Rancho Seco Final Status Survey Summary Report October 15, 2008 T&R, AB, NSEB +40' Bridge Survey Unit F8140003 Prepared By: Dan Reviewed By:
- k. Taliman 6Kýý,Ia Date: October 16, FSS Engi eer Date:
131(9[
Lead FSS Engineer 2008 Approved By: Z7
(/17 _
Date:
Z'_ Dismantlerrntý perintendent, Radiological
FINAL STATUS SURVEY
SUMMARY
REPORT Survey Unit:
F8140003, T&R, AB, NSEB +40' Bridge Survey Unit
Description:
Operating History: The Survey Unit consists of the access corridor between the Training and Records Building, Auxiliary Building, and Nuclear Service Electrical Building at the
+ 40' elevation. The floors, walls, and ceiling are included within this survey unit. This area is referred to as the "tunnel" in some drawings. During the survey of each interface with this interconnecting feature, no provision was made for survey of the tunnel.
Site Characterization: Direct measurements on the +40' elevation of the AB showed a mean gross activity level of 3,288 dpm/100 cm 2 and a maximum value of 24,781 22 dpm/100 cm2. Characterization surveys performed of the uncontrolled side of the AB resulted in a mean gross activity of 1982 dpm/100 cm2 with a maximum of 2360 dpm/100 cm 2 and a standard deviation of 160.8 dpm/100 cm 2. Direct measurements of the T&R building showed a mean gross activity level of 1,865 dpm/1 00 cm2 and a maximum value of 2,995 dpm/100 cm 2. Direct measurements of the NSEB showed a mean gross activity level of 1,913 dpm/100 cm 2 and a maximum value of 2,669 dpmrn100 2
cm2.
Based on the classification procedure (DSIP-0020) and levels of gross activity reported in the region of the survey unit, the "tunnel" was determined to be Class3.
Survey Unit Design Information:
The Survey Unit Design Parameters are presented in Table 1 below. The survey unit and measurement locations are depicted on the maps in Attachment 1. Direct measurement locations were randomly determined and 60 m2 were scanned for approximately 14%
coverage. Samples of removable contamination were collected at each direct measurement location. The instrumentation used for the survey along with the MDC values are listed in Tables 2-1 and 2-2 in Attachment 2.
Page 2 of 7 FSS Summary Report F8140003
Table 1. Survey Unit Design Parameters Survey Design Value Comment Parameter Survey Area:
F814 Survey Unit:
Class:
SU Area (m2):
Evaluator:
DCGL (dpm/100 cm2):
Area Factor:
Design DCGLemc (dpm/100 cm 2):
LBGR (dpm/100 cm 2):
Design Sigma (dpm/100 cm2):
Type I Error:
Type II Error:
Predominant Nuclide:
Sample Area (m2):
Scan Area (m 2):
Scan Coverage (%):
ZI-P*
Sign P:
Calculated Relative Shift:
Relative Shift Used:
N-Value:
Design N-Value + 20%:
Design Min Samples N:
Grid Spacing L:
0003 3
431.4 D.A.Tallman 43000 N/A N/A 21500 3627 0.05 0.05 Cs-137 N/A 60.8375 14%
1.645 1.645 0.99865 5.9 3
11 14 14 N/A T&R, AB, NSEB +40' Bridge Structure Surface LTP Table 5-4 Gross Activity DCGL Class 3 Class 3 Default 50% DCGL Class 3 Class 3 Uses 3.0 if Relative Shift is
>3 NUREG-1575 Table 5-5 Class 3 Class 3 Page 3 of 7 FSS Summary Report F8140003
Survey Results:
A total of 14 direct measurements were made in F8140003. The results including mean, median, standard deviation and range are shown in Table 2. All direct measurements were less than the DCGL. None of the scan measurements indicated areas of elevated activity.. Scan activity ranged from 1731 to 3153 dpm/1 00 cm 2, based on a surveyor efficiency of 0.5 and no background subtracted. Samples for, removable surface activity were all less than 10% of the DCGL as shown in Table 3. Removable surface activity samples were counted for alpha activity and none was detected at the MDC shown in Table 2-1 of Attachment 2.
Table 2. Direct Measurement Results Measurement ID Gross Activity (dpm/i00 cm)
F8140003-GO001 BD 1598 F8140003-GO002BD 1006 F8140003-GO003BD 939 F8140003-GO004BD 846 F8140003-GO005BD 1520 F8140003-GO006BD 1063 F8140003-GO007BD 980 F8140003-GO008BD 1063 F8140003-GO009BD 1535 F8140003-GO01OBD 877 F8140003-GO011BD 975 F8140003-GO012BD 887 F8140003-GO013BD 1401 F8140003-GO014BD 840 Mean:
1109 Median:
993 Standard Deviation:
277 Range:
840-1598 Page 4 of 7 FSS Summary Report F8140003
Table 3. Removable Surface Activity Results Measurement ID Surface Beta Activity (dpm/100 cm 2)
F8140003GOOOISM F8140003G0002SM F8140003G0003SM F8140003G0004SM F8140003G0005SM F8140003G0006SM F8140003G0007SM F8140003G0008SM F8140003G0009SM F8140003G001 OSM F8140003G0011SM F8140003G001 2SM F8140003G001 3SM F8140003G0014SM Mean:
Median:
Standard Deviation:
Ranqe:
-2.24
-4.82
-3.53
-2.24
-2.24
-2.24
-4.82
-3.53
-3.53
-3.53
-2.24
-4.82
-4.82
-3.53
-3.44
-3.53 1.03
-4.82 to -2.24 Page 5 of 7 FSS Summary Report F8140003
Survey Unit Data Assessment:
The survey design required 14 direct measurements for the Sign Test. The critical value and the results of the Sign Test are presented in Table 4. The sample mean and median values were less than the DCGL. The sample standard deviation was less than the design standard deviation so no additional samples were required.
Table 4. Data Assessment Results Survey Results Parameter Value Comment Material Background Used (dpm/100 cm2):
N/A Ambient Background Used (dpm/100 cm 2):
N/A Average Ambient BKG = 0 Actual Direct Measurements (N):
14 Median (dpm/100 cm2):
993 Mean (dpm/100 cm 2):
1109 Direct Measurement Standard Deviation 277 (dpm/100 cm2):
Total Standard Deviation (dpm/100 cm2):
277 Based on samples and backgrounds.
Maximum (dpm/100 cm 2):
1598 Material Type:
N/A Background Subtract Not Applied Sign Test Final N Value:
14 S+ Value:
14 Critical Value:
10 Sufficient Samples Collected:
Yes MaximumValue < DCGL:
Yes Median Value < DCGL:
Yes Mean Value < DCGL:
Yes Maximum Value < DCGLemc:
N/A Class 3 Total Standard Deviation <= Sigma:
Yes Pass the Sign Test?
Yes Reject the Null Hypothesis?
Yes Does the Survey Unit Pass All Criteria?
Yes Page 6 of 7 FSS Summary Report F8140003
Survey Unit Investigations and Results:
No investigations were required for either direct or scan measurements and no investigation results are reported.
ALARA Statement:
As stated in Chapter 4 of the LTP, as long as the residual activity within the survey unit is less than the DCGL (i.e. the survey unit average activity is less than the DCGL and the EMC criterion has been met), the ALARA criterion has been met.
Changes in Initial Survey Unit Assumptions:
The survey'unit was designed as a Class 3 structure survey and the sample results are consistent with that classification. The variability of the survey results was less than the characterization data used for survey design.
==
Conclusion:==
The FSS of this survey unit was properly designed as a Class 3 survey based on Table 5-4 of the LTP. The required number of direct measurements was made and the scan coverage met the requirement of Table 5-6 of the LTP. No direct measurements exceeded the DCGL of 43000 dpm/100 cm 2 and none of the removable surface activity measurements exceeded 10% of the DCGL. No investigations were required.
The direct measurement data support rejection of the null hypothesis, providing high confidence that the survey unit satisfied the release criteria and that the data quality objectives were met.
It is concluded that survey unit F8140003 meets the release criteria of 10CFR20.1402.
Page 7 of 7 FSS Summary Report F8140003 Maps October 15, 2008 Survey Unit F8140003
UQ 0
3h PLAN VIEW FLOOR KEY PLAN I East End Corridor Wall REFLECTED CEILING East End Vestibule Walls 1
East South West S West End West End Vestibule Walls Corridor Wall T11 00 South Wall Divider Wall
_ Looking I Looking Eat*Wes3t SACRAMENTO MAUNICIPAL UTILUTh' DLSTRICT Estlrn2tod Surfamsc~.as Collm,~
81,9m, wall.
260-9 m:
FbOm 88.6 m TOW~
43! Aml SCALE FEET C_= 1 FOOT SCALE METER 012345 AUX / T&R ! NSE BLDG BRIDGE 40'-0" ELEVATION GENERAL SURFACE AREA ESTIMATES F8140003-M1 flW~Z- ~ 1 4-flfWl3 n I PAC*r 1
'I TC 1-11 I f) W,-,:,, 14 0 'W.) C, I PACE 1 0-' 1 Tr HR L
0 Ci) 00 7
T T
T 4:
-r If*~F mNmw I
Tr 1 4 44l.,H-+/--444 4
-4 1+/-4.1i4+44-H 44-44H;A-44:-4+4-4+H-1
4 H.4-14 H
+H1A-,4l4 -H-
ý+IH-HA4-.1-44-.-H A444++--
4 H-44
++
+~
1 +
.", - -ITT I-T 1
4:
r-ri Mq
+
T
-1j 11 414-4-4-H 4ý
+H4 444+
+ 1 2:
T r
Ti 4-D OT Tv~
T~
7 4444444-H-+44-4+4-
+-4-414H-H--l-4+1 4-
-H4H1 H--i-4
-H
-4 4
~~~
L4 i
+144+
1 1-.Th+.
+
+
mvie X-I n 4: WI 4:
Ve~ibu~-~W~s oido~ W'11M 1
4-+
J41+'-+4 l~4 -'41H+4444.H+H 4-44 TSCA
":H---H 4`-f
ýE FEEI 1 FOOT:
4 4-4-
1 -f Ws 4:
4:
AUX /T&R INSE BLDG BRIDGE
- 11'I 11
+f-+
I i
~=4'SACRAM/ENTO MUIIF4lllAL 4:
I
-~
5(,~AL
-0 1
2-M3T 4 234 40'-0" ELEVATION BETA DIRECT/LOOSE ACTIVITY LOCATIONS F8140003-M2 D w: e1.o00o03 1
PAGE 1 of 35 TC HILL 1
3 7
4 7
'2 13 i
I Ir.
ld 17
,A
0
-4N cj.
BRIDGE PLAN VIEW FLOOR J
UII 1',*I_,,,....... u i '
t ].,_:j,........ *.<._,I~iil
- -r-F KEY PLAN
" 11 1,J /
N..
u REFLECTED CEILING Irj 00 SMU/E c
4Mh-SACAMNT MUNICIPA SCALE METER 0123 4 5 AUX / T&R / NSE BLDG BRIDGE 40'-0" ELEVATION BETA DIRECT/LOOSE ACTIVITY LOCATIONS F8 140003-M2 MG 81400,CA3 1i P4L(F
-1 OF 2ý TC HlII
(D~
0 itT!
AUX BLDG INPBLT&R KEY PLAN DEVELOPED NORTH WALL
- T Ei East End Corridor Wallgh F-Luok nQ East End Vestibule Wals
,e!-,cated 24 ' down
/
d West nd ails Corridor Wad South Wall Eou~t South West Enc Vestibule W O0 00 Uj SCALE METER 0-1 2 3 4 5 SACRAM/ENTO MUu\\ICIPA.
U*HII I tI AUX / T&R / NSE BLDG BRIDGE 40'-0" ELEVATION BETA DIRECT/LOOSE ACTIVITY LOCATIONS F8140003-M2 Dwcr., R1-0030 i I0 PACE 3 of 3 Tf,
- A4li
(D
_E
- Mtn, PLANVIEW FLOOR REFLECTED CEILING KEY PLAN N/
//
AI
.v, Loak ing_ _ j LL__ o ý,ing L mkrgLooking
.r.o*
inq:_ _ [*g
- ELq,,
o t
- North, West NorthI East HNorlh t
E!d DEVELOPED NCTH WALL Corridor Wall Northi Eest East End Vestibule Wails SCALE FEET
-=
1 FOOT SCALE METER 012345 It 00 South Wall Divider Wall L05t a Vestrb
_ Looking liLooking I
- Easýt West SMUD Al SACRAMENTO CMUNICIPAL -
UiLiTY D0STP!CT SDWC: 8140003.CI outn WestS st End West End uie Wails Corridor Wall ULX/T&R / NSE BLDG BRIDGE 40'-0" ELEVATION BETA SCAN LOCATIONS F8140003-M3 PACE i OF 1 TC HILL Instrumentation October 15, 2008 Survey Unit F8140003
Table 2-1. Survey Unit Instrumentation Instrument Detector MDC Static MDC Scan Model; Serial No.
Model; Serial No.
(dpm/100 cm2 )
(dpm/100 cm 2)
M2350; 203486 43-68B; 190476 433 1033 M2350; 142499 43-37; 148502 N/A 616 Tennelec; 0401171 N/A '
6 dpm a 12 dpm N/A Table 2-2. Investigation Criteria and DCGL Value Parameter Value cm2)
(dpm/100 c2 Investigation Criteria - Direct 21500 Investigation Criteria - Scan 43000 DCGLw 43000 DCGLEMC N/A Page 2 of 2 Att. 2 Instrumentation F8140003 Investigation October 15, 2008 Survey Unit F8140003 (none required)
Page 1 of 1 Att. 3 Investigation F8140003 Data Assessment October 15, 2008 Survey Unit F8140003
0D 4U-CD C)
F8140003 Gross Activity Sample Results Quantile Plot DCGL = 43000 dpm/1 00cm2 In 1,800 1,600 1,400 1,200 1,000 800 600 400 200
.0 0
20 40 60 Percentile 80 100 I
- Direct Measurements (dpm/100crn2) -
median -
-75th Percentile....- 50th Percentile
0 F8140003 Gross Activity Sample Results Scatter Plot DCGL = 43000 dpmll00cm=
5
~r j
0 2500 E 2000 0
E 1000 0
1 1940 o
0 o
00 0
0 0
0 0
o o
1109 278 O
0 0
0 0
0 0
0 0
0 0-0 0
0 o
0 0
0 0
0 0
0 0
0 0
0 0
0 Measurement Locations i
o Gross Activity -
Average -
"+3StDev" -
"-3StDev I
CD 07 00 C0 F8140003 Gross Activity Frequency Plot DCGL = 43000 dpm/1 00cm 2 10 9-0 8
7 6
5 4
3 2
1 0
O)
Bins - Upper End Value (dpmi1 OOcm2)