| title = PG&E Presentation, Pre-application Meeting on 2/3/2011 with Representatives of Pacific Gas and Electric Company to Discuss Digital Upgrade and Eagle-21 Portion of Reactor Trip System at Diablo Canyon, Units 1 and 2 (TAC Nos. ME5284 and ME52
| title = PG&E Presentation, Pre-application Meeting on 2/3/2011 with Representatives of Pacific Gas and Electric Company to Discuss Digital Upgrade and Eagle-21 Portion of Reactor Trip System at Diablo Canyon, Units 1 and 2
| author name =  
| author name =  
| author affiliation = Pacific Gas & Electric Co
| author affiliation = Pacific Gas & Electric Co
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:DIABLO CANYON POWER PLANTPROCESS PROTECTION SYSTEM REPLACEMENT
{{#Wiki_filter:DIABLO CANYON POWER PLANT PROCESS PROTECTION SYSTEM REPLACEMENT Third Phase 0 Meeting February 3, 2011 Scott B. Patterson Pacific Gas & Electric Co.
Avila Beach, CA sbp1@pge.com 805-545-4082 Ken Schrader Pacific Gas & Electric Co.
Avila Beach, CA j @pg kjse@pge.com 805-545-4328 John Hefler Altran Solutions Corp.
San Francisco, CA jhefler@altransolutions.com 415-543-6111 Ted Quinn Altran Solutions Corp.
San Francisco, CA tedquinn@cox.net 415-543-6111 Greg Clarkson Altran Solutions Corp.
San Francisco, CA gretg@rockcreektech.com 415-543-6111 1


Third Phase 0 Meeting February 3, 2011Scott B. PattersonPacific Gas & Electric Co.
Agenda Introduction ISG-06 Update Project Plan and Schedule LAR Discussion Technical Topics Factory Acceptance Test Questions (NRC Staff)
Avila Beach, CA sbp1@pge.com 805-545-4082 Ken SchraderPacific Gas & Electric Co.
Closing Comments/Adjourn 2
Avila Beach, CA


k j se@pge.com 1 1j@pg 805-545-4328 John HeflerAltran Solutions Corp.
ISG 6 Update NRC Status PG&E Progress ISG 6 Matrix - Vendor and PG&E documents ISG 6 and d Cyber C b Requirements R   i     t (NRC) 3
San Francisco, CA jhefler@altransolutions.com 415-543-6111Ted QuinnAltran Solutions Corp.
 
San Francisco, CAtedquinn@cox.net 415-543-6111Greg ClarksonAltran Solutions Corp.
NRC Status ISG 6 Revision was issued on 1/19/2011 Vendor Topical Report Review Tricon v10 ALS Forecast for approval dates Diversity Defense-in-Depth Approval Status 4
San Francisco, CA gretg@rockcreektech.com 415-543-6111 AgendaIntroductionISG-06 UpdateProject Plan and Schedule LAR Discussion 2Technical TopicsFactory Acceptance TestQuestions (NRC Staff)Closing Comments/Adjourn ISG 6 UpdateNRC StatusPG&E ProgressISG 6 Matrix -Vendor and PG&E documents ISG6dCbRit(NRC) 3ISG 6 an d C y b er R equ i remen t s (NRC)
 
NRC StatusISG 6 Revision was issued on 1/19/2011Vendor Topical Report ReviewTricon v10 ALS 4ALSForecast for approval datesDiversity Defense-in-Depth Approval Status PG&E ProgressCompleted Conceptual Design DocumentCompleted Revision 2 of the Functional Requirement and Interface Requirement Specifications 5 SpecificationsIncluding  the Logic Diagrams and IO ListProject Plan is near completeSQAP is near completeContracts to vendors for ISG 6 Phase 1  
PG&E Progress Completed Conceptual Design Document Completed Revision 2 of the Functional Requirement and Interface Requirement Specifications Including the Logic Diagrams and IO List Project Plan is near complete SQAP is near complete Contracts to vendors for ISG 6 Phase 1 documents 5
 
Phase 1 Documentation to be Submitted 6


documents Phase 1 Documentation to be Submitted 6
Phase 2 Submitted and Available for Audit 7
Phase 2 Submitted and Available for Audit 7
Phase 3 Available for Inspection 8
Phase 3 Available for Inspection 8
Cyber Security
Cyber Security
*Diablo Canyon is responsible to ensure compliance with the applicable cyber security regulations and guidance during all life cycle phases of the plant upgrade following 10 CFR7354RegulatoryGuide1152Rev2 9 9 CFR 73.54 , Regulatory Guide 1.152 Rev. 2 and ISG-01.
* Diablo Canyon is responsible to ensure compliance with the applicable cyber security regulations and guidance during all life cycle phases of the plant upgrade following 10 CFR 73 73.54, 54 Regulatory Guide 1.152 152 Rev Rev. 2 and ISG-01.
*Applicable to:
* Applicable to:
*Vendor equipment software development
* Vendor equipment software development
*Diablo Canyon responsible departments Cyber Security Summary
* Diablo Canyon responsible departments 9
*Diablo Canyon will comply fully with the applicable guidance on cyber security both for the vendor design program (offsite) and  
 
Cyber Security Summary
* Diablo Canyon will comply fully with the applicable guidance on cyber security both for the vendor design program (offsite) and the onsite installation,, testing g and later phases as called for in NRC Reg. Guide 1.152, ISG-01 and the applicable Regulations.
* Discuss interface to cyber security program 10 10
 
Project Plan and Schedule Project Scope Replacement PPS Concept Milestone Schedule Lif Lifecycle l DDocumentt Flow Fl 11
 
Project Scope 12
 
Replacement PPS Concept (ALS Provides Diverse Front-End Isolation and Actuation)
Note: SSPS & AMSAC are original equipment; not being replaced.
I    Process Inputs                                                        I (4-20 mA)
I                                          WR Temperatures                            I RTD Inputs                                                                                            PZR Pressure (DTTA)
(4-20 mA)                                                                                              Class I Analog Outputs (200  Platinum)                                                                                              (4-20 mA)
Trips to SSPS                                                                                                    (4-20 mA)
(Discrete)
NR Temperatures TRICON    Trips (To SSPS)
Containment Pressure                                                                      (4-20 mA)
Class I Analog Outputs                                                                                            (Discrete)
(4-20 mA)
(4-20 mA)                                                    Neutron Flux Inputs I
(0-10 VDC)                              RNASA RNASB II Protection Set Trouble                                                                                            (Discrete)
RCS Flow                                                            MAS (Discrete)                                                  Channel(s) in Bypass (4-20 mA)
Protection Set Failure                                                (Discrete)
MAS                            I                                                                        I (Discrete)
II                                          Data Link                    II PZR Pressure                    ALS    DTTA RTD Failure                                                                  Communication                              PPC MAS (4-20 mA)                                  (Discrete)                                                                        Links            Data Link              C Workstation (Fiberoptic)
AMSAC Process Inputs                              (4-20 (4 20 mA)                                                                                                  N Cl Non  Class I (4-20 mA)                              Process Control                                                                                              Analog Outputs (4-20 mA)                                                                                                    (4-20 mA)
Non Class I Analog Outputs                                                                                              RNARA RNARB (4-20 mA)                                                                                                    (Discrete)
Protection Set Trouble Data Link PPC                                    (4-20 mA)                  TRICON          (Discrete)
Data Link                                                                                    REMOTE                              MAS B    Workstation                            S/G Feedflow                          Protection Set Failure CHASSIS        (Discrete)
I                                                                                    II                                  (DFWCS)
Channel(s) in Bypass ALS - Advanced Logic System                                                                                                                                      (Discrete)
DFWCS - Digital Feedwater Control System                                                                                                                  DTTA RTD Failure DTTA - Delta T/Taverage (Thermal Trips)                                                                    II                                                  (Discrete)              II HMI - Human Machine Interface PPC - Plant Process Computer PZR - Pressurizer                                                Data Link ALS      B                                  MAINTENANCE RNARA/RNARB - Auxiliary Relay Cabinets TERMINAL                Data Link HMI RTD - Resistance Temperature Detector                                                      WORKSTATION Data Link RCS - Reactor Cooling System                TRICON      C                                      (Class II)
SSPS - Solid State Protection System WR - Wide Range 13
 
Project Milestone Schedule 2/24/2012 Vendor Phase 2 Items Complete 7/15/2011                          Provided to PG&E        3/23/2012 LAR Submitted                                              Phase 2 Items to NRC                                                Provided to NRC    12/10/2012          3/1/2013                                                      2/15/2014 8/1/2011                                                    Vendor FATs Design Package Issued                                                PPS Installation 3/31/2011                  ALS Topical Report Issued                                              Complete                                  5/24/2013 Tricon SER Issued                                                                                                                            DCPP PPS SER Issued DCPP PPS Replacement Project 4/1/2011    7/1/2011        10/1/2011      1/1/2012        4/1/2012      7/1/2012  10/1/2012      1/1/2013          4/1/2013        7/1/2013      10/1/2013      1/1/2014        4/1/2014 1/1/2011                                                                                                                                                                                                    4/30/2014 6/15/2011 LAR w/Phase 1 Items Complete by PG&E Team Provided to Licensing for Final Review 2/3/2011                                                                      6/1/2011 Phase 0 Meeting w/NRC                                                                                                                7/15/2011 Vendor Phase 1 Items Complete Provided to PG&E                              LAR Submitted to NRC LAR Submittal 2/1/2011              3/1/2011              4/1/2011          5/1/2011                6/1/2011                7/1/2011 1/1/2011                                                                                                                                                    8/1/2011 14


the onsite installation
Lifecycle Concept (PG&E)
, testin g and later 10 10 ,gphases as called for in NRC Reg. Guide 1.152, ISG-01 and the applicable
CDD FRS Document                                                    ALS IRS          Concept (PG&E)
Requirements Definition Flow IOM SyRS            SAD Glossary:
SyDS          HAD CDD      Conceptual Design Document FRS      Functional Requirements Specification IRS      Interface Requirements Specification SAD      Software Architecture Requirements          SRS HAD      Hardware Architecture Requirements                          SRS (CLB Spec)
SyRS      System Requirements Specification                              Requirements Definition SyDS      System Design Specification Design SRS      Software Requirements Specification HRS      Hardware Requirements Specification          SDD            SDS HDS      Hardware Design Specification SDD      Software Design Description SDS      Software Design Specification FAT      Factory Acceptance Test                      HDS          HDS SAT      Site Acceptance Test DVT      Design Verification Testing Design RTM      Requirements Traceability Matrix SVVR      Software Verification & Validation Report                                  Test SyVVR System Verification & Validation Report          FAT            FAT RTM          RTM SVVR          SVVR Test Installation/Checkout SAT RTM SyVVR 15


Regulations.
LAR Discussion Format of LAR - with two vendors, how should the LAR be structured?
*Discuss interface to cyber security program Project Plan and ScheduleProject ScopeReplacement PPS ConceptMilestone ScheduleLiflDtFlLif ecyc l e D ocumen t Fl ow 11 Project Scope 12 Replacement PPS Concept(ALS Provides Diverse Front-End Isolation and Actuation)
LAR Submittal as a Tier 1 for Tricon and ALS with NRC acceptance tied to both vendor topical approvall Confirm review schedule NRC Resources - who and when will they be available for our review Submittal of High Level Documents first before the LAR for review 16
ALSRTD Inputs(200  Platinum)Containment Pressure(4-20 mA)RCS Flow(4-20 mA)PZR Pressure(4-20 mA)I IINR Temperatures(4-20 mA)Trips to SSPS(Discrete)TRICONTrips (To SSPS)(Discrete)RNASA RNASB(Discrete)Class I Analog Outputs(4-20 mA)Neutron Flux Inputs(0-10 VDC)Process Inputs(4-20 mA)NClIClass I Analog Outputs(4-20 mA)INote: SSPS & AMSAC are original equipment; not being replaced.
I IWR Temperatures(4-20 mA)I I II IICommunicationLinks(Fiberoptic)PZR Pressure (DTTA)(4-20 mA)ProcessInputs PPCData Link CWorkstation IChannel(s) in Bypass(Discrete)AMSAC (4-20 mA)Protection Set Trouble(Discrete)Protection Set Failure(Discrete)MASMASDTTA RTD Failure(Discrete)MASData Link 13Protection Set Trouble(Discrete)Protection Set Failure(Discrete)Channel(s) in Bypass(Discrete)DTTA RTD Failure(Discrete)MAS(4-20 mA)TRICONREMOTECHASSISData Link PPCMAINTENANCETERMINALWORKSTATION(Class II)
BWorkstation Non Class IAnalog Outputs B CALSTRICONRNARA RNARB(Discrete)HMIS/G Feedflow(4-20 mA)(DFWCS)Data LinkData LinkData LinkProcess Inputs(4-20 mA)II I II IIData Link (4 20 mA)Process Control(4-20 mA)Non Class IAnalog Outputs(4-20 mA)ALS -Advanced Logic SystemDFWCS -Digital Feedwater Control System DTTA -Delta T/Taverage (Thermal Trips)
HMI -Human Machine Interface PPC -Plant Process Computer PZR -Pressurizer RNARA/RNARB -Auxiliary Relay Cabinets RTD -Resistance Temperature Detector RCS -Reactor Cooling System SSPS -Solid State Protection System WR -Wide Range Project Milestone Schedule1/1/20114/30/20144/1/20117/1/201110/1/20111/1/20124/1/20127/1/201210/1/20121/1/20134/1/20137/1/201310/1/20131/1/20144/1/2014DCPP PPS Replacement Project3/31/2011Tricon SER Issued8/1/2011ALS Topical Report Issued12/10/2012Vendor FATs Complete5/24/2013DCPP PPS SER Issued2/15/2014PPS Installation3/1/2013Design Package Issued2/24/2012Vendor Phase 2 Items Complete Provided to PG&E3/23/2012Phase 2 Items Provided to NRC7/15/2011LAR Submittedto NRC 141/1/20118/1/20112/1/20113/1/20114/1/20115/1/20116/1/20117/1/2011LAR Submittal6/1/2011Vendor Phase 1 Items CompleteProvided to PG&E6/15/2011LAR w/Phase 1 Items Complete by PG&E Team Provided to Licensing for Final Review2/3/2011Phase 0 Meeting w/NRC7/15/2011LAR Submitted to NRC Lifecycle Document Flow FRSIRSSyRSSADSyDS HAD SRS(CLB Spec)SRSSDDSDSHDS HDSCDDRequirements DefinitionDesignRequirements DefinitionConcept (PG&E)ALSIOMConcept (PG&E)Glossary:CDDConceptual Design DocumentFRSFunctional Requirements SpecificationIRSInterface Requirements Specification SADSoftware Architecture RequirementsHADHardware Architecture RequirementsSyRSSystem Requirements Specification SyDSSystem Design Specification SRSSoftware Requirements SpecificationHRSHardware Requirements SpecificationHDSHardware Design Specification SDDSoftware Design DescriptionSDSSoftware Design SpecificationFATFactory Acceptance Test 15HDS HDSFAT FAT RTM RTMSVVR SVVR SATRTMSyVVRDesign TestSATSite Acceptance TestDVTDesign Verification TestingRTMRequirements Traceability Matrix SVVRSoftware Verification & Validation ReportSyVVRSystem Verification & Validation Report TestInstallation/Checkout LAR DiscussionFormat of LAR -with two vendors, how should the LAR be structured? LAR Submittal as a Tier 1 for Tricon and ALS with NRC acceptance tied to both vendor topical l 16 approva lConfirm review scheduleNRC Resources -who and when will they be  


available for our reviewSubmittal of High Level Documents first before
Technical Topics NRC's evaluation of ALS diversity approach -
Risks? Challenges?
Maintenance Workstation Software (non-safety) -
What review will the NRC do and what level of documentation is expected M i t Maintenance  Workstation W k t ti is i SIL 1 Time Base Verification - can this be justified without periodic measurement of time base based on how it works (e.g. self-diagnostics)
Use of simple digital components like isolators, signal conditioners with respect to diversity and CCF's RPS/ESFAS Application Software QA 17


the LAR for review Technical TopicsNRC's evaluation of ALS diversity approach -Risks?  Challenges?Maintenance Workstation Software (non-safety) -
Factory Acceptance Test (FAT)
What review will the NRC do and what level of documentation is expected MitWkttiiSIL1 17M a i n t enance W or k s t a ti on i s SIL 1 Time Base Verification -can this be justified without periodic measurement of time base based on how it works (e.g. self-diagnostics)Use of simple digital components like isolators, signal conditioners with respect to diversity and
Site Acceptance Test (SAT)
Two Separate FATs before SER Each vendor will perform an FAT How much time does the NRC need after the submittal of the FAT report to issue the SER?
Integrated SAT after SER SAT to verify equipment after shipment and testing of any external interfaces at the Project Integration and Test (PIT) facility Design Verification Test (DVT) before being placed in service 18


CCF'sRPS/ESFAS Application Software QA Factory Acceptance Test (FAT)Site Acceptance Test (SAT)Two Separate FATs before SEREach vendor will perform an FATHow much time does the NRC need after the submittal of the FAT r eport to issue the SER?
Questions NRC Staff PG&E Westinghouse I
18Integrated SAT after SERSAT to verify equipment after shipment and testing of any external interfaces at the Project
Invensys 19


Integration and Test (PIT) facilityDesign Verification Test (DVT) before being placed in service QuestionsNRC StaffPG&EWestinghouse I 19I nvensys Closing Comments/Adjourn 20}}
Closing Comments/Adjourn 20}}

Latest revision as of 07:26, 21 March 2020

PG&E Presentation, Pre-application Meeting on 2/3/2011 with Representatives of Pacific Gas and Electric Company to Discuss Digital Upgrade and Eagle-21 Portion of Reactor Trip System at Diablo Canyon, Units 1 and 2
ML110380109
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/03/2011
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Polickoski J, NRR/DORL/LPL4, 415-5430
Shared Package
ML110380098 List:
References
TAC ME5284, TAC ME5285
Download: ML110380109 (20)


Text

DIABLO CANYON POWER PLANT PROCESS PROTECTION SYSTEM REPLACEMENT Third Phase 0 Meeting February 3, 2011 Scott B. Patterson Pacific Gas & Electric Co.

Avila Beach, CA sbp1@pge.com 805-545-4082 Ken Schrader Pacific Gas & Electric Co.

Avila Beach, CA j @pg kjse@pge.com 805-545-4328 John Hefler Altran Solutions Corp.

San Francisco, CA jhefler@altransolutions.com 415-543-6111 Ted Quinn Altran Solutions Corp.

San Francisco, CA tedquinn@cox.net 415-543-6111 Greg Clarkson Altran Solutions Corp.

San Francisco, CA gretg@rockcreektech.com 415-543-6111 1

Agenda Introduction ISG-06 Update Project Plan and Schedule LAR Discussion Technical Topics Factory Acceptance Test Questions (NRC Staff)

Closing Comments/Adjourn 2

ISG 6 Update NRC Status PG&E Progress ISG 6 Matrix - Vendor and PG&E documents ISG 6 and d Cyber C b Requirements R i t (NRC) 3

NRC Status ISG 6 Revision was issued on 1/19/2011 Vendor Topical Report Review Tricon v10 ALS Forecast for approval dates Diversity Defense-in-Depth Approval Status 4

PG&E Progress Completed Conceptual Design Document Completed Revision 2 of the Functional Requirement and Interface Requirement Specifications Including the Logic Diagrams and IO List Project Plan is near complete SQAP is near complete Contracts to vendors for ISG 6 Phase 1 documents 5

Phase 1 Documentation to be Submitted 6

Phase 2 Submitted and Available for Audit 7

Phase 3 Available for Inspection 8

Cyber Security

  • Diablo Canyon is responsible to ensure compliance with the applicable cyber security regulations and guidance during all life cycle phases of the plant upgrade following 10 CFR 73 73.54, 54 Regulatory Guide 1 1.152 152 Rev Rev. 2 and ISG-01.
  • Applicable to:
  • Vendor equipment software development
  • Diablo Canyon responsible departments 9

Cyber Security Summary

  • Diablo Canyon will comply fully with the applicable guidance on cyber security both for the vendor design program (offsite) and the onsite installation,, testing g and later phases as called for in NRC Reg. Guide 1.152, ISG-01 and the applicable Regulations.

Project Plan and Schedule Project Scope Replacement PPS Concept Milestone Schedule Lif Lifecycle l DDocumentt Flow Fl 11

Project Scope 12

Replacement PPS Concept (ALS Provides Diverse Front-End Isolation and Actuation)

Note: SSPS & AMSAC are original equipment; not being replaced.

I Process Inputs I (4-20 mA)

I WR Temperatures I RTD Inputs PZR Pressure (DTTA)

(4-20 mA) Class I Analog Outputs (200 Platinum) (4-20 mA)

Trips to SSPS (4-20 mA)

(Discrete)

NR Temperatures TRICON Trips (To SSPS)

Containment Pressure (4-20 mA)

Class I Analog Outputs (Discrete)

(4-20 mA)

(4-20 mA) Neutron Flux Inputs I

(0-10 VDC) RNASA RNASB II Protection Set Trouble (Discrete)

RCS Flow MAS (Discrete) Channel(s) in Bypass (4-20 mA)

Protection Set Failure (Discrete)

MAS I I (Discrete)

II Data Link II PZR Pressure ALS DTTA RTD Failure Communication PPC MAS (4-20 mA) (Discrete) Links Data Link C Workstation (Fiberoptic)

AMSAC Process Inputs (4-20 (4 20 mA) N Cl Non Class I (4-20 mA) Process Control Analog Outputs (4-20 mA) (4-20 mA)

Non Class I Analog Outputs RNARA RNARB (4-20 mA) (Discrete)

Protection Set Trouble Data Link PPC (4-20 mA) TRICON (Discrete)

Data Link REMOTE MAS B Workstation S/G Feedflow Protection Set Failure CHASSIS (Discrete)

I II (DFWCS)

Channel(s) in Bypass ALS - Advanced Logic System (Discrete)

DFWCS - Digital Feedwater Control System DTTA RTD Failure DTTA - Delta T/Taverage (Thermal Trips) II (Discrete) II HMI - Human Machine Interface PPC - Plant Process Computer PZR - Pressurizer Data Link ALS B MAINTENANCE RNARA/RNARB - Auxiliary Relay Cabinets TERMINAL Data Link HMI RTD - Resistance Temperature Detector WORKSTATION Data Link RCS - Reactor Cooling System TRICON C (Class II)

SSPS - Solid State Protection System WR - Wide Range 13

Project Milestone Schedule 2/24/2012 Vendor Phase 2 Items Complete 7/15/2011 Provided to PG&E 3/23/2012 LAR Submitted Phase 2 Items to NRC Provided to NRC 12/10/2012 3/1/2013 2/15/2014 8/1/2011 Vendor FATs Design Package Issued PPS Installation 3/31/2011 ALS Topical Report Issued Complete 5/24/2013 Tricon SER Issued DCPP PPS SER Issued DCPP PPS Replacement Project 4/1/2011 7/1/2011 10/1/2011 1/1/2012 4/1/2012 7/1/2012 10/1/2012 1/1/2013 4/1/2013 7/1/2013 10/1/2013 1/1/2014 4/1/2014 1/1/2011 4/30/2014 6/15/2011 LAR w/Phase 1 Items Complete by PG&E Team Provided to Licensing for Final Review 2/3/2011 6/1/2011 Phase 0 Meeting w/NRC 7/15/2011 Vendor Phase 1 Items Complete Provided to PG&E LAR Submitted to NRC LAR Submittal 2/1/2011 3/1/2011 4/1/2011 5/1/2011 6/1/2011 7/1/2011 1/1/2011 8/1/2011 14

Lifecycle Concept (PG&E)

CDD FRS Document ALS IRS Concept (PG&E)

Requirements Definition Flow IOM SyRS SAD Glossary:

SyDS HAD CDD Conceptual Design Document FRS Functional Requirements Specification IRS Interface Requirements Specification SAD Software Architecture Requirements SRS HAD Hardware Architecture Requirements SRS (CLB Spec)

SyRS System Requirements Specification Requirements Definition SyDS System Design Specification Design SRS Software Requirements Specification HRS Hardware Requirements Specification SDD SDS HDS Hardware Design Specification SDD Software Design Description SDS Software Design Specification FAT Factory Acceptance Test HDS HDS SAT Site Acceptance Test DVT Design Verification Testing Design RTM Requirements Traceability Matrix SVVR Software Verification & Validation Report Test SyVVR System Verification & Validation Report FAT FAT RTM RTM SVVR SVVR Test Installation/Checkout SAT RTM SyVVR 15

LAR Discussion Format of LAR - with two vendors, how should the LAR be structured?

LAR Submittal as a Tier 1 for Tricon and ALS with NRC acceptance tied to both vendor topical approvall Confirm review schedule NRC Resources - who and when will they be available for our review Submittal of High Level Documents first before the LAR for review 16

Technical Topics NRC's evaluation of ALS diversity approach -

Risks? Challenges?

Maintenance Workstation Software (non-safety) -

What review will the NRC do and what level of documentation is expected M i t Maintenance Workstation W k t ti is i SIL 1 Time Base Verification - can this be justified without periodic measurement of time base based on how it works (e.g. self-diagnostics)

Use of simple digital components like isolators, signal conditioners with respect to diversity and CCF's RPS/ESFAS Application Software QA 17

Factory Acceptance Test (FAT)

Site Acceptance Test (SAT)

Two Separate FATs before SER Each vendor will perform an FAT How much time does the NRC need after the submittal of the FAT report to issue the SER?

Integrated SAT after SER SAT to verify equipment after shipment and testing of any external interfaces at the Project Integration and Test (PIT) facility Design Verification Test (DVT) before being placed in service 18

Questions NRC Staff PG&E Westinghouse I

Invensys 19

Closing Comments/Adjourn 20