ML14336A664: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML14336A664 | | number = ML14336A664 | ||
| issue date = 11/06/2014 | | issue date = 11/06/2014 | ||
| title = Draft Request for Additional Information Relief Request (RR)-9 | | title = NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Draft Request for Additional Information Relief Request (RR)-9 | ||
| author name = Beltz T | | author name = Beltz T | ||
| author affiliation = NRC/NRR/DORL/LPLIII-1 | | author affiliation = NRC/NRR/DORL/LPLIII-1 | ||
| addressee name = Millen M | | addressee name = Millen M | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:NRR-PMDAPEm Resource From: Beltz, Terry Sent: Thursday, November 06, 2014 2:31 PM To: 'Millen, Michael (Michael.Millen@nexteraenergy.com)' | ||
Cc: 'Clark, Roger'; 'Hanneman, Harv'; | Cc: 'Clark, Roger'; 'Hanneman, Harv'; Audrain, Margaret; Pelton, David | ||
==Subject:== | ==Subject:== | ||
Point Beach Nuclear Plant, Units 1 and 2 - Draft Request for Additional Information re: | Point Beach Nuclear Plant, Units 1 and 2 - Draft Request for Additional Information re: Relief Request (RR)-9 (TAC Nos. MF4142 and MF4143) | ||
==Dear Mr. Millen:== | ==Dear Mr. Millen:== | ||
By letter dated May 13, 2014 (Agencywide | By letter dated May 13, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML14133A365), NextEra Energy Point Beach, LLC requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, associated with the pressure testing of emergency diesel generator Class 3 sub-systems at the Point Beach Nuclear Plant, Units 1 and 2. | ||
The NRC staff in the Component Performance, NDE, and Testing Branch of the Office of Nuclear Reactor Regulation has identified areas where additional information is needed to complete its review. A draft request for additional information (RAI) is provided below. | |||
You may accept the draft RAI as formal Request for Additional Information and provide a response by December 10, 2014. Alternatively, you may request to discuss the contents of this draft RAI with the NRC staff in a conference call, including any change to the proposed response date. | |||
Please let me know if you have any questions or concerns. | |||
Sincerely, TERRY A. BELTZ, SENIOR PROJECT MANAGER Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Licensing Project Branch 3-1 (301) 415-3049 O-8E8 Terry.Beltz@nrc.gov Confidentially Notice: The above email message, together with any forwarded emails or attachment(s), is for the sole use of the intended recipient(s) and may contain information that is sensitive, priviliged, confidential, or otherwise protected from disclosure under applicable federal law. Any unauthorized use or disclosure of the email message and any associated attachment(s) is prohibited. If you believe that you have received this email in error, please notify the sender immediately and delete it from your system. Thank You REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST (RR)-9 REGARDING EMERGENCY DIESEL GENERATOR CLASS 3 SUBSYSTEMS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NEXTERA ENERGY POINT BEACH, LLC DOCKET NUMBERS 50-266 AND 50-301 (TAC NOS. MF4142 AND MF4143) 1 | |||
and | By letter dated May 13, 2014 (Agencywide Documents Access and Management System Accession Number ML14133A365), NextEra Energy Point Beach, LLC requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, associated with the pressure testing emergency diesel generator Class 3 sub-systems at Point Beach Nuclear Plant, Units 1 and 2. | ||
To complete its review, the NRC staff requests the following additional information: | |||
: 1) Please state whether any repairs/replacement on the Class 3 piping addressed by the relief would follow IWA-4000 requirements after entered into your corrective action program. | |||
2 | |||
Hearing Identifier: NRR_PMDA Email Number: 1730 Mail Envelope Properties (87B1F1BDFE5A554CA9DC5EAA75EB6D0D0171C19251D3) | |||
Hearing Identifier: | |||
==Subject:== | ==Subject:== | ||
Point Beach Nuclear Plant, Units 1 and 2 - Draft Request for Additional Information re: | Point Beach Nuclear Plant, Units 1 and 2 - Draft Request for Additional Information re: Relief Request (RR)-9 (TAC Nos. MF4142 and MF4143) | ||
"'Hanneman, Harv'" <Harv.Hanneman@nexteraenergy.com> | Sent Date: 11/6/2014 2:31:28 PM Received Date: 11/6/2014 2:31:00 PM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients: | ||
Tracking Status: None | "'Clark, Roger'" <Roger.Clark@nexteraenergy.com> | ||
"'Millen, Michael (Michael.Millen@nexteraenergy.com)'" <Michael.Millen@nexteraenergy.com> | Tracking Status: None | ||
"'Hanneman, Harv'" <Harv.Hanneman@nexteraenergy.com> | |||
Post Office: | Tracking Status: None "Audrain, Margaret" <Margaret.Audrain@nrc.gov> | ||
Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov> | |||
Options | Tracking Status: None | ||
"'Millen, Michael (Michael.Millen@nexteraenergy.com)'" <Michael.Millen@nexteraenergy.com> | |||
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2963 11/6/2014 2:31:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received:}} |
Latest revision as of 16:48, 19 March 2020
ML14336A664 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 11/06/2014 |
From: | Beltz T Plant Licensing Branch III |
To: | Millen M Point Beach |
References | |
Download: ML14336A664 (3) | |
Text
NRR-PMDAPEm Resource From: Beltz, Terry Sent: Thursday, November 06, 2014 2:31 PM To: 'Millen, Michael (Michael.Millen@nexteraenergy.com)'
Cc: 'Clark, Roger'; 'Hanneman, Harv'; Audrain, Margaret; Pelton, David
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Draft Request for Additional Information re: Relief Request (RR)-9 (TAC Nos. MF4142 and MF4143)
Dear Mr. Millen:
By letter dated May 13, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML14133A365), NextEra Energy Point Beach, LLC requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, associated with the pressure testing of emergency diesel generator Class 3 sub-systems at the Point Beach Nuclear Plant, Units 1 and 2.
The NRC staff in the Component Performance, NDE, and Testing Branch of the Office of Nuclear Reactor Regulation has identified areas where additional information is needed to complete its review. A draft request for additional information (RAI) is provided below.
You may accept the draft RAI as formal Request for Additional Information and provide a response by December 10, 2014. Alternatively, you may request to discuss the contents of this draft RAI with the NRC staff in a conference call, including any change to the proposed response date.
Please let me know if you have any questions or concerns.
Sincerely, TERRY A. BELTZ, SENIOR PROJECT MANAGER Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Licensing Project Branch 3-1 (301) 415-3049 O-8E8 Terry.Beltz@nrc.gov Confidentially Notice: The above email message, together with any forwarded emails or attachment(s), is for the sole use of the intended recipient(s) and may contain information that is sensitive, priviliged, confidential, or otherwise protected from disclosure under applicable federal law. Any unauthorized use or disclosure of the email message and any associated attachment(s) is prohibited. If you believe that you have received this email in error, please notify the sender immediately and delete it from your system. Thank You REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST (RR)-9 REGARDING EMERGENCY DIESEL GENERATOR CLASS 3 SUBSYSTEMS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NEXTERA ENERGY POINT BEACH, LLC DOCKET NUMBERS 50-266 AND 50-301 (TAC NOS. MF4142 AND MF4143) 1
By letter dated May 13, 2014 (Agencywide Documents Access and Management System Accession Number ML14133A365), NextEra Energy Point Beach, LLC requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, associated with the pressure testing emergency diesel generator Class 3 sub-systems at Point Beach Nuclear Plant, Units 1 and 2.
To complete its review, the NRC staff requests the following additional information:
- 1) Please state whether any repairs/replacement on the Class 3 piping addressed by the relief would follow IWA-4000 requirements after entered into your corrective action program.
2
Hearing Identifier: NRR_PMDA Email Number: 1730 Mail Envelope Properties (87B1F1BDFE5A554CA9DC5EAA75EB6D0D0171C19251D3)
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Draft Request for Additional Information re: Relief Request (RR)-9 (TAC Nos. MF4142 and MF4143)
Sent Date: 11/6/2014 2:31:28 PM Received Date: 11/6/2014 2:31:00 PM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:
"'Clark, Roger'" <Roger.Clark@nexteraenergy.com>
Tracking Status: None
"'Hanneman, Harv'" <Harv.Hanneman@nexteraenergy.com>
Tracking Status: None "Audrain, Margaret" <Margaret.Audrain@nrc.gov>
Tracking Status: None "Pelton, David" <David.Pelton@nrc.gov>
Tracking Status: None
"'Millen, Michael (Michael.Millen@nexteraenergy.com)'" <Michael.Millen@nexteraenergy.com>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2963 11/6/2014 2:31:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: