Duane Arnold: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
|name=Duane Arnold | |name=Duane Arnold | ||
|acronym=DAEC | |acronym=DAEC | ||
|full name=Duane Arnold Energy Center | |||
|site type=Plant | |||
|region=3 | |region=3 | ||
|state=Iowa | |state=Iowa | ||
|town=Palo | |town=Palo | ||
|ISFSI docket=07200032 | |||
|mapping location=42° 6' 3.21" N, 91° 46' 39.34" W | |mapping location=42° 6' 3.21" N, 91° 46' 39.34" W | ||
|company=NextEra Energy | |company=NextEra Energy | ||
Line 12: | Line 15: | ||
|Power=1,912 MWt | |Power=1,912 MWt | ||
|Docket=05000331 | |Docket=05000331 | ||
|is cancelled=No | |||
|Decommission date=8/10/2020 | |||
|Reactor type=GE-4 | |Reactor type=GE-4 | ||
|Containment type=Mark I | |Containment type=Mark I |
Latest revision as of 18:02, 14 November 2023
Plant | |
---|---|
Company | NextEra Energy |
Where | Palo, Iowa |
Regulatory | |
Region | NRC Region 3 |
ISFSI docket | 07200032 |
wikipedia link | |
Docket | 05000331 |
---|---|
Licensed Power Level (Thermal) | 1,912 MWt |
Unit type | GE-4 |
Containment | Mark I |
Status | |
Decommission | 8/10/2020 |
NRC Website | |