| | number = ML101100708 | | | number = ML101100708 |
| | issue date = 04/20/2010 | | | issue date = 04/20/2010 |
| | title = 05/04/2010 Notice of Meeting to Discuss the Agency'S Annual Assessment of Safety Performance for the St. Lucie Nuclear Plant | | | title = Notice of Meeting to Discuss the Agency'S Annual Assessment of Safety Performance for the St. Lucie Nuclear Plant |
| | author name = Sykes M D | | | author name = Sykes M |
| | author affiliation = NRC/RGN-II/DRP/RPB3 | | | author affiliation = NRC/RGN-II/DRP/RPB3 |
| | addressee name = Nazar M | | | addressee name = Nazar M |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 20, 2010 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 20, 2010 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MEETING ANNOUNCEMENT - PUBLIC MEETING/OPEN HOUSE ST. LUCIE NUCLEAR PLANT - DOCKET NOS. 50-335, 50-389 | | MEETING ANNOUNCEMENT - PUBLIC MEETING/OPEN HOUSE ST. LUCIE NUCLEAR PLANT - DOCKET NOS. 50-335, 50-389 |
|
| |
|
| ==Dear Mr. Nazar:== | | ==Dear Mr. Nazar:== |
|
| |
|
| This letter is to inform you that the Nuclear Regulatory Commission will conduct a Category 3 public meeting on May 4, 2010. The purpose of the meeting is to provide an open public forum to discuss the Agency's annual assessment of safety performance for the St. Lucie Nuclear Plant. The NRC staff will be available to answer questions from the public regarding plant performance, as well as the Agency's oversight of the facility. Florida Power & Light Company is encouraged to attend this meeting. A meeting notice, which provides additional details, is enclosed. | | This letter is to inform you that the Nuclear Regulatory Commission will conduct a Category 3 public meeting on May 4, 2010. The purpose of the meeting is to provide an open public forum to discuss the Agencys annual assessment of safety performance for the St. Lucie Nuclear Plant. The NRC staff will be available to answer questions from the public regarding plant performance, as well as the Agencys oversight of the facility. Florida Power & Light Company is encouraged to attend this meeting. A meeting notice, which provides additional details, is enclosed. |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| Should you have any questions concerning this meeting, please contact me at (404) 997-4629. | | Should you have any questions concerning this meeting, please contact me at (404) 997-4629. |
| | | Sincerely, |
| Sincerely, /RA/ Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 | | /RA/ |
| | Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As stated cc w/encl.: (See page 2) | | As stated cc w/encl.: (See page 2) |
| | |
| ____ML101100708______________ X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE MSykes MDS NAME SNinh MSykes DATE 04/19/2010 04/19/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FPL 2 cc w/encl: Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution
| |
| | |
| Ronnie Lingle Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution
| |
| | |
| Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution
| |
| | |
| Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution
| |
| | |
| Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution
| |
| | |
| Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution
| |
| | |
| Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408 Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010
| |
| | |
| Seth B. Dunston Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution
| |
|
| |
|
| Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution | | ____ML101100708______________ X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE MSykes MDS NAME SNinh MSykes DATE 04/19/2010 04/19/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FPL 2 cc w/encl: William A. Passetti Richard L. Anderson Chief Site Vice President Florida Bureau of Radiation Control St. Lucie Nuclear Plant Department of Health Electronic Mail Distribution Electronic Mail Distribution Robert J. Hughes Ruben D. Almaguer Plant General Manager Director St. Lucie Nuclear Plant Division of Emergency Preparedness Electronic Mail Distribution Department of Community Affairs Electronic Mail Distribution Gene St. Pierre Vice President, Fleet Support J. Kammel Florida Power & Light Company Radiological Emergency Planning Electronic Mail Distribution Administrator Department of Public Safety Ronnie Lingle Electronic Mail Distribution Operations Manager St. Lucie Nuclear Plant Mano Nazar Electronic Mail Distribution Executive Vice President and Chief Nuclear Officer Eric Katzman Florida Power & Light Company Licensing Manager P. O. Box 14000 St. Lucie Nuclear Plant Juno Beach, FL 33408 Electronic Mail Distribution Senior Resident Inspector Larry Nicholson St. Lucie Nuclear Plant Director U.S. Nuclear Regulatory Commission Licensing P.O. Box 6090 Florida Power & Light Company Jensen Beach, FL 34957-2010 Electronic Mail Distribution Seth B. Dunston Alison Brown Training Manager Nuclear Licensing St. Lucie Nuclear Plant Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Faye Outlaw Mitch S. Ross County Administrator Vice President and Associate General St. Lucie County Counsel Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution Jack Southard Director Marjan Mashhadi Public Safety Department Senior Attorney St. Lucie County Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution |
|
| |
|
| FPL 3 Letter to Mano Nazar from Marvin D. Sykes dated April 20, 2010 | | FPL 3 Letter to Mano Nazar from Marvin D. Sykes dated April 20, 2010 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MEETING ANNOUNCEMENT - PUBLIC MEETING/OPEN HOUSE ST. LUCIE NUCLEAR PLANT - DOCKET NOS. 50-335, 50-389 Distribution w/encl: | | MEETING ANNOUNCEMENT - PUBLIC MEETING/OPEN HOUSE ST. LUCIE NUCLEAR PLANT - DOCKET NOS. 50-335, 50-389 Distribution w/encl: |
| Region II Administrator | | Region II Administrator=s Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer RidsNrrPMSt.Lucie Resource PMNS L. Slack, RII EICS RIDSNRRDIRS RIDSNRRDIRSIPAB OE Mail PUBLIC |
| =s Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer RidsNrrPMSt.Lucie Resource PMNS L. Slack, RII EICS RIDSNRRDIRS RIDSNRRDIRSIPAB OE Mail PUBLIC Enclosure | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PUBLIC MEETING/OPEN HOUSE FACILITY: St. Lucie Nuclear Plant DOCKETS: 50-335, 50-389 DATE & TIME: May 4, 2010, at 1:00 p.m. LOCATION: St. Lucie Energy Encounter Facility on Hutchinson Island 6501 S A1A, Jensen Beach, Florida PURPOSE: The purpose of the meeting is to provide an open public forum to discuss the Agency's annual assessment of safety performance for the St. Lucie Nuclear Plant. The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) (ML100620086) or from the NRC Web site at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/stl_2009q4.pdf. | | PUBLIC MEETING/OPEN HOUSE FACILITY: St. Lucie Nuclear Plant DOCKETS: 50-335, 50-389 DATE & TIME: May 4, 2010, at 1:00 p.m. |
| The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding the conduct of NRC meetings. CATEGORY: This is a Category 3meeting: Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory. Florida Power and Light Company is encouraged to attend this meeting. | | LOCATION: St. Lucie Energy Encounter Facility on Hutchinson Island 6501 S A1A, Jensen Beach, Florida PURPOSE: The purpose of the meeting is to provide an open public forum to discuss the Agencys annual assessment of safety performance for the St. Lucie Nuclear Plant. The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) (ML100620086) or from the NRC Web site at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/stl_2009q4.pdf. |
| The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC | | The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding the conduct of NRC meetings. |
| =s meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. NRC OFFICE PARTICIPATING: Region II (RII) OTHER ORGANIZATIONS PARTICIPATING: None PARTICIPANTS: NRC M. Sykes, Chief, Reactor Projects Branch 3, T. Hoeg, Senior Resident Inspector R. Hannah, Field Public Affairs Officer, RII | | CATEGORY: This is a Category 3 meeting: Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory. Florida Power and Light Company is encouraged to attend this meeting. |
| | The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC=s meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. |
| | NRC OFFICE PARTICIPATING: Region II (RII) |
| | OTHER ORGANIZATIONS PARTICIPATING: None PARTICIPANTS: NRC M. Sykes, Chief, Reactor Projects Branch 3, T. Hoeg, Senior Resident Inspector R. Hannah, Field Public Affairs Officer, RII Enclosure |
|
| |
|
| 2 Enclosure MEETING CONTACT: Marvin Sykes (404) 997-4629 MDS1@nrc.gov AUDIO TELE-CONFERENCING: Not Available VIDEO TELE-CONFERENCING: Not Available}} | | 2 Marvin Sykes MEETING (404) 997-4629 CONTACT: MDS1@nrc.gov AUDIO TELE-CONFERENCING: Not Available VIDEO TELE-CONFERENCING: Not Available Enclosure}} |
|
---|
Category:Letter
MONTHYEARIR 05000335/20240032024-11-0707 November 2024 Integrated Inspection Report 05000335/2024003 and 05000389/2024003 ML24291A2862024-11-0101 November 2024 – Relief Request: Proposed Alternative in Accordance with 10 CFR 50.55a(Z)(1), Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-167, Correction to St. Lucie L-2024-132, 2024 Population Update Analysis2024-10-22022 October 2024 Correction to St. Lucie L-2024-132, 2024 Population Update Analysis IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 ML24228A2962024-09-0606 September 2024 NRC to NMFS, Designation of FPL as the Non-Federal Representative for St. Lucie IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report 2024-09-09
[Table view] Category:Meeting Notice
MONTHYEARPMNS20241341, Notice of Presubmittal Meeting with NextEra Energy Llc/Florida Power & Light Company2024-10-22022 October 2024 Notice of Presubmittal Meeting with NextEra Energy Llc/Florida Power & Light Company PMNS20240533, Plants - 2023 Annual Assessment Meeting2024-04-12012 April 2024 Plants - 2023 Annual Assessment Meeting PMNS20240462, Notice of Presubmittal Meeting with NextEra Energy Llc/Florida Power & Light Company2024-04-0909 April 2024 Notice of Presubmittal Meeting with NextEra Energy Llc/Florida Power & Light Company PMNS20240303, Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan2024-03-0606 March 2024 Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan PMNS20231192, Notice of Presubmittal Meeting with NextEra Energy Llc/Florida Power & Light Company2023-11-0808 November 2023 Notice of Presubmittal Meeting with NextEra Energy Llc/Florida Power & Light Company PMNS20230932, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-14014 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230879, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-0101 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230809, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-07-11011 July 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230775, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-30030 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230718, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-12012 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230673, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-26026 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230599, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-15015 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230594, Annual Assessment Meeting2023-05-0404 May 2023 Annual Assessment Meeting PMNS20230449, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-18018 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230409, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-11011 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230278, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-0303 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230226, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-03-0707 March 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230134, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-22022 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230159, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-15015 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-26026 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230060, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-18018 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230003, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-0505 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221124, Notice of Presubmittal Meeting with Florida Power and Light to Discuss a Planned License Amendment Request for the St. Lucie Units 1 and 2 Facilities2022-10-31031 October 2022 Notice of Presubmittal Meeting with Florida Power and Light to Discuss a Planned License Amendment Request for the St. Lucie Units 1 and 2 Facilities PMNS20221132, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-31031 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-17017 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20220997, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-0303 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20220935, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-09-0909 September 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220832, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-16016 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220748, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-0303 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220468, Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company2022-05-0404 May 2022 Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company PMNS20220434, Annual Assessment Meeting2022-04-21021 April 2022 Annual Assessment Meeting PMNS20220063, Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company2022-02-0101 February 2022 Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company PMNS20211440, Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications2021-11-0808 November 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications PMNS20211354, Environmental Scoping Meeting Related to the Saint Lucie Plant, Units 1 and 2, Subsequent License Renewal Application2021-10-19019 October 2021 Environmental Scoping Meeting Related to the Saint Lucie Plant, Units 1 and 2, Subsequent License Renewal Application PMNS20211012, Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications2021-08-13013 August 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications PMNS20210781, Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications2021-06-10010 June 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications PMNS20210621, Pre-Submittal Meeting for Subsequent License Renewal Application for St. Lucie Plant,Units 1 and 2 - Safety2021-05-14014 May 2021 Pre-Submittal Meeting for Subsequent License Renewal Application for St. Lucie Plant,Units 1 and 2 - Safety PMNS20210558, Pre-Submittal Meeting for Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 - Environmental2021-05-0606 May 2021 Pre-Submittal Meeting for Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 - Environmental PMNS20210505, Annual Assessment Meeting Turkey Point Nuclear Generating Station Unit 3 & 4 2020 Annual Assessment Meeting2021-04-20020 April 2021 Annual Assessment Meeting Turkey Point Nuclear Generating Station Unit 3 & 4 2020 Annual Assessment Meeting PMNS20210362, Pre-Submittal Meeting for Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 - Safety2021-04-19019 April 2021 Pre-Submittal Meeting for Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 - Safety ML21076A6152021-03-22022 March 2021 NRC Pre-Submittal Meeting, St. Lucie and Turkey Point Nuclear Plants - Improved Technical Specification Conversion - March 22, 2021 (EPID L-2021-LRM-0032) (Presentation) PMNS20210260, Notice of Forthcoming Meeting with Nextera/Florida Power and Light Regarding the Conversion of Turkey Point, Units 3 and 4 and St. Lucie, Units 1 and 2 to Improved Technical Specifications2021-03-19019 March 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light Regarding the Conversion of Turkey Point, Units 3 and 4 and St. Lucie, Units 1 and 2 to Improved Technical Specifications PMNS20201308, Meeting with NextEra Energy/Florida Power & Light Company to Discuss Generic Safety Issue-191/Generic Letter 2004-02 Closeout Letters2020-11-0505 November 2020 Meeting with NextEra Energy/Florida Power & Light Company to Discuss Generic Safety Issue-191/Generic Letter 2004-02 Closeout Letters ML20282A5872020-10-0808 October 2020 Public Pre-submittal Teleconference with Florida Power & Light Company to Discuss a Proposed License Amendment Request for St. Lucie Plant, Unit Nos. 1 and 2, to Allow Risk-Informed Completion Times for Electrical Systems ML17074A2682017-03-15015 March 2017 Notice of Public Meeting for St. Lucie Nuclear Plant Regulatory Conference Regarding White Finding ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13079A3462013-03-20020 March 2013 Notice of Meeting with Florida Power & Light Company to Discuss the Results of the Annual Assessment of the St. Lucie Nuclear Plant Performance and to Provide Opportunities to Discuss the Public the NRC Reactor Oversight Process ML13059A5522013-03-0101 March 2013 3/14/13 - Forthcoming Meeting with Florida Power and Light Company Regarding Steam Generator Performance at St. Lucie Nuclear Plant, Units 1 and 2 ML12299A3502012-10-23023 October 2012 Notice of Category 1 Public Meeting - St. Lucie Nuclear Plant - Unit 1 ML12297A1772012-10-23023 October 2012 Meeting Announcement Category 1 Public Meeting St. Lucie Nuclear Plant - Unit 1 Docket No. 50-335 2024-04-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 20, 2010 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING/OPEN HOUSE ST. LUCIE NUCLEAR PLANT - DOCKET NOS. 50-335, 50-389
Dear Mr. Nazar:
This letter is to inform you that the Nuclear Regulatory Commission will conduct a Category 3 public meeting on May 4, 2010. The purpose of the meeting is to provide an open public forum to discuss the Agencys annual assessment of safety performance for the St. Lucie Nuclear Plant. The NRC staff will be available to answer questions from the public regarding plant performance, as well as the Agencys oversight of the facility. Florida Power & Light Company is encouraged to attend this meeting. A meeting notice, which provides additional details, is enclosed.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 997-4629.
Sincerely,
/RA/
Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16
Enclosure:
As stated cc w/encl.: (See page 2)
____ML101100708______________ X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE MSykes MDS NAME SNinh MSykes DATE 04/19/2010 04/19/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FPL 2 cc w/encl: William A. Passetti Richard L. Anderson Chief Site Vice President Florida Bureau of Radiation Control St. Lucie Nuclear Plant Department of Health Electronic Mail Distribution Electronic Mail Distribution Robert J. Hughes Ruben D. Almaguer Plant General Manager Director St. Lucie Nuclear Plant Division of Emergency Preparedness Electronic Mail Distribution Department of Community Affairs Electronic Mail Distribution Gene St. Pierre Vice President, Fleet Support J. Kammel Florida Power & Light Company Radiological Emergency Planning Electronic Mail Distribution Administrator Department of Public Safety Ronnie Lingle Electronic Mail Distribution Operations Manager St. Lucie Nuclear Plant Mano Nazar Electronic Mail Distribution Executive Vice President and Chief Nuclear Officer Eric Katzman Florida Power & Light Company Licensing Manager P. O. Box 14000 St. Lucie Nuclear Plant Juno Beach, FL 33408 Electronic Mail Distribution Senior Resident Inspector Larry Nicholson St. Lucie Nuclear Plant Director U.S. Nuclear Regulatory Commission Licensing P.O. Box 6090 Florida Power & Light Company Jensen Beach, FL 34957-2010 Electronic Mail Distribution Seth B. Dunston Alison Brown Training Manager Nuclear Licensing St. Lucie Nuclear Plant Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Faye Outlaw Mitch S. Ross County Administrator Vice President and Associate General St. Lucie County Counsel Electronic Mail Distribution Florida Power & Light Company Electronic Mail Distribution Jack Southard Director Marjan Mashhadi Public Safety Department Senior Attorney St. Lucie County Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution
FPL 3 Letter to Mano Nazar from Marvin D. Sykes dated April 20, 2010
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING/OPEN HOUSE ST. LUCIE NUCLEAR PLANT - DOCKET NOS. 50-335, 50-389 Distribution w/encl:
Region II Administrator=s Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer RidsNrrPMSt.Lucie Resource PMNS L. Slack, RII EICS RIDSNRRDIRS RIDSNRRDIRSIPAB OE Mail PUBLIC
SUBJECT:
PUBLIC MEETING/OPEN HOUSE FACILITY: St. Lucie Nuclear Plant DOCKETS: 50-335, 50-389 DATE & TIME: May 4, 2010, at 1:00 p.m.
LOCATION: St. Lucie Energy Encounter Facility on Hutchinson Island 6501 S A1A, Jensen Beach, Florida PURPOSE: The purpose of the meeting is to provide an open public forum to discuss the Agencys annual assessment of safety performance for the St. Lucie Nuclear Plant. The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) (ML100620086) or from the NRC Web site at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/stl_2009q4.pdf.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding the conduct of NRC meetings.
CATEGORY: This is a Category 3 meeting: Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory. Florida Power and Light Company is encouraged to attend this meeting.
The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC=s meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
NRC OFFICE PARTICIPATING: Region II (RII)
OTHER ORGANIZATIONS PARTICIPATING: None PARTICIPANTS: NRC M. Sykes, Chief, Reactor Projects Branch 3, T. Hoeg, Senior Resident Inspector R. Hannah, Field Public Affairs Officer, RII Enclosure
2 Marvin Sykes MEETING (404) 997-4629 CONTACT: MDS1@nrc.gov AUDIO TELE-CONFERENCING: Not Available VIDEO TELE-CONFERENCING: Not Available Enclosure