ML11227A057: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/15/2011
| issue date = 08/15/2011
| title = NRC Staff Notice of Updated Hearing File in the Matter of Diablo Canyon, Units 1 and 2
| title = NRC Staff Notice of Updated Hearing File in the Matter of Diablo Canyon, Units 1 and 2
| author name = Subin L B
| author name = Subin L
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC
| addressee name = Abramson P B, Karlin A S, Trikouros N G
| addressee name = Abramson P, Karlin A, Trikouros N
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:August 1 5, 201 1    In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)
{{#Wiki_filter:August 15, 2011 Administrative Judge                                Administrative Judge Alex S. Karlin, Chair                              Paul B. Abramson Atomic Safety and Licensing Board Panel            Atomic Safety and Licensing Board Panel Mail Stop: T-3F23                                  Mail Stop: T-3F23 Washington, DC 20555-001                            Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)
Docket Nos. 50
Docket Nos. 50-275-LR and 50-323-LR
-275-LR and 50-323-LR    


==Dear Administrative Judges:==
==Dear Administrative Judges:==


In accordance with the Board's September 15, 2010, Memorandum, and Section 2.1203(a), the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agency's Electronic Hearing Docket ("EHD") associated with this proceeding entitled "Diablo Hearing File," and the updated documents, along with an index listing the documents, will be published in that folder.
In accordance with the Boards September 15, 2010, Memorandum, and Section 2.1203(a), the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Hearing File, and the updated documents, along with an index listing the documents, will be published in that folder.
Respectfully submitted,
Respectfully submitted,
        /signed (electronically) by/
                                                      /signed (electronically) by/
Lloyd B. Subin Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O
Lloyd B. Subin Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1988 Lloyd.Subin@nrc.gov
-15 D21       Washington, DC 205 55-0001       (301) 415-1 988        Lloyd.Subin@nrc.gov Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop: T
-3F23 Washington, DC 20555
-001  Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop: T
-3F23 Washington, DC 20555
-0001  Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T
-3F23 Washington, DC 20555
-0001 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
        )            ) PACIFIC GAS AND ELECTRIC COMPANY
    )  Docket Nos. 50
-275-LR/ 50-323-LR      ) (Diablo Canyon Nuclear Power Plant,      ) ASLBP No. 10
-900-01-LR-BD01  Units 1 and 2)
    )                CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing NRC Staff lett er dated August 15, 2011, have been served upon the following by the Electronic Information Exchange, this 1 5 th day of August , 20 1 1:  Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop
- T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555
-0001 E-mail: ask 2@nrc.gov Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop
- T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555
-0001 E-mail: ngt@nrc.gov  Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop
- T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555
-0001 E-mail: pba@nrc.gov Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop
- O-16G4 Washington, DC 20555
-0001 E-mail: ocaamail@nrc.gov Office of the Secretary Attn: Rulemakings and Adjudications Staff Mail Stop: O
-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555
-0001 E-mail: HEARINGDOCKET@nrc.gov David A. Repka, Esq.
Tyson Smith, Esq.
Carlos Sisco Winston & Strawn LLP 101 California Street San Francisco, CA 94111
-5802 E-mail:  drepka@winston.com trsmith@winston.com CSisco@winston.com


Jill ZamEk, Esq.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net Diane Curran, Esq.
                                                    )
Harmon, Curran, Spielberg, and Eisenberg 1726 M Street NW Suite 600 Washington, DC 20036 E-mail: dcurran@harmoncurran.com
PACIFIC GAS AND ELECTRIC COMPANY                    )        Docket Nos. 50-275-LR/ 50-323-LR
                                                    )
(Diablo Canyon Nuclear Power Plant,                 )        ASLBP No. 10-900-01-LR-BD01 Units 1 and 2)                              )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing NRC Staff letter dated August 15, 2011, have been served upon the following by the Electronic Information Exchange, this 15th day of August, 2011:
Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23                                  Office of Commission Appellate U.S. Nuclear Regulatory Commission                    Adjudication Washington, DC 20555-0001                            U.S. Nuclear Regulatory Commission E-mail: ask2@nrc.gov                                Mail Stop - O-16G4 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23                                  Office of the Secretary U.S. Nuclear Regulatory Commission                  Attn: Rulemakings and Adjudications Staff Washington, DC 20555-0001                            Mail Stop: O-16G4 E-mail: ngt@nrc.gov                                  U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge                                E-mail: HEARINGDOCKET@nrc.gov Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23                                  David A. Repka, Esq.
U.S. Nuclear Regulatory Commission                  Tyson Smith, Esq.
Washington, DC 20555-0001                            Carlos Sisco E-mail: pba@nrc.gov                                  Winston & Strawn LLP 101 California Street San Francisco, CA 94111-5802 E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com


     /Signed (electronically) by
Diane Curran, Esq.
/ _______________________________
Harmon, Curran, Spielberg, and Eisenberg 1726 M Street NW Suite 600 Jill ZamEk, Esq.                      Washington, DC 20036 San Luis Obispo Mothers for Peace     E-mail: dcurran@harmoncurran.com 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net
Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop  
                                      /Signed (electronically) by/
- O-15D21 Washington, DC 20555 Telephone: (301) 415-1 988 E-mail: Lloyd.Subin@nrc.gov Date of signature
Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of signature: August 15, 2011}}
: August 15 , 2011}}

Latest revision as of 18:12, 10 March 2020

NRC Staff Notice of Updated Hearing File in the Matter of Diablo Canyon, Units 1 and 2
ML11227A057
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/15/2011
From: Subin L
NRC/OGC
To: Abramson P, Karlin A, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 20764, 50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01
Download: ML11227A057 (3)


Text

August 15, 2011 Administrative Judge Administrative Judge Alex S. Karlin, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR

Dear Administrative Judges:

In accordance with the Boards September 15, 2010, Memorandum, and Section 2.1203(a), the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Hearing File, and the updated documents, along with an index listing the documents, will be published in that folder.

Respectfully submitted,

/signed (electronically) by/

Lloyd B. Subin Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1988 Lloyd.Subin@nrc.gov

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) Docket Nos. 50-275-LR/ 50-323-LR

)

(Diablo Canyon Nuclear Power Plant, ) ASLBP No. 10-900-01-LR-BD01 Units 1 and 2) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing NRC Staff letter dated August 15, 2011, have been served upon the following by the Electronic Information Exchange, this 15th day of August, 2011:

Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 Office of Commission Appellate U.S. Nuclear Regulatory Commission Adjudication Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission E-mail: ask2@nrc.gov Mail Stop - O-16G4 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 Office of the Secretary U.S. Nuclear Regulatory Commission Attn: Rulemakings and Adjudications Staff Washington, DC 20555-0001 Mail Stop: O-16G4 E-mail: ngt@nrc.gov U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Administrative Judge E-mail: HEARINGDOCKET@nrc.gov Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 David A. Repka, Esq.

U.S. Nuclear Regulatory Commission Tyson Smith, Esq.

Washington, DC 20555-0001 Carlos Sisco E-mail: pba@nrc.gov Winston & Strawn LLP 101 California Street San Francisco, CA 94111-5802 E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com

Diane Curran, Esq.

Harmon, Curran, Spielberg, and Eisenberg 1726 M Street NW Suite 600 Jill ZamEk, Esq. Washington, DC 20036 San Luis Obispo Mothers for Peace E-mail: dcurran@harmoncurran.com 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net

/Signed (electronically) by/

Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of signature: August 15, 2011