| number = ML13336A775
| number = ML13336A775
| issue date = 12/02/2013
| issue date = 12/02/2013
| title = Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies - Correction Letter (TAC Nos. MF0829, MF0830, MF0831)
| title = Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies - Correction Letter
| author name = Bowen J S
| author name = Bowen J
| author affiliation = NRC/NRR/DPR/MSD/MSPB
| author affiliation = NRC/NRR/DPR/MSD/MSPB
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
| license number =  
| license number =  
| contact person = Boska J P, NRR/DPR, 415-2901
| contact person = Boska J, NRR/DPR, 415-2901
| case reference number = TAC MF0829, TAC MF0830, TAC MF0831
| case reference number = TAC MF0829, TAC MF0830, TAC MF0831
| document type = Letter
| document type = Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Randall K. Edington Executive Vice President Nuclear/ Chief Nuclear Officer Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034 December 2, 2013
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 2, 2013 Mr. Randall K. Edington Executive Vice President Nuclear/
Chief Nuclear Officer Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034


==SUBJECT:==
==SUBJECT:==
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3-INTERIM STAFF EVALUATION RELATING TO OVERALL INTEGRATED PLAN IN RESPONSE TO ORDER EA-12-049-MITIGATION CORRECTION LETTER {TAC NOS. MF0829, MF0830, MF0831)  
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3-INTERIM STAFF EVALUATION RELATING TO OVERALL INTEGRATED PLAN IN RESPONSE TO ORDER EA-12-049- MITIGATION STRATEGIES-CORRECTION LETTER {TAC NOS. MF0829, MF0830, MF0831)


==Dear Mr. Edington:==
==Dear Mr. Edington:==


On November 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) staff issued the public version of the Interim Staff Evaluation of the overall integrated plan in response to Order EA-12-049 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, on the NRC's email list server. The date of the letter was inadvertently omitted from the first page. Enclosed is the first page with the date included.
On November 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) staff issued the public version of the Interim Staff Evaluation of the overall integrated plan in response to Order EA 049 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, on the NRC's email list server. The date of the letter was inadvertently omitted from the first page. Enclosed is the first page with the date included.
If you have any questions, please contact John Boska at 301-415-2901.
If you have any questions, please contact John Boska at 301-415-2901.
Docket Nos. 50-528, 50-529, and 50-530  
Jeremy S. Bowen, Chief Project Management Branch Mitigating Strategies Directorate Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530


==Enclosure:==
==Enclosure:==


As Stated cc w/encl: Distribution via Listserv Jeremy S. Bowen, Chief Project Management Branch Mitigating Strategies Directorate Office of Nuclear Reactor Regulation OFFICIAl USE ONlY PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Randall K. Edington Executive Vice President Nuclear/ Chief Nuclear Officer Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034 November 25, 2013
As Stated cc w/encl: Distribution via Listserv


==SUBJECT:==
OFFICIAl USE ONlY              PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 25, 2013 Mr. Randall K. Edington Executive Vice President Nuclear/
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1 ,2, AND 3-INTERIM STAFF EVALUATION RELATING TO OVERALL INTEGRATED PLAN IN RESPONSE TO ORDER EA-12-049-MITIGATION STRATEGIES (TAC NOS. MF0829, MF0830, MF0831)
Chief Nuclear Officer Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034
 
==Dear Mr. Edington:==
 
On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Design-Basis External Events" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 12054A736).
By letter dated February 28, 2013 (ADAMS Accession No. ML 13136A022), Arizona Public Service Company (APS) submitted its Overall Integrated Plan for Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3 in response to Order EA-12-049.
By letter dated June 20, 2013, the NRC sent a request for additional information to APS (ADAMS Accession No. ML 13161A259).
By letter dated July 18, 2013, APS replied to the request for additional information (ADAMS Accession No. ML 13206A006).
By letter dated August 28, 2013 (ADAMS Accession No. ML 13246A007), APS submitted a six-month update to the Overall Integrated Plan. Based on a review of APS' plan, including the six-month update dated August 28, 2013, and information obtained through the mitigation strategies audit process, 1 the NRC concludes that the licensee has provided sufficient information to determine that there is reasonable assurance that the plan, when properly implemented, will meet the requirements of Order EA-12-049 at PVNGS, Units 1, 2 and 3. This conclusion is based on the assumption that the licensee will implement the plan as described, including the satisfactory resolution of the open and confirmatory items detailed in the enclosed Interim Staff Evaluation and Audit Report. Document transmitted herewith contains sensitive unclassified information.
When separated from enclosure 2, this document is decontrolled.
1 A description of the mitigation strategies audit process may be found at ADAMS Accession No. ML 13234A503.
OFFICIAl USE ONlY PROPRIETARY INFORMATION Enclosure December 2, 2013 Mr. Randall K. Edington Executive Vice President Nuclear/ Chief Nuclear Officer Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034  


==SUBJECT:==
==SUBJECT:==
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3-INTERIM STAFF EVALUATION RELATING TO OVERALL INTEGRATED PLAN IN RESPONSE TO ORDER EA-12-049-MITIGATION CORRECTION LETTER (TAC NOS. MF0829, MF0830, MF0831)  
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1,2, AND 3-INTERIM STAFF EVALUATION RELATING TO OVERALL INTEGRATED PLAN IN RESPONSE TO ORDER EA-12-049- MITIGATION STRATEGIES (TAC NOS. MF0829, MF0830, MF0831)


==Dear Mr. Edington:==
==Dear Mr. Edington:==


On November 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) staff issued the public version of the Interim Staff Evaluation of the overall integrated plan in response to Order EA-12-049 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, on the NRC's email list server. The date of the letter was inadvertently omitted from the first page. Enclosed is the first page with the date included.
On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12054A736). By letter dated February 28, 2013 (ADAMS Accession No. ML13136A022), Arizona Public Service Company (APS) submitted its Overall Integrated Plan for Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3 in response to Order EA-12-049. By letter dated June 20, 2013, the NRC sent a request for additional information to APS (ADAMS Accession No. ML13161A259). By letter dated July 18, 2013, APS replied to the request for additional information (ADAMS Accession No. ML13206A006). By letter dated August 28, 2013 (ADAMS Accession No. ML13246A007), APS submitted a six-month update to the Overall Integrated Plan.
If you have any questions, please contact John Boska at 301-415-2901.
Based on a review of APS' plan, including the six-month update dated August 28, 2013, and information obtained through the mitigation strategies audit process, 1 the NRC concludes that the licensee has provided sufficient information to determine that there is reasonable assurance that the plan, when properly implemented, will meet the requirements of Order EA-12-049 at PVNGS, Units 1, 2 and 3. This conclusion is based on the assumption that the licensee will implement the plan as described, including the satisfactory resolution of the open and confirmatory items detailed in the enclosed Interim Staff Evaluation and Audit Report.
Docket Nos. 50-528, 50-529, and 50-530
Document transmitted herewith contains sensitive unclassified information. When separated from enclosure 2, this document is decontrolled.
 
1 A description of the mitigation strategies audit process may be found at ADAMS Accession No. ML13234A503.
==Enclosure:==
OFFICIAl USE ONlY                PROPRIETARY INFORMATION Enclosure


As Stated cc w/encl: Distribution via Listserv DISTRIBUTION PUBLIC LPL4 R/F RidsNrrDorllpl4 Resource RidsNrrPMPaloVerde Resource RidsAcrsAcnw_MaiiCTR Resource Sincerely, IRA/ Jeremy S. Bowen, Chief Project Management Branch Mitigating Strategies Directorate Office of Nuclear Reactor Regulation JKratchman, NRR/JLD RidsNrrLASLent EBowman, NRR/DPR RidsRgn4MaiiCenter Resource L ML 1333 ADAMS Accession Nos.: Pkg: ML 13326A713, etter: 6A775 OFFICE NRR/MSD/PM NRR/MSD/LA NRR/MSD/MSPB/BC NAME JBoska Slent JBowen DATE 12/02/13 12/02/13 12/02/13 OFFICIAL RECORD COPY}}
Pkg: ML13326A713, Letter: ML13336A775 OFFICE       NRR/MSD/PM         NRR/MSD/LA             NRR/MSD/MSPB/BC NAME         JBoska             Slent                   JBowen DATE         12/02/13           12/02/13               12/02/13}}

Latest revision as of 01:46, 20 March 2020

Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies - Correction Letter
ML13336A775
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/02/2013
From: Jeremy Bowen
NRC/NRR/DPR/MSD/MSPB
To: Edington R
Arizona Public Service Co
Boska J, NRR/DPR, 415-2901
References
TAC MF0829, TAC MF0830, TAC MF0831
Download: ML13336A775 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 2, 2013 Mr. Randall K. Edington Executive Vice President Nuclear/

Chief Nuclear Officer Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3-INTERIM STAFF EVALUATION RELATING TO OVERALL INTEGRATED PLAN IN RESPONSE TO ORDER EA-12-049- MITIGATION STRATEGIES-CORRECTION LETTER {TAC NOS. MF0829, MF0830, MF0831)

Dear Mr. Edington:

On November 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) staff issued the public version of the Interim Staff Evaluation of the overall integrated plan in response to Order EA 049 for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, on the NRC's email list server. The date of the letter was inadvertently omitted from the first page. Enclosed is the first page with the date included.

If you have any questions, please contact John Boska at 301-415-2901.

Jeremy S. Bowen, Chief Project Management Branch Mitigating Strategies Directorate Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529, and 50-530

Enclosure:

As Stated cc w/encl: Distribution via Listserv

OFFICIAl USE ONlY PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 25, 2013 Mr. Randall K. Edington Executive Vice President Nuclear/

Chief Nuclear Officer Arizona Public Service Company P.O. Box 52034, MS 7602 Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1,2, AND 3-INTERIM STAFF EVALUATION RELATING TO OVERALL INTEGRATED PLAN IN RESPONSE TO ORDER EA-12-049- MITIGATION STRATEGIES (TAC NOS. MF0829, MF0830, MF0831)

Dear Mr. Edington:

On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12054A736). By letter dated February 28, 2013 (ADAMS Accession No. ML13136A022), Arizona Public Service Company (APS) submitted its Overall Integrated Plan for Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3 in response to Order EA-12-049. By letter dated June 20, 2013, the NRC sent a request for additional information to APS (ADAMS Accession No. ML13161A259). By letter dated July 18, 2013, APS replied to the request for additional information (ADAMS Accession No. ML13206A006). By letter dated August 28, 2013 (ADAMS Accession No. ML13246A007), APS submitted a six-month update to the Overall Integrated Plan.

Based on a review of APS' plan, including the six-month update dated August 28, 2013, and information obtained through the mitigation strategies audit process, 1 the NRC concludes that the licensee has provided sufficient information to determine that there is reasonable assurance that the plan, when properly implemented, will meet the requirements of Order EA-12-049 at PVNGS, Units 1, 2 and 3. This conclusion is based on the assumption that the licensee will implement the plan as described, including the satisfactory resolution of the open and confirmatory items detailed in the enclosed Interim Staff Evaluation and Audit Report.

Document transmitted herewith contains sensitive unclassified information. When separated from enclosure 2, this document is decontrolled.

1 A description of the mitigation strategies audit process may be found at ADAMS Accession No. ML13234A503.

OFFICIAl USE ONlY PROPRIETARY INFORMATION Enclosure

Pkg: ML13326A713, Letter: ML13336A775 OFFICE NRR/MSD/PM NRR/MSD/LA NRR/MSD/MSPB/BC NAME JBoska Slent JBowen DATE 12/02/13 12/02/13 12/02/13