ML15093A055

From kanterella
Jump to navigation Jump to search
Rancho Seco Report on Irradiated Fuel Management Funding Status
ML15093A055
Person / Time
Site: Rancho Seco
Issue date: 03/23/2014
From: Ronningen E
Sacramento Municipal Utility District (SMUD)
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
DPG 15-071
Download: ML15093A055 (5)


Text

Powering forward. Together.

  • SMUD DPG 15-071 March 23, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 RANCHO SECO REPORT ON IRRADIATED FUEL MANAGEMENT FUNDING STATUS Attention: Jack Parrott As required by 10 CFR 50.82(a)(8)(vii), this letter provides the information on the status of financial assurance for irradiated fuel management funding for Rancho Seco as a supplement to the Annual Report on Decommissioning Funding Status. Note that the costs for decommissioning are provided separately and include all costs required to maintain the licenses until they are terminated following removal of irradiated materials from the facility. In estimating costs for irradiated fuel management, SMUD assumes that all fuel is to be removed from the site by 2021 in accordance with the DOE's "Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste" issued (January 2013).

Irradiated Fuel Management Cost Estimate In accordance with 10 CFR 50.82(a)(8)(vii)(B), an estimate is provided in Attachment 1 for the costs of managing irradiate fuel until the Department of Energy takes possession of the material. In summary, the estimated costs for irradiated fuel management at Rancho Seco total $37.5 million.

Rancho Seco Nuclear Generating Station I 14440 Twin Cities Road I Herald, CA 95638-9799 I 1.209.333.2935 I smud.org

DPG 15-071 Page 2 of 4 Irradiated Fuel Management Funding Status In accordance with 10 CFR 50.82(a)(8)(vii)(A), SMUD is reporting that on December 4, 2014 the SMUD Board of Directors approved annual funding in the amount of

$4,339,854 for management of irradiated fuel for 2015. SMUD approved these funds through the annual budgeting process. Therefore, at the end of 2014, SMUD had committed and accumulated $4,339,854 for the management of irradiated fuel for 2015.

In general, SMUD holds the position that it is not financially responsible for the cost of irradiated fuel management. This statement is supported by Federal Court decisions that have, without ambiguity, determined that the Federal Government is responsible for the ongoing costs of irradiated fuel and Greater-Than-Class-C (GTCC) waste management. However, SMUD will continue to provide funding, on an annual budget basis, for ongoing costs for irradiated fuel management, including the costs of implementing changing regulations, relicensing and unforeseen circumstances. SMUD is committed to providing for the safe storage of the material and a high level of compliance with NRC regulatory requirements as long as it remains at the Rancho Seco facility.

Irradiated Fuel Management Funding Plan In accordance with 10 CFR 50.82(a)(8)(vii)(C), SMUD provides the following plan for accumulation of funds. This plan, once approved, will be included as an amendment to the Post Shutdown Decommissioning Activities Report and provided to the NRC.

As noted above, the Federal Government is financially responsible for the ongoing costs of managing the irradiated fuel and GTCC waste. Nevertheless, SMUD intends to fund the ongoing management of the materials through annual budgets, and by taking the appropriate legal actions for periodic reimbursement of those costs from the Federal Government.

SMUD also demonstrates that it has the means to provide ongoing funding as it is a municipal utility incorporated under the California MUD Act. As such, SMUD has full legal authority to establish its own rates and charges and has legal authority to recover its costs from ratepayers. Irradiated fuel management is funded by our ratepayers through operating revenues. As an operating expense, these costs are senior to any debt service payment. The rate covenants in SMUD's bond resolutions require that revenues, after operating expenses (excluding non-cash type expenses such as depreciation), must be greater than SMUD's debt service each year. Thus, the covenants provide assurance that cash necessary to fund irradiated fuel management will be available in any given year.

In addition, SMUD, as a municipal utility, cannot avoid its obligation to provide for irradiated fuel management through bankruptcy or dissolution proceedings. The Bankruptcy Code allows for a municipal reorganization where the municipal's liabilities and obligations must eventually be paid. The California Government Code affords

DPG 15-071 Page 3 of 4 similar protection and would require any successor to SMUD to satisfy all debts and obligations including the costs of irradiated fuel management, before any part of SMUD's electric system could be sold or encumbered.

SMUD believes that the information provided in this letter provides reasonable assurance that SMUD can provide for the safe management of the irradiated fuel and GTCC waste until the materials are accepted by the DOE.

If you or members of your staff have questions or require additional information, please contact me by email at einar.ronninqenasmud.orq or by phone at (916) 732-4817.

Sincerely, Einar T. Ronningen Superintendent, Rancho Seco Assets (ETR) : 2015 Rancho Seco Irradiated Fuel Management Cost Estimate CC with

Attachment:

NRC, Region IV

DPG 15-071 Page 4 of 4 ATTACHMENT 1 2015 IRRADIATED FUEL MANAGEMENT COST ESTIMATE

2015 RANCHO SECO h

IRRADIATED FUEL MANAGEMENT COST ESTIMATE Irradiated Fuel Management Costs by Year 2015 2016 2017 2018 2019 2020 2021 Totals SMUD Labor $ 485,000 $ 485,000 $ 485,000 $ 485,000 $ 485,000 $ 634,911 $ 634,911 $ 3,694,821 Relicensing $ 260,000 $ 260,000 $ 260,000 $ 260,000 $ 260,000 $ 1,300,000 Aging Management $ 105,063 $ 105,063 $ 210,125 Materials $ 24,400 $ 24,400 $ 24,400 $ 24,400 $ 24,400 $ 19,903 $ 19,903 $ 161,806 Dues & Publications $ 4,000 $ 4,000 $ 4,000 $ 4,000 $ 4,000 $ 182,148 $ 182,148 $ 384,296 Licenses & Fees $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 309,873 $ 309,873 $ 1,869,747 Other $ 31,714 $ 31,714 $ 31,714 $ 31,714 $ 31,714 $ 31,714 $ 31,714 $ 222,001 Training & Travel $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 10,506 $ 10,506 $ 121,013 Outside Services $2,050,000 $2,050,000 $2,050,000 $2,050,000 $2,050,000 $2,050,537 $ 2,050,537 $ 14,351,074 Insurance $ 390,000 $ 390,000 $ 390,000 $ 390,000 $ 390,000 $ 491,693 $ 491,693 $ 2,933,385 Overhead $ 240,000 $ 240,000 $ 240,000 $ 240,000 $ 240,000 $ 304,904 $ 304,904 $ 1,809,809 Facilities & Grounds $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 452,488 $ 452,488 $ 1,279,977 Fuel Loading Costs $ 6,306,439 $ 6,306,439 Contingency (10%) $ 383,011 $ 383,011 $ 383,011 $ 383,011 $ 383,011 $ 459,374 $ 459,374 $ 2,833,805 Total Annual Costs $4,213,126 $4,213,126 $4,213,126 $4,213,126 $4,213,126 $5,053,115 $11,359,553 Total Irradiated Fuel Management CostsI $ 37,478,297