(3 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 10/23/2012 | | | issue date = 10/23/2012 |
| | title = Southern Nuclear Operating Company'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation | | | title = Southern Nuclear Operating Company'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation |
| | author name = Ivey B L | | | author name = Ivey B |
| | author affiliation = Southern Nuclear Operating Co, Inc, Southern Co | | | author affiliation = Southern Nuclear Operating Co, Inc, Southern Co |
| | addressee name = | | | addressee name = |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:B. L. " Pete" Ivey Southern Nuclear V ice Preside nt Operating Company , Inc. R e g u lator y Affa irs 4 0 I nv ern es s Ce n ter Parkway Po st Office B o x 129 5 Bi rm ingh am , AL 35242 Tel 2 05.9 9 2.7 6 19 F ax 2 0 5.99 2.52 1 7 October 23, 2012 Docket 50-348 NL-12-2150 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant -Units 1 and Southern Nuclear Operating Company's Initial Status Report in Response March 12,2012 Commission Order Modifying Licenses with Regard Requirements for Reliable Spent Fuel Pool (Order Number | | {{#Wiki_filter:B. L. " Pete" Ivey Southern Nuclear Vice President Operating Company, Inc. |
| | Regulatory Affairs 40 Invern ess Center Parkway Post Office Box 1295 Bi rm ingham , AL 35242 Tel 205 .992.7619 Fax 205.992.52 17 October 23, 2012 Docket Nos.: 50-348 NL-12-2150 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Units 1 and 2 Southern Nuclear Operating Company's Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
|
| |
|
| ==References:== | | ==References:== |
| NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29, 2012 Ladies and Gentlemen: On March 12,2012, the Nuclear Regulatory Commission issued an order (Reference | | : 1. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation |
| : 1) to Southern Nuclear Operating Company (SNC). Reference 1 was immediately effective and directed SNC to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference
| | : 2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29, 2012 Ladies and Gentlemen: |
| : 1. Reference 1 requires submission of an initial status report by SNC 60 days following issuance of the final interim staff guidance.
| | On March 12,2012, the Nuclear Regulatory Commission issued an order (Reference 1) to Southern Nuclear Operating Company (SNC). Reference 1 was immediately effective and directed SNC to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in of Reference 1. |
| The final interim staff guidance (Reference | | Reference 1 requires submission of an initial status report by SNC 60 days following issuance of the final interim staff guidance. The final interim staff guidance (Reference 2) was issued August 29, 2012. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference 2. This report confirms SNC has received Reference 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in associated spent fuel storage pools as described in Attachment 2 of Reference 1. |
| : 2) was issued August 29, 2012. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference
| | |
| : 2. This report confirms SNC has received Reference 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in associated spent fuel storage pools as described in Attachment 2 of Reference
| | U. S. Nuclear Regulatory Commission NL-12-2150 Page 2 Major activities completed during this reporting period: |
| : 1.
| | * Resources have been identified and project plans initiated, including development of milestones, to assure compliance with Reference 1. |
| U. S. Nuclear Regulatory Commission NL-12-2150 Page 2 Major activities completed during this reporting period: Resources have been identified and project plans initiated, including development of milestones, to assure compliance with Reference | | * Established project teams, initiated meetings, established points of contacts at Joseph M. Farley Nuclear Plant (FNP) and corporate, initiated site walkdowns, and engaged design engineering. |
| : 1. Established project teams, initiated meetings, established points of contacts at Joseph M. Farley Nuclear Plant (FNP) and corporate, initiated site walkdowns, and engaged design engineering. Planned activities for the next six months: Development and submittal of the overall integrated plan. Define strategy and develop conceptual design. Technical difficulties encountered that could affect the ability to provide the licensee's February 28, 2013, submittal: None at this time. Project milestones schedule through completion of installation and testing: A project milestones schedule will be provided with the overall integrated plan. Implementation of the order will be completed for FNP Unit 1 prior to startup from Refueling Outage (RFO) 1 R26 (Spring 2015). Implementation of the order will be completed for FNP Unit 2 prior to startup from Refueling Outage (RFO) 2R23 (Fall 2014). This letter contains no new regulatory commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.
| | Planned activities for the next six months: |
| --U. S. Nuclear Regulatory Commission NL-12-2150 Page 3 Mr. B. L. Ivey states he is a Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and, to the best of his knowledge and belief, the facts set forth in this letter are true. Sworn to and subscribed before me this lOrd. day __, 2012.otary Public "" --My commission expires: &rd\ 1-21 J Respectfully submitted, B. . ___Vice-President
| | * Development and submittal of the overall integrated plan. |
| -Regulatory Affairs BU/CLN Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President | | * Define strategy and develop conceptual design. |
| & CEO Mr. D. G. Bost, Executive Vice President | | Technical difficulties encountered that could affect the ability to provide the licensee's February 28, 2013, submittal: |
| & Chief Nuclear Officer Mr. T. A. Lynch, Vice President | | * None at this time. |
| -Farley Mr. B. J. Adams, Vice President | | Project milestones schedule through completion of installation and testing: |
| -Fleet Operations Mr. M. J. Ajluni, Nuclear licensing Director RTYPE: CFA04.054 U. S. Nuclear Regulatory Mr. V. M. McCree, Regional Mr. R. E. Martin, NRR Project Manager -Mr. E. L. Crowe, Senior Resident Inspector | | * A project milestones schedule will be provided with the overall integrated plan. |
| -Ms. Lisa M. Regner, NRR/JLD/PMB, Mr. Blake A. Purnell, NRRlJLD/PMB, Mr. Steven R. Jones, NRRlDSS/SBPB, Alabama Department of Public Dr. D. E. Williamson , State Health}} | | * Implementation of the order will be completed for FNP Unit 1 prior to startup from Refueling Outage (RFO) 1R26 (Spring 2015). |
| | * Implementation of the order will be completed for FNP Unit 2 prior to startup from Refueling Outage (RFO) 2R23 (Fall 2014). |
| | This letter contains no new regulatory commitments . If you have any questions, please contact Ken McElroy at (205) 992-7369. |
| | |
| | U. S. Nuclear Regulatory Commission NL-12-2150 Page 3 Mr. B. L. Ivey states he is a Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and, to the best of his knowledge and belief, the facts set forth in this letter are true. |
| | Sworn to and subscribed before me this lOrd. day of_---'.()-=t---'~-"',o. :. . .h_(l/__'_y/' |
| | _ _, 2012. |
| | Juy\rl~~;t-~ ~ |
| | otary Public My commission expires: |
| | Respectfully submitted, |
| | &rd\ 1-21 ~ It |
| | -J B. . ~e~y:.-_ _ _-~ |
| | Vice-President - Regulatory Affairs BU/CLN cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. T. A. Lynch, Vice President - Farley Mr. B. J. Adams, Vice President - Fleet Operations Mr. M. J. Ajluni, Nuclear licensing Director RTYPE: CFA04.054 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Fleet Mr. E. L. Crowe, Senior Resident Inspector - Farley Ms. Lisa M. Regner, NRR/JLD/PMB, NRC Mr. Blake A. Purnell, NRRlJLD/PMB, NRC Mr. Steven R. Jones, NRRlDSS/SBPB, NRC Alabama Department of Public Health Dr. D. E. Williamson , State Health Officer}} |
|
---|
Category:Letter type:NL
MONTHYEARNL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-23-0295, Reply to a Notice of Violation; EA-22-1012023-05-0101 May 2023 Reply to a Notice of Violation; EA-22-101 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0213, Inservice Inspection Program Owner'S Activity Report for Outage 1R312023-03-21021 March 2023 Inservice Inspection Program Owner'S Activity Report for Outage 1R31 NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0080, Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.02023-02-0202 February 2023 Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 NL-23-0008, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting.2023-01-17017 January 2023 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting. NL-23-0011, Update to Supporting Documentation Regulatory Conference EA-22-101. Cover Letter Only2023-01-0505 January 2023 Update to Supporting Documentation Regulatory Conference EA-22-101. Cover Letter Only NL-22-0799, License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52022-12-20020 December 2022 License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-22-0897, Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A,2022-12-0909 December 2022 Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, NL-22-0887, Cycle 32 Core Operating Limits Report2022-11-21021 November 2022 Cycle 32 Core Operating Limits Report NL-22-0884, Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-1012022-11-17017 November 2022 Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-101 NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC2022-10-14014 October 2022 Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC NL-22-0756, Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.02022-09-30030 September 2022 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis2022-09-21021 September 2022 License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis NL-22-0608, Interim 10 CFR 21.21(a)(2) Report Regarding Framatome Supplied Siemens Medium Voltage Circuit Breakers2022-08-17017 August 2022 Interim 10 CFR 21.21(a)(2) Report Regarding Framatome Supplied Siemens Medium Voltage Circuit Breakers NL-22-0552, Inservice Inspection Program Owner'S Activity Report for Outage 2R282022-07-28028 July 2022 Inservice Inspection Program Owner'S Activity Report for Outage 2R28 NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 NL-22-0223, License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value2022-06-30030 June 2022 License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value NL-22-0361, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak.2022-06-20020 June 2022 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak. NL-22-0362, Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2022-06-0101 June 2022 Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update NL-22-0388, Cycle 29 Core Operating Limits Report2022-05-31031 May 2022 Cycle 29 Core Operating Limits Report NL-22-0344, Annual Radiological Environmental Operating Reports for 20212022-05-10010 May 2022 Annual Radiological Environmental Operating Reports for 2021 NL-22-0340, Response to Request for Additional Information Related to Request for License Amendment to Relocate Augmented Piping Inspection Program Details from Technical2022-05-10010 May 2022 Response to Request for Additional Information Related to Request for License Amendment to Relocate Augmented Piping Inspection Program Details from Technical NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations 2024-01-11
[Table view] Category:Status Report
MONTHYEARNL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding IR 05000348/20200062021-03-0303 March 2021 Annual Assessment Letter for Joseph M. Farley Nuclear Plant - Report 05000348/2020006 and 05000364/2020006 NL-16-1049, Seventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2016-08-0808 August 2016 Seventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) NL-16-0022, Sixth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2016-02-25025 February 2016 Sixth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) NL-15-1156, Fifth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2015-08-27027 August 2015 Fifth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) NL-15-0239, Fourth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)2015-02-26026 February 2015 Fourth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) NL-15-0243, Fourth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2015-02-26026 February 2015 Fourth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) NL-14-0179, Second Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)2014-02-26026 February 2014 Second Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) NL-13-1765, First Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)2013-08-27027 August 2013 First Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) NL-12-2150, Southern Nuclear Operating Company'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation2012-10-23023 October 2012 Southern Nuclear Operating Company'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 2023-03-29
[Table view] |
Text
B. L. " Pete" Ivey Southern Nuclear Vice President Operating Company, Inc.
Regulatory Affairs 40 Invern ess Center Parkway Post Office Box 1295 Bi rm ingham , AL 35242 Tel 205 .992.7619 Fax 205.992.52 17 October 23, 2012 Docket Nos.: 50-348 NL-12-2150 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Units 1 and 2 Southern Nuclear Operating Company's Initial Status Report in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
References:
- 1. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation
- 2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29, 2012 Ladies and Gentlemen:
On March 12,2012, the Nuclear Regulatory Commission issued an order (Reference 1) to Southern Nuclear Operating Company (SNC). Reference 1 was immediately effective and directed SNC to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in of Reference 1.
Reference 1 requires submission of an initial status report by SNC 60 days following issuance of the final interim staff guidance. The final interim staff guidance (Reference 2) was issued August 29, 2012. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference 2. This report confirms SNC has received Reference 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in associated spent fuel storage pools as described in Attachment 2 of Reference 1.
U. S. Nuclear Regulatory Commission NL-12-2150 Page 2 Major activities completed during this reporting period:
- Resources have been identified and project plans initiated, including development of milestones, to assure compliance with Reference 1.
- Established project teams, initiated meetings, established points of contacts at Joseph M. Farley Nuclear Plant (FNP) and corporate, initiated site walkdowns, and engaged design engineering.
Planned activities for the next six months:
- Development and submittal of the overall integrated plan.
- Define strategy and develop conceptual design.
Technical difficulties encountered that could affect the ability to provide the licensee's February 28, 2013, submittal:
Project milestones schedule through completion of installation and testing:
- A project milestones schedule will be provided with the overall integrated plan.
- Implementation of the order will be completed for FNP Unit 1 prior to startup from Refueling Outage (RFO) 1R26 (Spring 2015).
- Implementation of the order will be completed for FNP Unit 2 prior to startup from Refueling Outage (RFO) 2R23 (Fall 2014).
This letter contains no new regulatory commitments . If you have any questions, please contact Ken McElroy at (205) 992-7369.
U. S. Nuclear Regulatory Commission NL-12-2150 Page 3 Mr. B. L. Ivey states he is a Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and, to the best of his knowledge and belief, the facts set forth in this letter are true.
Sworn to and subscribed before me this lOrd. day of_---'.()-=t---'~-"',o. :. . .h_(l/__'_y/'
_ _, 2012.
Juy\rl~~;t-~ ~
otary Public My commission expires:
Respectfully submitted,
&rd\ 1-21 ~ It
-J B. . ~e~y:.-_ _ _-~
Vice-President - Regulatory Affairs BU/CLN cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. T. A. Lynch, Vice President - Farley Mr. B. J. Adams, Vice President - Fleet Operations Mr. M. J. Ajluni, Nuclear licensing Director RTYPE: CFA04.054 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Fleet Mr. E. L. Crowe, Senior Resident Inspector - Farley Ms. Lisa M. Regner, NRR/JLD/PMB, NRC Mr. Blake A. Purnell, NRRlJLD/PMB, NRC Mr. Steven R. Jones, NRRlDSS/SBPB, NRC Alabama Department of Public Health Dr. D. E. Williamson , State Health Officer