ML13137A211

From kanterella
Jump to navigation Jump to search
Projected Schedule for Completion of the Safety and Environmental Evaluations
ML13137A211
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/17/2013
From: Subin L
NRC/OGC
To: Abramson P, Karlin A, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 24545, 50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01
Download: ML13137A211 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 May 17, 2013 Administrative Judge Administrative Judge Alex S. Karlin, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR RE: Projected Schedule for Completion of the Safety and Environmental Evaluations

Dear Administrative Judges:

Pursuant to the Boards Revised Scheduling Order of November 19, 2012, this letter informs the Board of the NRC Staffs current milestone schedule for the Diablo Canyon Units 1 and 2 license renewal safety evaluation and environmental review. In light of PG&Es status report filed with the Board on May 14, 2013, the Staff expects to issue the DSEIS in September of 2014. Subsequent to issuing the DSEIS, the Staff expects to finalize its safety and environmental reviews, to include issuance of the supplemental environmental impact statement (SEIS) and any necessary supplements to the safety evaluation report by the end of April 2015.

This estimate is based on PG&Es intent to issue a written final report on the seismic studies in June 2014, as stated in PG&Es Updated Best Estimate Schedule for Seismic Studies attached to PG&Es May 14, 2013 Status Report issued to the Board.

Sincerely, Signed (electronically) by Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of signature: May 17, 2013

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) Docket Nos. 50-275-LR/ 50-323-LR

)

(Diablo Canyon Nuclear Power Plant, ) ASLBP No. 10-900-01-LR-BD01 Units 1 and 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that a copy of the foregoing letter regarding the Projected Schedule for Completion of the Safety and Environmental Evaluations, dated April 18, 2013, has been served upon the following by the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 17th day of May, 2013:

Signed (electronically) by Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of signature: May 17, 2013

David A. Repka, Esq.

Administrative Judge Tyson Smith, Esq.

Alex S. Karlin, Chair Carlos Sisco Atomic Safety and Licensing Board Panel Winston & Strawn LLP Mail Stop - T-3 F23 101 California Street U.S. Nuclear Regulatory Commission San Francisco, CA 94111-5802 Washington, DC 20555-0001 E-mail: drepka@winston.com E-mail: ask2@nrc.gov trsmith@winston.com CSisco@winston.com Administrative Judge Nicholas G. Trikouros Jill ZamEk, Esq.

Atomic Safety and Licensing Board Panel San Luis Obispo Mothers for Peace Mail Stop - T-3 F23 1123 Flora Road U.S. Nuclear Regulatory Commission Arroyo Grande, CA 93420 Washington, DC 20555-0001 E-mail: jzk@charter.net E-mail: ngt@nrc.gov Diane Curran, Esq.

Administrative Judge Harmon, Curran, Spielberg, and Eisenberg Paul B. Abramson 1726 M Street NW Atomic Safety and Licensing Board Panel Suite 600 Mail Stop - T-3 F23 Washington, DC 20036 U.S. Nuclear Regulatory Commission E-mail: dcurran@harmoncurran.com Washington, DC 20555-0001 E-mail: pba@nrc.gov Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop - O-16G4 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov Office of the Secretary Attn: Rulemakings and Adjudications Staff Mail Stop: O-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: HEARINGDOCKET@nrc.gov

/Signed (electronically) by/

Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of signature: May 17, 2012