ML19092A480: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 22: | Line 22: | ||
==Subject:== | ==Subject:== | ||
RE: D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-563 (EPID L-2019-LLA-0040) | RE: D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-563 (EPID L-2019-LLA-0040) | ||
By letter dated February 26, 2019 (Agencywide Documents Access and Management System Accession No. | By letter dated February 26, 2019 (Agencywide Documents Access and Management System Accession No. ML19063A498), Indiana Michigan Power Company submitted a license amendment request for the Donald C. | ||
ML19063A498), Indiana Michigan Power Company submitted a license amendment request for the Donald C. | |||
Cook Nuclear Plant, Unit Nos. 1 and 2. The proposed amendment would adopt TSTF-563 Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. | Cook Nuclear Plant, Unit Nos. 1 and 2. The proposed amendment would adopt TSTF-563 Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. | ||
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | ||
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 70 hours to complete. The NRC staff expects to complete this review in approximately 12 months, which is April, 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. | Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately [[estimated NRC review hours::70 hours]] to complete. The NRC staff expects to complete this review in approximately 12 months, which is April, 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. | ||
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications. | These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications. | ||
If you have any questions, please contact me at 301-415-3733. | If you have any questions, please contact me at 301-415-3733. |
Latest revision as of 21:13, 3 March 2020
ML19092A480 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 04/02/2019 |
From: | Robert Kuntz Plant Licensing Branch III |
To: | Levendosky H Indiana Michigan Power Co |
References | |
L-2019-LLA-0040 | |
Download: ML19092A480 (3) | |
Text
NRR-DMPSPEm Resource From: Kuntz, Robert Sent: Tuesday, April 2, 2019 1:50 PM To: Helen L Levendosky
Subject:
RE: D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-563 (EPID L-2019-LLA-0040)
By letter dated February 26, 2019 (Agencywide Documents Access and Management System Accession No. ML19063A498), Indiana Michigan Power Company submitted a license amendment request for the Donald C.
Cook Nuclear Plant, Unit Nos. 1 and 2. The proposed amendment would adopt TSTF-563 Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 70 hours2.917 days <br />0.417 weeks <br />0.0959 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is April, 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me at 301-415-3733.
Sincerely, Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing 1
Office of Nuclear Reactor Regulation 2
Hearing Identifier: NRR_DMPS Email Number: 900 Mail Envelope Properties (BN6PR09MB15070CCF156C6BEF863722B399560)
Subject:
RE: D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-563 (EPID L-2019-LLA-0040)
Sent Date: 4/2/2019 1:49:52 PM Received Date: 4/2/2019 1:49:00 PM From: Kuntz, Robert Created By: Robert.Kuntz@nrc.gov Recipients:
"Helen L Levendosky" <hllevendosky@aep.com>
Tracking Status: None Post Office: BN6PR09MB1507.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3494 4/2/2019 1:49:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: