|
|
(One intermediate revision by the same user not shown) |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:July 16, 2008 | | {{#Wiki_filter:July 16, 2008 Joseph W. Donahue, Vice President Nuclear Engineering & Services Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 |
| | |
| Joseph W. Donahue, Vice President Nuclear Engineering & Services Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - FINAL REPORT: RESULTS OF THE NRC STAFF REVIEW OF THE FIRE PROBABILISTIC RISK ASSESSMENT MODEL TO SUPPORT IMPLEMENTATION OF NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA-805, "PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS" (TAC NO. MC5630) | | SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - FINAL REPORT: |
| | RESULTS OF THE NRC STAFF REVIEW OF THE FIRE PROBABILISTIC RISK ASSESSMENT MODEL TO SUPPORT IMPLEMENTATION OF NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA-805, PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS (TAC NO. MC5630) |
|
| |
|
| ==Dear Mr. Donahue:== | | ==Dear Mr. Donahue:== |
|
| |
|
| This letter is to provide you with the final report of the U.S. Nuclear Regulatory Commission's review of the Shearon Harris Nuclear Power Plant, Unit 1, fire probabilistic risk assessment model. The final report, dated March 28, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080650420), is provided in the enclosure. This report supersedes the draft report provided on March 10, 2008 (enclosure to ADAMS Accession No. ML080650403), in its entirety. | | This letter is to provide you with the final report of the U.S. Nuclear Regulatory Commissions review of the Shearon Harris Nuclear Power Plant, Unit 1, fire probabilistic risk assessment model. The final report, dated March 28, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080650420), is provided in the enclosure. |
| | | This report supersedes the draft report provided on March 10, 2008 (enclosure to ADAMS Accession No. ML080650403), in its entirety. |
| The results documented in the final report are essentially unchanged from the draft report, although users should verify this when addressing specific technical facts and observations.
| |
| If you have any questions regarding this matter, please contact me at (301) 415-3178.
| |
| Sincerely, /RA/ Marlayna Vaaler, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
| |
| | |
| ==Enclosure:==
| |
| As stated
| |
| | |
| cc w/enclosure: See next page
| |
| | |
| ML080650403), in its entirety.
| |
| | |
| The results documented in the final report are essentially unchanged from the draft report, although users should verify this when addressing specific technical facts and observations. | | The results documented in the final report are essentially unchanged from the draft report, although users should verify this when addressing specific technical facts and observations. |
| If you have any questions regarding this matter, please contact me at (301) 415-3178. | | If you have any questions regarding this matter, please contact me at (301) 415-3178. |
| Sincerely, /RA/ Marlayna Vaaler, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 | | Sincerely, |
| | /RA/ |
| | Marlayna Vaaler, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As stated cc w/enclosure: See next page DISTRIBUTION | | As stated cc w/enclosure: See next page |
| : PUBLIC DRA r/f RidsNrrPMMVaaler RidsNrrLACSola RidsNrrDorlLpl2-2 RidsNrrDraAfpb RidsOgcRp RidsAcrsAcnw&mMailCenter RidsRgn2MailCenter (RMusser) SLaur PLain AKlein, NRR ADAMS Accession No.: (Letter) ML081560501 (Encl) ML080650420 (Pkg) ML080650382 NRR-106 OFFICE NRR/ADES/DRA NRR/ADES/DRA/AFPB BC:NRR/ADES/DRA/AFPBNAME SLaur PLain AKlein DATE 6/4/2008 7/1/2008 7/10/2008 OFFICE DD:NRR/ADES/DRA PM:NRR/ADRO/DORL BC:NRR/ADRO/DORL NAME MCunningham MVaaler FSaba for TBoyce DATE 7/14/2008 6/4/2008 7/16/2008 Mr. Joseph Donahue Shearon Harris Nuclear Power Plant, Progress Energy Unit No. 1 cc:
| |
| Mr. Robert J. Duncan II, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165
| |
| | |
| Mr. Kelvin Henderson Plant General Manager Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc. P. O. Box 165, Mail Zone 3 New Hill, North Carolina 27562-0165
| |
| | |
| Mr. Chris L. Burton Director of Site Operations Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc.
| |
| Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. David H. Corlett, Supervisor Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc. P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165
| |
| | |
| Ms. Phyllis N. Mentel, Manager Support Services Shearon Harris Nuclear Power Plant Progress Energy Carolinas, Inc. P. O. Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165
| |
| | |
| Resident Inspector / Harris NPS c/o U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998
| |
| | |
| Mr. J. Paul Fulford Manager, Performance Evaluation and Regulatory Affairs PEB 5 Progress Energy Carolinas, Inc. Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. John H. O'Neill, Jr. Pillsbury Winthrop Shaw Pittman, LLP 2300 N Street NW.
| |
| Washington, DC 20037-1128 Mr. John D. Runkle, Attorney at Law Post Office Box 3793 Chapel Hill, North Carolina 27515-3793 David T. Conley Associate General Counsel II - Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510
| |
| | |
| Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211
| |
| | |
| Ms. Beverly Hall, Section Chief Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7221 Mr. Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Mr. Tony Gurley, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, North Carolina 27602 Mr. Carl Thompson, Chair Board of County Commissioners of Chatham County P. O. Box 87 Pittsboro, North Carolina 27312
| |
|
| |
|
| Mr. Jim Warren NC Waste Awareness & Reduction Network Post Office Box 61051 Durham, North Carolina 27715-1051}} | | (Letter) ML081560501 (Encl) ML080650420 (Pkg) ML080650382 NRR-106 OFFICE NRR/ADES/DRA NRR/ADES/DRA/AFPB BC:NRR/ADES/DRA/AFPB NAME SLaur PLain AKlein DATE 6/4/2008 7/1/2008 7/10/2008 OFFICE DD:NRR/ADES/DRA PM:NRR/ADRO/DORL BC:NRR/ADRO/DORL NAME MCunningham MVaaler FSaba for TBoyce DATE 7/14/2008 6/4/2008 7/16/2008 Mr. Joseph Donahue Shearon Harris Nuclear Power Plant, Progress Energy Unit No. 1 cc: |
| | Mr. Robert J. Duncan II, Vice President Chapel Hill, North Carolina 27515-3793 Shearon Harris Nuclear Power Plant David T. Conley Carolina Power & Light Company Associate General Counsel II - |
| | Post Office Box 165, Mail Code: Zone 1 Legal Department New Hill, North Carolina 27562-0165 Progress Energy Service Company, LLC Post Office Box 1551 Mr. Kelvin Henderson Raleigh, North Carolina 27602-1551 Plant General Manager Shearon Harris Nuclear Power Plant Chairman of the North Carolina Progress Energy Carolinas, Inc. Utilities Commission P. O. Box 165, Mail Zone 3 Post Office Box 29510 New Hill, North Carolina 27562-0165 Raleigh, North Carolina 27626-0510 Mr. Chris L. Burton Public Service Commission Director of Site Operations State of South Carolina Shearon Harris Nuclear Power Plant Post Office Drawer 11649 Progress Energy Carolinas, Inc. Columbia, South Carolina 29211 Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Ms. Beverly Hall, Section Chief Division of Radiation Protection Mr. David H. Corlett, Supervisor N.C. Department of Environment Licensing/Regulatory Programs and Natural Resources Shearon Harris Nuclear Power Plant 3825 Barrett Drive Progress Energy Carolinas, Inc. Raleigh, North Carolina 27609-7221 P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. Robert P. Gruber Executive Director Ms. Phyllis N. Mentel, Manager Public Staff NCUC Support Services 4326 Mail Service Center Shearon Harris Nuclear Power Plant Raleigh, North Carolina 27699-4326 Progress Energy Carolinas, Inc. |
| | P. O. Box 165, Mail Zone 1 Ms. Margaret A. Force New Hill, North Carolina 27562-0165 Assistant Attorney General State of North Carolina Resident Inspector / Harris NPS Post Office Box 629 c/o U. S. Nuclear Regulatory Commission Raleigh, North Carolina 27602 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Mr. Tony Gurley, Chair Board of County Commissioners Mr. J. Paul Fulford of Wake County Manager, Performance Evaluation and P. O. Box 550 Regulatory Affairs PEB 5 Raleigh, North Carolina 27602 Progress Energy Carolinas, Inc. |
| | Post Office Box 1551 Mr. Carl Thompson, Chair Raleigh, North Carolina 27602-1551 Board of County Commissioners of Chatham County Mr. John H. ONeill, Jr. P. O. Box 87 Pillsbury Winthrop Shaw Pittman, LLP Pittsboro, North Carolina 27312 2300 N Street NW. |
| | Washington, DC 20037-1128 Mr. Jim Warren NC Waste Awareness & Reduction Network Mr. John D. Runkle, Attorney at Law Post Office Box 61051 Post Office Box 3793 Durham, North Carolina 27715-1051}} |
Letter Sequence Approval |
---|
|
|
MONTHYEARML0735511662007-12-20020 December 2007 NEI 07-12, Fire Probabilistic Risk Assessment (Fpra) Peer Review Process Guidelines Draft Version F, Rev. 0. Project stage: Request ML0800705312008-01-0909 January 2008 Review of the Fire Probabilistic Risk Assessment Model to Support Implementation of National Fire Protection Association (NFPA) Standard NFPA-805 Project stage: Approval ML0806504032008-03-10010 March 2008 Results of the of Review of the Fire Probabilistic Risk Assessment Model to Support Implementation of National Fire Protection Association (NFPA) Standard NFPA- 805, Performance-Based Standard for Fire.. Project stage: Approval ML0809406392008-04-10010 April 2008 Preliminary Results of the NRC Staff Review of the Fire Probabilistic Risk Assessment Model to Support Implementation of National Fire Protection Association Standard NFPA-805, Performance Based Standard for Fire.. Project stage: Approval ML0806504202008-05-29029 May 2008 Fire Probabilistic Risk Assessment Pre-Submittal Audit Project stage: Other ML0809406032008-06-24024 June 2008 Final Letter Report - Fire Probabilistic Risk Assessment Pre-Submittal Audit Project stage: Other ML0815605012008-07-16016 July 2008 Final Report: Results of the NRC Staff Review of Fire Probabilistic Risk Assessment Model to Support Implementation of National Fire Protection Association Standard NFA-805, Performance-Based Standard for Fire Protection ... Project stage: Approval ML0909604362009-05-28028 May 2009 Lessons from Regulatory Audits of the Pilot Plants That Are Transitioning to a Fire Protection Licensing Basis Based on the National Fire Protection Association (NFPA) Standard NFPA 805 as Allowed by 10 CFR 5.48 (C) Project stage: Other 2008-04-10
[Table View] |
|
---|
Category:Letter
MONTHYEARML24290A1102024-10-24024 October 2024 Notification of Licensed Operator Initial Examination 05000400/2025301 05000400/LER-2024-001-01, Automatic Reactor Trip Due to Main Generator Lock-Out2024-10-23023 October 2024 Automatic Reactor Trip Due to Main Generator Lock-Out IR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 05000400/LER-2024-001, Automatic Reactor Trip Due to Main Generator Lock-Out2024-07-22022 July 2024 Automatic Reactor Trip Due to Main Generator Lock-Out ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter IR 05000400/20230012023-05-10010 May 2023 Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000400/20220032022-11-10010 November 2022 Integrated Inspection Report 05000400/2022003 IR 05000400/20223012022-11-0202 November 2022 NRC Operator License Examination Report 05000400/2022301 2024-09-10
[Table view] |
Text
July 16, 2008 Joseph W. Donahue, Vice President Nuclear Engineering & Services Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - FINAL REPORT:
RESULTS OF THE NRC STAFF REVIEW OF THE FIRE PROBABILISTIC RISK ASSESSMENT MODEL TO SUPPORT IMPLEMENTATION OF NATIONAL FIRE PROTECTION ASSOCIATION STANDARD NFPA-805, PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS (TAC NO. MC5630)
Dear Mr. Donahue:
This letter is to provide you with the final report of the U.S. Nuclear Regulatory Commissions review of the Shearon Harris Nuclear Power Plant, Unit 1, fire probabilistic risk assessment model. The final report, dated March 28, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080650420), is provided in the enclosure.
This report supersedes the draft report provided on March 10, 2008 (enclosure to ADAMS Accession No. ML080650403), in its entirety.
The results documented in the final report are essentially unchanged from the draft report, although users should verify this when addressing specific technical facts and observations.
If you have any questions regarding this matter, please contact me at (301) 415-3178.
Sincerely,
/RA/
Marlayna Vaaler, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
As stated cc w/enclosure: See next page
(Letter) ML081560501 (Encl) ML080650420 (Pkg) ML080650382 NRR-106 OFFICE NRR/ADES/DRA NRR/ADES/DRA/AFPB BC:NRR/ADES/DRA/AFPB NAME SLaur PLain AKlein DATE 6/4/2008 7/1/2008 7/10/2008 OFFICE DD:NRR/ADES/DRA PM:NRR/ADRO/DORL BC:NRR/ADRO/DORL NAME MCunningham MVaaler FSaba for TBoyce DATE 7/14/2008 6/4/2008 7/16/2008 Mr. Joseph Donahue Shearon Harris Nuclear Power Plant, Progress Energy Unit No. 1 cc:
Mr. Robert J. Duncan II, Vice President Chapel Hill, North Carolina 27515-3793 Shearon Harris Nuclear Power Plant David T. Conley Carolina Power & Light Company Associate General Counsel II -
Post Office Box 165, Mail Code: Zone 1 Legal Department New Hill, North Carolina 27562-0165 Progress Energy Service Company, LLC Post Office Box 1551 Mr. Kelvin Henderson Raleigh, North Carolina 27602-1551 Plant General Manager Shearon Harris Nuclear Power Plant Chairman of the North Carolina Progress Energy Carolinas, Inc. Utilities Commission P. O. Box 165, Mail Zone 3 Post Office Box 29510 New Hill, North Carolina 27562-0165 Raleigh, North Carolina 27626-0510 Mr. Chris L. Burton Public Service Commission Director of Site Operations State of South Carolina Shearon Harris Nuclear Power Plant Post Office Drawer 11649 Progress Energy Carolinas, Inc. Columbia, South Carolina 29211 Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Ms. Beverly Hall, Section Chief Division of Radiation Protection Mr. David H. Corlett, Supervisor N.C. Department of Environment Licensing/Regulatory Programs and Natural Resources Shearon Harris Nuclear Power Plant 3825 Barrett Drive Progress Energy Carolinas, Inc. Raleigh, North Carolina 27609-7221 P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. Robert P. Gruber Executive Director Ms. Phyllis N. Mentel, Manager Public Staff NCUC Support Services 4326 Mail Service Center Shearon Harris Nuclear Power Plant Raleigh, North Carolina 27699-4326 Progress Energy Carolinas, Inc.
P. O. Box 165, Mail Zone 1 Ms. Margaret A. Force New Hill, North Carolina 27562-0165 Assistant Attorney General State of North Carolina Resident Inspector / Harris NPS Post Office Box 629 c/o U. S. Nuclear Regulatory Commission Raleigh, North Carolina 27602 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Mr. Tony Gurley, Chair Board of County Commissioners Mr. J. Paul Fulford of Wake County Manager, Performance Evaluation and P. O. Box 550 Regulatory Affairs PEB 5 Raleigh, North Carolina 27602 Progress Energy Carolinas, Inc.
Post Office Box 1551 Mr. Carl Thompson, Chair Raleigh, North Carolina 27602-1551 Board of County Commissioners of Chatham County Mr. John H. ONeill, Jr. P. O. Box 87 Pillsbury Winthrop Shaw Pittman, LLP Pittsboro, North Carolina 27312 2300 N Street NW.
Washington, DC 20037-1128 Mr. Jim Warren NC Waste Awareness & Reduction Network Mr. John D. Runkle, Attorney at Law Post Office Box 61051 Post Office Box 3793 Durham, North Carolina 27715-1051