Projected Schedule for Completion of the Safety and Environmental Evaluations in the Matter of Diablo Canyon, Units 1 and 2
ML12264A364
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/20/2012
From: Subin L
NRC/OGC
To: Abramson P, Karlin A, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 23484, 50-275-LR, 50-323-LR, ASBLP 10-900-01-LR-BD01
Download: ML12264A364 (5)


Text

September 20, 2012 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50-275-LR and 50-323-LR RE:

Projected Schedule for Completion of the Safety and Environmental Evaluations

Dear Administrative Judges:

Pursuant to the Boards Order of August 5, 2010 (Scheduling Initial Scheduling Conference), this letter informs the Board of the NRC Staffs current milestone schedule for the Diablo Canyon Units 1 and 2 license renewal safety evaluation and environmental review. In light of PG&Es status report filed with the Board on September 11, 2012, the Staff expects to issue the DSEIS in January of 2015. Subsequent to issuing the DSEIS, the Staff expects to finalize its safety and environmental reviews, to include issuance of the supplemental environmental impact statement (SEIS) and any necessary supplements to the safety evaluation report by the end of June 2015. This estimate is based on the applicant issuing its final report on the seismic studies by September 2014, as stated in PG&Es Updated Best Estimate Schedule for Seismic Studies attached to PG&Es September 11, 2012 update to the Board.

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Washington, DC 20555-001 Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Washington, DC 20555-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Washington, DC 20555-0001 Sincerely, Signed (electronically) by Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of signature: September 20, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of

)

)

PACIFIC GAS AND ELECTRIC COMPANY

)

Docket Nos. 50-275-LR/ 50-323-LR

)

(Diablo Canyon Nuclear Power Plant,

)

ASLBP No. 10-900-01-LR-BD01 Units 1 and 2)

)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Letter regarding Projected Schedule for Completion of the Safety and Environmental Evaluations, dated September 20, 2012 have been served upon the following by t he Elect ronic Inf orm at ion Exchange, this 20th day of September, 2012:

Adm inist rat ive Judge Alex S. Karlin, Chair At om ic Saf et y and Licensing Board Panel Mail St op - T-3 F23 U.S. Nuclear Regulat ory Com m ission Washingt on, DC 20555-0001 E-m ail: ask2@nrc.gov Adm inist rat ive Judge Nicholas G. Trikouros At om ic Saf et y and Licensing Board Panel Mail St op - T-3 F23 U.S. Nuclear Regulat ory Com m ission Washingt on, DC 20555-0001 E-m ail: ngt @nrc.gov Adm inist rat ive Judge Paul B. Abram son At om ic Saf et y and Licensing Board Panel Mail St op - T-3 F23 U.S. Nuclear Regulat ory Com m ission Washingt on, DC 20555-0001 E-m ail: pba@nrc.gov Of f ice of Com m ission Appellat e Adjudicat ion U.S. Nuclear Regulat ory Com m ission Mail St op - O-16G4 Washingt on, DC 20555-0001 E-m ail: ocaam ail@nrc.gov Office of the Secretary Attn: Rulemakings and Adjudications Staff Mail Stop: O-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: HEARINGDOCKET@nrc.gov David A. Repka, Esq.

Tyson Smith, Esq.

Carlos Sisco Winston & Strawn LLP 101 California Street San Francisco, CA 94111-5802 E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.

San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net Diane Curran, Esq.

Harmon, Curran, Spielberg, and Eisenberg 1726 M Street NW Suite 600 Washington, DC 20036 E-mail: dcurran@harmoncurran.com Signed (electronically) by Lloyd B. Subin Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop - O-15D21 Washington, DC 20555 Telephone: (301) 415-1988 E-mail: Lloyd.Subin@nrc.gov Date of signature: September 20, 2012