05000313/FIN-2009005-02: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 13: | Line 13: | ||
| identified by = NRC | | identified by = NRC | ||
| Inspection procedure = IP 71152 | | Inspection procedure = IP 71152 | ||
| Inspector = A Sanchez, G Werner, J Clark, J Josey, M Haire, M Shannon, N O | | Inspector = A Sanchez, G Werner, J Clark, J Josey, M Haire, M Shannon, N O'Keefe, R Azua, S Rotton, T Farnholtz | ||
| CCA = H.7 | | CCA = H.7 | ||
| INPO aspect = WP.3 | | INPO aspect = WP.3 |
Latest revision as of 00:15, 22 February 2018
Site: | Arkansas Nuclear |
---|---|
Report | IR 05000313/2009005 Section 4OA2 |
Date counted | Dec 31, 2009 (2009Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | A Sanchez G Werner J Clark J Josey M Haire M Shannon N O'Keefe R Azua S Rotton T Farnholtz |
CCA | H.7, Documentation |
INPO aspect | WP.3 |
' | |