| number = ML113560064
| issue date = 12/22/2011
| title = IR 05000271/2011011; 10/17/2011 - 12/1/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities
| author name = Conte R J
| author affiliation = NRC/RGN-I/DRS/EB1
| addressee name = Wamser C
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000271
| license number = DPR-028
| contact person =
| document report number = IR-11-011
| document type = Inspection Report, Letter
| page count = 12
}}
See also: [[followed by::IR 05000271/2011011]]
 
=Text=
{{#Wiki_filter: December 22, 20lLMr. Christopher WamserEntergy Nuclear Operations, Inc.Vermont Yankee Nuclear power Station185 Old Ferry RoadP.O. Box 500Brattleboro, VT 05302-0500
 
SUBJECT: VERMONT YANKEE NUCLEAR POWER STATION - NRC INTEGRATEDINSPECTION REPORT 0500027 1 t2ol 1 01 1
 
==Dear Mr. Wamser:==
on october 20,2011, the U.S. NuclearRegulatory Commission (NRC) completed an inspectionat the Vermont Yankee Nuclear Power Staiion. the enctosed report documbnts the results ofthe inspection, which were discussed on october 20, and December z 2011, wrth you and othermembers of your staff.This inspection was an examination of activities under your renewed operating license related tothe completion of commitments made during the renewed lic"nre apptication f,rocess andcompliance with the conditions of your licenie. Under the renewed operating license, entry intothe period of extended opelations is planned for March 22,2012. Th; inap;tion was directedtoward those activities and facilities accessible during the refueling outate. -witnin these areas,the inspection involved examination of selected proc6dur"s and representative records,observations of activities, and interviews with personnel.on the basis of the samples selected for review, there were no findings identified during thisinspection' We plan to continue to review Commitment Nos. 6, 12,aid 2s, along with yourprocess for commitment change management during future planned license renewal teaminspections, prior to March 22.20112. tn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document systemAgencywide Document Access and Management System (ADAMS). ADAMS is accessible fromthe NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic ReadingRoom).
 
Sincerely,/Z,tr*J>MRichard J. Conte, ChiefEngineering Branch 1Division of Reactor SafetyDocket No. 50-271License No. DPR-28
 
===Enclosure:===
NRC lnspection Report 0500027 1 1201 101 1cc w/enclosure: Distribution via ListServ
}}

Revision as of 06:17, 17 February 2018

IR 05000271/2011011; 10/17/2011 - 12/1/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities
ML113560064
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 12/22/2011
From: Conte R J
Engineering Region 1 Branch 1
To: Wamser C
Entergy Nuclear Operations
References
IR-11-011
Download: ML113560064 (12)


See also: IR 05000271/2011011

Text

December 22, 20lLMr. Christopher WamserEntergy Nuclear Operations, Inc.Vermont Yankee Nuclear power Station185 Old Ferry RoadP.O. Box 500Brattleboro, VT 05302-0500

SUBJECT: VERMONT YANKEE NUCLEAR POWER STATION - NRC INTEGRATEDINSPECTION REPORT 0500027 1 t2ol 1 01 1

Dear Mr. Wamser:

on october 20,2011, the U.S. NuclearRegulatory Commission (NRC) completed an inspectionat the Vermont Yankee Nuclear Power Staiion. the enctosed report documbnts the results ofthe inspection, which were discussed on october 20, and December z 2011, wrth you and othermembers of your staff.This inspection was an examination of activities under your renewed operating license related tothe completion of commitments made during the renewed lic"nre apptication f,rocess andcompliance with the conditions of your licenie. Under the renewed operating license, entry intothe period of extended opelations is planned for March 22,2012. Th; inap;tion was directedtoward those activities and facilities accessible during the refueling outate. -witnin these areas,the inspection involved examination of selected proc6dur"s and representative records,observations of activities, and interviews with personnel.on the basis of the samples selected for review, there were no findings identified during thisinspection' We plan to continue to review Commitment Nos. 6, 12,aid 2s, along with yourprocess for commitment change management during future planned license renewal teaminspections, prior to March 22.20112. tn accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document systemAgencywide Document Access and Management System (ADAMS). ADAMS is accessible fromthe NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic ReadingRoom).

Sincerely,/Z,tr*J>MRichard J. Conte, ChiefEngineering Branch 1Division of Reactor SafetyDocket No. 50-271License No. DPR-28

Enclosure: