ML13294A049

From kanterella
Jump to navigation Jump to search
NRC Staff October 2013 Hearing File Update Letter in the Matter of Diablo Canyon, Units 1 and 2
ML13294A049
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/21/2013
From: Catherine Kanatas
NRC/OGC
To: Abramson P, Karlin A, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-275-LR, 50-323-LR, ASLBP 10-900-01-LR-BD01, RAS 25257
Download: ML13294A049 (3)


Text

October 21, 2013 Administrative Judge Administrative Judge Alex S. Karlin, Chair Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR

Dear Administrative Judges:

In accordance with the Boards November 19, 2012 Revised Scheduling Order and Section 2.1203 and Section 2.336, as modified by the Secretarys October 10, 2013 Notice, 1 the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Canyon Hearing File, and if any documents are produced for this period, the updated documents, along with an index listing the documents, will be published in that folder.

1 See Notice of the Secretary (Regarding Agency Shutdown) (Oct. 10, 2013) (Agencywide Documents Access and Management System Accession No. ML13283A068) (Notice). Pursuant to the Notice, this hearing file update letter is timely filed. Id. at 3 (providing guidance on calculating the duration of an automatic extension given the lapse in government funds).

Judge Karlin October 21, 2013 Judge Abramson Judge Trikouros Respectfully Submitted, Signed (electronically) by Catherine E. Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of signature: October 21, 2013

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) 50-275-LR/ 50-3523-LR

)

(Diablo Canyon Nuclear Power Plant, )

Units 1 and 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised) I hereby certify that copies of the foregoing OCTOBER 2013 HEARING FILE UPDATE LETTER, dated October 21, 2013, have been served upon the Electronic Information Exchange, the NRCs E-filing System, in the above captioned proceeding, this 21st day of October, 2013.

/Signed (electronically) by/

Catherine E. Kanatas Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-2321 E-mail: catherine.kanatas@nrc.gov Date of signature: October 21, 2013