ML13028A066: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:file:///Gl/
{{#Wiki_filter:file:///Gl/...Proposed/Written%20Exam/written%20exam%20references/RO%20Provided%20to%20examinees/Steam%20Table%20Mollier.txt[1/4/2013 8:22:36 AM]
...Proposed/Written%20Exam/written%20exam%20references/RO%20Provided%20to%20examinees/Steam%20Table%20Mollier.txt
POINT BEACH NUCLEAR PLANT                                     EOP-3 UNIT 1 EMERGENCY OPERATING PROCEDURE                                 SAFETY RELATED Revision 4 3 11/2011 STEAM GENERATOR TUBE RUPTURE                                  Page 28 of 44 lsTEPI        ACTION/EXPECTED RESPONSE I I      RESPONSE NOT OBTAINED I
[1/4/2013 8:22:36 AM]
CAUTION RCS and ruptured S/G pressures must be maintained less than 1050 psig.
POINT BEACH NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE  
I'                                                                                    "  I
.......................................................................
* 37 Control RCS Pressure And Charging                                                 *
* 37 Control RCS Pressure And Charging *
* Flow To Minimize RCS To S/G Leakage:                                           *
* Flow To Minimize RCS To S/G Leakage:  
* a. Perform appropriate action(s)                                               *
* * *
* from table:                                                               *
* a. Perform appropriate action(s)  
* RUPTURED S/G LEVEL                                 *
*
* PZR LEVEL                                                                             *
* from table:  
* RISING         LOWERING       OFF SCALE HIGH                 *
* * * * *
* LESS THAN           0 Raise charging Raise charging Raise charging 0                                *
* RUPTURED S/G LEVEL *
* OR EQUAL TO           flow           flow             flow                           *
* PZR LEVEL  
* [ 4 4 % ] 24%                                                                         *
*
* 0 Depressurize                   0 Maintain RCS and               *
* RISING LOWERING OFF SCALE HIGH  
* RCS using                       ruptured S/G                   *
* * *
* Step 3 8                        pressures equal               *
* LESS THAN 0 Raise charging Raise charging 0 Raise charging  
* BETWEEN         Depressurize   Turn on         Maintain RCS and               *
*
*   [ 4 4 % ] 24%     RCS using       PZR heaters     ruptured S/G                   *
* OR EQUAL TO flow flow flow * * [44%] 24% *
* AND 50%         Step 3 8                        pressures equal               *
* 0 Depressurize 0 Maintain RCS and *
* BETWEEN       0 Depressurize   Turn on         Maintain RCS and               *
* RCS using ruptured S/G *
* 50% AND         RCS using       PZR heaters     ruptured S/G                   *
* Step 38 pressures equal  
*   [60%1 6 8 %       Step 3 8                        pressures equal               *
* * *
* 0 Reduce                                                         *
* BETWEEN Depressurize Turn on Maintain RCS and * * [44%] 24% RCS using PZR heaters ruptured S/G *
* charging flow                                                   *
* AND 50% Step 38 pressures equal  
* GREATER THAN Reduce                   Turn on PZR     Maintain RCS and               *
* * *
* OR EQUAL TO           charging flow heaters           ruptured S/G                   *
* BETWEEN 0 Depressurize Turn on Maintain RCS and *
* [60%] 68%                                             pressures equal
* 50% AND RCS using PZR heaters ruptured S/G * * [60%1 68% Step 38 pressures equal * * *
* MFIVs, MFRVs, and MFRV Bypass Valves 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Main Feedwater Isolation Valves (MFIVs), Main Feedwater Regulating Valves (MFRVs) and MFRV Bypass Valves LCO 3.7.3              Main Feedwater Isolation shall be OPERABLE.
* 0 Reduce *
APPLICABILITY: MODES 1, 2, and 3.
* charging flow  
ACTIONS
* * *
--------------------------------------------------NOTE-----------------------------------------------------
* GREATER THAN Reduce Turn on PZR Maintain RCS and *
Separate Condition entry is allowed for each valve.
* OR EQUAL TO charging flow heaters ruptured S/G * * [60%] 68% pressures equal * * * ....................................................................... STEAM GENERATOR TUBE RUPTURE EOP-3 UNIT 1 SAFETY RELATED Revision 43 11/2011 Page 28 of 44 lsTEP I ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED I I I CAUTION RCS and ruptured S/G pressures must be maintained less than 1050 psig. I' " I MFIVs, MFRVs, and MFRV Bypass Valves
CONDITION                            REQUIRED ACTION                      COMPLETION TIME A. One or more MFIVs                    A.1        Close or isolate MFIV.           72 hours inoperable.
AND A.2        Verify MFIV is closed or Once per isolated.                       7 days B. One or more MFRVs                    B.1        Close or isolate MFRV.           72 hours inoperable.
AND B.2        Verify MFRV is closed            Once per or isolated.                     7 days C. One or more MFRV                      C.1        Close or isolate MFRV            72 hours Bypass Valves                                Bypass Valve inoperable.
AND C.2        Verify MFRV Bypass                Once per 7 days Valve is closed or isolated Point Beach                                        3.7.3-1                  Unit 1 - Amendment No. 241 Unit 2 - Amendment No. 245


====3.7.3 Point====
MFIVs, MFRVs, and MFRV Bypass Valves 3.7.3 ACTIONS (continued)
Beach 3.7.3-1 Unit 1 - Amendment No. 241   Unit 2 - Amendment No. 245  
CONDITION                      REQUIRED ACTION                COMPLETION TIME D. Two valves in the same        D.1      Isolate affected flow        8 hours flowpath inoperable.                path E. Required Action and          E.1      Be in MODE 3.                6 hours associated Completion Time not met.              AND E.2      Be in MODE 4.                12 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.7.3.1      Verify each MFIV, MFRV, and MFRV bypass                18 months valve, actuate to the isolation position on an actual or simulated actuation signal.
SR 3.7.3.2      Verify each MFIV, MFRV, and MFRV Bypass                In accordance Valve isolation time is within limits.                with the Inservice Testing Program Point Beach                               3.7.3-2            Unit 1 - Amendment No. 241 Unit 2 - Amendment No. 245


===3.7 PLANT===
Rod Group Alignment Limits 3.1.4 3.1 REACTIVITY CONTROL SYSTEMS 3.1.4 Rod Group Alignment Limits LCO 3.1.4              All shutdown and control rods shall be OPERABLE, with individual rod positions within limits.
SYSTEMS
APPLICABILITY:          MODES 1 and 2.
ACTIONS
----------------------------------------------------NOTE---------------------------------------------------
One hour is allowed following rod motion prior to verifying rod operability and group alignment limits.
CONDITION                                REQUIRED ACTION                              COMPLETION TIME A. One or more rod(s)                A.1.1      Verify SDM to be within          1 hour inoperable.                                  the limits provided in the COLR.
OR A.1.2      Initiate boration to              1 hour restore SDM to within limit.
AND A.2        Be in MODE 3.                    6 hours (continued)
Point Beach                                        3.1.4-1                  Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206


3.7.3 Main Feedwater Isolation Valves (MFIVs), Main Feedwater Regulating Valves (MFRVs) and MFRV Bypass Valves
Rod Group Alignment Limits 3.1.4 ACTIONS (continued)
CONDITION              REQUIRED ACTION                      COMPLETION TIME B. One rod not within B.1    Restore rod to within        1 hour alignment limits.          alignment limits.
OR B.2.1.1 Verify SDM to be within      1 hour the limits provided in the COLR.
OR B.2.1.2 Initiate boration to          1 hour restore SDM to within limit.
AND B.2.2  Reduce THERMAL                2 hours POWER to  75% RTP.
AND B.2.3  Verify SDM to be within      Once per the limits provided in      12 hours the COLR.
AND B.2.4  Perform SR 3.2.1.1 and        72 hours SR 3.2.1.2.
AND B.2.5  Perform SR 3.2.2.1.          72 hours AND (continued)
Point Beach                    3.1.4-2              Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206


LCO 3.7.3 Main Feedwater Isolation shall be OPERABLE.  
Rod Group Alignment Limits 3.1.4 ACTIONS CONDITION                    REQUIRED ACTION                      COMPLETION TIME B.  (continued)            B.2.6  Re-evaluate safety            5 days analyses and confirm results remain valid for duration of operation under these conditions.
C. Required Action and    C.1    Be in MODE 3.                6 hours associated Completion Time of Condition B not met.
D. More than one rod not  D.1.1  Verify SDM to be within      1 hour within alignment limit.        the limits provided in the COLR.
OR D.1.2 Initiate boration to          1 hour restore required SDM to within limit.
AND D.2    Be in MODE 3.                 6 hours Point Beach                        3.1.4-3             Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206


APPLICABILITY: MODES 1, 2, and 3.  
Rod Group Alignment Limits 3.1.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FREQUENCY SR 3.1.4.1  Verify individual rod positions are within the        12 hours following alignment limits:
: a.    +/- 18 steps of demanded position (as allowed by Table 3.1.4-1) in MODE 1 > 85 percent RTP when bank demand position is < 215 steps; AND
: b.    +/- 24 steps of demanded position (as allowed by Table 3.1.4-2) in MODE 1 > 85 percent RTP when bank demand position is  215 steps; AND
: c.    +/- 24 steps of demanded position in MODE 1  85 percent RTP or in MODE 2.
SR 3.1.4.2  Verify rod freedom of movement (trippability) by      92 days moving each rod not fully inserted in the core 10 steps in either direction.
SR 3.1.4.3  Verify rod drop time of each rod, from the fully      Prior to reactor withdrawn position, is  2.2 seconds from the        criticality after beginning of decay of stationary gripper coil        each removal of voltage to dashpot entry, with:                      the reactor head
: a. T avg  500&deg;F; and
: b. All reactor coolant pumps operating.
Point Beach                          3.1.4-4            Unit 1 - Amendment No. 212 Unit 2 - Amendment No. 217


ACTIONS
Rod Group Alignment Limits 3.1.4 Table 3.1.4-1 N
 
Allowable Alignment Limits As A Function Of Measured Peaking Factor Margin (FQ(Z), FH )
--------------------------------------------------NOTE-----------------------------------------------------
At Power Levels > 85% Of Rated Power And Bank D Demand < 215 Steps Withdrawn ALIGNMENT LIMITS               REQUIRED MARGIN TO            REQUIRED MARGIN TO N
 
(STEPS)*                     FH LIMIT (%)                 FQ(Z) LIMIT (%)
Separate Condition entry is allowed for each valve.
12                               0.00                           0.00 13                               0.33                           0.83 14                               0.67                           1.67 15                               1.00                           2.50 16                               1.33                           3.33 17                               1.67                           4.17 18                               2.00                           5.00
 
* Between the bank demand position and the RPI System.
---------------------------------------------------------------------------------------------------------------
Table 3.1.4-2 N
 
Allowable Alignment Limits As A Function Of Measured Peaking Factor Margin (FQ(Z), FH )
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more MFIVs inoperable.
At Power Levels > 85% Of Rated Power And Bank D Demand  215 Steps Withdrawn ALIGNMENT LIMITS               REQUIRED MARGIN TO            REQUIRED MARGIN TO N
A.1  Close or isolate MFIV.
(STEPS)*                     FH LIMIT (%)                 FQ(Z) LIMIT (%)
 
12                               0.00                           0.00 13                               0.33                           0.83 14                               0.67                           1.67 15                               1.00                           2.50 16                               1.33                           3.33 17                               1.67                           4.17 18                               2.00                           5.00 19                               2.33                           5.83 20                               2.67                           6.67 21                               3.00                           7.50 22                               3.33                           8.33 23                               3.67                           9.17 24                               4.00                           10.0
AND A.2  Verify MFIV is closed or isolated.
72 hours
 
Once per 7 days B. One or more MFRVs inoperable.
B.1  Close or isolate MFRV.
 
AND B.2  Verify MFRV is closed or isolated.
72 hours
 
Once per 7 days
 
C. One or more MFRV Bypass Valves
 
inoperable.
C.1  Close or isolate MFRV Bypass Valve
 
AND C.2  Verify MFRV Bypass Valve is closed or
 
isolated    72 hours
 
Once per 7 days
 
MFIVs, MFRVs, and MFRV Bypass Valves
 
====3.7.3 Point====
Beach 3.7.3-2 Unit 1 - Amendment No. 241  Unit 2 - Amendment No. 245 ACTIONS  (continued)  CONDITION REQUIRED ACTION COMPLETION TIME D. Two valves in the same flowpath inoperable.
D.1  Isolate affected flow path  8 hours
 
E. Required Action and associated Completion
 
Time not met.
E.1  Be in MODE 3.
 
AND E.2  Be in MODE 4.
 
6 hours
 
12 hours
 
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.7.3.1 Verify each MFIV, MFRV, and MFRV bypass valve, actuate to the isolation position on an
 
actual or simulated actuation signal.
18 months
 
SR 3.7.3.2 Verify each MFIV, MFRV, and MFRV Bypass Valve isolation time is within limits.
In accordance
 
with the Inservice Testing
 
Program
 
Rod Group Alignment Limits
 
====3.1.4 Point====
Beach 3.1.4-1 Unit 1 - Amendment No. 201  Unit 2 - Amendment No. 206 3.1  REACTIVITY CONTROL SYSTEMS
 
3.1.4  Rod Group Alignment Limits
 
LCO  3.1.4 All shutdown and control rods shall be OPERABLE, with individual rod positions within limits.
 
APPLICABILITY: MODES 1 and 2. 
 
ACTIONS
 
----------------------------------------------------NOTE--------------------------------------------------- One hour is allowed following rod motion prior to verifying rod operability and group alignment limits.
---------------------------------------------------------------------------------------------------------------
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more rod(s) inoperable.
A.1.1 Verify SDM to be within the limits provided in the COLR.
 
OR A.1.2 Initiate boration to restore SDM to within limit.
AND A.2  Be in MODE 3. 
 
1 hour
 
1 hour
 
6 hours  (continued)
 
Rod Group Alignment Limits
 
====3.1.4 Point====
Beach 3.1.4-2 Unit 1 - Amendment No. 201  Unit 2 - Amendment No. 206 ACTIONS (continued)  CONDITION REQUIRED ACTION COMPLETION TIME B. One rod not within alignment limits.
B.1 Restore rod to within alignment limits.
 
OR B.2.1.1 Verify SDM to be within the limits provided in the COLR.
 
OR B.2.1.2 Initiate boration to restore SDM to within limit.
AND B.2.2 Reduce THERMAL POWER to  75% RTP.
 
AND  B.2.3 Verify SDM to be within the limits provided in the COLR.
AND B.2.4 Perform SR 3.2.1.1 and SR  3.2.1.2.
 
AND B.2.5 Perform SR 3.2.2.1.
 
AND  1 hour
 
1 hour
 
1 hour
 
2 hours
 
Once per 12 hours
 
72 hours
 
72 hours
 
(continued)
Rod Group Alignment Limits
 
====3.1.4 Point====
Beach 3.1.4-3 Unit 1 - Amendment No. 201  Unit 2 - Amendment No. 206 ACTIONS  CONDITION REQUIRED ACTION COMPLETION TIME B. (continued)
 
B.2.6 Re-evaluate safety analyses and confirm results remain valid for duration of operation under these conditions.
5 days C. Required Action and associated Completion Time of Condition B not met. C.1 Be in MODE 3.
 
6 hours D. More than one rod not within alignment limit.
D.1.1 Verify SDM to be within the limits provided in the COLR.
 
OR D.1.2 Initiate boration to restore required SDM to within limit.
 
AND D.2  Be in MODE 3.
1 hour
 
1 hour
 
6 hours
 
Rod Group Alignment Limits  
 
====3.1.4 Point====
Beach 3.1.4-4 Unit 1 - Amendment No. 212  Unit 2 - Amendment No. 217
 
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.1.4.1 Verify individual rod positions are within the following alignment limits:
: a. 18 steps of demanded position (as allowed by Table 3.1.4-1) in MODE 1 > 85 percent RTP when bank demand position is < 215 steps; 
 
AND  b. 24 steps of demanded position (as allowed by Table 3.1.4-2) in MODE 1 > 85 percent RTP when bank demand position is  215 steps; 
 
AND  c. 24 steps of demanded position in MODE 1  85 percent RTP or in MODE 2.
12 hours
 
SR  3.1.4.2 Verify rod freedom of movement (trippability) by moving each rod not fully inserted in the core  10 steps in either direction.
92 days SR  3.1.4.3 Verify rod drop time of each rod, from the fully withdrawn position, is  2.2 seconds from the beginning of decay of stationary gripper coil voltage to dashpot entry, with:  a. T avg  500&deg;F; and  b. All reactor coolant pumps operating.
 
Prior to reactor criticality after each removal of the reactor head
 
Rod Group Alignment Limits
 
====3.1.4 Point====
Beach 3.1.4-5 Unit 1 - Amendment No. 212  Unit 2 - Amendment No. 217 Table 3.1.4-1 Allowable Alignment Limits As A Function Of Measured Peaking Factor Margin (F Q (Z), FH N) At Power Levels > 85% Of Rated Power And Bank D Demand < 215 Steps Withdrawn ALIGNMENT LIMITS (STEPS)*   REQUIRED MARGIN TO FH NLIMIT (%)
REQUIRED MARGIN TO F Q(Z) LIMIT (%)
12 0.00 0.00 13 0.33 0.83 14 0.67 1.67 15 1.00 2.50 16 1.33 3.33 17 1.67 4.17 18 2.00 5.00
* Between the bank demand position and the RPI System.  
 
Table 3.1.4-2 Allowable Alignment Limits As A Function Of Measured Peaking Factor Margin (F Q (Z), FH N) At Power Levels > 85% Of Rated Power And Bank D Demand  215 Steps Withdrawn ALIGNMENT LIMITS (STEPS)*   REQUIRED MARGIN TO FH N LIMIT (%)
REQUIRED MARGIN TO F Q(Z) LIMIT (%)
12 0.00 0.00 13 0.33 0.83 14 0.67 1.67 15 1.00 2.50 16 1.33 3.33 17 1.67 4.17 18 2.00 5.00 19 2.33 5.83 20 2.67 6.67 21 3.00 7.50 22 3.33 8.33 23 3.67 9.17 24 4.00 10.0
* Between the bank demand position and the RPI System.
* Between the bank demand position and the RPI System.
Point Beach                                        3.1.4-5              Unit 1 - Amendment No. 212 Unit 2 - Amendment No. 217


POINT BEACH NUCLEAR PLANT CSP-ST.0 UNIT 1 CRITICAL SAFETY PROCEDURe SAFETY RELATED Revision 6 11/2011 CRITICAL SAFETY FUNCTION STATUS TREES Page 8 of 11 FIGURE 3 ST-3 HEAT SINK I - TOTAL FEEDWATER FLOW TO SIGs GREATER THAN 230 GPM NO YES . .. ... ..Q GO TO --I
POINT BEACH NUCLEAR PLANT                                               CSP-ST.0 UNIT 1 CRITICAL SAFETY PROCEDURe                                               SAFETY RELATED Revision 6 11/2011 CRITICAL SAFETY FUNCTION STATUS TREES                                   Page 8 of 11 FIGURE 3 S T - 3 HEAT S I N K I
* CSP-H.2 NARROW RANGE LEVEL IN ANY SIG PRESSURE IN BOTH SIGs NO GREATER THAN [51%] 29% NO YES LESS THAN 1105 PSlG YES me*aaa Q ::;:3 NARROW RANGE LEVEL IN BOTH SlGs LESS THAN [85%] 91 % NO YES ....o
TOTAL         NO FEEDWATER
* GO CSP-H.4 TO PRESSURE IN BOTH SlGs LESS THAN 1085 PSlG NO YES GO TO 1 1 CSP-H.5 NARROW RANGE LEVEL IN BOTH SGs GREATER THAN [51%] 29% NO YES}}
                                                            ........Q
                  - FLOW TO SIGs GREATER THAN 230 GPM YES GO TO
* CSP-H.2 NARROW       NO                                        NO PRESSURE IN RANGE LEVEL BOTH SIGs
  --IIN ANY SIG LESS THAN GREATER THAN 1105 PSlG
[51%] 29%   YES                                     YES me*aaa Q   3:;::
NARROW           NO RANGE LEVEL IN BOTH SlGs LESS
                                                                      ....o THAN [85%] 91% YES
* CSP-H.4 GO TO NO PRESSURE IN BOTH SlGs LESS THAN 1085 PSlG YES GO TO 1     1         CSP-H.5 NARROW             NO RANGE LEVEL IN BOTH SGs GREATER THAN [51%] 29%   YES}}

Latest revision as of 07:52, 6 February 2020

2012 Point Beach Nuclear Plant Initial License Examination Proposed Written Exam Handouts
ML13028A066
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/17/2012
From:
NRC/RGN-III
To:
Zoia, Charles
Shared Package
ML11354A219 List:
References
Download: ML13028A066 (1)


Text

file:///Gl/...Proposed/Written%20Exam/written%20exam%20references/RO%20Provided%20to%20examinees/Steam%20Table%20Mollier.txt[1/4/2013 8:22:36 AM]

POINT BEACH NUCLEAR PLANT EOP-3 UNIT 1 EMERGENCY OPERATING PROCEDURE SAFETY RELATED Revision 4 3 11/2011 STEAM GENERATOR TUBE RUPTURE Page 28 of 44 lsTEPI ACTION/EXPECTED RESPONSE I I RESPONSE NOT OBTAINED I

CAUTION RCS and ruptured S/G pressures must be maintained less than 1050 psig.

I' " I

  • 37 Control RCS Pressure And Charging *
  • Flow To Minimize RCS To S/G Leakage: *
  • a. Perform appropriate action(s) *
  • from table: *
  • RUPTURED S/G LEVEL *
  • PZR LEVEL *
  • RISING LOWERING OFF SCALE HIGH *
  • LESS THAN 0 Raise charging Raise charging Raise charging 0 *
  • OR EQUAL TO flow flow flow *
  • [ 4 4 % ] 24% *
  • 0 Depressurize 0 Maintain RCS and *
  • RCS using ruptured S/G *
  • Step 3 8 pressures equal *
  • BETWEEN Depressurize Turn on Maintain RCS and *
  • [ 4 4 % ] 24% RCS using PZR heaters ruptured S/G *
  • AND 50% Step 3 8 pressures equal *
  • BETWEEN 0 Depressurize Turn on Maintain RCS and *
  • 50% AND RCS using PZR heaters ruptured S/G *
  • [60%1 6 8 % Step 3 8 pressures equal *
  • 0 Reduce *
  • charging flow *
  • GREATER THAN Reduce Turn on PZR Maintain RCS and *
  • OR EQUAL TO charging flow heaters ruptured S/G *
  • [60%] 68% pressures equal

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


NOTE-----------------------------------------------------

Separate Condition entry is allowed for each valve.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more MFIVs A.1 Close or isolate MFIV. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable.

AND A.2 Verify MFIV is closed or Once per isolated. 7 days B. One or more MFRVs B.1 Close or isolate MFRV. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable.

AND B.2 Verify MFRV is closed Once per or isolated. 7 days C. One or more MFRV C.1 Close or isolate MFRV 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Bypass Valves Bypass Valve inoperable.

AND C.2 Verify MFRV Bypass Once per 7 days Valve is closed or isolated Point Beach 3.7.3-1 Unit 1 - Amendment No. 241 Unit 2 - Amendment No. 245

MFIVs, MFRVs, and MFRV Bypass Valves 3.7.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Two valves in the same D.1 Isolate affected flow 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> flowpath inoperable. path E. Required Action and E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND E.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify each MFIV, MFRV, and MFRV bypass 18 months valve, actuate to the isolation position on an actual or simulated actuation signal.

SR 3.7.3.2 Verify each MFIV, MFRV, and MFRV Bypass In accordance Valve isolation time is within limits. with the Inservice Testing Program Point Beach 3.7.3-2 Unit 1 - Amendment No. 241 Unit 2 - Amendment No. 245

Rod Group Alignment Limits 3.1.4 3.1 REACTIVITY CONTROL SYSTEMS 3.1.4 Rod Group Alignment Limits LCO 3.1.4 All shutdown and control rods shall be OPERABLE, with individual rod positions within limits.

APPLICABILITY: MODES 1 and 2.

ACTIONS


NOTE---------------------------------------------------

One hour is allowed following rod motion prior to verifying rod operability and group alignment limits.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more rod(s) A.1.1 Verify SDM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. the limits provided in the COLR.

OR A.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

AND A.2 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> (continued)

Point Beach 3.1.4-1 Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206

Rod Group Alignment Limits 3.1.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One rod not within B.1 Restore rod to within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> alignment limits. alignment limits.

OR B.2.1.1 Verify SDM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the limits provided in the COLR.

OR B.2.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

AND B.2.2 Reduce THERMAL 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> POWER to 75% RTP.

AND B.2.3 Verify SDM to be within Once per the limits provided in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> the COLR.

AND B.2.4 Perform SR 3.2.1.1 and 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> SR 3.2.1.2.

AND B.2.5 Perform SR 3.2.2.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND (continued)

Point Beach 3.1.4-2 Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206

Rod Group Alignment Limits 3.1.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2.6 Re-evaluate safety 5 days analyses and confirm results remain valid for duration of operation under these conditions.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B not met.

D. More than one rod not D.1.1 Verify SDM to be within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> within alignment limit. the limits provided in the COLR.

OR D.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore required SDM to within limit.

AND D.2 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Point Beach 3.1.4-3 Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206

Rod Group Alignment Limits 3.1.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify individual rod positions are within the 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> following alignment limits:

a. +/- 18 steps of demanded position (as allowed by Table 3.1.4-1) in MODE 1 > 85 percent RTP when bank demand position is < 215 steps; AND
b. +/- 24 steps of demanded position (as allowed by Table 3.1.4-2) in MODE 1 > 85 percent RTP when bank demand position is 215 steps; AND
c. +/- 24 steps of demanded position in MODE 1 85 percent RTP or in MODE 2.

SR 3.1.4.2 Verify rod freedom of movement (trippability) by 92 days moving each rod not fully inserted in the core 10 steps in either direction.

SR 3.1.4.3 Verify rod drop time of each rod, from the fully Prior to reactor withdrawn position, is 2.2 seconds from the criticality after beginning of decay of stationary gripper coil each removal of voltage to dashpot entry, with: the reactor head

a. T avg 500°F; and
b. All reactor coolant pumps operating.

Point Beach 3.1.4-4 Unit 1 - Amendment No. 212 Unit 2 - Amendment No. 217

Rod Group Alignment Limits 3.1.4 Table 3.1.4-1 N

Allowable Alignment Limits As A Function Of Measured Peaking Factor Margin (FQ(Z), FH )

At Power Levels > 85% Of Rated Power And Bank D Demand < 215 Steps Withdrawn ALIGNMENT LIMITS REQUIRED MARGIN TO REQUIRED MARGIN TO N

(STEPS)* FH LIMIT (%) FQ(Z) LIMIT (%)

12 0.00 0.00 13 0.33 0.83 14 0.67 1.67 15 1.00 2.50 16 1.33 3.33 17 1.67 4.17 18 2.00 5.00

  • Between the bank demand position and the RPI System.

Table 3.1.4-2 N

Allowable Alignment Limits As A Function Of Measured Peaking Factor Margin (FQ(Z), FH )

At Power Levels > 85% Of Rated Power And Bank D Demand 215 Steps Withdrawn ALIGNMENT LIMITS REQUIRED MARGIN TO REQUIRED MARGIN TO N

(STEPS)* FH LIMIT (%) FQ(Z) LIMIT (%)

12 0.00 0.00 13 0.33 0.83 14 0.67 1.67 15 1.00 2.50 16 1.33 3.33 17 1.67 4.17 18 2.00 5.00 19 2.33 5.83 20 2.67 6.67 21 3.00 7.50 22 3.33 8.33 23 3.67 9.17 24 4.00 10.0

  • Between the bank demand position and the RPI System.

Point Beach 3.1.4-5 Unit 1 - Amendment No. 212 Unit 2 - Amendment No. 217

POINT BEACH NUCLEAR PLANT CSP-ST.0 UNIT 1 CRITICAL SAFETY PROCEDURe SAFETY RELATED Revision 6 11/2011 CRITICAL SAFETY FUNCTION STATUS TREES Page 8 of 11 FIGURE 3 S T - 3 HEAT S I N K I

TOTAL NO FEEDWATER

........Q

- FLOW TO SIGs GREATER THAN 230 GPM YES GO TO

  • CSP-H.2 NARROW NO NO PRESSURE IN RANGE LEVEL BOTH SIGs

--IIN ANY SIG LESS THAN GREATER THAN 1105 PSlG

[51%] 29% YES YES me*aaa Q 3:;::

NARROW NO RANGE LEVEL IN BOTH SlGs LESS

....o THAN [85%] 91% YES

  • CSP-H.4 GO TO NO PRESSURE IN BOTH SlGs LESS THAN 1085 PSlG YES GO TO 1 1 CSP-H.5 NARROW NO RANGE LEVEL IN BOTH SGs GREATER THAN [51%] 29% YES