05000482/FIN-2009004-06: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71111.19
| Inspection procedure = IP 71111.19
| Inspector = C Long, C Peabody, C Ryan, G Apger, G Miller, G Tutak, J Adams, P Jayroe, S Alferinkc, Long C, Peabody G, Miller G, Werner M, Shannon N, O'Keefe P, Jayroe R, Kellar S, Garcho
| Inspector = C Long, C Peabody, C Ryan, G Apger, G Miller, G Tutak, J Adams, P Jayroe, S Alferinkc, Longc Peabody, G Miller, G Werner, M Shannon, N O'Keefe, P Jayroe, R Kellar, S Garchow
| CCA = P.2
| CCA = P.2
| INPO aspect = PI.2
| INPO aspect = PI.2

Latest revision as of 00:15, 22 February 2018

06
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Report IR 05000482/2009004 Section 1R19
Date counted Sep 30, 2009 (2009Q3)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.19
Inspectors (proximate) C Long
C Peabody
C Ryan
G Apger
G Miller
G Tutak
J Adams
P Jayroe
S Alferinkc
Longc Peabody
G Miller
G Werner
M Shannon
N O'Keefe
P Jayroe
R Kellar
S Garchow
CCA P.2, Evaluation
INPO aspect PI.2
'