| BSOP FERC Rate Case 525,313 (2008) | | BSOP FERC Rate Case 525,313 (2008) |
| In Attachment D of the RAI response dated June 8, 2011, the licensee provided a table of actual expenses from the MY trust fund, for the period of 2005-April 2011. | | In Attachment D of the RAI response dated June 8, 2011, the licensee provided a table of actual expenses from the MY trust fund, for the period of 2005-April 2011. |
|
| |
| Regulatory Basis: | | Regulatory Basis: |
| Reg. Guide 1.184, Decommissioning of Nuclear Power Reactors, states that funds set aside for radiological decommissioning, as required by 10 CFR 50.75, should not be used for: the maintenance and storage of spent fuel in the spent fuel pool; the design or construction of spent fuel dry storage facilities; or other activities not directly related to the long-term storage, radiological decontamination or dismantlement of the facility, or decontamination of the site. | | Reg. Guide 1.184, Decommissioning of Nuclear Power Reactors, states that funds set aside for radiological decommissioning, as required by 10 CFR 50.75, should not be used for: the maintenance and storage of spent fuel in the spent fuel pool; the design or construction of spent fuel dry storage facilities; or other activities not directly related to the long-term storage, radiological decontamination or dismantlement of the facility, or decontamination of the site. |
Letter Sequence RAI |
---|
|
|
MONTHYEARML1105908612011-02-28028 February 2011 Ltr. to W. Norton First Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination (TAC Nos. L24496, L24497, L24498) Project stage: RAI CY-11-009, Connecticut Yankee Atomic Power Company - Decommissioning Funding Assurance Status Report2011-03-15015 March 2011 Connecticut Yankee Atomic Power Company - Decommissioning Funding Assurance Status Report Project stage: Request ML1108101152011-03-15015 March 2011 Yankee, Decommissioning Funding Assurance Status Report Project stage: Request ML1107700222011-03-16016 March 2011 Application for NRC Consent to Indirect License Transfer/Threshold Determination That NRC Consent Is Not Required in Connection with Merger of Northeast Utilities and Nstar Project stage: Request ML1111014022011-04-20020 April 2011 W. Norton Letter Second Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination (TAC Nos. L24496, L24497, L24498) Project stage: RAI CY-11-015, Response to Second Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar2011-05-16016 May 2011 Response to Second Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar Project stage: Request ML1114703702011-05-27027 May 2011 W. Norton Letter Second Request for Additional Information, Part 2, for Application for NRC Consent to Indirect License Transfer/Threshold Determination Project stage: RAI ML11195A3392011-07-13013 July 2011 Morgan Lewis on Behalf of Northeast Utilities and Nstar - Submittal of Supplemental Response to Requests for Additional Information and Negation Action Plan Project stage: Supplement ML1119600682011-07-14014 July 2011 Enclosure - Request for Supplemental Information Related to the Request for Exemption from 10 CFR 50.38 and the Indirect License Transfer Related to Merger of Northeast Utilities and Nstar Project stage: Approval ML1119600612011-07-14014 July 2011 Ltr. to W. Norton Request for Exemption from 10 CFR 50.38 for Maine Yankee Atomic Power Company, Connecticut Yankee Atomic Power Company, and Yankee Atomic Electric Company - Supplemental Information Needed; Relationship of Exemption Reques Project stage: Approval ML1122100232011-08-0505 August 2011 Enclosuthird RAI Related to Application for NRC Consent/Threshold Determination for Indirect License Transfer Related to Merger of Northeast Utilities and Nstar Project stage: RAI ML1122100172011-08-0505 August 2011 W. Norton Letter Third Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination (TAC L24496, L24497, and L24498) Project stage: RAI CY-11-025, Connecticut Yankee and Yankee Atomic, Response to Third Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar2011-08-24024 August 2011 Connecticut Yankee and Yankee Atomic, Response to Third Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar Project stage: Request ML1125003732011-09-0606 September 2011 Notice of Mtg W/ Maine Yankee to Discuss Status of Review of Indirect License Transfer Request Related to Pending Merger of Northeast Utilities & Nstar; Status of Request for Exemption from 10 CFR 50.38; & Decommissioning Financial Assuranc Project stage: Approval ML1127700152011-10-0303 October 2011 Request for Exemption from 10 CFR 50.38 for Maine Yankee Atomic Power Co., Connecticut Yankee Atomic Power Co., and Yankee Atomic Electric Co. - Accepted for Review; Relationship of Exemption Request to Indirect License Transfer and Status Project stage: Approval CY-11-035, Follow-Up to Meeting on September 20, 2011, Regarding Foreign Ownership and Decommissioning Funding Issues2011-10-0505 October 2011 Follow-Up to Meeting on September 20, 2011, Regarding Foreign Ownership and Decommissioning Funding Issues Project stage: Meeting ML11298A0912011-10-20020 October 2011 Summary of Meeting with Yankee Companies, Northeast Utilities (Nu) & Nstar to Discuss Indirect License Transfer Request Related to Pending Merger of Nu & Nstar, Request for Exemption from 10 CFR 50.38 & Decommissioning Financial Assurance Project stage: Meeting ML11326A2562011-12-20020 December 2011 W. Norton Letter Threshold Determination for Facility Operating License No. DPR-36 for Maine Yankee Atomic Power Station (TAC No. L24497) Project stage: Other ML1132701272011-12-20020 December 2011 Enclosure 2 - Safety Evaluation Report Project stage: Approval ML1132701192011-12-20020 December 2011 Order Approving Application Regarding Proposed Merger. DPR-61 (Haddam Neck Plant) Project stage: Other ML1132701142011-12-20020 December 2011 Ltr. to Wayne Norton Order Approving the Indirect Transfer of Facility Operating License No. DPR-61 for the Haddam Neck Plant Project stage: Other ML11327A0292011-12-20020 December 2011 Safety Evaluation Report - Safety Evaluation Indirect Transfer of Control Related to the Merger of Northeast Utilities and Nstar Maine Yankee Atomic Power Company Project stage: Approval ML1132702092011-12-20020 December 2011 Ltr. to W. Norton Order Approving the Indirect Transfers of Facility Operating License No. DPR-3 for the Yankee Nuclear Power Station (Yankee-Rowe) Project stage: Other ML1132702272011-12-20020 December 2011 Order - Approving the Indirect Transfer of Facility Operating License No. DPR-3 for the Yankee Nuclear Power Station (Yankee-Rowe) Project stage: Other CY-12-026, Notice of Merger Closing2012-04-0909 April 2012 Notice of Merger Closing Project stage: Other ML12101A1332012-04-0909 April 2012 Yankee Atomic Electric Company, Notice of Merger Closing Project stage: Other CY-12-030, Notification Regarding Vote on Negation Action Plan and Submittal of Corrected Plan2012-04-24024 April 2012 Notification Regarding Vote on Negation Action Plan and Submittal of Corrected Plan Project stage: Other ML12124A2292012-04-24024 April 2012 Yankee Atomic Electric Company - Notification of Vote on Negation Action Plan and Submittal of Corrected Plan Project stage: Other 2011-05-16
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000213/20240012024-08-27027 August 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation NRC Inspection Report Nos. 07200039/2024001 and 05000213/2024001 IR 05000309/20240012024-06-26026 June 2024 Company – Independent Spent Fuel Storage Installation NRC Inspection Reports 07200030/2024001 And05000309/2024001 ML24094A0742024-05-30030 May 2024 Issuance of Exemption for Connecticut Yankee Atomic Power Company Regarding Haddam Neck Plant Independent Spent Fuel Storage Installation ML24124A1372024-04-30030 April 2024 Independent Spent Fuel Storage Installation - 2023 Individual Monitoring NRC Form 5 Report ML24117A0602024-04-23023 April 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2023 ML24094A0602024-03-28028 March 2024 Independent Spent Fuel Storage Installation, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for the Maine Yankee Independent Spent Fuel Storage Installation ML24074A3812024-03-11011 March 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML24074A3822024-03-11011 March 2024 Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML24085A2222024-03-11011 March 2024 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update ML24047A0552024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML24025A0392024-01-12012 January 2024 Independent Spent Fuel Storage Installation, Property Insurance Coverage ML24057A0212024-01-12012 January 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML23342A0972024-01-0909 January 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML23342A1112024-01-0909 January 2024 Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-23-014, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2023-12-0404 December 2023 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI IR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23117A0452023-04-25025 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23124A2012023-04-20020 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2022 ML23113A0052023-03-31031 March 2023 Request for Exemption from 10 CFR 50.82 10 CFR 50.75 for the Maine Yankee Independent Spent Fuel Storage Installation NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML23068A0132023-03-0606 March 2023 Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4622023-02-24024 February 2023 Closeout Letter to Maine Yankee Atomic Power Company Regarding 2018 and 2021 Updated DFPs for Maine Yankee ISFSI ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI ML22340A4922023-02-24024 February 2023 Closeout Letter to Connecticut Yankee Regarding 2018 and 2021 Updated DFPs for Haddam Neck Plant ISFSI IR 07200030/20234012023-01-26026 January 2023 Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200030/2023401 (Letter Only) ML23026A0802023-01-17017 January 2023 Company - Property Insurance Coverage CY-23-004, Independent Spent Fuel Storage Installation, Property Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Property Insurance Coverage CY-23-003, Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage CY-23-002, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments CY-23-001, Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 IR 07200030/20224012022-10-11011 October 2022 Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200030/2022401 IR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22216A0682022-07-28028 July 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-010, Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager2022-05-25025 May 2022 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager ML22136A1562022-04-28028 April 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2021 CY-22-006, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20212022-04-25025 April 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2021 ML22119A2112022-04-18018 April 2022 Independent Spent Fuel Storage Installation - Yankee Atomic Electric Company Adoption of NAC-MPC System, Amendment 8 Certificate of Compliance and Canister Registration 2024-08-27
[Table view] |
Text
MAINE YANKEE ATOMIC POWER COMPANY CONNECTICUT YANKEE ATOMIC POWER COMPANY YANKEE ATOMIC ELECTRIC COMPANY DOCKET NOS. 50-309, 50-213,50-029, 72-30, 72-39, AND 72-31 THIRD REQUEST FOR ADDITIONAL INFORMATION RELATED TO APPLICATION FOR NRC CONSENT/THRESHOLD DETERMINATION FOR INDIRECT LICENSE TRANSFER RELATED TO MERGER OF NORTHEAST UTILITIES AND NSTAR Request for Additional Information:
- 1. Trust Funds for Radiological Decommissioning vs. Spent Fuel For Maine Yankee Atomic Power Company (MY), Connecticut Yankee Atomic Power Company (CY) and Yankee Atomic Electric Company (Yankee Rowe (YR)), indicate if funds for spent fuel maintenance and storage (as required by 10 CFR 50.54(bb)) are maintained in a fund separate from the decommissioning trust fund. Also, indicate the system of subaccounts used to separate decommissioning funds from other funds in commingled accounts.
Regulatory Basis:
Per Reg. Guide 1.184, Decommissioning of Nuclear Power Reactors, amounts set aside for radiological decommissioning, as required by 10 CFR 50.75, should not be used for: the maintenance and storage of spent fuel in the spent fuel pool; the design or construction of spent fuel dry storage facilities; or other activities not directly related to the long-term storage, radiological decontamination or dismantlement of the facility, or decontamination of the site.
Per 10 CFR 50.82(a)(8) and 50.82(a)(8)(i)(A), expenditures from the decommissioning trust fund are allowed for decommissioning as currently defined in 10 CFR 50.2, and withdrawals from decommissioning trust funds are limited to legitimate decommissioning activities consistent with the definition of decommissioning.
Pursuant to 10 CFR 50.75(e)(2), the NRC reserves the right to review the accumulation of decommissioning funds.
- 2. Withdrawals from the Decommissioning Trust Fund For MY, CY, and YR, explain how the actual and projected expenditures from the decommissioning trust fund, which are listed in Attachments A through H of the request for additional information (RAI) response dated June 8, 2011 (ML11166A124), are for legitimate Enclosure
decommissioning activities consistent with the definition of decommissioning in 10 CFR 50.2, with particular attention to the expenses listed in the tables below.
- a. Connecticut Yankee These expenses were listed in Attachment A, pgs. 1-4, of the RAI response dated June 8, 2011 (ML11166A124), as follows:
Row Description Annual Cost 14 Morris Spent Fuel 1,755,089 11 Travel Expenses 42,666 50 Community Relations 26,300 58 DOE Litigation 1,096,000 69 Consulting Services 64,170 115 Vehicles Corporate 43,429 In Attachment A, Page 1, of the RAI response dated June 8, 2011, the licensee provided a table of annual decommissioning costs for 2010 for a total of $11.7 million. The licensee then provided a line item breakdown of each cost in part 2 of Attachment A, pages 1-4.
Further, in Attachment C of the RAI response dated June 8, 2011, the licensee provided a table of actual expenses from the CY trust fund, for the period of 2005-April 2011.
- b. Yankee Rowe These expenses were listed in Attachment B of the RAI response dated June 8, 2011, as follows:
Row Description Year/Cost 2 DOE Litigation 1,096,931 (2014) 1 FERC Rate Case Legal 548,465 (2010) 27 High Speed Internet 15,526 (2010)
In Attachment E of the RAI response dated June 8, 2011, the licensee provided a table of actual expenses from the YR trust fund, for the period of 2005-April 2011.
- c. Maine Yankee These expenses were listed in Attachment H of the RAI response dated June 8, 2011 (ML11166A124), as follows:
Row Description Year/Cost BSOP Meals 2,627 (2008)
EXEC Travel 10,506 (2008)
BSOP Business Auto 2,101 (2008)
BSOP FERC Rate Case 525,313 (2008)
In Attachment D of the RAI response dated June 8, 2011, the licensee provided a table of actual expenses from the MY trust fund, for the period of 2005-April 2011.
Regulatory Basis:
Reg. Guide 1.184, Decommissioning of Nuclear Power Reactors, states that funds set aside for radiological decommissioning, as required by 10 CFR 50.75, should not be used for: the maintenance and storage of spent fuel in the spent fuel pool; the design or construction of spent fuel dry storage facilities; or other activities not directly related to the long-term storage, radiological decontamination or dismantlement of the facility, or decontamination of the site.
Per 10 CFR 50.82(a)(8) and 50.82(a)(8)(i)(A), expenditures from the decommissioning trust fund are allowed for decommissioning as currently defined in 10 CFR 50.2, and withdrawals from decommissioning trust funds are limited to legitimate decommissioning activities consistent with the definition of decommissioning.
Pursuant to 10 CFR 50.75(e)(2), the NRC reserves the right to review the accumulation of decommissioning funds.
This information is required to evaluate compliance with 10 CFR 50.75 and 50.82.
- 3. Connecticut Yankee - Summary of Expenses Provide the supporting calculations and further clarification for the end of year balance listed for the year 2011 for spreadsheet 1 on page 2 of Enclosure 1, of the RAI response dated June 8, 2011. The total shown for the end of year balance is $206.4 million. Based on your March 15, 2011 submission (ML110810111), the end of year 2010 balance for the CY decommissioning trust fund was $197.2 million. However, the staff notes a discrepancy between the 2011 end of year balance reported ($206.4M) and the 2011 end of year balance based on the values submitted ($235.7M).
Please clarify the end of year 2011 fund balance.
Description Total ($ millions)
Fund balance Dec. 31, 2010 197.2 Less Spent Fuel Expense (10.8)
Earnings on Trust Fund 8.3 Collections deposited in trust fund 40.9 Total End of Year 2011 235.7 Regulatory Basis:
Per 10 CFR 50.82(a)(8) and 50.82(a)(8)(i)(A), expenditures from the decommissioning trust fund are allowed for decommissioning as currently defined in 10 CFR 50.2, and withdrawals from decommissioning trust funds are limited to legitimate decommissioning activities consistent with the definition of decommissioning.
Pursuant to 10 CFR 50.75(e)(2), the NRC reserves the right to review the accumulation of decommissioning funds.
This information is required to evaluate compliance with 10 CFR 50.75 and 50.82.
- 4. Connecticut Yankee - Decommissioning Funding Assurance Based on the information submitted by the licensee, in the RAI response dated June 8, 2011, CY has a potential shortfall in decommissioning funding of $5.66 million, beginning in 2023, listed on spreadsheet 1 on page 2 of Enclosure 1. Provide further information regarding total expenses from the decommissioning trust and projected future collections in sufficient detail for the staff to determine if there is reasonable assurance that sufficient funds will be available for decommissioning.
Regulatory Basis:
Per 10 CFR 50.82(a)(8)(i)(C), withdrawals are not permitted if they would inhibit the ability of the licensee to complete funding of any shortfalls in the decommissioning trust needed to ensure the availability of funds to ultimately release the site and terminate the license.
This information is required to evaluate compliance with 10 CFR 50.75 and 50.82.
- 5. Yankee Rowe - Summary of Expenses Provide the supporting calculations and further clarification for the end of year balance listed for the year 2011 for spreadsheet 2 on page 2 of Enclosure 1, in the RAI response dated June 8, 2011. The total shown for the end of year balance for 2011 is $46.1 million. Based on your March 15, 2011, submission (ML110810115), the end of year 2010 balance for the YR decommissioning trust fund was $95.6 million. However, the staff notes a discrepancy between the 2011 end of year balance reported ($46M) and the 2011 end of year balance based on the values submitted ($102.1M).
Please clarify the end of year balance for 2011.
Description Total ($ millions)
Fund balance Dec. 31, 2010 95.6 Less Spent Fuel Expense (7.1)
Earnings on Trust Fund 1.8 Collections deposited in trust fund 11.8 Total End of Year 2011 102.1 Regulatory Basis:
Per 10 CFR 50.82(a)(8) and 50.82(a)(8)(i)(A), expenditures from the decommissioning trust fund are allowed for decommissioning as currently defined in 10 CFR 50.2, and withdrawals from decommissioning trust funds are limited to legitimate decommissioning activities consistent with the definition of decommissioning.
Pursuant to 10 CFR 50.75(e)(2), the NRC reserves the right to review the accumulation of decommissioning funds.
This information is required to evaluate compliance with 10 CFR 50.75 and 50.82.