AECM-84-0090, Forwards Results of Analysis Performed Showing Relationship Between ECCS Reliability & Agastat Relay Test Intervals. Analysis Withheld (Ref 10CFR2.790)7 March 1984Dale L
MISSISSIPPI POWER & LIGHT CO.
Forwards Results of Analysis Performed Showing Relationship Between ECCS Reliability & Agastat Relay Test Intervals. Analysis Withheld (Ref 10CFR2.790)Request
ML20084D49030 April 1984INC.
Boyer R
TRANSAMERICA DELAVAL
Part 21 Rept Re Westinghouse Relay Type SA-1 Reported in IE Info Notice 83-63.Initially Reported on 840307.RTE Delta Switchgear Div Requests to Be Advised If Util Upgrades Equipment,To Enable Records ModOther
AECM-84-0378, Forwards Response to J Lehr 840724 Request for Addl Info Re Environ Impact of Gas Turbine Generator Sys Presently Installed at Plant.Info Includes Results of Sound Level Survey Conducted in Generator Area26 July 1984Dale L
MISSISSIPPI POWER & LIGHT CO.
Forwards Response to J Lehr 840724 Request for Addl Info Re Environ Impact of Gas Turbine Generator Sys Presently Installed at Plant.Info Includes Results of Sound Level Survey Conducted in Generator AreaRequest
AECM-84-0393, Forwards Supplemental Info Re Standby Diesel Generator Combustion Air Intake & Exhaust Sys,Per 840802 Discussions, Superseding Info in (AECM-84/0389)3 August 1984Dale L
MISSISSIPPI POWER & LIGHT CO.
Forwards Supplemental Info Re Standby Diesel Generator Combustion Air Intake & Exhaust Sys,Per 840802 Discussions, Superseding Info in (AECM-84/0389)Request
AECM-84-0464, Interim Part 21 & Deficiency Rept Re Potential Defect in Spare Piston Skirt Casings.Util Awaiting Outcome from Tdi. Reportability Still Indeterminate for Unit 2.Updated Rept Will Be Submitted by 850126.Part 21 Applicable to Unit 15 October 1984Dale L
MISSISSIPPI POWER & LIGHT CO.
Interim Part 21 & Deficiency Rept Re Potential Defect in Spare Piston Skirt Casings.Util Awaiting Outcome from Tdi. Reportability Still Indeterminate for Unit 2.Updated Rept Will Be Submitted by 850126.Part 21 Applicable to Unit 1Other
AECM-84-0485, Clarifies Statement in That Provided Confirmation of Completion of Commitments Re Tdi Diesel Generators.Statement Reaffirmed That Fuel Oil Line Insp Incorporated Into Augmented Maint/Surveillance Program7 November 1984Dale L
MISSISSIPPI POWER & LIGHT CO.
Clarifies Statement in That Provided Confirmation of Completion of Commitments Re Tdi Diesel Generators.Statement Reaffirmed That Fuel Oil Line Insp Incorporated Into Augmented Maint/Surveillance ProgramOther
AECM-84-0491, Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OL21 November 1984Dale L
MISSISSIPPI POWER & LIGHT CO.
Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OLOther
AECM-84-0525, Forwards Revised Vols 1-4, Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rept Provides Addl Basis for Conclusion That Tdi Diesel Generators Presently Installed Capable of Performing Intended Safety Function28 November 1984Dale L
MISSISSIPPI POWER & LIGHT CO.
Forwards Revised Vols 1-4, Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rept Provides Addl Basis for Conclusion That Tdi Diesel Generators Presently Installed Capable of Performing Intended Safety FunctionOther
ML20100N18928 February 1985TDI (TRANSAMERICA DELAVAL
INC.) OWNERS GROUP
Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation ReptOther
AECM-85-0101, Special Rept 85-003/0:on 850302,Phase C Linear Reactor of Div II Diesel Generator Failed During Maint Run.Caused by Breakdown of Reactor Insulation Due to Excessive Heat.All Linear Reactors in Div II Replaced29 March 1985Dale L
MISSISSIPPI POWER & LIGHT CO.
Special Rept 85-003/0:on 850302,Phase C Linear Reactor of Div II Diesel Generator Failed During Maint Run.Caused by Breakdown of Reactor Insulation Due to Excessive Heat.All Linear Reactors in Div II ReplacedOther
AECM-85-0120, Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Review Incomplete.Completeness, Applicability or Recommendations Not Endorsed.Discussion of Recommendations Will Be Submitted at Later Date16 April 1985Dale L
MISSISSIPPI POWER & LIGHT CO.
Forwards Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. Review Incomplete.Completeness, Applicability or Recommendations Not Endorsed.Discussion of Recommendations Will Be Submitted at Later DateOther
ML20199L62426 June 1986NRCSER Re Operability/Reliability of Tdi Emergency Diesel generator.Three-phase Plan for Assuring Generator Reliability Discussed.Sample License Conditions EnclOther
ML20199L59726 June 1986Office of Nuclear Reactor Regulation
Kintner L
Forwards Generic SER of Operability/Reliability of Emergency Diesel Generators Mfg by Tdi.Plans for Program Implementation Requested by 860715Other