ML21354A084: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:From:                        Tom Butler (1dzldrvr@gmail.com) Sent You a Personal Message
                            <kwautomail@phone2action.com>
Sent:                        Saturday, December 18, 2021 2:01 AM To:                          PointBeach-SLRSEIS Resource
 
==Subject:==
[External_Sender] Concerns about Point Beach EIS
 
==Dear Nuclear Regulatory Commission,==
 
Thank you for accepting my comments on the draft Environmental Impact Statement (DEIS) for the renewal of the Point Beach nuclear plant. The DEIS failed to properly consider some important considerations.
First, the DEIS did not properly consider the impacts of a potential accident. Contamination from radioactivity of Lake Michigan?s freshwater could be devastating for those who get their drinking water from Lake Michigan and those who recreate on or near the lake. This includes those who use Point Beach State Park to swim, fish, boat, and more. The impacts could be large and the DEIS didn?t properly study the environmental, health, and economic impacts of a potential spill.
Climate change is already wreaking havoc on our communities and we know that we need to work hard to avoid the worst impacts of climate change, but that it?s too late to stop all damage. However, the DEIS uses outdated data when looking at the impacts of climate change, including updated data about lakeshore levels.
Finally, the DEIS didn?t fully consider all of the impacts of extending the Point Beach license, including the short-term impacts. The data related to thermal pollution and the inability for the screens to properly stop fish and smaller life like phytoplankton from being killed. Over time, heating Lake Michigan to unnatural levels and killing of fish and smaller life could lead to ecological changes that need to be more properly considered and reviewed in the DEIS.
The EIS needs to be updated to include these concerns and up-to-date information before any permitting process moves forward.
Sincerely, Tom Butler 1655 Latitude Dr, Unit 6 San Jose, CA 95124 1dzldrvr@gmail.com (724) 309-5437 This message was sent by KnowWho, as a service provider, on behalf of an individual associated with Sierra Club. If you need more information, please contact Lillian Miller at Sierra Club at core.help@sierraclub.org or (415) 977-5500.
 
Federal Register Notice:      86FR62220 Comment Number:                100 Mail Envelope Properties    (-GwYpGthS2OMDh4MMcMtBw)
 
==Subject:==
[External_Sender] Concerns about Point Beach EIS Sent Date:            12/18/2021 2:01:07 AM Received Date:        12/18/2021 2:01:14 AM From:                Tom Butler (1dzldrvr@gmail.com) Sent You a Personal Message Created By:          kwautomail@phone2action.com Recipients:
"PointBeach-SLRSEIS Resource" <PointBeach-SLRSEIS.Resource@nrc.gov>
Tracking Status: None Post Office:          geopod-ismtpd-4-3 Files                          Size                  Date & Time MESSAGE                        2026                  12/18/2021 2:01:14 AM Options Priority:                      Normal Return Notification:          No Reply Requested:              No Sensitivity:                  Normal Expiration Date:}}

Revision as of 09:11, 18 January 2022

Comment (100) E-mail Regarding Point Beach Draft SEIS
ML21354A084
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/18/2021
From: Public Commenter
Public Commenter
To:
Office of Nuclear Material Safety and Safeguards
NRC/NMSS
References
86FR62220
Download: ML21354A084 (2)


Text

From: Tom Butler (1dzldrvr@gmail.com) Sent You a Personal Message

<kwautomail@phone2action.com>

Sent: Saturday, December 18, 2021 2:01 AM To: PointBeach-SLRSEIS Resource

Subject:

[External_Sender] Concerns about Point Beach EIS

Dear Nuclear Regulatory Commission,

Thank you for accepting my comments on the draft Environmental Impact Statement (DEIS) for the renewal of the Point Beach nuclear plant. The DEIS failed to properly consider some important considerations.

First, the DEIS did not properly consider the impacts of a potential accident. Contamination from radioactivity of Lake Michigan?s freshwater could be devastating for those who get their drinking water from Lake Michigan and those who recreate on or near the lake. This includes those who use Point Beach State Park to swim, fish, boat, and more. The impacts could be large and the DEIS didn?t properly study the environmental, health, and economic impacts of a potential spill.

Climate change is already wreaking havoc on our communities and we know that we need to work hard to avoid the worst impacts of climate change, but that it?s too late to stop all damage. However, the DEIS uses outdated data when looking at the impacts of climate change, including updated data about lakeshore levels.

Finally, the DEIS didn?t fully consider all of the impacts of extending the Point Beach license, including the short-term impacts. The data related to thermal pollution and the inability for the screens to properly stop fish and smaller life like phytoplankton from being killed. Over time, heating Lake Michigan to unnatural levels and killing of fish and smaller life could lead to ecological changes that need to be more properly considered and reviewed in the DEIS.

The EIS needs to be updated to include these concerns and up-to-date information before any permitting process moves forward.

Sincerely, Tom Butler 1655 Latitude Dr, Unit 6 San Jose, CA 95124 1dzldrvr@gmail.com (724) 309-5437 This message was sent by KnowWho, as a service provider, on behalf of an individual associated with Sierra Club. If you need more information, please contact Lillian Miller at Sierra Club at core.help@sierraclub.org or (415) 977-5500.

Federal Register Notice: 86FR62220 Comment Number: 100 Mail Envelope Properties (-GwYpGthS2OMDh4MMcMtBw)

Subject:

[External_Sender] Concerns about Point Beach EIS Sent Date: 12/18/2021 2:01:07 AM Received Date: 12/18/2021 2:01:14 AM From: Tom Butler (1dzldrvr@gmail.com) Sent You a Personal Message Created By: kwautomail@phone2action.com Recipients:

"PointBeach-SLRSEIS Resource" <PointBeach-SLRSEIS.Resource@nrc.gov>

Tracking Status: None Post Office: geopod-ismtpd-4-3 Files Size Date & Time MESSAGE 2026 12/18/2021 2:01:14 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: