{{#Wiki_filter:CALLAWAY FSAR CHANGE NOTICE LOG Change                                                       Interim Notice                                         Approval    Revision Number                 Description               Date   Incorporated   Section Revised     Table Revised   Figure Revised 19-0023 Revises SA SEC 9.2.5.2.2.1 and         11/07/19      OL-24    SP SEC 9.2.5.2.2.1  SP TBL 9.2-5 9.2.5.5, and SA TBL 9.2-5 to address                 11/19    SA SEC 9.2.5.5 mitigation of a potential failure of automatic controls by manually operating UHS cooling tower bypass valves to control temperature.
{{#Wiki_filter:CALLAWAY Rev. OL-24 11/19 FSAR CHANGE NOTICE LOG Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised 19-0023 Revises SA SEC 9.2.5.2.2.1 and 9.2.5.5, and SA TBL 9.2-5 to address mitigation of a potential failure of automatic controls by manually operating UHS cooling tower bypass valves to control temperature.
19-0022 Revises SP SEC 9.2.1.2.2.2 and          11/07/19     OL-24   SP SEC 9.2.1.2.2.2 SP TBL 9.2-5     SP FIG 9.2-2 9.2.1.2.2.3, SP TBL 9.2-5, 9.2-6,                     11/19    SP SEC 9.2.1.2.2.3  SP TBL 9.2-6 and 9.2-23, and adds a new Sheet 4 to                                             SP TBL 9.2-23 SP FIG 9.2-2 to reflect modifications for ESW waterhammer mitigation per MP 17-0006.
11/07/19 OL-24 11/19 SP SEC 9.2.5.2.2.1 SA SEC 9.2.5.5 SP TBL 9.2-5 19-0022 Revises SP SEC 9.2.1.2.2.2 and 9.2.1.2.2.3, SP TBL 9.2-5, 9.2-6, and 9.2-23, and adds a new Sheet 4 to SP FIG 9.2-2 to reflect modifications for ESW waterhammer mitigation per MP 17-0006.
18-0012 Revises SP SEC 11.5.2.3.2.4 and        11/04/19      OL-24    SP SEC 11.5.2.3.2.4 SP TBL 7.5-1 18.2.12.1, and SP TBL 7.5-1, 7A-2,                   11/19    SP SEC 18.2.12.1    SP TBL 7A-2 7A-3, and 11.5-3 to reflect a reduction                                           SP TBL 7A-3 of the credited range for Containment                                             SP TBL 11.5-3 High Range Radiation Monitors in a post-accident environment, due to noise from thermally-induced currents causing inaccuracy in readings <25 R/hr.
11/07/19 OL-24 11/19 SP SEC 9.2.1.2.2.2 SP SEC 9.2.1.2.2.3 SP TBL 9.2-5 SP TBL 9.2-6 SP TBL 9.2-23 SP FIG 9.2-2 18-0012 Revises SP SEC 11.5.2.3.2.4 and 18.2.12.1, and SP TBL 7.5-1, 7A-2, 7A-3, and 11.5-3 to reflect a reduction of the credited range for Containment High Range Radiation Monitors in a post-accident environment, due to noise from thermally-induced currents causing inaccuracy in readings <25 R/hr.
19-0007 Revises SA Chapter 13 to reflect       10/10/19     OL-24   SA SEC 13.1.1.2.1.2                 SA FIG 13.1-1 changes to the site organizational                    11/19    SA SEC 13.1.1.3.2                   SA FIG 13.1-2 structure.                                                     SA SEC 13.1.2.2.2                    SA FIG 13.1-3 SA SEC 13.1.2.2.3 19-0019 Corrects reference to a Table in SA    10/09/19      OL-24    SA SEC 2.3.3.1.3 SEC 2.3.3.1.3                                         11/19 Rev. OL-24 11/19
11/04/19 OL-24 11/19 SP SEC 11.5.2.3.2.4 SP SEC 18.2.12.1 SP TBL 7.5-1 SP TBL 7A-2 SP TBL 7A-3 SP TBL 11.5-3 19-0007 Revises SA Chapter 13 to reflect changes to the site organizational structure.
10/10/19 OL-24 11/19 SA SEC 13.1.1.2.1.2 SA SEC 13.1.1.3.2 SA SEC 13.1.2.2.2 SA SEC 13.1.2.2.3 SA FIG 13.1-1 SA FIG 13.1-2 SA FIG 13.1-3 19-0019 Corrects reference to a Table in SA SEC 2.3.3.1.3 10/09/19 OL-24 11/19 SA SEC 2.3.3.1.3


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 2 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 2 of 25)
Change                                                        Interim Notice                                          Approval    Revision Number                Description                Date    Incorporated    Section Revised  Table Revised  Figure Revised 19-0011 Revises SP SEC 9.3.3.5 in order to       10/09/19      OL-24      SP SEC 9.3.3.5 reflect a change in the high lever alarm               11/19 setpoint for the Control Building sump per Modification MP 16-0039.
Rev. OL-24 11/19 19-0011 Revises SP SEC 9.3.3.5 in order to reflect a change in the high lever alarm setpoint for the Control Building sump per Modification MP 16-0039.
19-0003 Revises SP TBL 5.3-7 to add material    09/22/19     OL-23f      SP SEC 9.1.4.2.2  SP TBL 5.3-7 properties for RV closure head bolting                 10/19 spares and SP SEC 9.1.4.2.2 to describe new manual rod cluster control change tool.
10/09/19 OL-24 11/19 SP SEC 9.3.3.5 19-0003 Revises SP TBL 5.3-7 to add material properties for RV closure head bolting spares and SP SEC 9.1.4.2.2 to describe new manual rod cluster control change tool.
18-0023 Revises SP SEC 19.1.25 and SP TBL       09/22/19    OL-23f      SP SEC 19.1.25   SP TBL 19.4-1 19.4-1 to reflect adoption of guidance                 10/19 from LS-ISG-2015-01 regarding buried and underground piping and tanks.
09/22/19 OL-23f 10/19 SP SEC 9.1.4.2.2 SP TBL 5.3-7 18-0023 Revises SP SEC 19.1.25 and SP TBL 19.4-1 to reflect adoption of guidance from LS-ISG-2015-01 regarding buried and underground piping and tanks.
19-0010 Removes a remark from SP TBL 3.2-1       08/20/19     OL-23f                        SP TBL 3.2-1 regarding the non-safety aux                           10/19 feedwater pump having been built to ASME Section III Class 3.
09/22/19 OL-23f 10/19 SP SEC 19.1.25 SP TBL 19.4-1 19-0010 Removes a remark from SP TBL 3.2-1 regarding the non-safety aux feedwater pump having been built to ASME Section III Class 3.
19-0006 Revises SA TBL 12.5-2 to change the     08/20/19     OL-23f                       SA TBL 12-5-2 type of detector used for workspace                    10/19 airborne radioactivity monitoring.
08/20/19 OL-23f 10/19 SP TBL 3.2-1 19-0006 Revises SA TBL 12.5-2 to change the type of detector used for workspace airborne radioactivity monitoring.
19-0005 Revises SP SEC 9.1A.2.1 to remove       08/20/19    OL-23f      SP SEC 9.1A.2.1.1 allowances for fuel storage that do not               10/19 conform to TS 4.3.1.1.
08/20/19 OL-23f 10/19 SA TBL 12-5-2 19-0005 Revises SP SEC 9.1A.2.1 to remove allowances for fuel storage that do not conform to TS 4.3.1.1.
Rev. OL-24 11/19
08/20/19 OL-23f 10/19 SP SEC 9.1A.2.1.1 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 3 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 3 of 25)
Change                                                        Interim Notice                                          Approval    Revision Number                  Description                Date    Incorporated    Section Revised  Table Revised  Figure Revised 19-0002 Revises the FSAR in order to reflect     08/20/19     OL-23f     SP SEC 3.5.1.3.2 SP TBL 1.1-1    SP FIG 10.2-1 installation of the new digital                        10/19      SP SEC 3.5.1.3.3 SP TBL 10.2-1 electrohydraulic controls for the main                            SP SEC 3.5.4 turbine generator per Modification MP                              SP SEC 5.4.1.3.8 16-0039.                                                          SP SEC 5.4.1.3.9 SP SEC 7.1.2.5.2 SP SEC 10.2.2.1 SP SEC 10.2.2.3.1 SP SEC 10.2.2.3.2 SP SEC 10.2.2.3.3 SP SEC 10.2.2.3.4 SP SEC 10.2.3.6 SP SEC 16.3.4.1 SP SEC 16.3.4.1.1 SP SEC 16.3.4.1.2 17-0012 Revises SP 8.3 and SA 8.2 in order to     07/16/19    OL-23e      SP SEC 8.3.1.1.2 reflect the addition of protective relays               7/19      SA SEC 8.2.1.3.2 to provide an alarm function for an open phase fault condition that were installed per Modification MP 15-0008.
Rev. OL-24 11/19 19-0002 Revises the FSAR in order to reflect installation of the new digital electrohydraulic controls for the main turbine generator per Modification MP 16-0039.
19-0008 Revises SA 9.2 and SA FIG 9.2-3 in        05/07/19     OL-23e      SA SEC 9.2.3.5                    SA FIG 9.2-3 order to reflect rerouting of the                       7/19 demineralized water system piping and removal of the associated turbidity meter per Modification MP 18-0060.
08/20/19 OL-23f 10/19 SP SEC 3.5.1.3.2 SP SEC 3.5.1.3.3 SP SEC 3.5.4 SP SEC 5.4.1.3.8 SP SEC 5.4.1.3.9 SP SEC 7.1.2.5.2 SP SEC 10.2.2.1 SP SEC 10.2.2.3.1 SP SEC 10.2.2.3.2 SP SEC 10.2.2.3.3 SP SEC 10.2.2.3.4 SP SEC 10.2.3.6 SP SEC 16.3.4.1 SP SEC 16.3.4.1.1 SP SEC 16.3.4.1.2 SP TBL 1.1-1 SP TBL 10.2-1 SP FIG 10.2-1 17-0012 Revises SP 8.3 and SA 8.2 in order to reflect the addition of protective relays to provide an alarm function for an open phase fault condition that were installed per Modification MP 15-0008.
Rev. OL-24 11/19
07/16/19 OL-23e 7/19 SP SEC 8.3.1.1.2 SA SEC 8.2.1.3.2 19-0008 Revises SA 9.2 and SA FIG 9.2-3 in order to reflect rerouting of the demineralized water system piping and removal of the associated turbidity meter per Modification MP 18-0060.
05/07/19 OL-23e 7/19 SA SEC 9.2.3.5 SA FIG 9.2-3 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 4 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 4 of 25)
Change                                                    Interim Notice                                      Approval    Revision Number                Description              Date    Incorporated    Section Revised    Table Revised  Figure Revised 19-0004 Revises SP 9.4 and SP TBL 9.4-10 in   04/30/19     OL-23e     SP SEC 9.4.4.2.1   SP TBL 9.4-10 order to reflect replacement of the                  7/19      SP SEC 9.4.4.2.2 EHC air conditioning (A/C) system and backup A/C system per Modification MP 16-0039.
Rev. OL-24 11/19 19-0004 Revises SP 9.4 and SP TBL 9.4-10 in order to reflect replacement of the EHC air conditioning (A/C) system and backup A/C system per Modification MP 16-0039.
18-0014 Adds a new section SA 2.2.1.2.3.10   04/17/19     OL-23d     SA SEC 2.2.1.2.3 and revises the response to SA NRC                  4/19      SA SEC 2.2.1.2.3.10 Question 310.05 to describe a new                              SA SEC NRC QR tank for sodium hypochlorite being                            310.05 installed per MP 17-0037.
04/30/19 OL-23e 7/19 SP SEC 9.4.4.2.1 SP SEC 9.4.4.2.2 SP TBL 9.4-10 18-0014 Adds a new section SA 2.2.1.2.3.10 and revises the response to SA NRC Question 310.05 to describe a new tank for sodium hypochlorite being installed per MP 17-0037.
17-0009 Revises SP 18.8.2.1.1 and the         03/26/19    OL-23d      SP APP 3A commitments to Reg. Guides 1.9 and                 4/19      SP SEC 8.1.4.3 1.108 in SP Appendix 3A and                                   SP SEC 16.8.2.1.1 SP 8.1.4.3 to implement the Engineered Safety Features Actuation System (ESFAS) Surveillance Test Risk Documented Evaluation (STRIDE).
04/17/19 OL-23d 4/19 SA SEC 2.2.1.2.3 SA SEC 2.2.1.2.3.10 SA SEC NRC QR 310.05 17-0009 Revises SP 18.8.2.1.1 and the commitments to Reg. Guides 1.9 and 1.108 in SP Appendix 3A and SP 8.1.4.3 to implement the Engineered Safety Features Actuation System (ESFAS) Surveillance Test Risk Documented Evaluation (STRIDE).
16-0013 Revises SP 9.4.1 and 16.7.13.1 and    04/30/19    OL-23d      SP SEC 9.4.1.1.2    SP TBL 3.2-1 SP Tables 3.2-1 and 9.4-4, and                     4/19       SP SEC 9.4.1.2.2   SP TBL 9.4-4 deletes SP 16.7.13.2 in order to                              SP SEC 9.4.1.2.3 support implementation of OL                                  SP SEC 16.7.13.1 Amendment 219 for new TS 3.7.20,                              SP SEC 16.7.13.1.1 "Class 1E Electrical Equipment Air                            SP SEC 16.7.13.1.2 Conditioning (A/C) System."
03/26/19 OL-23d 4/19 SP APP 3A SP SEC 8.1.4.3 SP SEC 16.8.2.1.1 16-0013 Revises SP 9.4.1 and 16.7.13.1 and SP Tables 3.2-1 and 9.4-4, and deletes SP 16.7.13.2 in order to support implementation of OL Amendment 219 for new TS 3.7.20, "Class 1E Electrical Equipment Air Conditioning (A/C) System."
Rev. OL-24 11/19
04/30/19 OL-23d 4/19 SP SEC 9.4.1.1.2 SP SEC 9.4.1.2.2 SP SEC 9.4.1.2.3 SP SEC 16.7.13.1 SP SEC 16.7.13.1.1 SP SEC 16.7.13.1.2 SP TBL 3.2-1 SP TBL 9.4-4 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 5 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 5 of 25)
Change                                                      Interim Notice                                        Approval    Revision Number                Description              Date    Incorporated    Section Revised  Table Revised  Figure Revised 19-0001 Revise FSAR Chapter 16 to remove       02/27/19     OL-23c     SP SEC 16.1.2.3.1 use of FSAR 16.0.2.2 for IST                          3/19      SP SEC 16.1.2.4.2 frequency extensions, as IST has its                            SP SEC 16.1.2.4.1 own provisions for frequency                                    SP SEC 16.1.2.4.2 extensions.                                                    SP SEC 16.4.1.1.1 SP SEC 16.4.1.1.2 18-0020 Updates SP 8.3.1.4.1.1 and 9.5.2.2     02/11/19     OL-23c     SP SEC 8.3.1.4.1.1 to add descriptions of the plant Wi-Fi                3/19      SP SEC 9.5.2.2 communication system.
Rev. OL-24 11/19 19-0001 Revise FSAR Chapter 16 to remove use of FSAR 16.0.2.2 for IST frequency extensions, as IST has its own provisions for frequency extensions.
18-0008 Revises Mode of applicability for     02/11/19    OL-23c      SP SEC 16.7.10.1 FSAR 16.7.10, "Emergency                             3/19 Exhaust System (EES) for Crane Operation Fuel Building."
02/27/19 OL-23c 3/19 SP SEC 16.1.2.3.1 SP SEC 16.1.2.4.2 SP SEC 16.1.2.4.1 SP SEC 16.1.2.4.2 SP SEC 16.4.1.1.1 SP SEC 16.4.1.1.2 18-0020 Updates SP 8.3.1.4.1.1 and 9.5.2.2 to add descriptions of the plant Wi-Fi communication system.
18-0024 Corrects formatting errors in FSAR-SP 11/28/18    OL-23b      SP SEC 16.24 16.24 and adds "16.24 ASME                           12/18      SP 16 TOC Inservice Inspection Program" to Chap                           SP TOC 16 Table of Contents (TOC). Corrects title of Chap 16 in FSAR-SP TOC to read "Technical Requirements."
02/11/19 OL-23c 3/19 SP SEC 8.3.1.4.1.1 SP SEC 9.5.2.2 18-0008 Revises Mode of applicability for FSAR 16.7.10, "Emergency Exhaust System (EES) for Crane Operation Fuel Building."
18-0019 Updates SA 2.2.1.1 and 2.2.1.2.1 to   11/29/18     OL-23b     SA SEC 2.2.1.1 remove obsolete descriptions of                      12/18      SA SEC 2.2.1.2.1 military and manufacturing facilities.
02/11/19 OL-23c 3/19 SP SEC 16.7.10.1 18-0024 Corrects formatting errors in FSAR-SP 16.24 and adds "16.24 ASME Inservice Inspection Program" to Chap 16 Table of Contents (TOC). Corrects title of Chap 16 in FSAR-SP TOC to read "Technical Requirements."
18-0018 Updates FSAR-SP Figure 6.2.4-1         09/13/18     OL-23b                                       SP FIG 6.2.4-1 Pages 13 and 16 to show correct                      12/18 configuration of ENV0084 and ENV0083.
11/28/18 OL-23b 12/18 SP SEC 16.24 SP 16 TOC SP TOC 18-0019 Updates SA 2.2.1.1 and 2.2.1.2.1 to remove obsolete descriptions of military and manufacturing facilities.
Rev. OL-24 11/19
11/29/18 OL-23b 12/18 SA SEC 2.2.1.1 SA SEC 2.2.1.2.1 18-0018 Updates FSAR-SP Figure 6.2.4-1 Pages 13 and 16 to show correct configuration of ENV0084 and ENV0083.
09/13/18 OL-23b 12/18 SP FIG 6.2.4-1 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 6 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 6 of 25)
Change                                                      Interim Notice                                        Approval    Revision Number                  Description              Date    Incorporated    Section Revised  Table Revised  Figure Revised 18-0017 Revises FSAR-SP 8.3A.4.a to provide     08/30/18    OL-23b      SP APP 8.3A.4 correct description of station blackout               12/18 (SBO) procedures to implement NUMARC 87-00 Section 4.
Rev. OL-24 11/19 18-0017 Revises FSAR-SP 8.3A.4.a to provide correct description of station blackout (SBO) procedures to implement NUMARC 87-00 Section 4.
18-0016 Revises FSAR-SP 9.5.1.5.2 to specify   09/13/18    OL-23b      SP SEC 9.5.1.5.2 professional membership grade in                     12/18 Society of Fire Prevention Engineers (SFPE) for Fire Protection Engineer qualifications.
08/30/18 OL-23b 12/18 SP APP 8.3A.4 18-0016 Revises FSAR-SP 9.5.1.5.2 to specify professional membership grade in Society of Fire Prevention Engineers (SFPE) for Fire Protection Engineer qualifications.
18-0011 Revises FSAR-SP 5.4A.2 and Table        12/03/18     OL-23b      SP APP 5.4A.2     SP TBL 7.1-2 7.1-2 to be consistent with FSAR-SP                   12/18 7.4 by removing references to Spent Fuel Pool Cooling System as being Safe Shutdown Equipment.
09/13/18 OL-23b 12/18 SP SEC 9.5.1.5.2 18-0011 Revises FSAR-SP 5.4A.2 and Table 7.1-2 to be consistent with FSAR-SP 7.4 by removing references to Spent Fuel Pool Cooling System as being Safe Shutdown Equipment.
17-0017 Revises Site Addendum Section          09/28/17    OL-23a      SA SEC 12.5.2.1.2 12.5.2.1.2 to be consistent with                     8/18 Table 12.5-1 by removing reference to additional counting equipment.
12/03/18 OL-23b 12/18 SP APP 5.4A.2 SP TBL 7.1-2 17-0017 Revises Site Addendum Section 12.5.2.1.2 to be consistent with Table 12.5-1 by removing reference to additional counting equipment.
17-0008 Replaces OPERABLE with                06/21/17     OL-23a                       SP TBL 16.11-5 FUNCTIONAL in the affected column                   8/18 heading for FSAR Table 16.11-5.
09/28/17 OL-23a 8/18 SA SEC 12.5.2.1.2 17-0008 Replaces OPERABLE with FUNCTIONAL in the affected column heading for FSAR Table 16.11-5.
16-0001 Changes FSAR-SP Appendix 3A and         05/30/18    OL-23a      SP APP 3A 8.3. to justify testing auxiliary                     8/18      SP SEC 8.3.1.1.2 feedwater valves with thermal overloads not jumpered, in accordance with Regulatory Position C.2 of Reg. Guide 1.106.
06/21/17 OL-23a 8/18 SP TBL 16.11-5 16-0001 Changes FSAR-SP Appendix 3A and 8.3. to justify testing auxiliary feedwater valves with thermal overloads not jumpered, in accordance with Regulatory Position C.2 of Reg. Guide 1.106.
(OL Amendment No. 218)
(OL Amendment No. 218) 05/30/18 OL-23a 8/18 SP APP 3A SP SEC 8.3.1.1.2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised
Rev. OL-24 11/19


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 7 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 7 of 25)
Change                                                        Interim Notice                                          Approval    Revision Number                Description                  Date    Incorporated    Section Revised    Table Revised    Figure Revised 17-0016 Changes FSAR-SP Table 3.9B-16 to         04/19/18     OL-22e                         SP TBL 3.9B-16 remove ABV0085 and ABV0087.                              5/18 17-0003 FSAR change for potential VCT             10/05/17     OL-22e     SP SEC 5.4.11.2     SP TBL 9.3-11    SP FIG 9.3-10 explosive atmosphere during                            5/18      SP SEC 9.1.4.2.3.1 shutdown for refueling.                                            SP SEC 9.3.4.2.1.2 SP SEC 9.3.5.2.1 SP SEC 11.2.2.2 SP SEC 11.3.2.3 17-0013 Replaces FSAR description of RCS         05/08/18     OL-22e     SP SEC 5.2.2.10.4.1 SP TBL 3.2-1    SP FIG 3.6-1 letdown "orifices" with "throttle valves"              5/18      SP SEC 5.2.5.2.3   SP TBL 7.4-1    (Sheet 25) as per Modification MP 14-0010.                                    SP SEC 7.4.3.1.1   SP TBL 9.3-9 SP SEC 7.7.1 SP SEC 9.3.4.2.1.1 SP SEC 9.3.4.2.2 SP SEC 9.3.4.2.3.1 SP SEC 9.3.4.2.3.3 SP SEC 9.3.4.5 SP SEC 15.6.2 17-0014 Revises FSAR material description for     02/12/18     OL-22e                         SP TBL 10.4-2 condenser air removal system piping                    5/18 as per RFR 170058.
Rev. OL-24 11/19 17-0016 Changes FSAR-SP Table 3.9B-16 to remove ABV0085 and ABV0087.
17-0015 Revises FSAR description of RCS           10/05/17     OL-22e     SP SEC 15.6.2 letdown flowrate during postulated                      5/18 letdown line rupture.
04/19/18 OL-22e 5/18 SP TBL 3.9B-16 17-0003 FSAR change for potential VCT explosive atmosphere during shutdown for refueling.
18-0004 Replaces FSAR to reflect retraction of   04/19/18     OL-22e     SP SEC 9.1.4.2.2 polar crane snubber wheels per                          5/18 Modification MP 16-0033.
10/05/17 OL-22e 5/18 SP SEC 5.4.11.2 SP SEC 9.1.4.2.3.1 SP SEC 9.3.4.2.1.2 SP SEC 9.3.5.2.1 SP SEC 11.2.2.2 SP SEC 11.3.2.3 SP TBL 9.3-11 SP FIG 9.3-10 17-0013 Replaces FSAR description of RCS letdown "orifices" with "throttle valves" as per Modification MP 14-0010.
Rev. OL-24 11/19
05/08/18 OL-22e 5/18 SP SEC 5.2.2.10.4.1 SP SEC 5.2.5.2.3 SP SEC 7.4.3.1.1 SP SEC 7.7.1 SP SEC 9.3.4.2.1.1 SP SEC 9.3.4.2.2 SP SEC 9.3.4.2.3.1 SP SEC 9.3.4.2.3.3 SP SEC 9.3.4.5 SP SEC 15.6.2 SP TBL 3.2-1 SP TBL 7.4-1 SP TBL 9.3-9 SP FIG 3.6-1 (Sheet 25) 17-0014 Revises FSAR material description for condenser air removal system piping as per RFR 170058.
02/12/18 OL-22e 5/18 SP TBL 10.4-2 17-0015 Revises FSAR description of RCS letdown flowrate during postulated letdown line rupture.
10/05/17 OL-22e 5/18 SP SEC 15.6.2 18-0004 Replaces FSAR to reflect retraction of polar crane snubber wheels per Modification MP 16-0033.
04/19/18 OL-22e 5/18 SP SEC 9.1.4.2.2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 8 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 8 of 25)
Change                                                    Interim Notice                                      Approval    Revision Number                Description              Date    Incorporated    Section Revised    Table Revised    Figure Revised 18-0005 Revises FSAR-SP Table 3.11(B)-1 and   04/10/18     OL-22e                         SP TBL 3.11(B)-1 Table 3.11(B)-2 Notes regarding                      5/18                          SP TBL 3.11(B)-2 post-accident room temperatures.
Rev. OL-24 11/19 18-0005 Revises FSAR-SP Table 3.11(B)-1 and Table 3.11(B)-2 Notes regarding post-accident room temperatures.
18-0001 Revises FSAR to reflect bypass of     04/19/18     OL-22e     SP SEC 8.3.1.1.2 UHS cooling tower fan motor                        5/18 high-speed thermal overloads as per Modification MP 17-0012.
04/10/18 OL-22e 5/18 SP TBL 3.11(B)-1 SP TBL 3.11(B)-2 18-0001 Revises FSAR to reflect bypass of UHS cooling tower fan motor high-speed thermal overloads as per Modification MP 17-0012.
18-0002 Revises FSAR to reflect               04/19/18     OL-22e     SA SEC 13.1.1.1.1                     SA FIG 13.1-1 organizational changes.                            5/18      SA SEC 13.1.1.2.1                     SA FIG 13.1-2 SA SEC 13.1.1.2.1.1                   SA FIG 13.1-3 SA SEC 13.1.1.2.1.2 SA SEC 13.1.1.2.1.3 SA SEC 13.1.1.3 SA SEC 13.1.1.3.2 SA SEC 13.1.2.2 SA SEC 13.1.2.2.1.1 SA SEC 13.1.2.2.3 SA SEC 13.1.3.1 SA SEC 13.2.1 18-0003 Revises FSAR material description for 03/22/18    OL-22e                          SP TBL 9.4-6 safety-related room cooler coils to                 5/18                          SP TBL 9.4-8 reflect Modification MP 07-0060.
04/19/18 OL-22e 5/18 SP SEC 8.3.1.1.2 18-0002 Revises FSAR to reflect organizational changes.
04/19/18 OL-22e 5/18 SA SEC 13.1.1.1.1 SA SEC 13.1.1.2.1 SA SEC 13.1.1.2.1.1 SA SEC 13.1.1.2.1.2 SA SEC 13.1.1.2.1.3 SA SEC 13.1.1.3 SA SEC 13.1.1.3.2 SA SEC 13.1.2.2 SA SEC 13.1.2.2.1.1 SA SEC 13.1.2.2.3 SA SEC 13.1.3.1 SA SEC 13.2.1 SA FIG 13.1-1 SA FIG 13.1-2 SA FIG 13.1-3 18-0003 Revises FSAR material description for safety-related room cooler coils to reflect Modification MP 07-0060.
completion.
completion.
16-0020 Revises FSAR description of           03/07/17     OL-22e     SP SEC 6.4.2.4     SP TBL 6.4-2 self-contained breathing apparatus                  5/18 (SCBA) use in Control room.
03/22/18 OL-22e 5/18 SP TBL 9.4-6 SP TBL 9.4-8 16-0020 Revises FSAR description of self-contained breathing apparatus (SCBA) use in Control room.
Rev. OL-24 11/19
03/07/17 OL-22e 5/18 SP SEC 6.4.2.4 SP TBL 6.4-2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 9 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 9 of 25)
Change                                                  Interim Notice                                    Approval    Revision Number                Description            Date    Incorporated    Section Revised  Table Revised  Figure Revised 17-0001 Updates FSAR description of solid   03/07/17     OL-22e     SP SEC 11.4.1.1 radwaste management practices.                    5/18      SP SEC 11.4.1.2 SP SEC 11.4.2.2 SP SEC 11.4.2.3.1 SP SEC 11.4.2.3.2 SP SEC 11.4.2.3.3 SP SEC 11.4.2.4 17-0002 Revises FSAR description of data   03/17/17     OL-22e     SA SEC 2.3.3.1.2                 SA FIG 2.3-20 communications for meteorological                5/18      SA SEC 2.3.3.1.3 instruments for Modification                                SA SEC 2.3.3.1.4.1 MP 11-0002 FCN 04.
Rev. OL-24 11/19 17-0001 Updates FSAR description of solid radwaste management practices.
17-0004 Revises FSAR description of General 06/21/17     OL-22e     SA SEC 13.2.1.2 Employee Training (GET).                          5/18 17-0005 Establishes separate FSAR Chapter   04/06/17     OL-22e     SP SEC 16.7.3.1 16 Technical Requirements for Class              5/18      SP SEC 16.7.3.1.1 1E electrical equipment air                                  SP SEC 16.7.3.1.2 conditioning (A/C) systems under                            SP SEC 16.7.3.2 Operating and Shutdown conditions.                          SP SEC 16.7.3.2.1 SP SEC 16.7.3.2.2 17-0006 Revises FSAR description of Annual 04/06/17     OL-22e     SP SEC 16.11.5.2 Radioactive Effluent Release Report              5/18 (ARERR). Format.
03/07/17 OL-22e 5/18 SP SEC 11.4.1.1 SP SEC 11.4.1.2 SP SEC 11.4.2.2 SP SEC 11.4.2.3.1 SP SEC 11.4.2.3.2 SP SEC 11.4.2.3.3 SP SEC 11.4.2.4 17-0002 Revises FSAR description of data communications for meteorological instruments for Modification MP 11-0002 FCN 04.
Rev. OL-24 11/19
03/17/17 OL-22e 5/18 SA SEC 2.3.3.1.2 SA SEC 2.3.3.1.3 SA SEC 2.3.3.1.4.1 SA FIG 2.3-20 17-0004 Revises FSAR description of General Employee Training (GET).
06/21/17 OL-22e 5/18 SA SEC 13.2.1.2 17-0005 Establishes separate FSAR Chapter 16 Technical Requirements for Class 1E electrical equipment air conditioning (A/C) systems under Operating and Shutdown conditions.
04/06/17 OL-22e 5/18 SP SEC 16.7.3.1 SP SEC 16.7.3.1.1 SP SEC 16.7.3.1.2 SP SEC 16.7.3.2 SP SEC 16.7.3.2.1 SP SEC 16.7.3.2.2 17-0006 Revises FSAR description of Annual Radioactive Effluent Release Report (ARERR). Format.
04/06/17 OL-22e 5/18 SP SEC 16.11.5.2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 10 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 10 of 25)
Change                                                      Interim Notice                                        Approval    Revision Number                  Description              Date    Incorporated      Section Revised    Table Revised    Figure Revised 17-0010 Revises FSAR description of flooding   06/27/17     OL-22e       SP SEC 3.6.2.2.1.3 SP TBL 3.6-6 analysis (not a change to the method                  5/18      SP SEC 9.3.3.2.1.1 SP TBL 3.11(B)-6 of analysis), updates analyzed flood levels, and adds a description of the floor and equipment drain system (FEDS) provisions for the boron injection tank (BIT) room.
Rev. OL-24 11/19 17-0010 Revises FSAR description of flooding analysis (not a change to the method of analysis), updates analyzed flood levels, and adds a description of the floor and equipment drain system (FEDS) provisions for the boron injection tank (BIT) room.
17-0011 Revises FSAR description of           06/04/17     OL-22e       SA SEC 8.2.1.3.2 switchyard for Modification                          5/18 MP 16-0021 17-0018 Revises the maximum temperature in     02/22/18     OL-22d       SP SEC 9.4.1.2.3   SP TBL 3.11(B)-2 Class 1E equipment rooms during                      02/18                          SP TBL 16.7-2 design basis accidents (DBAs).
06/27/17 OL-22e 5/18 SP SEC 3.6.2.2.1.3 SP SEC 9.3.3.2.1.1 SP TBL 3.6-6 SP TBL 3.11(B)-6 17-0011 Revises FSAR description of switchyard for Modification MP 16-0021 06/04/17 OL-22e 5/18 SA SEC 8.2.1.3.2 17-0018 Revises the maximum temperature in Class 1E equipment rooms during design basis accidents (DBAs).
17-0019 Revise FSAR description of Class 1E   11/19/17     OL-22c       SP SEC 8.3.1       SP TBL 3.10(N)-1 120-V vital instrument AC power                      11/17      SP SEC 8.3.2       SP TBL 8.3-1 supplies to reflect change to design                            SP SEC 16.7.13     SP TBL 8.3-4 and operation resulting from                                    SP SEC NRC QR installation of new swing inverters as                          420.1 implemented under MP 13-0020.                                    SP SEC NRC QR 420.4 16-0011 Adopts the core design methodology    09/15/17    OL-22b      SP SEC 4.3.1.5    SP TBL 1.6-2 from WCAP-10965-P-A, WCAP-                           11/17      SP SEC 4.3.3.2    SP TBL 4.1-2 16045-P-A, WCAP-16045-P-A-                                       SP SEC 4.3.4 Addemdum 1-A, and WCAP-11596-P-A to implement OL Amendment 217.
02/22/18 OL-22d 02/18 SP SEC 9.4.1.2.3 SP TBL 3.11(B)-2 SP TBL 16.7-2 17-0019 Revise FSAR description of Class 1E 120-V vital instrument AC power supplies to reflect change to design and operation resulting from installation of new swing inverters as implemented under MP 13-0020.
Rev. OL-24 11/19
11/19/17 OL-22c 11/17 SP SEC 8.3.1 SP SEC 8.3.2 SP SEC 16.7.13 SP SEC NRC QR 420.1 SP SEC NRC QR 420.4 SP TBL 3.10(N)-1 SP TBL 8.3-1 SP TBL 8.3-4 16-0011 Adopts the core design methodology from WCAP-10965-P-A, WCAP-16045-P-A, WCAP-16045-P-A-Addemdum 1-A, and WCAP-11596-P-A to implement OL Amendment 217.
09/15/17 OL-22b 11/17 SP SEC 4.3.1.5 SP SEC 4.3.3.2 SP SEC 4.3.4 SP TBL 1.6-2 SP TBL 4.1-2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 11 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 11 of 25)
Change                                                  Interim Notice                                    Approval    Revision Number              Description              Date    Incorporated      Section Revised  Table Revised  Figure Revised 15-0007 FSAR Chapter 16 terminology change 07/01/16     OL-22a       SP SEC 16.0       SP TBL 16.11-1 from OPERABLE to FUNCTIONAL to                  11/16      SP SEC 16.1.2. SP TBL 16.11-4 match Tech Spec definitions                                  SP SEC 16.1.3     SP TBL 16.11-9 SP SEC 16.2.1     SP TBL 16.3-3 SP SEC 16.2.2     SP TBL 16.3-7 SP SEC 16.3.3     SP TBL 16.11-2 SP SEC 16.3.4     SP TBL 16.11-5 SP SEC 16.4.1 SP SEC 16.4.6 SP SEC 16.4.8 SP SEC 16.4.9 SP SEC 16.5.1 SP SEC 16.5.2 SP SEC 16.7.4 SP SEC 16.7.5 SP SEC 16.7.6 SP SEC 16.7.7 SP SEC 16.7.9 SP SEC 16.7.10 SP SEC 16.7.11 SP SEC 16.7.13 SP SEC 16.8.1 SP SEC 16.8.2 Rev. OL-24 11/19
Rev. OL-24 11/19 15-0007 FSAR Chapter 16 terminology change from OPERABLE to FUNCTIONAL to match Tech Spec definitions 07/01/16 OL-22a 11/16 SP SEC 16.0 SP SEC 16.1.2.
SP SEC 16.1.3 SP SEC 16.2.1 SP SEC 16.2.2 SP SEC 16.3.3 SP SEC 16.3.4 SP SEC 16.4.1 SP SEC 16.4.6 SP SEC 16.4.8 SP SEC 16.4.9 SP SEC 16.5.1 SP SEC 16.5.2 SP SEC 16.7.4 SP SEC 16.7.5 SP SEC 16.7.6 SP SEC 16.7.7 SP SEC 16.7.9 SP SEC 16.7.10 SP SEC 16.7.11 SP SEC 16.7.13 SP SEC 16.8.1 SP SEC 16.8.2 SP TBL 16.11-1 SP TBL 16.11-4 SP TBL 16.11-9 SP TBL 16.3-3 SP TBL 16.3-7 SP TBL 16.11-2 SP TBL 16.11-5 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 12 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 12 of 25)
Change                                                      Interim Notice                                        Approval    Revision Number                  Description              Date    Incorporated      Section Revised  Table Revised    Figure Revised 15-0007                                                                 SP SEC 16.8.3 (cont.)                                                                SP SEC 16.9.2 SP SEC 16.9.3 SP SEC 16.10.1 SP SEC 16.11.1 SP SEC 16.11.2 SP SEC 16.11.3 SP SEC 16.11.4 SP SEC 16.15 16-0019 Update summary of flood levels to     11/10/16     OL-22                         SP TBL 3.6-6 reflect revised calculations                        11/16                        SP TBL 3.11(B)-6 16-0018 Switchyard description updates for MP 11/07/16     OL-22       SA SEC 8.2.1.3.1 16-0002, 345 kV breaker types                      11/16 16-0017 Revise License Renewal Supplement     11/10/16     OL-22       SP SEC 19.1.16   SP TBL 19.4-1 due to 10 CFR 54.37b review                        11/16      SP SEC 19.1.23 SP SEC 19.3.6.2 16-0016 Revise allowable room cooler tube     11/02/16     OL-22                         SP TBL 9.4-6 material to match previous                          11/16                        SP TBL 9.4-8 engineering evaluations 16-0015 EOF Feeder Cable Replacement         10/11/16     OL-22       SA SEC 8.3.1.1 11/16 16-0014 Update description of Cycle 22 fuel   10/19/16     OL-22                         SP TBL 4.3-1A assemblies                                          11/16 Rev. OL-24 11/19
Rev. OL-24 11/19 15-0007 (cont.)
SP SEC 16.8.3 SP SEC 16.9.2 SP SEC 16.9.3 SP SEC 16.10.1 SP SEC 16.11.1 SP SEC 16.11.2 SP SEC 16.11.3 SP SEC 16.11.4 SP SEC 16.15 16-0019 Update summary of flood levels to reflect revised calculations 11/10/16 OL-22 11/16 SP TBL 3.6-6 SP TBL 3.11(B)-6 16-0018 Switchyard description updates for MP 16-0002, 345 kV breaker types 11/07/16 OL-22 11/16 SA SEC 8.2.1.3.1 16-0017 Revise License Renewal Supplement due to 10 CFR 54.37b review 11/10/16 OL-22 11/16 SP SEC 19.1.16 SP SEC 19.1.23 SP SEC 19.3.6.2 SP TBL 19.4-1 16-0016 Revise allowable room cooler tube material to match previous engineering evaluations 11/02/16 OL-22 11/16 SP TBL 9.4-6 SP TBL 9.4-8 16-0015 EOF Feeder Cable Replacement 10/11/16 OL-22 11/16 SA SEC 8.3.1.1 16-0014 Update description of Cycle 22 fuel assemblies 10/19/16 OL-22 11/16 SP TBL 4.3-1A Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 13 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 13 of 25)
Change                                                  Interim Notice                                    Approval    Revision Number                  Description          Date    Incorporated      Section Revised    Table Revised  Figure Revised 16-0012 Organizational changes             10/11/16     OL-22       SA SEC 13.1.1                       SA FIG 13.1-1 11/16      SA SEC 13.1.2.2.1                   SA FIG 13.1-2 SA SEC 13.1.2.2.2                   SA FIG 13.1-3 SA SEC 13.1.2.2.3 SA SEC 13.1.2.2.4 SA SEC 13.1.2.1.16 16-0008 Incorporate the Hardened Condesate 10/24/16     OL-22       SP SEC 1.2.2.1     SP TBL 1.1-1    SP FIG 8.3-1 Storage Tank (HCST) into FSAR                    11/16      SP SEC 7.3.6.1     SP TBL 3.2-1    SP FIG 9.2-17 SP SEC 9.2.6       SP TBL 9.2-14 SP SEC 9.2.6.2.1   SP TBL 9.3-11 SP SEC 9.2.6.2.2 SP SEC 9.2.6.2.3 SP SEC 9.2.6.5 SP SEC 10.4.9.2.1 16-0006 Update utility grid description and 08/03/16     OL-22       SA SEC 8.1.1                       SA FIG 8.1-1 designate previous grid maps as                  11/16 historical information Rev. OL-24 11/19
Rev. OL-24 11/19 16-0012 Organizational changes 10/11/16 OL-22 11/16 SA SEC 13.1.1 SA SEC 13.1.2.2.1 SA SEC 13.1.2.2.2 SA SEC 13.1.2.2.3 SA SEC 13.1.2.2.4 SA SEC 13.1.2.1.16 SA FIG 13.1-1 SA FIG 13.1-2 SA FIG 13.1-3 16-0008 Incorporate the Hardened Condesate Storage Tank (HCST) into FSAR 10/24/16 OL-22 11/16 SP SEC 1.2.2.1 SP SEC 7.3.6.1 SP SEC 9.2.6 SP SEC 9.2.6.2.1 SP SEC 9.2.6.2.2 SP SEC 9.2.6.2.3 SP SEC 9.2.6.5 SP SEC 10.4.9.2.1 SP TBL 1.1-1 SP TBL 3.2-1 SP TBL 9.2-14 SP TBL 9.3-11 SP FIG 8.3-1 SP FIG 9.2-17 16-0006 Update utility grid description and designate previous grid maps as historical information 08/03/16 OL-22 11/16 SA SEC 8.1.1 SA FIG 8.1-1 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 14 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 14 of 25)
Change                                                  Interim Notice                                    Approval    Revision Number                Description          Date    Incorporated      Section Revised    Table Revised  Figure Revised 15-0012 Incorporate the ISFSI spent fuel   07/19/16     OL-22       SP SEC 1.2.2.1     SP TBL 1.1-1    SP FIG 1.2-20 storage facility into the FSAR                  11/16      SP SEC 1.2.3       SP TBL 3.2-1    SP FIG 1.2-21 SP SEC 1.2.9.3     SP TBL 3.3-1    SP FIG 1.2-22 SP SEC 3.1.8       SP TBL 3.5-2    SP FIG 1.2-44 SP SEC 3.8.4.1.2   SP TBL 9.2-20    SP FIG 1.2-45 SP SEC 9.1.2       SP TBL 16.11-7  SP FIG 3.8-97 SP SEC 9.1.2.1                     SP FIG 3.8-98 SP SEC 9.1.2.2                     SP FIG 9.1-9 SP SEC 9.1.4                       SA FIG 2.1-3 SP SEC 9.1.4.2.1                   SA FIG 2.4-3 SP SEC 9.1.4.2.3 SP SEC 9.1.4.2.3.1 SP SEC 9.1.4.3 SP SEC 9.1.4.6 SP SEC 9.1.6 SP SEC 9.5.1 SP SEC 9.5.1.1.1 SP SEC 9.5.1.2 SP SEC 9.5.1.3 SP SEC 12.2.1.3.1 SP SEC 12.2.1.7 SP SEC 12.3.2.2.3 SP SEC 12.3.2.2.9 SP SEC 12.4.2.1 SP SEC 15.7.4.1.1 SP SEC 16.11.5.2 SP SEC 16.11.5.2.1 SA SEC 2.4.2.3.2 14-0012 Change wording for Hydrogen to VCT 10/19/16     OL-22       SP SEC 9.3.4.2 11/16      SP SEC 11.3.2.3 Rev. OL-24 11/19
Rev. OL-24 11/19 15-0012 Incorporate the ISFSI spent fuel storage facility into the FSAR 07/19/16 OL-22 11/16 SP SEC 1.2.2.1 SP SEC 1.2.3 SP SEC 1.2.9.3 SP SEC 3.1.8 SP SEC 3.8.4.1.2 SP SEC 9.1.2 SP SEC 9.1.2.1 SP SEC 9.1.2.2 SP SEC 9.1.4 SP SEC 9.1.4.2.1 SP SEC 9.1.4.2.3 SP SEC 9.1.4.2.3.1 SP SEC 9.1.4.3 SP SEC 9.1.4.6 SP SEC 9.1.6 SP SEC 9.5.1 SP SEC 9.5.1.1.1 SP SEC 9.5.1.2 SP SEC 9.5.1.3 SP SEC 12.2.1.3.1 SP SEC 12.2.1.7 SP SEC 12.3.2.2.3 SP SEC 12.3.2.2.9 SP SEC 12.4.2.1 SP SEC 15.7.4.1.1 SP SEC 16.11.5.2 SP SEC 16.11.5.2.1 SA SEC 2.4.2.3.2 SP TBL 1.1-1 SP TBL 3.2-1 SP TBL 3.3-1 SP TBL 3.5-2 SP TBL 9.2-20 SP TBL 16.11-7 SP FIG 1.2-20 SP FIG 1.2-21 SP FIG 1.2-22 SP FIG 1.2-44 SP FIG 1.2-45 SP FIG 3.8-97 SP FIG 3.8-98 SP FIG 9.1-9 SA FIG 2.1-3 SA FIG 2.4-3 14-0012 Change wording for Hydrogen to VCT 10/19/16 OL-22 11/16 SP SEC 9.3.4.2 SP SEC 11.3.2.3 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 15 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 15 of 25)
Change                                                      Interim Notice                                        Approval    Revision Number                Description              Date    Incorporated      Section Revised    Table Revised  Figure Revised 16-0010 Additional FSAR Changes for NFPA       07/01/16     OL-21e       SP SEC 9.5.1.1.5   SP TBL 16.12-1 805                                                  8/16      SP QR 280 SP QR 730 16-0009 Administrative corrections to         05/12/16     OL-21e                                           SP FIG 6.2.4-1 Containment Penetration Figure                      8/16 16-0007 Update Boration System Bases with     05/17/16     OL-21e       SP SEC 16.1.2.1.2 correct RFR reference                                8/16        SP SEC 16.1.2.1.3 16-0005 Update the FSAR for the Hardened       03/11/16     OL-21e       SP SEC 1.2.2.1 Storage Buidling MP 13-0031                          8/16 16-0004 EDG fuel oil tank venting wording in 05/06/16     OL-21e       SP SEC 9.5.4.2.2 FSAR                                                8/16 16-0003 Cold Lab Chiller Replacement           03/11/15     OL-21e                           SP TBL 9.2-21 8/16 15-0019 FSAR Chp. 15 Thermohydraulic Code     12/02/15     OL-21e       SP SEC 15.0.11.6 Reference Updates                                    8/16        SP SEC 15.4.1.2 15-0018 Reflect Status of Ex-Vessel Dosimetry 10/20/15     OL-21e       SP SEC 19.1.17 8/16 15-0017 Revise description Emergency           11/18/15     OL-21e       SP SEC 9.5.3.2.3 Lighting Systems to match NFPA 805                  8/16 transition 15-0016 Revise FSAR to remove inaccurate       10/20/15     OL-21e       SP SEC 9.1.4.2.2 information about SFP Bridge Crane                  8/16 15-0015 Organizational Reporting Change for   10/20/15     OL-21e       SA SEC 13.1.2.2.1.1                 SA FIG 13.1-3 Fire Marshal                                        8/16 Rev. OL-24 11/19
Rev. OL-24 11/19 16-0010 Additional FSAR Changes for NFPA 805 07/01/16 OL-21e 8/16 SP SEC 9.5.1.1.5 SP QR 280 SP QR 730 SP TBL 16.12-1 16-0009 Administrative corrections to Containment Penetration Figure 05/12/16 OL-21e 8/16 SP FIG 6.2.4-1 16-0007 Update Boration System Bases with correct RFR reference 05/17/16 OL-21e 8/16 SP SEC 16.1.2.1.2 SP SEC 16.1.2.1.3 16-0005 Update the FSAR for the Hardened Storage Buidling MP 13-0031 03/11/16 OL-21e 8/16 SP SEC 1.2.2.1 16-0004 EDG fuel oil tank venting wording in FSAR 05/06/16 OL-21e 8/16 SP SEC 9.5.4.2.2 16-0003 Cold Lab Chiller Replacement 03/11/15 OL-21e 8/16 SP TBL 9.2-21 15-0019 FSAR Chp. 15 Thermohydraulic Code Reference Updates 12/02/15 OL-21e 8/16 SP SEC 15.0.11.6 SP SEC 15.4.1.2 15-0018 Reflect Status of Ex-Vessel Dosimetry 10/20/15 OL-21e 8/16 SP SEC 19.1.17 15-0017 Revise description Emergency Lighting Systems to match NFPA 805 transition 11/18/15 OL-21e 8/16 SP SEC 9.5.3.2.3 15-0016 Revise FSAR to remove inaccurate information about SFP Bridge Crane 10/20/15 OL-21e 8/16 SP SEC 9.1.4.2.2 15-0015 Organizational Reporting Change for Fire Marshal 10/20/15 OL-21e 8/16 SA SEC 13.1.2.2.1.1 SA FIG 13.1-3 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 16 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 16 of 25)
Change                                                    Interim Notice                                      Approval    Revision Number                Description              Date    Incorporated      Section Revised    Table Revised  Figure Revised 15-0014 Change to FSAR to remove 1 year     03/14/16     OL-21e       SP SEC 11.4.2.3.2 onsite storage for rad waste                        8/16      SP SEC 11.4.2.5 15-0013 Revise FSAR SA 8.4 to allow local   01/14/16     OL-21e       SA SEC 8.4.1 operation of AEPS                                  8/16 15-0010 update SP Figure 6.2.4-1 Containment 07/30/15     OL-21e                         SP TBL 6.2.4-1   SP FIG 6.2.4-1 Penetrations with administrative                  8/16 changes 15-0004 Update FSAR for MP 10-0004 which     06/29/16     OL-21e       SP SEC 6.2.1.1.3   SP TBL 6.2.1-6 modified the LOCA sequencer for                    8/16        SP SEC 6.2.2.2.2.3 SP TBL 6.2.1-7 ESW supply to UHS                                                                SP TBL 16.3-2 Rev. OL-24 11/19
Rev. OL-24 11/19 15-0014 Change to FSAR to remove 1 year onsite storage for rad waste 03/14/16 OL-21e 8/16 SP SEC 11.4.2.3.2 SP SEC 11.4.2.5 15-0013 Revise FSAR SA 8.4 to allow local operation of AEPS 01/14/16 OL-21e 8/16 SA SEC 8.4.1 15-0010 update SP Figure 6.2.4-1 Containment Penetrations with administrative changes 07/30/15 OL-21e 8/16 SP TBL 6.2.4-1 SP FIG 6.2.4-1 15-0004 Update FSAR for MP 10-0004 which modified the LOCA sequencer for ESW supply to UHS 06/29/16 OL-21e 8/16 SP SEC 6.2.1.1.3 SP SEC 6.2.2.2.2.3 SP TBL 6.2.1-6 SP TBL 6.2.1-7 SP TBL 16.3-2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 17 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 17 of 25)
Change                                            Interim Notice                              Approval    Revision Number              Description        Date    Incorporated      Section Revised  Table Revised  Figure Revised 10-0031 Broad FSAR Ch16 improvements: 06/05/16     OL-21e       SP SEC 16.7.8.1 remove special exemptions                    8/16      SP SEC 16.7.9.1 SP SEC 16.7.10.1 SP SEC 16.7.10.1.1 SP SEC 16.9.3.1 SP SEC 16.11.1.1 SP SEC 16.11.1.2 SP SEC 16.11.1.3 SP SEC 16.11.1.4 SP SEC 16.11.1.5 SP SEC 16.11.1.5.1 SP SEC 16.11.2.1 SP SEC 16.11.2.2 SP SEC 16.11.2.2.2 SP SEC 16.11.2.3 SP SEC 16.11.2.3.2 SP SEC 16.11.2.4 SP SEC 16.11.2.5 SP SEC 16.11.2.5.1 SP SEC 16.11.2.6 SP SEC 16.11.2.6.1 SP SEC 16.11.2.7 Rev. OL-24 11/19
Rev. OL-24 11/19 10-0031 Broad FSAR Ch16 improvements:
remove special exemptions 06/05/16 OL-21e 8/16 SP SEC 16.7.8.1 SP SEC 16.7.9.1 SP SEC 16.7.10.1 SP SEC 16.7.10.1.1 SP SEC 16.9.3.1 SP SEC 16.11.1.1 SP SEC 16.11.1.2 SP SEC 16.11.1.3 SP SEC 16.11.1.4 SP SEC 16.11.1.5 SP SEC 16.11.1.5.1 SP SEC 16.11.2.1 SP SEC 16.11.2.2 SP SEC 16.11.2.2.2 SP SEC 16.11.2.3 SP SEC 16.11.2.3.2 SP SEC 16.11.2.4 SP SEC 16.11.2.5 SP SEC 16.11.2.5.1 SP SEC 16.11.2.6 SP SEC 16.11.2.6.1 SP SEC 16.11.2.7 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 18 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 18 of 25)
Change                                                      Interim Notice                                        Approval    Revision Number                Description                Date    Incorporated      Section Revised    Table Revised  Figure Revised 10-0031                                                                   SP SEC 16.11.2.7.1 (Cont.)                                                                  SP SEC 16.11.2.7.2 SP SEC 16.11.2.8 SP SEC 16.11.2.8.1 SP SEC 16.11.2.8.2 SP SEC 16.11.3.1 SP SEC 16.11.4.1 SP SEC 16.11.4.1.2 SP SEC 16.11.4.3 SP SEC 16.11.5.2 SP SEC 16.11.5.2.1 SP SEC 16.24.4 15-0005 Incorporate changes related to licesne 02/29/16     OL-21d       SP SEC 4.4.1.1     SP TBL 1.6-2    SP FIG 4.4-3a amendment 216 which modified the                      4/16      SP SEC 4.4.2.2.1   SP TBL 15.0-2    SP FIG 4.4-3b DNB correlation stated in Technical                              SP SEC 4.4.7 Specifications and adopted WCAP-                                SP SEC 15.0.3.2 14565-P-A methodology at Callaway                                SP SEC 15.1.5.2 SP SEC 15.1.6 14-0003 incorporate changes related to license 10/8/15     OL-21c       SP SEC 5.4.7.2.7 amendment 213 which added new                        1/16      SP SEC 5.4.7.5 requirements for managing gas                                    SP SEC 6.2.2.1.2.3 accumulation in ECCS, RHR, and                                  SP SEC 6.2.2.1.4 Containment Spray.                                              SP SEC 6.3.2.2 SP SEC 6.3.4.2 SP SEC 6.3.4.2.1 Rev. OL-24 11/19
Rev. OL-24 11/19 10-0031 (Cont.)
SP SEC 16.11.2.7.1 SP SEC 16.11.2.7.2 SP SEC 16.11.2.8 SP SEC 16.11.2.8.1 SP SEC 16.11.2.8.2 SP SEC 16.11.3.1 SP SEC 16.11.4.1 SP SEC 16.11.4.1.2 SP SEC 16.11.4.3 SP SEC 16.11.5.2 SP SEC 16.11.5.2.1 SP SEC 16.24.4 15-0005 Incorporate changes related to licesne amendment 216 which modified the DNB correlation stated in Technical Specifications and adopted WCAP-14565-P-A methodology at Callaway 02/29/16 OL-21d 4/16 SP SEC 4.4.1.1 SP SEC 4.4.2.2.1 SP SEC 4.4.7 SP SEC 15.0.3.2 SP SEC 15.1.5.2 SP SEC 15.1.6 SP TBL 1.6-2 SP TBL 15.0-2 SP FIG 4.4-3a SP FIG 4.4-3b 14-0003 incorporate changes related to license amendment 213 which added new requirements for managing gas accumulation in ECCS, RHR, and Containment Spray.
10/8/15 OL-21c 1/16 SP SEC 5.4.7.2.7 SP SEC 5.4.7.5 SP SEC 6.2.2.1.2.3 SP SEC 6.2.2.1.4 SP SEC 6.3.2.2 SP SEC 6.3.4.2 SP SEC 6.3.4.2.1 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 19 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 19 of 25)
Change                                                  Interim Notice                                    Approval    Revision Number              Description            Date    Incorporated      Section Revised  Table Revised  Figure Revised 15-0006 Added new Chapter 19 to incorporate 7/22/15     OL-21b       SP SEC 19.0       SP TBL19.1-1 Callaway Operating License Renewal                8/15      SP SEC 19.1       SP TBL19.4-1 into the FSAR                                                SP SEC 19.1.1 SP SEC 19.1.10 SP SEC 19.1.11 SP SEC 19.1.12 SP SEC 19.1.13 SP SEC 19.1.14 SP SEC 19.1.15 SP SEC 19.1.16 SP SEC 19.1.17 SP SEC 19.1.18 SP SEC 19.1.19 SP SEC 19.1.2 SP SEC 19.1.20 SP SEC 19.1.21 SP SEC 19.1.22 SP SEC 19.1.23 SP SEC 19.1.24 SP SEC 19.1.25 SP SEC 19.1.26 SP SEC 19.1.27 SP SEC 19.1.28 SP SEC 19.1.29 SP SEC 19.1.3 SP SEC 19.1.30 SP SEC 19.1.31 SP SEC 19.1.32 SP SEC 19.1.33 SP SEC 19.1.34 SP SEC 19.1.35 Rev. OL-24 11/19
Rev. OL-24 11/19 15-0006 Added new Chapter 19 to incorporate Callaway Operating License Renewal into the FSAR 7/22/15 OL-21b 8/15 SP SEC 19.0 SP SEC 19.1 SP SEC 19.1.1 SP SEC 19.1.10 SP SEC 19.1.11 SP SEC 19.1.12 SP SEC 19.1.13 SP SEC 19.1.14 SP SEC 19.1.15 SP SEC 19.1.16 SP SEC 19.1.17 SP SEC 19.1.18 SP SEC 19.1.19 SP SEC 19.1.2 SP SEC 19.1.20 SP SEC 19.1.21 SP SEC 19.1.22 SP SEC 19.1.23 SP SEC 19.1.24 SP SEC 19.1.25 SP SEC 19.1.26 SP SEC 19.1.27 SP SEC 19.1.28 SP SEC 19.1.29 SP SEC 19.1.3 SP SEC 19.1.30 SP SEC 19.1.31 SP SEC 19.1.32 SP SEC 19.1.33 SP SEC 19.1.34 SP SEC 19.1.35 SP TBL19.1-1 SP TBL19.4-1 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 20 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 20 of 25)
Change                            Interim Notice              Approval    Revision Number  Description  Date    Incorporated      Section Revised Table Revised  Figure Revised 15-0006                                       SP SEC 19.1.36 (Cont.)                                      SP SEC 19.1.37 SP SEC 19.1.38 SP SEC 19.1.39 SP SEC 19.1.4 SP SEC 19.1.5 SP SEC 19.1.6 SP SEC 19.1.7 SP SEC 19.1.8 SP SEC 19.1.9 SP SEC 19.2 SP SEC 19.2.1 SP SEC 19.2.2 SP SEC 19.2.3 SP SEC 19.3 SP SEC 19.3.1 SP SEC 19.3.1.1 SP SEC 19.3.1.2 SP SEC 19.3.1.3 SP SEC 19.3.1.4 SP SEC 19.3.1.5 SP SEC 19.3.2 SP SEC 19.3.2.1 SP SEC 19.3.2.1.1 SP SEC 19.3.2.1.2 SP SEC 19.3.2.1.3 SP SEC 19.3.2.1.4 SP SEC 19.3.2.2 SP SEC 19.3.2.3 SP SEC 19.3.2.4 SP SEC 19.3.2.5 Rev. OL-24 11/19
Rev. OL-24 11/19 15-0006 (Cont.)
SP SEC 19.1.36 SP SEC 19.1.37 SP SEC 19.1.38 SP SEC 19.1.39 SP SEC 19.1.4 SP SEC 19.1.5 SP SEC 19.1.6 SP SEC 19.1.7 SP SEC 19.1.8 SP SEC 19.1.9 SP SEC 19.2 SP SEC 19.2.1 SP SEC 19.2.2 SP SEC 19.2.3 SP SEC 19.3 SP SEC 19.3.1 SP SEC 19.3.1.1 SP SEC 19.3.1.2 SP SEC 19.3.1.3 SP SEC 19.3.1.4 SP SEC 19.3.1.5 SP SEC 19.3.2 SP SEC 19.3.2.1 SP SEC 19.3.2.1.1 SP SEC 19.3.2.1.2 SP SEC 19.3.2.1.3 SP SEC 19.3.2.1.4 SP SEC 19.3.2.2 SP SEC 19.3.2.3 SP SEC 19.3.2.4 SP SEC 19.3.2.5 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 21 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 21 of 25)
Change                                                        Interim Notice                                          Approval    Revision Number                  Description              Date    Incorporated      Section Revised  Table Revised  Figure Revised 15-0006                                                                   SP SEC 19.3.2.6 (Cont.)                                                                  SP SEC 19.3.2.7 SP SEC 19.3.3 SP SEC 19.3.4 SP SEC 19.3.5 SP SEC 19.3.5.1 SP SEC 19.3.5.2 SP SEC 19.3.6 SP SEC 19.3.6.1 SP SEC 19.3.6.10 SP SEC 19.3.6.2 SP SEC 19.3.6.3 SP SEC 19.3.6.4 SP SEC 19.3.6.5 SP SEC 19.3.6.6 SP SEC 19.3.6.7 SP SEC 19.3.6.8 SP SEC 19.3.6.9 SP SEC 19.4 15-0008 Administrative change to update         5/13/15     OL-21b       SP SEC 6.3.1 position titles and and clarify EES run                8/15      SP SEC 16.0.1.4 times to be consistant with License                              SP SEC 16.0.2.2 Amendment 209                                                    SP SEC 16.0.2.3 SP SEC 16.7.10.1.1 Rev. OL-24 11/19
Rev. OL-24 11/19 15-0006 (Cont.)
SP SEC 19.3.2.6 SP SEC 19.3.2.7 SP SEC 19.3.3 SP SEC 19.3.4 SP SEC 19.3.5 SP SEC 19.3.5.1 SP SEC 19.3.5.2 SP SEC 19.3.6 SP SEC 19.3.6.1 SP SEC 19.3.6.10 SP SEC 19.3.6.2 SP SEC 19.3.6.3 SP SEC 19.3.6.4 SP SEC 19.3.6.5 SP SEC 19.3.6.6 SP SEC 19.3.6.7 SP SEC 19.3.6.8 SP SEC 19.3.6.9 SP SEC 19.4 15-0008 Administrative change to update position titles and and clarify EES run times to be consistant with License Amendment 209 5/13/15 OL-21b 8/15 SP SEC 6.3.1 SP SEC 16.0.1.4 SP SEC 16.0.2.2 SP SEC 16.0.2.3 SP SEC 16.7.10.1.1 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 22 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 22 of 25)
Change                                                      Interim Notice                                        Approval    Revision Number                Description              Date    Incorporated      Section Revised    Table Revised  Figure Revised 13-0016 Incorporate changes related to license 3/31/15     OL-21a       SP SEC 3.6.2.1.2.4 SP TBL 3.6-2 amendment 211 which adds a new                        5/15      SP SEC 3.6.3 crack exclusion for moderate energy HDPE piping.
Rev. OL-24 11/19 13-0016 Incorporate changes related to license amendment 211 which adds a new crack exclusion for moderate energy HDPE piping.
09-0038 Add description of the microwave       2/12/10       OL-21       SP SEC 9.5.2.1.2 communications links that are being                  5/15      SP SEC 9.5.2.2.4 added to the Callaway Plant                                      SP SEC 9.5.2.2.6 communications portfolio.(MP 09-                                SP SEC 9.5.2.2.7 0003) 14-0001 Update FSAR to reflect MP 13-0039,     5/13/15       OL-21       SP SEC 9.1.4.2.2   SP TBL 9.1-7    SP FIG 3.8-97 Cask Handling Crane modification                      5/15      SP SEC 9.1.4.2.3                   SP FIG 3.9-98 required for the Independent Spent                              SP SEC 9.1.4.3                     SP FIG 9.1-6 Fuel Storage Installation (ISFSI)                                SP SEC 15.0.1.3                     SP FIG 9.1-7 project.                                                        SP SEC 15.7                         SP FIG 15.0-31 SP SEC 15.7.5 10-0004 Add a summary description of the       5/22/15       OL-21       SP SEC 9.1.5 basis for conducting heavy load                      5/15      SP SEC 9.1.5.1 movements                                                        SP SEC 9.1.5.2 SP SEC 9.1.5.3 SP SEC 9.1.5.4 SP SEC 9.1.5.4.1 SP SEC 9.1.5.4.2 SP SEC 9.1.5.4.3 SP SEC 9.1.5.5 SP SEC 9.1.6 14-0004 Revise FSAR 18.3.2.2 to reflect       5/27/14       OL-21       SP SEC 18.3.2.2 MP 11-0020.                                          5/15 Rev. OL-24 11/19
3/31/15 OL-21a 5/15 SP SEC 3.6.2.1.2.4 SP SEC 3.6.3 SP TBL 3.6-2 09-0038 Add description of the microwave communications links that are being added to the Callaway Plant communications portfolio.(MP 09-0003) 2/12/10 OL-21 5/15 SP SEC 9.5.2.1.2 SP SEC 9.5.2.2.4 SP SEC 9.5.2.2.6 SP SEC 9.5.2.2.7 14-0001 Update FSAR to reflect MP 13-0039, Cask Handling Crane modification required for the Independent Spent Fuel Storage Installation (ISFSI) project.
5/13/15 OL-21 5/15 SP SEC 9.1.4.2.2 SP SEC 9.1.4.2.3 SP SEC 9.1.4.3 SP SEC 15.0.1.3 SP SEC 15.7 SP SEC 15.7.5 SP TBL 9.1-7 SP FIG 3.8-97 SP FIG 3.9-98 SP FIG 9.1-6 SP FIG 9.1-7 SP FIG 15.0-31 10-0004 Add a summary description of the basis for conducting heavy load movements 5/22/15 OL-21 5/15 SP SEC 9.1.5 SP SEC 9.1.5.1 SP SEC 9.1.5.2 SP SEC 9.1.5.3 SP SEC 9.1.5.4 SP SEC 9.1.5.4.1 SP SEC 9.1.5.4.2 SP SEC 9.1.5.4.3 SP SEC 9.1.5.5 SP SEC 9.1.6 14-0004 Revise FSAR 18.3.2.2 to reflect MP 11-0020.
5/27/14 OL-21 5/15 SP SEC 18.3.2.2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 23 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 23 of 25)
Change                                                    Interim Notice                                      Approval    Revision Number              Description              Date    Incorporated      Section Revised    Table Revised    Figure Revised 14-0005 Update the FSAR with the information 5/13/15       OL-21       SP SEC 3.7(B)       SP TBL 2.3-3      SP FIG 3.8-74 associated with the replacement                    5/15      SP SEC 3.7(N).1.3   SP TBL 3.10(N)-1  SP FIG 18.2-1 reactor vessel closure head (RRVCH)                            SP SEC 3.7(N).2     SP TBL 3.2-1      SP FIG 18.2-13 Integrated Head Assembly (IHA). (MP                            SP SEC 3.7(N).2.15 SP TBL 3.7(N)-1 10-0001)                                                      SP SEC 3.7(N).3.10 SP TBL 5.2-3 SP SEC 3.7(N).3.15 SP TBL 6.1-3 SP SEC 3.7(N).3.2   SP TBL 6.2.1-4 SP SEC 3.7(N).3.3   SP TBL 6.2.1-66 SP SEC 3.7(N).3.6   SP TBL 6.5-2 SP SEC 3.7(N).3.7   SP TBL 9.1-9 SP SEC 3.8.3.1     SP TBL 9.4-12 SP SEC 3.8.3.1.10   SP TBL 12.4-1 SP SEC 3.9(N).1.2 SP SEC 3.9(N).2.5 SP SEC 3.9(N).3.2.1 SP SEC 3.9(N).7 SP SEC 3.11(B).2.1 SP SEC 3A SP SEC 4.2.5 SP SEC 9.1.4.2.3.1 SP SEC 9.1.4.3 SP SEC 9.1.5 SP SEC 9.4.6.1.2 SP SEC 9.4.6.2.2 SP SEC 9.4.6.2.3 SP SEC 18.2.1.2 SP SEC NRC Q 331.1 SP SEC NRC Q 492.14 Rev. OL-24 11/19
Rev. OL-24 11/19 14-0005 Update the FSAR with the information associated with the replacement reactor vessel closure head (RRVCH)
Integrated Head Assembly (IHA). (MP 10-0001) 5/13/15 OL-21 5/15 SP SEC 3.7(B)
SP SEC 3.7(N).1.3 SP SEC 3.7(N).2 SP SEC 3.7(N).2.15 SP SEC 3.7(N).3.10 SP SEC 3.7(N).3.15 SP SEC 3.7(N).3.2 SP SEC 3.7(N).3.3 SP SEC 3.7(N).3.6 SP SEC 3.7(N).3.7 SP SEC 3.8.3.1 SP SEC 3.8.3.1.10 SP SEC 3.9(N).1.2 SP SEC 3.9(N).2.5 SP SEC 3.9(N).3.2.1 SP SEC 3.9(N).7 SP SEC 3.11(B).2.1 SP SEC 3A SP SEC 4.2.5 SP SEC 9.1.4.2.3.1 SP SEC 9.1.4.3 SP SEC 9.1.5 SP SEC 9.4.6.1.2 SP SEC 9.4.6.2.2 SP SEC 9.4.6.2.3 SP SEC 18.2.1.2 SP SEC NRC Q 331.1 SP SEC NRC Q 492.14 SP TBL 2.3-3 SP TBL 3.10(N)-1 SP TBL 3.2-1 SP TBL 3.7(N)-1 SP TBL 5.2-3 SP TBL 6.1-3 SP TBL 6.2.1-4 SP TBL 6.2.1-66 SP TBL 6.5-2 SP TBL 9.1-9 SP TBL 9.4-12 SP TBL 12.4-1 SP FIG 3.8-74 SP FIG 18.2-1 SP FIG 18.2-13 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 24 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 24 of 25)
Change                                                      Interim Notice                                        Approval    Revision Number                Description                Date    Incorporated      Section Revised    Table Revised  Figure Revised 14-0006 Update the FSAR with the information   4/27/15       OL-21       SP SEC 1.2.2.1     SP TBL 3.2-1    SP FIG 3.9(N)-4 associated with the replacement vessel                5/15      SP SEC 3.9(N).4.1 SP TBL 3B-6      SP FIG 3.9(N)-5 head. (MP 10-0005)                                              SP SEC 3.9(N).4.2 SP TBL 5.1-1 SP SEC 4.5.1.1    SP TBL 5.2-1 SP SEC 4.5.1.3     SP TBL 5.2-2 SP SEC 5.2.3.1    SP TBL 5.3-1 SP SEC 5.2.4.2.2  SP TBL 5.3-2 SP SEC 5.3.1.2     SP TBL 5.3-4 SP SEC 5.3.3.1 SP SEC 5.3.3.3 SP SEC 5.3.3.5 SP SEC 5.3.3.7 SP SEC 7.7.1.9.1 SP SEC 11.4.2.3.2 SP SEC 12.2.1.7 SP SEC 15.4.8.1.1 14-0007 Update the FSAR to describe the        9/8/14      OL-21      SP SEC 9.1.3.2.1.1 changes to the fuel pool cooling and                 5/15      SP SEC 9.1.3.2.3.1 cleanup system (FPCCS) to be implemented in order to allow flexible response to beyond design-basis external events (BDBEE). (MP 13-0026) 14-0010 Correct minor inconsistencies           8/4/14       OL-21       SA SEC 2.3.4.2.2 between several FSAR Site                            5/15      SA SEC 2.3.5.2.1.2 Addendum sections in Chapter 2 Rev. OL-24 11/19
Rev. OL-24 11/19 14-0006 Update the FSAR with the information associated with the replacement vessel head. (MP 10-0005) 4/27/15 OL-21 5/15 SP SEC 1.2.2.1 SP SEC 3.9(N).4.1 SP SEC 3.9(N).4.2 SP SEC 4.5.1.1 SP SEC 4.5.1.3 SP SEC 5.2.3.1 SP SEC 5.2.4.2.2 SP SEC 5.3.1.2 SP SEC 5.3.3.1 SP SEC 5.3.3.3 SP SEC 5.3.3.5 SP SEC 5.3.3.7 SP SEC 7.7.1.9.1 SP SEC 11.4.2.3.2 SP SEC 12.2.1.7 SP SEC 15.4.8.1.1 SP TBL 3.2-1 SP TBL 3B-6 SP TBL 5.1-1 SP TBL 5.2-1 SP TBL 5.2-2 SP TBL 5.3-1 SP TBL 5.3-2 SP TBL 5.3-4 SP FIG 3.9(N)-4 SP FIG 3.9(N)-5 14-0007 Update the FSAR to describe the changes to the fuel pool cooling and cleanup system (FPCCS) to be implemented in order to allow flexible response to beyond design-basis external events (BDBEE). (MP 13-0026) 9/8/14 OL-21 5/15 SP SEC 9.1.3.2.1.1 SP SEC 9.1.3.2.3.1 14-0010 Correct minor inconsistencies between several FSAR Site Addendum sections in Chapter 2 8/4/14 OL-21 5/15 SA SEC 2.3.4.2.2 SA SEC 2.3.5.2.1.2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised


CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 25 of 25)
CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 25 of 25)
Change                                                        Interim Notice                                          Approval    Revision Number                Description                  Date    Incorporated      Section Revised    Table Revised  Figure Revised 14-0015 Correction to the reference to           3/18/15       OL-21       SP SEC 9.5.1.4.2 Callaway Calculation contained in the                  5/15 FSAR 15-0001 Revising the FSAR to replace the         3/3/15       OL-21       SP SEC 5.2.4.1 outdated reference with a more generic                  5/15      SP SEC 5.2.4.1.1 description of the Inservice Inspection                            SP SEC 5.2.4.5 Program so as to remove unnecessary                                SP SEC 5.4.2.4.1 detail .                                                          SP SEC 6.6.1 SP SEC 6.6.3 SP SEC 6.6.3.1 SP SEC 6.6.6 15-0002 Add text to describe the new Spent       4/9/15       OL-21       SP SEC 9.1.3 Fuel Pool Instrumentation that satisfies                5/15 NRC Order EA-12-051 15-0003 Revise inconsistencies in the           4/10/15       OL-21       SP SEC 1.2.9.2 description of the pressure at which                    5/15      SP SEC 3.1.6 the RHR system is placed in service.                              SP SEC 5.2.2.10.4.1 SP SEC 7.6.2.1 15-0011 Update the FSAR to incorporate the       5/19/15       OL-21       SP SEC 4.1         SP TBL 4.3-1A cycle 21 core reload design                            5/15      SP SEC 4.2.2       SP TBL 5.3-10 SP SEC 4.2.2.2.3 SP SEC 4.2.2.2.4 SP SEC 4.2.2.3.3 SP SEC 15.6.5.3.1 SP SEC 15.6.5.3.3 SP SEC 15.6.7 Rev. OL-24 11/19}}
Rev. OL-24 11/19 14-0015 Correction to the reference to Callaway Calculation contained in the FSAR 3/18/15 OL-21 5/15 SP SEC 9.5.1.4.2 15-0001 Revising the FSAR to replace the outdated reference with a more generic description of the Inservice Inspection Program so as to remove unnecessary detail.
3/3/15 OL-21 5/15 SP SEC 5.2.4.1 SP SEC 5.2.4.1.1 SP SEC 5.2.4.5 SP SEC 5.4.2.4.1 SP SEC 6.6.1 SP SEC 6.6.3 SP SEC 6.6.3.1 SP SEC 6.6.6 15-0002 Add text to describe the new Spent Fuel Pool Instrumentation that satisfies NRC Order EA-12-051 4/9/15 OL-21 5/15 SP SEC 9.1.3 15-0003 Revise inconsistencies in the description of the pressure at which the RHR system is placed in service.
4/10/15 OL-21 5/15 SP SEC 1.2.9.2 SP SEC 3.1.6 SP SEC 5.2.2.10.4.1 SP SEC 7.6.2.1 15-0011 Update the FSAR to incorporate the cycle 21 core reload design 5/19/15 OL-21 5/15 SP SEC 4.1 SP SEC 4.2.2 SP SEC 4.2.2.2.3 SP SEC 4.2.2.2.4 SP SEC 4.2.2.3.3 SP SEC 15.6.5.3.1 SP SEC 15.6.5.3.3 SP SEC 15.6.7 SP TBL 4.3-1A SP TBL 5.3-10 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised}}

Latest revision as of 18:56, 6 December 2024

Rev. OL-24 to Final Safety Analysis Report, Change Notice Log
ML20209A079
Person / Time
Site: Callaway 
Issue date: 11/13/2019
From:
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20209A098 List: ... further results
References
ULNRC-06547
Download: ML20209A079 (25)


Text

CALLAWAY Rev. OL-24 11/19 FSAR CHANGE NOTICE LOG Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised 19-0023 Revises SA SEC 9.2.5.2.2.1 and 9.2.5.5, and SA TBL 9.2-5 to address mitigation of a potential failure of automatic controls by manually operating UHS cooling tower bypass valves to control temperature.

11/07/19 OL-24 11/19 SP SEC 9.2.5.2.2.1 SA SEC 9.2.5.5 SP TBL 9.2-5 19-0022 Revises SP SEC 9.2.1.2.2.2 and 9.2.1.2.2.3, SP TBL 9.2-5, 9.2-6, and 9.2-23, and adds a new Sheet 4 to SP FIG 9.2-2 to reflect modifications for ESW waterhammer mitigation per MP 17-0006.

11/07/19 OL-24 11/19 SP SEC 9.2.1.2.2.2 SP SEC 9.2.1.2.2.3 SP TBL 9.2-5 SP TBL 9.2-6 SP TBL 9.2-23 SP FIG 9.2-2 18-0012 Revises SP SEC 11.5.2.3.2.4 and 18.2.12.1, and SP TBL 7.5-1, 7A-2, 7A-3, and 11.5-3 to reflect a reduction of the credited range for Containment High Range Radiation Monitors in a post-accident environment, due to noise from thermally-induced currents causing inaccuracy in readings <25 R/hr.

11/04/19 OL-24 11/19 SP SEC 11.5.2.3.2.4 SP SEC 18.2.12.1 SP TBL 7.5-1 SP TBL 7A-2 SP TBL 7A-3 SP TBL 11.5-3 19-0007 Revises SA Chapter 13 to reflect changes to the site organizational structure.

10/10/19 OL-24 11/19 SA SEC 13.1.1.2.1.2 SA SEC 13.1.1.3.2 SA SEC 13.1.2.2.2 SA SEC 13.1.2.2.3 SA FIG 13.1-1 SA FIG 13.1-2 SA FIG 13.1-3 19-0019 Corrects reference to a Table in SA SEC 2.3.3.1.3 10/09/19 OL-24 11/19 SA SEC 2.3.3.1.3

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 2 of 25)

Rev. OL-24 11/19 19-0011 Revises SP SEC 9.3.3.5 in order to reflect a change in the high lever alarm setpoint for the Control Building sump per Modification MP 16-0039.

10/09/19 OL-24 11/19 SP SEC 9.3.3.5 19-0003 Revises SP TBL 5.3-7 to add material properties for RV closure head bolting spares and SP SEC 9.1.4.2.2 to describe new manual rod cluster control change tool.

09/22/19 OL-23f 10/19 SP SEC 9.1.4.2.2 SP TBL 5.3-7 18-0023 Revises SP SEC 19.1.25 and SP TBL 19.4-1 to reflect adoption of guidance from LS-ISG-2015-01 regarding buried and underground piping and tanks.

09/22/19 OL-23f 10/19 SP SEC 19.1.25 SP TBL 19.4-1 19-0010 Removes a remark from SP TBL 3.2-1 regarding the non-safety aux feedwater pump having been built to ASME Section III Class 3.

08/20/19 OL-23f 10/19 SP TBL 3.2-1 19-0006 Revises SA TBL 12.5-2 to change the type of detector used for workspace airborne radioactivity monitoring.

08/20/19 OL-23f 10/19 SA TBL 12-5-2 19-0005 Revises SP SEC 9.1A.2.1 to remove allowances for fuel storage that do not conform to TS 4.3.1.1.

08/20/19 OL-23f 10/19 SP SEC 9.1A.2.1.1 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 3 of 25)

Rev. OL-24 11/19 19-0002 Revises the FSAR in order to reflect installation of the new digital electrohydraulic controls for the main turbine generator per Modification MP 16-0039.

08/20/19 OL-23f 10/19 SP SEC 3.5.1.3.2 SP SEC 3.5.1.3.3 SP SEC 3.5.4 SP SEC 5.4.1.3.8 SP SEC 5.4.1.3.9 SP SEC 7.1.2.5.2 SP SEC 10.2.2.1 SP SEC 10.2.2.3.1 SP SEC 10.2.2.3.2 SP SEC 10.2.2.3.3 SP SEC 10.2.2.3.4 SP SEC 10.2.3.6 SP SEC 16.3.4.1 SP SEC 16.3.4.1.1 SP SEC 16.3.4.1.2 SP TBL 1.1-1 SP TBL 10.2-1 SP FIG 10.2-1 17-0012 Revises SP 8.3 and SA 8.2 in order to reflect the addition of protective relays to provide an alarm function for an open phase fault condition that were installed per Modification MP 15-0008.

07/16/19 OL-23e 7/19 SP SEC 8.3.1.1.2 SA SEC 8.2.1.3.2 19-0008 Revises SA 9.2 and SA FIG 9.2-3 in order to reflect rerouting of the demineralized water system piping and removal of the associated turbidity meter per Modification MP 18-0060.

05/07/19 OL-23e 7/19 SA SEC 9.2.3.5 SA FIG 9.2-3 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 4 of 25)

Rev. OL-24 11/19 19-0004 Revises SP 9.4 and SP TBL 9.4-10 in order to reflect replacement of the EHC air conditioning (A/C) system and backup A/C system per Modification MP 16-0039.

04/30/19 OL-23e 7/19 SP SEC 9.4.4.2.1 SP SEC 9.4.4.2.2 SP TBL 9.4-10 18-0014 Adds a new section SA 2.2.1.2.3.10 and revises the response to SA NRC Question 310.05 to describe a new tank for sodium hypochlorite being installed per MP 17-0037.

04/17/19 OL-23d 4/19 SA SEC 2.2.1.2.3 SA SEC 2.2.1.2.3.10 SA SEC NRC QR 310.05 17-0009 Revises SP 18.8.2.1.1 and the commitments to Reg. Guides 1.9 and 1.108 in SP Appendix 3A and SP 8.1.4.3 to implement the Engineered Safety Features Actuation System (ESFAS) Surveillance Test Risk Documented Evaluation (STRIDE).

03/26/19 OL-23d 4/19 SP APP 3A SP SEC 8.1.4.3 SP SEC 16.8.2.1.1 16-0013 Revises SP 9.4.1 and 16.7.13.1 and SP Tables 3.2-1 and 9.4-4, and deletes SP 16.7.13.2 in order to support implementation of OL Amendment 219 for new TS 3.7.20, "Class 1E Electrical Equipment Air Conditioning (A/C) System."

04/30/19 OL-23d 4/19 SP SEC 9.4.1.1.2 SP SEC 9.4.1.2.2 SP SEC 9.4.1.2.3 SP SEC 16.7.13.1 SP SEC 16.7.13.1.1 SP SEC 16.7.13.1.2 SP TBL 3.2-1 SP TBL 9.4-4 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 5 of 25)

Rev. OL-24 11/19 19-0001 Revise FSAR Chapter 16 to remove use of FSAR 16.0.2.2 for IST frequency extensions, as IST has its own provisions for frequency extensions.

02/27/19 OL-23c 3/19 SP SEC 16.1.2.3.1 SP SEC 16.1.2.4.2 SP SEC 16.1.2.4.1 SP SEC 16.1.2.4.2 SP SEC 16.4.1.1.1 SP SEC 16.4.1.1.2 18-0020 Updates SP 8.3.1.4.1.1 and 9.5.2.2 to add descriptions of the plant Wi-Fi communication system.

02/11/19 OL-23c 3/19 SP SEC 8.3.1.4.1.1 SP SEC 9.5.2.2 18-0008 Revises Mode of applicability for FSAR 16.7.10, "Emergency Exhaust System (EES) for Crane Operation Fuel Building."

02/11/19 OL-23c 3/19 SP SEC 16.7.10.1 18-0024 Corrects formatting errors in FSAR-SP 16.24 and adds "16.24 ASME Inservice Inspection Program" to Chap 16 Table of Contents (TOC). Corrects title of Chap 16 in FSAR-SP TOC to read "Technical Requirements."

11/28/18 OL-23b 12/18 SP SEC 16.24 SP 16 TOC SP TOC 18-0019 Updates SA 2.2.1.1 and 2.2.1.2.1 to remove obsolete descriptions of military and manufacturing facilities.

11/29/18 OL-23b 12/18 SA SEC 2.2.1.1 SA SEC 2.2.1.2.1 18-0018 Updates FSAR-SP Figure 6.2.4-1 Pages 13 and 16 to show correct configuration of ENV0084 and ENV0083.

09/13/18 OL-23b 12/18 SP FIG 6.2.4-1 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 6 of 25)

Rev. OL-24 11/19 18-0017 Revises FSAR-SP 8.3A.4.a to provide correct description of station blackout (SBO) procedures to implement NUMARC 87-00 Section 4.

08/30/18 OL-23b 12/18 SP APP 8.3A.4 18-0016 Revises FSAR-SP 9.5.1.5.2 to specify professional membership grade in Society of Fire Prevention Engineers (SFPE) for Fire Protection Engineer qualifications.

09/13/18 OL-23b 12/18 SP SEC 9.5.1.5.2 18-0011 Revises FSAR-SP 5.4A.2 and Table 7.1-2 to be consistent with FSAR-SP 7.4 by removing references to Spent Fuel Pool Cooling System as being Safe Shutdown Equipment.

12/03/18 OL-23b 12/18 SP APP 5.4A.2 SP TBL 7.1-2 17-0017 Revises Site Addendum Section 12.5.2.1.2 to be consistent with Table 12.5-1 by removing reference to additional counting equipment.

09/28/17 OL-23a 8/18 SA SEC 12.5.2.1.2 17-0008 Replaces OPERABLE with FUNCTIONAL in the affected column heading for FSAR Table 16.11-5.

06/21/17 OL-23a 8/18 SP TBL 16.11-5 16-0001 Changes FSAR-SP Appendix 3A and 8.3. to justify testing auxiliary feedwater valves with thermal overloads not jumpered, in accordance with Regulatory Position C.2 of Reg. Guide 1.106.

(OL Amendment No. 218) 05/30/18 OL-23a 8/18 SP APP 3A SP SEC 8.3.1.1.2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 7 of 25)

Rev. OL-24 11/19 17-0016 Changes FSAR-SP Table 3.9B-16 to remove ABV0085 and ABV0087.

04/19/18 OL-22e 5/18 SP TBL 3.9B-16 17-0003 FSAR change for potential VCT explosive atmosphere during shutdown for refueling.

10/05/17 OL-22e 5/18 SP SEC 5.4.11.2 SP SEC 9.1.4.2.3.1 SP SEC 9.3.4.2.1.2 SP SEC 9.3.5.2.1 SP SEC 11.2.2.2 SP SEC 11.3.2.3 SP TBL 9.3-11 SP FIG 9.3-10 17-0013 Replaces FSAR description of RCS letdown "orifices" with "throttle valves" as per Modification MP 14-0010.

05/08/18 OL-22e 5/18 SP SEC 5.2.2.10.4.1 SP SEC 5.2.5.2.3 SP SEC 7.4.3.1.1 SP SEC 7.7.1 SP SEC 9.3.4.2.1.1 SP SEC 9.3.4.2.2 SP SEC 9.3.4.2.3.1 SP SEC 9.3.4.2.3.3 SP SEC 9.3.4.5 SP SEC 15.6.2 SP TBL 3.2-1 SP TBL 7.4-1 SP TBL 9.3-9 SP FIG 3.6-1 (Sheet 25) 17-0014 Revises FSAR material description for condenser air removal system piping as per RFR 170058.

02/12/18 OL-22e 5/18 SP TBL 10.4-2 17-0015 Revises FSAR description of RCS letdown flowrate during postulated letdown line rupture.

10/05/17 OL-22e 5/18 SP SEC 15.6.2 18-0004 Replaces FSAR to reflect retraction of polar crane snubber wheels per Modification MP 16-0033.

04/19/18 OL-22e 5/18 SP SEC 9.1.4.2.2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 8 of 25)

Rev. OL-24 11/19 18-0005 Revises FSAR-SP Table 3.11(B)-1 and Table 3.11(B)-2 Notes regarding post-accident room temperatures.

04/10/18 OL-22e 5/18 SP TBL 3.11(B)-1 SP TBL 3.11(B)-2 18-0001 Revises FSAR to reflect bypass of UHS cooling tower fan motor high-speed thermal overloads as per Modification MP 17-0012.

04/19/18 OL-22e 5/18 SP SEC 8.3.1.1.2 18-0002 Revises FSAR to reflect organizational changes.

04/19/18 OL-22e 5/18 SA SEC 13.1.1.1.1 SA SEC 13.1.1.2.1 SA SEC 13.1.1.2.1.1 SA SEC 13.1.1.2.1.2 SA SEC 13.1.1.2.1.3 SA SEC 13.1.1.3 SA SEC 13.1.1.3.2 SA SEC 13.1.2.2 SA SEC 13.1.2.2.1.1 SA SEC 13.1.2.2.3 SA SEC 13.1.3.1 SA SEC 13.2.1 SA FIG 13.1-1 SA FIG 13.1-2 SA FIG 13.1-3 18-0003 Revises FSAR material description for safety-related room cooler coils to reflect Modification MP 07-0060.

completion.

03/22/18 OL-22e 5/18 SP TBL 9.4-6 SP TBL 9.4-8 16-0020 Revises FSAR description of self-contained breathing apparatus (SCBA) use in Control room.

03/07/17 OL-22e 5/18 SP SEC 6.4.2.4 SP TBL 6.4-2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 9 of 25)

Rev. OL-24 11/19 17-0001 Updates FSAR description of solid radwaste management practices.

03/07/17 OL-22e 5/18 SP SEC 11.4.1.1 SP SEC 11.4.1.2 SP SEC 11.4.2.2 SP SEC 11.4.2.3.1 SP SEC 11.4.2.3.2 SP SEC 11.4.2.3.3 SP SEC 11.4.2.4 17-0002 Revises FSAR description of data communications for meteorological instruments for Modification MP 11-0002 FCN 04.

03/17/17 OL-22e 5/18 SA SEC 2.3.3.1.2 SA SEC 2.3.3.1.3 SA SEC 2.3.3.1.4.1 SA FIG 2.3-20 17-0004 Revises FSAR description of General Employee Training (GET).

06/21/17 OL-22e 5/18 SA SEC 13.2.1.2 17-0005 Establishes separate FSAR Chapter 16 Technical Requirements for Class 1E electrical equipment air conditioning (A/C) systems under Operating and Shutdown conditions.

04/06/17 OL-22e 5/18 SP SEC 16.7.3.1 SP SEC 16.7.3.1.1 SP SEC 16.7.3.1.2 SP SEC 16.7.3.2 SP SEC 16.7.3.2.1 SP SEC 16.7.3.2.2 17-0006 Revises FSAR description of Annual Radioactive Effluent Release Report (ARERR). Format.

04/06/17 OL-22e 5/18 SP SEC 16.11.5.2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 10 of 25)

Rev. OL-24 11/19 17-0010 Revises FSAR description of flooding analysis (not a change to the method of analysis), updates analyzed flood levels, and adds a description of the floor and equipment drain system (FEDS) provisions for the boron injection tank (BIT) room.

06/27/17 OL-22e 5/18 SP SEC 3.6.2.2.1.3 SP SEC 9.3.3.2.1.1 SP TBL 3.6-6 SP TBL 3.11(B)-6 17-0011 Revises FSAR description of switchyard for Modification MP 16-0021 06/04/17 OL-22e 5/18 SA SEC 8.2.1.3.2 17-0018 Revises the maximum temperature in Class 1E equipment rooms during design basis accidents (DBAs).

02/22/18 OL-22d 02/18 SP SEC 9.4.1.2.3 SP TBL 3.11(B)-2 SP TBL 16.7-2 17-0019 Revise FSAR description of Class 1E 120-V vital instrument AC power supplies to reflect change to design and operation resulting from installation of new swing inverters as implemented under MP 13-0020.

11/19/17 OL-22c 11/17 SP SEC 8.3.1 SP SEC 8.3.2 SP SEC 16.7.13 SP SEC NRC QR 420.1 SP SEC NRC QR 420.4 SP TBL 3.10(N)-1 SP TBL 8.3-1 SP TBL 8.3-4 16-0011 Adopts the core design methodology from WCAP-10965-P-A, WCAP-16045-P-A, WCAP-16045-P-A-Addemdum 1-A, and WCAP-11596-P-A to implement OL Amendment 217.

09/15/17 OL-22b 11/17 SP SEC 4.3.1.5 SP SEC 4.3.3.2 SP SEC 4.3.4 SP TBL 1.6-2 SP TBL 4.1-2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 11 of 25)

Rev. OL-24 11/19 15-0007 FSAR Chapter 16 terminology change from OPERABLE to FUNCTIONAL to match Tech Spec definitions 07/01/16 OL-22a 11/16 SP SEC 16.0 SP SEC 16.1.2.

SP SEC 16.1.3 SP SEC 16.2.1 SP SEC 16.2.2 SP SEC 16.3.3 SP SEC 16.3.4 SP SEC 16.4.1 SP SEC 16.4.6 SP SEC 16.4.8 SP SEC 16.4.9 SP SEC 16.5.1 SP SEC 16.5.2 SP SEC 16.7.4 SP SEC 16.7.5 SP SEC 16.7.6 SP SEC 16.7.7 SP SEC 16.7.9 SP SEC 16.7.10 SP SEC 16.7.11 SP SEC 16.7.13 SP SEC 16.8.1 SP SEC 16.8.2 SP TBL 16.11-1 SP TBL 16.11-4 SP TBL 16.11-9 SP TBL 16.3-3 SP TBL 16.3-7 SP TBL 16.11-2 SP TBL 16.11-5 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 12 of 25)

Rev. OL-24 11/19 15-0007 (cont.)

SP SEC 16.8.3 SP SEC 16.9.2 SP SEC 16.9.3 SP SEC 16.10.1 SP SEC 16.11.1 SP SEC 16.11.2 SP SEC 16.11.3 SP SEC 16.11.4 SP SEC 16.15 16-0019 Update summary of flood levels to reflect revised calculations 11/10/16 OL-22 11/16 SP TBL 3.6-6 SP TBL 3.11(B)-6 16-0018 Switchyard description updates for MP 16-0002, 345 kV breaker types 11/07/16 OL-22 11/16 SA SEC 8.2.1.3.1 16-0017 Revise License Renewal Supplement due to 10 CFR 54.37b review 11/10/16 OL-22 11/16 SP SEC 19.1.16 SP SEC 19.1.23 SP SEC 19.3.6.2 SP TBL 19.4-1 16-0016 Revise allowable room cooler tube material to match previous engineering evaluations 11/02/16 OL-22 11/16 SP TBL 9.4-6 SP TBL 9.4-8 16-0015 EOF Feeder Cable Replacement 10/11/16 OL-22 11/16 SA SEC 8.3.1.1 16-0014 Update description of Cycle 22 fuel assemblies 10/19/16 OL-22 11/16 SP TBL 4.3-1A Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 13 of 25)

Rev. OL-24 11/19 16-0012 Organizational changes 10/11/16 OL-22 11/16 SA SEC 13.1.1 SA SEC 13.1.2.2.1 SA SEC 13.1.2.2.2 SA SEC 13.1.2.2.3 SA SEC 13.1.2.2.4 SA SEC 13.1.2.1.16 SA FIG 13.1-1 SA FIG 13.1-2 SA FIG 13.1-3 16-0008 Incorporate the Hardened Condesate Storage Tank (HCST) into FSAR 10/24/16 OL-22 11/16 SP SEC 1.2.2.1 SP SEC 7.3.6.1 SP SEC 9.2.6 SP SEC 9.2.6.2.1 SP SEC 9.2.6.2.2 SP SEC 9.2.6.2.3 SP SEC 9.2.6.5 SP SEC 10.4.9.2.1 SP TBL 1.1-1 SP TBL 3.2-1 SP TBL 9.2-14 SP TBL 9.3-11 SP FIG 8.3-1 SP FIG 9.2-17 16-0006 Update utility grid description and designate previous grid maps as historical information 08/03/16 OL-22 11/16 SA SEC 8.1.1 SA FIG 8.1-1 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 14 of 25)

Rev. OL-24 11/19 15-0012 Incorporate the ISFSI spent fuel storage facility into the FSAR 07/19/16 OL-22 11/16 SP SEC 1.2.2.1 SP SEC 1.2.3 SP SEC 1.2.9.3 SP SEC 3.1.8 SP SEC 3.8.4.1.2 SP SEC 9.1.2 SP SEC 9.1.2.1 SP SEC 9.1.2.2 SP SEC 9.1.4 SP SEC 9.1.4.2.1 SP SEC 9.1.4.2.3 SP SEC 9.1.4.2.3.1 SP SEC 9.1.4.3 SP SEC 9.1.4.6 SP SEC 9.1.6 SP SEC 9.5.1 SP SEC 9.5.1.1.1 SP SEC 9.5.1.2 SP SEC 9.5.1.3 SP SEC 12.2.1.3.1 SP SEC 12.2.1.7 SP SEC 12.3.2.2.3 SP SEC 12.3.2.2.9 SP SEC 12.4.2.1 SP SEC 15.7.4.1.1 SP SEC 16.11.5.2 SP SEC 16.11.5.2.1 SA SEC 2.4.2.3.2 SP TBL 1.1-1 SP TBL 3.2-1 SP TBL 3.3-1 SP TBL 3.5-2 SP TBL 9.2-20 SP TBL 16.11-7 SP FIG 1.2-20 SP FIG 1.2-21 SP FIG 1.2-22 SP FIG 1.2-44 SP FIG 1.2-45 SP FIG 3.8-97 SP FIG 3.8-98 SP FIG 9.1-9 SA FIG 2.1-3 SA FIG 2.4-3 14-0012 Change wording for Hydrogen to VCT 10/19/16 OL-22 11/16 SP SEC 9.3.4.2 SP SEC 11.3.2.3 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 15 of 25)

Rev. OL-24 11/19 16-0010 Additional FSAR Changes for NFPA 805 07/01/16 OL-21e 8/16 SP SEC 9.5.1.1.5 SP QR 280 SP QR 730 SP TBL 16.12-1 16-0009 Administrative corrections to Containment Penetration Figure 05/12/16 OL-21e 8/16 SP FIG 6.2.4-1 16-0007 Update Boration System Bases with correct RFR reference 05/17/16 OL-21e 8/16 SP SEC 16.1.2.1.2 SP SEC 16.1.2.1.3 16-0005 Update the FSAR for the Hardened Storage Buidling MP 13-0031 03/11/16 OL-21e 8/16 SP SEC 1.2.2.1 16-0004 EDG fuel oil tank venting wording in FSAR 05/06/16 OL-21e 8/16 SP SEC 9.5.4.2.2 16-0003 Cold Lab Chiller Replacement 03/11/15 OL-21e 8/16 SP TBL 9.2-21 15-0019 FSAR Chp. 15 Thermohydraulic Code Reference Updates 12/02/15 OL-21e 8/16 SP SEC 15.0.11.6 SP SEC 15.4.1.2 15-0018 Reflect Status of Ex-Vessel Dosimetry 10/20/15 OL-21e 8/16 SP SEC 19.1.17 15-0017 Revise description Emergency Lighting Systems to match NFPA 805 transition 11/18/15 OL-21e 8/16 SP SEC 9.5.3.2.3 15-0016 Revise FSAR to remove inaccurate information about SFP Bridge Crane 10/20/15 OL-21e 8/16 SP SEC 9.1.4.2.2 15-0015 Organizational Reporting Change for Fire Marshal 10/20/15 OL-21e 8/16 SA SEC 13.1.2.2.1.1 SA FIG 13.1-3 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 16 of 25)

Rev. OL-24 11/19 15-0014 Change to FSAR to remove 1 year onsite storage for rad waste 03/14/16 OL-21e 8/16 SP SEC 11.4.2.3.2 SP SEC 11.4.2.5 15-0013 Revise FSAR SA 8.4 to allow local operation of AEPS 01/14/16 OL-21e 8/16 SA SEC 8.4.1 15-0010 update SP Figure 6.2.4-1 Containment Penetrations with administrative changes 07/30/15 OL-21e 8/16 SP TBL 6.2.4-1 SP FIG 6.2.4-1 15-0004 Update FSAR for MP 10-0004 which modified the LOCA sequencer for ESW supply to UHS 06/29/16 OL-21e 8/16 SP SEC 6.2.1.1.3 SP SEC 6.2.2.2.2.3 SP TBL 6.2.1-6 SP TBL 6.2.1-7 SP TBL 16.3-2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 17 of 25)

Rev. OL-24 11/19 10-0031 Broad FSAR Ch16 improvements:

remove special exemptions 06/05/16 OL-21e 8/16 SP SEC 16.7.8.1 SP SEC 16.7.9.1 SP SEC 16.7.10.1 SP SEC 16.7.10.1.1 SP SEC 16.9.3.1 SP SEC 16.11.1.1 SP SEC 16.11.1.2 SP SEC 16.11.1.3 SP SEC 16.11.1.4 SP SEC 16.11.1.5 SP SEC 16.11.1.5.1 SP SEC 16.11.2.1 SP SEC 16.11.2.2 SP SEC 16.11.2.2.2 SP SEC 16.11.2.3 SP SEC 16.11.2.3.2 SP SEC 16.11.2.4 SP SEC 16.11.2.5 SP SEC 16.11.2.5.1 SP SEC 16.11.2.6 SP SEC 16.11.2.6.1 SP SEC 16.11.2.7 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 18 of 25)

Rev. OL-24 11/19 10-0031 (Cont.)

SP SEC 16.11.2.7.1 SP SEC 16.11.2.7.2 SP SEC 16.11.2.8 SP SEC 16.11.2.8.1 SP SEC 16.11.2.8.2 SP SEC 16.11.3.1 SP SEC 16.11.4.1 SP SEC 16.11.4.1.2 SP SEC 16.11.4.3 SP SEC 16.11.5.2 SP SEC 16.11.5.2.1 SP SEC 16.24.4 15-0005 Incorporate changes related to licesne amendment 216 which modified the DNB correlation stated in Technical Specifications and adopted WCAP-14565-P-A methodology at Callaway 02/29/16 OL-21d 4/16 SP SEC 4.4.1.1 SP SEC 4.4.2.2.1 SP SEC 4.4.7 SP SEC 15.0.3.2 SP SEC 15.1.5.2 SP SEC 15.1.6 SP TBL 1.6-2 SP TBL 15.0-2 SP FIG 4.4-3a SP FIG 4.4-3b 14-0003 incorporate changes related to license amendment 213 which added new requirements for managing gas accumulation in ECCS, RHR, and Containment Spray.

10/8/15 OL-21c 1/16 SP SEC 5.4.7.2.7 SP SEC 5.4.7.5 SP SEC 6.2.2.1.2.3 SP SEC 6.2.2.1.4 SP SEC 6.3.2.2 SP SEC 6.3.4.2 SP SEC 6.3.4.2.1 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 19 of 25)

Rev. OL-24 11/19 15-0006 Added new Chapter 19 to incorporate Callaway Operating License Renewal into the FSAR 7/22/15 OL-21b 8/15 SP SEC 19.0 SP SEC 19.1 SP SEC 19.1.1 SP SEC 19.1.10 SP SEC 19.1.11 SP SEC 19.1.12 SP SEC 19.1.13 SP SEC 19.1.14 SP SEC 19.1.15 SP SEC 19.1.16 SP SEC 19.1.17 SP SEC 19.1.18 SP SEC 19.1.19 SP SEC 19.1.2 SP SEC 19.1.20 SP SEC 19.1.21 SP SEC 19.1.22 SP SEC 19.1.23 SP SEC 19.1.24 SP SEC 19.1.25 SP SEC 19.1.26 SP SEC 19.1.27 SP SEC 19.1.28 SP SEC 19.1.29 SP SEC 19.1.3 SP SEC 19.1.30 SP SEC 19.1.31 SP SEC 19.1.32 SP SEC 19.1.33 SP SEC 19.1.34 SP SEC 19.1.35 SP TBL19.1-1 SP TBL19.4-1 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 20 of 25)

Rev. OL-24 11/19 15-0006 (Cont.)

SP SEC 19.1.36 SP SEC 19.1.37 SP SEC 19.1.38 SP SEC 19.1.39 SP SEC 19.1.4 SP SEC 19.1.5 SP SEC 19.1.6 SP SEC 19.1.7 SP SEC 19.1.8 SP SEC 19.1.9 SP SEC 19.2 SP SEC 19.2.1 SP SEC 19.2.2 SP SEC 19.2.3 SP SEC 19.3 SP SEC 19.3.1 SP SEC 19.3.1.1 SP SEC 19.3.1.2 SP SEC 19.3.1.3 SP SEC 19.3.1.4 SP SEC 19.3.1.5 SP SEC 19.3.2 SP SEC 19.3.2.1 SP SEC 19.3.2.1.1 SP SEC 19.3.2.1.2 SP SEC 19.3.2.1.3 SP SEC 19.3.2.1.4 SP SEC 19.3.2.2 SP SEC 19.3.2.3 SP SEC 19.3.2.4 SP SEC 19.3.2.5 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 21 of 25)

Rev. OL-24 11/19 15-0006 (Cont.)

SP SEC 19.3.2.6 SP SEC 19.3.2.7 SP SEC 19.3.3 SP SEC 19.3.4 SP SEC 19.3.5 SP SEC 19.3.5.1 SP SEC 19.3.5.2 SP SEC 19.3.6 SP SEC 19.3.6.1 SP SEC 19.3.6.10 SP SEC 19.3.6.2 SP SEC 19.3.6.3 SP SEC 19.3.6.4 SP SEC 19.3.6.5 SP SEC 19.3.6.6 SP SEC 19.3.6.7 SP SEC 19.3.6.8 SP SEC 19.3.6.9 SP SEC 19.4 15-0008 Administrative change to update position titles and and clarify EES run times to be consistant with License Amendment 209 5/13/15 OL-21b 8/15 SP SEC 6.3.1 SP SEC 16.0.1.4 SP SEC 16.0.2.2 SP SEC 16.0.2.3 SP SEC 16.7.10.1.1 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 22 of 25)

Rev. OL-24 11/19 13-0016 Incorporate changes related to license amendment 211 which adds a new crack exclusion for moderate energy HDPE piping.

3/31/15 OL-21a 5/15 SP SEC 3.6.2.1.2.4 SP SEC 3.6.3 SP TBL 3.6-2 09-0038 Add description of the microwave communications links that are being added to the Callaway Plant communications portfolio.(MP 09-0003) 2/12/10 OL-21 5/15 SP SEC 9.5.2.1.2 SP SEC 9.5.2.2.4 SP SEC 9.5.2.2.6 SP SEC 9.5.2.2.7 14-0001 Update FSAR to reflect MP 13-0039, Cask Handling Crane modification required for the Independent Spent Fuel Storage Installation (ISFSI) project.

5/13/15 OL-21 5/15 SP SEC 9.1.4.2.2 SP SEC 9.1.4.2.3 SP SEC 9.1.4.3 SP SEC 15.0.1.3 SP SEC 15.7 SP SEC 15.7.5 SP TBL 9.1-7 SP FIG 3.8-97 SP FIG 3.9-98 SP FIG 9.1-6 SP FIG 9.1-7 SP FIG 15.0-31 10-0004 Add a summary description of the basis for conducting heavy load movements 5/22/15 OL-21 5/15 SP SEC 9.1.5 SP SEC 9.1.5.1 SP SEC 9.1.5.2 SP SEC 9.1.5.3 SP SEC 9.1.5.4 SP SEC 9.1.5.4.1 SP SEC 9.1.5.4.2 SP SEC 9.1.5.4.3 SP SEC 9.1.5.5 SP SEC 9.1.6 14-0004 Revise FSAR 18.3.2.2 to reflect MP 11-0020.

5/27/14 OL-21 5/15 SP SEC 18.3.2.2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 23 of 25)

Rev. OL-24 11/19 14-0005 Update the FSAR with the information associated with the replacement reactor vessel closure head (RRVCH)

Integrated Head Assembly (IHA). (MP 10-0001) 5/13/15 OL-21 5/15 SP SEC 3.7(B)

SP SEC 3.7(N).1.3 SP SEC 3.7(N).2 SP SEC 3.7(N).2.15 SP SEC 3.7(N).3.10 SP SEC 3.7(N).3.15 SP SEC 3.7(N).3.2 SP SEC 3.7(N).3.3 SP SEC 3.7(N).3.6 SP SEC 3.7(N).3.7 SP SEC 3.8.3.1 SP SEC 3.8.3.1.10 SP SEC 3.9(N).1.2 SP SEC 3.9(N).2.5 SP SEC 3.9(N).3.2.1 SP SEC 3.9(N).7 SP SEC 3.11(B).2.1 SP SEC 3A SP SEC 4.2.5 SP SEC 9.1.4.2.3.1 SP SEC 9.1.4.3 SP SEC 9.1.5 SP SEC 9.4.6.1.2 SP SEC 9.4.6.2.2 SP SEC 9.4.6.2.3 SP SEC 18.2.1.2 SP SEC NRC Q 331.1 SP SEC NRC Q 492.14 SP TBL 2.3-3 SP TBL 3.10(N)-1 SP TBL 3.2-1 SP TBL 3.7(N)-1 SP TBL 5.2-3 SP TBL 6.1-3 SP TBL 6.2.1-4 SP TBL 6.2.1-66 SP TBL 6.5-2 SP TBL 9.1-9 SP TBL 9.4-12 SP TBL 12.4-1 SP FIG 3.8-74 SP FIG 18.2-1 SP FIG 18.2-13 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 24 of 25)

Rev. OL-24 11/19 14-0006 Update the FSAR with the information associated with the replacement vessel head. (MP 10-0005) 4/27/15 OL-21 5/15 SP SEC 1.2.2.1 SP SEC 3.9(N).4.1 SP SEC 3.9(N).4.2 SP SEC 4.5.1.1 SP SEC 4.5.1.3 SP SEC 5.2.3.1 SP SEC 5.2.4.2.2 SP SEC 5.3.1.2 SP SEC 5.3.3.1 SP SEC 5.3.3.3 SP SEC 5.3.3.5 SP SEC 5.3.3.7 SP SEC 7.7.1.9.1 SP SEC 11.4.2.3.2 SP SEC 12.2.1.7 SP SEC 15.4.8.1.1 SP TBL 3.2-1 SP TBL 3B-6 SP TBL 5.1-1 SP TBL 5.2-1 SP TBL 5.2-2 SP TBL 5.3-1 SP TBL 5.3-2 SP TBL 5.3-4 SP FIG 3.9(N)-4 SP FIG 3.9(N)-5 14-0007 Update the FSAR to describe the changes to the fuel pool cooling and cleanup system (FPCCS) to be implemented in order to allow flexible response to beyond design-basis external events (BDBEE). (MP 13-0026) 9/8/14 OL-21 5/15 SP SEC 9.1.3.2.1.1 SP SEC 9.1.3.2.3.1 14-0010 Correct minor inconsistencies between several FSAR Site Addendum sections in Chapter 2 8/4/14 OL-21 5/15 SA SEC 2.3.4.2.2 SA SEC 2.3.5.2.1.2 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised

CALLAWAY FSAR CHANGE NOTICE LOG (Sheet 25 of 25)

Rev. OL-24 11/19 14-0015 Correction to the reference to Callaway Calculation contained in the FSAR 3/18/15 OL-21 5/15 SP SEC 9.5.1.4.2 15-0001 Revising the FSAR to replace the outdated reference with a more generic description of the Inservice Inspection Program so as to remove unnecessary detail.

3/3/15 OL-21 5/15 SP SEC 5.2.4.1 SP SEC 5.2.4.1.1 SP SEC 5.2.4.5 SP SEC 5.4.2.4.1 SP SEC 6.6.1 SP SEC 6.6.3 SP SEC 6.6.3.1 SP SEC 6.6.6 15-0002 Add text to describe the new Spent Fuel Pool Instrumentation that satisfies NRC Order EA-12-051 4/9/15 OL-21 5/15 SP SEC 9.1.3 15-0003 Revise inconsistencies in the description of the pressure at which the RHR system is placed in service.

4/10/15 OL-21 5/15 SP SEC 1.2.9.2 SP SEC 3.1.6 SP SEC 5.2.2.10.4.1 SP SEC 7.6.2.1 15-0011 Update the FSAR to incorporate the cycle 21 core reload design 5/19/15 OL-21 5/15 SP SEC 4.1 SP SEC 4.2.2 SP SEC 4.2.2.2.3 SP SEC 4.2.2.2.4 SP SEC 4.2.2.3.3 SP SEC 15.6.5.3.1 SP SEC 15.6.5.3.3 SP SEC 15.6.7 SP TBL 4.3-1A SP TBL 5.3-10 Change Notice Number Description Approval Date Interim Revision Incorporated Section Revised Table Revised Figure Revised