ML20147B900: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project = TAC:57316, TAC:57317
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:4 l'li:
{{#Wiki_filter:4 l'li:
                                                  'APR 191978 Docket 70-2623 Mr. Greg J. Pollak Duke Power Company Power Building 422 South Church Street Charlotte, N. C. 20242
'APR 191978 Docket 70-2623 Mr. Greg J. Pollak Duke Power Company Power Building 422 South Church Street Charlotte, N. C.
20242


==Dear ftr. Pollak:==
==Dear ftr. Pollak:==
This is to confirm our telephone conversation of April 18, 1978 with regards to a site visit by liRC and contractor personnel. The visit is scheduled for April 25, 26 and 27, 1978. Persons making the visit in addition to myself include: Dan Glenn, Sr. Development Engineer -
This is to confirm our telephone conversation of April 18, 1978 with regards to a site visit by liRC and contractor personnel. The visit is scheduled for April 25, 26 and 27, 1978. Persons making the visit in addition to myself include: Dan Glenn, Sr. Development Engineer -
Battelle Pacific florthwest Laboratories (Pf4L), Larry Badwell, Ecologist -
Battelle Pacific florthwest Laboratories (Pf4L), Larry Badwell, Ecologist -
Line 26: Line 28:
Some of the areas of interest to be viewed / discussed at each respective site are listed below:
Some of the areas of interest to be viewed / discussed at each respective site are listed below:
IIcGuire
IIcGuire
: 1) Spent fuel pool
: 1) Spent fuel pool 2)
: 2) Construction remaining in units 1 and 2
Construction remaining in units 1 and 2
: 3) Spent fuel handling system
: 3) Spent fuel handling system 4)
: 4) Integrity of all support systems such as
Integrity of all support systems such as a.
: a. Spent fuel cooling and purification
Spent fuel cooling and purification b.
: b. Ventilation
Ventilation c.
: c. Emergency systems (Diesel generatnr and security)
Emergency systems (Diesel generatnr and security)
: 5) Electrical power supply
: 5) Electrical power supply
: 6) Licensing boundaries
: 6) Licensing boundaries
: 7) Cask loading and unloading facilities Oconee l                       1) Planned truck route fro?. the Oconee site
: 7) Cask loading and unloading facilities Oconee l
: 1) Planned truck route fro?. the Oconee site
: 2) Spent fuel pools
: 2) Spent fuel pools
: 3) Cask loading facility
: 3) Cask loading facility
: 4) Location of 1-year old fuel 7812180037 C
: 4) Location of 1-year old fuel 7812180037 C
a               k,                 -
a k,


  .'o ? ..
.'o ?
Mr. Greg J. Pollak Duke Power Company                                                                                               ,
Mr. Greg J. Pollak Duke Power Company,
Our itinerary is flexible within the three days available, and we will work to or around any schedule you may have or develop.
Our itinerary is flexible within the three days available, and we will work to or around any schedule you may have or develop.
                                                    <_stt d'   f Brett Spitalny Fuel Reprocessing and Recycle Branch Division of Fuel Cycle and liaterial Safety l
d'f
<_stt Brett Spitalny Fuel Reprocessing and Recycle Branch Division of Fuel Cycle and liaterial Safety l
l s}}
l s}}

Latest revision as of 13:40, 11 December 2024

Confirms 780418 Conversation Re Site Visit on 780425-27 by NRC & Contractor Personnel.Areas of Interest to Be Reviewed for Both McGuire & Oconee Sites Are Listed
ML20147B900
Person / Time
Site: 07002623
Issue date: 04/19/1978
From: Spitalny B
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Pollak G
DUKE POWER CO.
References
TAC-57316, TAC-57317, NUDOCS 7812180087
Download: ML20147B900 (2)


Text

4 l'li:

'APR 191978 Docket 70-2623 Mr. Greg J. Pollak Duke Power Company Power Building 422 South Church Street Charlotte, N. C.

20242

Dear ftr. Pollak:

This is to confirm our telephone conversation of April 18, 1978 with regards to a site visit by liRC and contractor personnel. The visit is scheduled for April 25, 26 and 27, 1978. Persons making the visit in addition to myself include: Dan Glenn, Sr. Development Engineer -

Battelle Pacific florthwest Laboratories (Pf4L), Larry Badwell, Ecologist -

Battelle/ Pill, and Ed Frederick, Manager of Regulatory Programs, Oak Ridge fiational Laboratory.

Some of the areas of interest to be viewed / discussed at each respective site are listed below:

IIcGuire

1) Spent fuel pool 2)

Construction remaining in units 1 and 2

3) Spent fuel handling system 4)

Integrity of all support systems such as a.

Spent fuel cooling and purification b.

Ventilation c.

Emergency systems (Diesel generatnr and security)

5) Electrical power supply
6) Licensing boundaries
7) Cask loading and unloading facilities Oconee l
1) Planned truck route fro?. the Oconee site
2) Spent fuel pools
3) Cask loading facility
4) Location of 1-year old fuel 7812180037 C

a k,

.'o ?

Mr. Greg J. Pollak Duke Power Company,

Our itinerary is flexible within the three days available, and we will work to or around any schedule you may have or develop.

d'f

<_stt Brett Spitalny Fuel Reprocessing and Recycle Branch Division of Fuel Cycle and liaterial Safety l

l s