ML21145A447: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:From: Giacinto, Joseph Sent: Tuesday, May 25, 2021 2:11 PM To: AdvancedReactors-GEISDocsPEm Resource | ||
==Subject:== | |||
X-energy Fuel and HALEU Needs Attachments: X-energy-29Apr2020-Pappano.pdf | |||
Fuel & HALEU Needs Dr. Pete Pappano, VP Fuel Production April 29, 2020 | |||
© 2020 X Energy LLC, all rights reserved © 20 2020 02 20 0 X Energy, Ene ne ergy, rgy gy LLC, LLC, al LLC a alll rights rights gh re ght res reserved es se erve er erv rve rve rvved 1 1 | |||
Elements of Reactor and Fuel Programs X-energy Reactor TRISO-X Fuel Development Development | |||
* Xe-100 Conceptual Design - TRISO-based Fuel Development Developmen | |||
* X-battery Conceptual Design - Nuclear Criticality Safety Evaluation | |||
* TCF CRADA - Fresh Fuel Transport Package Evaluation | |||
* Graphite Qualification - Conceptual Layout of Production Module | |||
* Heat Transfer Modeling CFD - Systems Engineering | |||
* Probabilistic Risk Assessment (PRA) - TRISO-X Facility Design | |||
* MST Code Development (Preliminary/Final) | |||
* NRC White Paper Development | |||
- TRISO-X License Application | |||
* NRC Topical Report Development Development | |||
- NRC Interaction Key to Deployment of the Advanced Reactor and TRISO-X Fuel Business is HALEU | |||
© 2020 X Energy, LLC, all rights reserved 2 | |||
TRISO Fuel Fabrication Overview HALEU Needed in Oxide Form U3O8 | |||
© 2020 X Energy, LLC, all rights reserved 3 | |||
TRISO-X Pilot Facility TRISO-X Pilot Facility inside ORNL, public/private partnership with X-energy engineers Ability to produce HALEU fuel elements | |||
© 2020 X Energy, LLC, all rights reserved 4 | |||
Key Milestones for TRISO-X TRISO-X Press Releases X-energy Dedicates TRISO-X Fuel Fabrication Pilot Line at ORNL February 27, 2019 X-energy Invited to Submit Part II for DOE Loan Guarantee Application March 14, 2019 X-energy and Global Nuclear Fuel Announce TRISO Fuel Collaboration Congressman Chuck Fleischmann Participates in Dedication with November 6, 2019 X-energy and ORNL Leadership | |||
© 2020 X Energy, LLC, all rights reserved 5 | |||
The Cross-cutting TRISO-X Fuel Fabrication Facility | |||
© 2020 X Energy, LLC, all rights reserved 6 | |||
HALEU Needs and Challenges | |||
* Need HALEU supply chain that mirrors LWR LEU supply chain 3/4Mining Conversion Enrichment Fuel Fabrication | |||
* Transport package 3/4Production of HALEU is not enough, need NRC approved packages to move material domestically and internationally | |||
* NCS code validation for fuel fabrication 3/4X-energy well along the way to V & V of NCS evaluations of equipment and facility layout | |||
* Cost 3/4Having a complete supply chain in place is a must, but not sufficient to ensure deployment 3/4Costs must NOT be prohibitive 3/4On-line calculators are probably unreliable for determining HALEU $ EUP | |||
© 2020 X Energy, LLC, all rights reserved 7 | |||
TRISO-X FFF Conceptual Design Complete | |||
* X-energy will receive a Part 70 Cat II SNM license amendment from the NRC | |||
* TRISO-X FFF: | |||
9 Modular/Scalable design 9 Already pilot level proven 9 Lean, NCS compliant layout 9 Adaptable to multiple fuel forms. | |||
9 Licensing activities underway 9 NCS, PHA, ISA all under NRC approved regulations 9 Designed to 5 MTU capacity to allow Xe-100 expansion and HALEU demand First US NRC CAT II Facility NU to 20% enriched U | |||
© 2020 X Energy, LLC, all rights reserved 8 | |||
Design and HALEU NCS Licensing Status Over 200 design docs/drawings to date | |||
~45 engineers dedicated to Prelim Design | |||
© 2020 X Energy, LLC, all rights reserved 9 | |||
Summary | |||
* HALEU is the key to deployment of ALL advanced reactors | |||
* A HALEU fuel cycle must be created 3/4 Enrichment 3/4 Deconversion 3/4 Fuel fabrication 3/4 Transport | |||
* X-energy has addressed HALEU fuel fabrication with the TRISO-X Fuel Facility | |||
* NCS and physical security for CAT II facilties underway | |||
* X-energy supports DOEs HALEU enrichment project in Piketon OH | |||
* Transportation packages must be addressed | |||
* Minimum of 4-6 MTU needed by 2023, if not sooner | |||
* Advanced reactor design funding is useless without a supporting fuel cycle | |||
© 2020 X Energy, LLC, all rights reserved 10}} |
Revision as of 06:26, 9 September 2021
ML21145A447 | |
Person / Time | |
---|---|
Issue date: | 05/25/2021 |
From: | NRC |
To: | NRC/NMSS/DREFS |
References | |
Download: ML21145A447 (11) | |
Text
From: Giacinto, Joseph Sent: Tuesday, May 25, 2021 2:11 PM To: AdvancedReactors-GEISDocsPEm Resource
Subject:
X-energy Fuel and HALEU Needs Attachments: X-energy-29Apr2020-Pappano.pdf
Fuel & HALEU Needs Dr. Pete Pappano, VP Fuel Production April 29, 2020
© 2020 X Energy LLC, all rights reserved © 20 2020 02 20 0 X Energy, Ene ne ergy, rgy gy LLC, LLC, al LLC a alll rights rights gh re ght res reserved es se erve er erv rve rve rvved 1 1
Elements of Reactor and Fuel Programs X-energy Reactor TRISO-X Fuel Development Development
- Xe-100 Conceptual Design - TRISO-based Fuel Development Developmen
- X-battery Conceptual Design - Nuclear Criticality Safety Evaluation
- TCF CRADA - Fresh Fuel Transport Package Evaluation
- Graphite Qualification - Conceptual Layout of Production Module
- Heat Transfer Modeling CFD - Systems Engineering
- Probabilistic Risk Assessment (PRA) - TRISO-X Facility Design
- MST Code Development (Preliminary/Final)
- NRC White Paper Development
- TRISO-X License Application
- NRC Topical Report Development Development
- NRC Interaction Key to Deployment of the Advanced Reactor and TRISO-X Fuel Business is HALEU
© 2020 X Energy, LLC, all rights reserved 2
TRISO Fuel Fabrication Overview HALEU Needed in Oxide Form U3O8
© 2020 X Energy, LLC, all rights reserved 3
TRISO-X Pilot Facility TRISO-X Pilot Facility inside ORNL, public/private partnership with X-energy engineers Ability to produce HALEU fuel elements
© 2020 X Energy, LLC, all rights reserved 4
Key Milestones for TRISO-X TRISO-X Press Releases X-energy Dedicates TRISO-X Fuel Fabrication Pilot Line at ORNL February 27, 2019 X-energy Invited to Submit Part II for DOE Loan Guarantee Application March 14, 2019 X-energy and Global Nuclear Fuel Announce TRISO Fuel Collaboration Congressman Chuck Fleischmann Participates in Dedication with November 6, 2019 X-energy and ORNL Leadership
© 2020 X Energy, LLC, all rights reserved 5
The Cross-cutting TRISO-X Fuel Fabrication Facility
© 2020 X Energy, LLC, all rights reserved 6
HALEU Needs and Challenges
- Need HALEU supply chain that mirrors LWR LEU supply chain 3/4Mining Conversion Enrichment Fuel Fabrication
- Transport package 3/4Production of HALEU is not enough, need NRC approved packages to move material domestically and internationally
- NCS code validation for fuel fabrication 3/4X-energy well along the way to V & V of NCS evaluations of equipment and facility layout
- Cost 3/4Having a complete supply chain in place is a must, but not sufficient to ensure deployment 3/4Costs must NOT be prohibitive 3/4On-line calculators are probably unreliable for determining HALEU $ EUP
© 2020 X Energy, LLC, all rights reserved 7
TRISO-X FFF Conceptual Design Complete
- X-energy will receive a Part 70 Cat II SNM license amendment from the NRC
- TRISO-X FFF:
9 Modular/Scalable design 9 Already pilot level proven 9 Lean, NCS compliant layout 9 Adaptable to multiple fuel forms.
9 Licensing activities underway 9 NCS, PHA, ISA all under NRC approved regulations 9 Designed to 5 MTU capacity to allow Xe-100 expansion and HALEU demand First US NRC CAT II Facility NU to 20% enriched U
© 2020 X Energy, LLC, all rights reserved 8
Design and HALEU NCS Licensing Status Over 200 design docs/drawings to date
~45 engineers dedicated to Prelim Design
© 2020 X Energy, LLC, all rights reserved 9
Summary
- HALEU is the key to deployment of ALL advanced reactors
- A HALEU fuel cycle must be created 3/4 Enrichment 3/4 Deconversion 3/4 Fuel fabrication 3/4 Transport
- X-energy has addressed HALEU fuel fabrication with the TRISO-X Fuel Facility
- NCS and physical security for CAT II facilties underway
- Transportation packages must be addressed
- Minimum of 4-6 MTU needed by 2023, if not sooner
- Advanced reactor design funding is useless without a supporting fuel cycle
© 2020 X Energy, LLC, all rights reserved 10