| title = North Anna Units 1 & 2, March 12, 2012 Information Request Response to Request for Additional Information Regarding Phase 2 Staffing Assessment Report Recommendation 9.3 (TAC Nos. MF4319 and MF4320)
| title = March 12, 2012 Information Request Response to Request for Additional Information Regarding Phase 2 Staffing Assessment Report Recommendation 9.3
| author name = Stoddard D G
| author name = Stoddard D
| author affiliation = Virginia Electric & Power Co (VEPCO)
| author affiliation = Virginia Electric & Power Co (VEPCO)
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANYRICHMOND, VIRGINIA 23261September 22, 2014U.S. Nuclear Regulatory Commission Serial No. 14-435Attention: Document Control Desk NL&OS/GDM ROWashington, DC 20555 Docket Nos. 50-338/339License Nos. NPF-4/7VIRGINIA ELECTRIC AND POWER COMPANYNORTH ANNA POWER STATION UNITS 1 AND 2MARCH 12. 2012 INFORMATION REQUESTRESPONSE TO REQUEST FOR ADDITIONAL INFORMATIONREGARDING PHASE 2 STAFFING ASSESSMENT REPORTRECOMMENDATION 9.3 (TAC NOS. MF4319 AND MF4320)By letter dated May 7, 2014 (ADAMS Accession No. ML14133A011), Virginia Electric andPower Company (Dominion) submitted the Phase 2 Staffing Assessment Report for NorthAnna Power Station Units 1 and 2 in response to the Nuclear Regulatory Commission (NRC)March 12, 2012 Information Request. In a letter dated August 21, 2014, the NRC transmitteda request for additional information (RAI) related to the submittal. Dominion's response to theRAI is provided in the attachment.As noted in the implementation schedule provided in the May 7, 2014 letter, re-evaluation ofthe staffing assessment using the final approved versions of the FLEX Support Guidelinesprocedures and the final approved on-shift communications equipment, Dominion intends torevise and resubmit the staffing assessment report by January 30, 2015.If you have any questions regarding this information, please contact Wanda Craft at(804) 273-4687.Sincerely,Daniel G. Stoddard vicki L HullNO'mRy PUBLICSenior Vice President -Nuclear Operations Commonwealth of VirginiaVirginia Electric and Power Company Reg. # 140542 IMy Commission Expires May 31, 2018COMMONWEALTH OF VIRGINIA)COUNTY OF HENRICOThe foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today byDaniel G. Stoddard, who is Senior Vice President -Nuclear Operations of Virginia Electric and Power Company. He hasaffirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, andthat the statements in the document are true to the best of his knowledge and belief.Acknowledged before me this 42 ~day of ( 2014.My Commission Expires: .A A -(, Q0/9Notary Public Serial No. 14-435Docket Nos. 50-338/339Page 2 of 2Commitments made in this letter: None
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 22, 2014 U.S. Nuclear Regulatory Commission                                               Serial No.         14-435 Attention: Document Control Desk                                                 NL&OS/GDM           RO Washington, DC 20555                                                             Docket Nos.         50-338/339 License Nos.       NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MARCH 12. 2012 INFORMATION REQUEST RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING PHASE 2 STAFFING ASSESSMENT REPORT RECOMMENDATION 9.3 (TAC NOS. MF4319 AND MF4320)
By letter dated May 7, 2014 (ADAMS Accession No. ML14133A011), Virginia Electric and Power Company (Dominion) submitted the Phase 2 Staffing Assessment Report for North Anna Power Station Units 1 and 2 in response to the Nuclear Regulatory Commission (NRC)
March 12, 2012 Information Request. In a letter dated August 21, 2014, the NRC transmitted a request for additional information (RAI) related to the submittal. Dominion's response to the RAI is provided in the attachment.
As noted in the implementation schedule provided in the May 7, 2014 letter, re-evaluation of the staffing assessment using the final approved versions of the FLEX Support Guidelines procedures and the final approved on-shift communications equipment, Dominion intends to revise and resubmit the staffing assessment report by January 30, 2015.
If you have any questions regarding this information, please contact Wanda Craft at (804) 273-4687.
Sincerely, Daniel G. Stoddard                                                                 vicki LPUBLIC NO'mRy     Hull Senior Vice President - Nuclear Operations Virginia Electric and Power Company Commonwealth of Virginia Reg. # 140542 My Commission Expires May 31, 2018 I
COMMONWEALTH OF VIRGINIA
                                                    )
COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Daniel G. Stoddard, who is Senior Vice President - Nuclear Operations of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this 42       ~day of (                       2014.
My Commission Expires:     .A     A     -(,     Q0/9 Notary Public
 
Serial No. 14-435 Docket Nos. 50-338/339 Page 2 of 2 Commitments made in this letter: None


==Attachment:==
==Attachment:==
Response to Request for Additional Information Regarding Phase 2 Staffing AssessmentReportcc: U.S. Nuclear Regulatory Commission, Region IIMarquis One Tower245 Peachtree Center Avenue NE, Suite 1200Atlanta, Georgia 30303-1257Dr. V. Sreenivas, NRC Project Manager -North AnnaU. S. Nuclear Regulatory CommissionOne White Flint NorthMail Stop 08 G9A11555 Rockville PikeRockville, Maryland 20852Ms. Karen Cotton, NRC Project Manager -SurryU. S. Nuclear Regulatory CommissionOne White Flint NorthMail Stop 08 G9A11555 Rockville PikeRockville, Maryland 20852Brian K. HarrisProject ManagerU.S. Nuclear Regulatory CommissionOne White Flint North, Mail Stop 11 F111555 Rockville PikeRockville, MD 20852-2738NRC Senior Resident InspectorNorth Anna Power Station  
 
.tSerial No. 14-435Docket Nos. 50-338/339ATTACHMENTRESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDINGPHASE 2 STAFFING ASSESSMENT REPORTVIRGINIA ELECTRIC AND POWER COMPANY(DOMINION)NORTH ANNA POWER STATION UNITS 1 AND 2 Serial No. 14-435Docket Nos. 50-338/339Attachment, Page 1 of 4Response to Request for Additional InformationPhase 2 Staffing Assessment ReportNorth Anna Power Station Units 1 and 2By letter dated May 7, 2014, (ADAMS Accession No. ML14133A011), Virginia Electricand Power Company (Dominion) submitted the Phase 2 Staffing Assessment Report forNorth Anna Power Station Units 1 and 2 in response to the Nuclear RegulatoryCommission (NRC) March 12, 2012 Information Request. In a letter dated August 21,2014, the NRC transmitted a request for additional information (RAI) related to thesubmittal. Dominion's response to the NRC RAI is provided below.NRC Question IIn your Phase 2 Staffing Assessment dated May 7, 2014, you provided information thatstated the following: (1) North Anna Power Station (NAPS) current on-shift staffing maynot be sufficient to perform the FLEX Support Guidelines (FSGS) identified by thestation to support activities following a Beyond-Design-Basis External Event, (2) Shiftpersonnel are not yet trained to perform FSG tasks, and (3) The qualification of on-shiftauxiliary operators (AOs) requires further review to ensure their capabilities toimplement the FSG strategies.Provide an update or supplement to the Phase 2 Staffing Assessment that indicatesNAPS has determined that the current on-shift staffing is capable of performing allrequired FSG tasks and all associated required training has been provided. Include anyactions taken to correct this issue, or justification as to why no action is required.Dominion ResponseThe NEI 12-01 Phase 2 Staffing Assessment that Dominion submitted to the NRC onMay 7, 2014 (Serial No. 14-199, ML14133A011) contained four items that requiredfollow-up action based on the results of the assessment (reference Attachment 2 of theMay 7, 2014 letter). The four follow-up action items have been resolved and their statusis provided below:1. Initial FSG task training for site personnel has been completed and FSG tasktraining requirements have been incorporated into the applicable departmentaltraining programs.2. A final NEI 12-01 Phase 2 Staffing Assessment table top exercise was conductedon August 27, 2014 using the final, approved FSGs and Emergency OperatingProcedures (EOPs). The table top exercise validated that the FSG strategiescould be successfully implemented using the current on-shift staff. Thepersonnel participating in the table top exercise had previously received finaltraining on the FSGs/EOPs.
Response to Request for Additional Information Regarding Phase 2 Staffing Assessment Report cc: U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 Dr. V. Sreenivas, NRC Project Manager - North Anna U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852 Ms. Karen Cotton, NRC Project Manager - Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852 Brian K. Harris Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 11 F1 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station
Serial No. 14-435Docket Nos. 50-338/339Attachment, Page 2 of 4An additional task identified subsequent to the tabletop requires a backupmethod for plant announcements. A Chemistry Technician has been assigned toperform this task.3. FSG task qualification training has been provided to the Auxiliary Operators. Inaddition, FSG task qualification requirements have been incorporated into theoperator training program.4. Dominion intends to revise the staffing assessment report to incorporate thisupdated information. As previously committed in the May 7, 2014 letter, a finalrevision of the Dominion NEI 12-01 Phase 2 Staffing Assessment Report will besubmitted to the NRC by January 30, 2015.NRC Question 2A review was also completed of the current security plan to identify the documented onshift security personnel (Revision 19). The following site specific information wasreviewed from the North Anna staffing study submittal (P.6, 17, 18, 21, 22). Thesespecific page numbers provided information concerning the use of security personnelduring events that were described in the staffing study. The site specifically stated that,"security personnel perform both security contingency plan actions and EP tasksconsisting of ERO notification and site personnel accountability. A representative of theNorth Anna Power Station Security department analyzed the EP tasks assigned to on-shift security individuals. It was concluded that performance of the EP tasks did notcause an overlap with their tasks related to the security plan.The following items were noted:1) Security is tasked to remove debris and to configure certain site equipment foruse.2) The staffing analysis determined that these duties (i.e., FSGs) would not causean overlap with the security tasks assigned in the site security plan.3) In accordance with Appendix C to Part 73, Section II.B.5(i), licensees shallestablish and maintain written implementing procedures that provide specificguidance and operating details that identify the actions to be taken and decisionsto be made by each member of the security organization who is assigned dutiesand responsibilities required for the effective implementation of the security plansand the site protective strategy.The NRC staff has reviewed your Staffing Assessment dated May 7, 2014, andrequests the following information to complete its review.
 
Serial No. 14-435Docket Nos. 50-338/339Attachment, Page 3 of 41) Has security received site specific training for removing [debris] and how toconfigure certain site equipment (e.g., equipment use, approaches to removedebris, associated procedures)? What are the main components of this training?How often is this training provided to security personnel?Dominion ResponseSecurity Officers qualified as Fire Brigade Members (FBMs) (extra positions above theminimum security plan staffing requirements) have received site specific training asbeyond design basis (BDB) Equipment Operators for: 1) debris removal from haulpaths, and 2) staging BDB equipment. Following a Job and Task Analysis conductedby the Nuclear Training Department, a new role as BDB Equipment Operator and twonew tasks were added for the Security Officers qualified as FBMs. The two new tasksare as follows:" Deliver equipment using a tow tractor." Clean debris using a wheel loader.Using the systematic approach to training, a training program has been developed andimplemented to initially train and qualify the Security Officers-FBMs as BDB EquipmentOperators. These Security Officers will be enrolled in a continuing training program tobe retrained on these two tasks on an annual basis.An additional task identified subsequent to the tabletop requires deployment ofcommunications equipment. As they become available before or after debris removal,the Security Officers -FBMs are assigned to support this task. An equipment operatingaid will be used for deployment of the communications equipment.2) Describe in detail how the normal on shift security personnel are allocated toprovide individuals to support EP functions [while] simultaneously continuing tomaintain their tasks related to the security plan. This description should addressthe tiered approach of the use of security personnel that is discussed in the NEIdocument, "Generic Basis for Responses to Staffing Assessment QuestionsRelated to Use of Security Personnel during a BDB Response". The response tothis question should be reviewed for the applicability of 10 CFR 73.21.Dominion ResponseThe Security Shift Supervisor and/or other on-shift security personnel perform SecurityContingency Plan tasks and Emergency Plan (EP) tasks [i.e., Emergency ResponseOrganization (ERO) notification and personnel accountability] during an Extended Lossof AC Power (ELAP) event. The security personnel perform the EP tasks from theirassigned location which does not interfere with their assigned tasks related to theSecurity Plan. The EP tasks were previously validated as part of the site's review for Serial No. 14-435Docket Nos. 50-338/339Attachment, Page 4 of 4NEI 10-05, Assessment of On-Shift Emergency Response Organization Staffing andCapabilities. The validation concluded performance of EP tasks did not cause anoverlap with their tasks relative to the Security Plan. In addition, Emergency PlanImplementing Procedures (EPIPs) contain guidance to perform the EP tasks, andSecurity personnel demonstrate effectiveness through EP training/drills and HostileAction Based exercises.The Security Officers -FBMs discussed in the response above are extra positionsabove the minimum security plan staffing requirements and do not have a requiredsecurity role during an ELAP event which allows them to perform assigned FSG taskswithout impacting the implementation of the Security Plan.In NEI document, "Generic Basis for Responses to Staffing Assessment QuestionsRelated to Use of Security Personnel during a BDB Response," two criteria consideredfor the tiered approach in the use of security personnel to apply are: 1) the securitypersonnel being used are credited in the security plan, and 2) the security personnel areperforming BDB tasks. The security personnel performing the EP tasks of EROnotification and personnel accountability are not performing BDB tasks so the NEIdocument does not apply to these individuals. The Security Officers -FBMs whoperform the BDB tasks of debris removal and equipment staging are extra securitypositions above the minimum security plan staffing requirements and do not have arequired security role during an ELAP event; therefore, the NEI document does notapply to these individuals.3) Have site procedures been developed for how security personnel are releasedfrom supporting beyond design basis event activities which would include thepriority of their dismissal? Are detailed security site procedures developed toreturn security to a normal posture after beyond design basis events?Dominion ResponseSite procedures describing the release of security personnel from supporting BDB eventactivities for an ELAP event, which would include the priority of their dismissal, are notrequired to control the use of the two Security Officers -FBMs. These two individualsare in positions above the minimum security plan staffing requirements and do not havea required security role during an ELAP event.}}
Serial No. 14-435
. t Docket Nos. 50-338/339 ATTACHMENT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING PHASE 2 STAFFING ASSESSMENT REPORT VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2
 
Serial No. 14-435 Docket Nos. 50-338/339 Attachment, Page 1 of 4 Response to Request for Additional Information Phase 2 Staffing Assessment Report North Anna Power Station Units 1 and 2 By letter dated May 7, 2014, (ADAMS Accession No. ML14133A011), Virginia Electric and Power Company (Dominion) submitted the Phase 2 Staffing Assessment Report for North Anna Power Station Units 1 and 2 in response to the Nuclear Regulatory Commission (NRC) March 12, 2012 Information Request. In a letter dated August 21, 2014, the NRC transmitted a request for additional information (RAI) related to the submittal. Dominion's response to the NRC RAI is provided below.
NRC Question I In your Phase 2 Staffing Assessment dated May 7, 2014, you provided information that stated the following: (1) North Anna Power Station (NAPS) current on-shift staffing may not be sufficient to perform the FLEX Support Guidelines (FSGS) identified by the station to support activities following a Beyond-Design-Basis External Event, (2) Shift personnel are not yet trained to perform FSG tasks, and (3) The qualification of on-shift auxiliary operators (AOs) requires further review to ensure their capabilities to implement the FSG strategies.
Provide an update or supplement to the Phase 2 Staffing Assessment that indicates NAPS has determined that the current on-shift staffing is capable of performing all required FSG tasks and all associatedrequiredtraining has been provided. Include any actions taken to correct this issue, orjustification as to why no action is required.
Dominion Response The NEI 12-01 Phase 2 Staffing Assessment that Dominion submitted to the NRC on May 7, 2014 (Serial No. 14-199, ML14133A011) contained four items that required follow-up action based on the results of the assessment (reference Attachment 2 of the May 7, 2014 letter). The four follow-up action items have been resolved and their status is provided below:
: 1. Initial FSG task training for site personnel has been completed and FSG task training requirements have been incorporated into the applicable departmental training programs.
: 2. A final NEI 12-01 Phase 2 Staffing Assessment table top exercise was conducted on August 27, 2014 using the final, approved FSGs and Emergency Operating Procedures (EOPs). The table top exercise validated that the FSG strategies could be successfully implemented using the current on-shift staff. The personnel participating in the table top exercise had previously received final training on the FSGs/EOPs.
 
Serial No. 14-435 Docket Nos. 50-338/339 Attachment, Page 2 of 4 An additional task identified subsequent to the tabletop requires a backup method for plant announcements. A Chemistry Technician has been assigned to perform this task.
: 3. FSG task qualification training has been provided to the Auxiliary Operators. In addition, FSG task qualification requirements have been incorporated into the operator training program.
: 4. Dominion intends to revise the staffing assessment report to incorporate this updated information. As previously committed in the May 7, 2014 letter, a final revision of the Dominion NEI 12-01 Phase 2 Staffing Assessment Report will be submitted to the NRC by January 30, 2015.
NRC Question 2 A review was also completed of the current security plan to identify the documented on shift security personnel (Revision 19). The following site specific information was reviewed from the North Anna staffing study submittal (P.6, 17, 18, 21, 22). These specific page numbers provided information concerning the use of security personnel during events that were described in the staffing study. The site specifically stated that, "security personnel perform both security contingency plan actions and EP tasks consisting of ERO notification and site personnel accountability. A representativeof the North Anna Power Station Security department analyzed the EP tasks assigned to on-shift security individuals. It was concluded that performance of the EP tasks did not cause an overlap with theirtasks relatedto the security plan.
The following items were noted:
: 1) Security is tasked to remove debris and to configure certain site equipment for use.
: 2) The staffing analysis determined that these duties (i.e., FSGs) would not cause an overlap with the security tasks assignedin the site security plan.
: 3) In accordance with Appendix C to Part 73, Section II.B.5(i), licensees shall establish and maintain written implementing procedures that provide specific guidance and operating details that identify the actions to be taken and decisions to be made by each member of the security organization who is assigned duties and responsibilitiesrequiredfor the effective implementation of the security plans and the site protective strategy.
The NRC staff has reviewed your Staffing Assessment dated May 7, 2014, and requests the following information to complete its review.
 
Serial No. 14-435 Docket Nos. 50-338/339 Attachment, Page 3 of 4
: 1) Has security received site specific training for removing [debris] and how to configure certain site equipment (e.g., equipment use, approaches to remove debris, associatedprocedures)? What are the main components of this training?
How often is this trainingprovided to security personnel?
Dominion Response Security Officers qualified as Fire Brigade Members (FBMs) (extra positions above the minimum security plan staffing requirements) have received site specific training as beyond design basis (BDB) Equipment Operators for: 1) debris removal from haul paths, and 2) staging BDB equipment. Following a Job and Task Analysis conducted by the Nuclear Training Department, a new role as BDB Equipment Operator and two new tasks were added for the Security Officers qualified as FBMs. The two new tasks are as follows:
    " Deliver equipment using a tow tractor.
    " Clean debris using a wheel loader.
Using the systematic approach to training, a training program has been developed and implemented to initially train and qualify the Security Officers-FBMs as BDB Equipment Operators. These Security Officers will be enrolled in a continuing training program to be retrained on these two tasks on an annual basis.
An additional task identified subsequent to the tabletop requires deployment of communications equipment. As they become available before or after debris removal, the Security Officers - FBMs are assigned to support this task. An equipment operating aid will be used for deployment of the communications equipment.
: 2) Describe in detail how the normal on shift security personnel are allocated to provide individuals to support EP functions [while] simultaneously continuing to maintain their tasks related to the security plan. This description should address the tiered approach of the use of security personnel that is discussed in the NEI document, "Generic Basis for Responses to Staffing Assessment Questions Related to Use of Security Personnelduring a BDB Response". The response to this question should be reviewed for the applicabilityof 10 CFR 73.21.
Dominion Response The Security Shift Supervisor and/or other on-shift security personnel perform Security Contingency Plan tasks and Emergency Plan (EP) tasks [i.e., Emergency Response Organization (ERO) notification and personnel accountability] during an Extended Loss of AC Power (ELAP) event. The security personnel perform the EP tasks from their assigned location which does not interfere with their assigned tasks related to the Security Plan. The EP tasks were previously validated as part of the site's review for
 
Serial No. 14-435 Docket Nos. 50-338/339 Attachment, Page 4 of 4 NEI 10-05, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities. The validation concluded performance of EP tasks did not cause an overlap with their tasks relative to the Security Plan. In addition, Emergency Plan Implementing Procedures (EPIPs) contain guidance to perform the EP tasks, and Security personnel demonstrate effectiveness through EP training/drills and Hostile Action Based exercises.
The Security Officers - FBMs discussed in the response above are extra positions above the minimum security plan staffing requirements and do not have a required security role during an ELAP event which allows them to perform assigned FSG tasks without impacting the implementation of the Security Plan.
In NEI document, "Generic Basis for Responses to Staffing Assessment Questions Related to Use of Security Personnel during a BDB Response," two criteria considered for the tiered approach in the use of security personnel to apply are: 1) the security personnel being used are credited in the security plan, and 2) the security personnel are performing BDB tasks. The security personnel performing the EP tasks of ERO notification and personnel accountability are not performing BDB tasks so the NEI document does not apply to these individuals. The Security Officers - FBMs who perform the BDB tasks of debris removal and equipment staging are extra security positions above the minimum security plan staffing requirements and do not have a required security role during an ELAP event; therefore, the NEI document does not apply to these individuals.
: 3) Have site procedures been developed for how security personnel are released from supporting beyond design basis event activities which would include the priority of their dismissal? Are detailed security site procedures developed to return security to a normal posture after beyond design basis events?
Dominion Response Site procedures describing the release of security personnel from supporting BDB event activities for an ELAP event, which would include the priority of their dismissal, are not required to control the use of the two Security Officers - FBMs. These two individuals are in positions above the minimum security plan staffing requirements and do not have a required security role during an ELAP event.}}

Latest revision as of 17:52, 19 March 2020

March 12, 2012 Information Request Response to Request for Additional Information Regarding Phase 2 Staffing Assessment Report Recommendation 9.3
ML14268A247
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/22/2014
From: Stoddard D
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
14-435, TAC MF4319, TAC MF4320
Download: ML14268A247 (7)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 22, 2014 U.S. Nuclear Regulatory Commission Serial No.14-435 Attention: Document Control Desk NL&OS/GDM RO Washington, DC 20555 Docket Nos. 50-338/339 License Nos. NPF-4/7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MARCH 12. 2012 INFORMATION REQUEST RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING PHASE 2 STAFFING ASSESSMENT REPORT RECOMMENDATION 9.3 (TAC NOS. MF4319 AND MF4320)

By letter dated May 7, 2014 (ADAMS Accession No. ML14133A011), Virginia Electric and Power Company (Dominion) submitted the Phase 2 Staffing Assessment Report for North Anna Power Station Units 1 and 2 in response to the Nuclear Regulatory Commission (NRC)

March 12, 2012 Information Request. In a letter dated August 21, 2014, the NRC transmitted a request for additional information (RAI) related to the submittal. Dominion's response to the RAI is provided in the attachment.

As noted in the implementation schedule provided in the May 7, 2014 letter, re-evaluation of the staffing assessment using the final approved versions of the FLEX Support Guidelines procedures and the final approved on-shift communications equipment, Dominion intends to revise and resubmit the staffing assessment report by January 30, 2015.

If you have any questions regarding this information, please contact Wanda Craft at (804) 273-4687.

Sincerely, Daniel G. Stoddard vicki LPUBLIC NO'mRy Hull Senior Vice President - Nuclear Operations Virginia Electric and Power Company Commonwealth of Virginia Reg. # 140542 My Commission Expires May 31, 2018 I

COMMONWEALTH OF VIRGINIA

)

COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Daniel G. Stoddard, who is Senior Vice President - Nuclear Operations of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this 42 ~day of ( 2014.

My Commission Expires: .A A -(, Q0/9 Notary Public

Serial No.14-435 Docket Nos. 50-338/339 Page 2 of 2 Commitments made in this letter: None

Attachment:

Response to Request for Additional Information Regarding Phase 2 Staffing Assessment Report cc: U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 Dr. V. Sreenivas, NRC Project Manager - North Anna U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852 Ms. Karen Cotton, NRC Project Manager - Surry U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G9A 11555 Rockville Pike Rockville, Maryland 20852 Brian K. Harris Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 11 F1 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector North Anna Power Station

Serial No.14-435

. t Docket Nos. 50-338/339 ATTACHMENT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING PHASE 2 STAFFING ASSESSMENT REPORT VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNITS 1 AND 2

Serial No.14-435 Docket Nos. 50-338/339 Attachment, Page 1 of 4 Response to Request for Additional Information Phase 2 Staffing Assessment Report North Anna Power Station Units 1 and 2 By letter dated May 7, 2014, (ADAMS Accession No. ML14133A011), Virginia Electric and Power Company (Dominion) submitted the Phase 2 Staffing Assessment Report for North Anna Power Station Units 1 and 2 in response to the Nuclear Regulatory Commission (NRC) March 12, 2012 Information Request. In a letter dated August 21, 2014, the NRC transmitted a request for additional information (RAI) related to the submittal. Dominion's response to the NRC RAI is provided below.

NRC Question I In your Phase 2 Staffing Assessment dated May 7, 2014, you provided information that stated the following: (1) North Anna Power Station (NAPS) current on-shift staffing may not be sufficient to perform the FLEX Support Guidelines (FSGS) identified by the station to support activities following a Beyond-Design-Basis External Event, (2) Shift personnel are not yet trained to perform FSG tasks, and (3) The qualification of on-shift auxiliary operators (AOs) requires further review to ensure their capabilities to implement the FSG strategies.

Provide an update or supplement to the Phase 2 Staffing Assessment that indicates NAPS has determined that the current on-shift staffing is capable of performing all required FSG tasks and all associatedrequiredtraining has been provided. Include any actions taken to correct this issue, orjustification as to why no action is required.

Dominion Response The NEI 12-01 Phase 2 Staffing Assessment that Dominion submitted to the NRC on May 7, 2014 (Serial No.14-199, ML14133A011) contained four items that required follow-up action based on the results of the assessment (reference Attachment 2 of the May 7, 2014 letter). The four follow-up action items have been resolved and their status is provided below:

1. Initial FSG task training for site personnel has been completed and FSG task training requirements have been incorporated into the applicable departmental training programs.
2. A final NEI 12-01 Phase 2 Staffing Assessment table top exercise was conducted on August 27, 2014 using the final, approved FSGs and Emergency Operating Procedures (EOPs). The table top exercise validated that the FSG strategies could be successfully implemented using the current on-shift staff. The personnel participating in the table top exercise had previously received final training on the FSGs/EOPs.

Serial No.14-435 Docket Nos. 50-338/339 Attachment, Page 2 of 4 An additional task identified subsequent to the tabletop requires a backup method for plant announcements. A Chemistry Technician has been assigned to perform this task.

3. FSG task qualification training has been provided to the Auxiliary Operators. In addition, FSG task qualification requirements have been incorporated into the operator training program.
4. Dominion intends to revise the staffing assessment report to incorporate this updated information. As previously committed in the May 7, 2014 letter, a final revision of the Dominion NEI 12-01 Phase 2 Staffing Assessment Report will be submitted to the NRC by January 30, 2015.

NRC Question 2 A review was also completed of the current security plan to identify the documented on shift security personnel (Revision 19). The following site specific information was reviewed from the North Anna staffing study submittal (P.6, 17, 18, 21, 22). These specific page numbers provided information concerning the use of security personnel during events that were described in the staffing study. The site specifically stated that, "security personnel perform both security contingency plan actions and EP tasks consisting of ERO notification and site personnel accountability. A representativeof the North Anna Power Station Security department analyzed the EP tasks assigned to on-shift security individuals. It was concluded that performance of the EP tasks did not cause an overlap with theirtasks relatedto the security plan.

The following items were noted:

1) Security is tasked to remove debris and to configure certain site equipment for use.
2) The staffing analysis determined that these duties (i.e., FSGs) would not cause an overlap with the security tasks assignedin the site security plan.
3) In accordance with Appendix C to Part 73,Section II.B.5(i), licensees shall establish and maintain written implementing procedures that provide specific guidance and operating details that identify the actions to be taken and decisions to be made by each member of the security organization who is assigned duties and responsibilitiesrequiredfor the effective implementation of the security plans and the site protective strategy.

The NRC staff has reviewed your Staffing Assessment dated May 7, 2014, and requests the following information to complete its review.

Serial No.14-435 Docket Nos. 50-338/339 Attachment, Page 3 of 4

1) Has security received site specific training for removing [debris] and how to configure certain site equipment (e.g., equipment use, approaches to remove debris, associatedprocedures)? What are the main components of this training?

How often is this trainingprovided to security personnel?

Dominion Response Security Officers qualified as Fire Brigade Members (FBMs) (extra positions above the minimum security plan staffing requirements) have received site specific training as beyond design basis (BDB) Equipment Operators for: 1) debris removal from haul paths, and 2) staging BDB equipment. Following a Job and Task Analysis conducted by the Nuclear Training Department, a new role as BDB Equipment Operator and two new tasks were added for the Security Officers qualified as FBMs. The two new tasks are as follows:

" Deliver equipment using a tow tractor.

" Clean debris using a wheel loader.

Using the systematic approach to training, a training program has been developed and implemented to initially train and qualify the Security Officers-FBMs as BDB Equipment Operators. These Security Officers will be enrolled in a continuing training program to be retrained on these two tasks on an annual basis.

An additional task identified subsequent to the tabletop requires deployment of communications equipment. As they become available before or after debris removal, the Security Officers - FBMs are assigned to support this task. An equipment operating aid will be used for deployment of the communications equipment.

2) Describe in detail how the normal on shift security personnel are allocated to provide individuals to support EP functions [while] simultaneously continuing to maintain their tasks related to the security plan. This description should address the tiered approach of the use of security personnel that is discussed in the NEI document, "Generic Basis for Responses to Staffing Assessment Questions Related to Use of Security Personnelduring a BDB Response". The response to this question should be reviewed for the applicabilityof 10 CFR 73.21.

Dominion Response The Security Shift Supervisor and/or other on-shift security personnel perform Security Contingency Plan tasks and Emergency Plan (EP) tasks [i.e., Emergency Response Organization (ERO) notification and personnel accountability] during an Extended Loss of AC Power (ELAP) event. The security personnel perform the EP tasks from their assigned location which does not interfere with their assigned tasks related to the Security Plan. The EP tasks were previously validated as part of the site's review for

Serial No.14-435 Docket Nos. 50-338/339 Attachment, Page 4 of 4 NEI 10-05, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities. The validation concluded performance of EP tasks did not cause an overlap with their tasks relative to the Security Plan. In addition, Emergency Plan Implementing Procedures (EPIPs) contain guidance to perform the EP tasks, and Security personnel demonstrate effectiveness through EP training/drills and Hostile Action Based exercises.

The Security Officers - FBMs discussed in the response above are extra positions above the minimum security plan staffing requirements and do not have a required security role during an ELAP event which allows them to perform assigned FSG tasks without impacting the implementation of the Security Plan.

In NEI document, "Generic Basis for Responses to Staffing Assessment Questions Related to Use of Security Personnel during a BDB Response," two criteria considered for the tiered approach in the use of security personnel to apply are: 1) the security personnel being used are credited in the security plan, and 2) the security personnel are performing BDB tasks. The security personnel performing the EP tasks of ERO notification and personnel accountability are not performing BDB tasks so the NEI document does not apply to these individuals. The Security Officers - FBMs who perform the BDB tasks of debris removal and equipment staging are extra security positions above the minimum security plan staffing requirements and do not have a required security role during an ELAP event; therefore, the NEI document does not apply to these individuals.

3) Have site procedures been developed for how security personnel are released from supporting beyond design basis event activities which would include the priority of their dismissal? Are detailed security site procedures developed to return security to a normal posture after beyond design basis events?

Dominion Response Site procedures describing the release of security personnel from supporting BDB event activities for an ELAP event, which would include the priority of their dismissal, are not required to control the use of the two Security Officers - FBMs. These two individuals are in positions above the minimum security plan staffing requirements and do not have a required security role during an ELAP event.