ML063040418: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 11/22/2006 | | issue date = 11/22/2006 | ||
| title = Acceptance for Review of Topical Report No. NEI 06-14, Quality Assurance Program Description, Nuclear Energy Institute, Revision 0 (Project No. 689) | | title = Acceptance for Review of Topical Report No. NEI 06-14, Quality Assurance Program Description, Nuclear Energy Institute, Revision 0 (Project No. 689) | ||
| author name = Coffin S | | author name = Coffin S | ||
| author affiliation = NRC/NRO/DNRL/AP1000B1 | | author affiliation = NRC/NRO/DNRL/AP1000B1 | ||
| addressee name = Heymer A | | addressee name = Heymer A | ||
| addressee affiliation = Nuclear Energy Institute (NEI) | | addressee affiliation = Nuclear Energy Institute (NEI) | ||
| docket = PROJ0689 | | docket = PROJ0689 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:November 22, | {{#Wiki_filter:November 22, 2006 Adrian P. Heymer, Senior Director New Plant Deployment Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 | ||
==SUBJECT:== | ==SUBJECT:== | ||
ACCEPTANCE FOR REVIEW OF TOPICAL REPORT NO. NEI 06-14, | ACCEPTANCE FOR REVIEW OF TOPICAL REPORT NO. NEI 06-14, QUALITY ASSURANCE PROGRAM DESCRIPTION, NUCLEAR ENERGY INSTITUTE, REVISION 0 (PROJECT NO. 689) | ||
==Dear Mr. Heymer,== | ==Dear Mr. Heymer,== | ||
By letter dated October 19, 2006, the Nuclear Energy Institute (NEI) submitted for U.S. | By letter dated October 19, 2006, the Nuclear Energy Institute (NEI) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review, its proposed Quality Assurance Program Description, Revision 0. By letter dated October 27, 2006, NEI designated this program as NEI 06-14. The NRC staff has performed an acceptance review of NEI 06-14, Revision 0, and found that the material presented is sufficient to begin our comprehensive review. The staff expects to issue a request for additional information (RAI) letter by December 8, 2006, and issue its safety evaluation report by February 28, 2007. The staff estimates that this review will require approximately 250 staff hours including project management time. The review schedule milestones and estimated costs were discussed in a telephone call with Jim Fisicaro of your staff on October 30, 2006, wherein, it was agreed that NEI would respond to the staffs RAI letter within 30 days barring complications. | ||
Section 170.21 of Title 10 of the Code of Federal Regulations requires that topical reports are subject to fees based upon the full cost of the review. You did not request a fee exemption; therefore, staff hours and the contractor cost, if applicable, will be billed accordingly. | |||
Sincerely | |||
/RA/ | |||
Stephanie M. Coffin, Chief AP1000 Projects Branch 1 Division of New Reactor Licensing Office of New Reactors Project No. 689 cc: See next page | |||
ML063040418 OFFICE DNRL/NWE1:LA DNRL/NWE1:PM EQVA DNRL/NWE1:BC NAME MViera JStarefos DThatcher SCoffin DATE 11/14/06 11/15/06 11/15/06 11/22/06 Letter to A .P. Heyman from S. M. Coffin, dated November 22, 2006. | |||
==SUBJECT:== | ==SUBJECT:== | ||
ACCEPTANCE FOR REVIEW OF TOPICAL REPORT NO. NEI 06-14, | ACCEPTANCE FOR REVIEW OF TOPICAL REPORT NO. NEI 06-14, QUALITY ASSURANCE PROGRAM DESCRIPTION, NUCLEAR ENERGY INSTITUTE, REVISION 0 (PROJECT NO. 689) | ||
DISTRIBUTION: | |||
PUBLIC NRR_DNRL Carol Abbott, NRR (CFA@nrc.gov) | |||
Randolph Blough, RI (ARB@nrc.gov) | |||
James Caldwell, RIII (JLC1@nrc.gov) | |||
Charles Casto, RII (CAC1@nrc.gov) | |||
Dwight Chamberlain, RIV (DDC@nrc.gov) | |||
Samuel Collins, RI (SJC1@nrc.gov) | |||
Marc Dapas, RI (MLD1@nrc.gov) | |||
Marsha Gamberoni, RI (MKG@nrc.gov) | |||
Geoffrey Grant, RIII (GEG@nrc.gov) | |||
Pat Gwynn, RIV (TPG@nrc.gov) | |||
Brian Holian, RI (BEH@nrc.gov) | |||
Art Howell, RIV (ATH@nrc.gov) | |||
Mark Lesser, RII (MSL1@nrc.gov) | |||
Bruce Mallett, RIV (BSM1@nrc.gov) | |||
Victor McCree, RII (VMM@nrc.gov) | |||
Cynthia Pederson, RIII (CDP1@nrc.gov) | |||
Loren Plisco, RII (LRP@nrc.gov) | |||
Mark Satorius, RIII (MAS@nrc.gov) | |||
William Travers, RII (WDT@nrc.gov) | |||
) | Kathryn Winsberg, OGC (KLW@nrc.gov) | ||
Combination List: Mr. Joseph D. Hegner Lead Engineer - Licensing cc: Mr. Charles Brinkman Dominion Generation Westinghouse Electric Co. Early Site Permitting Project Washington Operations 5000 Dominion Boulevard 12300 Twinbrook Pkwy., Suite 330 Glen Allen, VA 23060 Rockville, MD 20852 Mr. Edward L. Quinn Mr. David Lochbaum, Nuclear Safety Engineer Longenecker and Associates Union of Concerned Scientists Utility Operations Division 1707 H Street, NW, Suite 600 23292 Pompeii Drive Washington, DC 20006-3919 Dana Point, CA 92629 Mr. Paul Gunter Mr. Paul Leventhal Nuclear Information & Resource Service Nuclear Control Institute 1424 16th Street, NW, Suite 404 1000 Connecticut Avenue, NW Washington, DC 20036 Suite 410 Washington, DC 20036 Mr. James Riccio Greenpeace Mr. Jay M. Gutierrez 702 H Street, NW, Suite 300 Morgan, Lewis & Bockius, LLP Washington, DC 20001 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. Jim Fisicaro Nuclear Energy Institute Mr. W. Edward Cummins Suite 400 AP600 and AP1000 Projects 1776 I Street, NW Westinghouse Electric Company Washington, DC 20006-3708 P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. George Alan Zinke Project Manager Mr. Gary Wright, Manager Nuclear Business Development Office of Nuclear Facility Safety Entergy Nuclear Illinois Department of Nuclear M-ECH-683 Safety 1340 Echelon Parkway 1035 Outer Park Drive Jackson, MS 39213 Springfield, IL 62704 Ms. Marilyn Kray Mr. Brendan Hoffman Vice President, Special Projects Research Associate on Nuclear Exelon Generation Energy 200 Exelon Way, KSA3-E Public Citizens Critical Mass Kennett Square, PA 19348 Energy and Environmental Program Mr. Laurence Parme 215 Pennsylvania Avenue, SE Manager, GT-MHR Safety & Licensing Washington, DC 20003 General Atomics Company P.O. Box 85608 Mr. Lionel Batty San Diego, CA 92186-5608 Nuclear Business Team Graftech 12300 Snow Road Parma, Ohio 44130 | |||
Mr. Ian M. Grant Mr. Russell Bell Canadian Nuclear Safety Commission Nuclear Energy Institute 280 Slater Street, Station B Suite 400 P.O. Box 1046 1776 I Street, NW Ottawa, Ontario Washington, DC 20006-3708 K1P 5S9 Ms. Vanessa E. Quinn, Chief Mr. Glenn H. Archinoff Radiological Emergency Preparedness AECL Technologies Branch 481 North Frederick Avenue Nuclear and Chemical Preparedness and Suite 405 Protection Division Gaithersburg, MD. 20877 Department of Homeland Security 1800 South Bell Street, Room 837 Dr. Regis A. Matzie Crystal City-Arlington, VA 22202-3546 Senior Vice President and Chief Technology Officer Mr. Ron Simard Westinghouse Electric Company 6170 Masters Club Drive 2000 Day Hill Road Suwanee, GA 30024 Windsor, CT 06095-0500 Ms. Anne W. Cottingham Mr. Ed Wallace, General Manager Assistant General Counsel Projects Nuclear Energy Institute PBMR Pty LTD 1776 I Street, NW, Suite 400 PO Box 9396 Washington, DC 20006 Centurion 0046 Republic of South Africa Mr. David Repka Winston & Strawn LLP Mr. Dobie McArthur 1700 K Street, NW Director, Washington Operations Washington, DC 20006-3817 General Atomics 1899 Pennsylvania Avenue, NW, Suite 300 Mr. Robert E. Sweeney Washington, DC 20006 IBEX ESI 4641 Montgomery Avenue Suite 350 Bethesda, MD. 20814 Mr. Eugene S. Grecheck Vice President, Nuclear Support Services Dominion Energy, Inc. | |||
5000 Dominion Blvd. | 5000 Dominion Blvd. | ||
Glen Allen, VA | Glen Allen, VA 23060 | ||
E-mail Tom Miller (tom.miller@nuclear.energy.gov) | |||
Mark Beaumont (mark.beaumont@wsms.com) | |||
S. Frantz (sfrantz@morganlewis.com) | |||
K. Sutton (ksutton@morganlewis.com) | |||
J. Gutierrez (jgutierrez@morganlewis.com) | |||
Sandra Sloan (sandra.sloan@areva.com) | |||
M. Wetterhahn (mwetterhahn@winston.com) | |||
Guy Cesare (gcesare@enercon.com) | |||
W. Horin (whorin@winston.com) | |||
(erg-xl@cox.net) | |||
Louis Quintana (louis.quintana@ge.com) | |||
Steve Hucik (steven.hucik@ge.com) | |||
David Hinds (david.hinds@ge.com) | |||
Chris Maslak (chris.maslak@ge.com) | |||
M. Giles (mgiles@entergy.com) | |||
Patricia Campbell (patriciaL.campbell@ge.com) | |||
Bob Brown (bob.brown@ge.com) | |||
Peter Hastings (pshastings@duke-energy.com) | |||
Ronald Hagen (ronald.hagen@eia.doe.gov) | |||
Murawski (murawski@newsobserver.com) | |||
Cary Fleming (Cary.Fleming@constellation.com) | |||
Tansel Selekler (tansel.selekler@nuclear.energy.gov) | |||
T. R. Smith (trsmith@winston.com) | |||
James Beard (james1.beard@ge.com) | |||
Rod Krich (rod.krich@constellation.com) | |||
George Wrobel (george.wrobel@constellation.com) | |||
)}} | Barbara Lee-Murphy (barbara.lee-muphy@constellation.com) | ||
Tyson Smith (trsmith@winston.com)}} |
Latest revision as of 23:07, 13 March 2020
ML063040418 | |
Person / Time | |
---|---|
Site: | Nuclear Energy Institute |
Issue date: | 11/22/2006 |
From: | Stephanie Coffin NRC/NRO/DNRL/AP1000B1 |
To: | Heymer A Nuclear Energy Institute |
Starefos, Joelle,NRR/ADRA/DNRL,415-8488 | |
References | |
Download: ML063040418 (6) | |
Text
November 22, 2006 Adrian P. Heymer, Senior Director New Plant Deployment Nuclear Generation Division Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708
SUBJECT:
ACCEPTANCE FOR REVIEW OF TOPICAL REPORT NO. NEI 06-14, QUALITY ASSURANCE PROGRAM DESCRIPTION, NUCLEAR ENERGY INSTITUTE, REVISION 0 (PROJECT NO. 689)
Dear Mr. Heymer,
By letter dated October 19, 2006, the Nuclear Energy Institute (NEI) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review, its proposed Quality Assurance Program Description, Revision 0. By letter dated October 27, 2006, NEI designated this program as NEI 06-14. The NRC staff has performed an acceptance review of NEI 06-14, Revision 0, and found that the material presented is sufficient to begin our comprehensive review. The staff expects to issue a request for additional information (RAI) letter by December 8, 2006, and issue its safety evaluation report by February 28, 2007. The staff estimates that this review will require approximately 250 staff hours including project management time. The review schedule milestones and estimated costs were discussed in a telephone call with Jim Fisicaro of your staff on October 30, 2006, wherein, it was agreed that NEI would respond to the staffs RAI letter within 30 days barring complications.
Section 170.21 of Title 10 of the Code of Federal Regulations requires that topical reports are subject to fees based upon the full cost of the review. You did not request a fee exemption; therefore, staff hours and the contractor cost, if applicable, will be billed accordingly.
Sincerely
/RA/
Stephanie M. Coffin, Chief AP1000 Projects Branch 1 Division of New Reactor Licensing Office of New Reactors Project No. 689 cc: See next page
ML063040418 OFFICE DNRL/NWE1:LA DNRL/NWE1:PM EQVA DNRL/NWE1:BC NAME MViera JStarefos DThatcher SCoffin DATE 11/14/06 11/15/06 11/15/06 11/22/06 Letter to A .P. Heyman from S. M. Coffin, dated November 22, 2006.
SUBJECT:
ACCEPTANCE FOR REVIEW OF TOPICAL REPORT NO. NEI 06-14, QUALITY ASSURANCE PROGRAM DESCRIPTION, NUCLEAR ENERGY INSTITUTE, REVISION 0 (PROJECT NO. 689)
DISTRIBUTION:
PUBLIC NRR_DNRL Carol Abbott, NRR (CFA@nrc.gov)
Randolph Blough, RI (ARB@nrc.gov)
James Caldwell, RIII (JLC1@nrc.gov)
Charles Casto, RII (CAC1@nrc.gov)
Dwight Chamberlain, RIV (DDC@nrc.gov)
Samuel Collins, RI (SJC1@nrc.gov)
Marc Dapas, RI (MLD1@nrc.gov)
Marsha Gamberoni, RI (MKG@nrc.gov)
Geoffrey Grant, RIII (GEG@nrc.gov)
Pat Gwynn, RIV (TPG@nrc.gov)
Brian Holian, RI (BEH@nrc.gov)
Art Howell, RIV (ATH@nrc.gov)
Mark Lesser, RII (MSL1@nrc.gov)
Bruce Mallett, RIV (BSM1@nrc.gov)
Victor McCree, RII (VMM@nrc.gov)
Cynthia Pederson, RIII (CDP1@nrc.gov)
Loren Plisco, RII (LRP@nrc.gov)
Mark Satorius, RIII (MAS@nrc.gov)
William Travers, RII (WDT@nrc.gov)
Kathryn Winsberg, OGC (KLW@nrc.gov)
Combination List: Mr. Joseph D. Hegner Lead Engineer - Licensing cc: Mr. Charles Brinkman Dominion Generation Westinghouse Electric Co. Early Site Permitting Project Washington Operations 5000 Dominion Boulevard 12300 Twinbrook Pkwy., Suite 330 Glen Allen, VA 23060 Rockville, MD 20852 Mr. Edward L. Quinn Mr. David Lochbaum, Nuclear Safety Engineer Longenecker and Associates Union of Concerned Scientists Utility Operations Division 1707 H Street, NW, Suite 600 23292 Pompeii Drive Washington, DC 20006-3919 Dana Point, CA 92629 Mr. Paul Gunter Mr. Paul Leventhal Nuclear Information & Resource Service Nuclear Control Institute 1424 16th Street, NW, Suite 404 1000 Connecticut Avenue, NW Washington, DC 20036 Suite 410 Washington, DC 20036 Mr. James Riccio Greenpeace Mr. Jay M. Gutierrez 702 H Street, NW, Suite 300 Morgan, Lewis & Bockius, LLP Washington, DC 20001 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. Jim Fisicaro Nuclear Energy Institute Mr. W. Edward Cummins Suite 400 AP600 and AP1000 Projects 1776 I Street, NW Westinghouse Electric Company Washington, DC 20006-3708 P.O. Box 355 Pittsburgh, PA 15230-0355 Mr. George Alan Zinke Project Manager Mr. Gary Wright, Manager Nuclear Business Development Office of Nuclear Facility Safety Entergy Nuclear Illinois Department of Nuclear M-ECH-683 Safety 1340 Echelon Parkway 1035 Outer Park Drive Jackson, MS 39213 Springfield, IL 62704 Ms. Marilyn Kray Mr. Brendan Hoffman Vice President, Special Projects Research Associate on Nuclear Exelon Generation Energy 200 Exelon Way, KSA3-E Public Citizens Critical Mass Kennett Square, PA 19348 Energy and Environmental Program Mr. Laurence Parme 215 Pennsylvania Avenue, SE Manager, GT-MHR Safety & Licensing Washington, DC 20003 General Atomics Company P.O. Box 85608 Mr. Lionel Batty San Diego, CA 92186-5608 Nuclear Business Team Graftech 12300 Snow Road Parma, Ohio 44130
Mr. Ian M. Grant Mr. Russell Bell Canadian Nuclear Safety Commission Nuclear Energy Institute 280 Slater Street, Station B Suite 400 P.O. Box 1046 1776 I Street, NW Ottawa, Ontario Washington, DC 20006-3708 K1P 5S9 Ms. Vanessa E. Quinn, Chief Mr. Glenn H. Archinoff Radiological Emergency Preparedness AECL Technologies Branch 481 North Frederick Avenue Nuclear and Chemical Preparedness and Suite 405 Protection Division Gaithersburg, MD. 20877 Department of Homeland Security 1800 South Bell Street, Room 837 Dr. Regis A. Matzie Crystal City-Arlington, VA 22202-3546 Senior Vice President and Chief Technology Officer Mr. Ron Simard Westinghouse Electric Company 6170 Masters Club Drive 2000 Day Hill Road Suwanee, GA 30024 Windsor, CT 06095-0500 Ms. Anne W. Cottingham Mr. Ed Wallace, General Manager Assistant General Counsel Projects Nuclear Energy Institute PBMR Pty LTD 1776 I Street, NW, Suite 400 PO Box 9396 Washington, DC 20006 Centurion 0046 Republic of South Africa Mr. David Repka Winston & Strawn LLP Mr. Dobie McArthur 1700 K Street, NW Director, Washington Operations Washington, DC 20006-3817 General Atomics 1899 Pennsylvania Avenue, NW, Suite 300 Mr. Robert E. Sweeney Washington, DC 20006 IBEX ESI 4641 Montgomery Avenue Suite 350 Bethesda, MD. 20814 Mr. Eugene S. Grecheck Vice President, Nuclear Support Services Dominion Energy, Inc.
5000 Dominion Blvd.
Glen Allen, VA 23060
E-mail Tom Miller (tom.miller@nuclear.energy.gov)
Mark Beaumont (mark.beaumont@wsms.com)
S. Frantz (sfrantz@morganlewis.com)
K. Sutton (ksutton@morganlewis.com)
J. Gutierrez (jgutierrez@morganlewis.com)
Sandra Sloan (sandra.sloan@areva.com)
M. Wetterhahn (mwetterhahn@winston.com)
Guy Cesare (gcesare@enercon.com)
W. Horin (whorin@winston.com)
(erg-xl@cox.net)
Louis Quintana (louis.quintana@ge.com)
Steve Hucik (steven.hucik@ge.com)
David Hinds (david.hinds@ge.com)
Chris Maslak (chris.maslak@ge.com)
M. Giles (mgiles@entergy.com)
Patricia Campbell (patriciaL.campbell@ge.com)
Bob Brown (bob.brown@ge.com)
Peter Hastings (pshastings@duke-energy.com)
Ronald Hagen (ronald.hagen@eia.doe.gov)
Murawski (murawski@newsobserver.com)
Cary Fleming (Cary.Fleming@constellation.com)
Tansel Selekler (tansel.selekler@nuclear.energy.gov)
T. R. Smith (trsmith@winston.com)
James Beard (james1.beard@ge.com)
Rod Krich (rod.krich@constellation.com)
George Wrobel (george.wrobel@constellation.com)
Barbara Lee-Murphy (barbara.lee-muphy@constellation.com)
Tyson Smith (trsmith@winston.com)