Licenseee Slides from 06/07/11 Meeting with Representatives of Pacific Gas and Electric to Discuss the Proposed Architecture for the Digital Upgrade and Eagle-21 Portion of Reactor Trip System at Diablo Canyon, Units 1 and 2
ML111600238
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/07/2011
From:
Pacific Gas & Electric Co
To: Wang A
Plant Licensing Branch IV
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME5283, TAC ME5284
Download: ML111600238 (15)


Text

DIABLO CANYON POWER PLANT PROCESS PROTECTION SYSTEM REPLACEMENT Fourth Phase 0 Meeting June 7, 2011 Scott B. Patterson Pacific Gas & Electric Co.

Avila Beach, CA sbp1@pge.com 805-545-4082 Ken Schrader Pacific Gas & Electric Co.

Avila Beach, CA kjse@pge.com 11 j

@pg 805-545-4328 John Hefler Altran Solutions Corp.

San Francisco, CA jhefler@altransolutions.com 415-543-6111 Ted Quinn Altran Solutions Corp.

San Francisco, CA tedquinn@cox.net 415-543-6111 Greg Clarkson Altran Solutions Corp.

San Francisco, CA gretg@rockcreektech.com 415-543-6111

Agenda

Introductions

LAR Status ISG-06 Enclosure B Matrix Feedback on LAR Draft Sections Discussion on D3 Topical Assumptions 2

p p

Feedback on how to write LAR to help Tier 3 to 1 change NRC Status of Tricon Topical Report NRC Status of ALS Topical Report Factory Acceptance Test expectations

LAR Status Sections 4.1, 4.6, and 4.7 Drafted Drafting of other sections are in progress Some Phase 1 vendor documents still required 3

required LAR can be submitted about 30 days after the Tricon v10 SER is issued

ISG-06 Enclosure B Matrix See handout 4

Feedback on LAR Draft Sections Draft LAR sections 4.1, 4.6, and 4.7 Level of detail adequate to meet LIC-109/Staff SE Do Figures 4 7 4 8 and 4 11 include all the 5

Do Figures 4-7, 4-8, and 4-11 include all the info needed?

Is section organization/number written to support efficient approval?

Any other comments or suggestions?

Discussion on D3 Topical Assumptions April 19, 2011 Safety Evaluation requires two DI&C-ISG-02 positions to be addressed in LAR Position 4 - Effect of Common Cause Failure 66 Position 7 - Single Failure LAR Section 4.9.2.1.1 to address single failure and FMEA for partial Tricon/ALS failures

LAR - Tier 3 to 1 for ALS Recommendations on how to write the LAR to help convert from a Tier 3 to a Tier 1 77

NRC Audits NRO did an audit on CS Innovations for the AP1000 project Will audits by other divisions of the NRC be shared to not duplicate efforts?

8

Vendor Topical Report Status NRC Status of Tricon Topical Report Expected final SER?

This will affect when we can submit our LAR Need ~30 days after submittal to review and update LAR if 9

LAR if necessary NRC Status of ALS Topical Report Discussion of ALS Documentation Completeness Expected final SER?

Will affect if a Tier 3 to 1 can be possible 9

Project Milestone Schedule 10 10 Green Items are complete Red Items are overdue Blue Items will be delayed

Factory Acceptance Tests Two FATs - FAT for Tricon and a FAT for ALS ALS All Protection Set Core Logic Boards Identical for Core A All Protection Set Core Logic Boards Identical for Core B Does the NRC need to witness the FAT for all Protection Sets?

T i 11 Tricon Protection Sets have different software/loops - tests for each Two Identical Units Write software once, Install Twice Exact same software (Tricon) between Unit 1 and Unit 2 Exact same hardware (Tricon and ALS) configuration Does the NRC only want to witness the first units FAT?

ISG-06 Phase 1 Documents The Software Design Specification (SDS) and the Software Test Plan (STP) are documents from the Design Phase All other ISG-06 information required by ISG-12 All other ISG 06 information required by ISG 06 Enclosure B are Concept and Requirement Phase documents Would it be more appropriate to move the SDD and STP to Phase 2?

Lifecycle Document Flow FRS IRS SyRS SAD SyDS HAD SRS (CLB Spec)

SRS SDD SDS HDS HDS CDD Requirements Definition Design Requirements Definition Concept (PG&E)

ALS IOM Concept (PG&E)

Glossary:

CDD Conceptual Design Document FRS Functional Requirements Specification IRS Interface Requirements Specification SAD Software Architecture Requirements HAD Hardware Architecture Requirements SyRS System Requirements Specification SyDS System Design Specification SRS Software Requirements Specification HRS Hardware Requirements Specification HDS Hardware Design Specification SDD Software Design Description SDS Software Design Specification FAT Factory Acceptance Test 13 13 HDS HDS FAT FAT RTM RTM SVVR SVVR SAT RTM SyVVR Design Test SAT Site Acceptance Test DVT Design Verification Testing RTM Requirements Traceability Matrix SVVR Software Verification & Validation Report SyVVR System Verification & Validation Report Test Installation/Checkout

Discussion Items NRC Staff PG&E Westinghouse I

14 14 Invensys

Closing Comments/Adjourn 15 15