johnson
. Ref: IOC dated 3/28/84 via grease fittings.
: 3. Verify that associated         -X                                         Ref: DR/QR Report locking devices (jam                                                     #02-4758 nuts and lock washers).
from M. Wehmeyer to J. DiMare. If o11 cups are used, this should be completed monthly.
2 Check valve disc for X
Check by visually observ-i freedom of movement, ing valve / actuator oper-ation.
Ref: 04/16/84 letter from R. Jaquinto to f
R. Johnson 3.
Verify that associated
-X Ref: DR/QR Report locking devices (jam
#02-4758 nuts and lock washers).
are tight.
are tight.
02-5004     Engine Control Cabinet                     1. Inspect interior of cabinet.             X                             Ref: 3/29/84 IOC
02-5004 Engine Control Cabinet 1.
,                                                                                                  for cleanliness and clean                                               from M. Wehmeyer.
Inspect interior of cabinet.
I                                                                                                 as required.                                                             to T. Jacobs for Items 1-5 Ref: 07/30/84 IOC from J. Cadogan to K. More11k for Items 1-6
X Ref: 3/29/84 IOC for cleanliness and clean from M. Wehmeyer.
: 2. Visually check wiring for                 X insulation degradation.
I as required.
: 3. Visually check instrument                 X tubing for leaks.
to T. Jacobs for Items 1-5 Ref: 07/30/84 IOC from J. Cadogan to K. More11k for Items 1-6 2.
t                                   GG1249/41                                                                                                         Revision 1 - Eatire Page Revised i
Visually check wiring for X
i 4                                                                                                                                                                               .
insulation degradation.
3.
Visually check instrument X
tubing for leaks.
t GG1249/41 Revision 1 - Eatire Page Revised i
i 4
s.-
s.-
__ . _ _ _ _ _ _ _ _._____.__fl._.
fl..


                  . ~ . - . . - .       .    . . . ,.                        . - -        .          -.    ..        -.    .          -.      .              ,        , . -  .-
. ~. -.. -.
w GRAND GULF MAINTF1ANCE MATRIX Component           Component                                                                                 Alt.
w GRAND GULF MAINTF1ANCE MATRIX Component Component Alt.
Numtwr             Identification               PM Recommes<iation                     Monthly     Outace Outane       5 Year 10 Year Comments
Numtwr Identification PM Recommes<iation Monthly Outace Outane 5 Year 10 Year Comments 4.
: 4.         Functionally check cabinet                 X heater and calibration of thermostat.
Functionally check cabinet X
: 5.         Test pneumatic 5/D board                   X logic.
heater and calibration of thermostat.
  ,                                                        6.         Replace "0"-Rings, gaskets                 X and filter in pressure
5.
                                                                    -regulator.
Test pneumatic 5/D board X
02-500C             Circuit Breakers and Contact   1.       . Check all terminals                         X                                   To be accomplished during Blocks                                   clean / tighten.                                                               panel clean / inspection.
logic.
: 2.       Visually check wiring                       X                                   To be' accomplished during' insulation for degradation.                                                     panel clean / inspection.
6.
                                                          ' 2.       Trip' check circuit breakers.               X 02-500G             Control Panel Valves           1. - Inspect and clean control                         X                                   This recommendation ~
Replace "0"-Rings, gaskets X
panel valves.                                                                     interval should be reassessed depending.
and filter in pressure
on the degree of system
-regulator.
,                                                                                                                                                      fouling. Ref: Lead engine DR/QR Report
02-500C Circuit Breakers and Contact 1.
                                                                                                                                                      #02-500G
. Check all terminals X
: 2.       Inspect and clean the                       X                                   Ref: 06/25/84 IOC 200 mesh screen of check                                                         from K. King to valve.                                                                           B. Brown
To be accomplished during Blocks clean / tighten.
      . GG1249/42                                                                                                                   Revislon 1 - Entire Page Revised i
panel clean / inspection.
it l                                                                                                                         .
2.
Visually check wiring X
To be' accomplished during' insulation for degradation.
panel clean / inspection.
' 2.
Trip' check circuit breakers.
X 02-500G Control Panel Valves
: 1. - Inspect and clean control X
This recommendation ~
panel valves.
interval should be reassessed depending.
on the degree of system fouling. Ref: Lead engine DR/QR Report
#02-500G 2.
Inspect and clean the X
Ref: 06/25/84 IOC 200 mesh screen of check from K. King to valve.
B. Brown
. GG1249/42 Revislon 1 - Entire Page Revised i
it l
l


                                                                                                                                                                                                              /%
/%
                                                                                                                                                                                                              )
' )
GRAND GutF MAINTENANCE MATRIX P------ t   Component                                                                           . Alt.
GRAND GutF MAINTENANCE MATRIX P------
_ Number     Identification                   FM Recommendation                 Monthly   Outaes   Outage 5 Year 10 Year Comments 02-500J     Control Panel Assembly:           1. Inspect contacts and clean               X                             Ref: 08/10/84 IOC from
t Component Alt.
                                                                      . Relays                                   as required.                                                             K. Hore11k to J. Cadogan
_ Number Identification FM Recommendation Monthly Outaes Outage 5 Year 10 Year Comments 02-500J Control Panel Assembly:
.                                                                                                          2. . Visually check condition                   X of wiring and tightness of terminations.
1.
LO2-500N           Control Panel Switches Terminal . 1. Clean terminal boards and                 X                             Ref: IOC dated 3/29/84 Boards and Wiring                     ~ switch contacts.                                                         to J. Kasseyer from M. Weheeyer for Items 1, 2, 3.
Inspect contacts and clean X
: 2. Visually check wire insul-                 X ation and terminals for tightness and degradation.
Ref: 08/10/84 IOC from
: 3. Inspect for arcing and.                   X overheating.
. Relays as required.
02-515       Thermostatic Valves               1. Replace thermal power                                   X               Ref: Lead engine DR/QR elements.                                     -
K. Hore11k to J. Cadogan 2.
Report #02-8100
. Visually check condition X
: 2. Visually inspect valve               X                                   To be accompitsbed       ,
of wiring and tightness of terminations.
body for evidence of                                                     during monthly test     .'
LO2-500N Control Panel Switches Terminal. 1.
leakage.                                                                run. Insure that any replacement valves have cast steel valve bodies.
Clean terminal boards and X
02-5258-     Barring Device Control Valve     1. Replace Control Valve                     X
Ref: IOC dated 3/29/84 Boards and Wiring
                                                                      '.snd Press Regulator                     "0" rings / lube shaft.
~ switch contacts.
: 2. Replace press regulator                                 X elastomeric parts.
to J. Kasseyer from M. Weheeyer for Items 1, 2, 3.
GG1249/43                                                                                                     Revision 1 - Entire Page Revised l
5 2.
or
Visually check wire insul-X ation and terminals for tightness and degradation.
                                                                                                                                =
3.
Inspect for arcing and.
X overheating.
02-515 Thermostatic Valves 1.
Replace thermal power X
Ref: Lead engine DR/QR elements.
Report #02-8100 2.
Visually inspect valve X
To be accompitsbed body for evidence of during monthly test leakage.
run. Insure that any replacement valves have cast steel valve bodies.
02-5258-Barring Device Control Valve 1.
Replace Control Valve X
'.snd Press Regulator "0" rings / lube shaft.
2.
Replace press regulator X
elastomeric parts.
GG1249/43 Revision 1 - Entire Page Revised P
l or 2
=


9                                                                                                                                                               .
9
                                                                      .CD ..                                                                                       NM
.CD..
                                                                                                                                                                      )
)
GRAND GutF MAINTENANCE MATRIX Camponent Component                                                       .
NM GRAND GutF MAINTENANCE MATRIX Camponent Component Alt.
Alt.
Number Identification
Number   Identification           _PM Recommendation               Monthly   Outaae Outane 5 Year 10 Year Comments 02-525C   Barring Device Air Filter 1. Replace filter. element.                   X                                 Ref: 3/30/84 IOC from M. Wehmeyer to J. Freeman
_PM Recommendation Monthly Outaae Outane 5 Year 10 Year Comments 02-525C Barring Device Air Filter 1.
: 2. Drain barring device air                                                     This should be perf ormed .
Replace filter. element.
X Ref: 3/30/84 IOC from M. Wehmeyer to J. Freeman 2.
Drain barring device air This should be perf ormed.
filter. *See Comments
filter. *See Comments
* on a DAILY basis when barring device is in use.
* on a DAILY basis when barring device is in use.
,                                                                                                                        Ref: 5/10/84 IOC :
Ref: 5/10/84 IOC :
                                                                                                                        'from M. McGerigle to W. ::mn 02-550   Foundation Bolts         1. . Visually inspect founda-                 X                                 Items 1, 2; Ref:-TDI tion for breaks in the                                                       Instruction Manual, bond between the sole                                                       Maintenana:4 Schedule, plates and grout.                                                           Section f.
'from M. McGerigle to W. ::mn 02-550 Foundation Bolts 1.
: 2. Check foundation bolts                     X                                 Use TDI Instruction for correct torque.                                                         Manual, Volume I, Retorque as necessary                                                       Section 8 Appendix than recheck crankshaft                                                     IV for proper torque web deflections.                                                             values.                                         <
. Visually inspect founda-X Items 1, 2; Ref:-TDI tion for breaks in the Instruction Manual, bond between the sole Maintenana:4 Schedule, plates and grout.
: 3. Generator foundation bolts                                                   Ref: Lead engine DR/QR are to be retorqued                                                         Report #02-550 after a generator short circuit if the bolts
Section f.
                                            ;were initially torqued to 480 ft-lbs. If initial bolt torque
2.
,                                            wqs 600 ft-Ib no retorque is required.
Check foundation bolts X
i GG1249/44                                                                                     Revision 1 - Entire Page Revised
Use TDI Instruction for correct torque.
Manual, Volume I, Retorque as necessary Section 8 Appendix than recheck crankshaft IV for proper torque web deflections.
values.
3.
Generator foundation bolts Ref: Lead engine DR/QR are to be retorqued Report #02-550 after a generator short circuit if the bolts
;were initially torqued to 480 ft-lbs. If initial bolt torque wqs 600 ft-Ib no retorque is required.
i GG1249/44 Revision 1 - Entire Page Revised
.I 9
.I 9
i 8
i 8


m
m
  !~
!~
GRAND GULF MAINTEllANCE MATRIX e------ t     Camponent                                                                                         Alt, Number         Identification                           FM Recommendation                 Monthly     Outane   Outane . 5 Year 10 Year Comments
GRAND GULF MAINTEllANCE MATRIX e------
                          .02-6300         Thereocouples
t Camponent
: 1. Check that thermocouple                     X                                 An inconsistant reading
: Alt, Number Identification FM Recommendation Monthly Outane Outane. 5 Year 10 Year Comments
,                                                                                            indicates ambient engine-                                                     traced to thereoccuple
.02-6300 Thereocouples 1.
,                                                                                          temperature when the                                                         -trouble should result
Check that thermocouple X
                                                                                          . engine is cold.                                                               in replacement of the thermocouple.
An inconsistant reading indicates ambient engine-traced to thereoccuple temperature when the
: 2. Clean and inspect .                                   X                       Indications of fatigue
-trouble should result
                                                                                          -thereocourles and thereo-                                                     should rssult in re-couple shields.                                                               . placement of the thereo-couple and/or thereo-couple shield.
. engine is cold.
                                                                                                                                                                        - Ref: 7/31/84 memo from S. Riess to W. Littmann
in replacement of the thermocouple.
: 3. Pyreseter wiring-check                                                         To be accomplished during that terminations are                                                       _ control panel check-out tight.                                                                         and initial operation inspection. Items 1, 2, 3 Ref: 07/30/84 IOC i
2.
from J. Cadogan to
Clean and inspect.
                                                                                                                                                                        ~S. Riess.
X Indications of fatigue
02-6958       . Engine Control Air                       1. Inspect and clean engine                   X.                                 Ref: Lead engine DR/QR Pressure Regulator                             . shutdown equipment.                                                           Report #02-6958 (items 1 & 2).
-thereocourles and thereo-should rssult in re-couple shields.
: 2. Replace elastomeric parts                   X and gaskets in the pressure l                                                                                           regulator.
. placement of the thereo-couple and/or thereo-couple shield.
l                       695C-         ' Engine Control Pneumatic Trip         ' 1.   - Check switch set points.                   X                                   Pressure switches..
- Ref: 7/31/84 memo from S. Riess to W. Littmann 3.
Switches                                                                                                                     ~ Ref: . 3/30/84 IOC from M. Wehmeyer to
Pyreseter wiring-check To be accomplished during that terminations are
: l.                                                                                                                                                                         J. DiMare 4                          GG1249/45                                                                                                                   Revision 1 - Entire Page Revised
_ control panel check-out tight.
and initial operation inspection. Items 1, 2, 3 Ref: 07/30/84 IOC from J. Cadogan to i
~S. Riess.
02-6958
. Engine Control Air 1.
Inspect and clean engine X.
Ref: Lead engine DR/QR Pressure Regulator
. shutdown equipment.
Report #02-6958 (items 1 & 2).
2.
Replace elastomeric parts X
and gaskets in the pressure l
regulator.
l 695C-
' Engine Control Pneumatic Trip
' 1.
- Check switch set points.
X Pressure switches..
Switches
~ Ref:. 3/30/84 IOC from M. Wehmeyer to l.
J. DiMare GG1249/45 Revision 1 - Entire Page Revised 4
{'
{'
i i
i i
Line 2,852: Line 4,388:
s 3
s 3
A.
A.
: s GRAND GULF MAINTENANCE MATRIM C- ; - Et . Component.                                                                                   Alt.
GRAND GULF MAINTENANCE MATRIM s
  ,                                  Number         Identification                     PM Recommendation                 Monthly   Outane Outaae 5 Year .10 Year Comments
C- ; - Et. Component.
                                                                                    , 2.   -Replace elastomeric parts.                               X
Alt.
                                    .02-7178       . Aux..Sub Base & 011 &             1.     Inspect the valves fo.'       X                                         Replace packing as Water Piping - Jacket                     packing leakage.                                                         necessary. Ref:
Number Identification PM Recommendation Monthly Outane Outaae 5 Year.10 Year Comments
Water Valves Lead engine DR/QR Report #02-7178 (items 1 & 2)
, 2.
: 2.     Replace elastomeric parts.                             X
-Replace elastomeric parts.
                                    ~02-717C     . Auxiliary Sub-Base & 011 &       _ 1. Visually inspect for leaks. X                                           This becommendation is
X
* Water Piping - Jacket Water:             Note: In the event of a                                                 made on the basis that Pipe, Coglings, Fittings,                 Icak developing in the                                                 the maximum suggested Orifices, Y-Strainers                     existing Dresser Style 65                                               operating temperature of' (Small Bore Scope Only)                   couplings, these couplings                                               150*F for the Style 65 should be replaced with                                                 coupling may be exceeded.
.02-7178
Dresser Style 90 couplings                                               The maximum suggested equipped with Viton gaskets.                                             operating temperature of the Style 90 is 212*F.
. Aux..Sub Base & 011 &
!                                                                                                                                                                    Ref: Letter dated 12/13/84 from C. L. Ray to J. George. Ref:
1.
DR/QR Report #02-317A&8-02-717F       Auxiliary Sub-Base Lube 011       1. Visually inspect for leaks. X                                             This recommendation'is                               ii Pipe and Fittings                       Note: .In the event of a                                                 made on the basis that lekk developing in ;he                                                   the maximum suggested existing Dresser Style 65                                                 operating temperature of couplings, these couplings                                                 150*F for the Style 65 should be replaced with                                                   coupling may be exceeded.
Inspect the valves fo.'
Dresser Style 90 couplings                                               The maximum suggested equipped with Viton gaskets.                                             operating temperature of the Style 90 is 212*F.
X Replace packing as Water Piping - Jacket packing leakage.
GG1249/46                                                                                                     Revision 1 - Entire Page Revised e
necessary. Ref:
Water Valves Lead engine DR/QR Report #02-7178 (items 1 & 2) 2.
Replace elastomeric parts.
X
~02-717C
. Auxiliary Sub-Base & 011 &
_ 1.
Visually inspect for leaks. X This becommendation is Water Piping - Jacket Water:
Note: In the event of a made on the basis that Pipe, Coglings, Fittings, Icak developing in the the maximum suggested Orifices, Y-Strainers existing Dresser Style 65 operating temperature of' (Small Bore Scope Only) couplings, these couplings 150*F for the Style 65 should be replaced with coupling may be exceeded.
Dresser Style 90 couplings The maximum suggested equipped with Viton gaskets.
operating temperature of the Style 90 is 212*F.
Ref: Letter dated 12/13/84 from C. L. Ray to J. George. Ref:
DR/QR Report #02-317A&8-02-717F Auxiliary Sub-Base Lube 011 1.
Visually inspect for leaks. X This recommendation'is ii Pipe and Fittings Note:.In the event of a made on the basis that lekk developing in ;he the maximum suggested existing Dresser Style 65 operating temperature of couplings, these couplings 150*F for the Style 65 should be replaced with coupling may be exceeded.
Dresser Style 90 couplings The maximum suggested equipped with Viton gaskets.
operating temperature of the Style 90 is 212*F.
GG1249/46 Revision 1 - Entire Page Revised e
i l
i l


R.
R.
(s-GRAND CULF MAINTENANCE MATRIM C ;- - . t -
(s-GRAND CULF MAINTENANCE MATRIM C ;- -. t Component Alt.
Component                                                                                         Alt.
Number
Number           . Identification                           PM Recommendation                     Monthly Outace Outace' 5 Year 10 Year , Comments Ref: ' Letter dated '
. Identification PM Recommendation Monthly Outace Outace' 5 Year 10 Year, Comments Ref: ' Letter dated '
12/13/84 from C. L. Ray -
12/13/84 from C. L. Ray -
a to J. George. -Ref:
to J. George. -Ref:
04/02/84 IOC from M. Wehmeyer to 1
a 04/02/84 IOC from M. Wehmeyer to J. Freeman 1
J. Freeman
2.
: 2. Clean and inspect L.O.                       X                               Complete'when L.0, tank       1 kesp-ware pump suction                                                     .is drained.
Clean and inspect L.O.
strainer.                                                                 .Ref: 04/16/84 letter from R. Jaquinto to R. Johnson 02-717G/K         Aux 111ery Sub-Base Lube Oil               1. Disassemble, inspect                         X                               Ref: IOC dated 4/6/84 Valves                                         and refurbish.                                                               from M. Wehmeyer to
X Complete'when L.0, tank 1
,                                                                                                                                                  J. DiMare, Ref: Lead engine DR/QR Reports #02-717G/K
kesp-ware pump suction
: 2. Dissassemble, clean and                                         X           Ref: 07/31/84 IOC check relief valve                                                           to M. McGerigle from lift pressure.                                                               J. Cadogan, Ref: 08/16/84 IDC from M. McGerigle to J. Cadogan Ref: Lead engine DR/QR Report 802-717G/K (Items 1 & 2) 02-810A           Jacket Water Heaters                       1. Measure heater                               X                               Replace heater if 3                                                                     insulation resistance.                                                       degradation of 3                                                                                                                                                   insulation resis-
.is drained.
-! - GG1249/47-                                                                                                                 Revision 1 - Entire Page Revised a-p' l
strainer.
.Ref: 04/16/84 letter from R. Jaquinto to R. Johnson 02-717G/K Aux 111ery Sub-Base Lube Oil 1.
Disassemble, inspect X
Ref: IOC dated 4/6/84 Valves and refurbish.
from M. Wehmeyer to J. DiMare, Ref: Lead engine DR/QR Reports #02-717G/K 2.
Dissassemble, clean and X
Ref: 07/31/84 IOC check relief valve to M. McGerigle from lift pressure.
J. Cadogan, Ref: 08/16/84 IDC from M. McGerigle to J. Cadogan Ref: Lead engine DR/QR Report 802-717G/K (Items 1 & 2) 02-810A Jacket Water Heaters 1.
Measure heater X
Replace heater if 3
insulation resistance.
degradation of 3
insulation resis-GG1249/47-Revision 1 - Entire Page Revised a-1 p'
l


                                                                      . ~.   -      -      --
. ~.
GRAND GULF MAINTENANCE MATRIX Ceeponent           Component                                                                     Alt.
GRAND GULF MAINTENANCE MATRIX Ceeponent Component Alt.
Number               Identification           PM Recommendation               Monthly   Outaae Outace 5 Year 10 Year Comments
Number Identification PM Recommendation Monthly Outaae Outace 5 Year 10 Year Comments 2.
: 2. Clean and inspect'                         X                             tance is noted:
Clean and inspect' X
heater elements.                                                         Ref: 5/10/84 IOC from               -
tance is noted:
M. McGerigle to W. Brown
heater elements.
: 3. Check calibration and                     X                             for Items 1 2, 3'-
Ref: 5/10/84 IOC from M. McGerigle to W. Brown 3.
Check calibration and X
for Items 1 2, 3'-
inspect thermostat.
inspect thermostat.
02-8204               Lube Oil Susp Tank       1. Measure heater                             X                           ' Replace heater if de--
02-8204 Lube Oil Susp Tank 1.
Heaters                       insulation resistance.                                                   gradation of insulation resistance is noted.
Measure heater X
: 2. Inspect and clean                         X                             To be accomplished during heater elements.                                                         tank inspection.
' Replace heater if de--
: 3. Check calibration and                       X                             Ref: 05/10/84 IOC-
Heaters insulation resistance.
)                                                                                 inspect condition of
gradation of insulation resistance is noted.
* from M. McGerigle thermostat.                                                               to W. Brown for Items 1, 2, 3 4
2.
4 GG-8208               Full Flow Lube 011       1. Record filter d/p.             X                                         Use for trend data, Filters Ref: 04/02/84 IOC from M. Weheeyer to J. DiMare, Ref: TDI Instruction-Manual, Volume I, Maintenance Schedu:e
Inspect and clean X
                                                                            ' 2. Drain water and/or             X sludge from lubri-cating oil full flow filter.
To be accomplished during heater elements.
GG1249/48.                                                                                                 Revision 1 - Entire Page Revised h
tank inspection.
3.
Check calibration and X
Ref: 05/10/84 IOC-
)
inspect condition of from M. McGerigle thermostat.
to W. Brown for Items 1, 2, 3 4
GG-8208 Full Flow Lube 011 1.
Record filter d/p.
X Use for trend data, 4
Filters Ref: 04/02/84 IOC from M. Weheeyer to J. DiMare, Ref: TDI Instruction-Manual, Volume I, Maintenance Schedu:e
' 2.
Drain water and/or X
sludge from lubri-cating oil full flow filter.
GG1249/48.
Revision 1 - Entire Page Revised h
e e
e e


s GRAND GULF MAINTENANCE MATRIX Component' Cor m t.                                                                                             Alt.
s GRAND GULF MAINTENANCE MATRIX Component' Cor m t.
    . Number           Identif1 cation                 FM Recommendation                 Monthly   Outace.-         Outane 5 Year 10 Year Comments
Alt.
: 3.   . Replace filter                                                                   To be perfomed before
. Number Identif1 cation FM Recommendation Monthly Outace.-
                                                            . cartridges and                                                                   the filter d/p reaches 20 perform a visual                                                                   psid Ref: 05/30/84 IOC inspection to                                                                     free M. McGerigle determine the                                                                     to B. Brown, nature of the                                                                     Ref: Lead engine DR/QR material caught                                                                   Report 802-820F, in the filter.                                                                   Ref: 07/31/84 IOC from J. Cadogan to M. McGerigle                                 ,
Outane 5 Year 10 Year Comments 3.
: 4. Lube oil filter                           X
. Replace filter To be perfomed before
                                                    .        gauge - cs11 bra-tion check.
. cartridges and the filter d/p reaches 20 perform a visual psid Ref: 05/30/84 IOC inspection to free M. McGerigle determine the to B. Brown, nature of the Ref: Lead engine DR/QR material caught Report 802-820F, in the filter.
GG-101A       _ Emergency Generator             1. Check operation of             X                                                   Ref: IOC 03/30/84 brushes and slip rings.                                                           M. Wehmeyer to D. Mercaldi (Items 1-5)
Ref: 07/31/84 IOC from J. Cadogan to M. McGerigle 4.
Lube oil filter X
gauge - cs11 bra-tion check.
GG-101A
_ Emergency Generator 1.
Check operation of X
Ref: IOC 03/30/84 brushes and slip rings.
M. Wehmeyer to D. Mercaldi (Items 1-5)
I 2.
Clean / inspect a11 X
accessible parts of the generator.
3.
Megger rotor and stator.
.X 4.
Verify operation of X
space heaters.
- 5.
Measure vibration and X
check against base line
: data, r
I
I
: 2. Clean / inspect a11                        X accessible parts of the generator.
- GG1249/49 Revision 1 - Entire Page Revised k
: 3. Megger rotor and stator.                  .X
t P
: 4. Verify operation of            X space heaters.
t t
                                                      - 5. Measure vibration and                      X check against base line data, r
l g,
- GG1249/49                                                                                                             Revision 1 - Entire Page Revised                                 ,
t
k t
P                                                                                                                                                                                            t t
l                                                                                                                       g, t     ,


                                                                                                                                                                                                              .r 4
.r 4
k 1
k 1
GRAlm GULF MAINTENANCE MATRIX
GRAlm GULF MAINTENANCE MATRIX P- ;-- - _.t Component Outace 5 Year 10 Year Comments Alt.
!      P- ;-- - _ .t     Component                                                                                                             Alt.                                                                                           ,
Number Identification PM Recommendation Monthly Outage GG-1018-Emergency Generator Pedestal
Number           Identification                                 PM Recommendation                       Monthly     Outage           Outace      5 Year 10 Year Comments GG-1018-         Emergency Generator Pedestal                 . 1.
. 1.
Check ring oilers             X                                                         To be accomplished during-
i.
: i.                        Searing                                                      for proper operation                                                                     every test run of the-and verify o11 level.                                                                   engine.
Searing Check ring oilers X
To be accomplished during-for proper operation every test run of the-and verify o11 level.
engine.
Ref: 3/30/84 IOC:
Ref: 3/30/84 IOC:
from M. Idehmeyer
from M. Idehmeyer
                                                                                                                                                                              -to N. Cooporrider
-to N. Cooporrider 2.
: 2.           Drain flush refill-                       X bearing housing.
Drain flush refill-X bearing housing.
: 3.           Measure bearing housing                   X insulation resistance.
3.
: 4.           Disassemble and inspect bearing and check clearances.
Measure bearing housing X
GG-103           Jacket Water Heat                               1.           To avoid corrosion and'                                                                   Ref: Lead engine DR/QR Exchanger                                                   fouling jacket water                                                                     Report #02-810C heat exchanger and                                                                       Ref; 04/20/84 IOC associated service water                                                                 from M. Wehmeyer to piping should be flushed                                                                 R. Kadlec on a periodic basis (continuous service flow is sufficient).
insulation resistance.
                                                                                  - Alternatively, service water chemistry control                                                                                                                                   .
4.
can be used to maintain heat exchanger performance and integrity.
Disassemble and inspect bearing and check clearances.
I GG1249/50                                                                                                                                           Revision 1 - Entire Page Revised
GG-103 Jacket Water Heat 1.
To avoid corrosion and' Ref: Lead engine DR/QR Exchanger fouling jacket water Report #02-810C heat exchanger and Ref; 04/20/84 IOC associated service water from M. Wehmeyer to piping should be flushed R. Kadlec on a periodic basis (continuous service flow is sufficient).
- Alternatively, service water chemistry control can be used to maintain heat exchanger performance and integrity.
I GG1249/50 Revision 1 - Entire Page Revised I
?
?
s 1
s 1


                . - .-        ._ . - . .    .--                      . _ ~ .   .  .  . _ ,. -._ .      . . -          .-
. _ ~.
1 GRAIS GuiF MAINTENANCE MA'RIX Component Component                                                                             Alt.
1 GRAIS GuiF MAINTENANCE MA'RIX Component Component Alt.
Number     Identification           PM Recommendatiot.                 h thly       Outage   Outage       5 Year 10 Year Comments
Number Identification PM Recommendatiot.
: 2. Perform a daily visual                                                             To be perf ormed daily.
h thly Outage Outage 5 Year 10 Year Comments 2.
inspection for leakage                                                             Ref: 07/19/84 Telecon at packing whenever the                                                             D. Pasquale and engine is in the                                                                   R. Chil emergency STAN08Y mode. Verify that no leakage is present                                         .
Perform a daily visual To be perf ormed daily.
through the leak-off ports of the lantern ring.
inspection for leakage Ref: 07/19/84 Telecon at packing whenever the D. Pasquale and engine is in the R. Chil emergency STAN08Y mode. Verify that no leakage is present through the leak-off ports of the lantern ring.
: 3. kcord heat                       X                                                 .Use for trend data.
3.
kcord heat X
.Use for trend data.
exchanger perfor-4._
exchanger perfor-4._
mance by checking engine operating
mance by checking engine operating parameters.
* parameters.
4.
: 4. Evaluate heat exchanger                           X performance data
Evaluate heat exchanger X
: 5. Inspect tubes arid tube                       .X                                   Ref: TDI Instruction sheet for fouling and                                                               Manual, Volume I, errosion - remove                                                                   Maintenance Schedule entrance and exit channel covers.
performance data 5.
,                                                Replace packing rings                                                               Ref: Lead engine DR/QR at floating tube                                                                     Report #02-810C sheet after tube inspection.
Inspect tubes arid tube
.X Ref: TDI Instruction sheet for fouling and Manual, Volume I, errosion - remove Maintenance Schedule entrance and exit channel covers.
Replace packing rings Ref: Lead engine DR/QR at floating tube Report #02-810C sheet after tube inspection.
4
4
                                                                                                                                                                +
+
j   .GG1249/51                                                                                                   Revision 1 - Entire Page Revised 1
j
.GG1249/51 Revision 1 - Entire Page Revised 1
W
W
!    +
+


(                                                                                                                         b     -
(
GRAND GULF MAINTENANCE MATRIX                                                               i P - ; - _ .t     Component                                                               Alt.      ..
b GRAND GULF MAINTENANCE MATRIX i
Number       , Identification   PM Recommendation                 Monthly     Outane- Outace     5 Year 10 Year Comments
P - ; - _.t Component Alt.
: 6. Inspect and clean                         X                                   Replace / rework lantern ring. Verify                                                         lantern ring as
Number
                                          . leak-off holes are                                                           necessary to not plugged.                                                                 ensure concentricity prior to reinstall-ation.                   [
, Identification PM Recommendation Monthly Outane-Outace 5 Year 10 Year Comments 6.
: 7. Replace packing                                                               Replace packing when rings,                                                                       packing becomes hard or leakage at the packing is noted and cannot be stopped by tightening Ref: Lead engine DR/QR Report #02-810C.
Inspect and clean X
GG-104           Lube Oil Heat   1. Perform a daily visual                                                         Ref: Lead engine DR/QR   I
Replace / rework lantern ring. Verify lantern ring as
,                    Exchanger             inspection for leakage                                                       Report #02-820G, 4
. leak-off holes are necessary to not plugged.
                                          .at packing. Verify                                                           .Ref: 06/12/84 IOC that no leakage is                                                             from R. Chit to present through the                                                           P. Martin, 4
ensure concentricity prior to reinstall-ation.
                                          . Teak-off ports of                                                             Ref: 04/02/84 IOC         '
[
the lantern ring.                                                             from M. Wehmeyer to R. Kadlec
7.
: 2. Record heat                   X                                               Use for trend data exchanger perfor-mance by checking engine operating parameters.
Replace packing Replace packing when
;    GG1249/52                                                                                         Revision 1 - Entire Page Revised a
: rings, packing becomes hard or leakage at the packing is noted and cannot be stopped by tightening Ref: Lead engine DR/QR Report #02-810C.
I GG-104 Lube Oil Heat 1.
Perform a daily visual Ref: Lead engine DR/QR Exchanger inspection for leakage Report #02-820G,
.at packing. Verify
.Ref: 06/12/84 IOC 4
that no leakage is from R. Chit to present through the P. Martin,
. Teak-off ports of Ref: 04/02/84 IOC 4
the lantern ring.
from M. Wehmeyer to R. Kadlec 2.
Record heat X
Use for trend data exchanger perfor-mance by checking engine operating parameters.
GG1249/52 Revision 1 - Entire Page Revised a
t 4
t 4
I l
I l
a
a


      .--_-                    _ _ _ _ _ _ . - - - - ---              - . - .   .       -. . -        .    -    . .. . ~ . - .    . . . - . . . .        . , . . .            -      ,- .- - - .
... ~. -.
~
(
(
~
u GRAIS GULF MAINTEH4NCE MATRIX
u                                           .
' C 7 : -
GRAIS GULF MAINTEH4NCE MATRIX
_t. Ceapenent Alt.
            ' C 7 : - _t . Ceapenent                                                                                             Alt.                                                                 .
.. 10 Year Comments Number Identification
Number       Identification                 - PM Rec h tton.                       Monthiv   Outano           Outane           5 Year .. 10 Year Comments                          -
- PM Rec h tton.
: 3. Evaluate heat exchanger                       X'                                                                                 -,
Monthiv Outano Outane 5 Year 3.
                                                                  . performance data.
Evaluate heat exchanger X'
: 4. Inspect tubes and                             M                                                   Ref:. TDI Instruction tube sheet for                                                                                     Manual, Volume I.
. performance data.
ereeton and fouling -'                                                                             Maintenance Schedule remove entrance and-                                                                               Ref: 07/19/84 Telecon exit channel covers.                                                                               D. Pasquale and R. Chii
4.
: 5. Inspect and clean                             X           _
Inspect tubes and M
Repla.e/rouork               .,
Ref:. TDI Instruction tube sheet for Manual, Volume I.
1antern ring.
ereeton and fouling -'
    ~
Maintenance Schedule remove entrance and-Ref: 07/19/84 Telecon exit channel covers.
a                                                                                                                                                                    lantern ring as                 ~
D. Pasquale and R. Chii 5.
;                                                                  Verify leak-off                                                                                   -necessary to
Inspect and clean X
                                                                  - holes are not                                                                                     ensure concentricity.
Repla.e/rouork 1antern ring.
                                                                  . plugged.                                                                                                                           ,
lantern ring as
: 6. Replace packing                                                                                   or when packing becomes .
~
rings *at the floating                                                                           ' hard or leakagn at the tube sheet during                                                                                 packing is noted and reassembly after each                                                                             cannot be stopped by inspection.                                                                                       tightening.                     ,
~
: 7. Perform a spectro                                                                                 To be performed at cheetcal analysis                                                                                 approximate quarterly of the lube oil,                                                                                   intervals.
a Verify leak-off
;                                                                  Particular attention                                                                               Ref: Lead engine shall be given to                                                                                 #02-820G
-necessary to
                                                                  . percent moisture
- holes are not ensure concentricity.
                                                                  . content.
. plugged.
i
6.
            .GG1249/53                                                                                                                           Revision 1 - Entire Page Revised a
Replace packing or when packing becomes.
i U                                                                                                                                                                                                       ,
rings *at the floating
a v                   -.    ., -        .=r                                                                                   . -
' hard or leakagn at the tube sheet during packing is noted and reassembly after each cannot be stopped by inspection.
tightening.
7.
Perform a spectro To be performed at cheetcal analysis approximate quarterly of the lube oil, intervals.
Particular attention Ref: Lead engine shall be given to
#02-820G
. percent moisture
. content.
r
.GG1249/53 Revision 1 - Entire Page Revised i
a i
U a
v
.=r


          -.                _.    .-      .  . _ . ._ _ . . _        .      . . . _ _ . _ . . .      ._  _ . . . -  ~.         .                ._ _ __ . .            ._
~.
C                                                                                                                                                   O
C O
                                                                              . GRAND GULF MAINTEIWWICE MATRIX C r;:nc.t           Component                                   .
. GRAND GULF MAINTEIWWICE MATRIX C r;:nc.t Component Alt.'
Alt.'
Humber Identification PM Recommendation Monthly Outace Outage S Year 10 Year Comments GG-109 Lube 011 Keep-Wars Pump
Humber             Identification                     PM Recommendation                       Monthly     Outace Outage   S Year 10 Year Comments                         '''
.1.
GG-109             Lube 011 Keep-Wars Pump           .1.     Check operation of                   X                                             Items 1-5; Ref:
Check operation of X
pump / motor bearings.                                                             04/05/84 IOC from M. Wehmeyer to T..Fritsch~                   ,
Items 1-5; Ref:
: 2. Check mechanical seal               X 1eakage.
pump / motor bearings.
: 3. Clean, inspect and                                 X megger motor.
04/05/84 IOC from M. Wehmeyer to T..Fritsch~
: 4.     Check coupling                                     X alignment.
2.
: 5. Record pump                         X                                             Use for trend data discharge pressure.
Check mechanical seal X
6.'     Measure unit vibra-                                 X tion (pump / motor).
1eakage.
.                                                          7.     The pump should be                                                                 To be performed daily.
3.
inspected for signs of                                                             Ref: DR/QR Report       ''
Clean, inspect and X
leakage and corrective                                                             #02-820 modifications (addition of flexible piping connections) be imple-mented as required.
megger motor.
* GG-111             Flex Connection                     1.     Visually inspect for                                       X                                                     '
4.
evidence of cuts, noles,
Check coupling X
* or dents.
alignment.
  . GG1249/54                                                                                                                     Revision 1 - Entire Page Revised e     6m
5.
                                                                                        =
Record pump X
                                                                                                                                                                            /
Use for trend data discharge pressure.
6.'
Measure unit vibra-X tion (pump / motor).
7.
The pump should be To be performed daily.
inspected for signs of Ref: DR/QR Report leakage and corrective
#02-820 modifications (addition of flexible piping connections) be imple-mented as required.
GG-111 Flex Connection 1.
Visually inspect for X
evidence of cuts, noles, or dents.
. GG1249/54 Revision 1 - Entire Page Revised e
6m
=
/
9 f
9 f
s   *-
s e
            .- - -- -    -        -    -          --            -                                          e                                -            w -we e
w
-we e


GRAND GULF MAINTENANCE MATRIX
GRAND GULF MAINTENANCE MATRIX
    - Component Component       .
- Component Component Alt.
                                          .                  ..                                            Alt.
Number-Identification ~
Number-   Identification ~           PM Recommendation               Monthly           Outaae Outace     5 Year 10 Year Comments GG-113/14 Diesel Starting Air         1. Check operating oil           X                                                       All itses; Ref:
PM Recommendation Monthly Outaae Outace 5 Year 10 Year Comments GG-113/14 Diesel Starting Air 1.
,                _ Compressors'                   pressure.                                                                             04/02/84 IOC with attached Maintenance Chart from M. Wehmeyer to J. Kamseyer.
Check operating oil X
: 2. Overall visual                 X inspection.                                                                                     '
All itses; Ref:
: 3. Clean fir.s on inter                             X and after coolers.
_ Compressors' pressure.
d
04/02/84 IOC with attached Maintenance Chart from M. Wehmeyer to J. Kamseyer.
: 4. Replace intake filter                             X element.
2.
: 5. Change compressor oli.                           X 4
Overall visual X
: 6. Check belt tension.                               X
inspection.
: 7. Check pulley Clano                               X bolts / set screws tight.
3.
: 8. Inspect filter felts on                           X                                   Replace as necessary.
Clean fir.s on inter X
and after coolers.
d 4.
Replace intake filter X
element.
5.
Change compressor oli.
X 6.
Check belt tension.
X 4
7.
Check pulley Clano X
bolts / set screws tight.
8.
Inspect filter felts on X
Replace as necessary.
unloader system.
unloader system.
GG-115     Air Dryers and           1. 81ow down trap                 X                                                       Ref: 04/05/84 IOC Moisture Traps                   sediment bowls.                                                                       from M. Weheeyer to J. Kammeyer, Ref: TDI Instruction Manual, Velume I, Maintenance Schedule
GG-115 Air Dryers and 1.
: 2. Inspect and service                               X solsture traps.
81ow down trap X
GG1249/55                                                                                                     tevision 1 - Entire Page Revised f-S.
Ref: 04/05/84 IOC Moisture Traps sediment bowls.
                                                                  ~
from M. Weheeyer to J. Kammeyer, Ref: TDI Instruction Manual, Velume I, Maintenance Schedule 2.
Inspect and service X
solsture traps.
GG1249/55 tevision 1 - Entire Page Revised f-S.
~


                                                                                                                                                                                                      ,        4 GRAle GULF MINTENANCE MTRIX                                                                             <-          ,
4 GRAle GULF MINTENANCE MTRIX Ceeponent A --.. r_t -
Ceeponent   A -- . . r_t -                                                                                                   Alt.
Alt.
t Nieber '       Ide'ntification '                 PM Recommendation                         Monthiv     Outane               Dutaae ' 5 Year 10 Year' Comments
Nieber '
: 3.     Check proper operation                 X                                                             Replace desiccant charge of desiccant dryer.                                                                                 as required.                         '
Ide'ntification '
                                                                                                                                                                          ' Ref: 04/16/84 letter
PM Recommendation Monthiv Outane Dutaae ' 5 Year 10 Year' Comments t
                                                                                                                                                                          -from R. Jaquinto to R. Johnson                           !
3.
GG-118         Intake Air Filters             ' 1.
Check proper operation X
Visually inspect the                                 X.                                             Ref: TDI Instruction'         '
Replace desiccant charge of desiccant dryer.
oil distribution plate                                                                               Manual Vol.'.I Section 5.
as required.
and change the filter-
' Ref: 04/16/84 letter
,                                                                      oil.
-from R. Jaquinto to R. Johnson GG-118 Intake Air Filters
          -GG-119         Emergency Generator               1.     Inspect panel for                                     X                                             Items 1-5; Ref: ~3 /30/84
' 1.
: Control Panel                             cleanliness and clean                                                                               IOC free M. Wehmeyer as required.                                                                                       'to D.' Mercaldi
Visually inspect the X.
: 2.     Check terminal boards                               X for loose wiring.                                                                                                                         -
Ref: TDI Instruction' oil distribution plate Manual Vol.'.I Section 5.
: 3.     Visually check condition                             X of wire insulation for 4                                                          degradation.
and change the filter-oil.
: 4.     Clean and inspect relay                             X contacts.
-GG-119 Emergency Generator 1.
: 5.     Check meter calibrations.                           X
Inspect panel for X
: 6.     Bridge rectifier assembly.                                                                           Ref: DR/QR Report
Items 1-5; Ref: ~ /30/84 3
  ,                                                                .and SCR mounting.                                                                                     #GG-119, Attach.--1 i
: Control Panel cleanliness and clean IOC free M. Wehmeyer as required.
'to D.' Mercaldi 2.
Check terminal boards X
for loose wiring.
3.
Visually check condition X
of wire insulation for degradation.
4 4.
Clean and inspect relay X
contacts.
5.
Check meter calibrations.
X 6.
Bridge rectifier assembly.
Ref: DR/QR Report
.and SCR mounting.
#GG-119, Attach.--1 i
4 1
4 1
          'GG1249/56                                                                                                                                 Revision 1 - Entire Page Revised J.                                                                                                                                                                                                                .
'GG1249/56 Revision 1 - Entire Page Revised J.
s-a                                                                                                                                                                                                               '4 4
s-a
'4 4
t
t
!~
!~
a
a


                    -  ._.    --          . m.   . . .              . _ . ._..        ._        . _ . . _ _        . ~     _.        .        . , .        -                    __
m.
                  %                                                                                                                                                ~
. ~
GRAND GULF MINTENANCE MTRIM Component   Component                                                                                   Alt.
~
Number       Identification             PM Recommendation                   Monthly     Outage         Outace     S Year 10 Year Comments
GRAND GULF MINTENANCE MTRIM Component Component Alt.
: a. Inspect the temperature X                                                       If either Sf the labels sensitive label placed                                                         permanently blacken the on the most visible                                                             maximum temperature of the.-
Number Identification PM Recommendation Monthly Outage Outace S Year 10 Year Comments a.
face of.the hexagonal                                                         diode and/or SCR has been body of the diodes                                                             exceeded requiring an and the SCR. These                                                             electrical inspection labels shall be                                                                 and an inspection of inspected before and                                                           the mounting threads after each running                                                             of the heat sinks and
Inspect the temperature X If either Sf the labels sensitive label placed permanently blacken the on the most visible maximum temperature of the.-
                                                              .of the engine.                                                                 diode and/or SCR.
face of.the hexagonal diode and/or SCR has been body of the diodes exceeded requiring an and the SCR. These electrical inspection labels shall be and an inspection of inspected before and the mounting threads after each running of the heat sinks and
Replace the diode and/or
.of the engine.
,                                                                                                                                              SCR and the heat sinks as needed and assure that proper mounting tightness of 300 in-lbs (diode) and 275 in-lbs (SCR) and proper thread condi-tions are maintained.
diode and/or SCR.
: b. Inspect glyptol applied X                                                       To be performed after to the side of the lugs                                                         each monthly test run, and mounting bolt for                                                           Retighten any loose the lugs which attach                                                           connections, remove to the bottom of the                                                             old glyptol and reapply diode and the SCR heatsinks                                                     if connections are for signs of relative                                                           retightened.
Replace the diode and/or SCR and the heat sinks as needed and assure that proper mounting tightness of 300 in-lbs (diode) and 275 in-lbs (SCR) and proper thread condi-tions are maintained.
b.
Inspect glyptol applied X To be performed after to the side of the lugs each monthly test run, and mounting bolt for Retighten any loose the lugs which attach connections, remove to the bottom of the old glyptol and reapply diode and the SCR heatsinks if connections are for signs of relative retightened.
motion.
motion.
4 -
4 -
GG1249/57-                                                                                                         Revision 1 - Entire Page Revised l
GG1249/57-Revision 1 - Entire Page Revised l
l l
l l
____                            _ _ - _          _                  s--    -
s--
w--               s                                         -      _ _ _ - _ - - -_
w--
s


4 c                                                                            .                                                          O       .
4c O
GRAIS GULF IIAINTEleAf0CE MATRIX Component     Compcaant                             ,                                                  Alt.
GRAIS GULF IIAINTEleAf0CE MATRIX Component Compcaant Alt.
: Ilumber -     Idx.iM 4ation.                 PM Recommendation                         Monthly h     Outece 5 Year 10 Year Comments
: Ilumber -
: 7. f,ujustment potentiometers - X                                               To be performed after-inspect glyptol applied                                                       each monthly test run.
Idx.iM 4ation.
to the the side of the-                                                       If adjustments are i
PM Recommendation Monthly h
adjustment screws for each                                                   needed, remove gl3 ptol of the five adjustment                                                       and reapply when the potentiometers on the                                                         adjustment procedure printed circuit board                                                         is complete.
Outece 5 Year 10 Year Comments 7.
f,ujustment potentiometers - X To be performed after-inspect glyptol applied each monthly test run.
to the the side of the-If adjustments are i
adjustment screws for each needed, remove gl ptol 3
of the five adjustment and reapply when the potentiometers on the adjustment procedure printed circuit board is complete.
of the voltage regulator for signs of relative action.
of the voltage regulator for signs of relative action.
: 8. Printed circuit boards -               X                                     To be perfc? sed after check for cleanliness                                                         each monthly test run.
8.
and proper mounting of                                                       - Report any abnormal components.                                                                   conditions to engineer-ing for evaluation.
Printed circuit boards -
GG-121-       Lube Oil Keep-Wars Filter . 1. Record filtar d/p.                     X                                     Ref: 04/05/84 IOC from
X To be perfc? sed after check for cleanliness each monthly test run.
,                                                                                                                                    M. Wehmeyer to J. DiMare
and proper mounting of
: 2. Change filter                                                                 To be performed before elements.                                                                     the filter d/p reaches the manufacturers re-commended maximum differential pressure.
- Report any abnormal components.
Ref: Lead engine DR/QR Report 802-820E Jacket Water System           1. Check pH factor                       X                                       Ref: TDI Instruction of jacket water and                                                           Manual, Volume I, correct as recom-                                                             Maintenance Schedule mended by chemical
conditions to engineer-ing for evaluation.
                                                    ' supplier.
GG-121-Lube Oil Keep-Wars Filter.
GG1249/58                                                                                                     Revision 1 - Entire Page Revised 4
1.
Record filtar d/p.
X Ref: 04/05/84 IOC from M. Wehmeyer to J. DiMare 2.
Change filter To be performed before elements.
the filter d/p reaches the manufacturers re-commended maximum differential pressure.
Ref: Lead engine DR/QR Report 802-820E Jacket Water System 1.
Check pH factor X
Ref: TDI Instruction of jacket water and Manual, Volume I, correct as recom-Maintenance Schedule mended by chemical
' supplier.
GG1249/58 Revision 1 - Entire Page Revised 4
n 9
n 9


    . ,, __      -    .                        _ _ . _ _ _ . . . _ . _ _      .            _ ___ .        .___.._.___...____.____..._.___.-.m._._.                               -.          _                  . .-. .. ,
.___.._.___...____.____..._.___.-.m._._.
                                                                                                                                                          ~
~
O'                       -
O'
                  -                                                                                                                                                                                                                    ,i GRAf8 GULF IIAIIITEllAIICE IIATRIX -                                                                                           ~F
,i GRAf8 GULF IIAIIITEllAIICE IIATRIX -
_ Component     Component'                                       _ .                                              .
~F
Alt.                                                                         !
_ Component Component' Alt.
1:             Ihaber       Identification-                                   -pit ear - tion                               plenthly -           Outage Outaae   5 Year 10 Year Comments.
1:
1 Lee 011 System'-                                     1.   -Check lubricating                         X'                                                   Ref: T0! Instruction-eil with a viscesi-
Ihaber Identification-
                                                                                      ~
-pit ear - tion plenthly -
Manuel, Volume I,-             ..
Outage Outaae 5 Year 10 Year Comments.
meter for fuel ell                                                                             Maintenance Schedule,'
1 Lee 011 System'-
dilution. Send a                                                                               Items 1, 2.                                       '
1.
-Check lubricating X'
Ref: T0! Instruction-eil with a viscesi-Manuel, Volume I,-
~
meter for fuel ell Maintenance Schedule,'
dilution. Send a Items 1, 2.
_ sample of oil to:
_ sample of oil to:
laboratory for analysis.
laboratory for analysis.
- 2.
Drain lubricating '
Drain lubricating '
                                                                              - 2.                                                                      X                            ' When replacing' engine                             '
' When replacing' engine X
oli system and                                                                                 oil use N.D.'ei.1 that-clean sump tank.                                                                               meets or exceeds series 3' Depending on the                                                                               standards, the base stock results of lube                                                                                 should be more resistant oli analysis, refill                                                                           to thersel degradation                           '-
oli system and oil use N.D.'ei.1 that-clean sump tank.
with,new eil                                                                                   and coke formation. The additive package should provide high detergent dispersant properties'                             >
meets or exceeds series 3' Depending on the standards, the base stock results of lube should be more resistant oli analysis, refill to thersel degradation with,new eil and coke formation. The additive package should provide high detergent dispersant properties' with high alkalinity and a high level of.antiwear additive such as zinc i
with high alkalinity and                           ,
dithiophosphate. Total Base leumber (TBII) should be 12 to 15 for use with
a high level of.antiwear                             :
'#2 fuel oil and a sulfated ash content of 1.5% to 2.0E is preferred.- An engine oil with such properties, Mob 11 guard 412 or i
additive such as zinc                               i dithiophosphate. Total Base leumber (TBII) should be 12 to 15 for use with
equivalent product may be used to insure improved lubrication.
                                                                                                                                                                                      '#2 fuel oil and a sulfated ash content of 1.5% to 2.0E is preferred.- An engine                           :'
oil with such properties, Mob 11 guard 412 or                                 i equivalent product may be                           '
used to insure improved lubrication.
2 l
2 l
i i'             GG1249/59                                                                                                                                           Revision 1 - Entire Page Revised
i i'
                                                                                                                                                                                                                                          -i i
GG1249/59 Revision 1 - Entire Page Revised
l 1           -
-i i
4 e:
l f
i 1
1 i
4 I
e:


_.        . _ _      m         . _ _. .            _ . . _ _ . .      _          .      __        . . _ .          ._ . _ _
m GRAND GULF MAIIITEMICE MATRIX Component C:; :n _:.t Alt.
;                                                                      GRAND GULF MAIIITEMICE MATRIX
Number Identification
!      Component     C:; :n _:.t                                                                                                                                           '
. PM Roccamendation Monthly Outane-Outace 5 Year 10 Year Comments 3.
Alt.
Visually inspect lobe X
Number       Identification           . PM Roccamendation                     Monthly     Outane- Outace     5 Year 10 Year Comments
To ise performee oil sump tank level after lube oli switch floats.
: 3. Visually inspect lobe                           X                                   To ise performee oil sump tank level                                                                   after lube oli switch floats.                                                                       has been drained Check switch set                                                                       from sump points Ref: fMP-022/23 Item 7.                                                                                                               *
has been drained Check switch set from sump points Ref: fMP-022/23 Item 7.
: 4. Perform a spectro-                                                                   To be performed at cheefcal analysis                                                                     approxteately quarterly of the lube oil.                                                                       intervals. Ref: TDI Instruction Manual, Volume I, Maintenance Schedule System Operation           1. Record all operating                 X                                               To be performed               /
4.
parameters. Compare                                                                   during monthly with base line data                                                                   engir.e test run to ensure engine is operating properly Piping Systes           . 1. Conduct a detailed                   X                                               Tighten, repair or       -'y visual and audible                                                                     replace as required inspection of all                                                                     Ref: TDI Instruction fuel, air, oil,                                                                       Manual, Volume I, and water piping                                                                     Maintenance Schedule and valves for     '
Perform a spectro-To be performed at cheefcal analysis approxteately quarterly of the lube oil.
l                                                    1eakage                                                                                                       /
intervals. Ref: TDI Instruction Manual, Volume I, Maintenance Schedule System Operation 1.
: 2. Inspect, clean and                               X as appitcable, lubricate manual
Record all operating X
,                                                    valves on skid i
To be performed
GG1249/60                                                                                                       Revision 1 - Entire Page Revised 1
/
parameters. Compare during monthly with base line data engir.e test run to ensure engine is operating properly Piping Systes
. 1.
Conduct a detailed X
Tighten, repair or visual and audible replace as required
-'y inspection of all Ref: TDI Instruction fuel, air, oil, Manual, Volume I, and water piping Maintenance Schedule and valves for l
1eakage
/
2.
Inspect, clean and X
as appitcable, lubricate manual valves on skid i
GG1249/60 Revision 1 - Entire Page Revised 1


('                                                                                                                                               C GRAND GULF MAINTENANCE MATRIM
('
P- ;:r :t   P -- - : . t                                                                                   Alt.
C GRAND GULF MAINTENANCE MATRIM P-
Number     Identification         PM Recommendation                                     Monthly Outaeo Outace       5 Year 10 Year comments Engine Internals       1.         Remove alternate left                                 X                                   If excessive side doors and                                                                             water, sludge or examine the inside                                                                         any indication of of the engine for Lv                                                                       bearing failure abnormal conditions.                                                                       is present, drain Check with a good                                                                         crankcase, deter-light for evidence of                                                                     eine cause, and take         -
;:r :t P -- - :. t Alt.
babbit flakes                                                                             necessari corrective action.
Number Identification PM Recommendation Monthly Outaeo Outace 5 Year 10 Year comments Engine Internals 1.
j Miscell-   Engine Mounted         1.       . Replace elastomeric                                                       X anceous     Pressure Switches                 parts Gear Train             1.         Inspect gears for                                     X general condition
Remove alternate left X
: 2.       Measure gear back                                                 X                       Replace worn lash on all gears                                                                         gears exceeding maximum clearance.
If excessive side doors and water, sludge or examine the inside any indication of of the engine for Lv bearing failure abnormal conditions.
is present, drain Check with a good crankcase, deter-light for evidence of eine cause, and take babbit flakes necessari corrective action.
j Miscell-Engine Mounted 1.
. Replace elastomeric X
anceous Pressure Switches parts Gear Train 1.
Inspect gears for X
general condition 2.
Measure gear back X
Replace worn lash on all gears gears exceeding maximum clearance.
Complete TDI Inspection and Maintenance Form No. 355-1-1 TDI Instruction Manual, Vol. I, Section 5.
Complete TDI Inspection and Maintenance Form No. 355-1-1 TDI Instruction Manual, Vol. I, Section 5.
Use Vol. I, Section 8 Appendix III-I for clearance values Ref: 04/16/84 letter l                                                                                                                                           from 2. Jaquinto to e Johnston
Use Vol. I, Section 8 Appendix III-I for clearance values Ref: 04/16/84 letter l
from 2. Jaquinto to
~
~
i GG1249/61                                                                                                             Revision 1 - Entire Page Revised l
e Johnston i
I 1
GG1249/61 Revision 1 - Entire Page Revised I
4
l I
                                                                    - -                                                                                  ,    -.        R
1 4
R


1 l
1 Page 2 l
Page 2                       l O   If, after completing the review, the engineer determines that the component is acceptable, based on the existing ' documentation, the Component Design Report P
O If, after completing the review, the engineer determines that the component is P
t will be issued stating the conclusion of acceptability.
acceptable, based on the existing ' documentation, the Component Design Report t
If TDI documentation is not available, or if it is determined that the available documentation does not readily lead to a conclusion of acepetability the engineer will           alternatively continue the review as outlined in the following paragraphs.                                                .
will be issued stating the conclusion of acceptability.
4.2         Review of Small Bore Pipino for Acceptability In cases where the review of TOI documentation does not lead to component acceptability. the enginwr will judge if the component will perform its j       intended function under all normal and earthquake loadings.                   This judgment will be based on a review of the following information-Quality approved as built piping isometrics                                                           i j                 System operating parameters                                                                       l Physical piping data Site specific amplified response spectra                                                       '
If TDI documentation is not available, or if it is determined that the available documentation does not readily lead to a conclusion of acepetability the engineer will alternatively continue the review as outlined in the following paragraphs.
;                System function j       In addition to reviewing the above information, a . physical walkdown of the                                 i engine and skid piping may be required. The walkdown would include a review
4.2 Review of Small Bore Pipino for Acceptability In cases where the review of TOI documentation does not lead to component acceptability. the enginwr will judge if the component will perform its j
intended function under all normal and earthquake loadings.
This judgment will be based on a review of the following information-Quality approved as built piping isometrics i
j System operating parameters l
Physical piping data Site specific amplified response spectra System function j
In addition to reviewing the above information, a. physical walkdown of the i
engine and skid piping may be required.
The walkdown would include a review
(
(
of the piping to determine pipe support type and function, as well as a review                               i j       for the following:
of the piping to determine pipe support type and function, as well as a review i
j for the following:
?
?
Thermal flexibility:               The engineer will determine     if   sufficient flexibility exists for each between support section of small bore piping.                           j The thermal movement imparted by the supports onto the piping will also                               (
Thermal flexibility:
j               be considered.                                                                                       '
The engineer will determine if sufficient flexibility exists for each between support section of small bore piping.
i               Deadweicht spans:             The deadweight spans between supports will be reviewed by the engineer and acceptability will be based on judgment.
j The thermal movement imparted by the supports onto the piping will also
Seismic spans:       The seismic spans between supports will be reviewed by the engineer       and         acceptability will be based on judgment.                   The engineer's judgment will consider the site specific amplified response spectra and all components, fittings and branch connections. Engine                                   ,
(
induced . vibration will also be considered in determining acceptability l               of seismic spans and is further discussed in paragraph 4.5.                                             !
j be considered.
i               The engineer will document the reviews of the individual components by a
i Deadweicht spans:
!              written trip report.             The trip report will serve as a summarization of             I         .
The deadweight spans between supports will be reviewed by the engineer and acceptability will be based on judgment.
Seismic spans:
The seismic spans between supports will be reviewed by the engineer and acceptability will be based on judgment.
The engineer's judgment will consider the site specific amplified response spectra and all components, fittings and branch connections.
Engine induced. vibration will also be considered in determining acceptability l
of seismic spans and is further discussed in paragraph 4.5.
i The engineer will document the reviews of the individual components by a written trip report.
The trip report will serve as a summarization of I
the engineering walkdown.
the engineering walkdown.
l T011154/2                                                                               N'V' I
l T011154/2 N'V' I
  --  -      --- - - - _-        _ - . . - -}}
-.. - -}}

Latest revision as of 05:30, 13 December 2024

Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept
ML20100N189
Person / Time
Site: Grand Gulf 
Issue date: 02/28/1985
From:
TDI (TRANSAMERICA DELAVAL, INC.) OWNERS GROUP
To:
Shared Package
ML20100N184 List:
References
TAC-52411, NUDOCS 8504180418
Download: ML20100N189 (150)


Text

- -

i I

1 O

TDI DIESEL GENERATOR DESIGN REVIEW AND QUALITY REVALIDATION REPORT prepared for 1

MISSISSIPPI POWER AND LIGHT COMPANY GRAND GULF NUCLEAR STATION - UNIT 1-q by V

TDI DIESEL GENERATOR OWNERS GROUP Revision 1 February,.1985 Reviewed _by:

R. J. Deese Licensing Coordinator 2

.TDI. Diesel Generator Owners Group Approved by:

bi C. L. Ray

' (

' Technical Program Director TDI Diesel Generator Owners. Group l

N 8504180418 850416 PDR ADOCK 05000416 l

S PDR z,

l~

GG1434-l

2.6 -FINAL DOCUMENTATION' The DR/QR program.has been completed for Mississippi Power and Light.

A summary of the results of this effort are contained in Section 3.0.

Appendix ~ I contains component ' DR/QR Summary Reports which provide a detailed summary of.the review and analysis performed on each component

. including references to supporting documentation and the recommendations and conclusions resulting from this effort.

Appendix II contains a comprehensive set of maintenance and surveillance recommendations - for 'each component.

These recommendations were derived l

from existing vendor recommendations and the individual component DR/QR i

Summary reports. The purpose of this Appendix is to provide the utility a basis for its maintenance and surveillance program which will maintain the qualification of its diesel generators for the life of the plant.

This entire report constitutes final documentation of the completion of 1

the DR/QR Program on the Grand Gulf TDI diesel generators.

O O

GG1434 2-6.

.REV.'l

3.0 Results of Design Review and Quality Revalidation The DR/QR Program implemented for the Grand Gulf Nuclear Station - Unit 1 TDI diesels was consistently performed with the generic methodology described in Section 2.0.

The results of these reviews are summarized in this section.

More detailed component summary reports are contained in Appendix I of this report.

Section - 3.1 and 3.2 list the components of the Grand Gulf diesel generators which _have been reviewed-under Phase I

and Phase II respectively.

The majority of these_ components are assessed to be acceptable for their intended service with unlimited life provided the recommendations identified are followed.

These recommendations deal mainly with additional inspection requirements, and installation, operating and maintenance procedure improvements.

In some

cases, procurement specification recommendations are identified to aid the utility in its spare parts program.

Some of the components required _ modifications as identified in the recommended actions.

The implementation of these recommended actions by the. utility will result in a component which is acceptable for its intended service with unlimited life.

O l

O GG1703 3-1 REV 1 6

y i

3.1 Summary Resolution of Sixteen Generic Components (Phase I)

The results of the Phase I program have been submitted to the NRC in a series of reports and supplements (Refs. 2 through 34) which covered the 15 generic components.

The results of these reviews are summarized below.

Component Acceptability Recommended Action

. Turbocharger Unlimited Life Additional testing and (MP-022/3) maintenance requirements.

Revision of. operating procedures.

Base and_ Bearing Unlimited Life Additional maintenance and Caps (03-305A, inspection requirements.

03-305C, 03-3050)

Crankshaft Unlimited Life None (03-310A)

Cylinder Block Unlimited Life Additional maintenance and Q

and Liner inspection requirements.

(03-315A,03-315C)

Cylinder Head Unlimited Life None Studs (03-315E)

Connecting Rods:

Unlimited Life Additional inspection Connecting Rods requirenents.

and Bushings (03-340A)

I Connecting Rod Unlimited Life Additional maintenance Bearing Shells requirements. Additional (03-3408) inspections recommended.

Pistons (03-341A)

Unlimited Life AN piston skirt should be replaced with AE piston skirt.

Air Start Valve Unlimited Life Additional maintenance (03-359) requirements. Verification of dimensions recommended.

Cylinder Heads Unlimited Life Additional maintenance

'(03-360A) requirements.

GG1703 3-2 REV 1

.4

- Component Acceptability Recommended Action Fuel Injection Unlimited Life Additional testing and Equipment: Tube maintenance requirements.

Assembly (03-365C)

Procurement specification requirement.

Main and Connector Unlimited Life Additional procurement Pushrods (03-390C, requirement.

Additional 03-3900) inspections recommended.

Random destructive testing recommended.

Rocker Arm Unlimited Life Additional maintenance Capscrews requirements.

(03-390F)

{

l Jacket Water Unlimited Life Additional maintenance and Pump (03-425A)

. inspection requirements.

Wiring and Unlimited Life None Terminations (03-688B)

()

l D

l O GG1703 3 REV 1

k 3.2 Summary Resolution of Phase II Components Component Acceptability Recommended Action TURBO, INTAKE, INTERCOOLER & EXHAUST Intercooler Unlimited Life Additional maintenance (F-068) requirements.

Flex Connections Unlimited Life None (GG-111)

Intake Air Unlimited Life None Silencer (GG-116)

Intake Air Filters Unlimited Life None (GG-118)

Turbocharger Unlimited Life Additional inspection and (MP-022/023)

(pending comple-maintenance requirements.

tion of the Also additional pre-nozzle ring lubrication procedures.

vane and cap-O screws failure analysis) l Turbocharger Thrust Unlimited Life None Bearing Lubricant System (02-CFR)

Intake Manifold Modifications Additional maintenance 1

Piping recorimendations.

Addition (02-375) of U-Bolt supports to crossover piping.

Additional Quality inspections recommended.

Exhaust Manifold Modifications Replacement of slip joints.

(02-380A)

Refer to Component Design Review Checklist 02-380A l

for details.

Additional inspection requirements.

Exhaust' Manifold:

Unlimited Life Additional Quality inspections

. Gaskets and Bolting recommended.

(02-3808)

Turbocharger -

Unlimited Life Implementation of proper torque Bracket on bracket bolting.

Additional 3

(02-475A) inspections recommended.

GG1703 3-4 REV 1.

(3 Component' Acceptability Recommended Action V

. Turbocharger Bracket-Unlimited Life Additional Quality inspection Air Butterfly-and maintenance requirements.

Valve Assembly (with Actuator)

(02-4758)

Turbocharger Bracket-Unlimited Life None Bolting and Gaskets (02-475C)

Intercooler Unlimited Life None Piping:

Pipe (02-717N)

Intercooler Unlimited Life None Piping:

Couplings, Gaskets, Bolting (02-717P)

LUBE OIL Lube Oil Heat-Unlimited Life Additional maintenance Exchanger requirements.

(GG-104)

Lube Oil System -

Unlimited Life None Auxiliary Lube Oil Pump (GG-108) i Befere and After Unlimited Life Additional inspections y

Lube Pump recoreended.

j (GG 109)

Oil Prelube Unlimitec site Additional maintenance l

Filter.

requirements.

(GG-121) l Lube Oil Full Unlimited Life

. Additional maintenance-(

Pressure Strainer and inspection requirements (SE-025)'

l Lube Oil Pressure

-Unlimited Life Additional maintenance i-Regulating Valve requirements.

(00-420)

-Lube Oil Fittings -

Unlimited Life None Internal Headers (02-307A-LB)

O Lube Oil Fittings-Unlimited Life None

-Internal Headers (02-307A-SB)

GG1703 3-5 REV 1

Component-Acceptability Recommended Action Lube Oil Fittings -

Unlimited life None j

-Internal Tubing &

Fittings (02-3078)

Lube Oil Fitting Modifications Modifications to the Internal-Supports auxiliary internal lube (02-307D) oil header.

(Refer to DR/QR Report 02-3070 for details).

. Lube Oil Pumps Unlimited Life None (02-420)

Lube Oil Lines -

Unlimited Life None External:. Tubings, Fittings, Couplings (02-465A-LB)

Lube Oil Lines -

Unlimited Life None

' External: Tubing, Fittings, Couplings (02-465A-SB)

Lube Oil Lines -

There are no supports for this component.

External Supports Refer to Component Design Review Checklist (02-4658-LB) for 02-465-LB.

Lube Oil Lines Modification Redesign of support to avoid External:

Supports an overstressed condition in (02-465B-SB) the 3/8 inch diameter engine bolt and bent plate.

Lube 911 Liners Unlimited Life None i

External Valves (02-465C)

Turbocharger Lube Modifications Addition of two-direction, Oil Fittings:

Pipe, lateral restraints near Tube, Fittings,.and

-the horizontal' offsets in Flexible Coupling the 5/8-inch tubing, (02-467A-SB) between the lube oil header and the turbocharger.

Turbocharger -

Unlimited Life None Lube Oil Fittings:

Supports

-(02-467B-SB)-

O i

GG1703 6 REV 1

Component Acceptability Recommended Action Lube Oil Sump Tank Unlimited Life Additional maintenance with Strainer Assembly recommendations.

and Mounting Hardware (02-540A&C)

Lube Oil Sump

-Unlimited Life Additional-Quality Inspections Tank - Misc.

recommendect.

Fittings, Gaskets, Pipe & Bolting Material, Valves i

-(02-5408)

Auxiliary Sub Base & Unlimited life None 011'&' Water Piping -

Lube Oil: Pipe and Fittings (02-717F-LB)

Auxiliary Sub-Base Unlimited Life None i

& 011 & Water Piping

}

- Lube Oil: Piping &

Fittings.

(02-717F-SB)

Auxiliary Sub Base Unlimited Life Additional inspection

& 011 & Water requirements.

Piping - Lube 011:

Valves l

(02-717G)

Auxiliary Sub Base Unlimited-Life Additional maintenance

&~ Oil & Water requirements.

Piping

' Lube Oil Gaskets & Bolting (02-717H)

Auxiliary Sub Base Unlimited Life None

& 011 & Water-Piping - Lube 011:

Supports and Mounting Hardware (02-7171-LB)

Auxiliary Sub. Base Unlimited Life None'

& 011 & Water Piping - Lube Oil:

l Supports and Mounting Hardware (02-7171-58)

LGG1703 3-7 REV_ 1 l

=.

=- -.

Component Acceptability Recommended Action Misc. Equipment -

Unlimited Life Additional inspection and Heater, Lube Oil maintenance requirements.

Sump Tank p

(02-820A)

Full. Flow Lube Unlimited Life Additional inspection Oil Filter requirements.

(02-8208)-

ENGINE BASE & BEARING CAPS Base and Bearing Unlimited Life Additional inspection and Caps:

Base Assembly, maintenance requirements.-

Bearing Studs &

Nuts and. Main Bearing Caps

'(02-305A,C&D)

CRANKSHAFT & BEARINGS Crankshaft Unlimited Life None (02-310A)

Crankshaft and Unlimited Life Additional maintenance O

y Bearings:

Eearing recommendations.

Shells (02-3108) l

[

Crankcase and Unlimited Life Additional maintenance Bearings: Thrust requirements.

t Bearing Ring l

(02-310C)

Crankcase:

Unlimited Life Additional Quality Inspections Crankcase Assembly recommended.

(02-311A)

Crankcase:

Unlimited Life

.None Crankcase Mounting Hardware (02-311D)

Crankcase:

Unlimited Life None Crankcase Gaskets

.and Mounting Hardware

.(02-3868)

CiLINDER BLOCK. LINERS & WATER MANIFOLD Cylinder Block.

Unlimited Life

~ Additional inspection (02-315A) requirements.

GG1703 3-8 REV 1

-.,_.2

_ ~ _

~,.....--s,

- (~')

Component.

Acceptability Recommended Action V

Cylinder Block -

Unlimited Life Additional inspections and

~

Liner maintenance requirements.

(02-315C)

Cylinder Block Unlimited Life None Liners & Jacket Water Manifold and Piping,

1 (02-315D)

Cylinder Block -

Unlimited Life None Liners and Water Manifold:

Studs (02-315E)

Cylinder Block Unlimited Life Additional Quality Inspections Liners and Water recommended.

Manifold - Nuts (02-315F)

Cylinder Block -

Unlimited Life Additional review of site Liners and documentation toiverify Water Manifold -

that.the proper cylinder Seals and Gaskets liner seals have been installed.

O (02-315G)

Cylinder Block Unlimited Life Additional Quality Inspections Covers:

Gaskets recommended.

& Bolts (02-3858)

AIR START & BARRING DEVICE Starting Air Unlimited Life None Tank (GG-112) i Air Start Valve Unlimited Life Additional maintenance (02-359) requirements.

Starting Air Modifications Modification to supports Manifold Piping in order to provide stiffer (02-441A-LB) load paths and to relieve thermal restraint in certain directions.

(Refer to DR/QR report 02-441A-LB for details).

Starting Air Unlimited Life None Manifold -

O-Piping, Tubing, and Fittings (02-441A-SB)

GG1703 3-9 REV 1

.... ~

0 i

Component Acceptability Recommended Action Starting Air Unlimited Life Additional maintenance

)

Manifold: Valves, requirements.

Strainers, Filters.

-(02-4418)

Starting Air Unlimited Life None.

. Manifold Supports (02-441C-LB) i Starting Air Modifications Installation of a cover Manifold:

Supports plate on an air pulse tube (02-441C-SB) support for the Division II diesel.

Starting Air Unlimited Life Additional surveillance and Distributor Quality Inspection recommended.

(02-442A)

Barring Device -

Unlimited Life.

None.

Pneumatic Regulator Valve / Shutoff Valve j-(02-5258)

CONNECTING RODS 1

Connecting Rods:

Unlimited Life Additional inspection Connecting Rods requirements.

and Bushings (02-340A)

I Connecting Rod Unlisited Life Additional maintenance Bearing Shells requirements.

4 (02-3408)

PISTONS j

Pistons Unlimited Life Additional Quality Inspections (02-340C) recommended.

Pistons:

Unlimited Life Additional maintenance Rings requirements.

(02-3400) i

O GG1703-3-10 REV 1

,-.--s

-,e-.

n--,-,.--e.-

-w-


,--g g.

--,-,v-g

-,-wem w

-r-7 gr,

~

Component.

- Acceptability Recommended Action

' Pistons:

- Modifications Replace spiral ring Pin. Assembly retainers with Waldes j

(02-340E) snap ring retainers at i

first fuel outage.

Additional inspection recommendations.

Additional 1

Quality inspections recommended.

t CAMSHAFT & VALVE TRAIN s

Tappets-and Guides:

Unlimited Life Additional Quality Intake Exhaust

_ inspections recommended.

2 Tappet Assembly' Additional. maintenance 1

(02-345A) recommendations.

- Tappets.and Guides:

Unlimited Life Additional Quality Fuel Tappet inspections recommended.

1-1 Assembly Additional. maintenance (02-3458) recommendations.

1 Tappets an'd Unlimited Life None Guides - Fuel Pump Base Assembly.

.(02-345C)

Camshaft:

Unlimited Life-Additional Quality inspections l

Camshaft and maintenance requirements.

' Assembly i

(02-350A)

Camshaft:

Bearings Unlimited Life None (02-3508)

. Camshaft:

Unlimited Life Additional Quality inspections

~

-Supports, Bolting, and maintenance requirements.

and Gears (02-350C) i Cylinder Head Unlimited Life-Additional maintenance and Co~ vers:

Subcover

- Qual i ty' Inspecti on requi rements.

Assembly-(02-362A) l Rocker Arms and Unlimited Life Additional Quality inspections-

'Pushrods-Intake /

recommended.

. Intermediate and Exhaust. Rocker'

^

Shaft Assemblies

~

(02-390A&B)

Jn -

~GG1703 3-11.

'REV 1-

~

,. -.. ~

,,e-r-----

y y

+u w-.-e--1 e

-,,w--

~,,----,-r

-=ew---e--

+

e-~M

Compon nt' Acceptability Recommended Action

~

Rocker Arms and Unlimited Life Recommended that purchase order Pushrods-Pushrods specify destructive verification Intake and Exhaust-of weld quality.

Pushrods Connector (02-390C&D)

Rocker Arms Unlimited Life Additional inspection and and Pushrods:

maintenanct requirements.

Bushings (02-390E)

Rocker ' sins and Unlimited Life Additiotd quality Inspections Pushrods:-

recommended.

c Lifters (02-390F)

Rocker Arms and Unlimited Life Additional maintenance Pushrods: Miscel-requirements.

laneous Bolts and Drive Studs (02-390G)

IDLER GEAR ASSEMBLY & FRONT GEAR CASE Front Gearcase -

Unlimited Life Additional Quality Inspections 1

Gasket and Bolting recommended.

(02-335B)

Idler Gear Assembly - Unlimited life Additional Quality Inspections Crank to Pump Gear and maintenance requirements.

(02-355A)

Idler Gear Assembly Unlimited Life Additional Quality Inspections (02-3558) and maintenance requirements.

FLYWHEEL Flywheel-Unlimited Life None (02-330A) 4

. Flywheel Bolting Unlimited Life Additional Quality Inspections (02-3308) recommended.

ENGINE-INSTRUMENTATION & WIRING s

I

. Pyrometer Conduit Unlimited Life Additional maintenance Assembly,-

requirements.

Thermocouple i

(02-6300)-

GG1703

.3-12

REV 1 g.

.t

~

Component

-Acceptability Rectammended Action Engine and Auxiliary Modifications ~

-Perform an upgrade to Module Wiring Material tighten, fix, replace or Conduit and Fittings:

add missing conduit supports.

Pyrometer Conduit Addition of supports to all Cat. 1 Assembly - Conduit,-

flexible conduits.

Fittings and Supports-c (02-688A,02-630A, B,C)

Engine & Auxiliary Unlimited Life None

' Module Wiring Materi-al-Wiring and Termi-nation

.(02-6888)

Eng. & Aux. -

Unlimited Life None Module Wiring Material:

Boxes and Terminals (02-688C)~

Engine Alarm Unlimited Life None Sensors Temperature and Level Switches O

- Off Safety Engine Alarm Sensors-Wiring

.(02-690,02-691)-

+

OVERSPEED TRIP & GOVERNOR Overspeed Trip -

' Unlimited Life Modify testing procedures.

Governor Additional Quality-Inspections-(02-410A) recommended.

f I

P.

Overspeed Trip:

Unlimited Life Additional Quality Inspections Governor &

recommended.

Accessory Drive Assembly l -

(02-4108)

Overspeed Trip:

Unlimited Life Additional' Quality Inspections Couplings =(Flexible and maintenance requirements.

& Spider).

1(02-410C)

Overspeed Trip:

tunlimited Life Recommendation that Valve'"0" Vent. Valve 4

rings be changed every 5 years.

(02-4100)

O EGG 1703 3-13 REV 1

.sy:-

4 Component-Acceptability Recommended Action Governor Drive -

Unlimited Life Additional Quality inspections Governor and recommended.

Tachometer Drive Gear and Shaft (02-411A)

Governor Drive:

Unlimited Life Additional Quality inspections n

Couplings, Pins-and maintenance requirements.

EL

& Keys (02-4118)

Governor Linkage Unlimited Life Additional Quality Inspections u

(02-413A) and maintenance requirements.

J Governor Assembly:

Unlimited Life Additional Quality Inspections lf Woodard Governor and maintenance requirements.

l (02-415A)

Governor Assembly:

Unlimited Life Additional Quality Inspections Booster Servomotor recommended.

=

?

(02-4158)

Governor Assembly:

Unlimited Life Additional Quality Inspections Heat Exchanger recommended.

9 (02-415C)

ENGINE SHUTDOWN & EQUIPMENT Engine Shutdown Modifications Additional two-direction Equipment -

lateral restraints on tubing Tubing / Fittings lines and modifications (02-695A) to pipe and tubing supports (Refer to DR/QR Report 02-695A for deta.ils).

Engine Shutdown Unlimited Life Additional inspection Equipment-Valves, requirements.

Regulators, Orifices (02-6958)

Engine Shutdown -

Unlimited Life None Trip Switches (02-695C)

JACKET WATER Jacket Water Unlimited Life Additional maintenance Heat Exchanger requirements.-

(GG-103)

Auxiliary Ja::ket Unlimited Life None Water Pump-(GG-106)

GG1703 3-14 REV 1

-Component Acceptability Recommended Action Jacket Water Unlimited Life None Standby Heater Pump

.(GG-107)

Jacket Water Modifications Addition of an axial Standpipe - Pipe, restraint on the jacket Fittings, Gaskets-water standpipe overflow (00-700A) line and a two-way lateral restraints on the jacket water vent lines.

Jacket Water Unlimited Life Additional maintenance 1

Standpipe-Valve recommendations.

(00-700B)

Jacket Water Modifications Supports modified to accept Standpipe -

two-directional lateral loading.

Supports Diameter of U-bolts be in-

.(00-700C) creased from 1/4 inch to 3/8 inch.

Refer to DR/QR report 00-700C for details.

Jacket Water-Review Not Required.

i Standpipe-See Component Design Review Checklist Switches for 00-700E.

(00-700E)

Jacket Water Unlimited Life Additional inspections Standpipe and recommended.

1

' Miscellaneous Bolting Material (00-700F)

Jacket Water Unlimited Life None Inlet Manifold -

Manifold Assembly with Hardware Coupling and' Gaskets-i (02-316A&B) i I

1 1O l

GG1703 3-15 REV 1

\\

' Component' Acceptability Recommended Action Water Discharge Modifications Replacement of elbow and Manifold:

Jacket flange located on both lines g

Water Discharge between the 3-inch header

. Manifold,' Couplings and water jacket shroud and Seals with 2-inch 90 degree

(02-317A&B)

Dresser elbows (Styles 90 or 165).

Addition of an east-west restraint near interfacing flange between component Nos. 02-317A&B and 02-717C.

Modifications to supports.

Refer to DR/QR report 02-317A&B for details.

Water Discharge Unlimited Life None Manifold:

Supports (02-317C)'

Jacket Water Unlimited Life Revised installation procedures.

Pump Additional Quality Inspections (02-425A) and maintenance recommended.

Turbo Water Piping-Unlimited Life None O

Pipe and Fittings (Small Bore Scope I

Only)

(02-437)

Thermostatic Unlimited Life Additional inspection and Valves maintenance requirements.

L-(02-515)

Auxiliary Sub Base & Unlimited Life Additional maintenance Oil & Water recommendations.

I

_. Piping - Jacket Water:

Valves (02-7178)

Auxiliary Sub Base Unlinited Life

-None-i

& 011 & Water LPiping Jacket-Water - Pipe, Couplings, i

. Fittings,: Orifices,

& Y Strainers

~

(02-7_17C-LB)

Aux. Sub Base &

Unlimited Life None-O 011'& Water' Piping--

L

. Jacket. Water: Gaskets-and Bolting'.

(02-7170)

-GG1703

3-16;

.REV

.1-s

S Component-Acceptability Recommended Action Auxiliary Sub Base Unlimited Life None

& 011 & Water.

Piping - Jacket Water:. Supports

'(02-717E-LB)

F Auxiliary Sub Base Unlimited Life None

& 011 & Water-

. Piping - Jacket Water:

Supports (02-717E-SB)

'MiscJ Equipment -

Unlimited Life Additional inspection and Heater, Jacket maintenance requirements.

Water Standpipe (02-810A) 4 CYLINDER HEADS & VALVES Cylinder Heads Unlimited Life Additional maintenance (02-360A).

requirements.

Cylinder Head Unlimited Life Additional maintenance Valves:

Intake requirements.

& Exhaust Valves l

(02-3608)

' Cylinder Head Unlimited Life Additional Quality Inspections and Valves:

recommended.

Bolting and Gaskets (02-360C)~

Cylinder Head Unlimited Life None Valves - Springs and Retainers

(

(02-3600)

FUEL OIL INJECTION

~

Fue1 Drip Tank Unlimited Life None.

Assembly:

(00-621A)

. Fuel Injection Equip : Unlimited -Life.

Additional maintenance-ment-Fuel Injection recommendations.

1-F Pump.

(02-365A) l l

GG1703 3-17 REV.1:

l t-

Component-Acceptability Recommended Action

<O Fuel Injection Unlimited Life Additional maintenance Equipment-Fuel requirements.

Injection Tips (02-3658)

Fuel Oil Injection Unlimited Life Additional Quality Inspections Equipment-Tube and maintenance requirements.

Assembly.

(02-365C)

Fuel Injection Unlimited Life None Equipment

-Supports (02-365D) 1 Fuel Pump Linkage -

Unlimited Life Additional Quality Inspections Fuel Pump control recommended.

Shaft, Linkage Assembly and Bearings (02-371A&B)

Fuel Pump Linkage-Unlimited Life None

-Automatic Shutdown (02-4138)

'~

D Fuel Oil Booster Unlimited Life None Pump-Engine Driven Pump (02-445) i Fuel Oil Header:

Modifications Modification of sud orts.

[

Piping & Tubing Refer to DR/QR repc:t 02-450A (02-450A) for details.-

Fuel Oil. Header -

Modifications Redesign of supports (Details Fuel Oil Tubing listed in DR/QR Report Supports 02-4508).

(02-450B)

Fuel Oil Filters-Unlimited Life Additional maintenance and Strainers:

requirements.

Filters (02-455A)

Fue11011 Filters Unlimited Life Additional maintenance and Strainers:

requirements.

Strainers (02-4558)

LO

.GG1703 3-18 REV -1

Component Acceptability Recommended Action Fuel Oil Filters Unlimited Life None.

and Strainers:

Mounting Hardware.

(02-455C).

Auxiliary Sub Base.

Unlimited Life.

None

& 011 & Water.

Piping.- Fuel 011:

Piping & Fittings (02-717J)

Auxiliary Sub Base Unlimited Life Additional maintenance

& 011 & Water requirements.

Piping - Fuel 011:

' Valves (02-717K) 4 Auxiliary Sub Base Unlimited life Additional maintenance

& 011 & Water Piping-requirements

-Fuel Oil Gaskets and Bolting (02-717L)

' Auxiliary Sub Base Unlimited Life.

None O

& 011 & Water

. Piping - Fuel 011:

Supports (02-717M)

GENERATOR Generator Unlimited Life-None (GG-101A)

Generator - Shaft Unlimited Life None and Bearing (GG-1018)

Generator: Generator Modifications

~ Additional maintenance and Controls

~

inspection requirements.-

(GG-119)

Replacement of field flashing relays.

Reactors should be remounted and the cabinet should be properly ventilated.

Recom-mandations to correct construc-tion and mounting inadequacies-of the diodes, the heat sink

-SCRs~and the voltage regulator.

Refer to DR/QR report GG-119-(~

.for details.-

(

'GG1703-3-19

.REV 1'

i Component Acceptability Recommended Action CONTROL PANEL ASSEMBLY Control Panel Unlimited Life None Assembly -

Cabinet / System (02-500A)

Control Panel Unlimited Life None Assembly -

Accumulator (02-500F)

Control Panel Unlimited Life None Assembb : Valves

/

(02-54.G)

Control Panel-Unlimited Life None

' Assembly - Pressure Switches (02-500H)-

t Control Panel Unlimited Life None

. Assembly: -Relays (02-500J)

O Control Panel

-Unlimited Life None Assembly -' Solenoid Valves (02-500K)

Control Panel Unlimited Life None Assembly - Piping, i

Tubing and Fittings i

(02-500M)

Control Panel Unlimited Life None Assembly - Terminal Boards / Switches,.

Wiring

-(02-500N)

ENGINE & AUXILIARY SUB-BASE & FOUNDATION BOLTS Foundation Bolts Unlimited Life Generator-foundation

'(02-550) bolts should be

-retorqued after each generator short circuit occurrence.

i'

GG1703' 3-20.

REV I r

. a.

. ~. - -

m i

Component-

- Acceptability Recommended Action Auxiliary Sub Base & Unlimited Life None 011 & Water

Piping - Auxiliary Sub Base (02-717A) j.

4 1

6 1

f i

1-

.lt i

i 1

i f

i l

-i LO GG1703 3-21 REV 1

O i

/

How To Use This Report Tabs in this report' identify the following categories:

Turbo, Intake, Intercooler & Exhaust Lube 011 Engine Base & Bearing' Caps

. Crankshaft & Bearings Cylinder Block, Liners & Water Manifold Air Start & Barring Device Connecting rods Pistons Camshaft'& Valve Train

' Idler Gear Assembly & Front Gear Case Flywheel Engine Instrumentation & Wiring Overspeed Trip & Governor Engine Shutdown & Equ.ipment-

-Jacket Water i

Cylinder Heads & Valves Fuel Oil Injection Generator

_ Control Panel Assembly

)

Engine & Auxiliary Sub-Base & Foundation Bolts These categories.have been defined to allow the reader to review a complete diesel generator subsystem in.a convenient manner.

Within each category tabs identify Grand Gulf specific component numbers.

A given component report can be found by:

a)

If the component nubmer is known - use the alpha - numeric index which identifies the volume number and category in which the component report is located.

l l

b)

If only the component name is known - Section 3.2 may be used as a l

cross-reference to' find the volume number where the component report

(

may be found.

l j.

Some reports address _more than one component.

A tab is provided for each j

. component.- However,.some components are combined under onefreport.

Slip sheets are provided where required to reference back_to the appropriate tab.

Some components required more than one report.

These are identified by the

. abbreviation LB-Large Bore and SB-Saall Bore on the component number tabs.

O i-

-Index 1898

INDEX-(continued)

Component Component Volume Number Description Category No.

F-068 Intercooler Turbo, Intake, 2

Intrcir. & Ex-haust

'GG-101A-Generator - Generator Generator 4

GG-1018 Generator:

Shaft and Generator 4

Bearings GG-103 Jacket Water Heat Jacket Water 3

Exchanger GG-104 Lube Oil Heat Exchanger Lube 011 2

GG-106 Auxiliary Jacket Water Pump Jacket Water 3

GG-107 Jacket Water Standby Jacket Water 3

Heater Pump GG-108 Lube Oil System - Aux.

Lube Oil 2

Lube Oil Pump i

GG-109 Before & After Lube Lube Oil 2

-Oil Pump GG-111 Flex Connections Turbo, Intake, 2

Intercooler &

Exhaust.

GG-112 Starting Air Tank Air Start &

3 Barring Device GG-116 Intake Air Silencer Turbo, Intake, 2

Intercooler &

Exhaust GG-118 Intake Air Filter Turbo, Intake, 2

Intercooler &

Exhaust GG-119 Generator - Generator Generator 4

Control GG-121 011 Prelube Filter Lube Oil 2

MP022/023 Turbocharger Turbo, Intake, 2

Intrcir. & Exhaust REV 1 11 "9"

Index 1898

_ _ ~ _ -,. -

INDEX (continued) f3 d

Component Component Volume Number Description Category No.

SE-025 Lube Oil Full Pressure Lube Oil 2

Strainer

.00-420 Lube Oil Pressure Regulating Lube Oil 2

Valve 00-621A Fuel Oil Drip Tank Assembly Fuel Oil In-4 jection 1

00-700A Jacket Water Stand Pipe:

Jacket Water 3

Pipe, Fittings, Gaskets 00-7006 Jacket Water Stand Pipe:

Jacket Water 3

Valves 00-700C Jacket Water Stand Pipe Jacket Water 3

Supports 00-700E Jacket Water Stand Pipe:

Jacket Water 3

Switches O

00-700F Jacket Water Stand Pipe:

Jacket Water 3

Misc. Bolting Mat.

02-CFR Turbocharger Thrust Bearing Turbo, Intake,

-2 Lubricant System Intrcir. & Ex-haust 02-305A Base and Bearing Caps: Base Engine Base 2

Assembly

& Bearing Caps 02-305C Base and Bearing Caps:

Engine Bise 2

Main Bearing Studs & Nuts

& Bearing Caps 02-3050 Base and Bearing Caps:

Engine Base Main Bearing Caps

& Bearing Caps 2

02-307A Lube Oil Fittings:

Lube 011 2

Internal Headers 02-307B Lube Oil Fittings:

Lube Oil 2

Internal - Tubing & Fittings 02-3070 Lube Oil Fittings Internal:

Lube Oil 2

Supports O

iii REV 1 Index 1898 Entire Page Revised

\\

Component Component Volume Number Description Category No.

02-310A

. Crankshaft Crankshaft &

2

, Bearings i -

02-310B Crankshaft and Bearings:

Crankshaft &

2

Bearing Shells Bearing i

02-310C-Crankcase and Bearings:

Crankshaft &

2 Thrust Bearing Ring Bearing 02-311A Crankcase: Crankcase Assy Crankshaft &

2 Bearing 02-311D

~ Crankcase: Crankcase-Crankshaft &

2 Mounting Hardware Bearings 02-315A Cylinder Block Liners &

Cyl. Block'&

2 Water Manifold: Cylinder Liners & Water Block Manifold 02-315C Cylinder Block Liner &

Cyl. Block &

2 Water Manifold -

Liners &

Cylinder Liner Water Manifold 02-3150 Cylinder Block Liners &

Cyl. Block &

2 Jacket Water Manifold Liners &

& Piping Water Manifold 2

02-315E Cylinder Block - Liners Cyl. Block &

2 and Water Manifold: Studs Liners &

i Water Manifold l

02-315F Cylinder' Block Liners Cyl. Block &

2

& Water Manifold: Nuts Liner & Water-Manifold-4 02-315G Cylinder Block Liners &

Cyl. Block &

2 Water Manifold Seals &

Liners &

Gaskets Water Manifold 02-316A Jacket Water Inlet Manifold:

Jacket' Water 3

Manifold Assembly W/ Hardware and Coupling and Gaskets 02-3168 Jacket Water Inlet Manifold:

Jacket Water 3

Coupling and Gaskets 02-317A Water Discharge Manifold:

Jacket Water 3'

Jacket Water Discharge l

Manifold, Coupling and Seals

'v REV 1

~

i

[

Index 1898 Entire Page Revised m%. - -.

_.-r

.,,__j

~..

a.

_m,......_

INDEX (continued)

O Component

'i Component Volume Number Description Category No.

02-317B Water Dicharge Manifold:

Jacket Water 3

Coupling & Seals 02-317C Water Discharge Manifold:

Jacket Water 3

Supports 02-330A Flywheel' Flywheel 3

02-3308 Flywheel - Bolting Flywheel 3

02-335B Front Geat Case-Gasket and Idler Gear As-3 Bolting sembly & Front Gear Case 02-340A Connecting Rod:

Connecting Connecting 3

Rods & Eushings Rods l'

02-3408 Connecting Rod Bearing Connecting 3

Shells Rods i

02-340C Pistons Pistons 3

02-340D' Pistons: Rings Pistons 3

02-340E Piston: Pin Assembly Pistons 3

02-345A Tappets and Guides:

Camshaft &

3 Intake Exhaust Valve Train Tappet Assembly 02-345B Tappets and Guides: Fuel Camshaft &

3 Tappet Assembly Valve Train 02-345C Tappets and Guides: Fuel Camshaft &

3 Pump Base Assembly Valve Train 02-350A Camshaft:

Camshaft Assembly Camshaft &

3 i

Valve Train 02-350B Camshaft: Bearings Camshaft &

3 Valve Train 02-3500 Camshaft:' Supports, Bolting Caeshaft &

3 and Gears Valve Train 02-355A Idler Gear Assemble: Crank Idler Gear As-3 To Pump Gear sembly & Front Gear Case Index 1898 REV 1 Entire Page Revised

J INDEX (continued)

O o

Component Component Volume

' Number Description Category No.

]..

02-3558 Idler Gear Assembly Idler Gear As-3 sembly & Front Gear Case 02-359 Air Start Valves Air Start &

3 Barring Device 02-360A Cylinder Heads Cylinder Heads 3

& Valves 02-3608 Cylinder Head Valves:

Cylinder Heads 3

Intake & Exhaust Valves

& Valves 02-360C-Cylinder Head and Valves:

Cylinder Heads 3

l.

Bolting and Gaskets

& Valves-02-3600 Cylinder Head Valves -

Cylinder Heads 3

3 Sprir.gs & Retainers

& Valves 02-362A

~ Cylinder Head Covers:

Camshaft &

3 Subcover Assembly Valve Train l

02-365A Fuel Injection Equipment Fuel Oil In-4

~

- Fuel-Injection Pump jection 02-3658 Fuel Injection Equipment Fuel Oil In-4

. Fuel Injection. Tips jection 02-365C Fuel Oil Injection Tube Fuel Oil In-4 Assembly jection I

02-3650' Fuel Injection Equipment:

Fuel Oil In-4 L

Supports jection j

02-371A Fuel Pump Linkage: Fuel Fuel Oil In-4 Pump Control Shaft jection 1

02-371B.

Fuel Pump Linkage: Linkage Fuel 011 In-4

~ Assembly and Bearing

, jection-02-375 Intake Manifold Piping Turbo, Intake, 2

Intrcir. & Ex-haust 02-380A Exnaust Manifold -

Turbo, Intake, 2

Maaifold Intrcir. & Ex-haust vi i

Index 1898 REV 1

. Entire Page' Revised

_ _ _, s.

INDEX (continued)

O Component. Component.

Volume Number Description Category No.

i 02-3808 Exhaust Manifold: Gaskets Turbo, Intake, 2

and Bolting Intrcir. & Ex-haust 02-385B Cylinder Block Cyl. Block &

2 Covers Liners & Water Gaskets and Bolting Manifold 02-3868 Crankcase:

Crankcase Cranshaft &

2 Gaskets and Mounting Bearings Hardware 02-390A Rocker Arms & Pushrods Intake & Intermediate and Camshaft &

3 Exhaust Rocker Shaft Assembly Valve Train 02-390B Rocker Arms and Pushrods:

Camshaft &

3 Exhaust Rocker Shaft Valve Train Assembly 02-390C Rocker Arms & Pushrods-Camshaft &

3 Intake & Exhaust.-Pushrods Valve Train Connectors 02-3900 Rocker Arms and Pushrods:

Camshaft &

3 Pushrods Connector.

Valve Train 02-390E Rocker Arms and Pushrods:

Camshaft &

3 Bushings Valve Train 02-390F Rocker Arms and Pushrods:

Camshaft &

3 Lifters Valve Train 02-390G Rocker Arms and Pushrods:

Camshaft &

3 Misc. Bolts & Drive Studs Valve' Train 1

02-410A Overspeed Trip: Governor Overspeed Trip 3

& Governor 02-410B Overspeed Trip: Governor Overspeed Trip 3

and Accessory Drive

& Governor 02-410C Overspeed Trip: Couplings Overspeed Trip 3

(Flexible & Spider)

& Governor 02-410D Overspeed Trip Overspeed Trip 3

Vent Val,ves

& Governor vii Index 1898 REV 1 Entire Page Revised

.._m.

i c

INDEX (continued) c Component Component Volume i

' Number Description Category No.

. 02-411A Governor Drive: Governor Overspeed Trip 3

and Tachometer Drive Gear

& Governor

& Shaft 02-4118' Governor Drive: Couplings, Overspeed Trip 3

Pins & Keys

& Governor 413A Governor Linkage Overspeed Trip 3

L

& Governor i:

02-4138 Fuel Pump Linkage-Fuel Oil In-4 Automatic Shutdown

-jection 02-415A Governor Assembly: Woodward Overspeed Trip 3

Governor

& Governor l

02-4158 Governor Assembly-Booster Overspeed Trip 3

Servosoter

& Governor 02-415C Governor Assembly-Heat Overspeed Trip 3

Exchanger

. & Governor 02-420 Lube Oil, Pump Lube 011 2

i 02-425A Jacket Water Pump Jacket Water 3

l 02-437 Turbo Water Piping:

Jacket Water 3

l Pipe & Fittings 02-441A' Starting Air Manifold Air Start &

3 Piping Barring Device l

02-4418 Starting Air Manifold Air Start &

3 Valves, Strainer, Filters Barring Device i

02-441C' Starting Air Manifold Air Start &

3 l

. Supports

. Barring Device i

02-442A

. Starting Air Distributor Air Start &

3 Director Assembly.

Barring Device 02-442B Starting Air Distributor:-

Air Start &.

3 Tubing, Fittings, Gaskets Barring Device 02-445 Fuel Oil Booster Pump Fuel 011 In-4 i

Engine Driven jection viii

.Index 1898 REV 1 Entire Page Revised

,e r,

,,-g..w,

.e

,r.

m.,

n

_a a

--.-,,s_,..,

..n.

,,,.,,-nn.,.,a

..--e,.---n--.,e..

+e

..,-..,w..

,r-e,--

_~

i INDEX-(continued)

O Component

. Component Volume i

Number Description Category No.

02-450A Fuel-011' Header: Piping &

Fuel Oil.In-4 Tubing jection l

02-4508 Fuel Oil Header:

Fuel Oil In-4

[

Fuel Oil Tubing Supports jection j.

02-455A Fuel Oil Filters &

Fuel Oil In-4 l'

Strainers: Filters

-jection 02-455B Fuel Oil Filters and Fuel Oil In-4 Strainers:. Strainers jection 02-455C Fuel Oil Filters &

Fuel Oil In-4

{

~ Strainer: Mounting Hardware jection 02-465A-Lube Oil Lines External:

Lube Oil 2

. Tubing, Fittings, Couplings t

l 02-465B' Lube Oil Lines - External Lube Oil 2

Supports 02-465C Lube Oil Lines External:

Lube Oil 2

Valves l-02-467A Turbocharger Lube 011 Lube Oil 2

Fittings - Pipe, Tubing, i

Fittings & Flexible Coupling 4678 Turbocharger: Lube Oil Lube 011 2

Fittings - Supports 02-475A Turbocharger: Bracket Turbo, Intake, 2

Intrc1r. & Ex-naust i-02-4758 Turbocharger Bracket-Turbo, Intake, 2

Air Butterfly Valve Intrcir. & Ex-haust L

i 02-475C Turbocharger: Bracket -

Turbo, Intake, 2

i Bolting & Gaskets Intrcir. & Ex-l haust l

02-500A-Control Panel Assembly:

Control Panel 4

Cabinet / System Assembly O

02-500F Control Panel Assembly:

Control Panel 4

U Accumulator Assembly ix Index 1898 REV 1 Entire Page Revised

3 INDEX (continued)

Component Component Volume Number Description Category No.

02-500G Control Panel Control Panel 4

Valves-Assembly 02-500H

. Control Panel Assembly:

Control Panel 4

Pressure Switch Assembly 02-500J Control' Panel Assembly:

Control Panel 4

Relays Assembly 02-500K Control Panel Assembly:

Control Panel 4

Solenoid Valves Assembly 02-500M Control Panel Assembly:

Control Panel 4

Piping, Tubing, Fittings

. Assembly 02-500N Control Panel Assembly:

Control Panel 4

Terminal Boards / Switches, Assembly Wiring 02-515 Thermostatic Valve Jacket Water 3

()

02-5258 Barring Device - Pneumatic Air Start &

3 Regulator Valve Shut Barring Device Off Valve 02-540A Lube Oil Sump Lube Oil 2

with Strainer Assembly and Mounting Hardward 02-5408

' Lube Oil Sump -Tank: Misc.

Lube Oil 2

I Fittings, Gaskets, Pipe

& Bolting Material, Valves 02-540C Lube Oil Sump Tank:

Lube Oil 2

Mounting Hardware 02-550 Foundation Bolts Engine & Aux.

4 Sub Base &

Foundation Bolts 02-630A Pyrometer Conduit Assembly:

Engine Instru-3 Conduit mentation &

Wiring 02-630B Pyrometer Conduit Assembly:

Engine Instru-3 O

Conduit Fittings mentation &

Wiring x

Index 1898 REV 1 Entire Page Revised

W INDEX (continued) i O.

Component Component Volume

. Number Description Category No.

.02-630C Pyr'ometer Conduit Assembly:

Engine Instru-3 Support-mentation & Wiring 02-6300 Pyrometer. Conduit Assembly:

Engine Instu-3

-Thermocouple mentation &

Wiring 02-688A Engine & Aux Module Wiring-Engine Instru-3 Material-conduit ~& Fittings; mentation &

Pyrometer Conduit Assembly-

. iring W

Conduit, Fitting, Supports 102-6888

Engine & Aux. Module. Wiring Engine Instru-3 Material: Wiring &

mentation &

Terminations

. Wiring 02-688C Engine & Aux. Module Wiring Engine Instu-3 Material: Boxes & Terminals mentation &

Wiring 02-690 Engine Alarm Sensors Engine Instru-3 O

Temperature & Level mentation &

Switches Off Engine Wiring Safety Alarm Sensors-Wiring 02-691 Off Engine Alarm Sensors Engine Instru-

-3 mentation &.

Wiring l

02-695A Engine Shut Down Equipment:

Engine Shut--

3 Tubing & Fittings-down & Equip-l ment 1

02-6958

. Engine Shut Down Equipment:-

Engine Shut-3

. Valves, Regulator, Orifices down & Equip-ment 02-695C Engine Shutdown: Trip Engine Shut-3 Switches down & Equip-ment

'02-717A Aux Sub Base'& Oil &

Engine Aux.

4.

Water Piping: Aux.Sub Base

>Sub-Base &

Foundation Bolts O

02-7178 Aux Sub Base & 011 &

Jacket Water-3 Water Piping:' Jacket Water Valves xi Index.1898 REV -1 Entire Page Revised a.

.. - - -. - - = - -.. -. -

i INDEX (continued)

Component-Component Volume Number Description Category No.

4 02-717C Aux Sub. Base & 011 and Water Jacket Water 3

Piping Jacket Water-Pipe, Couplings, Fittings,-Orifices, Y Strainers 02-717D Aux Sub Base & 011 & Water Jacket Water 3

i Piping: Jacket Water Gaskets

.& Bolting-02-717E Aux Sub Base & 011 & Water Jacket Water 3

Piping Jacket Water:

Supports

+

02-717F Aux Sub Base & 011 & Water Lube Oil 2

Piping Lube Oil Pipe Tube and Fittings 02-717G Aux Sub Base & 011 & Water Lube Oil 2

j Piping: Lube Oil-Valves 02-717H

. Aux Sub Base & 011 & Water-Lube Oil 2

O Piping: Lube 011 Gaskets j

and Bolting

(

02-717I Aux Sub Base Lube & 011 Lube Oil 2

I

.& Water Piping - Lube 011: Supports & Mounting l

Hardware l

-717J 02 Aux Sub Base & 011 & Water Fuel Oil In-4 Piping:. Fuel Oil-Piping jection and Fittings l

02-717K Aux Sub Base & 011 & Water Fuel Oil In-4 Piping: Fuel Oil-Valves jection 1

02-717L

. Aux Sub Base & 011 & Water Fuel Oil In-4 Piping: Fuel Oil-Gaskets jection

& Bolting 02-717M Aux:Sub Base & 011 & Water Fuel Oil In-4 Piping: Fuel.0il-Supports jaction 02-717N Intercooler Piping - Pipe Turbo, Intake 2

Intercooler &

Exhaust O

xii Index 1898-REV. 1

}

Entire Page Revised

_ ~

(S INDEX (continued)

Component Component Volume Number Description Category No.

02-717P Intercooler Piping -

Turbo, Intake 2

Coupling, Gaskets, Intercooler &

1 Bolting Exhaust 02-810A Misc. Equipment - Heater, Jacket Water 3

Jacket Water 02-820A Misc. Equipment:

Lube Oil 2

Lube 011 Sump Tank' Heaters 02-8208 Full Flow Lube Lube Oil 2

011 Filter Appendix II 4

' Appendix III

~

4 1

i 1

y i

l i

xiii Index 1898 REV 1 Entire Paru Revised e

i i

Page 1 of 2 i

COMPONENT DESIGN REVIEW CHECKLIST i

GRAND GULF NUCLEAR STATION - UNIT 1 i

COMPONENT Intake Nanifold Piping CLASSIFICATION TYPE B

5 COMPONENT PART NO.02-375 TASK DESCRIPTION NO.:

DR-07-02-375-2

{

(SNPS PART NUMBER 03-375)

TASK DESCRIPTIONS:

[

Design review of this. component is not necessary since Impe11 performed a j

comparison of the Intake Manifold Structure and piping spool pieces, fittings and supports of Grand-Gulf to Comanche Peak and found that with the U-Bolt

?

[

Supports ~added to the crossover piping the component is adequate.

i-I The site experience for Grand Gulf noted some indication of Elbows cracking

[

during installation.

The apparent cause of the past cracks appear to be misalignment.

i.

i

...This problem is similar to that of Comanche Peak and as a maintenance 1

l recommendation when misalignment is encountered:

I Other castings may be tried in an attempt at a better fit.

)

1 Bolt hole diameters on the intake manifold elbows may be increased i

i e

i from 1/16" oversize to 1/8" oversize.

However under no circumst-t

{

ances shall any component be jacked to fit.

1 l

The.following Quality inspections are recommended to be performed:

4 i

Visually inspect all intake manifolds for cracks at the flange faces I

Upon installation, ensure that the manifold installation does not

[

cause excessive stress on flange bolt holes due to misalignment (see j

the CQRC for this component installation recommendations).

i-l.

' PRIMARY FUNCTION:.

{

Not required i

. ATTRIBUTES TO BE VERIFIED:

1 Not required O

l

[

GG1518/1 REY.1 ~

1

.a i

j.

Page 1 of 2 COMPONENT DESIGN RE"IEW CHECKLIST GRAND GULF NUCLEAR ST ATTON - UNIT 1 i

j COMPONENT Turbocharner - Bracket CLASSIFICATION TYPE B 1

COMPONENT PART NUMBER 02-475A TASK DESCRIPTION NO.: OR-07-02-475A-2 (SNPS PART NUMBER 03-475A)

J i

TASK DESCRIPTIONS:

i i

i-Design review of this component is not required based on the review of lead l

)

engine DR/QR reports (Shoreham/ Comanche Peak).

The review of industry and site experience indicates only one incident of-failure, which was 'actually related more to the bracket bolting than to the bracket itself.

The analytical basis for the Comanche Peak DR/QR report for this component 4

identified that in the worst case load condition, vibration and manifold nozzle j

loads could potentially produce bolt loads in excess of preloads.

Therefore, the bracket to engine and bracket to turbo base screws (P.N. G8-001-143 and G8-001-120) are recommended to be inspected on a regular basis as discussed below:

l i

Each month for the first three months of commercial operation these I

screws. should be inspected to assure that no screw has loosened because of engine operating loads.

If during these inspections none 1

l of the screws are found loosened or damaged, from then en inspections are to be conducted on a yearly basis (or during plant j

shutdown).

But if any time during inspection any screw is foui.d loosened or damaged, it must then be replaced (if damaged) and all c

screws retorqued as follows; 125 ft-lbs for the bracket to engine screws and 75 ft-lbs for the bracket to turbo base screws.

I l

To avoid damage to bracket to engine, and/or bracket to turbo, base screws, l

the proper torques as 'delinated above should be utilized for each respective l

bracket bolting application.

i There are no modification reconsnendations' for this component.

Quality revalidation for this component is not required.

i.

I i

PRIMARY FUNCTION:

L f

Not required o

1 GG1403/1 REV. 1 l

-...,.-..--.-.----,_-.-..--.-.-.-.--_..-.--,-....L-

COMPONENT DESIGN REVIEW CHECKLIST Page 2 of 2 ATTRIBUTES TO BE VERIFIED:

Not required

. SPECIFIED STANDARDS:

Not required

REFERENCES:

-Not required DOCUMENTATION REQUIRED:

Not required i

l GROUP CHAIRPERSON Id,-

PROGRAM MANAGERd\\4wh b&h l

1 i

e

(

REV. 1 CARRY OVER FROM i

PREVIOUS PAGE GG1403/2 l-

m t

j-Page 1 of 2 I

COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR POWER STATION - UNIT 1 i

Before & After COMPONENT Lube Oil Pump CLASSIFICATION TYPE A COMPONENT PART NUMBER GG-109 TASK DESCRIPTION NO.:

OR-07-GG-109-3 l

(SNPS PART NUMBER 10-113) i TASK OESCRIPTIONS:

i Design review for this component is not required based on the review of the applicable industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).

This pump is a standard three screw positive dis-j' placement pump used extensively in industrial, process, marine and utility power-plant services.

It is accepted in industry as a reliable product.

A review of pump nozzle loads indicates that the applied piping loads are above the manufacturers recommended allowables.

There has however been no 3

experience of pump leakage due to these loads at Comanche Peak or other V-16 installations.

As such the following inspection should be performed as part 1

of the daily engine walkdown:

The pump should be. inspected for signs of leakage and corrective modifications (addition of flexible piping connections) be l

implemented as required.

No modifications are required for this component based on the lead engine i

report.

1 l

Quality revalidation of this component was not required.

PRIMARY FUNCTION:

Not required l

ATTRIBUTES 70 8E VERIFIED:

Not required

{

l SPECIFIED STANDAR05:

Not required GG1068/1 REV 1

d Page 2 of 2 O

REFERENCES:

-Not required i

l' DOCUMENTATION REQUIRED:

Not required GROUP CHAIRPERSON 1

PROGRAM MANAGE N C % e u -

f f

O

~

i U

i l

l O

4 4

=

I 1

i l-3 REV. 1 CARRY OVER FROM PREVIOUS PAGE l

GG1068/2


y,

-y,y

-.w.,__,

_-v,,.,

_,.,e.--

Paga 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST

)-

GRAND GULF NUCLEAR STATION - UNIT 1 Crankshaft and Bearings:

' COMPONENT Bearina Shells CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-310B TASK DESCRIPTION NO.:

DR-07-02-3108-2 (SNPS PART NUMBER 0_3-3108)

TASK DESCRIPTIONS:

Design Review for this component is not required, based upon:

Part numbers R-3313,.R-3315 and R-3317 were reviewed for the Comanche l

Peak DSRV-16-4. engine.

Main bearing loads at Grand Gulf are equivalent to those seen at Comanche Peak.

At Comanche -Peak, the bearing shells were found suitable.for their application, with a margin of safety suitable for small variances in loading.

There have been no design related incidents reported in the EDG Computer Tracking System.'

i Grand Gulf site experience has been review (d and does not affect the e

integrity of the main bearing shell design.

TER 07-041 has been reviewed and found consistent with the conclusion reached in the Comanche-Peak DR/QR report.

i-There are no modification recommendations for this component.

{

The following maintenance recommendation -is made based on the lead engine DR/QR report:

1 The main bearings should be inspected for shell thickness and evaluated for wear and evidence of crankshaft misalignment at the first refueling outage and alternate outages thereafter.

If misalignment is indicated, corrective procedures should be implemented.

Quality revalidation requirements for this component have been' completed.

PRIMARY FUNCTION:

^

Not required

!D GG1475/1 REV. 1

. Y.

I Paga 2 of 2 ATTRIBUTES TO BE VERIFIED l

Not required l

SPECIFIED STANDARDS:

l Not. required

REFERENCES:

Not required j

DOCUMENTATION REQUIRED:

I

- Not required PROGRAM MANAGER d\\<a w a

GROUP CHAIRPERSON g

( /(/

Q 4

!O l

i

/

l i

I t

)

i Y

4 3

?

. E r

l~

~

i REV. 1 1

CARRY OVER FROM

' PREVIOUS PAGE~

l l

GG1475/2 s '.

n

,.m,-

v...

...,[

,)-.-


.h----

- - - - - - - - * ~ - - - - - - - - - - - '

d l

TDI OWNERS GROUP for GRAND GULF NUCLEAR STATION - UNIT 1 CYLINDER BLOCK l

COMPONENT PART NO. 02-315A I

INTRODUCTION The TDI Emergency Diesel Generator Owners Group Program for the Grand Gulf i

Nuclear Station requires Design and Quality Revalidation reviews of the cylinder blocks to determine the adequacy of design for its intended use at Grand Gulf.

The blocks are manufactured by TDI and are supplied under j

their part number 02-315-03-AE.

The cylinder block forms the framework i

of the liquid cooled engine and provides passage for coolant and support for the cylinder liners and cylinder-heads.

1 II OBJECTIVE i

~

The objective of this review was to evaluate the adequacy of the cylinder block for its intended service at Grand Gulf Nuclear Station.

l III METHODOLOGY-In order to meet the stated objective the following methods were.used:

Review of liquid penetrant inspections of Grand Gulf DSRV-16 Division l-1 engine block.

Review of engine operating conditions at Grand Gulf and identifica-tion of any differences from those at Comanche Peak.

Performance of dimensional check and evaluation of cylinder liner / block interai: tion.

Evaluation, of steady state stresses,- alternating stresses and stiff-ness in key portions of the cylinder block.

Evaluation of crack growth rate for cylinder' block landing and counterbore diameter by comparison with ' conservative Shoreham data and analysis.

i i

Review of Grand Gulf site, nuclear and non-nuclear experiences. -(See Appendix C)

Review of Quality Revalidation Checklist-results for acceptability.

l

=REV.1:

GG1603/1'

l l

4 IV RESULTS AND CONCLUSIONS A - generic investigation of the structural adequacy of the TDI R-4 and RV-4 Series diesel engine cylinder blocks for emergency standby service in nuclear power plants is summarized in Reference 1.

The investigation j

considers the cause, extent, and consequences of cylinder block cracking, and the inspections required to assure sufficient margin of safety during continued operation under test and postulated accident conditions.

g Evaluation of steady state stresses, alternating stresses and stiffness in key portions of the cylinder block was accomplished as part of the strain gauge testing and the results were included in the cumulative damage and crack growth analyses.

The cumulative damage algorithm is explained in Reference 1.

l The Division 1 diesel generator has been inspected for block top cracks in the region adjacent to and between the cylinders.

No cracked ligaments or i

stud-to-stud or stud-to-end cracks were found.

This engine has also i

completed 1397 hours0.0162 days <br />0.388 hours <br />0.00231 weeks <br />5.315585e-4 months <br /> of operation as-of June 11, 1984.

The load breakdown l

for this service is 411 hours0.00476 days <br />0.114 hours <br />6.795635e-4 weeks <br />1.563855e-4 months <br /> unknown load, 114 hours0.00132 days <br />0.0317 hours <br />1.884921e-4 weeks <br />4.3377e-5 months <br /> at load less than 50 percent, 455 hourt between 50 percent and 60 percent load, 78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> i

between 60 percent and 99 percent load, 310 hours0.00359 days <br />0.0861 hours <br />5.125661e-4 weeks <br />1.17955e-4 months <br /> at 100 percent load, and 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> at 110 percent locd (Ref. 2).

t The engine operating conditions at Grand Gulf were compared to those at Comanche Peak and Shoreham.

No significant differences were found that would affect the structural integrity assessment of the Grand Gulf blocks.

3 1

Results of dimensional inspection of the cylinder liners and of the mating i

block surfaces were used to evaluate the interaction of the block and cylinder liner in th'e analysis of steady and alternating stresses.

These results were utilized in the cumulative damage analysis.

i The power. output for this engine is 7000 kW at 100 percent load.

Maximum output required for LOOP /LOCA is 4654 kW.

The duratiori of a LOOP /LOCA used in this analysis is 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br />.

3 Strain gauge" testing of the original.Shoreham EDG 103 block, inspection data from before and after testing, and materials testing were used as a basis to predict adequate life for cylinder blocks.

The apparent rate of l~

propagation of cracks between stud holes in the original Shoreham EDG 103

block, when compared with the Grand Gulf Division 1

LOOP /LOCA requirements, indicates that even if the Grand Gulf : block - had ligament

. cracks it is predicted to withstand with sufficient margin a LOOP /LOCA event.

' In addition, this engine has completed substantial operational experience l

and has been inspected and was found to be without block top cracks.

To a

verify engine reliability it is recommended that material microstructure O

evaluation be performed, but this is not required until additional engine operation equal. to the existing operation based on a cumulative damage algorithm has been experienced.

GG1603/2 REV. 1 yw

.>we-yy.-,

e

- # [

-e v

v rr--

+w-

+-v

-e-

L Page 3 of 3

)

i Application of the algorithm following Figure 5-1 of Reference 1 shows that the blocks will perform satisfactorily for 421 hours0.00487 days <br />0.117 hours <br />6.960979e-4 weeks <br />1.601905e-4 months <br /> at 100 percent j.

power level without inspection.

Engine-operation in excess of this time period without. inspection could be justified if the fatigue damage index 1

l i

since the last inspection has not exceeded the allowable fatigue damage i

index before the last inspection.

In the future, after the additional engine operation without inspection has been accumulated, one of two alternative requirements should be fulfilled prior to continued engine operation thereafter.

The alternatives are:

Inspect the microstructure -of the block top and verify whether it represents typical. microstructure for grey cast iron, Class 40.

The block material at Grand Gulf is conservatively assumed to have the poor fatigue resistance equal to Shoreham EDG 103 block.

An addi-tional 122 operating hours are available if Grand Gulf blocks are 1

found to be made of typical material.

Inspect the block top for detectable ligament, stud-to-stud or j

stud-to-end cracks.

.If none are found, then additional engine operation may be performed until the future fatigue damage index equals the total allowable fatigue damage index accrued to the' last l 1

inspection.

This second alternative may be repeated indefinitely

.throughout the life of the engine.

The information provided on the following TERs - has been reviewed 'and is consistent with the final conclusions of this report:

07-011,07-018, j

07-036.

Quality Revalidation Inspection results identified in Appendix B have been reviewed and. considered in the performance of this design review and the l

results are consistent with the final conclusions of this report.

Based on the above review and implementation of routine inspections, it f

is concluded that the cylinder blocks are acceptable for their intended use at Grand Gulf.

V REFERENCES 1.

" Design Review of TDI-R4 and RV-4 Series Emergency Diesel Generator l

Cylinder Blocks." FaAA-84-9-11.

2.

FaAA Support Package Number SP-84-9-11(c).

O ll-L REV. 1-l GG1603/3' 1^

r

O ppendix B A

Page B1 of 8 07-02-315A COMPONENT QUALITY REVALIDATION CHECKLIST Mississippi Power & Light COMPONENT Cylinder Block UTILITY Grand Gulf Nuclear Station Unit-1 4

GPL NO.

02-315A REV. NO.

2 SNPS GPL NO.

03-315A TASK DESCRIPTIONS DIVISION I 1.

Assemble and review existing documentation.

2.

Perform a dimensional check on the area around the cylinder liner for all cylinder block liner landings.

3.

Perform a Liquid Penetrant test on the cylinder block liner ' landing i

along the top-landing surface, fillet radius, and vertical face adjacent to the landing surface.

Liner landings for cylinders 3L, y

4L, SL, 6L, 3R, 4R, 5R and 6R should be inspected with the liners removed.

If linear indications are found, increase inspection plan to all liner landings.

4.

Perform a Liquid Penetrant test on the-cylinder head mating surface on top of the cylinder block.

The area between stud hole and liner, and between adjacent cylinder stud hole should be inspected.

The i

inspection plan should include cylinders 3L, 4L, 5L, 6L, 3R, 4R, SR y

and 6R.

If linear indications are found, increase inspection plan to all cylinders.

5.

Perform an Eddy. Current test on the cylinder head stud holes if

- required (i.e. linear indications found at stud hole extending into threads).

6.

Remove a ' sample from the cylinder block by drilling and cutting.

The sample shall be tetrahedral in shape with a one inch square base and a _ height of - 5/8 inch.

Attachment B shows the location where I

the sample should be taken.

!O GG0935/1-REV. 1

=,

COMPONENT QUALITY REVALIDATION CHECKLIST Page B2 of 8 07-02-315A TASK DESCRIPTIONS (continued)

DIVISION II 1.

Assemble and review existing documentation.

2.

Perform a dimensional _ check on the area around the cylinder liner for all cylinder block liner landings.

i'

~ 3.

Perform a Liquid Penetrant test on the cylinder block liner landing along the top. landing surface, fillet radius, and vertical face adjacent to the landing surface.

This inspection plan should be y

performed on cylinders 3L, 4L, 5L', 6L, 3R, 4R, 5R and 6R.

l 4.

Perform a Liquid Penetrant test on the cylinder head mating surface on top of the cylinder block.

The area between stud holes and liner, 1

and between ' adjacent cylinder head and stud -holes should be inspected.

The inspection plan should be performed on cylinders 3L, 1

4L, SL, 6L, 3R, 4R, SR and 6R.

5.

Remove a sample from the cylinder block by drilling and cutting.

The sample shall be tetrahedral in shape with a one inch square base and a height of 5/8 inch.

Attachment B shows the location where the sample should be taken.

I ATTRIBUTES TO BE VERIFIED DIVISION I 1.

Quality status of Component Document Package

(

2.

Dimensions of the cylinder block liner landing ' area l

l 3-5.

Surface integrity of the cylinder block liner landing 6.

Samples taken from the cylinder block are in accordance with TER

  1. 99-016.

DIVISION II l

' 1.

~ Quality' status of Component Document Package 2.

Dimensions of the cylinder block liner landing area O

GG0935/2 REV. 1

!w

l

' How To Use This Report Tabs in this report identify the following categories:

Turbo, Intake,'Intercooler & Exhaust-i Lube Oil

' Engine Base & Bearing Caps Crankshaft & Bearings Cylinder Block, Liners & Water _ Manifold Air Start & Barring Device Connecting rods Pistons Camshaft & Valve Train Idler Gear Assembly & Front Gear Case

[

. Flywheel

. Engine Instrumentation & Wiring Overspeed Trip & Governor -

~

Engine Shutdown & Equipment Jacket Water Cylinder Heads & Valves i

Fuel Oil Injection Generator Control Panel Assembly Engine & Auxiliary Sub-Base & Foundation Bolts These categories have been defined to allow the reader to review a complete diesel generator subsystem-in a convenient' manner.

Within each category tabs identify Grand Gulf specific component numbers.

A given component report can be found by:

a)

If the component nubmer is known - use the alpha - numeric index which identifies the volume number and category in which the i

component report is located.

b)- -If only.the component name is known - Section 3.2 may be used as a cross-reference to find the volume number where the component report may be found.

Some reports address more than~one component.

A tab is provided for each-

~

component. 'However, some components are combined under one report.- Slip sheets are provided where required to reference back to the appropriate tab.

Some components required more than one report.

These are identified by the abbreviation LB-Large Bore and SB-Saall Bore on the component number tabs.

4

' O i

Index 1898 L

INDEX (continued) j Comporent Component.

Volume Nuuoer Description Category No.

F-068 Intercooler Turbo, Intake, 2

Intrcir. & Ex-haust GG-101A Generator - Generator Generator 4

GG-1018.

Generator:

Shaft and Generator 4

Bearings GG-103 Jacket Water Heat Jacket Water 3

i Exchanger GG-104 Lube Oil Heat Exchanger Lube Oil 2

GG-106 Auxiliary Jacket Water Pump Jacket Water 3

i GG-107 Jacket Water Standby Jacket Water 3

j Heater Pump GG-108 Lube Oil System - Aux.

Lube Oil 2

Lube Oil Pump GG-109 Before & After Lube Lube 011 2

Oil Pump.

GG-111 Flex Connections Turbo, Intake, 2

Intercooler &

Exhaust GG-112 Starting Air Tank Air Start &

3 j

Barring Device GG-116 Intake Air Silencer Turbo, Intake, 2

Intercooler &

Exhaust GG-118 Intake Air Filter Turbo, Intake, 2

Intercooler &

Exhaust GG-119 Generator - Generator, Generator 4

Control

GG-121 011 Prelube Filter Lube Oil 2

=MP022/023 Turbocharger

_ Turbo, Intake, 2

Intrcir. & Exhaust l

REV 1 ii Entire Page~ Revised l-Index 1898

2 6

INDEX (continued)

Component Component Volume Number Description Category No.

SE-025 Lube Oil Full Pressure Lube Oil 2

Strainer 00-420 Lube Oil Pressure Regulating Lube Oil 2

Valve 00-621A Fuel Oil Drip Tank Assembly Fuel Oil In-4 jection 00-700A Jacket Water Stand Pipe:

Jacket Water 3

Pipe, Fittings, Gaskets 00-7008

-Jacket Water Stand Pipe:

Jacket Water 3

Valves 00-700C Jacket Water Stand Pipe Jacket Water 3

Supports 00-700E Jacket Water Stand Fipe:

Jacket Water 3

Switches I

00-700F Jacket Water Stand Pipe:

Jacket Water 3

Misc. Bolting Mat.

02-CFR Turbocharger Thrust Bearing Turbo, Intake, 2

Lubricant System Intrcir.~& Ex-haust 02-305A Base and Bearing Caps: Base Engine Base 2

Assembly

& Bearing Caps 02-305C Base and Bearing Caps:

Engine Base 2

Main Bearing Studs & Nuts

& Bearing Caps 02-305D

-Base.and Bearing Caps:

Engine Base

. Main Bearing Caps

& Bearing Caps 2

02-307A Lube Oil Fittings:

Lube Oil 2

Internal Headers-l 02-3078 Lube Oil Fittings:.

Lube Oil 2

Internal - Tubing & Fittings 02-307D Lube Oil Fittings Internal:

Lube Oil 2

Supports-O iii REV 1 Index 1898 Entire Page Revised

INDEX (continued)

Component Component Volume Number Description Category No.

02-310A Crankshaft Crankshaft &

2 Bearings 02-310B Crankshaft and Bearings:

Crankshaft &

2 Bearing Shells 8 earing 02-310C.

Crankcase and Bearings:

Crankshaft &

2 Thrust Bearing Ring Bearing 02-311A Crankcase: Crankcase Assy Crankshaft &

2 Bearing 02-311D Crankcase: Crankcase Crankshaft &

2 Mounting Hardware Bearings 02-315A Cylinder Block Liners &

Cyl. Block &

2 Water Manifold: Cylinder Liners & Water Block Manifold 02-315C Cylinder Block Liner &

Cyl. Block &

2 Water Manifold -

Liners &

Cylinder Liner Water Manifold 02-315D Cylinder Block Liners &

Cyl. Block ~&

2 Jacket Water Manifold Liners &

& Piping Water Manifold 02-315E Cylinder Block - Liners Cyl. Block &

2 and Water Manifold: Studs Liners &

Water Manifold 02-315F Cylinder Block Liners Cyl. Block &

2

& Water Manifold: Nuts Liner & Water Manifold l

02-315G Cylinder Block Liners &

Cyl. Block &

2 l

Water Manifold Seals &

Liners &

Gaskets Water Manifold 02-31CA Jacket Water Inlet Manifold:

Jacket Water 3

Manifold Assembly W/ Hardware and Coupling and Gaskets 02-316B Jacket Water Inlet Manifold:

Jacket Water 3

i Coupling and Gaskets Os 02-317A Water Discharge Manifold:

Jacket Water 3

Jacket Water Discharge Manifold, Coupling and Seals iv REV 1 Index 1898 Entire Page Revised

INDEX (continued)

Component Component Volume Number Description Category No.

02-317B Water Dicharge Manifold:

Jacket Water 3

Coupling & Seals 02-317C Water Discharge Manifold:

Jacket Water 3

Supports 02-330A Flywheel Flywheel 3

02-3308 Flywheel - Bolting Flywheel 3

02-335B Front Gear Case-Gasket and Idler Gear As-3 Bolting sembly & Front Gear Case

.02-340A Connecting Rod:

Connecting Connecting 3

Rods & Bushings Rods 02-340B Connecting Rod Bearing Connecting 3

Shells Rods 02-340C Pistons Pistons 3

02-3400 Pistons: Rings Pistons 3

02-340E Piston: Pin Assembly Pistons

-3 4

02-345A Tappets and Guides:

Camshaft &

3 Intake Exhaust Valve Train Tappet Assembly i-02-345B Tappets and Guides: Fuel

-Camshaft &

3 Tappet Assembly Valve Train 02-345C Tappets and Guides: Fuel Camshaft &

3 Pump Base Assembly Valve Train 02-350A Camshaft:

Camshaft Assembly Camshaft &

3 i

Valve Train i

02-350B Camshaft: Bearings-Camshaft &

3 Valve Train 350C Camshaft: Supports, Bolting Camshaft &

3 and Gears Valve Train 02-355A Idler Gear Assemble: Crank Idler Gear As-3 To Pump Gear =

sembly & Front Gear Case v

Index'1898-REV 1 l

Entire Page Revised i:

~ __-_- - - - -

INDEX (continued)

Component Component Volume Number Description Category No.

02-3558 Idler Gear Assembly Idler Gear As-3 sembly & Front Gear Case 02-359 Air Start Valves Air Start &

3 Barring Device 02-360A Cylinder Heads Cylin' der Heads 3

& Valves 02-3608 Cylinder Head Valves:

Cylinder Heads 3

Intake & Exhaust Valves

& Valves i

02-360C Cylinder Head and. Valves:

Cylinder Heads 3

Bolting and Gaskets

& Valves 02-3600 Cylinder Head _ Valves -

Cylinder Hea'ds 3

Springs & Retainers

& Valves

'02-362A Cylinder Head Covers:

Camshaft &

3 Subcover Assembly Valve Train 1

02-365A Fuel _ Injection Equipment Fuel Oil In-4

- Fuel Injection-Pump jection 02-365B Fuel Injection Equipment Fuel Oil In-4

- Fuel Injection Tips jection t

02-365C Fuel Oil Injection Tube Fuel Oil In-4 Assembly jection 02-365D Fuel Injection Equipment:

Fuel Oil In-4 Supports jection L

02-371A Fuel Pump Linkage: Fuel Fuel Oil In-4 Pump Control Shaft jection l

02-371B Fuel Pump Linkage: Linkage Fuel Oil In-4 Assembly and Bearing jection f

02-375 Intake Manifold Piping Turbo, Intake, 2

Intrcir. & Ex-haust 02-380A Exhaust Manifold -

. Turbo, Intake, 2

Manifold.

Intrcir. & Ex-haust vi Index 1898 REV,1 j

Entire Page Revised

.., _, ~., _.

a-

.e

1 INDEX (continued)

Component Component Volume o

Number Description Category No.

l 02-3808 Exhaust Manifold: Gaskets Turbo, Intake, 2

and Bolting Intrcir. & Ex-haust 02-385B Cylinder Block Cyl. Block &

2 Covers Liners & Water Gaskets and Bolting Manifold 02-3868

' Crankcase:

Crankcase Cranshaft &

2

)

Gaskets and Mounting Bearings Hardware 02-390A Rocker Arms'& Pushrods Intake & Intermediate and Camshaft &

3 Exhaust Rocker Shaft Assembly Valve Train 02-3908 Rocker Arms and Pushrods:

Camshaft &.

3 1

Exhaust Rocker Shaft' Valve Train I

Assembly

~

02-390C Rocker Arms & Pushrods-Camshaft &

3 0

Intake & Exhaust -Pushrods Valve Train Connectors 02-3900 Rocker Arms and Pushrods:

Camshaft &

3 Pushrods Connector.

Valve Train 02-390E Rocker Arms and Pushrods:

Camshaft &

3 Bushings ~

Valve Train 02-390F Rocker Arms and Pushrods:

Camshaft &

3 Lifters Valve Train 02-390G Rocker Arms and Pushrods:

-Camshaft &

3 Misc. Bolts & Drive Studs Valve Train 02-410A Overspeed Trip: Governor Overspeed Trip-3

& Governor 02-410B Overspeed Trip: Governor-Overspeed Trip 3

and Accessory Drive

& Governor 02-410C

'Overspeed Trip: Couplings Overspeed Trip 3

(Flexible & Spider)

& Governor 02-4100 Overspeed Trip Overspeed Trip 3

. Vent Valves

& Governor vii Index 1898 REV -1 Entire Page Revised

INDEX (continued)

Component Component Volume Number Description Category No.

i 1

02-411A Governor Drive: Governor Overspeed Trip 3

and Tachometer Drive Gear

& Governor

& Shaft 02-4118~

Governor Drive: Couplings, Overspeed Trip 3

Pins & Keys

& Governor 4

02-413A Governor Linkage Overspeed Trip 3

& Governor 02-413B Fuel Pump Linkage-Fuel Oil In-4 Automatic Shutdown jection i,

02-415A Governor Assembly: W odward Overspeed Trip 3

o Governor

& Governor 02-415B Governor Assembly-Booster Overspeed Trip 3

Servosoter

& Governor 1

02-415C Governor Assembly-Heat Overspeed Trip 3

Exchanger

& Governor 1

02-420 Lube Oil Pump Lube Oil 2

02-425A Jacket Water Pump Jacket Water 3

l 02-437 Turbo Water Piping:

Jacket Water 3

Pipe &~ Fittings 02-441A Starting Air Manifold Air Start &

3 Piping Barring Device 02-4418 Starting Air Manifold Air Start &_

3 Valves, Strainer, Filters-Barring Device 02-441C Starting Air Manifold Air Start &

3 Supports Barring Device 02-442A Starting Air Distributor Air Start &

3

~

Director Assembly.

Barring Device L

L 02-442B

_ Starting Air Distributor:

Air Start &

3 j

Tubing, Fittings, Gaskets Barring Device 02-445 Fuel Oil Booster Pump Fuel Oil.In-4 Engine Driven'

-jection viii Index 1898-

- REV 1 Entire Page-Revised 4

INDEX (continued)

-Component Component Volume Number Description Category No.

02-450A Fuel Oil Header: Piping &

Fuel Oil In-4 Tubing jection l

02-4508 Fuel Oil Header:

Fuel Oil In-4 Fuel Oil Tubing Supports jection 02-455A Fuel Oil Filters &

Fuel Oil In-4 Strainers: Filters jection 02-455B Fuel Oil Filters and Fuel Oil In-4 Straine's:

Strainers jection r

02-455C Fuel Oil Filters &

Fuel Oil In--

4 Strainer: Mounting Hardware jection 02-465A Lube Oil Lines External:

Lube Oil 2

Tubing, Fittings, Couplings l

02-465B Lube Oil Lines - External Lube Oil 2

Supports O

02-465C Lube Oil Lines External:

Lube Oil 2

Valves 02-467A Turbocharger Lube Oil Lube Oil 2

Fittings - Pipe, Tubing, Fittings & Flexible Coupling 02-4678 Turbocharger: Lube Oil Lube Oil 2

Fittings - Supports 02-475A Turbocharger: Bracket Turbo, Intake, 2

Intrcir. & Ex-l haust 02-475B Turbocharger Bracket-Turbo, Intake, 2

Air Butterfly Valve Intrcir. & Ex-haust 02-475C Turbocharger: Bracket -

Turbo, Intake, 2

Bolting & Gaskets-Intrcir.'& Ex-haust 02-500A Control Panel Assembly:

Control Panel 4

l Cabinet / System Assembly l

l

)

02-500F Control Panel Assembly:

Control Panel 4

l s- /

Accumulator Assembly IX.

Index 1898 REV 1 Entire Page Revised i

t INDEX (continued)

Component Component Volume Number Description Category No.

02-500G Control Panel Control Panel 4

Valves Assembly 02-500H Control Panel Assembly:

Control Panel 4

. Pressure Switch Assembly 02-500J Control Panel Assembly:

Control Panel 4

Relays Assembly 02-500K Control Panel Assembly:

Control Panel 4

Solenoid Valves Assembly 02-500M Control Panel Assembly:

Control Panel 4

Piping, Tubing, Fittings Assembly 1

02-500N-Control Panel Assembly:

Control Panel 4

Terminal Boards / Switches, Assembly Wiring 02-515 Thermostatic Valve Jacket Water 3

. 02-5258 Barring Device - Pneumatic Air Start &

3 Regulator Valve Shut Barring Device 4

Off Valve 4

02-540A Lube Oil Sump Lube Oil 2

with Strainer Assembly and Mounting Hardward 02-540B Lube Oil Sump Tank: Misc.

- Lube Oil 2

Fittings, Gaskets, Pipe

& Bolting Material, Valves

)

02-540C Lube Oil Sump Tank:

Lube.011 2

i Mounting Hardware 02-550-Foundation Bolts Engine & Aux.

4 Sub Base &

Foundation Bolts 02-630A Pyrometer Conduit Assembly:

Engine Instru-3 Conduit mentation &

l Wiring i-02-630B Pyrometer Conduit Assembly:

Engine Instru-

,3 i

Conduit Fittings mentation &

Wiring

.X l

l Index 1898

.REV 1

INDEX (continued) s Component Component-Volume Number Description Category No.

02-630C Pyrometer Conduit Assembly:

Engine Instru-3 Support mentation & Wiring 02-630D Pyrometer Conduit Assembly:

Engine Instu-3 Thermocouple mentation &

Wiring 02-688A Engine & Aux Module Wiring Engine Instru-3 Material-Conduit & Fittings; mentation &

Pyrometer Conduit Assembly-Wiring Conduit, Fitting, Supports-02-6888 Engine & Aux. Module Wiring Engine Instru-3 Material: Wiring &

mentation &

Terminations Wiring 02-688C Engine & Aux. Module Wiring Engine Instu-3 Material: Boxes & Terminals mentation &'

Wiring 02-690 Engine Alarm Sensors Engine Instru-3 O

Temperature & Level mentation &

Switches Off Engine Wiring Safety Alarm Sensors-4

-Wiring 02-691 Off Engine Alarm Sensors Engine Instru-3 mentation &

Wiring 02-695A Engine Shut Down Equipment:

Engine Shut-3 Tubing & Fittings down & Equip-ment 02-6958 Engine Shut Down Equipment:

Engine Shut-3 Valves, Regulator, Orifices down & Equip-ment 02-695C Engine Shutdown: Trip Engine Shut-3 Switches down & Equip-ment 02-717A Aux Sub Base & Oil &

Engine Aux.

4 l

Water Piping: Aux Sub Base Sub-Base &

Foundation Bolts 0

02-7178 Aux Sub Base & Oil &

Jacket Water 3

Water Piping: Jacket Water Valves.

xi Index 1898 REV 1 Entire Page Revised

.~

g-'S INDEX (continued)

O Component Component Volume Number Description Category No.

02-717C Aux Sub Base & 011 and Water Jacket Water 3

Piping Jacket Water-Pipe, Couplings, Fittings, Orificas, Y Strainers 02-7170 Aux Sub Base & 011 & Water Jacket Water 3

Piping: Jacket Water Gaskets

& Bolting

~

02-717E Aux Sub Base & Oil & Water Jacket Water 3

Piping - Jacket Water:

i Supports 02-717F Aux Sub Base & Oil & Water Lube Oil 2

Piping Lube Oil Pipe Tube and Fittings 02-717G Aux Sub Base & 011 & Water Lube Oil 2

Piping: Lube Oil-Valves 02-717H Aux Sub Base & 011 & Water Lube Oil 2

()

Piping: Lube Oil Gaskets and Bolting 02-717I Aux Sub Base Lube & Oil

-Lube Oil 2

& Water Piping - Lube Oil: Supports & Mounting Hardware 02-717J Aux Sub Base & 011 & Water Fuel Oil In-4 Piping: Fuel Oil-Piping jection l

and Fittings 02-717K Aux Sub Base & 011 & Water-Fuel Oil In-4 Piping: Fuel Oil-Valves jection 02-717L Aux Sub Base & Oil & Water Fuel Oil In-4 Piping: Fuel Oil-Gaskets jection

& Bolting 02-717M Aux Sub Base & Oil & Water Fuel Oil In-4 Piping: Fuel Oil-Supports jection 02-717N Intercooler Piping - Pipe Turbo, Intake 2

Inte-cooler &

Exhaust O

xii Index 1898 REV 1 Entire Page Revised

l INDEX (continued)

Component Component Volume Number Description Category No.

02-717P Intercooler Piping -

Turbo, Intake 2

Coupling, Gaskets, Intercooler &

Bolting Exhaust 02-810A Misc. Equipment - Heater, Jacket Water 3

Jacket Water 02-820A Misc. Equipment:

Lube 011 2

Lube Oil Sump Tank' Heaters 02-8208 Full Flow Lube Lube Oil 2

011 Filter Appendix II 4

Appendix III

~

4

O

-xiii Index-1898 REV 1 Entire Page Revised

o Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 COMPONENT Connecting Rod Bearing Shells CLASSIFICATION TYPE A

4 COMPONENT PART NUMBER 02-340B TASK DESCRIPTION NO:

DR-07-02-3408-2 (SNPS PART NUMBER 03-3408) i

~ TASK DESCRIPTIONS:

Design review for this component is not required based on the review of the applicable industry and site experience and the lead engine DR/QR report (Comanche Peak).

A -review of the connecting rod bearing shells in Comanche Peak indicated that the bearing shells are suitable for their intended applica-

~

tion, with a margin of safety which will account for. small variances in load-ing.

The loading on the connecting rod bearing shells at Grand Gulf and Comanche Peak are equivalent and the operating parameters are similar.

The following maintenance recommendations should be implemented for the con-necting rod bearing shells:

Inspect. and measure the connecting rod bearing shells to verify O

lube oil maintenance which affects wear rate.

The visual and dimensional inspection of the bearing shells 'should be conducted at the fuel outage which precedes 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of operation by at least the sum of hours of operation in a LOOP /LOCA event plus the expected hours of operation between outages.

-Perform an x-ray examination on all replacement bearing shells.

No modifications are recommended for this component.

The Quality - revalidation requirements for this component have been completed and are considered satisfactory.

1 PRIMARY FUNCTION:

Not. required

-ATTRIBUTES TO BE VERIFIED:.

Not required

O GG1631/1

.REV. 1 L-. - - -. -

=.

-. ~

1 COMPONENT QUALITY REVALIDATION CHECKLIST Page B3 of 3 07-02-340C COMPONENT REVIEW Division I 1.

All EDGCTS site experience documents have been reviewed with satisfactory results.

I l

'2.

A Magnetic Particle test rather than a Liquid Penetrant test was performed on the piston skirts and stud boss area.

Satisfactory l

results were reported by TER# 07-002.

l l

3.

. No-. inspection report has been received which fulfills this requirement.

Division II 1.

All-EDGCTS site experience documents have been reviewed with y-unsatisfactory results.

MNCR# 01030-83 remains open.

l 2-3.

. No inspection reports has been received which fulfills these requirements.

l l

RESULTS AND CONCLUSIONS Division-I The Quality Revalidation effort with respect to this component, as outlined above, is complete.

The results have-been forwarded to the design Group for their evaluation and conclusions in support of the final report.

Division II Same as Division I-GROUP. CHAIRPERSON IdA h PROGRAM ' MANAGER O CJryn L

O (GG1039/3_

REV. 1

Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 COMPONENT Piston: Rings CLASSIFICATION TYPE A

COMPONENT PART NUMBER 02-3400 TASK DESCRIPTION N0: DR-07-02-340D-2 (SNPS PART. NUMBER 03-341B)

TASK DESCRIPTIONS:

Design _ review.for.this component is not required, based on the review of applicable industry. and site experience and the lead engine DR/QR reports for

'this component (Shoreham/ Comanche Peak).

Maintenance recommendations are as follows:

Inspect and measure piston rings every five years per TDI Inspection and Maintenance Record Form.

Visually inspect liners for wear every outage.

Boroscopic inspection is acceptable if heads are not removed.

Note: Ring replacement and cylinder liner honing should be performed in accordance with TDI maintenance procedures.

135* fuel spray tips may be used if inspection results indicate a need for additional action to improve lubrication and reduce coke buildup.

When replacing engine oil use H.D.

oil that exceeds series 3 standards.

The base stock should be more resistant to thermal degradation and coke formation.

The additive package should provide high detergent dispersant properties with high alkalinity and a high level of antiwear additive such as Zinc dithiophosphate.

Total Base Number (TBN) should be 12 to 15 for use with #2 fuel oil and a sulfated ash content of 1.5% to 2.0% is preferred.

An engine oil with such properties, Mobilguard 412. or equivalent product may be used to insure improved lubrication.

No modifications are recommended for the component.

Quality inspections performed for this component have been reviewed and are i

considered satisfactory.

PRIMARY FUNCTION:

Not required GG1468/2 REV. I l

COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 COMPONENT Pistons:

Pin Assembly CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-340E TASK DESCRIPTION NO.:

DR-07-02-340E-2 (SNPS PART NUMBER 03-341C)

TASK DESCRIPTIONS:

Design review for this component is not required based on the review of appli-cable industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).

The one site experience reported was the loss of a pin retainer which resulted.n scoring of the cylinder liner by the pin.

For increased reliability as stated in the Shoreham DR/QR report, it is recom-mended' that Grand Gulf replace the present spiral ring retainers (P/N F-108-030) with Waldes snap ring retainers (P/N GE-003-067) at the first fuel outage.

The following inspections identified in the lead engine reports should also be conducted at Grand Gulf:

Visually inspect all pins for chrome plate damage.

Inspect end plugs and reroll or replace any that are loose.

l Note:

The above inspections should be performed on a five year basis or whenever the pistons are removed and disassembled to an extent that such inspections are possible.

l Inspect all new or replacement pins by Liquid Penetrant test or a Magnetic l

j Particle test before installation in the engines.

l l

In addition to the above recommended inspections, the following Quality inspections should be performed:

l Perform a visual inspection of the pin assembly for signs of distress.

1 I

Perform a dimensional check of one spare pin.

-Perform a visual inspection of rolled end plug installation.

l PRIMARY FUNCTION:

l Not required ATTRIBUTES TO BE VERIFIED:

Not required GG1466/1 REV 1 1

1

=. -. -.. -

t Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 I

Tappets-and Guides:

COMPONENT Intake and Exhaust Tappet Assembly CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-345A TASK DESCRIPTION NO: OR-07-02-34SA-2

' (SNPS PART NUMBER 03-345A)

TASK OESCRIPTIONS:

Design review for this component is not required based on the review of applicable industry and site experience and the lead engine DR/QR report (Shoreham/ Comanche Peak).

1 There are no modification recommendations for this component.

The following routine maintenance is recommended for this component:

Verify that the intake and exhaust tappet rollers -are free to rotate, and 1

that there is no measurable clearance between the cam rollers and roller pins.

.This inspection should take place at each outage using TDI inspection and maintenance record form 345-1-1.

It is recommended that the following Quality inspection be performed:

9 Verify that the rollers are free to rotate and that no measurable clearance exists-between the pin and roller.

PRIMARY FUNCTION:

i Not required ATTRIBUTES TO BE VERIFIED:

Not required SPECIFIED STANDARDS:

-Not required O

GG1581/1 REV. 1 ya p

,,..a

+c

.-c w

ew-w - - -

-r

~

t

REFERENCES:

Not required DOCUMENTATION REQUIRED:

Not required

- - PROGRAM MANAGER NC_,\\(

GROUP CHAIRPERSON V'

c

+*

O F

O

. REY.1 CARRY OVER FROM GG1581/2

~

l PREVIOUS PAGE

Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Tappets and Guides:

COMPONENT Fuel Tappet Assembly CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-345B TASK DESCRIPTION NO: DR-07-02-345B-2

~(SNPS PART NUMBER 03-3458) l TASK DESCRIPTIONS:

Design review for this component is not ' required based on the review of appli-cable industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).

There are no modification recommendations for this component.

The following routine maintenance is recommend for this component:

Verify that ~ the fuel tappet. rollers are free to rotate and that there is no measurable clearance between the cam roller and roller pin.

This inspection should take place at each outage.

It is recommended that the following Quality inspection be performed:

Verify that the rollers are free to rotate and that no measurable clear-ance exits between the pin and the roller.

PRIMARY FUNCTION:

Not required ATTRIBUTES TO BE VERIFIED:

Not required-SPECIFIED STANDARDS:

Not required

REFERENCES:

.Not required GG1579/1 REV. 1-

COMPONENT QUALITY REVALIDATION CHECKLIST Page B2 of 3 07-02-362A ACCEPTANCE CRITERIA Division I 1.

Satisfactory Document Package 2-3.

Review of inspection report by the Design Group Division II Same as Division I REFERENCES Division I 1.

QCI-FSI-F11.1-020 2-3.

Approved Site NDE Procedures Division II Same as Division I DOCUMENTATION REQUIRED Division I

(

1.

Document Susmary Sheet 1

2-3.

Inspection Report Division II l

Same as Division I GROUP CHAIRPERSON /

([I4,h PROGRAM MANAGER

~

U%~.

COMPONENT REVIEW 1

Division I

\\

\\

1.

All EDGCTSt. site experience documents were assembled and -' reviewed

.v with satisfactory results.

1 GG0940/2 REV. 1 2,\\ -

t a

Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Rocker Arms and Pushrods -

Intake / Intermediate and Exhaust COMPONENT Rocker Shaft Assemblies CLASSIFICATION TYPE B

COMPONENT PART NUMBER 02-390A&B TASK DESCRIPTION NO.

DR-07-02-390A&B-2 (SNPS PART NUMBER 03-390A&B) 1:

TASK DESCRIPTIONS Design review for this component is not required based on the design review for the DSRV-16 engine at Comanche Peak, which establishes the acceptability of

.the rocker shaft assemblies for their intended design.

Base.d on a review of i

site, nuclear and non-nuclear industry experience, there have been no design i.

related. failures associated with this component.

The only adverse experience at Grand Gul f, involving a cracked swivel pad, occurred during engine reassembly is not connected with engine operation.

There are no maintenance or modification recommendations for this component.

The following Quality inspections are recommended'to be performed:

Perform a visual inspection of the intake, exhaust and intermediate rocker arm assembly for signs of distress, linear indications and chipped pieces in the outer lips of the pushrod cups.

The lips

,should be flush in the assembly.

Perform a Material Comparator test on one intake / intermediate rocker 1

shaft and one exhaust rocker shaft.-

PRIMARY FUNCTION l

Not required i

ATTRIBUTES TO BE VERIFIED Not required O

. GG1630/1' N.

-.. - -.. -, ~.

e.

COMPONENT QUALITY ~ REVALIDATION CHECKLIST Page 83 of 3 07-02-390C COMPONENT-REVIEW (continued) s.;

^2.

All main and connector pushrods are friction welded as reported by TER#'s-07-003 and 07-006.

3.

Liquid-Penetrant tests were performed on all main and connector pushrods.

All, connector pushrods were satisfactory as reported by TER# 07-003.

All main pushrods were determined to be satisfactory as reported by TER#'s07-006 and 07-042.

Division II j

A'

-1.

All EDGCTS; site experience documents were assembled and reviewed with 7

satisfactory results.

2-3.

No b inspection report has been received which fulfills this requirement.

RESULTS AND CONCLUSION Diyision I O

i Thi-Quality Revalidatiion effort with respect to this component, as out-l lined above, is complete.

The results he"e been forwarded to the Design Review Group for their evaluation and conclusions in support of the final report.

Division II 1:

[l Same as Division I s.

e I

GROUP CHAIRPERSON 1/afft, I-PROGRAM MANAGER d e

(JVy a s

a<

s

?

g f

t ll 3

w GG0936/3

. l7 N

~ Y

+ ;,

_g9

*i

COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Governor Drive:

COMPONENT Couplings, Pins & Keys CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-411B TASK DESCRIPTION NO.: DR-07-02-4118-2 (SNPS PART NUMBER 03-4028)

TASK DESCRIPTIONS:

Design review for this component is not _ required based on the review of appli-cable industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).

Maintenance recommendations include:

Check coupling tightness at refueling outages; Replace coupling elastomeric insert in Koppers coupling at refueling outages.

Replace coupling elastomeric insert prior to placing the engine in 1

emergency standby service.

There are no modification recommendations for this component.

It is recommended that the folli,ing Quality inspections be performed:

Perform a visual inspection of the coupling for degradation of material; Verify the coupling material is neoprene by reviewing existing documentation; Visually inspect the set screw and drive pin in accordance with installa-tion instructions.

l PRIMARY FUNCTION:

Not required l

ATTRIBUTES TO BE VERIFIED:

Not required j

-_GG1553/1 REV. 1 1

l

I How To Use This Report Tabs in this report identify the following categories:

Turbo, Intake, Intercooler & Exhaust Lube 011 Engine Base & Bearing Caps Crankshaft & Bearings-Cylinder Block, Liners & Water Manifold Air Start & Barring Device Connecting rods Pistons Camshaft & Valve Train Idler Gear Assembly & Front Gear Case Flywheel Engine Instrumentation & Wiring Overspeed Trip & Governor Engine Shutdown & Equipment i

Jacket Water Cylinder Heads & Valves i

Fuel Oil Injection Generator Control Panel Assembly Engine & Auxiliary Sub-Base & Foundation Bolts These categories have been defined to allow the reader to' review a complete diesel generator subsystem in a convenient manner.

Within each category tabs ' identify Grand Gulf specific component numbers.

l A given component report can be found by:

a)

If the component nubmer is known - use the alpha - numeric index-which identifies the volume number and category in which the-component report is located.

~~

l~

b)

-If only the component name is known - Section 3.2 may be used as a i

cross-reference to find the volume number where the component report l

.may be found.

I

-Some reports address more than one component.

A-tab-is provided for each component.

However,-some components are combined under one report.

Slip-sheets are provided where required to reference back to the' appropriate tab.

Some components required more than one report.

These are identified by~the abbreviationiLB-Large Bore and SB-Small Bore on the component number tabs.

O l

l,

.j-Index 1898

INDEX (continued)

Component Component-Volume Number Description Category No.

l F-068 Intercooler Turbo,. Intake, 2

Intrc1r. & Ex-haust GG-101A Generator - Generator Generator 4

GG-1018 Generator:

Shaft and Generator 4

Bearings GG-103 Jacket Water Heat Jacket Water 3

Exchanger GG-104 Lube Oil Heat Exchanger Lube Oil 2

GG-106 Auxiliary Jacket Water Pump Jacket Water 3

GG-107 Jacket Water Standby Jacket Water 3

Heater Pump GG-108 Lube Oil System - Aux.

Lube Oil 2

Lube Oil Pump

.l GG-109 Before & After Lube Lube Oil 2

011 Pump GG-111 Flex Connections

-Turbo, Intake, 2

Intercooler &

Exhaust l

GG-112-Starting Air Tank Air Start &

3 Barring Device GG-116 Intake Air Silencer Turbo, Intaka, 2

i Intercooler &

Exhaust l

GG-118 Intake Air Filter Turbo, Intake, 2

l-Intercooler &

Exhaust GG-119 Generator - Generator _

Generator 4

Control GG-121 011 Prelube' Filter Lube Oil 2

MP022/023 Turbocharger Turbo,-Intake,

_2 Intrcir. & Exhaust REV 1

.Index 1898

. :.8 ::

.~&-

INDEX (continued)

Component Component Volume Number Description Category No.

2 SE-025 Lube Oil! Full Pressure Lube Oil 2

Strainer 00-420 Lube Oil Pressure Regulating Lube Oil 2

Valve 00-621A Fuel Oil Drip Tank Assembly Fuel Oil In-4 jection l

00-700A' Jacket Water Stand Pipe:

Jacket Water 3

Pipe, Fittings, Gaskets 00-7008 Jacket Water Stand Pipe:

Jacket Water 3

Valves 00-700C Jacket Water. Stand Pipe Jacket Water 3

Supports 00-700E Jacket Water Stand Pipe:

Jacket Water 3

2 Switches

+

O 00-700F' Jacket Water Stand Pipe:

Jacket Water 3

Misc. Bolting Mat.

02-CFR Turbocharger Thrust Bearing Turbo, Intake, 2

Lubricant System Intrcir. & Ex-haust 02-305A Base and Bearing Caps: Base Engine Base 2

Assembly

& Bearing Caps 02-305C Base and Bearing Caps:

Engine Base 2

Main Bearing Studs & Nuts

& Bearing Caps 02-305D Base and Bearing Caps:

' Engine Base Main Bearing Caps

& Bearing Caps 2

1 02-307A-Lube Oil Fittings:

Lube Oil 2

Internal Headers 02-307B Lube Oil Fittings:

Lube Oil 2

. Internal - Tubing & Fittings 02-307D

_ Lube 011 Fittings Internal:

Lube Oil.

2 Supports O

E iii REV 1 Index 1898

' Entire Page Revised u.

INDEX (continued)

Component Component-Volume Number Description-Category No.

02-310A Crankshaft Crankshaft &

2 Bearings 02-310B Crankshaft and Bearings:

Crankshaft &

2 Bearing Shells Bearing 02-310C.

Crankcase and Bearings:

Crankshaft &

2 Thrust Bearing Ring Bearing 02-311A Crankcase: Crankcase Assy Crankshaft &

2 Bearing 02-3110 Crankcase: Crankcase Crankshaft &

2 Mounting Hardware Bearings i 315A Cylinder Block Liners &

Cyl. Block &

2 Water Manifold: Cylinder Liners & Water

~

Block Manifold 02-315C Cylinder Block Liner &

Cyl. Block &

2 Water Manifold -

Liners &

O Cylinder Liner Water Manifold 02-3150 Cylinder Block Liners &.

Cy1. Block &

2 Jacket Water Manifold Liners &

& Piping Water Manifold 02-315E Cylinder Block - Liners Cyl. Block &

2 and Water Manifold: Studs Liners &

Water Manifold 02-315F-Cylinder Block Liners Cyl. Block &

2

& Water Manifold: Nuts Liner & Water Manifold l

02-315G Cylinder Block Liners &

Cyl. Block'&

2 Water Manifold Seals &

Liners &

Gaskets Water Manifold l

02-316A

' Jacket Water Inlet Manifold:

Jacket Water 3

Manifold Assembly W/ Hardware and Coupling'and Gaskets 02-316B Jacket Water Inlet Manifold:

Jacket Water 3

Coupling and Gaskets O

02-317A Water Discharge Manifold:

Jacket Water.

3 Jacket Water Discharge Manifold, Coupling and Seals iv REV 1 Index 1898 Entire Page Revised I,

Component Component Volume

~

Number Description Category No.

02-317B Water Dicharge Manifold:

Jacket Water 3

Coupling & Seals o

02-317C.

Water Discharge Manifold:

Jacket Water 3

. Supports 02-330A Flywheel Flywheel 3

02-330B Flywheel - Bolting Flywheel 3

02-335B Front Gear Case-Gasket and Idler Gear'As-3 Bolting

.sembly & Front Gear Case

.02-340A Connecting Rod:

Connecting Connecting 3

. Rods & Bushings Rods 02-3408 Connecting Rod Bearing Connecting 3

Shells Rods 02-340C Pistons Pistons-3 02-3400 Pistons: Rings Pistons 3

02-340E Piston: Pin Assembly Pistons 3

02-345A fappets and Guides:

Camshaft &

3 Intake Exhaust Valve Train Ttppet Assembly 02-3458 Tappets and Guides: Fuel Camshaft &-

3 Tappet Assembly Valve Train 02-345C Tappets and Guides: Fuel Camshaft &

3 Pump Base Assembly Valve Train 02-350A Camshaft:

Camshaft Assembly Camshaft &

3 Valve Train 350B.

Camshaft: Bearings

. Camshaft &.

3 Valve Train.

i 02-350C Camshaft: Supports, Bolting Camshaft &

3 ar.d Gears Valve Train 02-355A Idler Gear Assemble: Crank Idler Gear As-3 To Pump Gear sembly & Front Gear Case v

l Index 1898-REV 1 i

Entire.Page Revised E

. t c

l l

i INDEX (continued)

Component Component Volume Number Description Category No. 3558 Idler Gear Assembly Idler Gear As-3 sembly & Front Gear Case 02-359 Air Start Valves Air Start &

3 Barring Device 02-360A Cylinder Heads Cylinder Heads 3

& Valves 02-360B Cylinder Head Valves:

Cylinder Heads 3

Intake & Exhaust Valves

& Valves 360C.

Cylinder Head and Valves:

Cylinder Heads 3

Bolting and Gaskets

& Valves 02-3600 Cylinder Head Valves -

Cylinder Heads 3

Springs & Retainers

& Valves 02-362A Cylinder Head Covers:

Camshaft &

3 Subcover Assembly Valve Train 02-365A Fuel Injection Equipment Fuel Oil In-4

- Fuel Injection Pump jection l

1 02-365B Fuel Injection Equipment Fuel Oil In-4 Fuel Injection Tips

. jection 02-365C Fuel Oil Injection Tube Fuel Oil In-4 Assembly jection 02-3650

-Fuel Injection Equipment:

Fuel Oil In-4

)

Supports jection 02-371A Fuel Pump Linkage: Fuel Fuel Oil In-4 I.

Pump Control Shaft jection 02-371B Fuel Pump Linkage: Linkage Fuel Oil In-4 Assembly and Bearing jection 02-375 Intake Manifold Piping Turbo, Intake, 2

l Intrc1r. & Ex-

)

haust 02-380A Exhaust Manifold'-

Turbo,-Intake, 2

. Manifold Intrcir.'& Ex-haust-vi Index 1898 REV 1 i

Entire Page Revised j

l

.e

INDEX (continued)

Component Component.

Volume Number Description Category No.

02-380B Exhaust Manifold: Gaskets Turbo, Intake, 2

and Bolting Intrcir. & Ex-haust 02-3858 Cylinder Block Cyl. Block &

2 Covers' Liners & Water Gaskets and Bolting Manifold 02-386B Crankcase:

Crankcase Cranshaft &.

2 Gaskets and Mounting Bearings Hardware 02-390A Rocker Arms & Pushrods Intake & Intermediate and Camshaft &

3 Exhaust Rocker Shaft Assembly Valve Train 02-3908 Rocker Arms and Pushrods:

Camshaft &

3 Exhaust Rocker Shaft Valve Train Assembly l

~

02-390C Rocker Arms & Pushrods-Camshaft &

3 O

Intake & Exhaust -Pushrods Valve Train-Connectors 02-3900 Rocker Arms and Pushrods; Camshaft &

3 Pushrods Connector.

Valve Train l

02-390E Rocker Arms and Pushrods:

Camshaft &

3 Bushings Valve Train 02-390F Rocker Arms and Pushrods:

Camshaft &

3 Lifters Valve Train 02-390G Rocker Arms and Pushrods:

Camshaft &-

3 Misc.' Bolts & Drive Studs Valve Train 02-410A Overspeed Trip: Governor Overspeed Trip 3

& Governor 02-410B Overspeed Trip: Governor Overspeed Trip 3

and Accessory Drive' -

& Governor 02-410C Overspeed Trip: Couplings Overspeed Trip 3.

(Flexible & Spider)-

& Governor I

02-4100 Overspeed Trip Overspeed Trip 3

Vent Valves

& Governor vii Index 1898 REV 1 Entire Page Revised-

INDEX (continued)

O Component Component Volume j.

Number Description Category No.

02-411A Governor Drive: Governor Overspeed Trip 3

and Tachometer Drive Gear

& Governor

& Shaft 02-411E~

- Governor Drive: Couplings, Overspeed Trip 3

4 Pins & Keys

& Governor 02-413A Governor. Linkage Overspeed Trip 3

& Governor 02-413B Fuel Pump Linkage-Fuel Oil In-4 Automatic Shutdown jection

02-415A

-Governor Assembly: Woodward Overspeed Trip 3

Governor

& Governor.

02-415B Governor Assembly-Booster Overspeed Trip 3

Servosoter

& Governor L

02-415C-Governor Assembly-Heat Overspeed Trip 3

Exchanger-

& Governor 02-420 Lube Oil Pump Lube Oil 2

02-425A Jacket Water Pump Jacket Water 3

02-437 Turbo Water Piping:

Jacket' Water 3

Pipe & Fittings 02-441A Starting Air Manifold Air Start &

3 Piping Barring Device 02-441B Starting Air Manifold Air Start &

3 1

Valves, Strainer,' Filters

.Barring Device l

02-441C Starting Air Manifold Air Start &

3 l

Supports Barring Device t

~02-442A Starting Air Distributor Air Start &

3

)

Director Assembly._

Barring Device 02-442B Starting Air Distributor:

Air Start &

3 Tubing, Fittings, Gaskets Barring Device 02-445 Fuel Oil Booster Pump Fuel Oil In-4 Engine Driven jection O

r viii Index 1898 REV 1 Entire Page Revised

Component Component Volume Number Description Category No.

02-450A Fuel 011 Header: Piping &

Fuel Oil In-4 Tubing-jection 4

02-4508 Fuel' Oil Header:

Fuel Oil In-4 Fuel Oil Tubing Supports jection 02-455A Fuel Oil Filters &

Fuel Oil In-4 Strainers: Filters jection 02-4558 Fuel Oil Filters and Fuel Oil In-4 Strainers:

Strainers jection 02-455C-Fuel Oil Filters &

Fuel Oil In-4 Strainer: Mounting Hardware jection 02-465A Lube'011 Lines External:

Lube Oil 2

Tubing, Fittings, Couplings

}

02-4658 Lube Oil Lines

' External Lube Oil 2

Supports O

02-465C Lube Oil Lines External:

Lube Oil 2

Valves 02-467A Turbocharger Lube Oil Lube Oil 2

Fittings - Pipe, Tubing, Fittings & Flexible Coupling 02-467B Turbocharger: Lube Oil Lube Oil 2

Fittings - Supports 02-475A Turbocharger: Bracket Turbo, Intake, 2

Intrcir. & Ex-l haust 02-4758 Turbocharger Bracket-Turbo, Intake, 2

Air Butterfly Valve Intrcir.'& Ex-haust i

02-475C Turbocharger: Bracket -

Turbo, Intake, 2

Bolting & Gaskets Intrc1r. & Ex-haust 02-500A Control Panel Assembly:

Control Panel 4

Cabinet / System Assembly i

02-500F=

Control Panel-Assembly:

Control Panel 4

Accumulator ~

Assembly I

ix Index 1898 REV 1 Entire Page Revised

INDEX (continued)

Component Component

-Volume Number Description Category No.

02-500G Control Panel Control Panel 4

Valves Assembly 02-500H Control Panel Assembly:

Control Panel 4

Pressure Switch Assembly 02-500J~

Control Panel Assembly:

Control Panel 4

Relays Assembly 02-500K Control Panel Assembly:

Control Panel 4

Solenoid Valves Assembly 02-500M Control Panel Assembly:

Control Panel 4

Piping, Tubing, Fittings Assembly 02-500N Control Panel Assembly:

Control Panel 4

Terminal Boards / Switches, Assembly 4

Wiring 02-515 Thermostatic Valve Jacket Water 3

0 02-525B Barring Device - Pneumatic Air Start &

3 Regulator Valve Shut

.Barring Device Off Valve 02-540A Lube 011' Sump Lube Oil 2

with Strainer Assembly and Mounting Hardward 02-540B Lube Oil Sump Tank: Misc.

Lube Oil 2

i Fittings, Gaskets, Pipe

& Bolting Material, Valves 02-540C Lube'011 Sump Tank:

Lube Oil 2

Mounting Hardware 02-550 Foundation Bolts Engine & Aux.

4 Sub Base &

Foundation Bolts 02-630A Pyrometer Conduit Assembly:

Engine Instru-3 L

Conduit mentation &

Wiring 02-630B Pyrometer Conduit Assembly:

Engine Instru-

-3 Conduit Fittings mentation &

Wiring X

Index 1898 REV 1 Entire Page Revised 1

INDEX (continued)

Component Component Volume Number Description Category No.

02-630C Pyrometer Conduit Assembly:

Engine Instru-3 Support mentation & Wiring 02-6300 Pyrometer Conduit Assembly:

Engine Instu-3 Thermocouple mentation &

Wiring 02-688A Engine & Aux Module Wiring Engine Instru-3 Material-Conduit & Fittings; mentation &

Pyrometer Conduit Assembly-Wiring Conduit, Fitting, Supports 02-6888 Engine & Aux. Module Wiring Engine Instru-3 Material: Wiring &

mentation &

Terminations Wiring 02-688C Engine & Aux. Module Wiring Fngine Instu-3 Material: Boxes & Terminals mentation &

t Wiring 02-690 Engine Alarm Sensors Engine Instru-3 O

Temperature & Level mentation &

Switches Off Engine Wiring 4

Safety Alarm Sensors-Wiring 02-691 Off Engine Alarm Sensors Engine Instru-3 mentation &

Wiring 02-695A Engine Shut Down Equipment:

Engine Shut-3 Tubing & Fittings down & Equip-

[

ment 02-695B Engine Shut Down Equipment:

Engine Shut-3 Valves, Regulator, Orifices down & Equip-ment 02-695C Engine Shutdown: Trip Engine Shut-3 Switches down & Equip-ment 1

02-717A Aux Sub Base & Oil &

Engine Aux.

4 Water Piping: Aux Sub Base Sub-Base &

Foundation Bolts -

Ox 02-717B Aux Sub Base & 011 &

Jacket Water 3

Water Piping: Jacket Water Valves xi Index 1898 REV 1 Entire Page Revised

INDEX (continued)

Component Component Volume Number Description Category No.

02-717C Aux Sub Base & 011 and Water Jacket Water 3

Piping Jacket Water-Pipe, Couplings, Fittings,-Orifices, Y Strainers 02-717D Aux Sub Base & 011 & Water Jacket Water 3

i Piping: Jc xet Water Gaskets

& Bolting 02-717E Aux Sub Base & 011 & Water Jacket Water 3

l Piping - Jacket Water:

Supports t

02-717F Aux Sub Base & 011 & Water Lube Oil 2

~

Piping Lube Oil Pipe Tube and Fittings 02-717G Aux Sub Base & 011 & Water Lube Oil 2

j Piping: Lube Oil-Valves 02-717H Aux Sub Base & 011 & Water Lube Oil 2

0 Piping: Lube Oil Gaskets and Bolting i

02-717I Aux Sub Base Lube & 011 Lube Oil 2

i

& Water. Piping - Lube l

011: Supports & Mounting l

Hardware 02-717J Aux Sub Base & 011 & Water Fuel Oil In-'

4 Piping: Fuel Oil-Piping jection l

and Fittings i

02-717K Aux Sub Base & 011 & Water Fuel Oil In-4 l

Piping: Fuel Oil-Valves

.jection I

02-717L Aux Sub Base & 011 & Water Fuel Oil In-'

4 i,

. Piping: Fuel Oil-Gaskets.

jection I

& Bolting _

I 02-717M Aux Sub Base & 011'& Water Fuel Oil In-4 Piping: Fuel Oil-Supports jection 02-717N Intercooler Piping - Pipe Turbo, Intake 2

Intercooler &

Exhaust xii Index 1898 REV 1 Entire Page Revised

.. ~.

....2.

INDEX (continued)

Component Component Volume Number Description Category No.

02-717P Intercooler Piping -

Turbo, Intake 2

Coupling, Gaskets, Intercooler &

Bolting Exhaust 02-810A Misc. Equipment - Heater, Jacket Water 3

Jacket Water 02-820A Misc. Equipment:

Lube Oil 2

Lube Oil Sump Tank' Heaters 02-8208 Full Flow Lube Lube Oil 2

011 Filter Appendix II 4

Appendix III

~

4 O

1 i

O xiii Index 1898 REV -1 Entire Page Revised

4 Page 1 of 2 COMPONENT DESIGN P.EVIEW CHECKLIST i

l GRAND GULF NUCLEAR STATION - UNIT 1 COM.FONENT Jacket Water Heat Exchanger CLASSIFICATION TYPE B 1

COMPONENT PART NUMBER GG-103 TASK DESCRIPTION NO:

DR-07-GG-103-3 (SMPS PART NUMBER 10-103 )

TASK DESCRIPTIONS:

i Design review for this component is - not required based on the review of 1

applicable industry and site experience and the lead engine DR/QR reports i

(Shoreham/ Comanche Peak).

l The following maintenance recommendations should be implemented for the jacket water heat exchanger:

To avoid corrosion and fouling, the jacket water heat exchanger and associated service water piping should be flushed on a periodic basis in y

1 the engine standby mode (continuous service flow is sufficient).

j Alternatively, service water chemistry control can be used to maintain i

heat exchanger performance and integrity.

During an outage replace packing rings when packing becomes hard or leakage at the packing is noted and cannot be stopped by tightening.

There are no modification recommendations for this component.

Quality revalidation for this component is not required.

l PRIMARY FUNCTION:

Not required ATTRIBUTES TO BE VERIFIED:

4 Not required i

SPECIFIED STANDARDS:

Not required

- GG1453/1

. REV.1 4

r

.,-ew-

,-r.. -, -,,. -,. -,

4%..

.....--s

~--..--w-..--.,m-+.-

--e---

Page 1 of 2 O/

COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION UNIT 1 Jacket Water COMPONENT Standpipe:

Valve CLASSIFICATION TYPE B COMPONENT NO 00-7008 TASK DESCRIPTION NO:

DR-07-00-700B-4 (SNPS PART NUREETT6-7008)

TASK DESCRIPTIONS:

Design review for this component is not required based on a review of the applicable industry and site experience listed in the EDG Component Tracking System, and the lead engine DR/QR reports (Shoreham/ Comanche Peak).

No modifications are recommended for this component based on the lead engine DR/QR reports.

1 i

The following maintenance recommendations are made for this component:

Packing should be inspected for leakage on a monthly basis.

Elastomeric parts should be replaced every 5 years.

O

  • lity revaT:dation of this component was not required.

Qua PRIMARY FUNCTION:

i Not required i

ATTRIBUTES TO BE VERIFIED:

Not required l

SPECIFIED STANDARDS:

Not required

REFERENCES:

Not required GG1052/1 REV. 1

Page 2 of 2 O

DOCUMENTATION REQUIRED:

Not required GROUP CHAIRPERSON PROGRAM MANAGER M \\ h WV

.i O

l i

i l

I O

REV. 1 CARRY OVER FROM PREVIOUS PAGE GG1052/2

Page 1 of 2 v

COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Jacket Water Standpipe and COMPONENT Miscellaneous Bolting Material CLASSIFICATION TYPE A COMPONENT PART NUMBER 00-700F TASK DESCRIPTION NO.:

DR-07-00-700F-3 (SNPS PART NUMBER 00-700F)

TASK DESCRIPTIONS:

Design review for this component is not required based on the review of the lead engine DR/QR reports (Shoreham/ Comanche Peak) and the lack of site, industry and non-nuclear industry experience.

The standpipe and bolting is similar to that used at other plants.

The reviews of drawings, specifications and seismic analysis for Shoreham and Comanche Peak have shown adequate ful-fillment of design requirements and generally low stress levels.

A review of non-code jacket water standpipe design such as is utilized at Grand Gulf has indicated that single sided fillet welds have been used on large bore jacket water, engine driven and auxiliary pump suction and engine return nozzles.

This results in high stresses at weld roots which may lead to cracking of weld joints.

As such the following inspection is applicable to 1

this component:

Visually inspect jacket water standpipe, pump suction and engine return nozzle welds each routine engine run and every 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> during extended engine runs.

Any visible cracking or minor jacket water leakage should result in rework of nozzle welds.

Quality revalidation for this component is not required.

l l

l PRIMARY FUNCTION:

l Not required ATTRIBUTES TO BE VERIFIED:

Not required SPECIFIED STANDARDS:

Not required GG1218/1 REV. 1

REFERENCES:

1.

TDI _ Drawing 101776, 100931, 00-700-01-ER, 00-700-001-EW and 00-700-01-EV

+

i 2.

Specification No 9645-M-018.0, Rev. 22, 4-23-82, design specification for standby. diesel generators ' for Mississippi Power and Light Co., Grand Gulf Nuclear Station Units 1 and 2, Grand Gulf MI, by Bechtel Power Co.

i DOCUMENTATION REQUIRED:

Not required i

GROUP CHAIRPERSON 1

PROGRAM MANAGER d \\4 w h I

j i,

O i

I i

1 1

i REV. 1 CARRY OVER FROM PREVIOUS PAGE i

i -

GG1218/2 i

l an

.-.w-,n,n.,.

....~n,,.--,....,-,-----w--...-w,

,,,.,,-,,-..,m-,,w,...,,-.

. ~,,.

c-

..--...,n

,,.,,., -, mw

,-----.------.--,--e,r-p.

..r.,-

,---a-

Pagt Al of 1.

i COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Water Discharge-COMPONENT Manifold:

Supports CLASSIFICATION TYPE B COMPONENT PART NUMBER 02-317C TASK DESCRIPTION NO.:

DR-07-02-317C-2 (SNPS PART NUMBER 03-317C) i TASK DESCRIPTIONS 4

Design review for this component is not required based on the review of the lead engine DR/QR reports (Shoreham/ Comanche Peak) and the lack of industry, non-nuclear industry, and site experience.

Based on previous experience, supports appear to be adequate provided that the corresponding piping component review, Component No. 02-317A&B,.does.not 1

mandate modifications.

If the piping analysis warrants modifications to the supports, these modifications will be addressed in the DR/QR report for l

l Comoonent No. 02-317A&B.

Quality revalidation for this component is not required.

PRIMARY FUNCTION Not required ATTRIBUTES TO BE VERIFIED Not required l

SPECIFIED STANDARDS l

Not required REFERENCES Not required DOCUMENTATION REQUIRED Not required GROUP CHAIRPERSON

-= PROGRAM MANAGER d W w e O

(j v o

i GG1443/1 REV.1 I -

.,,,--.i.-m---,-

w

--.--,.+.----,v-

-.y

-~mmm r...

e

,,,.-..------.--p-.

.,.m,+e,-%w,.

-,-e,ep<-w.-

COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1.

Turbo Water Piping -

Pipe and Fittings COMPONENT (Small Bore Scope Only)

CLASSIFICATION TYPE B COMPONENT PART NUMBER 02-437 TASK DESCRIPTION NO.:

DR-05-02-437-3 (SNPS PART NUMBER 03-437A)

TASK DESCRIPTIONS:

. Design review - is ' not required for this component based on a review of the applicable industry and site experience and the lead engine DR/QR report (Coranche Peak).

The comparative review of the piping configurations from Comanche Peak and Grand Gulf indicates the TDI designs for this component are essentially the same.

The review of applicable site ' experience indicates that deficient items (cracked welds, cracked piping and piping misalignment) were discovered on. the turbo water piping.

All deficiencies addressed have been corrected as detailed in the reference. documents listed in the component tracking system (dated 7-27-84).

The cause of these deficiencies has been attributed to the improper operating / faulty turbocharger.

The turbocharger was also replaced (Ref. MCR 767-83, SHT.10 and 13).

There are no maintenance or modification recommendations for this component.

l1 Quality revalidation for this component is not required.

PRIMARY FUNCTION:

Not required i

ATTRIBUTES TO BE VERIFIED:

l l

Not required l

SPECIFIED STANDARDS:

i Not required

REFERENCES:

Not required O

l l

GG1747/1 REV. 1 i

1-

= -

Page 1 of 2 s

COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 4

Auxiliary Sub Base & 011 &

Water Piping - Jacket COMPONENT Water: ' Valves CLASSIFICATION TYPE B COMPONENT PART NUMBER 02-717B TASK DESCRIPTION NO.:

DR-07-02-717B-1 (SNPS PART NUMBER ~03-7178)_

l TASK DESCRIPTIONS:

Design review for this component is not required based on a review of the applicable industry and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).

No modifications are required for this component.

i The following maintenance recommendations are made for this component:

1 Packing should be inspected for leakage on a monthly basis.

Elastomeric parts should be replaced every 5 years.

Quality revalidation for this component is not required.

PRIMARY FUNCTION:

Not required ATTRIBUTES TO BE VERIFIED:

i Not required l

SPECIFIED STANDARDS:

~

Not required i

1

REFERENCES:

i l

Not required h

I i O GG0368/l REV. 1

Page 2 of 2 O

DOCUMENTATION REQUIRED:

Not required GROUP CHAIRPERSON' PROGRAM MANAGER AC\\<

()I c.)

O 4

e f

O REV. 1 CARRY OVER FROM GG0368/2 i

-~ _. _

COMPONENT QUALITY REVALIDATION CHECKLIST Page B3 of 4

'07-02-360B REFERENCES (continued) l Division II

.Same as Division I DOCUMENTATION REQUIRED Division I 1.

Document Summary Sheet 2-8.

Inspection Report.

Division II Same as Division I GROUP CHAIRPERSON dM PROGRAM MANAGER e-(JVy.rau.

O COMPONENT REVIEW Division I j

1.

All EDGCTS site experience documents were assembled and reviewed with satisfactory results.

1

[

2.

A visual. inspection of the valve seating was performed with satisfactory results.

This was reported by TER# 07-019.

1 3.

A visual inspection. of tha valve and valve ring (seating) was performed.

This was reported by TER# 07-019.

i 4.

A visual inspection. was performed on - the valve stems.

This was reported by TER#'s07-019 ' and 07-045.

Unsatisfactory results were dispositioned by MNCRs 472-84, 473-84 and 475-84.

5.

. Dimensional inspections were_ performed and the valve to valve guide clearances were ' determined.

The results were. reported by TER#

07-046.-

6.

A visual inspection of the valve stems was performed at the contact area with the rocker arm.

This was reported by TER#'s 07-019_and O

07-045.

Unsatisfactory results were dispositioned by MNCRs 472-84, 473-84 and 475-84.

l GG0957/3 REV. 1

)

Page 1 of 2 COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Fuel Injection Equipment -

COMPONENT Fuel Injection Pump CLASSIFICATION TYPE A COMPONENT PART NUMBER 02-365A TASK DESCRIPTION NO.: DR-07-02-365A-1 (SNPS PART NUMBER 03-365A) i f

TASK DESCRIPTIONS:

Design review for this component is not required based on the review of the i

applicable industry and site experience and the lead engine DR/QR reports l

(Shoreham/ Comanche Peak).

This component is used on all of the TDI engines as well as engines manufactured by Cooper Industries, Worthington &

j Nordberg.

There are no modifications recommended for this component.

The following maintenance recommendations for this component should be implemented during alternate refueling outages:

Tear down pump for inspection and complete fuel injection pump inspection in accordance with the TDI Instruction Manual.

Evaluate pump condition to determine if remaining pumps require examination.

. Quality revalidation for this component is not required.

l PRIMARY FUNCTION:

Not required ATTRIBUTES TO BE VERIFIED:

Not required I

SPECIFIED STANDARDS:

Not required O

GG1062/1 REV.,1

REFERENCES:

t Not required

- DOCUMENTATION REQUIRED:

Not required GROUP CHAIRPERSON PROGRAM MANAGER M \\ & %

}f C3 4

r 1

l l

l-REV 1 CARRY 0VER FR06.\\-

PREVIOUS PAGE GG1062/2

.;s m

+f.-

,.. N, __

n.

-. -~_,,

COMPONENT DESIGN REVIEW CHECKLIST GRAND GULF NUCLEAR STATION - UNIT 1 Fuel Injection Equipment-

-COMPONENT Fuel Injection Tips CLASSIFICATION TYPE A COMPONENT PART NUMER 07 "5B TASK DESCRIPTION NO.:

DR-07-02-3658-4 (SNPS PART NUMBER 03-3Eb)

~

t TASK OESCRIPTIONS:

i -

Design review for this component is not required based on the review of the applicable industry - and site experience and the lead engine DR/QR reports (Shoreham/ Comanche Peak).

This component.is used on all of-the TDI engines as well as engines manufactured by Cooper Industries, Worthington &

.Nordberg.

The following maintenance recommendations should be implemented:

1)

Inspect for leaks when the engine is running during the monthly 1

operational test; 2)

.During refueling outage the assembly should be disassembled, inspect, clean, reassembled, pop tested, and spray pattern checked; 3)- TDI SIM Nos.

107 and 108 be incorporated in the Grand Gulf maintenance procedures.

3

{

There are no modifica. ion recommendations for this component.

s 4

Quality revalidation for this component is not required.

l PRIMARY FUNCTION:

l Not required ATTRIBUTES TO BE VERIFIED:

l Not required l

SPECIFIED STANDARDS:

Not required O

GG1063/1 REV. 1 I

.__.______.._-._.._L_._.__._______._____-_,.__-.___._.-..._._

7

,)

? o-s TDI OWNERS GROUP i

/

i for s

I GRAND GULF NUCLEAR POWER STATION l

4 MAINTENANCE REVIEW APPENDIX - II i

(

I INTRODUCTION yThe purpose of this Appendix is to provide Grand Gulf with a set of i

"naintenance and. surveillance recommendations for diesel generator com-ponents which have been developed by TDI and/or the Owners Group as a

~

i

result of. the overall Owners Group Program.

This Appendix is intended to supple ment. the existing TDI Instruction Manual, Volume I and Volume III, which will maintain the qualification of the diesel generators for the life of the plant.

j II METHODOLOGY During the implementation of the Owners Group Program Plan, the Owners l

Group Technical, Staff reviewed many sources of inform-tion regarding the i.

maintenance and surveillance for the. diesel generator components ident-ified in this Appendix.

These sources included TDI Instruction Manuals,

>> Service Information Menos (SIMS), and TDI correspondence on specific components.

This review along with Technical Staff input regarding the adequacy of the recommendations found in the sources mentioned above, and additional maintenance recommendations identified during the DR/QR review, forms the basis for the content of this matrix.

r III RESULTS AND CONCLUSIONS Proper maintenance. is important in ensuring long, reliable and satis-i factory service of the emergency diesel generators.

Maintenance work, in l

order to be effective, must be carried out thoroughly -and regularly.

It is for these reasons that a detailed schedule of maintenance servica has

.been laid out by the Owners Group for the TDI Diesel Generators at Grand

' Gulf Nuclear Power Stat. ion.

The schedule details specific components requiring maintenance on a regular basis.

This schedule separates the maintenance f activities into a daily, monthly, outage, alternate outage (every othef), 5 year and 10 year frequencies.

It should be noted here that the duration time between outages at Grand Gulf is assumed to be 18 months.

b I

O

- GG1249/1

4 Page 2 of 3 The Grand Gulf Unit 1 Diesel Engines have had extensive operating and maintenance experience.

The recommended intervals between routine maintenance items, such as inspection / cleaning of heat exchangers filters, strainers etc.,

should be adjusted based on the past experience and maintenance programs in ffect at Grand Gulf Nuclear Station.

Those less significant diesel generator system components with which standard engineering practice and maintenance will ensure continued operation, are not specifically addressed in the matrix.

Standard main-tenance practices are briefly discussed below.

The engine' and generator should be kept clean and dry at all times.

Oil and water leakage should be wiped off the unit as quickly as possible in order to assist in locating the source of leakage, prevent potential equipment damage and maintain a safe working environment.

Leaking pipes, gaskets and packing glands should be attended to promptly so as not to impair the reliability and/or operation of the system.

Flanged gasketed connections may be retightened to stop leaks and any abnormal engine noises or vibrations.

Actions required to correct any abnormal conditions should be carried out in a timely manner.

Loose bolts and electrical terminals should be attended to in a safe, practical manner.

Specific items to be maintained on a DAILY basis consist of the following:

]O 1.

Observe and-record lubricating oil and jacket water temperatures (keep warm pump running).

J 2.

Drain all low point water collectors, barring device air filter and air receiver tank float traps in the air start system.

3.

Check engine and auxiliary equipment and piping connections for oil, water, and: fuel oil leaks.

4.

Check level of lubricating oil in the governor and pedestal bearing.

l Add oil as needed.

1 5.

Check fuel oil pump rack for freedom of_ movement through full limit of travel.

Do not disconnect from governe..

6.

Check turbocharger bearing lubricating oil system sight glass for oil flow.

7.

Drain water from crankcase vent piping drip legs.

8.

Verify all. controls in proper position for standby mode.

9.

Check-all governor knob settings.

Load Maxista Droop Zero O

Speed To provide mechanical governor control at 460 rpm.

GG1249/2 Revision 1

d "D D "

~

~

J Page 3 of 3

10. Visually inspect lube oil heat exchanger and jacket water heat exchanger for signs of leakage from the lantern ring leakoff ports,

~

indicating leaking packing rings.

The following Preventive Maintenance Recommendation Matrix was designed to assist the Maintenance Department in determining the scope of work required to maintain the intended design function of the diesel generators at Grand Gulf on a planned schedule basis.

It should be followed closely and referred to often.

4 l

O d

O GG1249/3 t

.. _ g ma.

r_ ~ ['

~

'l 4

GRAIS GULF MAINTEllANCE MATRIX 3

'Camponent Component-Alt.

Number Identification FM Recommendation Monthly.

Outano-Outane. 5 Year 10 Year Comments.

F-068 Intercoolers

' 1.

Evaluate heat exchanger X

4 performance by checking engine operating parameters.

2.

Clean / inspect shell and X

Ref: Lead engine OR/QR -

ties sides every optage Report #F-068 (Items 2,3, or as necessary.

4) 3.

Visually inspect for X

Ref: 7/26/84 IOC external leaks.

free J. Cadogan to M. McGerigle, Ref: 08/14/84 letter to C. Ray from M. Lowrey 4.

The drain connection on the To be performed daily, air intake system low point should be verified open, and cleaned daily.

MP-022/3 Turbocharger 1.

Measure vibration and X-To be accomplished during check with base line data.

24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> test run.

' 2.

Clean lepeller and diffuser.

X i

'3.

Measure rotor end play X

Review thrust bearing (axial clearance) to axial clearances after identify trends of in-inspection to determine creasing clearance, f.e; if a trend exists. Any

-thrust bearing degradation.'

trend toward increasing axial clearar<e could signify thrust bearing degradation. Ref: Lead engine DR/QR Report fMP-022/3 GG1249/4-Revision 1 - Entire Page Revised I

I 9

i i -

~

}.

4 k'

r 5-~*

.~

h i

1 GRAND GULF MAINTENANCE M TRIX Component-Component' Alt.

Number'

. Identification

. PN lies;ommendation Monthly Outane Outane 5 Year 10 Year Comments 4.

Perform visual and blue X

NOTE: Thrust bearing check inspections of inspection should also' the thrust bearing.

be performed after 40 non prelubed (automatic).

fut starts. Ref: Lead engine DR/QR Report NF-022/3 5.

Disassemble inspect X

For Items 1-6, Ref; and refurbish.

IOC dated 3/23/84 free M. Wehmeyer to R. Kadlec.

6.

Perfore a spectro-X To be performed during chemical engine oil-the last monthly analysis to assist the test run prior to oil 4..

bearing monitoring change. NOTE: Sample program. To further to be drawn up stream of expand / clarify cheetcal lube oil filter.

analysis, ferrographic Ref: Lead engine DR/QR analysis may be utilized.

Report #NP-022/3 Particular attention shall be paid to copper i

level, and particulate.

size, which could signify thrust bearing degradation.

SE-025 Full Pressure Lube 011 Strainer.

1.

Record strainer d/p, X..

Use for trend data 2.

Inspect'and clean X

To be performed when

elements, the differential pressure across the strainer rises significantly.

GG1249/5 Revision 1 - Entire Page Revised I

r D

I

O O

GRAls GULF MAINTENANCE MATRIX Component Component Alt.

Number I,dentification PM Recommendation Monthly Outaes Outage 5 Year 10 Year Comments Ref: Lead engine M/QR Report #02-820H, Ref: TDI Instruction Manual, Volume I, Maintenance Schedule 3.

Lube oil strainer X

pressure gauge -

calibration clock i

00-420 Lube 011 Pressure Regulating 1.

Ofsassemble and clean.

X If valve sticks repeated-Valve ly, more frequent cleaning may be necessary. If valve plugging becomes a problem, the dimensions of the valves' internal parts should be checked to ensure proper clear-ance.

Ref: Lead engine 2.

During initial startup after DR/QR Report #00-420 a major reassembly of f

Lube 011 piping, the L.D.

regulating valve should be disassembled and cleaned untti abnormal L.0. pressure excursions subside.

00-7008 Jacket Water Standpipe: Valves 1.

Inspect the valves for X

Ref: Lead engine DR/QR packing leakage.

Report #02-7178 (Items 1,2)

GG1249/6 Revision 1 - Entire Page Revised 4

s.

GRAIS GULF MAINTEMAIIN! MATRIX

= Component Component' Alt.

l

_ Number-

. Identification PM Recommendation Monthly Outace Outaae 5 Year -10 Year Comments 2.

Replace elastomeric-X

[

parts in Circle Seal

' valves.

~ 00-700F, Jacket ifater Standpipe 1.

Visually inspect jackat Any visible cracking or and Miscellaneous Bolting water standpipe, puep einer jacket water leakage suction and engine return should result in rework

. nozzle welds during each of nozzle welds. Refr:

routine engine run and DR/QR Report 802-700F

_t every 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> during,

t extended engine runs.

02-305A.

. Base' Assembly.

1.

Perfore a visual inspection X

Note: Any cracks detected of the base. The inspection must be investigated should include the areas further before the engine

[

adjacent to the nut pockets is allowed to return to of each bearing saddle and.

service. The eating be conducted after a thorough surfaces of the base and wipe down of the surfaces, cap shall be throughly using good lighting.

cleaned with solvent.

before any reassembly.

Ref: _ Lead engine DR/QR Report 802-305A.

02-305C~

Main Bearing Caps - Studs 1.

Upon removal of bearing Refr: Lead engine DR/QR and Nuts caps, clean mating Report 802-305C surfaces with a solvent prior to reassembly of the caps to the base.

02-307B Lube 011 Tubing and Fittings 1.

Check tubing for dents X

Items 1, 2; Ref: TDI

- Internal.

or crimps.

Instruction Manual, Vol. I, Maintenance Schedule GG1249/7-Revision 1 - Entire Page Revised I.

l e

N GRAND GULF MAINTFNANCE MATRIX Component Component Alt.

Number Identification PM Recommendation Monthly Outane Outage 5 Year 10 Year Comments 2.

Perform gear-train X

spray check.

'02-310A

Crankshaft 1.

Measure crankshaft web X

Complete TDI Inspection deflection.

and Malatenance Record Form No. 310-1-1. TDI Instruction Manual, S

. Volume I Section 6.

Ref: TOI Instruction Manual, Vol. I, Main-tenance Schedule 2.

Measure diameter of This inspection is to be crank journals.

performed during major engine overhauls.

Complete TDI Inspection and Maintenance Record Form No. 310-3-1. TDI Instruction Manual, Volume I Section 6.

02-3108

. Main Bearings Shells' 1.

Inspect and measure main X

The first inspection bearing shell thickness should be performed at Inspection shall evaluate the first fuel outage bearing wear and evidence and at alternate outages.

of harmful crankshaft thereafter.

misalignment. If results Complete TDI Inspection show evidence of mis-and Maintenance Record alignment, TDI recom-'

Form No. 310-2-1, TDI mandations for crankshaft Instruction Manual, realignment should be Volume I, Section 6 -

implemented, one sheet for each main bearing. Use Volume I, Appendix III for clearance values. Ref: TDI In-struction Manual, Vol. 1.

GG1249/8 Revision 1 - Entire Page Revised l

t 4

w

)

%J V

GRAND GULF MAINTENANCE MATRIX Component Component Alt.

Number Identification PM Recommendation Monthly Outane Outane 5 Year 10 Year Comments Maintenance Schedule Ref: Lead engine DR/QR Report 802-3108 02-310C Thrust Bearing Ring 1.

Measure thrust bearing X

Complete applicable ring clearance via of sections TDI

" bump check" method to be, Inspection and Main-

\\

performed in conjunction

' tenance Record Form with crankshaft web No. 310-1-1 TDI Instruc-deflection measurements.

tion Manual Volume I-The following information Section 6.

NOTE: If should be recorded:

the clearance is

  • Date of inspection greater than the maximum
  • Hours of engine operation '

allowed in the TDI

  • Hours of engine operation Instruction Manual, since last bearing re-then at least one bearing placement (Last bearing must be replaced.

replaced:

forward Bearings should also back) be replaced if they

  • NeirTog clearance are cracked or gouged.

Ref: Lead engine DR/QR Repo-t 802-310C, Ref: 8/13/84 meno from G. McCarthy to D. Pasquale 2.

Visually inspect thrust X

To be performed simult-bearing ring for signs-aneously with main of cracks, gouges, wear bearing shell inspec-or degradation.

tion.

Ref: Lead engine DR/QR Report #02-310C GG1249/9 Revision 1 - Entire Page Revised h

m i-GRAND GULF MAINTENANCE MATRIM.

Component component' Alt.

-Number Identification PM Recommendation.

Monthly Outace Outaae 5 Year 10 Year Comments 02-311A' Crankcase Assembly-1.

Perfo m a visual inspection X.

The first inspection to be; of the vertical portion performed after 185 hours0.00214 days <br />0.0514 hours <br />3.058862e-4 weeks <br />7.03925e-5 months <br /> of the crankcase arch wall of at or near full load to the nut pocket area operation may be used to.

for indications of justify the discontinua-cracking.

. tion of further inspect-tions. 'Ref: Lead engine

.DR/QR Regiort #02-311A -

02-315A Cylinder Block 1.

Perform an inspection of.

Ref: DR/QR Report the cylir:dar block per.

802-315A DR/QR Report 802-315A.

02-315C'

Cylinder Liners 1.

Perform a visual inspection X

Borescopic inspection of liners for potential is acceptable if heads progressive wear.

are not removed.

Complete TDI Inspection and Maintenance Record form No. 315-1-1, TDI Instruction Manual Volume I, Section 6.

Ref: Lead engine DR/QR Report #02-3418.

02-317A84 Water Discharge Manifold -

1.

' Visually inspect for leaks. X This recommendation is

. Jacket Water Discharge Note: In the event of a made on the basis that 3

Piping, Couplings and Seals leak developing in the.

the maximum suggested existing Dresser Style 65 operating temperature of-

. couplings, these couplings 150*F for the Style 65 should be replaced with coupilng may be exceeded.

Dresser Style 90 couplings The maximum suggested equipped with Viton gaskets, operating temperature of the Style 90 is 212*F.

GG1249/10 Revision 1 - Entire Page Revised I

I l

2

h J

i.

GRAIS GULF MAINTENAIICE MATRIM Component Ceaponent Alt.

Number Identification PM Recommendation Monthly Outaos Outaae 5 Year -10 Year Comments Ref: Letter dated 12/13/84 from C. L.-Ray to J. George. Ref:

i DR/QR Report #02-317A&B 02-340A/B-Connecting Rods, Bushings 1.

Inspect and measure To be performed in and Bearing Shells.

connecting rod bearing conjunction with piston shell to verify lube oil pin inspection. Complete maintenance, which

.TDI Inspection and affects wear rate.

Maintenance Record Form The visual and dimensional No. 340-1-1. TDI inspection of the bearing Instruction Manual, shells should be conducted Volume I, Section 6, at the fuel outage which Appendix III for precedes 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of clearnance values. Ref:

operation by at least the Lead engine DR/QR

-sum of hours of operation Report #02-3408-in a LOOP /LOCA event-plus the expected hours of operation between outages.

2.

. Inspect and measure X

Complete TDI Inspection the connecting rods.

Maintenance Record Fors No. 340-2-1,'2, TDI Instruction Manual, Volume I, Sectica 6.

3.

Perform an x-ray examin.

This is to be performed ation on all replacement prior to installation of bearing shells to.

any replacement bearing

. acceptance criteria shells. Ref: Lead engine developed by owners DR/QR Report #02-3408 Group Technical Staff.

L l

GG1249/11 Revision 1 - Entire Page Revised l

l r-l..

l l

+

L i

et' 9

r

-2

- ~ - -.

GRAND GULF MAINTENANCE MATRIXJ Component. Component Alt.

Number Ide.5.ification PM Recommendation Monthly Outace Outane 5 Year 10 Year Comments 4.

At major engine overhauls X

If fretting has occurred, visually inspect the rack a further engineering teeth surfaces for signs evaluation will be of fretting.

necessary. Ref: Lead engine OR/QR Report

  1. 02-340A 02-340C

. Pistons 1.

Inspect and measure. skirt X

Complete TDI Inspection and piston pin.

and Maintenance Report Form No. 341-1-1. TDI Instruction Manual, Volume I, Section 6.

Use Volume 1. Section 8, Appendix III for clear-ance values. To be performed in conjunc-tion with piston pin inspection.

02-3400 Pisten Rings 1.

Inspect and measure Complete TDI Inspection replacement piston rings, and Maintenance Record.

Form No. 341-2-1 TDI Instruction Manual, Volume I, Section 6.

Use Volume I, Section 8. Appendix III for clearance values. To be perform-ed in conjunction with piston pin inspection.

i GG1249/12 Revision 1 - Entire Page Revised b

$f

A h.

GRAND GULF MAINTENANCE MATRIX Component

' Component Alt.

Number Identification PM Recommendation Monthly-Outaae Outace 5 Year 10 Year Comments 2.

. Visually inspect liners X.

Borescopic inspection for wear.

is acceptible if heads NOTE: Ring replacement are not removed. Com-and cylinder ifner plate TDI Inspection honing should be performed and Maintenance Record in accordance with TDI Form No. 315-1-1. TDI maintenance procedures.

Instruction Manual, Volume I, Section 6.

Use Volume I, Section 8. Appendix III for clearance values.

Ref: Lead engine DR/QR Report #02-3418 (Items 2,3,4) 3.

135' fuel oil spray.

X Ref: 07/31/84 memo tips may be used if from L. Swanger to inspection results D. Pasquale indicate a need for additional action to improve lubrication and reduce coke buildup.

4.

When replacing engine X

NOTE: Do no't six oil use H.D. oil that L.O. brands or types.

exceeds series 3 When changing L.O.

standards. The base replace the entire stock should be L.O. charge. Ref:

more resistant to" 08/14/84 letter to thermal degradation C. Ray from M. Lowrey.

and coke formation.

The additive package should provide high detergent dispersant properties with high GG1249/13 Revision 1 - Entire Page Revised 4

i i

l' GRAIS GULF MAINTENANCE MATRIM

.. Component-Component' Alt.

Number-Identification PM Recommendation Monthly Outane Outage.

5 Year 10 Year Comments l

I alkalinity and a high level of antiwear additive such as zinc dithiophosphate.

Total Base Number.

(TBN) should be 12' to 15 for use with

  1. 2 fuel oil and a.

sulfated ash content of 1.55 to 2.0K is preferred. An engine oil with such properties, Mob 11 guard 412 or equivalent product may be used to ensure feproved lubrication.

! 340E.

[PistonPinAssembly 1.

Visually inspect'for X.

Also to be performed i-chroes plate damage.

whenever pistons are Replace pins which show removed and disassembled chipped or blistered chrome.

to an extent that such NOTE: All new or re-inspectionis possible.

i placement pins will be Ref: Lead engine L.P. or M.P. Inspected _

DR/QR Report #02-341C, before installation in For details on acceptance.

Owners Group engines.

criteria. Ref: 08/22/84 memo from W. Littmann to D. Pasquale and Lead i

engine DR/QR Report

  1. 02-341C.

't i

l GG1249/14 Revision 1 - Entire Page Revised i

e i

1.

e a

f

<-~~\\

g J

GRAND GULF MAINTENANCE MATRIX Component.

Component Alt.

Number Identification PM Recommendation Monthly Outane Outage 5 Year' 10 Year Comments

' 2.

Inspect end plugs and Nota: This inspection is reroll or replace any to be performed whenever that are loose.

the engine is sufficantly dismantled to allow this inspection.

Ref: Lead engine DR/QR Report 902-341C 02-345A' Intake and Exhaust Tappet 1.

Inspect intake and exhaust X

Complete TDI Inspection Assembly tappet assembly condition.

and Maintenance Report Form No. 345-1-1, TDI Instruction Manual, Volume I, Section 6.

Ref: TDI Instruction Manual, Vol. 1 Main-tenance Schedule Ref: TDI Letter dated 2/16/84 from D. Schmitz to J. Kammeyer.

(Ref. IOC 09/14/84 from J. Carbonaro to D. Pasquale).

2.

Verify that can rollers X

Complete TDI Inspection are free to rotate, and and Maintenance Record

(

l that there is no Form No. 345-1-1 TDI measurable clearance Instruction Manual, Vol.

-between the can I, Section 6.

Raf:

rollers and the roller Lead engine DR/QR Report pins.

  1. 02-345A GG1249/15 Revision 1 - Entire Page Revised L

4 l

]

f\\

i:

%J iy.

I, GRAls GULF MAINTENANCE MATRIX i Component.

' Component Alt.'

Number

' Identification -

PM Recommendation

Monthly Outane Outane 5 Year 10 Year Comments s

02-3458' Fuel Tappet-Assembly 1.

Inspect fuel tappet-X Complete TDI Inspection assembly condition.

-.and Maintenance Report Form No. 345-1-1. TDI.

' Instruction Manual, Volume I, Section 6.

Ref: TDI Instruction Manual, Vol. 1. Main-tenance Schedule 2.

Verify t*.at can rollers.

X Complete TDI Inspection are free to rotate, and and Maintenance Record that there is no measurable-Form No. 345-1-1 TDI clearance between the Instruction Manual, can rollers and the roller Vol. I, Section 6.

pins.

Ref: Lead engine DR/QR Report #02-3458 02-350A

~Can Shaft Assembly 1.

Perform a visual inspection X

Any signs of cracking, of all cas lobe surfaces pitting or spalling shall i =

for signs of cracking, be followed by a detailed pitting or spalling.

analysis to evaluate the expected 11fe based on the size and exteat of surface distress and I

any corrective measures shall be implemented as indicated by this analysis. Signs of spalling shall result in tamediate replacement of 1-the can.

Ref: TOI Instruction Manual, Vol. I, Main-tenance Schedule, Ref: Lead engine DR/QR Report #02-350A

- GG1249/16 Revision 1 - Entire Page Revised I

4 1

M

C O

Z GRANO GULF MAINTENANCE MATRIM

. Component

. Component Alt.

5 Nweber Identification-PM Recommendation Monthly Outaae Outaae 5 Year 10 Year Comments 02-3500 Can Shaft Searings 1.

Inspect and measure cam X

Complete TDI Inspection -

shaft bearing shells, and Maintenance Record Form No. 350-1-1. TDI Instruction Manual, Volume I, Section 6.

Use Volume I, Section 8 Appendix III for clear-ance values.

02-350C.

Can Gear 1.

Visually inspect can gear:

X.

Ref: Memo from 8.

for chipped or broken 8tekford to E. Montgomery teeth, pitting, excessive' dated 6/23/84,.

wear, or other abnormal Ref: Lead engine conditions.

- DR/QR Report #02-350C 2.

Measure gear back lash.

X Complete applicable NOTE - if can gear hub is' sections of TDI Inspec-removed.-it is ESSENTIAL tion and Maintenance that the nut be relocked Record, Form No. 355-1-1, at the position corres-TDI M nual Volume I, i-ponding to the pre-Sectir.o 0, Appendix.

scribed torque range of III-1 for clearance 80 (-0+10) ft-lbs.

values. Ref: Lead Insertion of,the cotter-engine DR/QR Report pin must be accomplished

  1. 02-350C at a torque > 80 ft-Ibs

' force and < 30 ft-1bs

~

force. If this is not possible another bolt, nut or washer should be used.

4 GG1249/17 Revision 1 - Entire Page Revised t

l i

1 A

e

.n...

l

]

j GRAND GULF MAINTENANCE MATRIM P---

-t Component.

Outane 5 Year. 10 Year Comments Alt.

Number Identification-PM Recommendation.

Monthly Outace L

-The above is applicable to 4-bolt arrangeents only.

The torque range for 6-bolt arrangements is 70 1 20 ft-lbs with the ssee restric-tions as described above for insertion of the cotter' pins.
  • 355A Crank to Pump Gear-

- 1.

Visually inspect crankshaft X

Arty abnormal situations to lube oil pump gear or indications of for chipped or broken teeth, progressive pitting.

excessive wear, or should be reported progressive pitting for an engineering or other abnormal evaluation.

conditions.

Ref: Lead engine DR/QR Report #02-355A

- 2.

. Measure gear backlash.

X Complete applicable sections of TDI Inspection and Main-

.r tenance Record Form.

Mo. 355-1-1 TDI Manual, Volume I, Section 6.

Use Volume 1. Section 8, i

Appendix III-1 from clearance values.

Ref: TDI Instruction Manual, Vol. I, Main-t

,c

-tenance Schedule i

GG1249/18 Revision 1 - Entire Page Revised 4

e b

7 e

a g,

e

,o v-,

~.

l GRM S GULF MAINTENANCE MATRIX Component'.

Component Alt.

Number Identification PM Cecommendation Monthly Outage Outage 5 Year 10 Year Comments 02-3558

' Idler Gear Assembly 1.

Visually inspect idler X.

Any abnormal indications gears for chipped or should be reported for an broken teeth, excessive engineering evaluation.

wear pitting, or other Ref: Lead engine DR/QR abnormal conditions.

Report #02-3558 2.

Measure gear backlash.

X Complete applicable NOTE: If idler gear hub is sections lof TDI Inspec-

-removed, it is recommended tion and Maintenance that the nut be relocked at Record Form No. 355-1-1.

the position corresponding TDI Instruction Manual, to the torque of 70120 ft-

"/ol.-I, Section 6, use 1bs. Insertion of the cotter Vol. 1. Section 8. Appen-pin must be accomplished at' dix III-1 for clearance a torque 1 50 ft-lb and.1 values.

90 ft-Ib.

If this is not Ref: TDI Is.struction possible, another bolt, nut Manual, Vol. I, Main-or washer.should be used.

tenance Schedule Raf: Lead engine DR/QR Report #02-3558 02-359 Air Start Valves-1.

Remove, clean and inspect X

Ensure valve insta11ation air start valves.

includes retorque (Replace copper valve-requirements.

to head gasket)

Ref: DR/QR Report

  1. 02-359 (Items 1, 2, 3) 2.

Inspect the piston, cap, X

guide and housing sliding surfaces'to evaluate i

wear or corrosion.

4 1

GG1249/19 Revision 1 - Entire Page Revised k

1 3

e

GRAND GULF MAINTENANCE MATRIX Component Component Alt.

Number Identification FM Recommendetion Monthly Outace ~Outace 5 Year 10 Year Comments 3.

Ensure that the desiccant' To be performed daily.

dryer between the air Ref: DR/QR Report compressor after cooler

  1. 02-359 and the air receivers

.is working properly by blowing down the air receivers daily, and monitoring the moisture content.

02-360A-

' Cylinder. Head 1.

Visually inspect cylinder ~

X Complete TDI Inspection heads (all cylinders).

and Maintenance Record Fors No. 360-1-1. TDI Instruction Manual, Volume I. Section 6.

One sheet for each head.

2.

. Record cold compression X

If so indicated remove pressures and maximum cylinder heads,. grind firing pressures.

valves and reseat.

Ref: TDI Instruction Manual Volume I, Section 6.

3.

Blow-over the engine with In the event water is starting air per TDI main-detected, the cylinder tenance requirements, Volume head should be replaced I or at appropriate intervals or returned to the after shutdown of vendor for repair.

the engine to ensure Ref:. Lead engine DR/QR against harmful effects Report #02-360A of water leaks.

L GG1249/20 Revision 1 - Entire Page Revised I

b 4

p.

I

GRAND GULF MAINTENANCE MATRIX Comp >nent Component Alt.

Mumber Identification PM Recommendation Monthly Outap Outage 5 Year 10 Year Comments I

4.

Visually inspect the X

If water leakage is fuel injection port on detected, the head (s) each cylinder head should be replaced.

"during" the normal Ref: Lead engine monthly engine run DR/Qlt Report #02-360A for water leaks.

'02-3608 Cylinder Head - Intake and 1.

Visually inspect intake X

Complete the appilcable Exhaust Valves and exhaust valve, discs, sections of TDI Inspection stems and seats for wire and Maintenance Record drawing, pitting, distortion.

Form 360-2-1.

concentricity, or any abnormal condition.

2.

Visually inspect subcovers This is a one time caly for evidence of valve inspection to be per-guide blowby (soot).

formed after 500-600 hrs. of engine operation after rebuild of the cylinder head. Ref:

Lead engine DR/QR Report #02-360B i

3.

Measure intake and exhaust X

Complete applicable valves t. sad thickness.

sections of TDI Inspection and Main-tenance Records Form 360-2-1. TDI Instruction Manual, Volume I, Section 6.

One sheet for each cylinder. Use Section 8 Appendix III for clearance values. (Items 3, 4)

GG1249/21 Revision 1 - Entire Page Revised i

4 e

f~%'

O

%./

0 GRAND GULF MAINTENANCE MATRIK Component Component Alt.

Number Identification.

- PM Recommendation Monthly Outage Outane 5 Year 10 Year Comments-

. 4.

Measure intake and exhaust X

Complete applicable valves - valve-to-guide sections of TDI-,

clearances.

Inspection and 'ain-A tenance Record Form 360-2-1, TDI Manual, Volume I, Section 5.

One sheet for each cylinder.- Use Section

8. Appendix Il for clearance values.

t 02-362A Cylinder Head Covers -

1.

Perform a liquid penetrant X

This inspection is to Subcover Assembly examination of the rocker be performed in conjunc-are pedestals between the tion with the rocker counter bores and top are bushing inspections i

'and vertical machined when the rocker are surfaces (connector shafts are removed from pushrod side only),

the subcovers (Ref:

Lead engine DR/QR Report #02-390E) or when the rocker are shaft assembly is removed. Subcovers with pedestal cracks

'that extend through the counter bore web down to the threads should be replaced. Ref: Lead j

engine DR/QR Report

  1. 02-362A s

a GG1249/22 Revision 1 - Entire Page Revised 0

~...

I

~

J -

J l GRAND GULF MAINTENANCE MATRIM Component : Component

. Alt.

Number Identification PM Recommendation Monthly Outaos ' Outaos 5 Year 10 Year Comments 02-365A Fuel Injection pumps 1.

Tear down one pump for X

Use representative pump inspection, to determine need to-

. overhaul other. pumps Ref: TDI Instruction Manual, Volume I, Maintenance Schedule 2.

Complete fuel injection X

Based on' inspection re-pump inspection in

.sults and operating a cordance with TDI parameters. NOTE '

Instruction and Main-Olsassembly of fuel tenance Manual Volume I.

injection pumps should be performed by a Bendix-Corp. representative.

Complete TDI Instruction and Maintenance Record Fora No. 365-1-1, Section 6. Items 1, 2 Ref: 3/26/84 IOC from M. Wehmeyer to T. Fritsch, Ref: 4/27/84 Letter from R..Johnston to R. Jaquinto, Ref: TOI Instruction Manual Section I.

Maintenance Schedule for Item 3. Ref: Lead engine DR/QR Report

  1. 02-365A (Items 2&3).

s 1

1

.GG1249/23 Revision 1 - Entire Page Revised i

)

)I 4

th

E l

GRM S GULF MAINTENANCE MATRIM

Component Component

' Alt.

Number Identification PM Recommendation Monthly Outage Outane 5 Year 10 Year faaments

.02-3658 Fuel Injectior Nozzles.

1.

Remove, inspect and clean X

Ensure that a new copper.

l

tips, gasket is used upon reinsta11ation of i

nozzle into head.

Complete TDI Inspection and Maintenance Record Form 365-2-1 Instruction Manual, Volume I.

Section 6.

Ref:. TDI Instruction Manual, Vol.

I, Section 5, Maintenance Schedule Ref: Lead engine DR/QR Report #02-3658 (Items 1-4)-

L 2.

Check nozzle pop pressure.

X 3.

Check spray pattern.

X 4.

Check assembly for X

To be performed with the

leakage, engine running during the monthly test run.

Ref: Grand Gulf DR/QR i

Report #02-3658 Task Description.

02-365C '

Fuel Injection Tubing-1.

Check tubing for leaks X

All fuel oil leak inspec-at compression fittings, tions to be performed while the engine is running.

1 I

GG1249/24 Revision 1 - Entire Page Revised

v..

GRAND GULF MAINTENANCE MATRIX Component Componaat Alt.

Number Identification' PM Recommendation Monthly Outage Outace 5 Year 10 Year Comments 2.

Visually inspect tubing X

Fitting inspection for lengths for F.O. leaks leaks to be performed or cracks, at first engine opera-tion following the installation of tubing.

Subsequent inspections to be performed period-ically as indicated.

Fuel oil leakage from shrouded fuel oil lines t'

can be detected at the leakoff ports in the base nutsi which are provided for this purpose. Ref: Letter from C. A. Malovrh to V. A. Saleta dated 08/30/84 02-371A Fuel Pump control Shaft Check lube ' ll cups X

Ref: Lead engine DR/QR o

and fill cs necessary.

Report #02-371A 02-3718 Fuel Pump Linkage Assembly 1.

' Grease swivel link on, X

and Bearings F.0. pump assemblies all cylinders.02-375 Intake Manifold 1.

Care should be exercised If required, other castings-in assembly of cylinder may be tried to achieve heads onto the engine, an acceptable fit or bolt to avoid cracking of-hole diameters may be in-the intake manifold creased to 1/8" oversized.

elbows.

Component should under no circumstances be jacked to fit. Ref: Lead engine frR/QR Report #02-375 GG1249/25 Revision 1 - Entire Page Revised 4

6

_~

1 h.

GRAND GULF MAINTENANCE MATRIX Component Component.

Alt.

Number Identification PM Recommendation Monthly Outace..

Outaae S Year 10 Year Comments' 02-3804 Exhaust Manifold 1.

Visually and NT examine.

X.

To be performed during a sampling of circum.

.the first refueling forential pipe welds and outage and alternate corresponding heat-outages thereafter.

affected zones. This However, diesel examination is to.

operation should not -

be performed in exceed 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> be-accordance with Impell tween inspections.

memo from G. Shears.

Ref: 4/24/84 Letter to J. Kammeyer dated from A. Zeuthen to

,t.

08/13/84.

E. Montgomery Ref: Lead engine DR/QR Report

  1. 02-380A 02-385A :

Crankcase' Relief Valve-

~ 1.

Clean flame arrestors.

X Ref: 3/26/84 IOC from M. Wehmeyer to J. Kammeyer 2.

Inspect seat and disc.

X 02-387A Crankcase Vacuum Fan 1.

Clean and inspect fan.

X Refr: 3/26/84 IOC from M. Wehmeyer to J. Kasseyer 2.

Clean motor and check X

bearings for roughness.

I 02-390E

. Rocker Arm Bushings 1.

Visually inspect and The visual and dimensional measure intake rocker are inspection of the rocker bushings.

are bushings should be conducted at the fuel outage which precedes 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> of operation i

GG1249/26 Revision 1 - Entire Page Revised 4

J t

\\.

J L

r.

k i

A

w J-54w-

)

.a

~

ce

,a E '.,

GRAND GULF MAINTEN *CE MATtiX Component CamponerA P.

Alt.

-Number Idet.tf41 cation '

PM Recosumendation Monthly

' Outag Out4qe 5 Year 10 Year Comments i v; by at least the sus of expected hours et

.- a, -

operation in a LOOP /LOCA-event plus the expected.

a hours of cotrat!on.

+

.,Tg, between outages. This inspection schedule,

may be revised after

.1 the first or subsequent p;,.

. ^ '

Inspection results a-justify a' longer period

)

of engine operation e

p..;w

~ N between inspections. Ref:

w;

,,N 7/31/84 meno from G.

McCarthy to D. Pasquale g

(Items 1, 2, 3) l T

Not to,Aceec 1300

.1

. ! 2. 3 VisoallyJnapect and i;..

nessure exhaest rocker are oushingi.

~

V maximum hoors of engine s

^

operation,between

+

1

-y inspections as g,

i X
f described above.

2

i..

y

<1, 3.

Visually inspect Ond' 1,

- measure. intermediate' Not to exceed 730

~

L maximum hours'of' engine s

i rocket ars bush %gs.

operation bet'neen e

inspection'as descrit,ed p,

^

'M above.

s

/ %, C 3':s4,:

<.,,'y 3

i c

y

-J

~h W m.Qic Valve Lifters 1.,t. Check' valve lash.

L X

L :. y u

~

N 2.

Acinji.ellandadjust X

Ensure lifters are L

if' f..

lifters - perfore installed with the fill leak denn test.

T holes up.

- e s

?)

j' GG1249/27.

N

,i.

7 Revision 1 - Entire Pege Reviseo

t V

lL u

f, N

3

,i 1

/

v nn +

  1. '~

q

.h s

3 >, V; 9 e

c T.-

l

].

j-.

../

\\

g e

s,

k, gj-u

\\

j-t.

.f

,4

'..O.

...N'-

[.

E ',. "

~...,

f,

~

J.

. '.f

[#

v. wu e

9 o

. 17 4 '-

g

-M L

1 o

.s

~

,e GRAND TULF MAINTENANCE MATRIX Cocyonent Component Alt.

?

,;f }w*aer Identif*4;;t w PM Recommendation Monthly Outage Outaci 5 Year 10 Year Comments s

y es.

i

\\

F Verify condition of '

C+C lifters via cov arison L

of lifter leak down f

r rate (actual) to specifications noted j ff G.

on TDI. Haint Manual.

Ref: TOI liaint. Manual Section 6-B-5.

Ref:

04/16/84 letter to 7

R. Johnson from A.

Jaquinto, j

1 02-360G Rocker Ars Caperws, 1.

Verify capscrew torque k

This inspection shovid be Drive Studs (Pop Rivets) values p rformed at eacn outage if the rockee arms are j

g dissassembled for l

'A

+

inspection.

[

p use TOI Instruction Manual, Volume I, l

Section 8 Appendix i

r

,s IV for proper torque i

=

valces.

1 y

j 2.

Verify that rocker ara X

Ref: Lean engine DR/QR drive studs are intact Report #02-390G (Items and tight.

1,2)

M g

s.

s,

/

,/

l r

GG1249/28 Revision 1 - Entire Page Revised l

I l

i N

l b

7_

~

k l

l E

b

1 l

GR408 GULF MAINTENAllCE MATRIX

.Camponent. ' C- ; - _ _t

' Alt.

Nueber Identification -

PM Recommendation

. Monthly Outace ~Outaae 5 Year-10 Year. Commevcs

.02-410A Overspeed Trip Governor.

.1.

Check trip set point X

Modify the surveillance.-

- adjust as required.'

testing procedure to Note: 'After setting the.

. include verification 4

4.

overspeed governor, the that the overspeed trip i

-adjustment screw settings is correctly set to an should be marked with overspeed trip setting :

' Torque-Seal to reveal.

of 518 rpe il X every any unintended changes outage. -

in the set positions.

. Ensure that the electric governor and the mechanical

. backup governor setting are properly returned to their normal settings following

~

1 the overspe*d test. The test is to be performed with no load on the engine by increasing the normal governor speed setting (s) until a trip occurs. After s

several inspection periods, the history of the required adjustments should be reviewed to evaluate and possibly modify the testing interval.

.Ref: Lead engine DR/QR Report #02-410A i -

1.

Remove plugs from housing X

Ref: IOC dated

^2-4108

. Overspeed Trip Governor.

and check for magnetic

-03/27/84 from-and. Accessory Drive

' particles.

M. Weyneyer to N. Cooperrider.

(Items 1,2,3)

GG1249/29 Revision 1 - Entire Page Revised 9

v m

>=

y

C C

O GAAfB GULF MAINTENANCE MATRIX Component-. Component -.

Alt.

-Number Identification '

PM Recoemendation Monthly Outace Outage- - 5 Year 10 Year Comments

' 2.

Check shafts for excessive X

radial and axial movement.

3.

Visually inspect accessory X

drive gear for excessive.

wear.

02-410C Overspeed Trip Drive Couplings

.1.

Remove the present L-110 To be completed at Lovejoy couplings and the first refueling replace them with new outage.

units in accordance with SIM 363 and DR/QR Report recommendations.

2.

. Verify that coupilng is X

tight on shaft.

3.

Replace the Love!'s coupling X

Replace elastomer if spiders or test coupling hardness is greater elastcaer for hardness.

than 90 Shore A.

Ref: Lead engine DR/QR Report #02-410C (Itees 1,2,3) 02-4100 Overspeed Trip Vent Valve 1.

Disassemble and replace

'X Ref: Lead engine i

"0" Rings.

DR/QR Report #02-4100 02-411A Governor Drive - Governor 1.

Visually inspect drive X

and Tachometer Drive Gear

. gear and shaft for signs j

and Shaft of wear.

GG1249/30 Revision 1 - Entire Page Revised P

i GRAND GULF MAINTENANCE MATRIX

~ Component Component-Alt.

~ 5 Year. 10 Year Comments Number Identification PM Recossendation

.. Monthly Outane Outace 02-4118 Governor Drive - Couplings,.'

1.

Check that coupling is X

If the coupling is four.J Pins and Keys tight on shaft.

to be loose, it should.

be removed, all mating

~

surfaces cleaned, and the unit reassembled.

using Loctite 609 on the mating surfaces.

Ref: Lead engine DR/QR Report #02-4118 (Items 1&2) 2.

Replace elastomeric X

insert in the Koppers coupling.

3.

Replace the present Ref: Lead engine DR/QR neoprene elastomeric Report #02-4118 inserts in the Koppers couplings before placing the engines into emergency STAND 8Y service.

02-413A Governor Linkage 1.

' Install positive locking Ref: Lead engine DR/QR hardware to the lever are Report #02-413A (Items clamp bolt heads and shaft 1-4) roll pins. NOTE: To be perforised as necessary after tightening gov-ernor linkage hardware to design torque specifi-cations.

GG1249/31 Revision 1 - Entire Page Revised

.t i

. _ ~

O GRAND GULF MA.NTENANCE MATRIX-Component-Component Alt.

Number

' Identification ~

PM Recommendation Monthly Outace Outace 5 Year-10 Year Comments 2.

' Inspect for loose parts

'X on the linkage assembly.

3.

Lubricate cross shaft X

bearings cups.

4.

Grease the rod end X

fittings, especially those at the ends

.of the cross shaft.

02-4138 Fuel Pump Linkage: Autcoatic 1.

Check cylinder for X

To be accomplished during Shutdown cylinder extension and return.

controls system check.

2.

Check tallrad vent X

To be accomplished during for air leakage.

controls system check.

Items 1, 2; Ref: IOC dated 3/26/84 from M. Weheeyer to R. Kaklec.

' 02-415A Woodward Governor 1.

Drain, flush, refill and X

NOTE: Venting the vent actuator oil system hydraulic actuator shall with new oil from a be performed per the clean container ensuring Woodward manual if more the appropriate cleanliness than a half quart of procedures are followed.

oil is added.

GG1249/32 Revision 1 - Entire Page Revised i

t p'

no

i L-o o

Os v

l GRAND GULF MAINTENANCE MATRIM Component Component-Alt.

Number Identification

'PM Recommendation Monthly Outace.

Outane 5 Year 10 Year Comments 2.

. Disassemble. Clean and X

' Items 1, 2, 3; Ref:

Refurbish the actuator.

03/27/84 IOC from M. Wehmeyer to N. Cooporrider.

Ref: TDI Instruction Manual volume I. Section

5. Maintenance Schedule 3.

Replace flex element X

Ref: Lead engine DR/QR for governor drive Report 802-4118 Governor-coupling.

Drive Couplinas 4.

. Verify all gc'. N r X

A1) knob settings should control knob settings be secured with a.

are in appropriate commercially available positions:.

product such as LOAD - Maximum Torque-Seal.

DROOP - Zero Speed - To provide mechanical governor control at.460 rpm.

5.

Modify the surveillance X

Note: These tests shall testing procedures to include examinations of include an evaluation of the engine speed transient the governor settings by during start and transient means of the two tests below:

Ioading conditions.

In-cluded as part of the GG1249/33 Revision 1 - Entire Page Revised 4

e a

GRAND GULF MINTENANCE MTRIX Component Component Alt.

Number-Identification PM Recommendation Monthly Outage Outage 5 Year 10 Year Comments a)

Perform a test of' above tests is the verift-the governor settings cation that the engine set while under mechanical /

speed of 450 rpm is not-electrical governor exceeded by more than 11.2 control, with the diesel' port ont (500 rps max.)

generator off the grid eithar during an engine in the isochronous mode, start or during the largest single idad reduction.

b)

Perform a test of the Ref: Lead engine DR/QR governor settings while Report #02-415A.

under mechanical (only) governor control, with the diesel generator off the grid 11 the isochronous soie.

6.

Augment the setting Ref: Lead engine DR/QR adjustment procedures as Report 802-415A.

described in the Woodward Manuals to include tests of the governor response during an engine start to ensure agreement with the specifications as detailed in Item #5.

t 02-4158 Governor Booster Servosotor 1.

Clean, inspect, and X

Refr: 3/27/84 IOC from replace "0" - rings M. Wehmeyer to and gaskets.

J. Kammeyer 02-415C Governor Heat Exchanger 1.

Clean and inspect.

X GG1249/34 Revision 1 - Entire Page Revised 4

1 I

i

.v\\

s GRAND GULF MAINTENANCE MATRIX Component Component Alt.

Number

' Identification

'PM Recommendation Monthly Outane Outace 5 Year 10 Year Comments 02-425A Jacket Water Pump - Gear 1.

Visually' inspect jacket X

Any abnormal situations water pump gear for or indications of pro-chipped or broken grossive pitting should teeth, excessive wear, be reported for an or potential / progressive engineering evaluation.

-pitting or other Ref: Lead engine OR/QR abnormal conditions.

Report #02-3558 1

2.

Check the key to keyway X

This along with the drive interface for a tight fit of the impeller on fit on both the pump to the shaft will preclude.

shaft to impeller, and past problems where-the spline to pump relative motion between shaft during pump shaft and impeller caused i

reassembly.

fretticg and upset of the keyway sides. Ref: Lead

. engine DR/QR Report

  1. 02-425A.

3.

.It is recommended that Ref: Lead engine DR/QR the castle nut that Report #02-425A. To drives the external be performed upon spline on its taper, reassembly.

i have minimum and maximum torque values of 120 ft-lbs and 660 ft-1bs, respectively.

i' GG1249/35 Revision 1 - Entire Page Revised

$4

Cm O

U

/%

l GRAND GULF MAINTENANCE MATRIM Component Component..

- Alt.

Number Identification PM Recommendation Monthly Outace

~0utane 5 Year ' 10 Year Comments02-437 Turbo Water Piping -

1.

Visually inspect for-leaks. X This recommendation is.

Pipe and Fittings

. Note: In the event of a

~ made on the basis that leak developing in the the maximum suggested existing Dresser Style 65 operating temperature of.

couplingt, these couplings 150*F for the Style 65 should be replaced with coupling may be exceeded.

Dresser Style 90 couplings The maximum suggested equipped with Viton gaskets.

operating temperature of

-the Style 90 is 212*F.

Ref: Letter dated 12/13/84 from C. L. Ray to J. George.

02-441A Starting Air Manifold:

1.

Ensure that the starting X

Ref: 08/27/84 Memo'from Air Vent

. air manifold vent is W. Littmann to J. Cadogan, open and effective.

Ref: Lead engine DR/QR Report #00-442A (STAD) 02-441B Air Filter to Starting Air 1.

Inspect filter elements.

X Replace as necessary.

Distributor Ref: TDI Instruction Manual Vol. I, Main-tenance Schedule Ref:

Lead engine DR/QR Report #02-441B 2.

Replace filter elements.

X It is also recommeaded that the filter be changed at a maxJaum pressure drop of 25 psi. Ref: Lead engine DR/QR Report

  1. 02-441B

- GG1249/36 Revision 1 - Entire Page Revised 1

4 7

\\

I' GRAIS GULF MAINTEhANCE MATRIX l

' Component -Component Alt.

l Number Identification'

'PM Recommendation Monthly Outane.Outace 5 Year 10 Year. Comments

' Strainer - Starting 3.

Slow down strainer DAILY.

Ref: Lead engine OR/QR Air System '

Report #02-4418 4.

Clean and inspect strainer X If the st'rainer is

monthly, excessively dirty, the frequency of cleaning i

and inspecting should be increased. Ref:

Lead engine DR/QR Report #02-4418 Air Start Block Valves 5.

Clean, refurbish valves X

Ref: Lead engine DR/QR

-replace "0" rings and

-Report #02-4418 (Items clean the screened 5,6,7) fitting. Ensure leak tightness after reassembly.

6.

Inspect for tightness X

of fittings and bolts

.and apply locking com-pound, as required during reassembly of components.

7.

Replace the "0"-rirbe X

of the shuttle valve.

02-442A Starting Air Distributor 1.

Visually inspect the X

Evaluate the degree of Assembly poppet valve spool ends wear to determine and timing can of the whether existing starting air distributor.

condition would have an adverse effect on timing and the specified ability to start the engine.

GG1249/37 Revision 1 - Fntire Page Revised 9

3

$9' n

O

)

GRAle GULF MINTENANCE NATRIX Component Component Monthly Ontage'-

Outace S Year 10 Year Comments.

Alt.

Number

. Identification PH Recommendation.

s 2.

Ensure that the starting.

X Ref: Lead engine DR/QR -

air manifold went is.

Report 600-44'A (STAD) ~~

open and unobstructed.

(Items 1 &'2) 02-455A~

. Fuel Oil Filter 1.

Record filter d/p.

X Change' filter elements.

at or before the filter ld/p reaches 20 psid rise above the clean d/p -

Purge entrapped air from

'the filter canister using the vent valve provided,.

,and divert some fuel.

oil into the newly replaced cartridge.

After air has been purged close vent valve and return handle to previous ope.ating position. Ref: toad engine DR/

  1. 02-455A.' QR Report 2.

Inspect canister gaskets X

To be performed during and replace as necessary, change cut of filter elements.

Ref: 03/27/84 IOC from M. Wheeyer to J. Disare.

- 3.

Inspect tubing and mech-X

.anical connections for tig' tness and/or leaks.

1

- GG1249/38 Revision 1 - Entire Page Revised E

0 t

}

+ -

m I

L GRAIS GULF MAINTENANCE MATRIX--

Component P:- Trt Alt.

{

Number Identification

.PM Recommendation Monthly Outaae Outaae-5 Year.10 Year. Comments' 02-4558-

' Fuel 011 Strainers..

1.

Record stritner d/p.

X If greater than 5 psid-shift / clean element.'

e; Ref: Lead engine DR/QR' Report 802-4558 (Items 1&2)

'2.

Clean strainer elements.

X i.

3.

Purge air free stand-by As required.

strainers 02-467A

. Turbocharger Lube Oil 1.

Visually inspect for leaks.

X-This recommendation is Fittings Pipe Tubing, Fittings,

. Note: In the event of a made on the basis that-and Flexible Coupling

. leak developing in the the maximum suggested.

(Sea 11 Bore Scope only) existing Dresser Style 65 operating temperature of a

couplings, these couplings 1150*F for the Style 65 should be replaced with -

coup ing may be exceeded.

Dresser Style 90 couplings The mas:taum suggested i

equipped with Viton gaskets.

operating temperature of the Style 90 is 212*F.

Ref: Letter dated

>1 12/13/84 from C. L. Ray to J. George. Ref:

DR/QR Report #02-317A&8 t

-[

[..

- GG1249/39 Revision 1 - Entire Page Revised i

i

~. -

~_

4 GRM S GULF 80AINTEllAllCE IIATRIX Component P 7 it Alt.

Ilumber Identification ~

Plt Recommendation Isonthly

-Outane Outaae 5 Year -10 Year ' Comments

02-475A C Turbocharger: : Bracket 1.

Ec:h month for the first

[Refs OR/QR Reports I

- Bolting and Gaskets three months of commercial

  1. 02-475A.C-operation these screws should be inspected to assure that no screw

.has loosened because

'of engine operating loads. If during these inspections none of the screws are found.

loosened or oamaged, from then on inspections are to be conducted on-

ayearlybasis(or

. during plant shutdown).

But if any time during' inspectica any screw is found loosened or damaged, it must then be s

replaced (if damaged) and all screws retorqued as follows; 125 ft-Ibs for the bracket to

. engine screws.and 75 ft-lbs for the bracket to turbo base screws, foote: To avoid damage 1.

to bracket to engine, and/or bracket to turbo, base screws, the proper

-torques as delinated above should be utilized for each respective

-bracket bolting

-application.

ee GG1249/40 Revision 1 - Entire Page Revised t

t l.

i.

W l-r

~

l 1

-GRAND GULF MAINTENANCE MATRIX Component Component' Alt.

Number Identification PM Recommendation Monthly Dutaae Outaae 5 Year 10 Year Comments j

02-4758

. Air Butterfly Valve 1.

Lube valve shaft X

. Ref: IOC dated 3/28/84 via grease fittings.

from M. Wehmeyer to J. DiMare. If o11 cups are used, this should be completed monthly.

2 Check valve disc for X

Check by visually observ-i freedom of movement, ing valve / actuator oper-ation.

Ref: 04/16/84 letter from R. Jaquinto to f

R. Johnson 3.

Verify that associated

-X Ref: DR/QR Report locking devices (jam

  1. 02-4758 nuts and lock washers).

are tight.

02-5004 Engine Control Cabinet 1.

Inspect interior of cabinet.

X Ref: 3/29/84 IOC for cleanliness and clean from M. Wehmeyer.

I as required.

to T. Jacobs for Items 1-5 Ref: 07/30/84 IOC from J. Cadogan to K. More11k for Items 1-6 2.

Visually check wiring for X

insulation degradation.

3.

Visually check instrument X

tubing for leaks.

t GG1249/41 Revision 1 - Eatire Page Revised i

i 4

s.-

fl..

. ~. -.. -.

w GRAND GULF MAINTF1ANCE MATRIX Component Component Alt.

Numtwr Identification PM Recommes<iation Monthly Outace Outane 5 Year 10 Year Comments 4.

Functionally check cabinet X

heater and calibration of thermostat.

5.

Test pneumatic 5/D board X

logic.

6.

Replace "0"-Rings, gaskets X

and filter in pressure

-regulator.

02-500C Circuit Breakers and Contact 1.

. Check all terminals X

To be accomplished during Blocks clean / tighten.

panel clean / inspection.

2.

Visually check wiring X

To be' accomplished during' insulation for degradation.

panel clean / inspection.

' 2.

Trip' check circuit breakers.

X 02-500G Control Panel Valves

1. - Inspect and clean control X

This recommendation ~

panel valves.

interval should be reassessed depending.

on the degree of system fouling. Ref: Lead engine DR/QR Report

  1. 02-500G 2.

Inspect and clean the X

Ref: 06/25/84 IOC 200 mesh screen of check from K. King to valve.

B. Brown

. GG1249/42 Revislon 1 - Entire Page Revised i

it l

l

/%

' )

GRAND GutF MAINTENANCE MATRIX P------

t Component Alt.

_ Number Identification FM Recommendation Monthly Outaes Outage 5 Year 10 Year Comments 02-500J Control Panel Assembly:

1.

Inspect contacts and clean X

Ref: 08/10/84 IOC from

. Relays as required.

K. Hore11k to J. Cadogan 2.

. Visually check condition X

of wiring and tightness of terminations.

LO2-500N Control Panel Switches Terminal. 1.

Clean terminal boards and X

Ref: IOC dated 3/29/84 Boards and Wiring

~ switch contacts.

to J. Kasseyer from M. Weheeyer for Items 1, 2, 3.

5 2.

Visually check wire insul-X ation and terminals for tightness and degradation.

3.

Inspect for arcing and.

X overheating.02-515 Thermostatic Valves 1.

Replace thermal power X

Ref: Lead engine DR/QR elements.

Report #02-8100 2.

Visually inspect valve X

To be accompitsbed body for evidence of during monthly test leakage.

run. Insure that any replacement valves have cast steel valve bodies.

02-5258-Barring Device Control Valve 1.

Replace Control Valve X

'.snd Press Regulator "0" rings / lube shaft.

2.

Replace press regulator X

elastomeric parts.

GG1249/43 Revision 1 - Entire Page Revised P

l or 2

=

9

.CD..

)

NM GRAND GutF MAINTENANCE MATRIX Camponent Component Alt.

Number Identification

_PM Recommendation Monthly Outaae Outane 5 Year 10 Year Comments 02-525C Barring Device Air Filter 1.

Replace filter. element.

X Ref: 3/30/84 IOC from M. Wehmeyer to J. Freeman 2.

Drain barring device air This should be perf ormed.

filter. *See Comments

  • on a DAILY basis when barring device is in use.

Ref: 5/10/84 IOC :

'from M. McGerigle to W. ::mn 02-550 Foundation Bolts 1.

. Visually inspect founda-X Items 1, 2; Ref:-TDI tion for breaks in the Instruction Manual, bond between the sole Maintenana:4 Schedule, plates and grout.

Section f.

2.

Check foundation bolts X

Use TDI Instruction for correct torque.

Manual, Volume I, Retorque as necessary Section 8 Appendix than recheck crankshaft IV for proper torque web deflections.

values.

3.

Generator foundation bolts Ref: Lead engine DR/QR are to be retorqued Report #02-550 after a generator short circuit if the bolts

were initially torqued to 480 ft-lbs. If initial bolt torque wqs 600 ft-Ib no retorque is required.

i GG1249/44 Revision 1 - Entire Page Revised

.I 9

i 8

m

!~

GRAND GULF MAINTEllANCE MATRIX e------

t Camponent

Alt, Number Identification FM Recommendation Monthly Outane Outane. 5 Year 10 Year Comments

.02-6300 Thereocouples 1.

Check that thermocouple X

An inconsistant reading indicates ambient engine-traced to thereoccuple temperature when the

-trouble should result

. engine is cold.

in replacement of the thermocouple.

2.

Clean and inspect.

X Indications of fatigue

-thereocourles and thereo-should rssult in re-couple shields.

. placement of the thereo-couple and/or thereo-couple shield.

- Ref: 7/31/84 memo from S. Riess to W. Littmann 3.

Pyreseter wiring-check To be accomplished during that terminations are

_ control panel check-out tight.

and initial operation inspection. Items 1, 2, 3 Ref: 07/30/84 IOC from J. Cadogan to i

~S. Riess.

02-6958

. Engine Control Air 1.

Inspect and clean engine X.

Ref: Lead engine DR/QR Pressure Regulator

. shutdown equipment.

Report #02-6958 (items 1 & 2).

2.

Replace elastomeric parts X

and gaskets in the pressure l

regulator.

l 695C-

' Engine Control Pneumatic Trip

' 1.

- Check switch set points.

X Pressure switches..

Switches

~ Ref:. 3/30/84 IOC from M. Wehmeyer to l.

J. DiMare GG1249/45 Revision 1 - Entire Page Revised 4

{'

i i

l

}'

t*

s 3

A.

GRAND GULF MAINTENANCE MATRIM s

C- ; - Et. Component.

Alt.

Number Identification PM Recommendation Monthly Outane Outaae 5 Year.10 Year Comments

, 2.

-Replace elastomeric parts.

X

.02-7178

. Aux..Sub Base & 011 &

1.

Inspect the valves fo.'

X Replace packing as Water Piping - Jacket packing leakage.

necessary. Ref:

Water Valves Lead engine DR/QR Report #02-7178 (items 1 & 2) 2.

Replace elastomeric parts.

X

~02-717C

. Auxiliary Sub-Base & 011 &

_ 1.

Visually inspect for leaks. X This becommendation is Water Piping - Jacket Water:

Note: In the event of a made on the basis that Pipe, Coglings, Fittings, Icak developing in the the maximum suggested Orifices, Y-Strainers existing Dresser Style 65 operating temperature of' (Small Bore Scope Only) couplings, these couplings 150*F for the Style 65 should be replaced with coupling may be exceeded.

Dresser Style 90 couplings The maximum suggested equipped with Viton gaskets.

operating temperature of the Style 90 is 212*F.

Ref: Letter dated 12/13/84 from C. L. Ray to J. George. Ref:

DR/QR Report #02-317A&8-02-717F Auxiliary Sub-Base Lube 011 1.

Visually inspect for leaks. X This recommendation'is ii Pipe and Fittings Note:.In the event of a made on the basis that lekk developing in ;he the maximum suggested existing Dresser Style 65 operating temperature of couplings, these couplings 150*F for the Style 65 should be replaced with coupling may be exceeded.

Dresser Style 90 couplings The maximum suggested equipped with Viton gaskets.

operating temperature of the Style 90 is 212*F.

GG1249/46 Revision 1 - Entire Page Revised e

i l

R.

(s-GRAND CULF MAINTENANCE MATRIM C ;- -. t Component Alt.

Number

. Identification PM Recommendation Monthly Outace Outace' 5 Year 10 Year, Comments Ref: ' Letter dated '

12/13/84 from C. L. Ray -

to J. George. -Ref:

a 04/02/84 IOC from M. Wehmeyer to J. Freeman 1

2.

Clean and inspect L.O.

X Complete'when L.0, tank 1

kesp-ware pump suction

.is drained.

strainer.

.Ref: 04/16/84 letter from R. Jaquinto to R. Johnson 02-717G/K Aux 111ery Sub-Base Lube Oil 1.

Disassemble, inspect X

Ref: IOC dated 4/6/84 Valves and refurbish.

from M. Wehmeyer to J. DiMare, Ref: Lead engine DR/QR Reports #02-717G/K 2.

Dissassemble, clean and X

Ref: 07/31/84 IOC check relief valve to M. McGerigle from lift pressure.

J. Cadogan, Ref: 08/16/84 IDC from M. McGerigle to J. Cadogan Ref: Lead engine DR/QR Report 802-717G/K (Items 1 & 2) 02-810A Jacket Water Heaters 1.

Measure heater X

Replace heater if 3

insulation resistance.

degradation of 3

insulation resis-GG1249/47-Revision 1 - Entire Page Revised a-1 p'

l

. ~.

GRAND GULF MAINTENANCE MATRIX Ceeponent Component Alt.

Number Identification PM Recommendation Monthly Outaae Outace 5 Year 10 Year Comments 2.

Clean and inspect' X

tance is noted:

heater elements.

Ref: 5/10/84 IOC from M. McGerigle to W. Brown 3.

Check calibration and X

for Items 1 2, 3'-

inspect thermostat.

02-8204 Lube Oil Susp Tank 1.

Measure heater X

' Replace heater if de--

Heaters insulation resistance.

gradation of insulation resistance is noted.

2.

Inspect and clean X

To be accomplished during heater elements.

tank inspection.

3.

Check calibration and X

Ref: 05/10/84 IOC-

)

inspect condition of from M. McGerigle thermostat.

to W. Brown for Items 1, 2, 3 4

GG-8208 Full Flow Lube 011 1.

Record filter d/p.

X Use for trend data, 4

Filters Ref: 04/02/84 IOC from M. Weheeyer to J. DiMare, Ref: TDI Instruction-Manual, Volume I, Maintenance Schedu:e

' 2.

Drain water and/or X

sludge from lubri-cating oil full flow filter.

GG1249/48.

Revision 1 - Entire Page Revised h

e e

s GRAND GULF MAINTENANCE MATRIX Component' Cor m t.

Alt.

. Number Identif1 cation FM Recommendation Monthly Outace.-

Outane 5 Year 10 Year Comments 3.

. Replace filter To be perfomed before

. cartridges and the filter d/p reaches 20 perform a visual psid Ref: 05/30/84 IOC inspection to free M. McGerigle determine the to B. Brown, nature of the Ref: Lead engine DR/QR material caught Report 802-820F, in the filter.

Ref: 07/31/84 IOC from J. Cadogan to M. McGerigle 4.

Lube oil filter X

gauge - cs11 bra-tion check.

GG-101A

_ Emergency Generator 1.

Check operation of X

Ref: IOC 03/30/84 brushes and slip rings.

M. Wehmeyer to D. Mercaldi (Items 1-5)

I 2.

Clean / inspect a11 X

accessible parts of the generator.

3.

Megger rotor and stator.

.X 4.

Verify operation of X

space heaters.

- 5.

Measure vibration and X

check against base line

data, r

I

- GG1249/49 Revision 1 - Entire Page Revised k

t P

t t

l g,

t

.r 4

k 1

GRAlm GULF MAINTENANCE MATRIX P- ;-- - _.t Component Outace 5 Year 10 Year Comments Alt.

Number Identification PM Recommendation Monthly Outage GG-1018-Emergency Generator Pedestal

. 1.

i.

Searing Check ring oilers X

To be accomplished during-for proper operation every test run of the-and verify o11 level.

engine.

Ref: 3/30/84 IOC:

from M. Idehmeyer

-to N. Cooporrider 2.

Drain flush refill-X bearing housing.

3.

Measure bearing housing X

insulation resistance.

4.

Disassemble and inspect bearing and check clearances.

GG-103 Jacket Water Heat 1.

To avoid corrosion and' Ref: Lead engine DR/QR Exchanger fouling jacket water Report #02-810C heat exchanger and Ref; 04/20/84 IOC associated service water from M. Wehmeyer to piping should be flushed R. Kadlec on a periodic basis (continuous service flow is sufficient).

- Alternatively, service water chemistry control can be used to maintain heat exchanger performance and integrity.

I GG1249/50 Revision 1 - Entire Page Revised I

?

s 1

. _ ~.

1 GRAIS GuiF MAINTENANCE MA'RIX Component Component Alt.

Number Identification PM Recommendatiot.

h thly Outage Outage 5 Year 10 Year Comments 2.

Perform a daily visual To be perf ormed daily.

inspection for leakage Ref: 07/19/84 Telecon at packing whenever the D. Pasquale and engine is in the R. Chil emergency STAN08Y mode. Verify that no leakage is present through the leak-off ports of the lantern ring.

3.

kcord heat X

.Use for trend data.

exchanger perfor-4._

mance by checking engine operating parameters.

4.

Evaluate heat exchanger X

performance data 5.

Inspect tubes arid tube

.X Ref: TDI Instruction sheet for fouling and Manual, Volume I, errosion - remove Maintenance Schedule entrance and exit channel covers.

Replace packing rings Ref: Lead engine DR/QR at floating tube Report #02-810C sheet after tube inspection.

4

+

j

.GG1249/51 Revision 1 - Entire Page Revised 1

W

+

(

b GRAND GULF MAINTENANCE MATRIX i

P - ; - _.t Component Alt.

Number

, Identification PM Recommendation Monthly Outane-Outace 5 Year 10 Year Comments 6.

Inspect and clean X

Replace / rework lantern ring. Verify lantern ring as

. leak-off holes are necessary to not plugged.

ensure concentricity prior to reinstall-ation.

[

7.

Replace packing Replace packing when

rings, packing becomes hard or leakage at the packing is noted and cannot be stopped by tightening Ref: Lead engine DR/QR Report #02-810C.

I GG-104 Lube Oil Heat 1.

Perform a daily visual Ref: Lead engine DR/QR Exchanger inspection for leakage Report #02-820G,

.at packing. Verify

.Ref: 06/12/84 IOC 4

that no leakage is from R. Chit to present through the P. Martin,

. Teak-off ports of Ref: 04/02/84 IOC 4

the lantern ring.

from M. Wehmeyer to R. Kadlec 2.

Record heat X

Use for trend data exchanger perfor-mance by checking engine operating parameters.

GG1249/52 Revision 1 - Entire Page Revised a

t 4

I l

a

... ~. -.

~

(

u GRAIS GULF MAINTEH4NCE MATRIX

' C 7 : -

_t. Ceapenent Alt.

.. 10 Year Comments Number Identification

- PM Rec h tton.

Monthiv Outano Outane 5 Year 3.

Evaluate heat exchanger X'

. performance data.

4.

Inspect tubes and M

Ref:. TDI Instruction tube sheet for Manual, Volume I.

ereeton and fouling -'

Maintenance Schedule remove entrance and-Ref: 07/19/84 Telecon exit channel covers.

D. Pasquale and R. Chii 5.

Inspect and clean X

Repla.e/rouork 1antern ring.

lantern ring as

~

~

a Verify leak-off

-necessary to

- holes are not ensure concentricity.

. plugged.

6.

Replace packing or when packing becomes.

rings *at the floating

' hard or leakagn at the tube sheet during packing is noted and reassembly after each cannot be stopped by inspection.

tightening.

7.

Perform a spectro To be performed at cheetcal analysis approximate quarterly of the lube oil, intervals.

Particular attention Ref: Lead engine shall be given to

  1. 02-820G

. percent moisture

. content.

r

.GG1249/53 Revision 1 - Entire Page Revised i

a i

U a

v

.=r

~.

C O

. GRAND GULF MAINTEIWWICE MATRIX C r;:nc.t Component Alt.'

Humber Identification PM Recommendation Monthly Outace Outage S Year 10 Year Comments GG-109 Lube 011 Keep-Wars Pump

.1.

Check operation of X

Items 1-5; Ref:

pump / motor bearings.

04/05/84 IOC from M. Wehmeyer to T..Fritsch~

2.

Check mechanical seal X

1eakage.

3.

Clean, inspect and X

megger motor.

4.

Check coupling X

alignment.

5.

Record pump X

Use for trend data discharge pressure.

6.'

Measure unit vibra-X tion (pump / motor).

7.

The pump should be To be performed daily.

inspected for signs of Ref: DR/QR Report leakage and corrective

  1. 02-820 modifications (addition of flexible piping connections) be imple-mented as required.

GG-111 Flex Connection 1.

Visually inspect for X

evidence of cuts, noles, or dents.

. GG1249/54 Revision 1 - Entire Page Revised e

6m

=

/

9 f

s e

w

-we e

GRAND GULF MAINTENANCE MATRIX

- Component Component Alt.

Number-Identification ~

PM Recommendation Monthly Outaae Outace 5 Year 10 Year Comments GG-113/14 Diesel Starting Air 1.

Check operating oil X

All itses; Ref:

_ Compressors' pressure.

04/02/84 IOC with attached Maintenance Chart from M. Wehmeyer to J. Kamseyer.

2.

Overall visual X

inspection.

3.

Clean fir.s on inter X

and after coolers.

d 4.

Replace intake filter X

element.

5.

Change compressor oli.

X 6.

Check belt tension.

X 4

7.

Check pulley Clano X

bolts / set screws tight.

8.

Inspect filter felts on X

Replace as necessary.

unloader system.

GG-115 Air Dryers and 1.

81ow down trap X

Ref: 04/05/84 IOC Moisture Traps sediment bowls.

from M. Weheeyer to J. Kammeyer, Ref: TDI Instruction Manual, Velume I, Maintenance Schedule 2.

Inspect and service X

solsture traps.

GG1249/55 tevision 1 - Entire Page Revised f-S.

~

4 GRAle GULF MINTENANCE MTRIX Ceeponent A --.. r_t -

Alt.

Nieber '

Ide'ntification '

PM Recommendation Monthiv Outane Dutaae ' 5 Year 10 Year' Comments t

3.

Check proper operation X

Replace desiccant charge of desiccant dryer.

as required.

' Ref: 04/16/84 letter

-from R. Jaquinto to R. Johnson GG-118 Intake Air Filters

' 1.

Visually inspect the X.

Ref: TDI Instruction' oil distribution plate Manual Vol.'.I Section 5.

and change the filter-oil.

-GG-119 Emergency Generator 1.

Inspect panel for X

Items 1-5; Ref: ~ /30/84 3

Control Panel cleanliness and clean IOC free M. Wehmeyer as required.

'to D.' Mercaldi 2.

Check terminal boards X

for loose wiring.

3.

Visually check condition X

of wire insulation for degradation.

4 4.

Clean and inspect relay X

contacts.

5.

Check meter calibrations.

X 6.

Bridge rectifier assembly.

Ref: DR/QR Report

.and SCR mounting.

  1. GG-119, Attach.--1 i

4 1

'GG1249/56 Revision 1 - Entire Page Revised J.

s-a

'4 4

t

!~

a

m.

. ~

~

GRAND GULF MINTENANCE MTRIM Component Component Alt.

Number Identification PM Recommendation Monthly Outage Outace S Year 10 Year Comments a.

Inspect the temperature X If either Sf the labels sensitive label placed permanently blacken the on the most visible maximum temperature of the.-

face of.the hexagonal diode and/or SCR has been body of the diodes exceeded requiring an and the SCR. These electrical inspection labels shall be and an inspection of inspected before and the mounting threads after each running of the heat sinks and

.of the engine.

diode and/or SCR.

Replace the diode and/or SCR and the heat sinks as needed and assure that proper mounting tightness of 300 in-lbs (diode) and 275 in-lbs (SCR) and proper thread condi-tions are maintained.

b.

Inspect glyptol applied X To be performed after to the side of the lugs each monthly test run, and mounting bolt for Retighten any loose the lugs which attach connections, remove to the bottom of the old glyptol and reapply diode and the SCR heatsinks if connections are for signs of relative retightened.

motion.

4 -

GG1249/57-Revision 1 - Entire Page Revised l

l l

s--

w--

s

4c O

GRAIS GULF IIAINTEleAf0CE MATRIX Component Compcaant Alt.

Ilumber -

Idx.iM 4ation.

PM Recommendation Monthly h

Outece 5 Year 10 Year Comments 7.

f,ujustment potentiometers - X To be performed after-inspect glyptol applied each monthly test run.

to the the side of the-If adjustments are i

adjustment screws for each needed, remove gl ptol 3

of the five adjustment and reapply when the potentiometers on the adjustment procedure printed circuit board is complete.

of the voltage regulator for signs of relative action.

8.

Printed circuit boards -

X To be perfc? sed after check for cleanliness each monthly test run.

and proper mounting of

- Report any abnormal components.

conditions to engineer-ing for evaluation.

GG-121-Lube Oil Keep-Wars Filter.

1.

Record filtar d/p.

X Ref: 04/05/84 IOC from M. Wehmeyer to J. DiMare 2.

Change filter To be performed before elements.

the filter d/p reaches the manufacturers re-commended maximum differential pressure.

Ref: Lead engine DR/QR Report 802-820E Jacket Water System 1.

Check pH factor X

Ref: TDI Instruction of jacket water and Manual, Volume I, correct as recom-Maintenance Schedule mended by chemical

' supplier.

GG1249/58 Revision 1 - Entire Page Revised 4

n 9

.___.._.___...____.____..._.___.-.m._._.

~

O'

,i GRAf8 GULF IIAIIITEllAIICE IIATRIX -

~F

_ Component Component' Alt.

1:

Ihaber Identification-

-pit ear - tion plenthly -

Outage Outaae 5 Year 10 Year Comments.

1 Lee 011 System'-

1.

-Check lubricating X'

Ref: T0! Instruction-eil with a viscesi-Manuel, Volume I,-

~

meter for fuel ell Maintenance Schedule,'

dilution. Send a Items 1, 2.

_ sample of oil to:

laboratory for analysis.

- 2.

Drain lubricating '

' When replacing' engine X

oli system and oil use N.D.'ei.1 that-clean sump tank.

meets or exceeds series 3' Depending on the standards, the base stock results of lube should be more resistant oli analysis, refill to thersel degradation with,new eil and coke formation. The additive package should provide high detergent dispersant properties' with high alkalinity and a high level of.antiwear additive such as zinc i

dithiophosphate. Total Base leumber (TBII) should be 12 to 15 for use with

'#2 fuel oil and a sulfated ash content of 1.5% to 2.0E is preferred.- An engine oil with such properties, Mob 11 guard 412 or i

equivalent product may be used to insure improved lubrication.

2 l

i i'

GG1249/59 Revision 1 - Entire Page Revised

-i i

l f

i 1

1 i

4 I

e:

m GRAND GULF MAIIITEMICE MATRIX Component C:; :n _:.t Alt.

Number Identification

. PM Roccamendation Monthly Outane-Outace 5 Year 10 Year Comments 3.

Visually inspect lobe X

To ise performee oil sump tank level after lube oli switch floats.

has been drained Check switch set from sump points Ref: fMP-022/23 Item 7.

4.

Perform a spectro-To be performed at cheefcal analysis approxteately quarterly of the lube oil.

intervals. Ref: TDI Instruction Manual, Volume I, Maintenance Schedule System Operation 1.

Record all operating X

To be performed

/

parameters. Compare during monthly with base line data engir.e test run to ensure engine is operating properly Piping Systes

. 1.

Conduct a detailed X

Tighten, repair or visual and audible replace as required

-'y inspection of all Ref: TDI Instruction fuel, air, oil, Manual, Volume I, and water piping Maintenance Schedule and valves for l

1eakage

/

2.

Inspect, clean and X

as appitcable, lubricate manual valves on skid i

GG1249/60 Revision 1 - Entire Page Revised 1

('

C GRAND GULF MAINTENANCE MATRIM P-

r
t P -- - :. t Alt.

Number Identification PM Recommendation Monthly Outaeo Outace 5 Year 10 Year comments Engine Internals 1.

Remove alternate left X

If excessive side doors and water, sludge or examine the inside any indication of of the engine for Lv bearing failure abnormal conditions.

is present, drain Check with a good crankcase, deter-light for evidence of eine cause, and take babbit flakes necessari corrective action.

j Miscell-Engine Mounted 1.

. Replace elastomeric X

anceous Pressure Switches parts Gear Train 1.

Inspect gears for X

general condition 2.

Measure gear back X

Replace worn lash on all gears gears exceeding maximum clearance.

Complete TDI Inspection and Maintenance Form No. 355-1-1 TDI Instruction Manual, Vol. I, Section 5.

Use Vol. I, Section 8 Appendix III-I for clearance values Ref: 04/16/84 letter l

from 2. Jaquinto to

~

e Johnston i

GG1249/61 Revision 1 - Entire Page Revised I

l I

1 4

R

1 Page 2 l

O If, after completing the review, the engineer determines that the component is P

acceptable, based on the existing ' documentation, the Component Design Report t

will be issued stating the conclusion of acceptability.

If TDI documentation is not available, or if it is determined that the available documentation does not readily lead to a conclusion of acepetability the engineer will alternatively continue the review as outlined in the following paragraphs.

4.2 Review of Small Bore Pipino for Acceptability In cases where the review of TOI documentation does not lead to component acceptability. the enginwr will judge if the component will perform its j

intended function under all normal and earthquake loadings.

This judgment will be based on a review of the following information-Quality approved as built piping isometrics i

j System operating parameters l

Physical piping data Site specific amplified response spectra System function j

In addition to reviewing the above information, a. physical walkdown of the i

engine and skid piping may be required.

The walkdown would include a review

(

of the piping to determine pipe support type and function, as well as a review i

j for the following:

?

Thermal flexibility:

The engineer will determine if sufficient flexibility exists for each between support section of small bore piping.

j The thermal movement imparted by the supports onto the piping will also

(

j be considered.

i Deadweicht spans:

The deadweight spans between supports will be reviewed by the engineer and acceptability will be based on judgment.

Seismic spans:

The seismic spans between supports will be reviewed by the engineer and acceptability will be based on judgment.

The engineer's judgment will consider the site specific amplified response spectra and all components, fittings and branch connections.

Engine induced. vibration will also be considered in determining acceptability l

of seismic spans and is further discussed in paragraph 4.5.

i The engineer will document the reviews of the individual components by a written trip report.

The trip report will serve as a summarization of I

the engineering walkdown.

l T011154/2 N'V' I

-.. - -