ML20066E922

From kanterella
Jump to navigation Jump to search
Proposed Change 163 to Tech Specs Removing Surveillance Requirement of Indication of LPCI Crosstie Monitor
ML20066E922
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 01/15/1991
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20066E919 List:
References
NUDOCS 9101220396
Download: ML20066E922 (2)


Text

_. . . . . _

.sV-1 ATTACIIMENT A Proposed Change No. 163 to Vermont Yankee Technical Speelfications Pages Delete _d Pages Inserted 51 51 ,

i i

l l

'l l

l l

I l

.l l

1 1

--WPP94/33 9101220396 910115 POR ADOCK 05000271 p PDR

i

~

VTNPS . .,

TABLE 4.2.1 (continued)

Low Pressure Coolant injection System Trip Function Functional Test (8) Calib.ation(8) Instrument Check Low Reactor Pressure (Note 1) Once/ Operating Cycle (PT-2-3-56C/D(SI))

Ifigh Drywell Pressure (Note 1) Once/ Operating Cycle Once Each Day (PT-10-101A-D(M))

Low-Low Resctor Vessel Water Level (Note 1) Once/ Operating Cycle Once Each Day Reactor Vessel Shrcud Level (Note 1) Once/ Operating Cycle Low Reactor Pressure (Note 1) Every Three months (PT-2-128A/B)

RHR Pump Discharge Pressure (Note 1) Every Three Months High Drywell Pressure (Note 1) Once/ Operating Cycle (PT-10-101A-D(SI))

Low Reactor Pressur3 (Note 1) Once/ Operating Cycle (PT 3-56A/B)(SI) & 52C/D(M))

Auxiliary Power Monitor (Note 1) Every Refueling Outage Once Each Day Pump Bus Power Monitor (Note 1) None Once Each Day Trip System Logic Once/ Operating Cycle Once/ Operating Cycle (Note 3)

Amendment No. $f, 76 90, 106. II0 51