ML21041A173: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML21041A173
| number = ML21041A173
| issue date = 10/01/2019
| issue date = 10/01/2019
| title = Original Question for Modified Question #80
| title = Original Question for Modified Question 80
| author name = Setzer T
| author name = Setzer T
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Hope Creek 2019 SRO Q#80 (Original Question)
Given:
* Pressure transmitter BB-PT-N078A has failed its surveillance calibration check
* The failure is non-conservative Which one of the following describes the action(s) required by Technical Specifications?
A.      Trip the inoperable channel in one trip system within 12 hours.
B.      Trip the inoperable trip system within one hour and be in at least HOT SHUTDOWN within 12 hours.
C.      Trip the inoperable channel in one trip system within 24 hours.
D.      Commence a normal shutdown within one hour and be in at least Startup within 6 hours, Hot Shutdown with 6 hours and Cold Shutdown within the following 24 hours.
Answer:          A}}

Latest revision as of 21:58, 23 May 2022

Original Question for Modified Question 80
ML21041A173
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/01/2019
From: Thomas Setzer
Operations Branch I
To:
Public Service Enterprise Group
Shared Package
ML19007A361 List:
References
EPID L-2019-OLL-0016
Download: ML21041A173 (1)


Text

Hope Creek 2019 SRO Q#80 (Original Question)

Given:

  • Pressure transmitter BB-PT-N078A has failed its surveillance calibration check
  • The failure is non-conservative Which one of the following describes the action(s) required by Technical Specifications?

A. Trip the inoperable channel in one trip system within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

B. Trip the inoperable trip system within one hour and be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

C. Trip the inoperable channel in one trip system within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

D. Commence a normal shutdown within one hour and be in at least Startup within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, Hot Shutdown with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Cold Shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Answer: A