ML20147E922: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20147E922
| number = ML20147E922
| issue date = 03/17/1997
| issue date = 03/17/1997
| title = Notice of Withdrawal of Application for Amend to License DPR-61.License Amend No Longer Required Due to Licensee 961205 Ltr Certifying Permanent Cessation of Operation & Permanent Offload of Fuel from Reactor Vessel
| title = Notice of Withdrawal of Application for Amend to License DPR-61.License Amend No Longer Required Due to Licensee Certifying Permanent Cessation of Operation & Permanent Offload of Fuel from Reactor Vessel
| author name = Dembek S
| author name = Dembek S
| author affiliation = NRC (Affiliation Not Assigned)
| author affiliation = NRC (Affiliation Not Assigned)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9703190279
| document report number = NUDOCS 9703190279
| title reference date = 12-05-1996
| package number = ML20147E885
| package number = ML20147E885
| document type = FEDERAL REGISTER NOTICES, TEXT-CODE OF FEDERAL REGULATIONS
| document type = FEDERAL REGISTER NOTICES, TEXT-CODE OF FEDERAL REGULATIONS
Line 19: Line 20:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_ . . _ _ . _ _ _ _ _ . .        _ _ . _ , _ _ _ _ _ _ _ _ _ _                          _ . . . _ _ . _ . _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ . _ . _ _
j i',
4 7590-01-P UNITED STATES NUCLEAR REGULATORY COMISSION                                                        >
l                                                                  CONNECTICUT YANKEE ATOMIC POWER COMPANY DOCKET N0. 50-213 HADDAM NECK PLANT I                                                                  NOTICE OF WITHDRAWAL 0F APPLICATION FOR
;                                                                  AMENDMENT TO FACILITY OPERATING LICENSE s
l                              The U.S. Nuclear Regulatory Comission (the Commission) has granted the request of Connecticut Yankee Atomic Power Company (the licensee) to withdraw I.                      18 proposed license amendments to Facility Operating License No. DPR-61 for
:                        the Haddam Neck Plant, located in Middlesex County, Connecticut. The license f                        amendments are no longer required due to the licensee's {{letter dated|date=December 5, 1996|text=December 5, 1996, letter}} certifying permanent cessation of operation and permanent offload of a
j                      fuel from the reactor vessel. The licensee withdrew the amendment requests in a {{letter dated|date=December 23, 1996|text=letter dated December 23, 1996}}.
4 The submittal date, subject, and FEDERAL REGISTER location (and date of l                      publication) for the previously issued Notice of Consideration of Issuance of Amendment for the 18 proposed amendments being withdrawn are listed below:
ll                                                                                                                                                                    l
: 1. December 20, 1994; 24-Month Fuel Cycle - Steam Generator Inspection l                      Frequency; 60 FR 6574 (February 2, 1995) i                              2. October 20,1995; 24-Month Fuel Cycle - Electrical Power Systems '
Surveillance Extensions; 60 FR 65673 (December 20,1995)
: 3. October 24, 1995; Limiting Safety Syston Settings;J60 FR 62488 (December 6,1995) 3                              4. October 27, 1995; Containment Isolation Valves; 60 FR 65675 4
i-                    (December 20,1995) i I                  9703190279 970317 PDR      ADOCK 05000213 P                                      PDR
 
I i
l                        5. Movember 1, 1995; 24-Month Fuel Cycle - Containment Isolation Valves
,                  Surveillance Extensions; 60 FR 62488 (December 6, 1995)
: 6. December 4, 1995; 24-Month Fuel Cycle - Reactivity Control Systems                          !
l                Surveillance Extensions; 61 FR 7548 (February 28,1996) i j                        7. December 19, 1995; 24-Month Fuel Cycle - Containment Air i                                                                                                                        {
j Recirculation System Surveillance Extensions; 61 FR 7548 (February 28,1996) j                        8. December 19, 1995; Dose Consequences Reanalysis and Containment                              !
j                Pressure and Temperature Reanalysis; 61 FR 11229 (March 19, 1996) i j                        9. December 19, 1995; 24-Month Fuel Cycle - Plant Systems Surveillance                          !
i j                Extensions; 61 FR 7548 (February 28,1996) j                        10. December 20, 1995; 24-Month Fuel Cycle - Reactor Coolant Systems Surveillance Extensions; 61 FR 7548 (February 28,1996) l                        11. December 20, 1995; 24-Month Fuel Cycle - Instrumentation 4
i                Surveillance Extensions; 61 FR 7548 (February 28,1996) d l                      12. January 12, 1996, superseded by an {{letter dated|date=April 16, 1996|text=April 16, 1996, letter}}; Ultimate
:                Heat Sink; 61 FR 28610 (June 5, 1996)
,                      13. February 27, 1996; Turbine Cycle - Safety Valves; 61 FR 28608
{,                (June 5,1996)
: 14. February 28, 1996; Reactor Coolant System - Relief Valves; This proposed amendment was not noticed in the FEDERAL REGISTER prior to the j                withdrawal of the request.
3
]                      15. March 7, 1996; Containment Air Recirculation System; This proposed j              amendment was not noticed in the FEDERAL REGISTER prior to the withdrawal of 4
  !              the request.
i l
 
i    .
4 4
;                      16. March 7,1996; RH-MOV-8'08A (Replacement of Menual Valve with a l            Motor-0perated Valve); 61 FR 28609 (June 5,1996) i'
: 17. March 28, 1996; Reactor Coolant System Safety Valves; 61 FR 28609
{            (June 5,1996)
(
: 18. April 22, 1996; 10 CFR Part 50, Appendix J Primary Reactor
!            Containment Leakai,e Testing Requirements for Light-Water Cooled Power Reactors j          Option B Performance-Based Requirements; 61 FR 28610 (June 5, 1996) j                    For further details with respect to this action, see the amendment
;            applications, and the licensee': {{letter dated|date=December 23, 1996|text=letter dated December 23, 1996}}, which 1
withdrew the 18 license amendment applications.                The above documents are j          available for public inspection at the Commission's Public Document Room, the l
Golman Diilding, 2120 L Street, NW., Washington, DC, and at the local public 5
docuent room located at the Russell Library,123 Broad Street, Middletown, l          Connecticut 06457.
{                  Dated at Rockville, Maryland, this        17th day of      March        1997.
i FOR THE NUCLEAR REGULATORY COMISSION
!                                                                    I i.
!                                                        Stephen Dembek, Project Manager Special Projects Office - Licensing
{                                                        Office of Nuclear Reactor Regulation l
1 I
 
2
  'l Withdrawn License Amendment Reauests (Continued)
!      TAC No.: Aeolication Date:        Syb.iect:
1 l      M95352  March 28, 1996          Reactor Coolant System Safety Valves i
M95284    April 22, 1996          10 CFR Part 50, Appendix J. Primary Reactor
;                                        Containment lea /.290 Testing Requirements for Light-Water Cooled Power Reactors Option B i
Performance-Based Requirements e
      ..f' 1
l l
,}}

Latest revision as of 02:37, 12 December 2021

Notice of Withdrawal of Application for Amend to License DPR-61.License Amend No Longer Required Due to Licensee Certifying Permanent Cessation of Operation & Permanent Offload of Fuel from Reactor Vessel
ML20147E922
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 03/17/1997
From: Stephen Dembek
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20147E885 List:
References
NUDOCS 9703190279
Download: ML20147E922 (4)


Text

_ . . _ _ . _ _ _ _ _ . . _ _ . _ , _ _ _ _ _ _ _ _ _ _ _ . . . _ _ . _ . _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ . _ . _ _

j i',

4 7590-01-P UNITED STATES NUCLEAR REGULATORY COMISSION >

l CONNECTICUT YANKEE ATOMIC POWER COMPANY DOCKET N0. 50-213 HADDAM NECK PLANT I NOTICE OF WITHDRAWAL 0F APPLICATION FOR

AMENDMENT TO FACILITY OPERATING LICENSE s

l The U.S. Nuclear Regulatory Comission (the Commission) has granted the request of Connecticut Yankee Atomic Power Company (the licensee) to withdraw I. 18 proposed license amendments to Facility Operating License No. DPR-61 for

the Haddam Neck Plant, located in Middlesex County, Connecticut. The license f amendments are no longer required due to the licensee's December 5, 1996, letter certifying permanent cessation of operation and permanent offload of a

j fuel from the reactor vessel. The licensee withdrew the amendment requests in a letter dated December 23, 1996.

4 The submittal date, subject, and FEDERAL REGISTER location (and date of l publication) for the previously issued Notice of Consideration of Issuance of Amendment for the 18 proposed amendments being withdrawn are listed below:

ll l

1. December 20, 1994; 24-Month Fuel Cycle - Steam Generator Inspection l Frequency; 60 FR 6574 (February 2, 1995) i 2. October 20,1995; 24-Month Fuel Cycle - Electrical Power Systems '

Surveillance Extensions; 60 FR 65673 (December 20,1995)

3. October 24, 1995; Limiting Safety Syston Settings;J60 FR 62488 (December 6,1995) 3 4. October 27, 1995; Containment Isolation Valves; 60 FR 65675 4

i- (December 20,1995) i I 9703190279 970317 PDR ADOCK 05000213 P PDR

I i

l 5. Movember 1, 1995; 24-Month Fuel Cycle - Containment Isolation Valves

, Surveillance Extensions; 60 FR 62488 (December 6, 1995)

6. December 4, 1995; 24-Month Fuel Cycle - Reactivity Control Systems  !

l Surveillance Extensions; 61 FR 7548 (February 28,1996) i j 7. December 19, 1995; 24-Month Fuel Cycle - Containment Air i {

j Recirculation System Surveillance Extensions; 61 FR 7548 (February 28,1996) j 8. December 19, 1995; Dose Consequences Reanalysis and Containment  !

j Pressure and Temperature Reanalysis; 61 FR 11229 (March 19, 1996) i j 9. December 19, 1995; 24-Month Fuel Cycle - Plant Systems Surveillance  !

i j Extensions; 61 FR 7548 (February 28,1996) j 10. December 20, 1995; 24-Month Fuel Cycle - Reactor Coolant Systems Surveillance Extensions; 61 FR 7548 (February 28,1996) l 11. December 20, 1995; 24-Month Fuel Cycle - Instrumentation 4

i Surveillance Extensions; 61 FR 7548 (February 28,1996) d l 12. January 12, 1996, superseded by an April 16, 1996, letter; Ultimate

Heat Sink; 61 FR 28610 (June 5, 1996)

, 13. February 27, 1996; Turbine Cycle - Safety Valves; 61 FR 28608

{, (June 5,1996)

14. February 28, 1996; Reactor Coolant System - Relief Valves; This proposed amendment was not noticed in the FEDERAL REGISTER prior to the j withdrawal of the request.

3

] 15. March 7, 1996; Containment Air Recirculation System; This proposed j amendment was not noticed in the FEDERAL REGISTER prior to the withdrawal of 4

! the request.

i l

i .

4 4

16. March 7,1996; RH-MOV-8'08A (Replacement of Menual Valve with a l Motor-0perated Valve); 61 FR 28609 (June 5,1996) i'
17. March 28, 1996; Reactor Coolant System Safety Valves; 61 FR 28609

{ (June 5,1996)

(

18. April 22, 1996; 10 CFR Part 50, Appendix J Primary Reactor

! Containment Leakai,e Testing Requirements for Light-Water Cooled Power Reactors j Option B Performance-Based Requirements; 61 FR 28610 (June 5, 1996) j For further details with respect to this action, see the amendment

applications, and the licensee'
letter dated December 23, 1996, which 1

withdrew the 18 license amendment applications. The above documents are j available for public inspection at the Commission's Public Document Room, the l

Golman Diilding, 2120 L Street, NW., Washington, DC, and at the local public 5

docuent room located at the Russell Library,123 Broad Street, Middletown, l Connecticut 06457.

{ Dated at Rockville, Maryland, this 17th day of March 1997.

i FOR THE NUCLEAR REGULATORY COMISSION

! I i.

! Stephen Dembek, Project Manager Special Projects Office - Licensing

{ Office of Nuclear Reactor Regulation l

1 I

2

'l Withdrawn License Amendment Reauests (Continued)

! TAC No.: Aeolication Date: Syb.iect:

1 l M95352 March 28, 1996 Reactor Coolant System Safety Valves i

M95284 April 22, 1996 10 CFR Part 50, Appendix J. Primary Reactor

Containment lea /.290 Testing Requirements for Light-Water Cooled Power Reactors Option B i

Performance-Based Requirements e

..f' 1

l l

,