ML13015A106

From kanterella
Jump to navigation Jump to search
NRC Staff Notification of Update to Hearing File in the Matter of Diablo Canyon, Units 1 and 2
ML13015A106
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/15/2013
From: Subin L
NRC/OGC
To: Abramson P, Karlin A, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 24015, 50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01
Download: ML13015A106 (2)


Text

January 15, 2013 Administrative Judge Administrative Judge Alex S. Karlin, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR

Dear Administrative Judges:

In accordance with the Boards November 19, 2012 Revised Scheduling Order and Section 2.1203 and Section 2.336, the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Hearing File, and the updated documents, along with an index listing the documents, will be published in that folder.

Respectfully submitted,

/signed (electronically) by/

Lloyd B. Subin Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1988 Lloyd.Subin@nrc.gov

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) Docket Nos. 50-275-LR/ 50-323-LR

)

(Diablo Canyon Nuclear Power Plant, ) ASLBP No. 10-900-01-LR-BD01 Units 1 and 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the foregoing NRC Staff letter dated January 15, 2013, have been served upon the following by the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 15th day of January 2013:

/Signed (electronically) by/

Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of signature: January 15, 2013