May 15, 2015 Administrative Judge Administrative Judge Paul S. Ryerson, Chair Dr. Gary S. Arnold Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and

2) Docket Nos. 50-275-LR and 50-323-LR

Dear Administrative Judges:

In accordance with the Boards November 19, 2012 Revised Scheduling Order and Section 2.1203 and Section 2.336, the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agencys Electronic Hearing Docket (EHD) associated with this proceeding entitled Diablo Canyon Hearing File, and if any documents are produced for this period, the updated documents, along with an index listing the documents, will be published in that folder.

Respectfully Submitted, Signed (electronically) by Joseph A. Lindell Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1474 E-mail: joseph.lindell@nrc.gov Date of signature: May 15, 2015

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) 50-275-LR/ 50-3523-LR

)

(Diablo Canyon Nuclear Power Plant, )

Units 1 and 2) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised) I hereby certify that copies of the foregoing MAY 2015 HEARING FILE UPDATE LETTER, dated May 15, 2015, have been served upon the Electronic Information Exchange, the NRCs E-filing System, in the above captioned proceeding, this 15th day of May, 2015.

/Signed (electronically) by/

Joseph A. Lindell Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1474 E-mail: joseph.lindell@nrc.gov Date of signature: May 15, 2015