{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 26, 2011 Mr. R. M. Krich Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 26, 2011 Mr. R. M. Krich Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801


==SUBJECT:==
==SUBJECT:==
BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR PART 2 OF NRC SUPPLEMENTAL INSPECTION  
BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR PART 2 OF NRC SUPPLEMENTAL INSPECTION


==Dear Mr. Krich:==
==Dear Mr. Krich:==


The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a supplemental inspection at your Browns Ferry Nuclear Plant beginning on October 1, 2011. The inspection team will be led by John Jandovitz, a Project Engineer from the NRC's Region III office. This inspection will be conducted in accordance with Inspection Procedure 95003, "Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input,
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a supplemental inspection at your Browns Ferry Nuclear Plant beginning on October 1, 2011. The inspection team will be led by John Jandovitz, a Project Engineer from the NRCs Region III office. This inspection will be conducted in accordance with Inspection Procedure 95003, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input, Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.
The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than the specified dates described in the enclosure to this letter. Contact Mr. Jandovitz with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection. 
TVA                                         2 Thank you for your cooperation in this matter. If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Jandovitz at 630-829-9763 or john.jandovitz@nrc.gov. You may also contact Mr. Craig Kontz at 404-997-4715 or craig.kontz@nrc.gov.
 
Sincerely,
The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than the specified dates described in the enclosure to this letter. Contact Mr. Jandovitz with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.
                                              /RA/
 
Eugene F. Guthrie, Chief Special Projects, Browns Ferry Division of Reactor Projects Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
 
TVA 2   Thank you for your cooperation in this matter. If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Jandovitz at 630-829-9763 or john.jandovitz@nrc.gov. You may also contact Mr. Craig Kontz at 404-997-4715 or craig.kontz@nrc.gov. Sincerely,         /RA/ Eugene F. Guthrie, Chief Special Projects, Browns Ferry Division of Reactor Projects Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68  


==Enclosure:==
==Enclosure:==
As stated cc w/encl: (See page 3)  
As stated cc w/encl: (See page 3)
 
PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.
"PAPERWORK REDUCTION ACT STATEMENT
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.


This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. PUBLIC PROTECTION NOTIFICATION
____ML112690416_________                G SUNSI REVIEW COMPLETE OFFICE            RII:DRP        RII:DRP      RIII:DRP SIGNATURE          EFG /RA for/  EFG /RA/      Via email NAME              C Kontz        E Guthrie    J Jandovitz DATE                  09/26/2011    09/26/2011    09/26/2011 E-MAIL COPY?        YES    NO    YES      NO  YES      NO    YES  NO    YES    NO    YES    NO  YES NO TVA                                    3 cc w/encl:
K. J. Polson Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution C.J. Gannon General Manager Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution J. E. Emens Manager, Licensing Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution T. C. Matthews Manager, Corporate Nuclear Licensing -
BFN Tennessee Valley Authority Electronic Mail Distribution E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority Electronic Mail Distribution Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 Donald E. Williamson State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 30317 Montgomery, AL 36130-3017 James L. McNees, CHP Director Office of Radiation Control Alabama Dept. of Public Health P. O. Box 303017 Montgomery, AL 36130-3017


The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number."
TVA                                         4 Letter to R. M. Krich from Eugene F. Guthrie dated September 26, 2011
 
____ML112690416_________
G SUNSI REVIEW COMPLETE  OFFICE RII:DRP RII:DRP RIII:DRP    SIGNATURE EFG /RA for/ EFG /RA/ Via email    NAME C Kontz E Guthrie J Jandovitz    DATE 09/26/2011 09/26/2011 09/26/2011    E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO TVA 3  cc w/encl: K. J. Polson Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution C.J. Gannon General Manager Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution J. E. Emens Manager, Licensing Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution T. C. Matthews Manager, Corporate Nuclear Licensing -
 
BFN Tennessee Valley Authority Electronic Mail Distribution E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority Electronic Mail Distribution Chairman Limestone County Commission 310 West Washington Street Athens, AL  35611 Donald E. Williamson State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 30317 Montgomery, AL  36130-3017
 
James L. McNees, CHP Director Office of Radiation Control Alabama Dept. of Public Health P. O. Box 303017 Montgomery, AL  36130-3017
 
TVA 4   Letter to R. M. Krich from Eugene F. Guthrie dated September 26, 2011  


==SUBJECT:==
==SUBJECT:==
BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR PART 2 OF NRC SUPPLEMENTAL INSPECTION Distribution w/encl
BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR PART 2 OF NRC SUPPLEMENTAL INSPECTION Distribution w/encl:
: C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerry Resource Enclosure Requested Information for Part 2 of Browns Ferry 95003 Inspection
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerry Resource


Note: Unless otherwise noted, the information requested below corresponds to documents generated for the past five years for unit 1 and the last three years for units 2 and 3. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
Requested Information for Part 2 of Browns Ferry 95003 Inspection Note: Unless otherwise noted, the information requested below corresponds to documents generated for the past five years for unit 1 and the last three years for units 2 and 3. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
A. Information To Be supplied By October 3
A. Information To Be supplied By October 3
: 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the: a. Corrective action program. b. Operating experience program c. Self-assessment program d. Maintenance Rule program e. Maintenance program
: 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the:
: f. Preventative Maintenance Program g. Corrective Maintenance Program h. Degraded/non-conforming condition process (e.g., RIS 2005-20) i. System Health process or equivalent equipment reliability improvement programs j. Maintenance training Program
: a. Corrective action program.
: k. Surveillance Testing l. Post Maintenance Testing m. Browns Ferry Nuclear Plant's Procedure Control Procedure (i.e. the procedure that delineates expectations for procedure use and adherence) 2. The risk ranking of systems, structures and components for each unit.
: b. Operating experience program
: 3. The Maintenance Rule (MR) 50.65(a)(3) periodic report 4. A list of systems in a(1) and in a(2) a. System Health reports for all a(1) systems 5. A list of maintenance preventable functional failures in the last 5 years for U1 and 3 years for U2 and U3 6. The work order and surveillance procedures for those maintenance activities scheduled for the week of October 3 as listed in Attachment 1.
: c. Self-assessment program
: d. Maintenance Rule program
: e. Maintenance program
: f. Preventative Maintenance Program
: g. Corrective Maintenance Program
: h. Degraded/non-conforming condition process (e.g., RIS 2005-20)
: i. System Health process or equivalent equipment reliability improvement programs
: j. Maintenance training Program
: k. Surveillance Testing
: l. Post Maintenance Testing
: m. Browns Ferry Nuclear Plants Procedure Control Procedure (i.e. the procedure that delineates expectations for procedure use and adherence)
: 2. The risk ranking of systems, structures and components for each unit.
: 3. The Maintenance Rule (MR) 50.65(a)(3) periodic report
: 4. A list of systems in a(1) and in a(2)
: a. System Health reports for all a(1) systems
: 5. A list of maintenance preventable functional failures in the last 5 years for U1 and 3 years for U2 and U3
: 6. The work order and surveillance procedures for those maintenance activities scheduled for the week of October 3 as listed in Attachment 1.
B. Information To Be Supplied By October 17
B. Information To Be Supplied By October 17
: 1. List of Audits/assessments of the Maintenance, Maintenance training, Operations, and Engineering Organizations for the last 3 years. 2. List of management observations conducted on Maintenance in the last year
: 1. List of Audits/assessments of the Maintenance, Maintenance training, Operations, and Engineering Organizations for the last 3 years.
: 2. List of management observations conducted on Maintenance in the last year
: 3. List of Audits/assessments of the CAP Program for the last three years
: 3. List of Audits/assessments of the CAP Program for the last three years
: 4. List of All Significant Conditions Adverse to Quality Issues
: 4. List of All Significant Conditions Adverse to Quality Issues
: 5. List of All Conditions Adverse to Quality by year
: 5. List of All Conditions Adverse to Quality by year
: a. Sorted by System, Priority, Organization
: a. Sorted by System, Priority, Organization
: 6. List of Problem Evaluation Reports (PERs) for Human Performance Errors a. Sorted by System, Organization 7. List of PERS for inadequate or repeat corrective actions for maintenance a. Sorted by System, Organization
: 6. List of Problem Evaluation Reports (PERs) for Human Performance Errors
: a. Sorted by System, Organization
: 7. List of PERS for inadequate or repeat corrective actions for maintenance
: a. Sorted by System, Organization
: 8. List of PERS for design deficiencies
: 8. List of PERS for design deficiencies
: a. Sorted by System 2 Enclosure
: a. Sorted by System Enclosure
 
2
: 9. List of PERS for Maintenance Procedure Errors
: 9. List of PERS for Maintenance Procedure Errors
: a. Sorted by Procedure, System
: a. Sorted by Procedure, System
Line 78: Line 93:
: a. Sorted by internal vs external OE
: a. Sorted by internal vs external OE
: 13. List of maintenance (work orders) requiring rework or repetitive maintenance on the same or similar SSCs and associated PERS
: 13. List of maintenance (work orders) requiring rework or repetitive maintenance on the same or similar SSCs and associated PERS
: 14. List of maintenance training to be conducted in the 4 th quarter 15. List of station top ten equipment issues
: 14. List of maintenance training to be conducted in the 4th quarter
: 15. List of station top ten equipment issues
: 16. List of operator-work-arounds for equipment issues
: 16. List of operator-work-arounds for equipment issues
: 17. List of top ten equipment issues for Operations
: 17. List of top ten equipment issues for Operations
: 18. List of all PMTs deferred.
: 18. List of all PMTs deferred.
: 19. WO 112649705, "Re-Tension Fuse Clip for BFN-3-FU2-211-0003EDLM'"
: 19. WO 112649705, Re-Tension Fuse Clip for BFN-3-FU2-211-0003EDLM
: 20. Procedure EPI-0-000-BKR005, "Maintenance and Inspection of 4160 Volt, 480 Volt and 259 Volt Switchgear Components
: 20. Procedure EPI-0-000-BKR005, Maintenance and Inspection of 4160 Volt, 480 Volt and 259 Volt Switchgear Components
: 21. Performance Metrics for Operations and Maintenance (may be in a MRM report)
: 21. Performance Metrics for Operations and Maintenance (may be in a MRM report)
: a. Trends of maintenance backlogs, by month
: a. Trends of maintenance backlogs, by month
: 1. Provide number by month for each category of maintenance i.e. corrective maintenance, preventative maintenance
: 1. Provide number by month for each category of maintenance i.e. corrective maintenance, preventative maintenance
: b. Maintenance schedule adherence statistics 1. Maintenance deferred for each work week 2. Activities added to maintenance weekly schedule C. Information To Be Supplied By October 31
: b. Maintenance schedule adherence statistics
: 1. Maintenance deferred for each work week
: 2. Activities added to maintenance weekly schedule C. Information To Be Supplied By October 31
: 1. The work orders and surveillance procedures for those maintenance activities scheduled for the week of November 7 as listed in Attachment 1.
: 1. The work orders and surveillance procedures for those maintenance activities scheduled for the week of November 7 as listed in Attachment 1.
D. Information To Be Supplied By November 21
D. Information To Be Supplied By November 21
: 1. The work orders and surveillance procedures for those maintenance activities scheduled for the week of November 28 as listed in Attachment 1.
: 1. The work orders and surveillance procedures for those maintenance activities scheduled for the week of November 28 as listed in Attachment 1.
Documents requested to be available as printed copies on-site during the inspection
Documents requested to be available as printed copies on-site during the inspection:
: 1. Updated Final Safety Analysis Report 2. Technical Specifications
: 1. Updated Final Safety Analysis Report
: 3. The QA manual 4. Copy of Plant P&IDs Attachment Browns Ferry IP 95003 Part 2 Maintenance Activities Work Week W40 (October 3 - 7, 2011)
: 2. Technical Specifications
WO# Unit 2, Sys 071 - 34 hour RCIC Outage:
: 3. The QA manual
* pressure switch calibrations     111431158W, 111431177
: 4. Copy of Plant P&IDs Enclosure
* pressure gage replacement     110952897W, 112357574W
 
* repair remote indication for RCIC Condenser Cond. Pump 112172917W
Browns Ferry IP 95003 Part 2 Maintenance Activities Work Week W40 (October 3 - 7, 2011)                           WO#
* cable replacement for RCIC turbine stop valve   112095809W
Unit 2, Sys 071 - 34 hour RCIC Outage:
* repair valve packing leaks     112137969W,112364885
* pressure switch calibrations                           111431158W, 111431177
* replace handswitch     111436612W
* pressure gage replacement                               110952897W, 112357574W
* rewire governor valve     111241696W
* repair remote indication for RCIC Condenser Cond. Pump 112172917W
* cable replacement for RCIC turbine stop valve           112095809W
* repair valve packing leaks                             112137969W,112364885
* replace handswitch                                     111436612W
* rewire governor valve                                   111241696W
* associated PMTs.
* associated PMTs.
Unit 1 Sys 027 - 1A CCW
Unit 1 Sys 027 - 1A CCW
* Pump motor replacement     112409165 Unit 2 Sys 002 - Condensate Demin H
* Pump motor replacement                                 112409165 Unit 2 Sys 002 - Condensate Demin H
* Repair valve position indicator and air leak   111350567W, 082511400W
* Repair valve position indicator and air leak           111350567W, 082511400W
* Reroute air lines.       091593907W Unit 1 and 3, Sys 074 - RHR Loop 1 (Div 1)
* Reroute air lines.                                     091593907W Unit 1 and 3, Sys 074 - RHR Loop 1 (Div 1)
* monthly lineup and system venting   112242496W, 112243995W Unit 1 and 3, Sys 075 CS
* monthly lineup and system venting                       112242496W, 112243995W Unit 1 and 3, Sys 075 CS
* Sparger to Rx Vessel Diff Pressure Functional test 112242287W, 112243835W
* Sparger to Rx Vessel Diff Pressure Functional test     112242287W, 112243835W
* CS system venting     112242519W, 112243999W Unit 1 Sys 003 - Feedwater Core and Cont. Cooling system
* CS system venting                                       112242519W, 112243999W Unit 1 Sys 003 - Feedwater Core and Cont. Cooling system
* analog trip unit functional. 112242272W Unit 1 Sys 099 - RPS and PCIS
* analog trip unit functional.                           112242272W Unit 1 Sys 099 - RPS and PCIS
* Analog trip unit channel A1 (and A2) functional 112242257W Unit 0 Sys 63 - Off Gas       092615800W
* Analog trip unit channel A1 (and A2) functional         112242257W Unit 0 Sys 63 - Off Gas                                       092615800W
* perform leak rate testing Unit X Sys 064       112243161W
* perform leak rate testing Unit X Sys 064                                               112243161W
* Containment Breaker Position verification Unit 1 Sys 090 Radiation Monitoring     111752394W
* Containment Breaker Position verification Unit 1 Sys 090 Radiation Monitoring                           111752394W
* ICS Terminal not reading 2 Attachment Work Week 45 (Nov 7 - Nov 13)
* ICS Terminal not reading Attachment
WO Unit 1 B FPC Heat Exchanger
 
* Ops verify 1A FPC pump in service   112391958A
2 Work Week 45 (Nov 7 - Nov 13)                       WO Unit 1 B FPC Heat Exchanger
* Ops initiate risk contingencies   112391958B
* Ops verify 1A FPC pump in service             112391958A
* 1B FPC pump OOS (sentinel)   IMR07811BH
* Ops initiate risk contingencies               112391958B
* Cleanout coupling grease/lube bearing   112391965W
* 1B FPC pump OOS (sentinel)                   IMR07811BH
* Contingency WO for 1B pump check valve   110882939W
* Cleanout coupling grease/lube bearing         112391965W
* Inspect/Clean HX     112391958D
* Contingency WO for 1B pump check valve       110882939W
* Eddy Current Test     112391958F
* Inspect/Clean HX                             112391958D
* Plug tubes contingency WO     112391958J
* Eddy Current Test                             112391958F
* PMTs/Functional Tests     VARIOUS Unit 1 A CRD Pump
* Plug tubes contingency WO                     112391958J
* Lubricate Drive Water Pump/Components   111155064W
* PMTs/Functional Tests                         VARIOUS Unit 1 A CRD Pump
* Replace RCW piping     111522234W
* Lubricate Drive Water Pump/Components         111155064W
* Clean CRD pump oil cooler, seal, -    111381632W
* Replace RCW piping                           111522234W
* Pipes rubbing together     110863036W
* Clean CRD pump oil cooler, seal,             111381632W
* PMTs/Functional Tests     VARIOUS Unit 1 B SLC Pump
* Pipes rubbing together                       110863036W
* Pump 1B OOS (sentinel)     IMR06031BH
* PMTs/Functional Tests                         VARIOUS Unit 1 B SLC Pump
* Disassemble/inspect pump     092529900W
* Pump 1B OOS (sentinel)                       IMR06031BH
* Replace 1B accumulator bladder   111454053W
* Disassemble/inspect pump                     092529900W
* License renewal tank inspection   111177548W
* Replace 1B accumulator bladder               111454053W
* PMTs/Functional Tests     VARIOUS Work Week 48 (Nov 28 - Dec 4)     WO Unit 0 System 248 - 250 v Main Bank4 Batter/Charger
* License renewal tank inspection               111177548W
* Hot "B" phase wire     072552000W
* PMTs/Functional Tests                         VARIOUS Work Week 48 (Nov 28 - Dec 4)                       WO Unit 0 System 248 - 250 v Main Bank4 Batter/Charger
* Repair of ground     111717257W
* Hot B phase wire                           072552000W
* Battery replacement     081666600G
* Repair of ground                             111717257W
* Troubleshoot gauge fluctuation   110814762W
* Battery replacement                           081666600G
* Thermography       072774400W
* Troubleshoot gauge fluctuation               110814762W
* Increase circuit breaker setting   092221900W/901W
* Thermography                                 072774400W
* DCN 69722 - replace breaker   111137986W/061517800W
* Increase circuit breaker setting             092221900W/901W
* Perform resistance checks     081666600O
* DCN 69722 - replace breaker                   111137986W/061517800W
* Replace charger timer     072643800W
* Perform resistance checks                     081666600O
* PMT's        VARIOUS  
* Replace charger timer                         072643800W
* PMTs                                        VARIOUS Attachment


3 Attachment Unit 1 System 71 RCIC
3 Unit 1 System 71 RCIC
* MOV operability     112414369W
* MOV operability                         112414369W
* Valve position verification
* Valve position verification
* MOV operability Unit 2 System 74 RHR Loop I (Div II)
* MOV operability Unit 2 System 74 RHR Loop I (Div II)
* New switch for RHRSW outlet valve   111451875A
* New switch for RHRSW outlet valve       111451875A
* 2-RHR Pump Motor Work     VARIOUS
* 2-RHR Pump Motor Work                   VARIOUS
* Handswitch replacement RHR outlet valve   111436599W
* Handswitch replacement RHR outlet valve 111436599W
* Breaker maintenance
* Breaker maintenance
* Movats Testing     111311779W Unit 2 System 268 LPCI MG Set
* Movats Testing                         111311779W Unit 2 System 268 LPCI MG Set
* Add grease to flywheel
* Add grease to flywheel
* PMT       111784025P Unit 3 sys 31 SD BD Chiller (App R LCO)
* PMT                                     111784025P Unit 3 sys 31 SD BD Chiller (App R LCO)
* Corrective maintenance on PI   111552652W
* Corrective maintenance on PI           111552652W
* New belts       111644354W
* New belts                               111644354W
* PM's
* PMs
* Clean strainer       112440519W Unit 3 Sys 67 - EECW
* Clean strainer                         112440519W Unit 3 Sys 67 - EECW
* Flush       112415987W
* Flush                                   112415987W
* Repair of root valve     082210600W
* Repair of root valve                   082210600W
* PMs Unit 3 Sys 248 - 250V Battery
* PMs Unit 3 Sys 248 - 250V Battery
* Battery Cell data     112075017E Unit 0 Sys 23 - RHRSW pump C1
* Battery Cell data                       112075017E Unit 0 Sys 23 - RHRSW pump C1
* Engineering interface required   IMR023MC1Z
* Engineering interface required         IMR023MC1Z
* Cable replacement 11004285W/ 072665500W 072665534W}}
* Cable replacement                       11004285W/
072665500W 072665534W Attachment}}

Latest revision as of 23:55, 6 February 2020

Notification of Inspection and Request for Information for Part 2 of NRC Supplemental Inspection
ML112690416
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/26/2011
From: Eugene Guthrie
Division Reactor Projects II
To: Krich R
Tennessee Valley Authority
References
rgn-002
Download: ML112690416 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 26, 2011 Mr. R. M. Krich Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR PART 2 OF NRC SUPPLEMENTAL INSPECTION

Dear Mr. Krich:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a supplemental inspection at your Browns Ferry Nuclear Plant beginning on October 1, 2011. The inspection team will be led by John Jandovitz, a Project Engineer from the NRCs Region III office. This inspection will be conducted in accordance with Inspection Procedure 95003, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input, Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.

The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than the specified dates described in the enclosure to this letter. Contact Mr. Jandovitz with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

TVA 2 Thank you for your cooperation in this matter. If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Jandovitz at 630-829-9763 or john.jandovitz@nrc.gov. You may also contact Mr. Craig Kontz at 404-997-4715 or craig.kontz@nrc.gov.

Sincerely,

/RA/

Eugene F. Guthrie, Chief Special Projects, Browns Ferry Division of Reactor Projects Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68

Enclosure:

As stated cc w/encl: (See page 3)

PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

____ML112690416_________ G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RIII:DRP SIGNATURE EFG /RA for/ EFG /RA/ Via email NAME C Kontz E Guthrie J Jandovitz DATE 09/26/2011 09/26/2011 09/26/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO TVA 3 cc w/encl:

K. J. Polson Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution C.J. Gannon General Manager Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution J. E. Emens Manager, Licensing Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution T. C. Matthews Manager, Corporate Nuclear Licensing -

BFN Tennessee Valley Authority Electronic Mail Distribution E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority Electronic Mail Distribution Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 Donald E. Williamson State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 30317 Montgomery, AL 36130-3017 James L. McNees, CHP Director Office of Radiation Control Alabama Dept. of Public Health P. O. Box 303017 Montgomery, AL 36130-3017

TVA 4 Letter to R. M. Krich from Eugene F. Guthrie dated September 26, 2011

SUBJECT:

BROWNS FERRY NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR PART 2 OF NRC SUPPLEMENTAL INSPECTION Distribution w/encl:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerry Resource

Requested Information for Part 2 of Browns Ferry 95003 Inspection Note: Unless otherwise noted, the information requested below corresponds to documents generated for the past five years for unit 1 and the last three years for units 2 and 3. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.

A. Information To Be supplied By October 3

1. Copies of the corporate and site level procedures and sub-tier procedures associated with the:
a. Corrective action program.
b. Operating experience program
c. Self-assessment program
d. Maintenance Rule program
e. Maintenance program
f. Preventative Maintenance Program
g. Corrective Maintenance Program
h. Degraded/non-conforming condition process (e.g., RIS 2005-20)
i. System Health process or equivalent equipment reliability improvement programs
j. Maintenance training Program
k. Surveillance Testing
l. Post Maintenance Testing
m. Browns Ferry Nuclear Plants Procedure Control Procedure (i.e. the procedure that delineates expectations for procedure use and adherence)
2. The risk ranking of systems, structures and components for each unit.
3. The Maintenance Rule (MR) 50.65(a)(3) periodic report
4. A list of systems in a(1) and in a(2)
a. System Health reports for all a(1) systems
5. A list of maintenance preventable functional failures in the last 5 years for U1 and 3 years for U2 and U3
6. The work order and surveillance procedures for those maintenance activities scheduled for the week of October 3 as listed in Attachment 1.

B. Information To Be Supplied By October 17

1. List of Audits/assessments of the Maintenance, Maintenance training, Operations, and Engineering Organizations for the last 3 years.
2. List of management observations conducted on Maintenance in the last year
3. List of Audits/assessments of the CAP Program for the last three years
4. List of All Significant Conditions Adverse to Quality Issues
5. List of All Conditions Adverse to Quality by year
a. Sorted by System, Priority, Organization
6. List of Problem Evaluation Reports (PERs) for Human Performance Errors
a. Sorted by System, Organization
7. List of PERS for inadequate or repeat corrective actions for maintenance
a. Sorted by System, Organization
8. List of PERS for design deficiencies
a. Sorted by System Enclosure

2

9. List of PERS for Maintenance Procedure Errors
a. Sorted by Procedure, System
10. List of Equipment Deficiencies for the Unit 1 Residual Heat Removal System
11. List of PERS for configuration control errors
a. Sorted by System, Component, Organization
12. List of Operating Experience (OE) information and associated PERS
a. Sorted by internal vs external OE
13. List of maintenance (work orders) requiring rework or repetitive maintenance on the same or similar SSCs and associated PERS
14. List of maintenance training to be conducted in the 4th quarter
15. List of station top ten equipment issues
16. List of operator-work-arounds for equipment issues
17. List of top ten equipment issues for Operations
18. List of all PMTs deferred.
19. WO 112649705, Re-Tension Fuse Clip for BFN-3-FU2-211-0003EDLM
20. Procedure EPI-0-000-BKR005, Maintenance and Inspection of 4160 Volt, 480 Volt and 259 Volt Switchgear Components
21. Performance Metrics for Operations and Maintenance (may be in a MRM report)
a. Trends of maintenance backlogs, by month
1. Provide number by month for each category of maintenance i.e. corrective maintenance, preventative maintenance
b. Maintenance schedule adherence statistics
1. Maintenance deferred for each work week
2. Activities added to maintenance weekly schedule C. Information To Be Supplied By October 31
1. The work orders and surveillance procedures for those maintenance activities scheduled for the week of November 7 as listed in Attachment 1.

D. Information To Be Supplied By November 21

1. The work orders and surveillance procedures for those maintenance activities scheduled for the week of November 28 as listed in Attachment 1.

Documents requested to be available as printed copies on-site during the inspection:

1. Updated Final Safety Analysis Report
2. Technical Specifications
3. The QA manual
4. Copy of Plant P&IDs Enclosure

Browns Ferry IP 95003 Part 2 Maintenance Activities Work Week W40 (October 3 - 7, 2011) WO#

Unit 2, Sys 071 - 34 hour3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> RCIC Outage:

  • pressure switch calibrations 111431158W, 111431177
  • pressure gage replacement 110952897W, 112357574W
  • repair remote indication for RCIC Condenser Cond. Pump 112172917W
  • cable replacement for RCIC turbine stop valve 112095809W
  • replace handswitch 111436612W
  • rewire governor valve 111241696W

Unit 1 Sys 027 - 1A CCW

  • Pump motor replacement 112409165 Unit 2 Sys 002 - Condensate Demin H
  • Repair valve position indicator and air leak 111350567W, 082511400W
  • Reroute air lines. 091593907W Unit 1 and 3, Sys 074 - RHR Loop 1 (Div 1)
  • monthly lineup and system venting 112242496W, 112243995W Unit 1 and 3, Sys 075 CS
  • Sparger to Rx Vessel Diff Pressure Functional test 112242287W, 112243835W
  • CS system venting 112242519W, 112243999W Unit 1 Sys 003 - Feedwater Core and Cont. Cooling system
  • analog trip unit functional. 112242272W Unit 1 Sys 099 - RPS and PCIS
  • Analog trip unit channel A1 (and A2) functional 112242257W Unit 0 Sys 63 - Off Gas 092615800W
  • perform leak rate testing Unit X Sys 064 112243161W
  • Containment Breaker Position verification Unit 1 Sys 090 Radiation Monitoring 111752394W
  • ICS Terminal not reading Attachment

2 Work Week 45 (Nov 7 - Nov 13) WO Unit 1 B FPC Heat Exchanger

  • Ops verify 1A FPC pump in service 112391958A
  • Ops initiate risk contingencies 112391958B
  • 1B FPC pump OOS (sentinel) IMR07811BH
  • Cleanout coupling grease/lube bearing 112391965W
  • Inspect/Clean HX 112391958D
  • Plug tubes contingency WO 112391958J
  • PMTs/Functional Tests VARIOUS Unit 1 A CRD Pump
  • Lubricate Drive Water Pump/Components 111155064W
  • Replace RCW piping 111522234W
  • Clean CRD pump oil cooler, seal, 111381632W
  • Pipes rubbing together 110863036W
  • PMTs/Functional Tests VARIOUS Unit 1 B SLC Pump
  • Pump 1B OOS (sentinel) IMR06031BH
  • Disassemble/inspect pump 092529900W
  • PMTs/Functional Tests VARIOUS Work Week 48 (Nov 28 - Dec 4) WO Unit 0 System 248 - 250 v Main Bank4 Batter/Charger
  • Hot B phase wire 072552000W
  • Repair of ground 111717257W
  • Battery replacement 081666600G
  • Troubleshoot gauge fluctuation 110814762W
  • Increase circuit breaker setting 092221900W/901W
  • DCN 69722 - replace breaker 111137986W/061517800W
  • Perform resistance checks 081666600O
  • Replace charger timer 072643800W
  • PMTs VARIOUS Attachment

3 Unit 1 System 71 RCIC

  • MOV operability 112414369W
  • Valve position verification
  • MOV operability Unit 2 System 74 RHR Loop I (Div II)
  • New switch for RHRSW outlet valve 111451875A
  • 2-RHR Pump Motor Work VARIOUS
  • Handswitch replacement RHR outlet valve 111436599W
  • Breaker maintenance
  • Movats Testing 111311779W Unit 2 System 268 LPCI MG Set
  • Add grease to flywheel
  • PMT 111784025P Unit 3 sys 31 SD BD Chiller (App R LCO)
  • Corrective maintenance on PI 111552652W
  • New belts 111644354W
  • Clean strainer 112440519W Unit 3 Sys 67 - EECW
  • Flush 112415987W
  • Repair of root valve 082210600W
  • PMs Unit 3 Sys 248 - 250V Battery
  • Battery Cell data 112075017E Unit 0 Sys 23 - RHRSW pump C1
  • Engineering interface required IMR023MC1Z
  • Cable replacement 11004285W/

072665500W 072665534W Attachment