Notice of Receipt of & Availability for Comment of post-shutdown Decommission Activities Rept
ML20198G928
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/27/1997
From: Weiss S
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20198G890 List:
References
NUDOCS 9709050207
Download: ML20198G928 (2)


Text

.,.....

f,,

'o 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION CONNECTICUT YANKEE ATOFolC POWER COMPANY-HADDAM NECK PLANT DOCKET NO. 50-213 NOTICE OF RECEIPT OF AND AVAILABILITY FOR COMMENT OF POST-SHUTDOWN DECOMMISSION ACTIVITIES REPORT The U.S. Nuclear Regulatory Commission (NRC) is it, receipt of and is making available for public inspection and comment, the Post-Shutdown Decommissioning Activities Report (PSDAR), dated August 22,1997, for the Hsddam Neck Plant (HNP) located in Middlesex County, Connecticut, Town of Haddam.

The licensee has selected the DECON alternative for decommissioning the site'. The Connecticut Yankee Atomic Power Company (CYAPCo or licensee) plans to decontaminate the main coolant system in early 1998 and to initiate large component removal, (e.g. reactor vessel, steam generators and pressurizer) in mid-1998. Decontamination and removal of all structures r!nd systems, except the Spent Fuel Storage Building (SFSB),is scheduled for completion by the end of 2002. The SFSB removalis projected for 2022. Soil remediation and the final site survey, excluding the SFSB, are scheduled for mid 2004. The licensee states, in the PSDAR, that environmental impacts due to decommissioning will be within the bounds of the NRC Final Generic EnvironmentalImpact Statement, NUREG-0586, the GEIS and the estimated total cost of decommissioning expected to about $426,726,000.

3 DECON is the alternative in dich the equipnent, structures, and portloos of the f acility and site containing radioactive contaminants are removed or decontaminated to a level that permits the property to be released for unrestricted use shortly after cessation of operations.

9709050207 970827 PDR ADOOK 05000213 W

PDR

74

.p-e-HNP has'been shut down since July 22,1996. CYAPCo informed the NRC, by letter Ldated December 5,1996, that as required by 10 CFR 50.82(a)(1)(i) and (ii),it had

-permanently ceased power operations and had removed the nuclear fuel from the reactor vessel.' Th'e fuel is nc u stored, onsite, in the spent fuel pool.

The PSDAR is available for public inspection at the local public document room located in the Russell Library,123 Broad Street, Middletown, Connecticut 06457, and at the' Commission Public Document Room, 2120 L Street, N.W., Washington, DC 20037.

The NRC will hold a public meeting in the vicinity of the HNP within the next -

60-days. The NRC will publish a notice in the Federal Reaister and in the local media announcing the date, time, and location of this meeting along with a brief description of the purpose of the meeting.

comments regarding the PSDAR should be submitted in writing to Mr. Morton B.

Fairtile; Mail Stop 01.1 B 20, U.S. Nuclear Regulatory Commission, Washington, DC -

20555-0001 within 30-days after the date of this notice.

-Dated at Rockville, Maryland, this 27th day of August 1997.

FOR THE NUCLEAR REGULATORY COMM!SSION e

Sey our H. Weiss, Director.

Won-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation 1

- _ - _ _ ___ _