ML110670527: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 12: Line 12:
| document type = Slides and Viewgraphs
| document type = Slides and Viewgraphs
| page count = 23
| page count = 23
| project =
| stage = Meeting
}}
}}
=Text=
{{#Wiki_filter:hnirit IH  Pr D
r)prn I
U
1111 Obj ect.......v
* Initiate License Termination Plan (LTP) review process with the NRC
" Provide overview of path forward
  -  Schedule
  -    Issues/Concerns
* Methodology of Derived Concentration Guideline Levels (DCGLs)
* Final Status Survey (FSS) release criteria
Site Desc          . .  .. .* ..
iptiOn
" Humboldt Bay Power Plant.(HBPP) Unit 3 a 220 MWt (65 Mwe) Boiling Water Reactor
" HBPP Unit 3 operated commercially from August 1963 until July 1976
" Unit 3 is on same site as the ISFSI, fossil Units 1 and 2 and recently completed 10 unit Humboldt Bay Generating Station (HBGS) 3
i i Major Activte
            ....a j .o ._.....
I'7,
* HBGS completed construction and startup (2010)
* Units I and 2 demolition (2010-2011)
* 60 Kv Switchyard (2012)
* Reactor vessel removal (2012)
* Removal and demolition of Unit 3 piping, components and structures (2010-2014)
* Site FSS (2015-2016)                    z-I
W Li ce nse Te r m i .n.atio tFI Apply "lessons learned" from previous LTP submittals Draw upon experience of HBPP personnel Maintain open dialogue early with the NRC and Stakeholders
§-r A strong foundation provides for a strong, defensible program 5
__00 % -% '%6-A,-%0 .. %N I' i~  cense Term inatiion-Historical Site Assessment (HSA) developed Performed characterizations Developed site specific DCGLs Develop and Submit LTP, License Amendment Request (LAR), HSA
>Public Meeting
>NRC Approval/License Amendment Develop FSS Program Perform FSS Submit Final Reports NRC Terminates License 6
I 'EkIVIi
            'LT F Sc.hedu Develop DCGLs    Complete LTP Meeting with NRC March 7, 2011 Write LTP    In Progress                I Submit LTP    December 2011 7
3 LL&Issess M,
" Personal interviews of former HBPP personnel employed during Unit 3 operations
" Documents reviewed
  - Plant operating reports and logs
  - Licensee Event Reports
  - Construction and as-built drawings
  - Maps and photographs
  - Environmental and radiological characterization reports
" Submit with LTP 8
aracterizat.ons
" Characterization performed in 1997
  - MARSSIM based sampling survey
" A comprehensive characterization effort performed in 2007-2008
  - Surface scans and fixed-point measurements
  - Soil sampling and gamma walkovers
" Ongoing characterization of the site
  - Excavation soil sampling
  - Cross-Contamination Prevention & Monitoring Plan 9
Formulate an initial list of potential nuclides yes no 10
DCGLs
                                    *~
ýtl Site-Specific S uite of Nuclides H-3        1-129      Pu-241 C-14      Cs-137      Am-241 Ni-59      Eu-152    Cm-243 Co-60      Eu-I 54    Cm-244 Ni-63      Np-237      Cm-245 Sr-90      Pu-238    Cm-246 Nb-94      Pu-239 Tc-99      Pu-240 11
DCGLs
" HBPP Unit 3 located on an industrial site co-located with electricity producing units (HBGS)
* Humboldt Bay site essential to electrical needs in the area
* No better site available in the region to locate generating stations
  - Infrastructure in place
  - Remote location
  - California Coastal Commission
  - Environmental impact
  - Active Switchyard
  - Transmission/Distribution
  - Natural Gas 12
'I DCGLs Scenarios 0 Building Surfaces
    - Industrial Worker
    - Parameters
* Soils
    - Industrial Worker
    - Parameters 13
rX 11 "evel    op FSS Proga.m          .
* Develop HBPP Site-Specific FSS Procedures
* Develop Technical Basis Documents as necessary to support FSS effort
* Compi Ie Su rvey Unit FSS Survey Packages for each Survey Area
* Identify fin a I classifications for Survey Units
* Perform nE.cessary reviews and approvals of FSS Survey Packages 14
II        Perftorm    ... F
* Take isolation and controls of units
* Perform FSS
* Perform any investigations
* Perform Data Quality Assessment (DQA) on data
* Formulate decision based on Data Quality Objectives (DQOs)
* Archive data 15
Submiti t- Final a i eports m  ' " * " ' -* ""
    ~1 e Write "Pilot Report"
* Compile records when all Survey Units in a Survey Area complete
* Write and submit Final Report for each Survey Area
* Archive the report 16
!II u:Lture Interacti ons
" Teleconference Meetings
" Correspondence
" Public Meeting(s) 17
NRC/PG&E MEETING MARCH 7,2011 HUMBOLDT BAY POWER PLANT ALTERNATE DISPOSAL EXEMPTION REQUEST Pacific Gas and Electric Company"
PURPOSE and AGENDA rDiscuss results of first exe mption
*1 request r;-Discuss proposed seco nd exe mption request 2
FIRST EXEMPTION REQUEST go-                                        -- -b
*. April 1, 2010  -  PG&E Submits Request for 200,000 cu. ft.
July 16, 2010  -  NRC Submits Questions rt July 29, 2010 - NRC/PG&E Public Meeting r;7 August 12, 2010- PG&E Submits Revised Request v-, November 2, 2010- NRC Approves r December 16, 2010 - State of Idaho Concurs 3
FIRST EXEMPTION REQUEST Concentration Limits in First Exemption Request r Actual Concentration Values (to date) 4
SECOND EXEMPTION REQUEST r' Proposed for 2,000,000 cu. ft.
* Basis for Volume
* Similar to First Request
*- Concentration Limits from First Request V Isotope Concentrations Based on Actual Shipments/Disposal
* Dose Estimates for Second Request
  .Submittal Expected in Mid-2011 5
CONCLUSIONS Con mments/Questions 6}}

Latest revision as of 06:33, 11 March 2020

Presentation Slides from March 7, 2011, Meeting with Humboldt Bay Power Plant Unit 3, on Decommissioning, License Termination, & Alternate Disposal Exemption Request
ML110670527
Person / Time
Site: Humboldt Bay
Issue date: 03/07/2011
From:
Pacific Gas & Electric Co
To:
NRC/FSME
References
Download: ML110670527 (23)


Text

hnirit IH Pr D

r)prn I

U

1111 Obj ect.......v

  • Initiate License Termination Plan (LTP) review process with the NRC

" Provide overview of path forward

- Schedule

- Issues/Concerns

  • Methodology of Derived Concentration Guideline Levels (DCGLs)
  • Final Status Survey (FSS) release criteria

Site Desc . . .. .* ..

iptiOn

" Humboldt Bay Power Plant.(HBPP) Unit 3 a 220 MWt (65 Mwe) Boiling Water Reactor

" HBPP Unit 3 operated commercially from August 1963 until July 1976

" Unit 3 is on same site as the ISFSI, fossil Units 1 and 2 and recently completed 10 unit Humboldt Bay Generating Station (HBGS) 3

i i Major Activte

....a j .o ._.....

I'7,

  • HBGS completed construction and startup (2010)
  • Units I and 2 demolition (2010-2011)
  • Reactor vessel removal (2012)
  • Removal and demolition of Unit 3 piping, components and structures (2010-2014)
  • Site FSS (2015-2016) z-I

W Li ce nse Te r m i .n.atio tFI Apply "lessons learned" from previous LTP submittals Draw upon experience of HBPP personnel Maintain open dialogue early with the NRC and Stakeholders

§-r A strong foundation provides for a strong, defensible program 5

__00 % -% '%6-A,-%0 .. %N I' i~ cense Term inatiion-Historical Site Assessment (HSA) developed Performed characterizations Developed site specific DCGLs Develop and Submit LTP, License Amendment Request (LAR), HSA

>Public Meeting

>NRC Approval/License Amendment Develop FSS Program Perform FSS Submit Final Reports NRC Terminates License 6

I 'EkIVIi

'LT F Sc.hedu Develop DCGLs Complete LTP Meeting with NRC March 7, 2011 Write LTP In Progress I Submit LTP December 2011 7

3 LL&Issess M,

" Personal interviews of former HBPP personnel employed during Unit 3 operations

" Documents reviewed

- Plant operating reports and logs

- Licensee Event Reports

- Construction and as-built drawings

- Maps and photographs

- Environmental and radiological characterization reports

" Submit with LTP 8

aracterizat.ons

" Characterization performed in 1997

- MARSSIM based sampling survey

" A comprehensive characterization effort performed in 2007-2008

- Surface scans and fixed-point measurements

- Soil sampling and gamma walkovers

" Ongoing characterization of the site

- Excavation soil sampling

- Cross-Contamination Prevention & Monitoring Plan 9

Formulate an initial list of potential nuclides yes no 10

DCGLs

  • ~

ýtl Site-Specific S uite of Nuclides H-3 1-129 Pu-241 C-14 Cs-137 Am-241 Ni-59 Eu-152 Cm-243 Co-60 Eu-I 54 Cm-244 Ni-63 Np-237 Cm-245 Sr-90 Pu-238 Cm-246 Nb-94 Pu-239 Tc-99 Pu-240 11

DCGLs

" HBPP Unit 3 located on an industrial site co-located with electricity producing units (HBGS)

  • Humboldt Bay site essential to electrical needs in the area
  • No better site available in the region to locate generating stations

- Infrastructure in place

- Remote location

- California Coastal Commission

- Environmental impact

- Active Switchyard

- Transmission/Distribution

- Natural Gas 12

'I DCGLs Scenarios 0 Building Surfaces

- Industrial Worker

- Parameters

  • Soils

- Industrial Worker

- Parameters 13

rX 11 "evel op FSS Proga.m .

  • Develop HBPP Site-Specific FSS Procedures
  • Develop Technical Basis Documents as necessary to support FSS effort
  • Compi Ie Su rvey Unit FSS Survey Packages for each Survey Area
  • Identify fin a I classifications for Survey Units
  • Perform nE.cessary reviews and approvals of FSS Survey Packages 14

II Perftorm ... F

  • Take isolation and controls of units
  • Perform any investigations
  • Perform Data Quality Assessment (DQA) on data
  • Formulate decision based on Data Quality Objectives (DQOs)
  • Archive data 15

Submiti t- Final a i eports m ' " * " ' -* ""

~1 e Write "Pilot Report"

  • Compile records when all Survey Units in a Survey Area complete
  • Write and submit Final Report for each Survey Area
  • Archive the report 16

!II u:Lture Interacti ons

" Teleconference Meetings

" Correspondence

" Public Meeting(s) 17

NRC/PG&E MEETING MARCH 7,2011 HUMBOLDT BAY POWER PLANT ALTERNATE DISPOSAL EXEMPTION REQUEST Pacific Gas and Electric Company"

PURPOSE and AGENDA rDiscuss results of first exe mption

  • 1 request r;-Discuss proposed seco nd exe mption request 2

FIRST EXEMPTION REQUEST go- -- -b

  • . April 1, 2010 - PG&E Submits Request for 200,000 cu. ft.

July 16, 2010 - NRC Submits Questions rt July 29, 2010 - NRC/PG&E Public Meeting r;7 August 12, 2010- PG&E Submits Revised Request v-, November 2, 2010- NRC Approves r December 16, 2010 - State of Idaho Concurs 3

FIRST EXEMPTION REQUEST Concentration Limits in First Exemption Request r Actual Concentration Values (to date) 4

SECOND EXEMPTION REQUEST r' Proposed for 2,000,000 cu. ft.

  • Basis for Volume
  • Similar to First Request
  • - Concentration Limits from First Request V Isotope Concentrations Based on Actual Shipments/Disposal
  • Dose Estimates for Second Request

.Submittal Expected in Mid-2011 5

CONCLUSIONS Con mments/Questions 6