ML090850558: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML090850558
| number = ML090850558
| issue date = 10/07/2008
| issue date = 10/07/2008
| title = Rancho Seco Final Status Survey Report for October 7, 2008, Turbine Building High Pressure Pedestals, (+) 0' El. to (+) 20' El. Survey Unit F8261004
| title = Final Status Survey Report for October 7, 2008, Turbine Building High Pressure Pedestals, (+) 0' El. to (+) 20' El. Survey Unit F8261004
| author name = Anderson D
| author name = Anderson D
| author affiliation = Sacramento Municipal Utility District (SMUD)
| author affiliation = Sacramento Municipal Utility District (SMUD)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:1J Rancho Seco Final Status Survey Summary Report October 7, 2008 Turbine Building High Pressure Pedestals, (+) 0' El. to (+) 20' El.Survey Unit F8261004 Prepared By: .
{{#Wiki_filter:1J Rancho Seco Final Status Survey Summary Report October 7, 2008 Turbine Building High Pressure Pedestals, (+) 0' El. to (+) 20' El.
-FSS Engineer Date:. I/07/ 20" Reviewed By: .Date: (0 fi?Lead FSS Engineer Approved By: ?Date: __-_7_Dismantlement Superintendent, Radiological FINAL STATUS SURVEY  
Survey Unit F8261004 Prepared By:       .-     o*,__--        Date:. I/07/ 20" FSS Engineer Reviewed By:.                               Date:   (0       fi?
Lead FSS Engineer Approved By:     Ž?Date:                           __-_7_
Dismantlement Superintendent, Radiological
 
FINAL STATUS SURVEY  


==SUMMARY==
==SUMMARY==
REPORT Survey Unit:F8261004, Turbine Building High Pressure Pedestals, (+) 0' El. to (+) 20' El.Survey Unit
REPORT Survey Unit:
F8261004, Turbine Building High Pressure Pedestals, (+) 0' El. to (+) 20' El.
Survey Unit


== Description:==
== Description:==


Operating History: The reinforced concrete and steel structure contained the turbine-generator and supporting systems. The building contained five main elevations.
Operating History: The reinforced concrete and steel structure contained the turbine-generator and supporting systems. The building contained five main elevations. Residual radioactive material was known to be present on all levels of the interior of the building.
Residual radioactive material was known to be present on all levels of the interior of the building.Operating records and the HSA document several events with the potential for a release of radioactivity inside this structure.
Operating records and the HSA document several events with the potential for a release of radioactivity inside this structure.
Site Characterization: Direct measurements were made of each of the interior elevation surfaces as well as the exterior surfaces of the structure.
Site Characterization: Direct measurements were made of each of the interior elevation surfaces as well as the exterior surfaces of the structure. These measurements confirmed the presence of plant-derived radionuclides. Direct measurements in the condenser pit elevation showed a mean gross activity level of 3,077 dpm/l100 cm 2 and a maximum value of 24,900 dpm/l 00 cm 2 . Direct measurements on the grade elevation showed a mean gross activity level of 2,035 dpm!100 cm 2 and a maximum value of 6,980 dpm/100 cm 2. Direct measurements on the mezzanine elevation showed a mean gross activity level of 1,566 dpm/100 cm 2 and a maximum value of 2,626 dpm/100 cm 2. Direct measurements on the +40' elevation showed a mean gross activity level of 2,843 dpm/100 cm 2 and a maximum value of 3,615 dpm/ 100 cm 2. Direct measurements on the building exterior showed a mean gross activity level of 1,984 dpm/100 cm 2 and a maximum value of 10,312 dpm/100 cm 2 . Based on the classification procedure (DSIP-0020) and levels of gross activity reported, the interior of the turbine building was determined to be Class 1, 2, & 3 areas and the exterior was a Class 3.
These measurements confirmed the presence of plant-derived radionuclides. Direct measurements in the condenser pit elevation showed a mean gross activity level of 3,077 dpm/l100 cm 2 and a maximum value of 24,900 dpm/l 00 cm 2.Direct measurements on the grade elevation showed a mean gross activity level of 2,035 dpm!100 cm 2 and a maximum value of 6,980 dpm/100 cm 2.Direct measurements on the mezzanine elevation showed a mean gross activity level of 1,566 dpm/100 cm 2 and a maximum value of 2,626 dpm/100 cm 2.Direct measurements on the +40' elevation showed a mean gross activity level of 2,843 dpm/100 cm 2 and a maximum value of 3,615 dpm/ 100 cm 2.Direct measurements on the building exterior showed a mean gross activity level of 1,984 dpm/100 cm 2 and a maximum value of 10,312 dpm/100 cm 2.Based on the classification procedure (DSIP-0020) and levels of gross activity reported, the interior of the turbine building was determined to be Class 1, 2, & 3 areas and the exterior was a Class 3.HSA Events: HSA Report pg. 63.Survey Unit Design Information:The Survey Unit Design Parameters are presented in Table 1 below. The survey unit and measurement locations are depicted on the maps in Attachment  
HSA Events: HSA Report pg. 63.
: 1. Direct measurement locations were determined using a random-start, fixed grid pattern and 262.2 m 2 were scanned for 100% coverage.
Survey Unit Design Information:
Samples of removable contamination were collected at each direct measurement location.
The Survey Unit Design Parameters are presented in Table 1 below. The survey unit and measurement locations are depicted on the maps in Attachment 1. Direct measurement locations were determined using a random-start, fixed grid pattern and 262.2 m2 were scanned for 100% coverage. Samples of removable contamination were collected at each direct measurement location. The instrumentation used for the survey along with the MDC values are listed in Tables 2-1 and 2-2 in Attachment 2.
The instrumentation used for the survey along with the MDC values are listed in Tables 2-1 and 2-2 in Attachment 2.Page 2 of 9 FSS Summary Report F8261004 Table 1. Survey Unit Design Parameters Survey Design Value Comment Parameter Survey Area: F826Survey Unit:
Page 2 of 9                         FSS Summary Report                           F8261004
Class: SU Area (m2): Evaluator:
 
DCGL (dpm/100 cm 2): Area Factor: Design DCGLemc (dpm/100 cm 2): LBGR (dpm/100 cm 2): Design Sigma (dpm/100 cm 2): Type I Error: Type II Error: Predominant Nuclide: Sample Area (m2): Scan Area (m 2): Scan Coverage (%): Zl-a : Sign P: Calculated Relative Shift: Relative Shift Used: N-Yalue: Design N-Value + 20%: Design Min Samples N: Grid Spacing L: 1004 1 262.2 D. Anderson 43,000 3.8 163,400 25,030 5,990 0.05 0.05 Cs-137 6.9 262.2 100%1.645 1.645 0.99865 3 3 11 14 38 2.6Turbine Building High Pressure Pedestals, (+) 0'El. to (+) 20' El.Structure SurfaceLTP Table 5-4 Gross Activity DCGL Class 1 Class 1 Adjusted Class 1 Class 1 Uses 3.0 if Relative Shift is>3 NUREG-1575 Table 5-5 Class 1 Class 1 Page 3 of 9 FSS Summary Report F8261004 Survey Results: A total of 43 direct measurements were made in F8261004.
Table 1. Survey Unit Design Parameters Survey Design                     Value                   Comment Parameter Survey Area:                       F826      Turbine Building High Pressure Pedestals, (+) 0' El. to (+) 20' El.
The results including mean, median, standard deviation and range are shown in Table 2. All direct measurementswere less than the DCGL. One scan measurement indicated an area of elevated activity
Survey Unit:                       1004            Structure Surface Class:                         1              LTP Table 5-4 SU Area  (m2):                   262.2 Evaluator:               D. Anderson DCGL    (dpm/100 cm 2):                 43,000        Gross Activity DCGL Area Factor:                         3.8                      Class 1 Design DCGLemc                        163,400                        Class 1 (dpm/100 cm 2):
(> DCGLEMC).
LBGR    (dpm/100 cm 2):                 25,030                      Adjusted Design Sigma  (dpm/100 cm 2 ):                 5,990 Type I Error:                       0.05 Type II Error:                         0.05 Predominant Nuclide:                       Cs-137 Sample Area (m2):                         6.9                      Class 1 Scan Area  (m2):                   262.2 Scan Coverage (%):                        100%                        Class 1 Zl-a :
Due to scan measurements that were greater than the DCGL, a total of nine scan grids were investigated.
1.645 1.645 Sign P:                  0.99865 Calculated Relative Shift:                            3 Relative Shift Used:                            3 Uses 3.0 if Relative Shift is
Beta scan activity ranged from 3,045 to 187,872 dpm/100 cm 2 , based on a surveyor efficiency of 0.5 and no background subtracted.Samples for removable surface activity were all less than 10% of the DCGL as shown in Table 3. Removable surface activity samples were counted for alpha activity and none was detected at the MDC shown in Table 2-1 of Attachment 2.Page 4 of 9 FSS Summary Report F8261004 Table 2. Direct Measurement Results Measurement ID Gross Activity (dpm/100 cm)i F8261004-CO001 BD F8261004-XO002BD F8261004-XO003BD F8261004-XO004BD F8261004-XO005BD F8261004-CO006BD F8261004-CO007BD F8261004-CO008BD F8261004-C0009BD F8261004-XOOIOBD F8261004-C0011BD F8261004-CO012BD F8261004-CO013BD F8261004-Co014BD
                                                                                    >3 N-Yalue:                          11 Design N-Value + 20%:                              14  NUREG-1575 Table 5-5 Design Min Samples N:                              38                      Class 1 Grid Spacing L:                          2.6                      Class 1 Page 3 of 9                     FSS Summary Report                         F8261004
 
Survey Results:
A total of 43 direct measurements were made in F8261004. The results including mean, median, standard deviation and range are shown in Table 2. All direct measurements were less than the DCGL. One scan measurement indicated an area of elevated activity
(> DCGLEMC). Due to scan measurements that were greater than the DCGL, a total of nine scan grids were investigated. Beta scan activity ranged from 3,045 to 187,872 dpm/100 cm 2 , based on a surveyor efficiency of 0.5 and no background subtracted.
Samples for removable surface activity were all less than 10% of the DCGL as shown in Table 3. Removable surface activity samples were counted for alpha activity and none was detected at the MDC shown in Table 2-1 of Attachment 2.
Page 4 of 9                       FSS Summary Report                           F8261004
 
Table 2. Direct Measurement Results Measurement ID           Gross Activity (dpm/100 cm) i F8261004-CO001 BD                     1,758 F8261004-XO002BD                       4,023 F8261004-XO003BD                       5,015 F8261004-XO004BD                       2,877 F8261004-XO005BD                       3,737 F8261004-CO006BD                       2,028 F8261004-CO007BD                       1,976 F8261004-CO008BD                       1,857 F8261004-C0009BD                       2,148 F8261004-XOOIOBD                       3,153 F8261004-C0011BD                       1,841 F8261004-CO012BD                       1,727 F8261004-CO013BD                       2,028 F8261004-Co014BD                       2,179 F8261004-Co015BD                      1,738 F8261004-CO016BD                      1,961 F8261004-XO017BD                      5,589 F8261004-XO018BD                      3,428 F8261004-XO019BD                      4,641 F8261004-CO02OBD                      1,862 F8261004-C0021 BD                      1,899 F8261004-XO022BD                      3,494 F8261004-CO023BD                      1,847 F8261004-CO024BD                      1,681 F8261004-XO025BD                      3,351 F8261004-CO026BD                      1,670 F8261004-CO027BD                      1,686 F8261004-CO028BD                      6,375 F8261004-CO029BD                      1,779 F8261004-XO030BD                      2,028 F8261004-X0031BD                      2,260 F8261004-XO032BD                      5,104 F8261004-CO033BD                      6,126 F8261004-CO034BD                      1,707 F8261004-CO035BD                      2,033 F8261004-XO036BD                      3,395 F8261004-CO037BD                      2,044 F8261004-XO038BD                      3,351 F8261004-XO039BD                      3,461 F8261004-XO040BD                      4,090 F8261004-X0041 BD                      3,792 F8261004-Co042BD                      1,774 F8261004-CO043BD                      1,644 Mean:                    2,841 Median:                    2,044 Standard Deviation:                    1,329 Ranqe:              1,644 - 6,375 Page 5 of 9            FSS Summary Report                  F8261004
 
Table 3. Removable Surface Activity Results Measurement ID          Surface Beta Activity (dpm/100 cm 2)
F8261004C0001 SM                      -0.95 F8261004X0002SM                          4.22 F8261004X0003SM                        -0.95 F8261004X0004SM                          0.34 F8261004X0005SM                        -3.53 F8261004CO006SM                        -3.53 F8261004C0007SM                          0.34 F8261004CO008SM                        -0.95 F8261004C0009SM                        -4.82 F8261004X0010SM                        -0.95 F8261004C001 1SM                        5.51 F8261004C0012SM                        -4.82 F8261004C0013SM                        -3.53 F8261004C0014SM                        -3.53 F8261004C0015SM                          0.34 F8261004C0016SM                          0.34 F8261004X0017SM                          0.34 F8261004X0018SM                        -2.24 F8261004X0019SM                        -3.53 F8261004C0020SM                          2.93 F8261004C0021SM                        -2.24 F8261004X0022SM                        -4.82 F8261004C0023SM                        -3.53 F8261004C0024SM                        -3.53 F8261004X0025SM                        -0.95 F8261004C0026SM                        -0.95 F8261004C0027SM                          2.93 F8261004C0028SM                        30.05 F8261004C0029SM                        -2.24 F8261004X0030SM                        -3.53 F8261004X0031SM                        -2.24 F8261004X0032SM                          5.51 F8261004C0033SM                        23.59 F8261004C0034SM                        -3.53 F8261004C0035SM                        -3.53 F8261004X0036SM                        -3.53 F8261004C0037SM                        -2.24 F8261004X0038SM                        -4.82 F8261004X0039SM                        -4.82 F8261004XO040SM                        -4.82 F8261004X0041SM                        -0.95 F8261004C0042SM                        -2.24 F8261004C0043SM                          0.34 Mean:                      -0..26 Median:                      -2.24 Standard Deviation:                      6.67 Ranqe:              -4.82 to 30.05 Page 6 of 9              FSS Summary Report                    F8261004
 
Survey Unit Data Assessment:
The survey design required 43 direct measurements for the Sign Test. The critical value and the results of the Sign Test are presented in Table 4. The sample mean and median values were less than the DCGL. The sample standard deviation, was less than the design standard deviation so no additional samples were required.
Page 7 ofra9                        FSS Summary Report                        F8261004
 
Table 4. Data Assessment Results Survey Results Parameter                  Value          Comment Material Background Used (dpm/100 cm2):          N/A
  'Ambient Background Used (dpm/100 cm 2):          N/A  Average Ambient BKG = 0 Actual Direct Measurements (N):              43 2
Median  (dpm/100 cm ):    2,044 Mean (dpm/IO0 cm 2):      2,841 Direct Measurement Standard Deviation              1,329 (dpm/100 cm 2):
Total Standard Deviation    (dpm/100 cm 2
                                              ):    1,329      Based on samples and backgrounds.
Maximum (dpm/100 cm 2):      6,375 Material Type:          N/A  Background Subtract Not Applied Sign Test Final N Value:            43 S+ Value:            43 Critical Value:            27 Sufficient Samples Collected:            Yes Maximum Value < DCGL:                'Yes Median Value < DCGL:                Yes Mean Value < DCGL:              Yes Maximum Value < DCGLemc:                  Yes                  Class 1 Total Standard Deviation <= Sigma:              Yes Pass the Sign Test?          Yes Reject the Null Hypothesis?            Yes Does the Survey Unit Pass All Criteria?            Yes Page 8 of 9                      FSS Summary Report                        F8261004
 
Survey Unit Investigations and Results:
Nine investigations (scan grids 4, 5, 11, 17, 112, 118, 252, 268 and 269) were required for the scan measurements and the results are reported in Attachment 3. The EMC unity rule was not exceeded as shown in Table 3-1.
ALARA Statement:
As stated in Chapter 4 of the LTP, as long as the residual activity within the survey unit is less than the DCGL (i.e. the survey unit average activity is less than the DCGL and the EMC criterion has been met), the ALARA criterion has been met.
Changes in Initial Survey Unit Assumptions:
The survey unit was designed as a Class 1 structure survey and the sample results are consistent with that classification. The variability of the survey results was less than the characterization data used for survey design. Nine potential areas of elevated activity were detected and evaluated as shown in Attachment 3. Therefore the EMC criterion was met.
 
==
Conclusion:==
 
The FSS of this survey unit was properly designed as a Class 1 survey based on Table 5-4 of the LTP. The required number of direct measurements was made and the scan coverage met the requirement of Table 5-6 of the LTP. No direct measurements exceeded the DCGL of 43,000 dpm/100 cm2 and none of the removable surface activity measurements exceeded 10% of the DCGL. Nine investigations were required.
The direct measurement data support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and that the data quality objectives were met.
It is concluded that survey unit F8261004 meets the release criteria of 10CFR20.1402.
Page 9 of 9                          FSS Summary Report                              F8261004
 
Attachment 1 Maps October 7, 2008 Survey Unit F8261004
 
0, 0  ..
                              ..          L)
      ,/ -                      L Li        LJjj  -:rjz L'D
                  -- "Ii
            <--'"-L        ,-o--.-
u                                            .... .
az                                  a
      -F"-Z                                    o Location of Turbine Building inside the Industrial Area 00 S Map F826100471, Location of Turbine Building at Rancho Seco site
 
I    in, Q"      I          2>1,R"                            1019W ln'q,,      I          21' A"                    I'      10'  rn CD 0
co 00 22" 0.4 b
N (N
North Column Looking North 932 ft2 - 86.6 m' 2
01 Developed Reflected (N~
View
,T-            North Column                      North Column                  Develope id                  277 ft2 - 25.7 m2 00                                              Looking South                  Reflected V'iew Looking North oo 0o                                                                                            Map F8261004-2, Turbine Building (+) 0' El. to (+) 40' El.
O1 F8261003, Class 1 High Pressure Turbine Pedestals - North Column Area Estimate: 2,266 sq ft. - 210.5 sq. meters 0] F8261004, Class 1                0.0  1.0    2.0  3.0    4-0                F8261003 Area Estimate: 112.3 sq. meters Distance n Metms                        F8261004 Area Estimate: 40.0 sq. meters 9 F8261005, Class 2 F8261005 Area Estimate: 98.2 sq. meters
 
Cb 0
00 Developed Refelected View 0l F8261003, Class 1 0 F8261004, Class 1
[a F8261005, Class 2 I    I                          1Ii Developed Reflected View 115 ft2 - 10.7 m2 00 0.0  1,0    2.0  3.0  4.0 Map F8261004-3, Turbine Building (+) 0' El. to (+) 40' El.
Distance in MWtors      High Pressure Turbine Pedestals - South Column Area Estimate: 1,151 sq ft. - 106.9 sq. meters F8261003 Area Estimate: 67 sq. meters F8261004 Area Estimate: 40 sq. meters
 
L              ~30' 9"J 46-1-1'            "-1r'7 0        I-6 z
00 17'4" Nb                                                                              Developed Reflected View It1 00 134.3 ft' - 12.5 m2 West Column          West Column                Developed Looking West          Looking East            Reflected View Map F8261004-4, Turbine Building (+) 0' El. to (+) 40' El.
High Pressure Turbine Pedestals - West Column 1] F8261003, Class 1 Area Estimate: 1,428.3 sq ft. - 132.7 sq. meters
[] F8261004, Class 1                                              F8261003 Area Estimate: 40.0 sq. meters 0.0  1.0    20    3.0  4.0 Distance in Melers                F8261004 Area Estimate: 26.0 sq. meters t] F8261005, Class 2                                              F8261005 Area Estimate: 66.7 sq. meters
 
p              30'9" C0 0 U 00                                                                          z 0
C'4 I- 6' 1,.        14'2"          .13'6"- 1-4, ri6 174/          I!
Developed Reflected View I'll
                                                            ~lw                                    134.3 ft2 - 12.5 m' 00 East Column                  East Column          Developed oo      Looking East                Looking West        Reflected View          Map F8261004-5, Turbine Building (+) 0' El. to (+) 40' El.
0o 4:2                                                                              High Pressure Turbine Pedestals - East Column fl F8261003, Class 1 Area Estimate: 1,428.3 sq ft. - 132.7 sq. meters 0 F8261004, Class 1                                                          F8261003 Area Estimate: 40.0 sq. meters 0.0 1.0    2.0    3.0 Distance in Meters 40                      F8261004 Area Estimate: 26.0 sq. meters M F8261005, Class 2                                                          F8261005 Area Estimate: 66.7 sq. meters
 
CfQ A
--I                            N 0                              I 00                                            03 05 01 21'8" (0 09 (N 0 4',
V~1      K          LI                                                                                    IA Q COO 7      '            8,6 HP Turbine Pedestal fRi W                                                                                      E HP Turbine Pedestal Plan View - 40' El.
i1k                03 19' 2"
                                                                                  -I I
05 2R,'A" Ii
                                                                                                                                      -I 02 1110"                                            S1, 10"
'71 00                                                  26'4"                                  ,      21'8" 114-                              48' O1F8261003, Class  1 0
O1F8261004, Class  1                                                              Map F8261004-6, Turbine Building (+) O' El.
IMF8261005, Class 2                                                                High Pressure Turbine Pedestals - Floor Surface Area 0.0    1.0      2.0    3.0      4.0 Distance in Meters with Trench Vertical Surfaces Area Estimate: 1,402 sq ft. - 130.2 sq. meters
 
      -]-- ...]                                                                                                                                                                                                                                                                I-r- -- ---
F- -11]    --, --rrI...
i-*1-      -I-                                                                                                                                                                                                                                          I    I--
I L-
                                -A 4------+--
                --                        '-'ii                                      iT1 F-I                              ~                I
                                                                                                                                                                                                                              *T
                                                                                                                                                                                                                                                -I-            *-~
I*~    ~4't 00                                                                              j -.-
0                                  F                                                                                      2                                                                                                                    -I          *~~-
00                                                                                                                                                                                                                                -"---I.-
                                          *1 I                                                                                                                                                                                                                          -4 F-li                                                                                                                          7
                                                                                                                                              -4I
                                                                                                                                                                              ~1                                                              - -
I-                          II                                                                                                                                                                F-r 04                                      ~-1 4
1 tl  1  *    [
Ti1771 1
1717ITYi
                                                                                                                                                                                                                                                    ! I      I i      i    it            i ,                      -" ,      ,        ii
* F - - !-i--
                                                                                                        -    t  t i    i. - - i- * - I - -*H ---  -                '
i i1t    t 11+_                                  -LI estGColumi 4 -i
(
                                                                                                                                              -ill--I--I-              -- 3 3 an*o*-*
mnfrqmn Nort6        eedgqe I n -
rt-.,o~ati                        ---
E ast Colymr nuaIh flenImFr
                                                                                                                                                                                                .                1 I.ooking      SLo th                  net )rs from West!ed,            le    -
11 zIzt~11z}~zi3i]EiEf I                                                  T  ~.ii ii7fi    1--I.7                    r*-                  [VIZ, [II
                                                                                                                                                                  -t
                                                                                                                                                                                                  ]                                                                        ii
                                          -=4      _"__
7-7-
I---.        ::*---L=E I  _______                                                                                                            LE                    I ivv11-vi-vr .7'                                              -      -      -                            I        IL L
L-,-J iIH'~'~' LA r~~H H.
                                                                                                                                                                                            ;-~-J1F      I.                                                      ,2b.]L_,--VJ rrr                                                                                                                          1-
        ~~1~~                                  I-i-I        F,                        IT
                                                                                                                  --1-- I- -. 4 .        P-2an-V;6w-Ptl-                                  Ii-                                          *-T-en h-Xerti( *a1- uurace III        _______                                                                                                    -]              I
        ~1~                                                          .. }F      I
                                                                                                              -,*i--T-I---.-
                                                                                                                                                        .{
7 7-i-ii--7 North Column                                                                                                            1'        I                    i-i-<
00 I.-----
                                                    -1  :ooki56-Nrt                          --I--                                    -      i-f    -      -  -f -] -
                                                                                                                                                                                                                          -        -i--- V -
C)                                                          -F            F 117                                                                                                F    F
                        -1~- I ~    --- I                                                I F
                                                                                                                                                    -i--1                                                                                                                                                          II, S i ! i                  ,I    i-i          , ; t            F 0                                  5                            10                        15                            20                              25                    30                      35                        40                          45                50 0      1      2    3  4 Map F82601004-7, High Pressure Turbine Pedestals Distance in Meters                                                                                                                                                    Random Start Location
 
E      -t L-  )  fl ool  0  ,
              /
00 0.5 m        a    frm 11 8.0 m                      13 Dis    ce from
                  ..            E E E  E                                          E          E West edge --    to                    0  U) 0                    0                    0U) of survey unit      0 00                                                            Map F8261004-8, Turbine Building (+) O' El.
High Pressure Turbine Pedestals - Floor Surface Area C                N                                            Beta Direct Measurements F8261004C000 1 BD, F8261004X0002BD to F8261004XO005BD F8261004CO006BD to F8261004CO009BD, F8261004XO010BD, F8261004C0011BD to F8261004CO016BD, 0  0.5    1.0    1.5 2.0 Distance in Meters            F8261004X0017BD to F8261004X0019BD (2.5 meter grid spacing)
 
0(
0 O0 v                      -m0.58      m    0.08 m                                    from edge 0.50 m                          from edge from edge from edge Map F8261004-9, Turbine Building (+) 0' El. to (+) 40' El.
High Pressure Turbine Pedestals - East and South Columns Beta Direct Measurements Iz1                                                F8261004X0025BD, 00 F8261004C0026BD to F8261004C0027BD, F8261004X0032BD, F8261004C0033BD to F8261004C0035BD, F8261004X0036BD, F8261004C0037BD, F8261004X0038BD, F8261004C0042BD to F8261004C0043BD 0  0.5 1.0 1.5 2.0 Distance in Meters                      2.5 meter grid spacing
 
05 00 7
Looking North                                V 0.72 m 0.58 m                      0.50 m    1.04 m from edge                  from edge                                                                        from edge from edge Map F8261004-10, Turbine Building (+) 0' El. to (+)40' El.
High Pressure Turbine Pedestals - West and North Columns Beta Direct Measurements 00 F8261004C0020BD to F8261004C0021 BD, F8261004X0022BD F8261004C0023BD to F8261004C0024BD, F8261004C0028BD to F8261004C0029BD,
* F8261004X0030BD to F8261004X0031BD, and F8261004X0039BD to F8261004X0041 BD 0  0.5 1.0 1.5 2.0 Distance in Meters 2.5 meter grid spacing
 
I
: 0)                                      ~          4 00 East Column                                                              South Column Looking East                                                              Looking South 1m                                              -T CI)  r-. C 1im  1im  z  r:
WO 1-C:
CI)                                              COW )
C9 (P      a4 (P
0                                    C    C)    0  0          C0  0  0 side                                            I
                                                                      $tart Grid wraps to left side of West Column (Map F8261004-12)
C-Il 00 Map F8261004-11; Turbine Building (+) 0' El. to (+) 40' El.
_  - Concrete painted with 1 layer of paint                                        High Pressure Turbine Pedestals - East and South Columns Beta Scan Measurements I
F8261004C0001BS to F8261004C0036BS, F8261004C0043BS to F8261004C0072BS, and Ditace inMetr                                                                    F8261004C0103BS to F8261004C01 14BS
 
0t 00 U)  U) 11          C)
T.
U)I  U)  U)
C.0 co    co Cl>  CT) tn  Ln U)  U)
In    Co  M 04  00 LO  LO V) (n U) 39BS    CO to CO  &#xfd;; CO t'.
U&#xfd; S :M 7B                            West Column                                                    North Column
                      -M, LO 7              Looking West                                                    Looking North E    \E                                  ilm                                                                            lm 1m    Im C-                                                                            co 0
Grids wrap to right s!de                        Grids wrap to left side                          Grid wraps from left sid of South Column                              of West Column                                    of East Column (Map F8261004-11)                                                                              (Map F8261004-11)
ItJ 00 Map F8261004-12, Turbine Building (+) 0' El. to (+) 40' El.
High Pressure Turbine Pedestals - West and North Columns Beta Scan Measurements I M - Concrete painted with 1 layer of paint                                F8261004C0037BS to F8261004CO06OBS, F8261004C0073BS to F8261004C0102BS, and 0  0.5 1-0 1.5 2.0                                                          F8261004C0109BS to F8261004C0132BS Distance in Meters
 
U')
00 (0
244BS        243BS    242BS    241 BS 240BS  239BS 212BS        211BS  210BS      209BS  208BS  207BS 185BS        186BS    187BS    188BS  189BS 190BS 191B5 192BS 193BS  194BS  195BS 182BS        181BS    18085    179BS  17885  17785 17685 175BS 174BS  17385  17285 J
158BS  159BS  160BS
                                                    ~In
                                                        /
                                                    /
                                    /
Map F8261004-13, Turbine Building (+) 0' El.
'71                                                                                      High Pressure Turbine Pedestals - Floor Surface Area 00 C)
I M - Concrete painted with 1 layer of paint                                          Beta Scan Measurements C)                                                                                        F8261004C0133BS to F8261004C0213BS, N                                                                                    F8261004C0221BS to F8261004C0228BS, F8261004C0230BS to F8261004C0237BS, F8261004C0239BS to F8261004C0245BS, 0  0.5      1.0    1.5  2.0 Distance in Meters                                                      F8261004C0255BS to F8261004C0256BS, and F8261004C0259BS to F8261004C0285BS
 
(D 0
00 00 C)                                              Map F8261004-14, Turbine Building (+) 0' El.
ik                                              High Pressure Turbine Pedestals - Trench Walls I M - Concrete painted with 1 layer of paint Beta Scan Measurements F8261004C0214BS to F8261004C0237BS, 0    0.5      1.0    1.5 2.0          F8261004C0246BS to F8261004C0254BS, and Distance in Meters F8261004C0257BS to F8261004C0258BS
 
(0 00 00 N                          Map F8261004-15, Turbine Building (+) 0' El.
High Pressure Turbine Pedestals - Floor Surface Area 0 0.5    1.0    1.5 2.0 Juncture Scan Measurements Distance in Meters F8261004C0001JS to F8261003C0018JS
 
                            +,,+  ***i!o
                                    ++*  * .-        . *  ,  I  *
* CDb
                                                  * .                                      ,  ** *+*_*+  +,>4,    *.+
                              ~~*-;I          frq*
0 East Column                                          South Column Looking East                        -Looking                  South 00 Map F8261004-16, Turbine Building (+ ' El. to (+40 El.
High Pressure Turbine Pedestals - East and South Columns Juncture Scan Measurements 0 0.5 1.0 1.5 2.0 Ditac inMetem                                            F8261004CO019JS to F8261004C0020JS.
 
Map F8261004-17, Turbine Building (+) 0' El.
High Pressure Turbine Pedestals Beta Scan: Measurements of Railings F8261004M0286BS to F8261004M0289BS Page 18 of 18 Att. 1 Maps                                  F8261004
 
Attachment 2 Instrumentation October 7, 2008 Survey Unit F8261004
 
Table 2-1. Survey Unit Instrumentation Instrument                    Detector                MDC Static            MDC Scan Model; Serial No.          Model; Serial No.          (dpm/l00 cm )  2 (dpmll00 cm 2 )
M2350; 193700              43-68B; 190294'                  433                1,033 M2350; 193700              43-68B; 1902942                  909                2,169 M2350; 193700              43-68B; 1902943                  257                  612 M2350; 203486              43-68B; 161400'                  433                1,033 M2350; 203486              43-68B; 1614002                  909                2,169 M2350; 193715              43-68B; 160703'                  433                1,033 M2350; 193715              43-68B; 1607032                  909                2,169 M2350; 189089              43-68B; 148460'                  433                1,033 M2350; 189089              43-68B; 1484602                  909                2,169 M2350; 175834            43-116-1B; 1906423                472                1,930 M2350; 175834            43-116-1B; 1906424                491                  739 Tennelec; 0401171                  N/A                  5.88 dpm a,              N/A 11.71 dpmf3 2'Concrete surfaces Concrete surfaces with I layer of paint 3Metal surfaces 4
Concrete junctures Table 2-2. Investigation Criteria and DCGL Value Param eter                      (dpm/100 V l eCcm 2 )2 Investigation Criteria - Direct                  163,400 Investigation Criteria - Scan                    163,400 DCGLw                                            43,000 DCGLEMC                                          163,400 Page 2 of 2                          Att. 2. Instrumentation                        F8261004
 
Attachment 3 Investigation October 7, 2008 Survey Unit F8261004
 
Table 3-1 Survey Unit Investigation Investigation Initial Value  Investigation Elevated        Area    DCGLemc    Investigation DCLemc Result        Area ()                              Result      Unity Level (cpm)
Gd                (cpm)          (cpm)                                        (dpm/lOOcm2)  Fraction 4        22,200        15,982        12,986          0.026    499.6    21,483,230      67,362      0.003 5      22,200        25,610        34,328          0.062    211.3    9,085,040    178,068      0.020 11      22,200        8,795          6,415          0.068      192.8    8,290,830      33,276      0.000 17      22,200        2,441          8,583          0.077      170.5  7,330,640      44,522      0.006 112      22,200        3,075          2,562          0.052    251.5    10,813,640      13,290      0.000 118      22,200        3,355          3,107          0.052    251.5    10,813,640      16,117      0.000 252      22,200        5,352          6,580          0.065    201.6    8,669,660      34,132      0.000 268      10,500        4,372          4,273          0.124      106.7  4,586,810      47,101      0.010 269      10,500        4,864          4,013          0.333. 45.4    1,950,050      44,235      0.023 DCGL  =    SU Mean =
Survey Unit Remainder                                    43,000        2,841      0.066 EMC Unity Sum    0.128 Page 2 of 2                                      Att. 3 Investigation F8261004


F8261004-Co015BD F8261004-CO016BD F8261004-XO017BD F8261004-XO018BD F8261004-XO019BD F8261004-CO02OBD F8261004-C0021 BD F8261004-XO022BD F8261004-CO023BD F8261004-CO024BD F8261004-XO025BD F8261004-CO026BD F8261004-CO027BD F8261004-CO028BD F8261004-CO029BD F8261004-XO030BD F8261004-X0031BD F8261004-XO032BD F8261004-CO033BD F8261004-CO034BD F8261004-CO035BD F8261004-XO036BD F8261004-CO037BD F8261004-XO038BD F8261004-XO039BD F8261004-XO040BD F8261004-X0041 BD F8261004-Co042BD F8261004-CO043BD Mean: Median: Standard Deviation:
Attachment 4 Data Assessment October 7, 2008 Survey Unit F8261004
Ranqe: 1,758 4,023 5,015 2,877 3,737 2,028 1,976 1,857 2,148 3,153 1,841 1,727 2,028 2,179 1,738 1,961 5,589 3,428 4,641 1,862 1,899 3,494 1,847 1,681 3,351 1,670 1,686 6,375 1,779 2,028 2,260 5,104 6,126 1,707 2,033 3,395 2,044 3,351 3,461 4,090 3,792 1,774 1,644 2,841 2,044 1,329 1,644 -6,375 Page 5 of 9 FSS Summary Report F8261004 Table 3. Removable Surface Activity Results Measurement ID Surface Beta Activity (dpm/100 cm 2)F8261004C0001 SM F8261004X0002SM F8261004X0003SM F8261004X0004SM F8261004X0005SM F8261004CO006SM F8261004C0007SM F8261004CO008SM F8261004C0009SM F8261004X0010SM F8261004C001 1 SM F8261004C0012SM F8261004C0013SM F8261004C0014SM F8261004C0015SM F8261004C0016SM F8261004X0017SM F8261004X0018SM


F8261004X0019SM F8261004C0020SM F8261004C0021SM F8261004X0022SM F8261004C0023SM F8261004C0024SM F8261004X0025SM F8261004C0026SM F8261004C0027SM F8261004C0028SM F8261004C0029SM F8261004X0030SM
F8261004 Gross Activity Sample Results Quantile Plot DCGL = 43000 dpmll 00cm2 7,000 6,000 5,000 4,000 00  II 3,000 2,000                                                                            2044 1,000 Cl)
, P&#xfd; 0  I0          2 0            20          40          60              80          100 Percentile
* Direct Measurements (dpm/l100cm2) -median  - - - 75th Percentile .... 50th Percentilej


F8261004X0031SM F8261004X0032SM F8261004C0033SM F8261004C0034SM F8261004C0035SM F8261004X0036SM F8261004C0037SM F8261004X0038SM F8261004X0039SM F8261004XO040SM F8261004X0041SM F8261004C0042SM
CD 0
F8261004 Gross Activity Sample Results Scatter Plot DCGL = 43000 dpml00cm=            1 8000 7000                                                            0                              -828 IN 6000 E                                            0 5000      0 0
0 E 4000      0 0
00 0
0 0                        00 0  0        0
    *0 3000                                                                                              2841 0      0  0  0)      0000      O0      00      00  0&deg;0        0 0    00(:
o bed 2000 CD 1000 i
0
        -1000                                                                                            -1146
        -2000  r                                                r a00 0,      0Co      000,0-0                      aW.wOwOrnWMOmfflOwOwOwmwOwwOw0w Measurement Locations It 00 C)
I  o  Gross Activhty -  Average -    - "+3SIDev"  - -  "-3StDev P0 C)


F8261004C0043SM Mean: Median: Standard Deviation:
0         F8261004 Gross Activity Frequency Plot 2
Ranqe:-0.95 4.22-0.95 0.34-3.53-3.53 0.34-0.95-4.82-0.95 5.51-4.82-3.53-3.53 0.34 0.34 0.34-2.24-3.53 2.93-2.24-4.82-3.53
DCGL = 43000 dpm/l 00cm 24 23 22 21 20 19 18     17 16 15 14 LL 13 C 12 4-J 00  0  11 10 9
-3.53-0.95
8 7
-0.95 2.93 30.05-2.24-3.53-2.24 5.51 23.59-3.53
6 5
-3.53-3.53-2.24-4.82-4.82-4.82-0.95-2.24 0.34-0..26-2.24 6.67-4.82 to 30.05 Page 6 of 9 FSS Summary Report F8261004 Survey Unit Data Assessment:
4 3
The survey design required 43 direct measurements for the Sign Test. The critical value and the results of the Sign Test are presented in Table 4. The sample mean and median values were less than the DCGL. The sample standard deviation, was less than the designstandard deviation so no additional samples were required.ra Page 7 of 9 FSS Summary Report F8261004 Table 4. Data Assessment Results Survey Results Parameter Value CommentMaterial Background Used (dpm/100 cm 2): N/A'Ambient Background Used (dpm/100 cm 2): N/A Average Ambient BKG = 0 Actual Direct Measurements (N): 43 Median (dpm/100 cm 2): 2,044 Mean (dpm/IO0 cm 2): 2,841 Direct Measurement Standard Deviation 1,329 (dpm/100 cm 2): Total Standard Deviation (dpm/100 cm 2): 1,329 Based on samples and backgrounds.
2 1
Maximum (dpm/100 cm 2): 6,375 Material Type: N/A Background Subtract Not Applied Sign Test Final N Value: 43 S+ Value: 43 Critical Value: 27 Sufficient Samples Collected:
CD' 0
Yes Maximum Value < DCGL: 'Yes Median Value < DCGL: Yes Mean Value < DCGL: Yes Maximum Value < DCGLemc: Yes Class 1 Total Standard Deviation
0,               N-                   LO)
<= Sigma: Yes Pass the Sign Test? YesReject the Null Hypothesis?
N-N-   c~J   N-(N                C?)
Yes Does the Survey Unit Pass All Criteria?
Bins - Upper End Value (dpm/1 00cm2)}}
Yes Page 8 of 9 FSS Summary Report F8261004 Survey Unit Investigations and Results: Nine investigations (scan grids 4, 5, 11, 17, 112, 118, 252, 268 and 269) were requiredfor the scan measurements and the results are reported in Attachment
: 3. The EMC unity rule was not exceeded as shown in Table 3-1.ALARA Statement:
As stated in Chapter 4 of the LTP, as long as the residual activity within the survey unit is less than the DCGL (i.e. the survey unit average activity is less than the DCGL and the EMC criterion has been met), the ALARA criterion has been met.Changes in Initial Survey Unit Assumptions:The survey unit was designed as a Class 1 structure survey and the sample results are consistent with that classification.
The variability of the survey results was less than the characterization data used for survey design. Nine potential areas of elevated activity were detected and evaluated as shown in Attachment
: 3. Therefore the EMC criterion was met.Conclusion:
The FSS of this survey unit was properly designed as a Class 1 survey based on Table 5-4 of the LTP. The required number of direct measurements was made and the scan coverage met the requirement of Table 5-6 of the LTP. No direct measurements exceeded the DCGL of 43,000 dpm/100 cm 2 and none of the removable surface activity measurements exceeded 10% of the DCGL. Nine investigations were required.The direct measurement data support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and that the data quality objectives were met.It is concluded that survey unit F8261004 meets the release criteria of 1OCFR20.1402.
Page 9 of 9 FSS Summary Report F8261004 Attachment 1 Maps October 7, 2008 Survey Unit F8261004 0, -- -0 ....L),/ L -Li LJjj -:rjz"Ii<-- --'"-L u ,-o--.- .... .L'D az a-F"-Z o Location of Turbine Building inside the Industrial Area 00 S Map F826100471, Location of Turbine Building at Rancho Seco site CD 0 00 I in, Q" I 2>1,R" 1019W ln'q,, I 21' A" 10' rn I' -co 0.4 22" b N (N North Column Looking North 932 ft2 -86.6 m'2 01 (N~North Column Looking North ,T-00 oo 0o North Column Develope Looking South Reflected V Developed Reflected View id 277 ft 2 -25.7 m 2'iew Map F8261004-2, Turbine Building (+) 0' El. to (+) 40' El.High Pressure Turbine Pedestals
-North Column Area Estimate:
2,266 sq ft. -210.5 sq. meters F8261003 Area Estimate:
112.3 sq. meters F8261004 Area Estimate:
40.0 sq. meters F8261005 Area Estimate:
98.2 sq. meters O1 F8261003, Class 1 0] F8261004, Class 1 9 F8261005, Class 2 0.0 1.0 2.0 3.0 4-0 Distance n Metms Cb 0 00 00 Developed Refelected View 0l F8261003, Class 1 0 F8261004, Class 1[a F8261005, Class 2 I I 1Ii 0.0 1,0 2.0 3.0 4.0 Distance in MWtors Developed Reflected View 115 ft 2 -10.7 m 2 Map F8261004-3, Turbine Building (+) 0' El. to (+) 40' El.High Pressure Turbine Pedestals
-South Column Area Estimate:
1,151 sq ft. -106.9 sq. meters F8261003 Area Estimate:
67 sq. meters F8261004 Area Estimate:
40 sq. meters L ~30' 9"J 46-1-1' "-1r'7 0 00 I-6 z Nb West Column West Column Developed Looking West Looking East Reflected View 17'4" It1 00 1] F8261003, Class 1[] F8261004, Class 1 t] F8261005, Class 2 Developed Reflected View 134.3 ft' -12.5 m 2 Map F8261004-4, Turbine Building (+) 0' El. to (+) 40' El.High Pressure Turbine Pedestals
-West Column Area Estimate:
1,428.3 sq ft. -132.7 sq. meters F8261003 Area Estimate:
40.0 sq. meters F8261004 Area Estimate: 26.0 sq. meters F8261005 Area Estimate:
66.7 sq. meters 0.0 1.0 20 3.0 4.0 Distance in Melers p 30'9" C0 000 U z 0 C'4 I- 6' 1,. 14'2" .1 3'6"- 1-4, ri 6~lw 174/ I!Developed Reflected View 134.3 ft 2-12.5 m'I'll 00 oo 0o 4:2 East Column Looking East fl F8261003, Class 1 0 F8261004, Class 1 M F8261005, Class 2 East Column Looking West 0.0 1.0 2.0 3.0 Distance in Meters Developed Reflected View Map F8261004-5, Turbine Building (+) 0' El. to (+) 40' El.High Pressure Turbine Pedestals
-East Column Area Estimate:
1,428.3 sq ft. -132.7 sq. meters F8261003 Area Estimate:
40.0 sq. meters 40 F8261004 Area Estimate:
26.0 sq. meters F8261005 Area Estimate:
66.7 sq. meters CfQ--I 0 00 A N I 03 (0 (N 09 0 01 21'8" 05 4', IA Q COO LI V~1 K HP Turbine Pedestal fRi 7 ' 8,6 W E HP Turbine Pedestal Plan View -40' El.i 1k 03 19' 2" 05 Ii-I I 2R,' A" 02 11 10"-I S1, 10"'71 00 0 26'4" , 21'8" 114- 48'O1 F8261003, Class 1 O1 F8261004, Class 1 IM F8261005, Class 2 0.0 1.0 2.0 3.0 4.0 Distance in Meters Map F8261004-6, Turbine Building (+) O' El.High Pressure Turbine Pedestals
-Floor Surface Area with Trench Vertical Surfaces Area Estimate:
1,402 sq ft. -130.2 sq. meters
-]- -...]-i- -*1- --I- -r- -- ---00 0 00---7-'-'ii -A iT1F -11] -r -, rI...--- L-j -.-4------+--
F I I-*1~-1 II 2-F-li-4I~1 I "-4 I-I I--~ I I*~ ~4't-"---I.-F-I-I- *-~-I *~~-F-r---4 7 04tl 1 [ 1 ! I I 1 Ti 1717 1771 ITYii i1i i it i ,-" , , i i !-i-- F ---t t --1 ---I ---- -i i. i- ' H t t-LI 11+_estGColumi4 -i (-ill--I--I-nu aIh flenIm Fr
--3 rt-.,o~ati n e -3 mn frqmn N ort6 edgqe I E---ast Colymr zIzt~11z}~zi3i]EiEf I T ii7f 7~.ii i 1--I..I.ooking SLo th net 11)rs from West! ed,le -1[VIZ, [II r*--t]-=4_" _ _7-I---.ii 7- I _______ivv11-vi-vr
.7' ---iIH'~'~' LA r~~H rrr~~1~~ I-i-I F, IT III _______~1~ ..}F I I IL 1- --I- 7- -..7 7-LE I L-,-J L P-2an-V;6w-Ptl-
-] I;-~-J1F I.1-Ii- h-Xerti(H.,2b.]L_,--VJ aceuur 00 C)--I.------1 North Column:ooki56- Nrt--I---i-f -.{ --f -] -117-F 1 ' I i-i-< --i ---V -S i ! i ,I i-i , ; t FF F F-, i-ii-- 7-1~- I --- I ~ I-i--1-2-F II, 0 5 0 1 2 3 4 Distance in Meters 10 15 20 25 30 35 40 45 50 Map F82601004-7, High Pressure Turbine Pedestals Random Start Location E -t oo L- ) fl/l 0 , 00 0.5 m a frm 11 8.0 m 13 Dis ..ce from E West edge -- to of survey unit 0 00 C N 0 0.5 1.0 1.5 2.0 Distance in Meters E E E E E 0 U) 0 0 0U)Map F8261004-8, Turbine Building (+) O' El.High Pressure Turbine Pedestals
-Floor Surface Area Beta Direct Measurements F8261004C000 1 BD, F8261004X0002BD to F8261004XO005BD F8261004CO006BD to F8261004CO009BD, F8261004XO010BD, F8261004C0011BD to F8261004CO016BD, F8261004X0017BD to F8261004X0019BD (2.5 meter grid spacing) 0(0 O0 v -m0.58 m 0.08 m from edge 0.50 m from edge from edge from edge Iz1 00 Map F8261004-9, Turbine Building (+) 0' El. to (+) 40' El.High Pressure Turbine Pedestals
-East and South Columns Beta Direct Measurements F8261004X0025BD, F8261004C0026BD to F8261004C0027BD, F8261004X0032BD, F8261004C0033BD to F8261004C0035BD, F8261004X0036BD, F8261004C0037BD, F8261004X0038BD, F8261004C0042BD to F8261004C0043BD 2.5 meter grid spacing 0 0.5 1.0 1.5 2.0 Distance in Meters 05 00 00 1.04 m from edge 7 0.58 m from edge 0 0.5 1.0 1.5 2.0 Distance in Meters 0.50 m from edge Looking North V 0.72 m from edge Map F8261004-10, Turbine Building (+) 0' El. to (+)40' El.High Pressure Turbine Pedestals
-West and North Columns Beta Direct Measurements F8261004C0020BD to F8261004C0021 BD, F8261004X0022BD F8261004C0023BD to F8261004C0024BD, F8261004C0028BD to F8261004C0029BD,* F8261004X0030BD to F8261004X0031BD, and F8261004X0039BD to F8261004X0041 BD 2.5 meter grid spacing 0)00~ 4 I East Column Looking East South Column Looking South 1m C9 0-T CI) r-. C C C) 0 0 1im 1im z r: C:WO 1- CI)C0 0 0 COW )(P a4 (P I side$tart Grid wraps to left side of West Column (Map F8261004-12)
C-Il 00_ -Concrete painted with 1 layer of paint Map F8261004-11; Turbine Building (+) 0' El. to (+) 40' El.High Pressure Turbine Pedestals
-East and South Columns Beta Scan Measurements F8261004C0001BS to F8261004C0036BS, F8261004C0043BS to F8261004C0072BS, and F8261004C0103BS to F8261004C01 14BS I Ditace inMetr 0t 00U) U)11 C)T.U) I U) U)
C.0 co coCl> CT)tn LnU) U)In Co M 04 00LO LO V) (n U)39BS CO CO CO to &#xfd;; t'.U&#xfd;S :M 7 B-M, LO 7 E \E West Column Looking West North Column Looking North ilm C-0 lm 1m Im co Grids wrap to right s!de of South Column (Map F8261004-11)
Grids wrap to left side of West Column Grid wraps from left sid of East Column (Map F8261004-11)
ItJ 00I M -Concrete painted with 1 layer of paint Map F8261004-12, Turbine Building (+) 0' El. to (+) 40' El.High Pressure Turbine Pedestals
-West and North Columns Beta Scan Measurements F8261004C0037BS to F8261004CO06OBS, F8261004C0073BS to F8261004C0102BS, and F8261004C0109BS to F8261004C0132BS 0 0.5 1-0 1.5 2.0 Distance in Meters 00 U')(0244BS243BS 242BS 241 BS 240BS 239BS 212BS 211BS 210BS 209BS208BS207BS 185BS 186BS 187BS 188BS 189BS 190BS 191B5 192BS 193BS 194BS 195BS 182BS 181BS 18085 179BS 17885 17785 17685 175BS 174BS 17385 17285 J~In///158BS 159BS 160BS'71 00 C)C)I M -Concrete painted with 1 layer of paint N Map F8261004-13, Turbine Building (+) 0' El.High Pressure Turbine Pedestals
-Floor Surface Area Beta Scan Measurements F8261004C0133BS to F8261004C0213BS, F8261004C0221BS to F8261004C0228BS, F8261004C0230BS to F8261004C0237BS, F8261004C0239BS to F8261004C0245BS, F8261004C0255BS to F8261004C0256BS, and F8261004C0259BS to F8261004C0285BS 0 0.5 1.0 1.5 2.0 Distance in Meters (D 0 00 00 C)ik I M -Concrete painted with 1 layer of paint Map F8261004-14, Turbine Building (+) 0' El.High Pressure Turbine Pedestals
-Trench Walls Beta Scan Measurements F8261004C0214BS to F8261004C0237BS, F8261004C0246BS to F8261004C0254BS, and F8261004C0257BS to F8261004C0258BS 0 0.5 1.0 1.5 2.0 Distance in Meters (0 00 00 N 0 0.5 1.0 1.5 2.0 Distance in Meters Map F8261004-15, Turbine Building (+) 0' El.High Pressure Turbine Pedestals
-Floor Surface Area Juncture Scan Measurements F8261004C0001JS to F8261003C0018JS
+,,+ .-., I * .+,>4, , ** *+*_*+ CDb~~*-;I frq*0 East Column South Column Looking East -Looking South 00 Map F8261004-16, Turbine Building (+ ' El. to (+40 El.High Pressure Turbine Pedestals
-East and South Columns Juncture Scan Measurements 0 0.5 1.0 1.5 2.0 Ditac in Metem F8261004CO019JS to F8261004C0020JS.
Map F8261004-17, Turbine Building (+) 0' El.High Pressure Turbine Pedestals Beta Scan: Measurements of Railings F8261004M0286BS to F8261004M0289BS Page 18 of 18 Att. 1 Maps F8261004 Attachment 2 Instrumentation October 7, 2008 Survey Unit F8261004 Table 2-1. Survey Unit Instrumentation Instrument Detector MDC Static MDC Scan Model; Serial No. Model; Serial No. (dpm/l00 cm 2) (dpmll00 cm 2)M2350; 193700 43-68B; 190294' 433 1,033 M2350; 193700 43-68B; 1902942 909 2,169 M2350; 193700 43-68B; 1902943 257 612 M2350; 203486 43-68B; 161400' 433 1,033 M2350; 203486 43-68B; 1614002 909 2,169 M2350; 193715 43-68B; 160703' 433 1,033 M2350; 193715 43-68B; 1607032 909 2,169 M2350; 189089 43-68B; 148460' 433 1,033 M2350; 189089 43-68B; 1484602 909 2,169 M2350; 175834 43-116-1B; 1906423 472 1,930 M2350; 175834 43-116-1B; 1906424 491 739 Tennelec; 0401171 N/A 5.88 dpm a, N/A 11.71 dpmf3'Concrete surfaces 2 Concrete surfaces with I layer of paint 3 Metal surfaces 4 Concrete junctures Table 2-2. Investigation Criteria and DCGL Value Param eter V l eC 2 (dpm/100 cm 2)Investigation Criteria -Direct 163,400 Investigation Criteria -Scan 163,400 DCGLw 43,000 DCGLEMC 163,400 Page 2 of 2 Att. 2. Instrumentation F8261004 Attachment 3 Investigation October 7, 2008 Survey Unit F8261004 Table 3-1 Survey Unit Investigation Investigation Initial Value Investigation Elevated Area DCGLemc Investigation DCLemc Result Area () Result Unity Gd Level (cpm) (cpm) (cpm) (dpm/lOOcm
: 2) Fraction 4 22,200 15,982 12,986 0.026 499.6 21,483,230 67,362 0.003 5 22,200 25,610 34,328 0.062 211.3 9,085,040 178,068 0.020 11 22,200 8,795 6,415 0.068 192.8 8,290,830 33,276 0.000 17 22,200 2,441 8,583 0.077 170.5 7,330,640 44,522 0.006 112 22,200 3,075 2,562 0.052 251.5 10,813,640 13,290 0.000 118 22,200 3,355 3,107 0.052 251.5 10,813,640 16,117 0.000 252 22,200 5,352 6,580 0.065 201.6 8,669,660 34,132 0.000 268 10,500 4,372 4,273 0.124 106.7 4,586,810 47,101 0.010 269 10,500 4,864 4,013 0.333. 45.4 1,950,050 44,235 0.023 DCGL = SU Mean =Survey Unit Remainder 43,000 2,841 0.066 EMC Unity Sum 0.128 Page 2 of 2 Att. 3 Investigation F8261004 Attachment 4 Data Assessment October 7, 2008 Survey Unit F8261004 00 Cl), P&#xfd;F8261004 Gross Activity Sample Results Quantile Plot DCGL = 43000 dpmll 00cm 2 II 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 2044 I0 2 0 20 40 60 Percentile 80 100* Direct Measurements (dpm/l100cm2) -median ---75th Percentile
.... 50th Percentilej CD 0 CD It 00 C)C)P0 o F8261004 Gross Activity Sample Results Scatter Plot DCGL = 43000 dpml00cm=1 IN E E*0 bed i 8000 7000 6000 5000 4000 3000 2000 1000 0-1000-2000 0 0 0 0 0 0 00 0 0 0 0 0 0 0 000 0 0 0) 000 0 O0 00 00 0&deg;0 0 0 00(:-828 2841-1146 r r a00 0, 0Co 000,0-0 aW.wOwOrnWMOmfflOwOwOwmwOwwOw0w Measurement Locations I o Gross Activhty -Average --"+3SIDev" --"-3StDev "
0-4-00 CD'F8261004 Gross Activity Frequency Plot DCGL = 43000 dpm/l 00cm 2 LL C 0 4-J 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 0, (N N-N-C?)N-c~J N-LO)Bins -Upper End Value (dpm/1 00cm2)}}

Latest revision as of 15:37, 12 March 2020

Final Status Survey Report for October 7, 2008, Turbine Building High Pressure Pedestals, (+) 0' El. to (+) 20' El. Survey Unit F8261004
ML090850558
Person / Time
Site: Rancho Seco
Issue date: 10/07/2008
From: Donna Anderson
Sacramento Municipal Utility District (SMUD)
To:
NRC/FSME
Shared Package
ML090830613 List: ... further results
References
DPG 09-097
Download: ML090850558 (35)


Text

1J Rancho Seco Final Status Survey Summary Report October 7, 2008 Turbine Building High Pressure Pedestals, (+) 0' El. to (+) 20' El.

Survey Unit F8261004 Prepared By: .- o*,__-- Date:. I/07/ 20" FSS Engineer Reviewed By:. Date: (0 fi?

Lead FSS Engineer Approved By: Ž?Date: __-_7_

Dismantlement Superintendent, Radiological

FINAL STATUS SURVEY

SUMMARY

REPORT Survey Unit:

F8261004, Turbine Building High Pressure Pedestals, (+) 0' El. to (+) 20' El.

Survey Unit

Description:

Operating History: The reinforced concrete and steel structure contained the turbine-generator and supporting systems. The building contained five main elevations. Residual radioactive material was known to be present on all levels of the interior of the building.

Operating records and the HSA document several events with the potential for a release of radioactivity inside this structure.

Site Characterization: Direct measurements were made of each of the interior elevation surfaces as well as the exterior surfaces of the structure. These measurements confirmed the presence of plant-derived radionuclides. Direct measurements in the condenser pit elevation showed a mean gross activity level of 3,077 dpm/l100 cm 2 and a maximum value of 24,900 dpm/l 00 cm 2 . Direct measurements on the grade elevation showed a mean gross activity level of 2,035 dpm!100 cm 2 and a maximum value of 6,980 dpm/100 cm 2. Direct measurements on the mezzanine elevation showed a mean gross activity level of 1,566 dpm/100 cm 2 and a maximum value of 2,626 dpm/100 cm 2. Direct measurements on the +40' elevation showed a mean gross activity level of 2,843 dpm/100 cm 2 and a maximum value of 3,615 dpm/ 100 cm 2. Direct measurements on the building exterior showed a mean gross activity level of 1,984 dpm/100 cm 2 and a maximum value of 10,312 dpm/100 cm 2 . Based on the classification procedure (DSIP-0020) and levels of gross activity reported, the interior of the turbine building was determined to be Class 1, 2, & 3 areas and the exterior was a Class 3.

HSA Events: HSA Report pg. 63.

Survey Unit Design Information:

The Survey Unit Design Parameters are presented in Table 1 below. The survey unit and measurement locations are depicted on the maps in Attachment 1. Direct measurement locations were determined using a random-start, fixed grid pattern and 262.2 m2 were scanned for 100% coverage. Samples of removable contamination were collected at each direct measurement location. The instrumentation used for the survey along with the MDC values are listed in Tables 2-1 and 2-2 in Attachment 2.

Page 2 of 9 FSS Summary Report F8261004

Table 1. Survey Unit Design Parameters Survey Design Value Comment Parameter Survey Area: F826 Turbine Building High Pressure Pedestals, (+) 0' El. to (+) 20' El.

Survey Unit: 1004 Structure Surface Class: 1 LTP Table 5-4 SU Area (m2): 262.2 Evaluator: D. Anderson DCGL (dpm/100 cm 2): 43,000 Gross Activity DCGL Area Factor: 3.8 Class 1 Design DCGLemc 163,400 Class 1 (dpm/100 cm 2):

LBGR (dpm/100 cm 2): 25,030 Adjusted Design Sigma (dpm/100 cm 2 ): 5,990 Type I Error: 0.05 Type II Error: 0.05 Predominant Nuclide: Cs-137 Sample Area (m2): 6.9 Class 1 Scan Area (m2): 262.2 Scan Coverage (%): 100% Class 1 Zl-a :

1.645 1.645 Sign P: 0.99865 Calculated Relative Shift: 3 Relative Shift Used: 3 Uses 3.0 if Relative Shift is

>3 N-Yalue: 11 Design N-Value + 20%: 14 NUREG-1575 Table 5-5 Design Min Samples N: 38 Class 1 Grid Spacing L: 2.6 Class 1 Page 3 of 9 FSS Summary Report F8261004

Survey Results:

A total of 43 direct measurements were made in F8261004. The results including mean, median, standard deviation and range are shown in Table 2. All direct measurements were less than the DCGL. One scan measurement indicated an area of elevated activity

(> DCGLEMC). Due to scan measurements that were greater than the DCGL, a total of nine scan grids were investigated. Beta scan activity ranged from 3,045 to 187,872 dpm/100 cm 2 , based on a surveyor efficiency of 0.5 and no background subtracted.

Samples for removable surface activity were all less than 10% of the DCGL as shown in Table 3. Removable surface activity samples were counted for alpha activity and none was detected at the MDC shown in Table 2-1 of Attachment 2.

Page 4 of 9 FSS Summary Report F8261004

Table 2. Direct Measurement Results Measurement ID Gross Activity (dpm/100 cm) i F8261004-CO001 BD 1,758 F8261004-XO002BD 4,023 F8261004-XO003BD 5,015 F8261004-XO004BD 2,877 F8261004-XO005BD 3,737 F8261004-CO006BD 2,028 F8261004-CO007BD 1,976 F8261004-CO008BD 1,857 F8261004-C0009BD 2,148 F8261004-XOOIOBD 3,153 F8261004-C0011BD 1,841 F8261004-CO012BD 1,727 F8261004-CO013BD 2,028 F8261004-Co014BD 2,179 F8261004-Co015BD 1,738 F8261004-CO016BD 1,961 F8261004-XO017BD 5,589 F8261004-XO018BD 3,428 F8261004-XO019BD 4,641 F8261004-CO02OBD 1,862 F8261004-C0021 BD 1,899 F8261004-XO022BD 3,494 F8261004-CO023BD 1,847 F8261004-CO024BD 1,681 F8261004-XO025BD 3,351 F8261004-CO026BD 1,670 F8261004-CO027BD 1,686 F8261004-CO028BD 6,375 F8261004-CO029BD 1,779 F8261004-XO030BD 2,028 F8261004-X0031BD 2,260 F8261004-XO032BD 5,104 F8261004-CO033BD 6,126 F8261004-CO034BD 1,707 F8261004-CO035BD 2,033 F8261004-XO036BD 3,395 F8261004-CO037BD 2,044 F8261004-XO038BD 3,351 F8261004-XO039BD 3,461 F8261004-XO040BD 4,090 F8261004-X0041 BD 3,792 F8261004-Co042BD 1,774 F8261004-CO043BD 1,644 Mean: 2,841 Median: 2,044 Standard Deviation: 1,329 Ranqe: 1,644 - 6,375 Page 5 of 9 FSS Summary Report F8261004

Table 3. Removable Surface Activity Results Measurement ID Surface Beta Activity (dpm/100 cm 2)

F8261004C0001 SM -0.95 F8261004X0002SM 4.22 F8261004X0003SM -0.95 F8261004X0004SM 0.34 F8261004X0005SM -3.53 F8261004CO006SM -3.53 F8261004C0007SM 0.34 F8261004CO008SM -0.95 F8261004C0009SM -4.82 F8261004X0010SM -0.95 F8261004C001 1SM 5.51 F8261004C0012SM -4.82 F8261004C0013SM -3.53 F8261004C0014SM -3.53 F8261004C0015SM 0.34 F8261004C0016SM 0.34 F8261004X0017SM 0.34 F8261004X0018SM -2.24 F8261004X0019SM -3.53 F8261004C0020SM 2.93 F8261004C0021SM -2.24 F8261004X0022SM -4.82 F8261004C0023SM -3.53 F8261004C0024SM -3.53 F8261004X0025SM -0.95 F8261004C0026SM -0.95 F8261004C0027SM 2.93 F8261004C0028SM 30.05 F8261004C0029SM -2.24 F8261004X0030SM -3.53 F8261004X0031SM -2.24 F8261004X0032SM 5.51 F8261004C0033SM 23.59 F8261004C0034SM -3.53 F8261004C0035SM -3.53 F8261004X0036SM -3.53 F8261004C0037SM -2.24 F8261004X0038SM -4.82 F8261004X0039SM -4.82 F8261004XO040SM -4.82 F8261004X0041SM -0.95 F8261004C0042SM -2.24 F8261004C0043SM 0.34 Mean: -0..26 Median: -2.24 Standard Deviation: 6.67 Ranqe: -4.82 to 30.05 Page 6 of 9 FSS Summary Report F8261004

Survey Unit Data Assessment:

The survey design required 43 direct measurements for the Sign Test. The critical value and the results of the Sign Test are presented in Table 4. The sample mean and median values were less than the DCGL. The sample standard deviation, was less than the design standard deviation so no additional samples were required.

Page 7 ofra9 FSS Summary Report F8261004

Table 4. Data Assessment Results Survey Results Parameter Value Comment Material Background Used (dpm/100 cm2): N/A

'Ambient Background Used (dpm/100 cm 2): N/A Average Ambient BKG = 0 Actual Direct Measurements (N): 43 2

Median (dpm/100 cm ): 2,044 Mean (dpm/IO0 cm 2): 2,841 Direct Measurement Standard Deviation 1,329 (dpm/100 cm 2):

Total Standard Deviation (dpm/100 cm 2

): 1,329 Based on samples and backgrounds.

Maximum (dpm/100 cm 2): 6,375 Material Type: N/A Background Subtract Not Applied Sign Test Final N Value: 43 S+ Value: 43 Critical Value: 27 Sufficient Samples Collected: Yes Maximum Value < DCGL: 'Yes Median Value < DCGL: Yes Mean Value < DCGL: Yes Maximum Value < DCGLemc: Yes Class 1 Total Standard Deviation <= Sigma: Yes Pass the Sign Test? Yes Reject the Null Hypothesis? Yes Does the Survey Unit Pass All Criteria? Yes Page 8 of 9 FSS Summary Report F8261004

Survey Unit Investigations and Results:

Nine investigations (scan grids 4, 5, 11, 17, 112, 118, 252, 268 and 269) were required for the scan measurements and the results are reported in Attachment 3. The EMC unity rule was not exceeded as shown in Table 3-1.

ALARA Statement:

As stated in Chapter 4 of the LTP, as long as the residual activity within the survey unit is less than the DCGL (i.e. the survey unit average activity is less than the DCGL and the EMC criterion has been met), the ALARA criterion has been met.

Changes in Initial Survey Unit Assumptions:

The survey unit was designed as a Class 1 structure survey and the sample results are consistent with that classification. The variability of the survey results was less than the characterization data used for survey design. Nine potential areas of elevated activity were detected and evaluated as shown in Attachment 3. Therefore the EMC criterion was met.

==

Conclusion:==

The FSS of this survey unit was properly designed as a Class 1 survey based on Table 5-4 of the LTP. The required number of direct measurements was made and the scan coverage met the requirement of Table 5-6 of the LTP. No direct measurements exceeded the DCGL of 43,000 dpm/100 cm2 and none of the removable surface activity measurements exceeded 10% of the DCGL. Nine investigations were required.

The direct measurement data support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and that the data quality objectives were met.

It is concluded that survey unit F8261004 meets the release criteria of 10CFR20.1402.

Page 9 of 9 FSS Summary Report F8261004

Attachment 1 Maps October 7, 2008 Survey Unit F8261004

0, 0 ..

.. L)

,/ - L Li LJjj -:rjz L'D

-- "Ii

<--'"-L ,-o--.-

u .... .

az a

-F"-Z o Location of Turbine Building inside the Industrial Area 00 S Map F826100471, Location of Turbine Building at Rancho Seco site

I in, Q" I 2>1,R" 1019W ln'q,, I 21' A" I' 10' rn CD 0

co 00 22" 0.4 b

N (N

North Column Looking North 932 ft2 - 86.6 m' 2

01 Developed Reflected (N~

View

,T- North Column North Column Develope id 277 ft2 - 25.7 m2 00 Looking South Reflected V'iew Looking North oo 0o Map F8261004-2, Turbine Building (+) 0' El. to (+) 40' El.

O1 F8261003, Class 1 High Pressure Turbine Pedestals - North Column Area Estimate: 2,266 sq ft. - 210.5 sq. meters 0] F8261004, Class 1 0.0 1.0 2.0 3.0 4-0 F8261003 Area Estimate: 112.3 sq. meters Distance n Metms F8261004 Area Estimate: 40.0 sq. meters 9 F8261005, Class 2 F8261005 Area Estimate: 98.2 sq. meters

Cb 0

00 Developed Refelected View 0l F8261003, Class 1 0 F8261004, Class 1

[a F8261005, Class 2 I I 1Ii Developed Reflected View 115 ft2 - 10.7 m2 00 0.0 1,0 2.0 3.0 4.0 Map F8261004-3, Turbine Building (+) 0' El. to (+) 40' El.

Distance in MWtors High Pressure Turbine Pedestals - South Column Area Estimate: 1,151 sq ft. - 106.9 sq. meters F8261003 Area Estimate: 67 sq. meters F8261004 Area Estimate: 40 sq. meters

L ~30' 9"J 46-1-1' "-1r'7 0 I-6 z

00 17'4" Nb Developed Reflected View It1 00 134.3 ft' - 12.5 m2 West Column West Column Developed Looking West Looking East Reflected View Map F8261004-4, Turbine Building (+) 0' El. to (+) 40' El.

High Pressure Turbine Pedestals - West Column 1] F8261003, Class 1 Area Estimate: 1,428.3 sq ft. - 132.7 sq. meters

[] F8261004, Class 1 F8261003 Area Estimate: 40.0 sq. meters 0.0 1.0 20 3.0 4.0 Distance in Melers F8261004 Area Estimate: 26.0 sq. meters t] F8261005, Class 2 F8261005 Area Estimate: 66.7 sq. meters

p 30'9" C0 0 U 00 z 0

C'4 I- 6' 1,. 14'2" .13'6"- 1-4, ri6 174/ I!

Developed Reflected View I'll

~lw 134.3 ft2 - 12.5 m' 00 East Column East Column Developed oo Looking East Looking West Reflected View Map F8261004-5, Turbine Building (+) 0' El. to (+) 40' El.

0o 4:2 High Pressure Turbine Pedestals - East Column fl F8261003, Class 1 Area Estimate: 1,428.3 sq ft. - 132.7 sq. meters 0 F8261004, Class 1 F8261003 Area Estimate: 40.0 sq. meters 0.0 1.0 2.0 3.0 Distance in Meters 40 F8261004 Area Estimate: 26.0 sq. meters M F8261005, Class 2 F8261005 Area Estimate: 66.7 sq. meters

CfQ A

--I N 0 I 00 03 05 01 21'8" (0 09 (N 0 4',

V~1 K LI IA Q COO 7 ' 8,6 HP Turbine Pedestal fRi W E HP Turbine Pedestal Plan View - 40' El.

i1k 03 19' 2"

-I I

05 2R,'A" Ii

-I 02 1110" S1, 10"

'71 00 26'4" , 21'8" 114- 48' O1F8261003, Class 1 0

O1F8261004, Class 1 Map F8261004-6, Turbine Building (+) O' El.

IMF8261005, Class 2 High Pressure Turbine Pedestals - Floor Surface Area 0.0 1.0 2.0 3.0 4.0 Distance in Meters with Trench Vertical Surfaces Area Estimate: 1,402 sq ft. - 130.2 sq. meters

-]-- ...] I-r- -- ---

F- -11] --, --rrI...

i-*1- -I- I I--

I L-

-A 4------+--

-- '-'ii iT1 F-I ~ I

  • T

-I- *-~

I*~ ~4't 00 j -.-

0 F 2 -I *~~-

00 -"---I.-

  • 1 I -4 F-li 7

-4I

~1 - -

I- II F-r 04 ~-1 4

1 tl 1 * [

Ti1771 1

1717ITYi

! I I i i it i , -" , , ii

  • F - - !-i--

- t t i i. - - i- * - I - -*H --- - '

i i1t t 11+_ -LI estGColumi 4 -i

(

-ill--I--I- -- 3 3 an*o*-*

mnfrqmn Nort6 eedgqe I n -

rt-.,o~ati ---

E ast Colymr nuaIh flenImFr

. 1 I.ooking SLo th net )rs from West!ed, le -

11 zIzt~11z}~zi3i]EiEf I T ~.ii ii7fi 1--I.7 r*- [VIZ, [II

-t

] ii

-=4 _"__

7-7-

I---.  ::*---L=E I _______ LE I ivv11-vi-vr .7' - - - I IL L

L-,-J iIH'~'~' LA r~~H H.

-~-J1F I. ,2b.]L_,--VJ rrr 1-

~~1~~ I-i-I F, IT

--1-- I- -. 4 . P-2an-V;6w-Ptl- Ii- *-T-en h-Xerti( *a1- uurace III _______ -] I

~1~ .. }F I

-,*i--T-I---.-

.{

7 7-i-ii--7 North Column 1' I i-i-<

00 I.-----

-1 :ooki56-Nrt --I-- - i-f - - -f -] -

- -i--- V -

C) -F F 117 F F

-1~- I ~ --- I I F

-i--1 II, S i ! i ,I i-i , ; t F 0 5 10 15 20 25 30 35 40 45 50 0 1 2 3 4 Map F82601004-7, High Pressure Turbine Pedestals Distance in Meters Random Start Location

E -t L- ) fl ool 0 ,

/

00 0.5 m a frm 11 8.0 m 13 Dis ce from

.. E E E E E E West edge -- to 0 U) 0 0 0U) of survey unit 0 00 Map F8261004-8, Turbine Building (+) O' El.

High Pressure Turbine Pedestals - Floor Surface Area C N Beta Direct Measurements F8261004C000 1 BD, F8261004X0002BD to F8261004XO005BD F8261004CO006BD to F8261004CO009BD, F8261004XO010BD, F8261004C0011BD to F8261004CO016BD, 0 0.5 1.0 1.5 2.0 Distance in Meters F8261004X0017BD to F8261004X0019BD (2.5 meter grid spacing)

0(

0 O0 v -m0.58 m 0.08 m from edge 0.50 m from edge from edge from edge Map F8261004-9, Turbine Building (+) 0' El. to (+) 40' El.

High Pressure Turbine Pedestals - East and South Columns Beta Direct Measurements Iz1 F8261004X0025BD, 00 F8261004C0026BD to F8261004C0027BD, F8261004X0032BD, F8261004C0033BD to F8261004C0035BD, F8261004X0036BD, F8261004C0037BD, F8261004X0038BD, F8261004C0042BD to F8261004C0043BD 0 0.5 1.0 1.5 2.0 Distance in Meters 2.5 meter grid spacing

05 00 7

Looking North V 0.72 m 0.58 m 0.50 m 1.04 m from edge from edge from edge from edge Map F8261004-10, Turbine Building (+) 0' El. to (+)40' El.

High Pressure Turbine Pedestals - West and North Columns Beta Direct Measurements 00 F8261004C0020BD to F8261004C0021 BD, F8261004X0022BD F8261004C0023BD to F8261004C0024BD, F8261004C0028BD to F8261004C0029BD,

  • F8261004X0030BD to F8261004X0031BD, and F8261004X0039BD to F8261004X0041 BD 0 0.5 1.0 1.5 2.0 Distance in Meters 2.5 meter grid spacing

I

0) ~ 4 00 East Column South Column Looking East Looking South 1m -T CI) r-. C 1im 1im z r:

WO 1-C:

CI) COW )

C9 (P a4 (P

0 C C) 0 0 C0 0 0 side I

$tart Grid wraps to left side of West Column (Map F8261004-12)

C-Il 00 Map F8261004-11; Turbine Building (+) 0' El. to (+) 40' El.

_ - Concrete painted with 1 layer of paint High Pressure Turbine Pedestals - East and South Columns Beta Scan Measurements I

F8261004C0001BS to F8261004C0036BS, F8261004C0043BS to F8261004C0072BS, and Ditace inMetr F8261004C0103BS to F8261004C01 14BS

0t 00 U) U) 11 C)

T.

U)I U) U)

C.0 co co Cl> CT) tn Ln U) U)

In Co M 04 00 LO LO V) (n U) 39BS CO to CO ý; CO t'.

Uý S :M 7B West Column North Column

-M, LO 7 Looking West Looking North E \E ilm lm 1m Im C- co 0

Grids wrap to right s!de Grids wrap to left side Grid wraps from left sid of South Column of West Column of East Column (Map F8261004-11) (Map F8261004-11)

ItJ 00 Map F8261004-12, Turbine Building (+) 0' El. to (+) 40' El.

High Pressure Turbine Pedestals - West and North Columns Beta Scan Measurements I M - Concrete painted with 1 layer of paint F8261004C0037BS to F8261004CO06OBS, F8261004C0073BS to F8261004C0102BS, and 0 0.5 1-0 1.5 2.0 F8261004C0109BS to F8261004C0132BS Distance in Meters

U')

00 (0

244BS 243BS 242BS 241 BS 240BS 239BS 212BS 211BS 210BS 209BS 208BS 207BS 185BS 186BS 187BS 188BS 189BS 190BS 191B5 192BS 193BS 194BS 195BS 182BS 181BS 18085 179BS 17885 17785 17685 175BS 174BS 17385 17285 J

158BS 159BS 160BS

~In

/

/

/

Map F8261004-13, Turbine Building (+) 0' El.

'71 High Pressure Turbine Pedestals - Floor Surface Area 00 C)

I M - Concrete painted with 1 layer of paint Beta Scan Measurements C) F8261004C0133BS to F8261004C0213BS, N F8261004C0221BS to F8261004C0228BS, F8261004C0230BS to F8261004C0237BS, F8261004C0239BS to F8261004C0245BS, 0 0.5 1.0 1.5 2.0 Distance in Meters F8261004C0255BS to F8261004C0256BS, and F8261004C0259BS to F8261004C0285BS

(D 0

00 00 C) Map F8261004-14, Turbine Building (+) 0' El.

ik High Pressure Turbine Pedestals - Trench Walls I M - Concrete painted with 1 layer of paint Beta Scan Measurements F8261004C0214BS to F8261004C0237BS, 0 0.5 1.0 1.5 2.0 F8261004C0246BS to F8261004C0254BS, and Distance in Meters F8261004C0257BS to F8261004C0258BS

(0 00 00 N Map F8261004-15, Turbine Building (+) 0' El.

High Pressure Turbine Pedestals - Floor Surface Area 0 0.5 1.0 1.5 2.0 Juncture Scan Measurements Distance in Meters F8261004C0001JS to F8261003C0018JS

+,,+ ***i!o

++* * .- . * , I *

  • CDb
  • . , ** *+*_*+ +,>4, *.+

~~*-;I frq*

0 East Column South Column Looking East -Looking South 00 Map F8261004-16, Turbine Building (+ ' El. to (+40 El.

High Pressure Turbine Pedestals - East and South Columns Juncture Scan Measurements 0 0.5 1.0 1.5 2.0 Ditac inMetem F8261004CO019JS to F8261004C0020JS.

Map F8261004-17, Turbine Building (+) 0' El.

High Pressure Turbine Pedestals Beta Scan: Measurements of Railings F8261004M0286BS to F8261004M0289BS Page 18 of 18 Att. 1 Maps F8261004

Attachment 2 Instrumentation October 7, 2008 Survey Unit F8261004

Table 2-1. Survey Unit Instrumentation Instrument Detector MDC Static MDC Scan Model; Serial No. Model; Serial No. (dpm/l00 cm ) 2 (dpmll00 cm 2 )

M2350; 193700 43-68B; 190294' 433 1,033 M2350; 193700 43-68B; 1902942 909 2,169 M2350; 193700 43-68B; 1902943 257 612 M2350; 203486 43-68B; 161400' 433 1,033 M2350; 203486 43-68B; 1614002 909 2,169 M2350; 193715 43-68B; 160703' 433 1,033 M2350; 193715 43-68B; 1607032 909 2,169 M2350; 189089 43-68B; 148460' 433 1,033 M2350; 189089 43-68B; 1484602 909 2,169 M2350; 175834 43-116-1B; 1906423 472 1,930 M2350; 175834 43-116-1B; 1906424 491 739 Tennelec; 0401171 N/A 5.88 dpm a, N/A 11.71 dpmf3 2'Concrete surfaces Concrete surfaces with I layer of paint 3Metal surfaces 4

Concrete junctures Table 2-2. Investigation Criteria and DCGL Value Param eter (dpm/100 V l eCcm 2 )2 Investigation Criteria - Direct 163,400 Investigation Criteria - Scan 163,400 DCGLw 43,000 DCGLEMC 163,400 Page 2 of 2 Att. 2. Instrumentation F8261004

Attachment 3 Investigation October 7, 2008 Survey Unit F8261004

Table 3-1 Survey Unit Investigation Investigation Initial Value Investigation Elevated Area DCGLemc Investigation DCLemc Result Area () Result Unity Level (cpm)

Gd (cpm) (cpm) (dpm/lOOcm2) Fraction 4 22,200 15,982 12,986 0.026 499.6 21,483,230 67,362 0.003 5 22,200 25,610 34,328 0.062 211.3 9,085,040 178,068 0.020 11 22,200 8,795 6,415 0.068 192.8 8,290,830 33,276 0.000 17 22,200 2,441 8,583 0.077 170.5 7,330,640 44,522 0.006 112 22,200 3,075 2,562 0.052 251.5 10,813,640 13,290 0.000 118 22,200 3,355 3,107 0.052 251.5 10,813,640 16,117 0.000 252 22,200 5,352 6,580 0.065 201.6 8,669,660 34,132 0.000 268 10,500 4,372 4,273 0.124 106.7 4,586,810 47,101 0.010 269 10,500 4,864 4,013 0.333. 45.4 1,950,050 44,235 0.023 DCGL = SU Mean =

Survey Unit Remainder 43,000 2,841 0.066 EMC Unity Sum 0.128 Page 2 of 2 Att. 3 Investigation F8261004

Attachment 4 Data Assessment October 7, 2008 Survey Unit F8261004

F8261004 Gross Activity Sample Results Quantile Plot DCGL = 43000 dpmll 00cm2 7,000 6,000 5,000 4,000 00 II 3,000 2,000 2044 1,000 Cl)

, Pý 0 I0 2 0 20 40 60 80 100 Percentile

  • Direct Measurements (dpm/l100cm2) -median - - - 75th Percentile .... 50th Percentilej

CD 0

F8261004 Gross Activity Sample Results Scatter Plot DCGL = 43000 dpml00cm= 1 8000 7000 0 -828 IN 6000 E 0 5000 0 0

0 E 4000 0 0

00 0

0 0 00 0 0 0

  • 0 3000 2841 0 0 0 0) 0000 O0 00 00 0°0 0 0 00(:

o bed 2000 CD 1000 i

0

-1000 -1146

-2000 r r a00 0, 0Co 000,0-0 aW.wOwOrnWMOmfflOwOwOwmwOwwOw0w Measurement Locations It 00 C)

I o Gross Activhty - Average - - "+3SIDev" - - "-3StDev P0 C)

0 F8261004 Gross Activity Frequency Plot 2

DCGL = 43000 dpm/l 00cm 24 23 22 21 20 19 18 17 16 15 14 LL 13 C 12 4-J 00 0 11 10 9

8 7

6 5

4 3

2 1

CD' 0

0, N- LO)

N-N- c~J N-(N C?)

Bins - Upper End Value (dpm/1 00cm2)