ML20066E922: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_.                .    . . . _
      .sV-1 ATTACIIMENT A Proposed Change No. 163 to Vermont Yankee Technical Speelfications Pages Delete _d                                Pages Inserted 51                                            51                ,
i i
:l l
                                                                                              'l l
l l
I l
                                                                                            .l l
1 1
        --WPP94/33 9101220396 910115 POR  ADOCK 05000271 p                PDR
 
i
    ~
VTNPS .                                                          .,
TABLE 4.2.1 (continued)
Low Pressure Coolant injection System Trip Function          Functional Test (8)            Calib.ation(8)      Instrument Check Low Reactor Pressure                    (Note 1)              Once/ Operating Cycle (PT-2-3-56C/D(SI))
Ifigh Drywell Pressure                  (Note 1)              Once/ Operating Cycle  Once Each Day (PT-10-101A-D(M))
Low-Low Resctor Vessel Water Level      (Note 1)              Once/ Operating Cycle  Once Each Day Reactor Vessel Shrcud Level            (Note 1)              Once/ Operating Cycle Low Reactor Pressure                    (Note 1)              Every Three months (PT-2-128A/B)
RHR Pump Discharge Pressure            (Note 1)              Every Three Months High Drywell Pressure                  (Note 1)              Once/ Operating Cycle (PT-10-101A-D(SI))
Low Reactor Pressur3                  (Note 1)              Once/ Operating Cycle (PT 3-56A/B)(SI) & 52C/D(M))
Auxiliary Power Monitor                (Note 1)              Every Refueling Outage  Once Each Day Pump Bus Power Monitor                (Note 1)              None                    Once Each Day Trip System Logic                Once/ Operating Cycle      Once/ Operating Cycle (Note 3)
Amendment No. $f, 76 90, 106. II0                                                                    51}}

Revision as of 13:58, 21 December 2020

Proposed Change 163 to Tech Specs Removing Surveillance Requirement of Indication of LPCI Crosstie Monitor
ML20066E922
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 01/15/1991
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20066E919 List:
References
NUDOCS 9101220396
Download: ML20066E922 (2)


Text

_. . . . . _

.sV-1 ATTACIIMENT A Proposed Change No. 163 to Vermont Yankee Technical Speelfications Pages Delete _d Pages Inserted 51 51 ,

i i

l l

'l l

l l

I l

.l l

1 1

--WPP94/33 9101220396 910115 POR ADOCK 05000271 p PDR

i

~

VTNPS . .,

TABLE 4.2.1 (continued)

Low Pressure Coolant injection System Trip Function Functional Test (8) Calib.ation(8) Instrument Check Low Reactor Pressure (Note 1) Once/ Operating Cycle (PT-2-3-56C/D(SI))

Ifigh Drywell Pressure (Note 1) Once/ Operating Cycle Once Each Day (PT-10-101A-D(M))

Low-Low Resctor Vessel Water Level (Note 1) Once/ Operating Cycle Once Each Day Reactor Vessel Shrcud Level (Note 1) Once/ Operating Cycle Low Reactor Pressure (Note 1) Every Three months (PT-2-128A/B)

RHR Pump Discharge Pressure (Note 1) Every Three Months High Drywell Pressure (Note 1) Once/ Operating Cycle (PT-10-101A-D(SI))

Low Reactor Pressur3 (Note 1) Once/ Operating Cycle (PT 3-56A/B)(SI) & 52C/D(M))

Auxiliary Power Monitor (Note 1) Every Refueling Outage Once Each Day Pump Bus Power Monitor (Note 1) None Once Each Day Trip System Logic Once/ Operating Cycle Once/ Operating Cycle (Note 3)

Amendment No. $f, 76 90, 106. II0 51