ML17290A353: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 10/10/2017 | | issue date = 10/10/2017 | ||
| title = Comment (1) of David Young on Behalf of Nuclear Energy Institute on Technical Basis for the Proposed Guidance in NUREG-0654/FEMA-REP-1, Section Ii.B | | title = Comment (1) of David Young on Behalf of Nuclear Energy Institute on Technical Basis for the Proposed Guidance in NUREG-0654/FEMA-REP-1, Section Ii.B | ||
| author name = Young D | | author name = Young D | ||
| author affiliation = Nuclear Energy Institute (NEI) | | author affiliation = Nuclear Energy Institute (NEI) | ||
| addressee name = Johnson D | | addressee name = Johnson D | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Joil | {{#Wiki_filter:Page 1 of 1 Joil As of: 10/12/17 9:48 AM 1fil6 OCT I 2 /{H 9: 56 Received: October 10, 2017 Status: Pending_Post PUBLIC SUBMISSION Tracking No. lkl-8z55-ld3q Comments Due: October 11, 2017 RE(~[!V(() Submission Type: Web Docket: NRC-2017-0190 Technical Basis for the Proposed Guidance in NUREG-0654/FEMA-REP-1, Section II.B Comment On: NRC-2017-0190-0001 Technical Basis for the Proposed Guidance in NUREG-0654/FEMA-REP-1, Section II.B; Request for Comment Document: NRC-2017-0190-DRAFT-0001 Comment on FR Doc # 2017-19093 Submitter Information Name: David Young Submitter's Representative: Lana Dargan r/;1/cN17 Organization: Nuclear Energy Institute f"c2?~!hf 7/) | ||
October 10, 2017 Status: Pending_Post | General Comment See Attached Attachments 10-10-17_Industry Comments on draft Technical Basis for the Proposed Guidance in NUREG-0654 FEMA-REP-1 Section II.B (2) | ||
NRC-2017-0190-DRAFT-0001 Comment on FR Doc # 2017-19093 Submitter Information Name: David Young Submitter's Representative: | SUNSI Review Complete Template = ADM - 013 E-RIDS= ADM-03 Add= ;J?h(_ ~(~~-s.5) https://www.fdms.gov/fdms/getcontent?objectld=0900006482bb5d6c&format=xml&showorig=false 10/12/2017 | ||
Lana Dargan Organization: | |||
Nuclear Energy Institute General Comment See Attached Attachments | DAVID L. YOUNG Technical Advisor, Nuclear Security and Incident Preparedness 1201 F Street, NW, Suite 1100 Washington, DC 20004 | ||
https://www.fdms.gov/fdms/getcontent?objectld=0900006482bb5d6c&format=xml&showorig=false 10/12/2017 DAVID L. YOUNG Technical Advisor, Nuclear Security and Incident Preparedness 1201 F Street, NW, Suite 1100 Washington, DC 20004 NUCLEAR ENERGY INSTITUTE P: 202.739.8127 dly@nei.org nei.org October 10, 2017 Don Johnson Office of Nuclear Security and Incident Response, U.S. Nuclear Regulatory Commission, Washington; DC 20555-0001 Submitted via Regulations.gov Project Number: 689 | ~I NUCLEAR ENERGY INSTITUTE P: 202.739.8127 dly@nei.org nei.org October 10, 2017 Don Johnson Office of Nuclear Security and Incident Response, U.S. Nuclear Regulatory Commission, Washington; DC 20555-0001 Submitted via Regulations.gov Project Number: 689 | ||
==Subject:== | ==Subject:== | ||
Industry comments on draft "Technical Basis for the Proposed Guidance in REP-1, Section H.B." [Regulations.gov Docket ID NRC-2017-0190J | Industry comments on draft "Technical Basis for the Proposed Guidance in NUREG-0654/FEMA-REP-1, Section H.B." [Regulations.gov Docket ID NRC-2017-0190J | ||
==Dear Mr. Johnson:== | ==Dear Mr. Johnson:== | ||
The Nuclear Energy Institute (NEI) and the industry are pleased to provide the following comments on the draft Technical Basis for the Proposed Guidance in NUREG-0654/FEMA-REP-1, Section II.B. | The Nuclear Energy Institute (NEI) and the industry are pleased to provide the following comments on the draft Technical Basis for the Proposed Guidance in NUREG-0654/FEMA-REP-1, Section II.B. | ||
* Section 2.4.2, Communications | * Section 2.4.2, Communications - The bases discusses an additional communicator position staffed at a Site Area Emergency (SAE) Emergency Classification Level (ECL). Please provide additional information regarding the purpose of this position. The Bases document states "For an SAE ECL, or greater, at least 1 additional communicator should be staffed in the EOF." The purpose of this additional communicator is not clear. Specifically, is the intent for this position to be an NRC communicator, or is this position expected to be qualified to perform State/local communications as well. Considering the NUREG-0654, Rev. 1, staffing guidance included an HPN Communicator, is the position expected to have sufficient background to perform HPN type communications. If the NRC ENS communicator is located in the EOF, is the expectation that this additional communicator be located in another facility (i.e., the TSC)? Additional detail regarding the purpose of this communicator would be helpful. | ||
-The bases discusses an additional communicator position staffed at a Site Area Emergency (SAE) Emergency Classification Level (ECL). Please provide additional information regarding the purpose of this position. | * Section 2.4.3, Radiation Protection -The bases document contains the following statement, "This function should be staffed by 2 qualified RP staff members on-shift (or 1 per unit for multi-unit sites). These staff members should not have any collateral duties during emergency response. "Many licensees currently utilize an on-shift RP tech to perform the on-shift Dose Assessment function. This assignment is a natural extension of RP Technician skills NUCLEAR. CLEAN AIR ENERGY | ||
The Bases document states "For an SAE ECL, or greater, at least 1 additional communicator should be staffed in the EOF." The purpose of this additional communicator is not clear. Specifically, is the intent for this position to be an NRC communicator, or is this position expected to be qualified to perform State/local communications as well. Considering the NUREG-0654, Rev. 1, staffing guidance included an HPN Communicator, is the position expected to have sufficient background to perform HPN type communications. | |||
If the NRC ENS communicator is located in the EOF, is the expectation that this additional communicator be located in another facility (i.e., the TSC)? Additional detail regarding the purpose of this communicator would be helpful. | Mr. Don Johnson October 10, 2017 Page 2 and the practice has been found acceptable for many years. It would be helpful for the guidance to specifically allow for the assignment of the dose assessment function to an on-shift RP Technician as a collateral duty provided that the results of an on-shift staffing analysis, required by 10 CFR Part SO, Appendix E, Section IV.A.9, verify that all assigned functions can be satisfactorily performed. | ||
* Section 2.4.3, Radiation Protection -The bases document contains the following statement, "This function should be staffed by 2 qualified RP staff members on-shift (or 1 per unit for unit sites). These staff members should not have any collateral duties during emergency response. "Many licensees currently utilize an on-shift RP tech to perform the shift Dose Assessment function. | * Section 2.4.10, Supervision of Repair Team Activities - The Bases document specifies maintenance craft "Supervisors" need to be staffed within 90 minutes. At some sites, there may be a limited number of available craft supervisors when divided between the mechanical, electrical and I&C maintenance disciplines. Many sites rely on "Lead" technicians who are qualified to direct troubleshooting and repair activities and experienced in leading maintenance teams in these types of tasks. Additional guidance would be helpful as to how these types of technicians can be integrated/ credited as an alternative approach to addressing the repair team supervisory function. | ||
This assignment is a natural extension of RP Technician skills NUCLEAR. CLEAN AIR ENERGY Mr. Don Johnson October 10, 2017 Page 2 and the practice has been found acceptable for many years. It would be helpful for the guidance to specifically allow for the assignment of the dose assessment function to an on-shift RP Technician as a collateral duty provided that the results of an on-shift staffing analysis, required by 10 CFR Part SO, Appendix E, Section IV.A.9, verify that all assigned functions can be satisfactorily performed. | * Section 2.4.11, Field Monitoring Teams - The discussion of the Onsite Field Monitoring Team includes a driver position for the team. Considering the relatively small size of nuclear power plant sites, and that Owner Controlled Areas do not have extensive or congested road networks, it seems that a driver may not be necessary for the performance of the onsite field monitoring function at many sites (i.e., the monitor can drive his/herself between survey locations). | ||
* Section 2.4.10, Supervision of Repair Team Activities | Additional guidance would be helpful as to how a licensee could provide site-specific conditions obviating the need for an onsite monitoring team driver. | ||
-The Bases document specifies maintenance craft "Supervisors" need to be staffed within 90 minutes. At some sites, there may be a limited number of available craft supervisors when divided between the mechanical, electrical and I&C maintenance disciplines. | If you have questions or require additional information, please do not hesitate to contact me at dly@nei.org or at my office number, 202.739.8127. | ||
Many sites rely on "Lead" technicians who are qualified to direct troubleshooting and repair activities and experienced in leading maintenance teams in these types of tasks. Additional guidance would be helpful as to how these types of technicians can be integrated/ | Sincerely, | ||
credited as an alternative approach to addressing the repair team supervisory function. | ~-- | ||
* Section 2.4.11, Field Monitoring Teams -The discussion of the Onsite Field Monitoring Team includes a driver position for the team. Considering the relatively small size of nuclear power plant sites, and that Owner Controlled Areas do not have extensive or congested road networks, it seems that a driver may not be necessary for the performance of the onsite field monitoring function at many sites (i.e., the monitor can drive his/herself between survey locations). | ..,,~ | ||
Additional guidance would be helpful as to how a licensee could provide site-specific conditions obviating the need for an onsite monitoring team driver. If you have questions or require additional information, please do not hesitate to contact me at dly@nei.org or at my office number, 202.739.8127. | David Young}} | ||
Sincerely, David Young}} |
Latest revision as of 09:57, 18 March 2020
ML17290A353 | |
Person / Time | |
---|---|
Site: | Nuclear Energy Institute |
Issue date: | 10/10/2017 |
From: | Young D Nuclear Energy Institute |
To: | Dante Johnson Office of Nuclear Security and Incident Response |
References | |
82FR42711 00001, NRC-2017-0190, NUREG-0654/FEMA-REP-1 | |
Download: ML17290A353 (3) | |
Text
Page 1 of 1 Joil As of: 10/12/17 9:48 AM 1fil6 OCT I 2 /{H 9: 56 Received: October 10, 2017 Status: Pending_Post PUBLIC SUBMISSION Tracking No. lkl-8z55-ld3q Comments Due: October 11, 2017 RE(~[!V(() Submission Type: Web Docket: NRC-2017-0190 Technical Basis for the Proposed Guidance in NUREG-0654/FEMA-REP-1,Section II.B Comment On: NRC-2017-0190-0001 Technical Basis for the Proposed Guidance in NUREG-0654/FEMA-REP-1,Section II.B; Request for Comment Document: NRC-2017-0190-DRAFT-0001 Comment on FR Doc # 2017-19093 Submitter Information Name: David Young Submitter's Representative: Lana Dargan r/;1/cN17 Organization: Nuclear Energy Institute f"c2?~!hf 7/)
General Comment See Attached Attachments 10-10-17_Industry Comments on draft Technical Basis for the Proposed Guidance in NUREG-0654 FEMA-REP-1 Section II.B (2)
SUNSI Review Complete Template = ADM - 013 E-RIDS= ADM-03 Add= ;J?h(_ ~(~~-s.5) https://www.fdms.gov/fdms/getcontent?objectld=0900006482bb5d6c&format=xml&showorig=false 10/12/2017
DAVID L. YOUNG Technical Advisor, Nuclear Security and Incident Preparedness 1201 F Street, NW, Suite 1100 Washington, DC 20004
~I NUCLEAR ENERGY INSTITUTE P: 202.739.8127 dly@nei.org nei.org October 10, 2017 Don Johnson Office of Nuclear Security and Incident Response, U.S. Nuclear Regulatory Commission, Washington; DC 20555-0001 Submitted via Regulations.gov Project Number: 689
Subject:
Industry comments on draft "Technical Basis for the Proposed Guidance in NUREG-0654/FEMA-REP-1, Section H.B." [Regulations.gov Docket ID NRC-2017-0190J
Dear Mr. Johnson:
The Nuclear Energy Institute (NEI) and the industry are pleased to provide the following comments on the draft Technical Basis for the Proposed Guidance in NUREG-0654/FEMA-REP-1,Section II.B.
- Section 2.4.2, Communications - The bases discusses an additional communicator position staffed at a Site Area Emergency (SAE) Emergency Classification Level (ECL). Please provide additional information regarding the purpose of this position. The Bases document states "For an SAE ECL, or greater, at least 1 additional communicator should be staffed in the EOF." The purpose of this additional communicator is not clear. Specifically, is the intent for this position to be an NRC communicator, or is this position expected to be qualified to perform State/local communications as well. Considering the NUREG-0654, Rev. 1, staffing guidance included an HPN Communicator, is the position expected to have sufficient background to perform HPN type communications. If the NRC ENS communicator is located in the EOF, is the expectation that this additional communicator be located in another facility (i.e., the TSC)? Additional detail regarding the purpose of this communicator would be helpful.
- Section 2.4.3, Radiation Protection -The bases document contains the following statement, "This function should be staffed by 2 qualified RP staff members on-shift (or 1 per unit for multi-unit sites). These staff members should not have any collateral duties during emergency response. "Many licensees currently utilize an on-shift RP tech to perform the on-shift Dose Assessment function. This assignment is a natural extension of RP Technician skills NUCLEAR. CLEAN AIR ENERGY
Mr. Don Johnson October 10, 2017 Page 2 and the practice has been found acceptable for many years. It would be helpful for the guidance to specifically allow for the assignment of the dose assessment function to an on-shift RP Technician as a collateral duty provided that the results of an on-shift staffing analysis, required by 10 CFR Part SO, Appendix E,Section IV.A.9, verify that all assigned functions can be satisfactorily performed.
- Section 2.4.10, Supervision of Repair Team Activities - The Bases document specifies maintenance craft "Supervisors" need to be staffed within 90 minutes. At some sites, there may be a limited number of available craft supervisors when divided between the mechanical, electrical and I&C maintenance disciplines. Many sites rely on "Lead" technicians who are qualified to direct troubleshooting and repair activities and experienced in leading maintenance teams in these types of tasks. Additional guidance would be helpful as to how these types of technicians can be integrated/ credited as an alternative approach to addressing the repair team supervisory function.
- Section 2.4.11, Field Monitoring Teams - The discussion of the Onsite Field Monitoring Team includes a driver position for the team. Considering the relatively small size of nuclear power plant sites, and that Owner Controlled Areas do not have extensive or congested road networks, it seems that a driver may not be necessary for the performance of the onsite field monitoring function at many sites (i.e., the monitor can drive his/herself between survey locations).
Additional guidance would be helpful as to how a licensee could provide site-specific conditions obviating the need for an onsite monitoring team driver.
If you have questions or require additional information, please do not hesitate to contact me at dly@nei.org or at my office number, 202.739.8127.
Sincerely,
~--
..,,~
David Young